0% found this document useful (0 votes)
267 views308 pages

Apollo Configuration Management Manual

This document establishes configuration management requirements for the Apollo program. It revises and replaces an earlier configuration management manual from May 1964. The document defines policies, responsibilities, and procedures for configuration identification, control of engineering changes, and documentation requirements. It aims to effectively manage the configuration of all Apollo hardware, software, and related items.

Uploaded by

Carlos López
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
267 views308 pages

Apollo Configuration Management Manual

This document establishes configuration management requirements for the Apollo program. It revises and replaces an earlier configuration management manual from May 1964. The document defines policies, responsibilities, and procedures for configuration identification, control of engineering changes, and documentation requirements. It aims to effectively manage the configuration of all Apollo hardware, software, and related items.

Uploaded by

Carlos López
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 308

https://ntrs.nasa.gov/search.jsp?

R=19800071127 2019-11-22T11:18:03+00:00Z
-7. '"='

NHB 8040.2
(FORMERLY NPC 500-1 1

APOLLO PROGRAM

5
+.,
h APOLLO
!9 C O N F I G U R A T I O N
fi
.4. MANAGEMENT
MANUAL

JANUARY 1970

N A T I O N A L AERONAUTICS A N D SPACE ADMINISTRATION


Washington, D.C. 20546
NHB 8040.2

PREFACE

S i n c e ' t h e i n i t i a l implementation of t h e Apollo Program Config-


u r a t i o n Management r e q u i r e m e n t s i n May 1964 (through former
NPC 500-11, s i g n i f i c a n t p r o g r e s s h a s been made i n developing
t h i s system. The i n i t i a l r e q u i r e m e n t s e s t a b l i s h e d by t h e
Apollo Program O f f i c e , supplemented by t h e MSF f i e l d i n s t a l -
l a t i o n s ' r e q u i r e m e n t s , have l e d t o t h e e s t a b l i s h m e n t of a
s p e c i f i c a t i o n program and change c o n t r o l system t h a t a r e e f f e c -
t i v e l y h e l p i n g t o c o n t r o l program performance, c o s t s , and sched-
ules.

T h i s p u b l i c a t i o n , which b a s i c a l l y r e v i s e s and s u p e r s e d e s NPC


500-1, i n c l u d e s improvements based on o u r e x p e r i e n c e and r e p r e -
s e n t s t h e f i n a l phase i n t h e implementation of c o n f i g u r a t i o n
management on t h e Apollo Program. This publication contains
t h e l a t e s t r e q u i r e m e n t s which a r e c o n s i d e r e d n e c e s s a r y , a s a
minimum, t o e f f e c t i v e l y manage t h e c o n f i g u r a t i o n of a l l Apollo
end items. T h i s r e v i s i o n accomplishes t h e f o l l o w i n g main
purposes :

a. Reduction of a l l e x h i b i t s t o "minimum r e q u i r e m e n t s " f o r


a d e q u a t e c o n f i g u r a t i o n management.

b. R e c o g n i t i o n of f i e l d i n s t a l l a t i o n supplements t o t h e former
NPC 500-1. .

c. A d d i t i o n of c o n f i g u r a t i o n management r e q u i r e m e n t s f o r com-
p u t e r programs.

d. Alignment of f u t u r e Apollo c o n f i g u r a t i o n management r e q u i r e -


ments w i t h t h e o v e r a l l NASA c o n c e p t of Phased P r o j e c t Plan-
ning (PPP) .
e. D e f i n i t i o n of c o n f i g u r a t i o n management i n t e r c e n t e r i n t e r -
face responsibilities.

f. E s t a b l i s h m e n t of a c o n f i g u r a t i o n management a u d i t system.

g. Recognition of r e c e n t Department of Defense (DOD) c o n f i g u r -


a t i o n management p o l i c y manuals, s t a n d a r d s and s p e c i f i c a t i o n s .

T h i s p u b l i c a t i o n s h a l l n o t c a u s e any changes t o b e made t o


e x i s t i n g c o n t r a c t s . However, on a d d i t i o n s t o c u r r e n t c o n t r a c t s

For sale by the Superintendentol Documents, U.S. Gove_pnent Printing Office


-
Wmhington, D.C.20402 Price $2.25
and new c o n t r a c t s , it s h o u l d b e implemented t o t h e e x t e n t
practical.

S u p e r s e d e d Document

NPC 500-1, d a t e d May 1 8 , 1964 and F e b r u a r y 1967 R e p r i n t are


canceled.

~ o c c oA. P e t r o n e
A p o l l o Program D i r e c t o r

I
DISTRIBUTION:
~
i
SDL 1 (SIQ)
APOLLO PROGRAM
CONFIGURATION MANAGEMENT
MANUAL

1.0 POLICY.. ... . . . . . . . .. . . . . . . 1

2.0 PURPOSE . . . . . . . . . . . .. . . . . . . 2

3.0 APPLICABILITY . . . . . . . . .. . . . . . .
4.0 GENERAL . . . . . . . . . . . .. . . . . . .
5.0 AUTHORITIES AND R E S P O N S I B I L I T I E S . . . . . . .
6.0 INTERFACE MANAGMENT. . . . . . . . . . . . .
7.0 COMPUTER PROGRAM CONFIGURATION
MANAGEMENT. ................
8.0 CONTRACT END ITEM SELECTION
AND CONTROL ................
9.0 REPORT REQUIREMENTS . . . . . . . . . . . . .

EXHIBITS

I PREPARATION O F PROGRAM, PROJECT AND SYSTEM


PERFORMANCE AND DESIGN REQUIREMENTS S P E C I F I -
CATIONS

I1 PREPARATION O F CONTRACT END I T E M DETAIL


S P E C I F I C A T I O N (PRIME EQUIPMENT)

I11 PREPARATION O F CONTRACT END I T E M DETAIL


SPECIFICATION (FACILITY) 111-i

IV PREPARATION O F CONTRACT END I T E M DETAIL


SPECIFICATION (IDENTIFICATION ITEM) IV-i

V PREPARATION O F CONTRACT END I T E M DETAIL


S P E C I F I C A T I O N (REQUIREMENT I T E M S ) V- i

VI PREPARATION O F DETAIL S P E C I F I C A T I O N
( C R I T I C A L COMPONENTS)
-
PAGE

VII S P E C I F I C A T I O N MAINTENANCE VII-i

V I I I PROCEDURES FOR PROGRAM, P R O J E C T AND


SYSTEM REQUIREMENTS S P E C I F I C A T I O N
CHANGES

IX PREPARATION O F ENGINEERING CHANGE


PROPOSALS FOR CONTRACT END ITEMS

X REQUIREMENTS FOR CONFIGURATION


I D E N T I F I C A T I O N .NUMBERS

XI REQUIREIIIENTS FOR GONFIGURATION


I D E N T I F I C A T I O N AND ACCEPTANCE OF
CONTRACT END ITEMS AND RELATED DATA

XI1 ENGINEERING RELEASE RECORD REQUIRE-


MENTS

X I 1 1 REQUIREMENTS FOR V E R I F Y I N G THE INCORPORATION


O F CLASS I ENGINEERING CHANGES

XIV FORMAL CONFIGURATION MANAGEMENT REVIEWS,


I N S P E C T I O N S AND DEMONSTRATIONS

XV . C O N F ~ A T I O NMANAGEMENT AUDITS

XVI CONFIGURATION I D E N T I F I C A T I O N AND ACCOUNTING


REPORTS REQUIREMENTS

X V I I EXPLAKATION O F TERM3

> : V I I I PREPARATION O F CONTRACT END I T E M D E T A I L


S P E C I F I C A T I O N (COMPUTER PROGRAM)

XIX COMPUTER PROGRAM I D E N T I F I C A T I O N , CONTROL


AND ACCOUNTING XIX - i

XX PREPARATION O F INTERFACE CONTROL DOCUMEN-


TATION AND INTERFACE R E V I S I O N NOTICES
APOLLO PROGRAM
CONFIGURATION MANAGEMENT MANUAL

1.0 POLICY

T h i s document r e v i s e s and s u p e r s e d e s NPC 500-1 "Apollo


C o n f i g u r a t i o n Management Manual", d a t e d May 18, 1964.

The d e f i n i t i o n and a p p l i c a b i l i t y of c o n f i g u r a t i o n management


p r o c e d u r e s s h a l l t a k e i n t o c o n s i d e r a t i o n t h e scope of t h e
e f f o r t i n terms of c o s t s and complexity, t h e d e g r e e t o which
a p r o j e c t h a s p r o g r e s s e d towards completion, and t h e c o n f i g -
u r a t i o n management p r o c e d u r e s now i n e f f e c t .
C o n t r a c t s i n i t i a t e d subsequent t o t h e e f f e c t i v i t y d a t e of
t h i s document may a t t h e o p t i o n of i n d i v i d u a l u s i n g a g e n c i e s
r e q u i r e compliance w i t h t h e f o l l o w i n g Department of Defense
documentation:
O MIL-S-83490 " S p e c i f i c a t i o n , Types and Forms", d a t e d
30 October 1968
O MIL-STD-480 " C o n f i g u r a t i o n C o n t r o l - E n g i n e e r i n g Changes,
D e v i a t i o n s and Waivers", d a t e d 30 October 1968
O MIL-STD-481 "Configuration Control -
E n g i n e e r i n g Changes,
D e v i a t i o n s and Waivers ( S h o r t Form)", d a t e d
30 October 1968
O MIL-STD-490 " S p e c i f i c a t i o n P r a c t i c e s " , d a t e d 30 October 1968

O O t h e r DOD documentation, newly r e l e a s e d , a s i t becomes


a v a i l a b l e f o r guidance.

