0% found this document useful (0 votes)
98 views1 page

5-Day SAP S/4 HANA MRP Training

This 5-day training course covers SAP MRP Planning on SAP S/4 HANA. Day 1 and 2 cover the supply chain planning process and core production planning process. Day 3 goes over the technical processes for requirements planning like calculating net requirements and lot sizes. Day 4 looks at processing MRP results and evaluations. Day 5 discusses additional MRP processes such as master production scheduling, long-term planning, multi-site planning, and MRP areas.

Uploaded by

Neeraj Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views1 page

5-Day SAP S/4 HANA MRP Training

This 5-day training course covers SAP MRP Planning on SAP S/4 HANA. Day 1 and 2 cover the supply chain planning process and core production planning process. Day 3 goes over the technical processes for requirements planning like calculating net requirements and lot sizes. Day 4 looks at processing MRP results and evaluations. Day 5 discusses additional MRP processes such as master production scheduling, long-term planning, multi-site planning, and MRP areas.

Uploaded by

Neeraj Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

SAP MRP Planning on SAP S/4 HANA

Training Duration - 5 Days


Duration Corresponding SAP Topics Coverage
Reference
Day 1 and Day 2 MRP Planning on SAP S/4 HANA o Outlining the Supply Chain Planning Process
o Outlining the Core Production Planning
Process

Material Requirements Planning Execution o Outlining Material Requirements Planning


o Setting Up the MRP Prerequisites
o Executing the MRP Run
o Setting Up the MRP Run
o Planning MRP Interactively
o Applying Firming Mechanisms

Day 3 Technical Processes of Requirements Planning o Calculating Net Requirements


o Applying Buffers in Net Requirements
Calculation
o Calculating Lot Sizes
o Selecting Procurement Types
o Setting Up Basic-Date Scheduling
o Setting Up Lead-Time Scheduling
o Selecting BOM and Routing

Day 4 MRP Results Processing and Evaluations o Comparing an MRP List and a
Stock/Requirements List
o Applying the Planning Table
o Identifying Exception Messages
o Applying Additional Evaluation Aids

Day 5 Additional MRP Processes o Applying Master Production Scheduling (MPS)


o Setting Up Long-Term Planning
o Executing Long-Term Planning
o Analyzing Multi-Site Planning
o Setting Up MRP Areas
o Applying MRP Areas

You might also like