0% found this document useful (0 votes)
721 views1 page

Rate - Erection

This document provides a table listing precast rates for various construction items. It includes 12 items with descriptions of construction tasks like erection of precast girders, beams, boxes, slabs, bridges, retaining walls. Unit rates are provided per metric ton for loading, shifting, erecting items, and per square meter for tasks like casting precast segments and chipping dowel bars. The rates will be used for labour charges for the precast construction work as per instructions of the Engineer-in-Charge.

Uploaded by

Anjum Jauher
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
721 views1 page

Rate - Erection

This document provides a table listing precast rates for various construction items. It includes 12 items with descriptions of construction tasks like erection of precast girders, beams, boxes, slabs, bridges, retaining walls. Unit rates are provided per metric ton for loading, shifting, erecting items, and per square meter for tasks like casting precast segments and chipping dowel bars. The rates will be used for labour charges for the precast construction work as per instructions of the Engineer-in-Charge.

Uploaded by

Anjum Jauher
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PRECAST RATES

SL.NO Item Code Item Description Unit Rate


1 Labour charges for Erection of Precast girders and beams as per instruction of EIC. MT 30

Labour charges for Loading & Shifting of I Girder from PC Yard as per instruction of
2 MT 21
EIC.
Labour charges for Erection of Precast Box segments(RUB & MIB) as per instruction of
3 MT 134.4
EIC.
4 Labour Charges for Erection of Precast solid slab as per instruction of EIC. MT 18
5 Labour Charges for Loading & shifting of Precast solid slab as per instruction of EIC. MT 15

Labour charges for Tilting/Erection of Road Under Bridge(RUB) Box Segments


6 MT 112
(Precast at Site) as per instruction of EIC.

7 Labour charges for Erection of Precast RCC Slab(RUB & MIB) as per instruction of EIC. MT 123

Labour charges for Erection of Precast Retaining Wall of Road Under Bridge(RUB) as
8 MT 116
per instruction of EIC.
Labour charges for Loading & Shifting of Retaining Wall of Road Under Bridge from PC
9 Yard as per instruction of EIC MT 32

Labour charges for Loading & Shifting of Precast RCC Slab of RUB & MIB from PC Yard
10 MT 33
as per instruction of EIC.
Labour charges for Casting of precast I girder Scope also include Shuttering, De-
11 shuttering, Reinforcement tying, Concrete pouring and Stacking of Precast segment. sqm 310
Measurement will be taken both side. (Rajasthan)
Labour charges of Chipping of Dowel bar left for Shear key and Ballast Retainer for
12 sqm 121
Precast MIB/RUB structure as per instructed by EIC