E x c e p t i o n s t o DOD documentation r e q u i r e m e n t s :

a. For t h e p r e p a r a t i o n of "Program", " P r o j e c t " , and "System"


s p e c i f i c a t i o n s r e q u i r e d by NASA c o n t r a c t s ; compliance.
w i t h t h e r e q u i r e m e n t s , i n s t r u c t i o n s , and f o r m a t d e t a i l e d
by E x h i b i t I of t h i s document s h a l l a p p l y .

b. Where NASA.requires t h e p r e p a r a t i o n of "two p a r t " s p e c i -


f i c a t i o n s , such s p e c i f i c a t i o n s s h a l l b e p r e p a r e d i n
accordance w i t h t h e e x h i b i t s of t h i s document which
r e l a t e t o t h e p r e p a r a t i o n of "two p a r t " s p e c i f i c a t i o n s .
2.0 PURPOSE

T h i s manual e s t a b l i s h e s t h e c o n f i g u r a t i o n management r e q u i r e -
ments which w i l l a c c u r a t e l y d e f i n e a l l Apollo Program end
items a t any p o i n t i n time. A c c u r a t e d e f i n i t i o n of equipment
i s t h e b a s i s f o r e s t a b l i s h i n g schedules, developing r e a l i s t i c
budget r e q u i r e m e n t s and f o r accomplishing e f f e c t i v e change
c o n t r o l t h r o u g h o u t t h e l i f e of t h e program.

3.0 APPLICABILITY

The r e q u i r e m e n t s e s t a b l i s h e d h e r e i n a r e a p p l i c a b l e t o a l l
NASA o r g a n i z a t i o n s and c o n t r a c t o r s p a r t i c i p a t i n g i n t h e Apollo
Program.

R e v i s i o n s t o v a r i o u s e x h i b i t s have been made based on Program


needs and e x p e r i e n c e i n a p p l y i n g c o n f i g u r a t i o n management on
Apollo s i n c e 1964. C o n f i g u r a t i o n management p r o v i d e s f o r a l l
l e v e l s of management t h e n e c e s s a r y p r o c e d u r e s and d i s c i p l i n e s
t o a c h i e v e e f f e c t i v e c o n t r o l o v e r a l l s p a c e v e h i c l e and ground
system p r o d u c t s f a b r i c a t e d f o r t h e Apollo Program. T h i s con-
t r o l i s needed on a c o n t i n u i n g b a s i s from i n i t i a l d e f i n i t i o n
of a p r o d u c t t o t h e f i n a l u s e of t h e s p e c i f i c harciware and
s o f t w a r e , and i s p r o v i d e d by:

a. A C o n f i g u r a t i o n I d e n t i f i c a t i o n B a s e l i n e System which
d e f i n e s , through s p e c i f i c a t i o n s and a s s o c i a t e d d a t a , t h e
r e q u i r e m e n t s f o r a l l end items.

b. A C o n f i g u r a t i o n C o n t r o l System which c o n t r o l s a l l changes


t o t h e end i t e m s .

c. A C o n f i g u r a t i o n Accounting System which documents a l l


changes t o b a s e l i n e c o n f i g u r a t i o n s and m a i n t a i n s an a c c u r a t e
r e c o r d of c o n f i g u r a t i o n change i n c o r p o r a t i o n .
4.1 A p o l l o B a s e l i n e System

A fundamental c o n c e p t o f c o n f i g u r a t i o n management i s
the establishment of "baselines" t o serve a s a point
of d e p a r t u r e f o r c o n t r o l l i n g s u b s e q u e n t performance
and d e s i g n changes from . t h a t b a s e l i n e . Apollo u s e s
t h r e e ( 3 ) baselines f o r e s t a b l i s h i n g requirements, a l l
documented by approved s p e c i f i c a t i o n s . Once t h e s e
b a s e l i n e s a r e d e f i n e d , c h a n g e s i n r e q u i r e m e n t s must be
f o r m a l l y approved t o i n s u r e a d e q u a t e c o n s i d e r a t i o n o f
program i m p a c t w i t h r e s p e c t t o c o n t r a c t c o s t s , s c h e d u l e s
and i n c e n t i v e s a s w e l l a s m i s s i o n c a p a b i l i t y . Figure 1
i d e n t i f i e s t h e t h r e e ( 3 ) Apollo b a s e l i n e s w i t h r e s p e c t
t o c u r r e n t A p o l l o p h a s i n g , and t h e t y p e s of c h a n g e s
r e q u i r e d t o each. Due t o t h e n a t u r e o f t h e A p o l l o R&D
program, b a s e l i n e s a r e n o t p r o v i d e d a t a d e f i n i t e p e r i o d
( s u c h a s end o f t h e d e f i n i t i o n p h a s e ) b u t a r e completed
i n an i n c r e m e n t a l manner a s s p e c i f i c end i t e m s s u c h a s
stages/modules a r e developed. A major con£ i g u r a t i o n
management t a s k i n t h e b a s e l i n e s y s t e m i s t o i d e n t i f y t h e
t e c h n i c a l d o c u m e n t a t i o n d e f i n i n g t h e approved c o n f i g u -
r a t i o n o f t h e s y s t e m o r end i t e m t h r o u g h o u t t h e p e r i o d
when h a r d w a r e / s o f t w a r e i s a c q u i r e d . Based on t h e d e s i g n
reviews performed, a b a s e l i n e f o r a given end item i s
e s t a b l i s h e d and t h e s p e c i f i c documentation c o n s t i t u t i n g
t h a t b a s e l i n e i s recorded. The c o n f i g u r a t i o n o f t h e
end i t e m a t any l a t e r d a t e i s i d e n t i f i e d by t h e o r i g i n a l
b a s e l i n e c o n f i g u r a t i o n p l u s a l l t h e e n s u i n g c h a n g e s ap-
proved and i n c o r p o r a t e d s i n c e t h a t t i m e . The c o n f i g u r a -
t i o n of a n end i t e m w i l l b e known and t h o r o u g h l y documented
a t any g i v e n p o i n t i n t i m e . Another t a s k i s t h e accomplish-
ment o f a minimum s e t of r e v i e w s and i n s p e c t i o n s n e c e s s a r y
t o v a l i d a t e t h e a c c u r a c y and adequacy o f a l l b a s e l i n e s .
PDR's and C D R ' s a r e s e l f - e x p l a n a t o r y and a r e d e f i n e d i n
E x h i b i t XIV. The F i r s t A r t i c l e C o n f i g u r a t i o n I n s p e c t i o n
(FACI) must be i n t e r p r e t e d and a p p l i e d t o t h e A p o l l o Program
a s a f u n c t i o n o f t h e d e v e l o p m e n t a l s t a t u s o f e a c h major end
item. The end i t e m t o b e FACI'd s h o u l d be chosen b a s e d on
t h e knowledge t h a t , from t h i s i t e m o n , s u b s e q u e n t end i t e m s
w i l l r e q u i r e i d e n t i c a l performance r e p e a t i b i l i t y . The FACI
must e s t a b l i s h t h e e x a c t r e l a t i o n s h i p between t h e chosen
CEI ( i d e n t i f i e d a s t h e b a s e l i n e c o n f i g u r a t i o n f o r subsequent
i t e m s ) and t h e c o n f i g u r a t i o n of t h e CEI ( s ) u s e d f o r
qualification testing i f different. In addition, the
c o n t r a c t o r must s a t i s f y t h e p r o c u r i n g agency t h a t t h e
p h y s i c a l hardware f o r e a c h e n d i t e m i s b u i l t t o t h e e x a c t
e n g i n e e r i n g drawings and s p e c i f i c a t i o n s a s s o c i a t e d w i t h
t h a t end i t e m . Changes can b e made t o t h e C E I FACI'd
t h r o u g h t h e p r o c e d u r e s and r e q u i r e m e n t s e s t a b l i s h e d i n
Exhibit IX. Delta-FACI's ( e . g . a FACI on a s u b s e q u e n t CEI
i n t h e a r e a i n which c h a n g e s have been made) may b e conducted
i f n e c e s s a r y . FACI's a r e n o t i n t e n d e d t o d e m o n s t r a t e t h a t
C E I ' s can p e r f o r m a c c o r d i n g t o s p e c i f i c a t i o n s o r c a n
accomplish t h e m i s s i o n r e q u i r e m e n t s . The FACI s h o u l d p r o v e
o n l y t h a t t h e C E I i s b u i l t a c c o r d i n g t o r e q u i r e m e n t s and
has an identifiable relationship with an equivalent
CEI(s) which was qualified by test. The requirement in
the original version of this manual for the Final Config-
uration Review (FCR) has been made an option (to be con-
ducted as required by a Center). Two reviews which occur
during the operational phase, the DCR and FRR are defined
in Apollo Program Directive Nos. 7 and 8, and require inputs
from configuration management functions concerning
configuration status, open items and associated data.
Requirements on the selection and control of Contract
End Items (CEI) are found in Paragraph 8.
4.2 Apollo Change Control System
The control of changes to Apollo hardware/software is
achieved through the use of the multi-level change
control system shown in Figure 2. Six levels of control
are established each of which has specific criteria for
submitting changes to the next higher level for approval.
The requirements for submitting changes to the APO CCB
(Level I) are defined in Paragraph 5.1.3. Each MSF Center
has established Level I1 and subordinate CCB's as defined
in individual Center supplements to this document. (See
Paragraph 5.2.4.) Additional requirements for submittal
of changes to the APO CCB and to MSF Center CCB's are
published from time to time in appropriate APO directives
such as Apollo Program Directive No. 34. Configuration
control is the systematic evaluation, coordination and
approval or disapproval of proposed changes to any base-
line. Formal control of the configuration of end items
starts with the establishment of the Design Requirements
Baseline and continues through completion of all mission
objectives. Exhibit IX is a-key exhibit in this total
rocess since it provides the basis for management
zecision-making after a detail specification for an item
has been initially approved to define the Design Require-
ments Baseline for the item. All Class I changes will
be submitted for approval to the appropriate CCB which
is the functional body responsible for configuration
control. The decision of the CCB will be recorded by
means of a CCB Directive, upon which the Contracting
Officer will issue the contractual authority for the
contractor to effect the change. Engineering changes will
be held to a minimum and should be approved only if nec-
essary to correct safety hazards, safety of flight or
necessary to comply with officially approved performance
requirements. Changes which will result in substantial
cost savings without compromising safety, performance or
schedules should receive a high order of consideration.
4.3 Apollo Configuration Accounting System
Each Center will develop a system capable of reporting
and documenting the changes made to end items, systems
and equipment subsequent to the establishment of a base-
line configuration. Documentation of configuration
s t a t u s s h a l l b e a s y s t e m a t i c r e c o r d o f approved c h a n g e s ,
w i t h t h e i r scheduled i n c o r p o r a t i o n d a t e i n t o t h e hardware,
and t h e a c t u a l i n c o r p o r a t i o n d a t e . C o n f i g u r a t i o n Accounting
Systems must b e c a p a b l e o f :

(a) D e f i n i n g t h e e x a c t b a s e l i n e and a l l changes


thereto.

(b) P r o v i d i n g management p e r s o n n e l w i t h t h e
v i s i b i l i t y n e c e s s a r y t o p e r m i t follow-up
a c t i o n on d e c i s i o n s t o a s s u r e p r o p e r a c t i o n
i s t a k e n by a p p r o p r i a t e o r g a n i z a t i o n s ,
i n c l u d i n g t h e p r o v i d i n g o f feedback i n f o r -
mation t o d e t e r m i n e i f d e c i s i o n s o f t h e
v a r i o u s l e v e l s o f C C B ' s a r e b e i n g imple-
mented a s d i r e c t e d .

5.0 AUTHORITIES AND RESPONSIBILITIES

The A p o l l o Program O f f i c e , C o n f i g u r a t i o n Management O f f i c e


(CMO) w i l l p r o v i d e t h e o v e r - a l l management d i r e c t i o n r e q u i r e d
t o c o n d u c t c o n f i g u r a t i o n management t h r o u g h o u t t h e A p o l l o
Program. A d d i t i o n a l l y , t h e A p o l l o Program O f f i c e w i l l
e s t a b l i s h a C o n f i g u r a t i o n C o n t r o l Board (CCB) t o o p e r a t e
w i t h i n t h e a d m i n i s t r a t i v e framework of t h e CMO f o r making
d e c i s i o n s on changes r e q u i r i n g A p o l l o Proqram O f f i c e ap-
proval. Each C e n t e r Program O f f i c e w i l l e s t a b l i s h a
C o n f i g u r a t i o n Management O f f i c e (CMO) which w i l l b e r e s p o n s i b l e
f o r t h e management d i r e c t i o n r e q u i r e d t o c o n d u c t c o n f i g u r a t i o n
management. The Program Manager w i l l e s t a b l i s h a C o n f i g u r a t i o n
C o n t r o l Board (CCB) t o o p e r a t e w i t h i n t h e a d m i n i s t r a t i v e
framework o f h f s CMO f o r making d e c i s i o n s on changes. Specific
r e s p o n s i b i l i t i e s f o r NASA o r g a n i z a t i o n s a r e p r o v i d e d i n t h e
p a r a g r a p h s below.. Each c o n t r a c t o r w i l l e s t a b l i s h a c o n f i g u r a t i o n
Management O f f i c e (CMO). which w i l l be r e s p o n s i b l e f o r t h e
management d i r e c . t i o n r e q u i r e d t o c o n d u c t c o n f i g u r a t i o n manage-
ment w i t h i n t h e c o n t r a c t o r ' s o r g a n i z a t i o n . The c o n t r a c t o r w i l l
a l s o e s t a b l i s h a C o n f i g u r a t i o n C o n t r o l Board (CCB) t o o p e r a t e
w i t h i n t h e a d m i n i s t r a t i v e framework o f t h e CMO f o r making
" d e c i s i o n s on p r o p o s e d changes.

5.1 A p o l l o Program O f f i c e (APO)

5.1.1 The Apollo Program D i r e c t o r h a s o v e r a l l


r e s p o n s i b i l i t y f o r Apollo Configuration
Management i n c l u d i n g :

5.1.1.1 I s s u i n g p o l i c i e s and r e q u i r e m e n t s f o r
A p o l l o C o n f i g u r a t i o n Management.

5.1.1.2 E s t a b l i s h i n g a Program O f f i c e CMO and CCB.

5.1.1.3 A c t i n g a s Chairman o f t h e CCB o r d e s i g -


nating a representative with decision
a u t h o r i t y f o r c h a n g e s r e q u i r i n g Program
Office approval.
5.1.1.4 E s t a b l i s h i n g and c o n t r o l l i n g i n t e r c e n t e r
i n t e r f a c e r e q u i r e m e n t s and changes t o
t h e s e requirements through t h e o v e r a l l
A p o l l o change c o n t r o l s y s tern.

5.1.2 C o n f i g u r a t i o n Management Off i c e (CMO) , A p o l l o


Program O f f i c e s h a l l be r e s p o n s i b l e 'f0.r:

5.1.2.1 E s t a b l i s h i n g C o n f i g u r a t i o n Management
o p e r a t i n g methods and p r o c e d u r e s and
i s s u i n g t h e Apollo C o n f i g u r a t i o n Manage-
ment Manual t o b e implemented by a l l
NASA o r g a n i z a t i o n s and c o h t r a c t o r s
p a r t i c i p a t i n g i n t h e A p o l l o Program.

5.1.2.2 A s s u r i n g management c o m p a t i b i l i t y o f
t h e c o n f i g u r a t i o n management s y s t e m s
e s t a b l i s h e d by t h e C e n t e r s , and c o o r -
dinating intercenter configuration
management agreements and p r o c e d u r e s .

5.1.2.3 Reviewing t h e o p e r a t i o n of A p o l l o
C o n f i g u r a t i o n Management and imple-
menting changes by i s s u i n g A p o l l o
Program D i r e c t i v e s a s r e q u i r e d .

5.1.2.4 Approving proposed C e n t e r Supplements


t o t h e Apollo C o n f i g u r a t i o n Manage-
ment Manual.

5.1.2.5 A s s u r i n g t h a t t h e S p e c i f i c a t i o n Program
i s d e f i n e d and implemented.

5.1.2.6 Assuring t h a t requirements i n P r o j e c t


specifications are consistent with
r e q u i r e m e n t s i n t h e A p o l l o Program
specification.

5.1.2.7 M a i n t a i n i n g and d i s t r i b u t i n g r e c o r d s of
Program CCB a g e n d a s , ECP a c t i o n s ,
d i r e c t i v e s and m i n u t e s o f CCB m e e t i n g s .

5.1.2.8 A s s u r i n g t h a t f o l l o w - u p a c t i o n h a s been
t a k e n on D i r e c t i v e s i s s u e d by t h e A p o l l o
Program D i r e c t o r and/or t h e CCB.

5.1.2.9 A s s u r i n g t h a t i n t e r c e n t e r i n t e r f a c e con-
t r o l i s o p e r a t i n g a s an i n t e g r a l p a r t o f
t h e A p o l l o change c o n t r o l system.

5.1.2.10 Conducting a u d i t s of MSF C e n t e r and


c o n t r a c t o r C o n f i g u r a t i o n Management Sys-
tems, when deemed a p p r o p r i a t e
( E x h i b i t XV) .
5.1.3 C o n f i g u r a t i o n C o n t r o l Board ( C C B ) , Apollo
Program O f f i c e - -

5.1.3.1 The Apollo Program O f f i c e CCB i s t h e


Level I CCB, and a s such reviews and
approves a l l changes t h a t :

5.1.3.1.1 Affect t h e requirements


e s t a b l i s h e d i n t h e Apollo
Program S p e c i f i c a t i o n .

5.1.3.1.2 A f f e c t t h e launch d a t e .

5.1.3.1.3 Affect c o n t r o l l e d milestone


d a t e s o r hardware q u a n t i t i e s
a s d e f i n e d i n Apollo Program
D i r e c t i v e No. 4 ( s e r i e s ) .

5.1.3.1.4 R e s u l t i n a c o n t r a c t document,
m o d i f i c a t i o n o r supplemental
agreement whose e s t i m a t e d
dollar cost w i l l require that
t h e document, m o d i f i c a t i o n o r
supplemental agreement be
s u b m i t t e d f o r Headquarters
a p p r o v a l p e r NPC-400.

5.1.3.1.5 Are proposed f o r Apollo Space


V e h i c l e s a t KSC p e r Apollo
Program D i r e c t i v e No. 34
(current issue) .
5.1.3.1.6 Are proposed f o r Apollo Hard-
ware and Software f o r S a t u r n /
Apollo A p p l i c a t i o n s p e r Apollo
Program D i r e c t i v e No. 18!

5.1.3.1.7 Concern t h e assignment of In-


F l i g h t Experiments t o Apollo
Space V e h i c l e s .

5.1.3.2 The Level I CCB w i l l review and approve


procurement p l a n s s u b m i t t e d t o Headquarters
f o r approval.

5.1.3.3 The Level I CCB w i l l a s s u r e t h a t changes


which have been s u b m i t t e d t h a t have I n t e r -
Center i n t e r f a c e a s p e c t s have been coor-
d i n a t e d and agreed upon by each Center.

5.1.3.4 The Level I CCB w i l l f o r m a l i z e d e c i s i o n s


by i s s u i n g a CCB D i r e c t i v e t o t h e a p p r o p r i a t e
C e n t e r CMO ( s ).
5.2 C e n t e r L e v e l Program O f f i c e s

5.2.1 The Program Managers a t t h e C e n t e r s s h a l l be


responsible for:

5.2.1.1 Establishing a Configuration Control


Board (CCB) and a s r e q u i r e d s u b o r d i n a t e
L e v e l Boards.

5.2.1.2 A p p o i n t i n g a Chairman f o r t h e CCB who


s h a l l have d e c i s i o n - m a k i n g a u t h o r i t y f o r
CCB a c t i o n . The chairman o f t h e Board
w i l l d e s i g n a t e membership.

5.2.1.3 P r o v i d i n g s u p p o r t t o t h e CCB f o r the


t e c h n i c a l e v a l u a t i o n o f ECP' s.

5.2.1.4 E s t a b l i s h i n g a C o n f i g u r a t i o n Management
Office.

5.2.1.5 The c o n d u c t o f d e s i g n r e v i e w s and


e s t a b l i s h i n g t h e Design and P r o d u c t
baselines.

5.2.1.6 The c o n d u c t o f a c c e p t a n c e and i n s p e c t i o n


t e s t s a t t h e c o n t r a c t o r ' s f a c i l i t y and
a s s u r i n g t h a t t h e equipment h a s m e t t h e
acceptance requirements p r i o r t o shipment.

5.2.1.7 Issuing v i a the Contracting Officer


n e c e s s a r y c o n t r a c t c h a n g e s t o implement
t h e C o n f i g u r a t i o n C o n t r o l Board D i r e c t i v e s
(CCBD' s ) .
5.2.2 C e n t e r L e v e l Program O f f i c e s , C o n f i g u r a t i o n Manage-
m e n t . 0 f f i c e (CMO) s h a l l be r e s p o n s i b l e f o r :

5.2.2.1 E s t a b l i s h i n g C e n t e r and c o n t r a c t o r p r o c e d u r e s
and supplements i n compliance w i t h t h e
A p o l l o C o n f i g u r a t i o n Management Manual.

5.2.2.2 I n i t i a t i n g and c o m p l e t i n g t h e s p e c i f i c a t i o n
program and t h e e s t a b l i s h m e n t o f t h e
o f f i c i a l specification f i l e s .

5.2.2.3 A s s u r i n g t h a t r e q u i r e m e n t s i n System/CEI
Specifications a r e consistent with require-
ments i n P r o j e c t S p e c i f i c a t i o n s .

5.2.2.4 E s t a b l i s h i n g i n t e r n a l approval/change
p r o c e d u r e s f o r s p e c i f i c a t i o n s and main-
t a i n i n g s p e c i f i c a t i o n s t a t u s documentation.

5.2.2.5 M a i n t a i n i n g a f i l e o f r e c o r d which w i l l i n c l u d e
t h e r e s u l t o f e v e r y ECP a c t i o n . This f i l e
w i l l become a permanent p a r t of t h e a p p l i -
c a b l e C o n t r a c t End I t e m F i l e .
5.2.2.6 Reviewing, a p p r o v i n g and m o n i t o r i n g
contractor configuration identification,
c o n t r o l and a c c o u n t i n g p r o c e d u r e s .

5.2.2.7 I n s u r i n g t h a t a d e q u a t e c o n t r o l s and s a f e -
g u a r d s have been e s t a b l i s h e d by e a c h
c o n t r a c t o r f o r c o n t r o l of C l a s s 11 c h a n g e s .

5.2.2.8 Approving, i s s u i n g and m a i n t a i n i n g t h e


C o n f i g u r a t i o n I d e n t i f i c a t i o n and S t a t u s
Accounting I n d i c e s ; CCB a g e n d a s , d i r e c t i v e s ,
and m i n u t e s o f m e e t i n g s .

5.2.2.9 A s s u r i n g t h a t follow-up a c t i o n h a s been


t a k e n on t h e d i r e c t i v e s i s s u e d by t h e CCB.

5.2.3.1 Approving, r e j e c t i n g o r d e f e r r i n g f o r f u r t h e r
s t u d y a l l P r o j e c t and End I t e m S p e c i f i c a t i o n
and E q u i p m e n t / F a c i l i t y Change P r o p o s a l s .

5.2.3.2 E v a l u a t i n g e a c h p r o p o s e d change from a l l


aspects, e-g., technical, interface,
l o g i s t i c s , schedule impact, c o s t , t e c h n i c a l
data, contractual, etc.

5.2.3.3 Coordinating with t h e a p p r o p r i a t e Apcllo


I n t e r f a c e C o o r d i n a t i o n P a n e l . t h o s e changes
with Inter-Center i n t e r f a c e impact p r i o r
t o a p p r o v a l and i s s u a n c e of a CCB D i r e c t i v e .

5.2.3.4 S u b m i t t i n g , w i t h recommendations, t h o s e
changes a f f e c t i n g t h e i t e m s s e t f o r t h i n
p a r a g r a p h 5 . 1 . 3 . 1 t o t h e A p o l l o Program
O f f i c e CCB f o r a p p r o v a l .

5.2.3.5 F o r m a l i z i n g a l l d e c i s i o n s by i s s u i n g a
C o n f i g u r a t i o n C o n t r o l Board D i r e c t i v e .
The D i r e c t i v e w i l l e s t a b l i s h t h e r e q u i r e -
ments f o r c o n c u r r e n t a c t i o n w i t h r e s p e c t
t o development, p r o d u c t i o n , and r e t r o f i t
r e q u i r e m e n t s t o s y s tems/equipments
( i n c l u d i n g t r a i n i n g i t e m s , ground e q u i p -
ment, p e c u l i a r t o o l i n g , s p a r e s , s p a r e p a r t s ,
r e v i s i o n s t o t e c h n i c a l manuals, e n g i n e e r i n g
and t e c h n i c a l d a t a and s o f t w a r e end i t e m s ) ,
and on t h e methods o f a c c o m p l i s h i n g t h e
changes.

5.2.3.6 O p e r a t i n g w i t h i n t h e a d m i n i s t r a t i v e frame-
work o f t h e CMO.
5.2.4 A u t h o r i z e d C e n t e r Supplements
I

Approved MSF C e n t e r C o n f i g u r a t i o n Management


Manuals and P l a n s a r e r e c o g n i z e d a s o f f i c i a l
c e n t e r s u p p l e m e n t s t o t h i s manual and w i l l be
implemented by t h e a p p r o p r i a t e c e n t e r s .

6.0 INTERFACE MANAGEMENT

C o n f i g u r a t i o n management p l a y s a key r o l e i n t h e c o n t r o l o f
i n t e r - c e n t e r and i n t e r n a l c e n t e r i n t e r f a c e r e q u i r e m e n t s and
changes. The i m p o r t a n c e o f c o n t r o l o v e r i n t e r f a c e s i s
r e f l e c t e d i n . t h e Apollo Program's o f f i c i a l definition$..of
I n t e r f a c e C o n t r o l Documents: "ICD1s a r e documents e s t a b -
l i s h i n g i n t e r - c e n t e r j o i n t agreements f o r i n t e r f a c e r e q u i r e -
ments and a r e c o n t r o l l e d i n t h a t t h e s e i n t e r f a c e r e q u i r e -
ments c a n n o t be u n i l a t e r a l l y changed. These documents must
b e r e f e r e n c e d o r i n c l u d e d i n a p p r o p r i a t e Apollo-Saturn
S p e c i f i c a t i o n s ( e . g . , P r o j e c t , CEI S p e c s ) t o e n s u r e t h a t a l l
changes h a v i n g p r o g r a m / p r o j e c t i m p a c t a r e p r o c e s s e d t h r o u g h
normal C e n t e r change c o n t r o l p r o c e d u r e s . " In addition t h e ICD
c r i t e r i a r e q u i r e s t h a t any changes t o i n t e r f a c e c o n t r o l r e q u i r e -
ments, ( p h y s i c a l , f u n c t i o n a l , d e s i g n , e t c . ) which w i l l have an
i m p a c t on hardware o r s o f t w a r e p e r f o r m a n c e , c o s t o r s c h e d u l e
accomplishment must b e c o n t r o l l e d t h r o u g h C C B ' s a t a l l a f f e c t e d
Centers t o a s s u r e t h a t a l l s i d e s of t h e i n t e r f a c e a r e f u l l y
c o o r d i n a t e d and informed. The o r g a n i z a t i o n a l and p o l i c y
r e q u i k e m e n t s f o r I n t e r f a c e Management a r e c o n t a i n e d i n APD
47, ( c u r r e n t i s s u e ) .

I n t e r f a c e Management s h a l l be accomplished i n f o u r d i s t i n c t
phases: I d e n t i f i c a t i o n , Documentation, I m p l e m e n t a t i o n and
C o n t r o l . The I d e n t i f i c a t i o n p h a s e s h a l l c o n s i s t o f t h e
d e t e r m i n a t i o n of t h e e x i s t e n c e and t h e n e c e s s i t y f o r c o n t r o l
o f an i n t e r f a c e . The Documentation p h a s e i s t h e p e r i o d i n
which I C D 1 s a r e p r e p a r e d . The i n t e r f a c e s s h a l l b e s o d e f i n e d
a s t o a s s u r e complete d e s i g n c o m p a t a b i l i t y . The I C D ' s a r e t o
b e p r e p a r e d and r e l e a s e d i n a c c o r d a n c e w i t h p r o c e d u r e s c o n t a i n e d
h e r e i n . The I m p l e m e n t a t i o n p h a s e i s t h a t p a r t o f t h e program
d u r i n g which i n t e r f a c e r e q u i r e m e n t s , a s d e f i n e d by t h e I C D ' s
and e n g i n e e r i n g change c o n t r o l r e q u i r e m e n t s , a r e c o n t r a c t u a l l y
imposed on d e s i g n o r g a n i z a t i o n s and/or c o n t r a c t o r s t o e s t a b l i s h
an i n t e r f a c e b a s e l i n e . The C o n t r o l p h a s e i s t h a t p a r t of t h e
program which r e q u i r e s a p p r o v a l of proposed c h a n g e s t o i n t e r f a c e
r e q u i r e m e n t s i n o r d e r t o p r e v e n t u n i l a t e r a l changes which c o u l d
r e s u l t i n incompatible i n t e r f a c e s .

A s . a n example, A p o l l o I n t e r - C e n t e r I n t e r f a c e C o n t r o l Documents
s h a l l i n c l u d e b u t n o t be l i m i t e d t o t h e f o l l o w i n g i n t e r f a c e a r e a s :

Launch V e h i c l e to Spacecraft
Q Ball Spacecraft
Q Ball t o Launch Complex
S p a c e c r a f t GSE Launch Complex
Spacecraft Launch Complex
Launch V e h i c l e Launch Complex
Space V e h i c l e Launch Complex
Spacecraft LVGSE
Launch V e h i c l e to Manned Space F l i g h t Network
Spacecraft KSC I n d u s t r i a l Area
Launch V e h i c l e GSE Launch Complex
Space V e h i c l e GSE Launch Complex
S p a c e c r a f t GSE Launch V e h i c l e GSE
Spacebraft Manned Space F l i g h t Network

Each c e n t e r s h a l l p r e p a r e and implement i n t r a c e n t e r I C D ' s


between C e n t e r - l e v e l i n t e r f a c i n g end i t e m s , t h e i r a p p l i c a b l e
ground s u p p o r t equipment and any h a r d w a r e , s o f t w a r e o r
documentation e l e m e n t s n o t c a t e g o r i z e d a s end i t e m s which
a r e u n d e r c o g n i z a n c e o f o r a f f e c t two o r more c o n t r a c t o r s .
I n t r a - c e n t e r I C D 1 s s h a l l be compatible with i n t e r - c e n t e r
I C D ' S a t and where mutual i n t e r f a c e s e x i s t . Intra-center
I C D ' s , o r changes t h e r e t o , s h a l l n o t b e approved p r i o r t o
a p p r o v a l o f any a f f e c t e d i n t e r - c e n t e r I C D , o r change t h e r e t o .

The I n t e r - C e n t e r C o o r d i n a t i o n P a n e l s have t h e r e s p o n s i b i l i t y
t o c o o r d i n a t e , m a i n t a i n , and t e c h n i c a l l y a p p r o v e a l l I n t e r -
C e n t e r i n t e r f a c e s between a f f e c t e d NASA C e n t e r s . The P a n e l s
a r e c h a r g e d w i t h i n i t i a t i n g t h e o r i g i n a l p r e p a r a t i o n o f , and
p r e p a r i n g a l l r e v i s i o n s t o , I n t e r f a c e C o n t r o l Documents. The
P a n e l s must a s s u r e t e c h n i c a l c o m p a t i b i l i t y f o r p h y s i c a l ,
f u n c t i o d a l and p r o c e d u r a l i n t e r f a c e a s p e c t s from t h e c o n t r a c t o r s
t h r o u g h t h e a p p r o p r i a t e NASA C e n t e r s . The P a n e l s a r e formed
t o make a v a i l a b l e t h e t e c h n i c a l competnece o f APO, MSFC, KSC
and MSC, and t h e i r c o n t r a c t o r s , f o r t h e s o l u t i o n o f t h e i n t e r -
f a c e problems of t h e l a u n c h v e h i c l e , t h e s p a c e c r a f t , f a c i l i t i e s ,
and a s s o c i a t e d equipment.

The I n t e r - C e n t e r R e p o s i t o r y r e c e i v e s , r e c o r d s , r e p r o d u c e s ,
and d i s t r i b u t e s a l l A p o l l o I n t e r - C e n t e r ICD1s/IRN's approved
by t h e C o o r d i a n t i o n P a n e l s and c o g n i z a n t C e n t e r L e v e l I1
CCB'S.

7.0 COMPUTER PROGRAM CONFIGURATION MANAGEMENT

While t h e c o n f i g u r a t i o n management r e q u i r e m e n t s d e f i n e d i n t h i s
manualdeal b o t h w i t h hardware and s o f t w a r e (computer p r o g r a m s ) ,
i t h a s become n e c e s s a r y on t h e Apollo program ( a s a r e s u l t o f
t h e i n c r e a s i n g u s e o f "computer--basedw s y s t e m s ) t o a m p l i f y
t h e s e r e q u i r e m e n t s i n t e r m s more g e n e r a l l y u s a b l e by computer
program t e c h n i c a l and management p e r s o n n e l . The b a s i c p r o d u c t
r e q u i r i n g c o n t r o l i s a computer program c o n t r a c t end i t e m
(CPCEI) , which i s d e f i n e d a s t h e r e s u l t o f a computer program-
ming p r o c e s s l e a d i n g t o p r o d u c t i o n o f a punched deck o f c a r d s ,
m a g n e t i c t a p e , o r o t h e r p h y s i c a l media c o n t a i n i n g an o r d e r e d
s e t in a form s u i t a b l e f o r i n s e r t i o n i n t o a d i g i t a l computer.
Computer programming u s u a l l y r e q u i r e s t h e development o f
s e v e r a l programs and t h e d a t a e s s e n t i a l t o t h e i r u s e . A
p a r t i c u l a r a p p l i c a t i o n ( e - g . , automatic checkout of a launch
v e h i c l e , onboard g u i d a n c e and n a v i g a t i o n ) may r e q u i r e t h e
development o f :
O p e r a t i o n a l p r o g r a m ( s ) which p e r f o r m ( s ) t h e r e q u i r e d t a s k s
(e.g.,,.generation of t r a j e c t o r y c a l c u l a t i o n s , test-
s t i m u l i , etc. ) .
A d a t a b a s e which c o n t a i n s a l l t h e s t a t i c and dynamic d a t a
s u p p l i e d t o t h e o p e r a t i o n a l program ( e . g . , l a u n c h s i t e
c o - o r d i n a t e s , mathematical c o n s t a n t s ) .

S u p p o r t programs used f o r t h e t e s t and e v a l u a t i o n o f


t h e o p e r a t i o n a l program ( e . g . , s i m u l a t i o n , d a t a r e c o r d i n g ,
d a t a r e d u c t i o n programs) .
U t i l i t y programs which i n c l u d e a l l t o o l s n e c e s s a r y f o r t h e
g e n e r a t i o n o f t h e o p e r a t i o n a l and s u p p o r t programs ( e . g . ,
c o m p i l e r s , a s s e m b l e r s , m o n i t o r s , debugging a i d s ) .

The programs and d a t a form a "programming systein." For b o t h


t e c h n i c a l and m a n a g e r i a l r e a s o n s it i s u s u a l l y d e s i r a b l e t o
p a r t i t i o n t h e t o t a l programming s y s t e m i n t o s e v e r a l CPCEI ' s.
F o r example, t h e o p e r a t i o n a l program combined w i t h t h e
d a t a b a s e may b e one CPCEI, a s i m u l a t i o n program u s e d t o t e s t
t h e f i r s t CPCEI may b e i t s e l f a CPCEI, and t h e s e t of u t i l i t y
programs may b e d e s i g n a t e d a s a n o t h e r CPCEI. T h i s s e l e c t i o n
i s done by t h e p r o c u r i n g agency o r c o n t r a c t o r i n t h e d e f i n i t i o n
phase. I t r e s u l t s i n t h e a l l o c a t i o n of f u n c t i o n s t o s e p a r a t e l y
i d e n t i f i e d computer p r o g r a m s , , e a c h o f which can t h e n be con-
v e n i e n t l y produced and managed a s a u n i t . C e r t a i n characteristics
o f t h e CPCEI and t h e p r o c e s s r e q u i r e d t o p r o d u c e i t a f f e c t t h e
a p p l i c a t i o n o f c o n f i g u r a t i o n management t e c h n i q u e s a s o r i g i n a l l y
d e v e l o p e d f o r hardware C E I 1 s . Some o f t h e more i m p o r t a n t
c h a r a c t e r i s t i c s are:

a. U n l i k e a t y p i c a l hardware p r o d u c t i o n i t e m , t h e major
c o s t o f CPCEI development i s i n t h e d e s i g n and
t e s t i n g process. F a b r i c a t i o n o f a computer program -
t h e punching of c a r d s o r paper t a p e - i s u s u a l l y a small
p a r t o f t o t a l development c o s t . Even i n t h e c a s e where
many c o p i e s a r e r e q u i r e d , p r o d u c t i o n i n t h e s e n s e o f
making a d d i t i o n a l c o p i e s i s a r o u t i n e m a t t e r of
r e p r o d u c i n g t h e program on a computer. This does n o t
usually require a d e t a i l e d specification o r engineering
d r a w i n g s a s d o e s t h e p r o d u c t i o n o f d u p l i c a t e hardware
i tems .
b. The f a b r i c a t i o n o f a p r o t o t y p e computer program i s
b a s e d , i n g e n e r a l , on h a n d w r i t t e n c o d i n g s h e e t s which
c o n t a i n a l i s t o f t h e program i n s t r u c t i o n s . These
c o d i n g s h e e t s , produced i n t h e d e s i g n p r o c e s s , a r e
u s u a l l y d i s c a r d e d a f t e r t h e e n t i r e program i s assembled.
They a r e r e p l a c e d by l i s t i n g s g e n e r a t e d a s a normal
p a r t o f t h e assembly p r o c e s s . The p r i n t e r - g e n e r a t e d
l i s t i n g s provide t h e only a c c u r a t e r e c o r d of t h e
program c o n f i g u r a t i o n . To some d e g r e e , t h e n , assembly
i s a s e l f - d d c u m e n t i n g p r o c e s s . However, a program i s
u s u a l l y s o complex t h a t s u p p o r t i n g documents w r i t t e n
by t h e programmer a r e r e q u i r e d t o make t h e l i s t i n g s
u n d e r s t a n d a b l e t o computer p e r s o n n e l .
Experience h a s i n d i c a t e d t h a t t h e volume o f changes
t o a CPCEI d u r i n g i t s l i f e c y c l e can be v e r y k i g h .
T h i s can be a t t r i b u t e d t o two f a c t o r s :
1. Many systems a r e d e s i g n e d s o t h a t e x p e c t e d changes
can be handled by computer program m o d i f i c a t i o n s
r a t h e r t h a n hardware m o d i f i c a t i o n s .

2. Many computer programs a r e e x t r e m e l y complex, run-


ning i n t o t e n s and.hundreds of thousands of
i n s t r u c t i o n s and d a t a words. E r r o r s a r e i n e v i t a b l e
when implementing t h i s l a r g e a number o f i n s t r u c -
t i o n s . . F a i l u r e s due t o e r r o r s may show up
t h r o u g h o u t t h e e n t i r e programming p r o c e s s .
The d e s i g n and development o f l a r g e - s c a l e computer
programs i s u s u a l l y accomplished i n a! modular. f a s h i o n .
The program i s d i v i d e d i n t o "subprograms", c a l l e d
computer program components (CPC+. A modular d e s i g n
a i d s i n t h e debugging p r o c e s s by a l l o w i n g f o r ' i s o -
l a t i o n of e r r o r s and e n s u i n g changes, and it a l s o
a l l o w s f o r d i v i s i o n o f r e s p o n s i b i l i t y among s e v e r a l
programmers.
The c o n c e p t s o f q u a l i t y a s s u r a n c e , c o n t r o l and r e l i a -
b i l i t y d i f f e r from t h a t o f hardware C E I f s . Some o f
these differences are:
1. I n s t r u c t i o n s do n o t wear o u t w i t h u s e ; hence,
t h e r e a r e no l o g i s t i c r e q u i r e m e n t s r e l a t e d t o
spare p a r t s provisioning, interchangeability,
substitution, etc.

2. l n s p e c t i o * o f . t h e p h y s i c a l i t e m i s n o t an a d e q u a t e
means o f v e r i f y i n g t h e q u a l i t y o f a computer program
I t must a l s o b e t e s t e d e x t e n s i v e l y i n an
environment t h a t c l o s e l y s i m u l a t e s o p e r a t i n g
conditions .
" Q u a l i t y c o n t r o l " and " a c c e p t a n c e t e s t i n g , " a s
c o n c e p t s which have primary s i g n i f i c a n c e i n
r e l a t i o n t o q u a n t i t y p r o d u c t i o n o f equipment C E I ' s ,
do n o t have a comparable a p p l i c a b i l i t y t o computer
programs. The p r o d u c t i o n o f uniform c o p i e s - f o r
example, i n m u l t i - s i t e a p p l i c a t i o n s - i s n o t
u s u a l l y a major problem i n CPCEI c o n t r a c t s . The
major problem i s u s u a l l y t h e p r o p e r a d a p t a t i o n o f
t h e c o p i e s t o t h e i n d i v i d u a l r e q u i r e m e n t s of e a c h
site.
4. The e q u i v a l e n t o f m i l i t a r y s t a n d a r d s f o r t h e
c o n t r o l o f p r o d u c t i o n does n o t e x i s t f o r computer
programming. Programming d e s i g n s t a n d a r d s a r e
g e n e r a l l y produced f o r and t a i l o r e d t o each e f f o r t .
The programming p r o c e s s f o r a CPCEI w i t h i n a s y s t e m s t a r t s
i n t h e d e f i n i t i o n phase and c o n t i n u e s t h r o u g h o u t a c q u i s i t i o n
and o p e r a t i o n s . I n o r d e r t o p r o v i d e computer program c o n f i g u r a -
t i o n management r e q u i r e m e n t s i n a complete , c o n c i s e and
i n t e g r a t e d form, two e x h i b i t s a r e i n c l u d e d h e r e i n
a s follows:

Exhibit X V I I I - P r e p a r a t i o n o f C o n t r a c t End I t e m
D e t a i l S p e c i f i c a t i o n (Computer Program)

Exhibit XIX'- Computer Program I d e n t i f i c a t i o n , C o n t r o l


and Accounting

Requirements s t a t e d i n t h e s e e x h i b i t s a r e t o b e a p p l i e d t o a l l
new computer program p r o c u r e m e n t s , and i n t e g r a t e d i n t o ongoing
prograhing operations as practical.

8.0 CONTRACT END ITEM SELECTION AND CONTROL

A C o n t r a c t End I t e m ( C E I ) i s a n i n d i v i d u a l p r o d u c t o f t h e
c o n t r a c t o r o r an e n g i n e e r i n g d e s c r i p t i o n t h e r e o f which s h a l l
be f o r m a l l y a c c e p t e d by t h e p r o c u r i n g agency. I t i s normally
t h e l o w e s t l e v e l of assembly f o r d i r e c t management c o n t r o l o f
t h e c o n t r a c t o r by t h e p r o c u r i n g agency. The c o n t r a c t o r ' s
s y s t e m s arid p r o c e d u r e s f o r d o c u m e n t a t i o n , communication and
a c c o u n t a b i l i t y s h a l l t i e t o g e t h e r and r e c o n c i l e h i s e n g i n e e r i n g
and p r o d u c t i o n e f f o r t s below t h e c o n t r a c t end i t e m l e v e l .
T h i s w i l l a l l o w management a c t i o n s t o be f o c u s e d a t t h e c o n t r a c t
end i t e m l e v e l t o d e m o n s t r a t e t h a t t h e r e q u i r e m e n t s o f t h e
p r o c u r i n g agency ( i . e . , f o r performance o f equipment, f o r
o p e r a t i o n , f o r maintenance, and f o r t r a i n i n g ) a r e c o n t r a c t u a l l y
fulfilled. The a c t i o n s , r e c o r d s and documents r e q u i r e d f o r t h i s
c o n t r a c t a c c o u n t a b i l i t y a r e shown i n F i g u r e 3 . This i l l u s t r a t i o n
i s t h e b a s i s f o r t h e configuration i d e n t i f i c a t i o n requirements
i n t h i s E x h i b i t . ~ u r i r i gt h e p r o p o s a l o r d e f i n i t i o n p h a s e o f
a program t h e c o n t r a c t o r i s i n v o l v e d i n recommending l e v e l s
o f assembly f o r c o n t r o l a s c o n t r a c t end i t e m s . A s p a r t of h i s
e f f o r t , t h e c o n t r a c t o r s h a l l s e a r c h F e d e r a l c a t a l o g s and s e l e c t ,
as h i s f i r s t p r e f e r e n c e , i t e m s o f i n v e n t o r y which-can be used t o
meet t h e r e q u i r e m e l i t s f o r c o n t r a c t end i t e m s ( o r s u b a s s e m b l i e s
thereof). Iteds of i n v e n t o r y s h a l l p r e f e r a b l y be s e l e c t e d f o r
u s e a s d e s i g n e d , b u t w i l l a l s o be s e l e c t e d f o r m o d i f i c a t i o n a s
may be r e q u i r e d t o meet d e s i g n r e q u i r e m e n t s and where t h i s
m o d i f i c a t i o n w i l i have a lower t o t a l c o s t i m p a c t t h a n new d e s i g n .
Where p o s s i b l e , new d e s i g n w i l l p r o v i d e f o r maintenance by
inventoried parts. The u s e o f i t e m s a l r e a d y a v a i l a b l e t o t h e
p r o c u r i n g agency t o r e d u c e program c o s t s , r e l i a b i l i t y and
l o g i s t i c problems i s an o b v i o u s f a c t o r of c o n s i d e r a t i o n d u r i n g
e v a l u a t i o n o r r e v i e k o f t h e adequacy of a c o n t r a c t o r ' s
technical efforts. I t a l s o allows t h e requirements i n Figure 3
t o be s i m p l i f i e d and r e d u c e a d m i n i s t r a t i v e c o s t s . The c o n t r a c t o r
s h a l l n o r m a l l y s e l e e t t h e h i g h e s t l e v e l of assembly of e a c h i t e m
produced i n h i s p l a n t a s a c o n t r a c t end i t e m . his w i l l a l s o
n o r m a l l y r e s u l t i n reduced a d m i n i s t r a t i v e c o s t s . This s e l e c t i o n
should consider t h a t :
(a) a l l s u b a s s e m b l i e s o f a C E I s h o u l d have a
common m i s s i o n r e l a t i o n s h i p . F o r example, a
s p e c i a l m i s s i o n package f o r a s p a c e v e h i c l e ,
which p r o v i d e s a s e p a r a t e o r a d d i t i o n a l
c a p a b i l i t y t o t h a t v e h i c l e may be b e s t i d e n t i f i e d
a s a s e p a r a t e C E I r a t h e r t h a n a s a subassembly
of t h e v e h i c l e . The package may t h e r b y be more
r e a d i l y s c h e d u l e d , a l l o c a t e d and p r o v i d e b e t t e r
v i s i b i l i t y o f m i s s i o n r e q u i r e m e n t s and capa-
bilities.'
b t h e c o n t r a c t end i t e m and i t s s u b a s s e m b l i e s
s h o u l d have a common i n s t a l l a t i o n and o p e r a t i o n
r e q u i r e m e n t . For example, a r a d i o command and
c o n t r o l s e t w i t h b o t h ground and a i r b o r n e
packages s h o u l d be i d e n t i f i e d by a minimum o f
two C E I ' s t o s e p a r a t e l y i d e n t i f y ground and
a i r b o r n e packages.
(c) t h e c o n t r a c t end i t e m normally s h o u l d n o t c o n t a i n
a subassembly e x p e c t e d t o have i t s own i n d e p e n d e n t
c y c l e o f changes r e l a t i n g t o CEI m i s s i o n , e . g . ,
a launch v e h i c l e programmer, where changes i n
b o o s t e r t r a j e c t o r y w i l l n o r m a l l y be accomplished
e n t i r e l y w i t h i n t h e programmer. The programmer
s h o u l d be a C E I s o t h a t t h e i n t e r c h a n g e a b i l i t y o f
t h e v e h i c l e and programmer a r e i n d e p e n d e n t l y
i d e n t i f i e d . T h i s w i l l r e d u c e t h e c o s t o f drawing
maintenance and i n c r e a s e t h e s i g n i f i c a n c e o f t h e
p a r t numbers f o r b o t h t h e l a u n c h v e h i c l e apd t h e
programmer.

(d) t h e above c o n s i d e r a t i o n s a r e p r o v i d e d t o i l l u s t r a t e
t h a t t h e s e l e c t i o n p f c o n t r a c t end i t e m s r e q u i r e s
a n a l y s i s o f b o t h t e c h n i c a l and a d m i n i s t r a t i v e
i m p l i c a t i o n s , and t h a t f i p a l c h o i c e i s a t r a d e - o f f .
There a r e no r u l e s , o t h e r t h a n t h a t a C E I i s an
end p r o d u c t t o be f o r m a l l y a c c e p t e d .
(e) a c o n t r a c t end i t e m which can b e produced i n t h e
c o n t r a c t o r ' s p l a n t s h a l l be c o m p l e t e , d e l i v e r e d
and f o r m a l l y a c c e p t e d by the p r o c u r i n g agency a t
the contractor's plant. A f a c i l i t y o r contract
end i t e m of ground equipment which can o n l y b e
c o n s t r u c t e d i n t h e f i e l d s h a l l be f o r m a l l y
accepted a t t h e s i t e of c o n s t r u c t i o n . F i e l d
i n s t a l l a t i o n , checkout and t e s t t a s k s t o be
accomplished a f t e r a c c e p t a n c e a r e n o t j u s t i f i a b l e
grounds f o r e x t e n d i n g p r o d u c t i o n o r c o n s t r u c t i o n
e f f o r t s beyond t h e f a c t o r y d e l i v e r y d a t e ~ i o rt h e
B e n e f i c i a l Occupancy Date.
(f) a f t e r a c c e p t a n c e , a l l c o n t r a c t end i t e m s , s p a r e s
and t e c h n i c a l manuals w i l l be Government p r o p e r t y ,
and s h a l l be f o r n a l l y c o n t r o l l e d a s such i n
a c c o r d a n c e w i t h t h e r e q u i r e m e n t s of t h e p r o c u r i n g
agency.
9.0 REPORT REQUIREMENTS
B a s i c C o n f i g u r a t i o n Management r e p o r t i n g r e q u i r e m e n t s
f o r record purposes a r e contained i n E x h i b i t X V I .
These r e p o r t s do n o t p r e c l u d e t h e r e q u i r e m e n t f o r
o t h e r r e p o r t s which may be n e c e s s a r y f o r program
v i s i b i l i t y and c o n t r o l . Requirements f o r new r e p o r t s
t o t h e APO w i l l be l e v i e d by i s s u a n c e o f A p o l l o Program
D i r e c t i v e s and w i l l n o t become e x h i b i t s t o t h i s
document u n l e s s t h e i r p u r p o s e and v a l u e i n d i c a t e a
b a s i c improvement i n t h e o p e r a t i o n a l a s p e c t s of
C o n f i g u r a t i o n Management.
ACQUISITION

REQUIREMENTS CHANGES ( E X H I B I T V I I )
REQUIREMENTS . +
- DESIGN
REQUIREMENTS
DESIGN' REQUIREMENTS CHANGES ( E X H I B I T I X )
I
BASELINE I
I
I
I FABRICATION & OPERATIONS
I
I i
I
I
I
I
r PRODUC;
I
I
PRODUCT CONFIGURATION CHANGES
I CONFIGURATION
I BASELINE ( E XIH I B I T I X )
I
I I

v 7
I
I j

-
k I
BASELINE PART I I
I PART I 1 I
ESTABLISHED APOLLo CONTRACT CONTRACT I
BY RELEASE OF PROGRAM END ITEM I END ITEM
I
SPEC1 FICATION SPECIFICATION !
SPEC1
I
( E X H I B I T I) ( E X H I B I T 11, I ( E X H I BFICATION
I T 11) I

111, I V ) $.
FACI FLIGHT
PDR CDR FIRST READINESS
BASELINE PRELIMINARY CRITICAL ARTICLE REVIFW
REVI EWED DESIGN
BY --t REV1EW REVIEW CONFIGURATION DESIGN
INSPECTION C ERT IF I CAT1ON
('EXHIBIT X I V ) ( E X H I B I T X I \ ) (EXHIBIT XIV) REvI,Ew

APOLLO CONF IGURAT lON MANAGEMENT SYSTEM


FIGURE 1
APOLLO CHANGE CONTROL ORGAN I ZATI ONAL LEVELS
FIGURE 2
CONTRACT
1
I
CONTRACT

9:::" 1 DOCUMENTS AND ACTIONS

I I - I
NASA REVIEWS
WORK SPECIFICATIONS ACCEPTANCE INSPECTIONS
STATEMENT REQUIREMENTS DEMONSTRATIONS
i

DELIVERABLE PRODUCTS

I I h
I ,
DRAWINGS TECHNICAL
A
a EQUIPMENT SPARES
AND IDENTIFICATION DATA
LISTS

CHANGE 1 DOCUMENTAT I O N

I I I
ECP
SCN
CCN
OR
APPROVED
CIINFIGURATION
---...-. --... --..
I CONFIGURAT
STATUS

?
CCBD EQUIVALENT
INDEX REPORT I 1 REPORT
PRODUCTS, DOCUMENTS AND ACT l ONS CONTROLLED
AT CONTRACT END ITEM LEVEL
FIGURE 3
EXHIBIT I

PREPARATION OF
PROGRAM, PROJECT AND SYSTEM
PERFORMANCE AND DESIGN
REQUIREMENTS SPECIFICATIONS
EXHIBIT I

PREPARATION OF PROGRAM. PROJECT AND SYSTEM


PERFORMANCE ANDDESIGN REQUIREMENTSSPECIFICATION

CONTENTS

PARAGRAPH PAGE
1 . ..........
PURPOSE . .. . . 1-1
2 . SCOPE . . . . . . . . . . . . . . -1-1
3 . APPLICABILITY . . . . . . . . .. . . 1.1
4 . REFERENCE DOCUMENTS . . . . . .. . . 1.1
5 . EXPLANATION OF TERMS . . . . .. . . 1.2
6 . PROCEDURAL REQUIREMENTS . . . . . 1-2

FORMATS AND ILLUSTRATIONS

Example .An. Specification Format Title Page ....... 1-12


Example .Awl Specification Format Outline........ 1-13
Figure 1. Sample Specification Tree ........... 1-16
EXHIBIT I

PREPARATION OF
PROGRAM, PROJECT AND SYSTEM PERFORMANCE AND DESIGN
REQUIREMENTS SPECIFICATIONS

1. PURPOSE
This exhibit provides NASA Apollo organizations and
contractors with requirements and guidance for the
preparation of Apollo Program, Project and Systems
Performance and Design Requirements Specifications.
2. SCOPE
The Apollo Program Specification shall contain technical
requirements for the program as an entity. Lower level
specifications shall contain technical requirements for
the projects and systems as entities. In this exhibit,
the words program, project and system are interchangeable
as applicable. These requirements relate to:
a. Mission requirements, identification and description
of the program.
b. Program performance requirements.
c. Performance budgets.
d. Standard requirements applicable to all contractor
designs.
e. Program qualification and test requirements.
These specifications provide the basis for, but do not alone
govern, hardware design and construction, nor are they to
be used as the basis for factory acceptance of contract end
items comprising the system.
3. APPLICABILITY
This exhibit is applicable to all NASA Apollo organizations
and contractors and shall be used in the preparation of
performance/design requirements specifications.
4. REFERENCE DOCUMENTS
Defense Standardization Manual 4120.3-M, "Standardization
Policies, Procedures and Instructions", April 1, 1966.

Exhibit X, "Requirements for Configuration Identification


Numbers".
EXHIBIT I

EXPLANATION OF TENIS

(See E x h i b i t X V I I )

PROCEDURAL REQUIREMENTS

Format f o r t h e s p e c i f i c a t i o n s d e s c r i b e d i n t h i s . e x h i b i t
s h a l l be i n accordance w i t h Example "A". S p e c i f i c a t i o n
c o n t e n t s h a l l be i n accordance w i t h t h e f o l l o w i n g
p a r a g r a p h s r e f e r e n c e d t o Example "A".

P r e p a r a t i o n of T i t l e Page

The t i t l e page f o r t h e s p e c i f i c a t i o n s h a l l be a s shown on


t h e sample format.

S p e c i f i c a t i o n Numbers

A s e p a r a t e and d i s t i n c t number s h a l l be a s shown on t h e


sample format and be i n accordance w i t h t h e i n s t r u c t i o n s of
Exhibit X.

P r e ~ a r a t i o nof " S e c t i o n 2. A ~ ~ l i c a b Documents"


le

APPLICABLE DOCUMENTS - L i s t o n l y t h o s e documents ( s p e c i f i c a -


t i o n s , s t a n d a r d s , drawings, b u l l e t i n s , manuals, e t c . ) which
a r e a p p l i c a b l e t o p a r a g r a p h s w i t h i n t h e body of t h e s p e c i -
f i c a t i o n . Within t h e body of t h e s p e c i f i c a t i o n , r e f e r e n c e
t o t h e s e documents s h a l l be made by r e f e r e n c e t o t h e i r b a s i c
document number, o r o t h e r d e f i n i t i v e d e s i g n a t i o n .

P r e ~ a r a t i o nof ' S e c t i o n 3 . Reauirements"

This section s h a l l contain the following:

1. The performance and d e s i g n requirements f o r t h e


program.

2. The d e f i n i t i o n of t h o s e major elements which make


up t h e program.

3. The i d e n t i f i c a t i o n of program i n t e r f a c e s .

4. The a l l o c a t i o n of performance budgets and s p e c i f i c


d e s i g n c o n s t r a i n t s t o t h e v a r i o u s elements of t h e
program.
EXHIBIT I

5. The identification and relationships of Contract


End Items as required by the level of specifica-
t-ion, (i.e., a system specification would identify
all CEI's of the system while a program specifica-
tion would only mention certain major CEI's necessary
for a conplete definition of the program).
6. The design constraints and standards necessary to
insure compatibility of program hardware.
7. The performance requirements related to personnel
utilization, operation, maintenance and logistic
support of the program to the extent these define
or constrain the design of program equipment.
8. The identification and use of major Government
Furnished Property to be designed into and redelivered
with program equipment.
9. The identification and use of major Government
Furnished Property to be used with other program
equipment as an independent entity.
Requirements shall be stated in quantitative physical terms
with tolerances which can be verified by subsequent analytical
test, or demonstrative data, or by inspection of the equip-
ment and related supporting engineering data. Requirements
shall be the basis for, and be verified by, the tests
specified in Section 4.
Paragraph 3.1 "Performance"
Program performance requirements shall be specified in terms
of program characteristics and operability. General intro-
ductory material may be included in this paragraph. All
requirements shall be specified in appropriate sub-paragraphs.
Performance requirements shall be specified to the level of
detail nedessary to clearly establish the program elements,
limits for design, functional interfaces, and performance
budgets without imposing inappropriate limitations on
lower management.
Paragraph 3.1.1 "Characteristics"
Characteristics are as defined below.
EXHIBIT I

Paragraph 3.1.1.1 "Mission Performance" I

State the general requirements established for the program


in relating it to NASA objectives and goals, and the basic
overall mission requirements which are common to more than
one program element. The requirements shall include such
items as mission mode, command mode, payload, launch,
orbital operations, non-orbital operations, and recovery
aspects as appropriate. Also included shall be the
definition of the mission requirements of the program in
terms bf the relationship to support activities. Critical
performance interfaces relating program to support activi-
-
ties shall be specified in quantitative terms. Specific
performance parameters peculiar to the program shall be
specified. Requirements which are peculiar to the program
shall be specified in quantitative terms and shall not be
phrased as gbals but rather as requirements.
paragkaph 3.1.1.2 "Logistics"
Summarize the requirements established for the program by
logistics considerations as they affect equipment design.
The type of maintenance to be performed shall be specified.
Requirements shall be compatible with the Mission Perfor-
mance requirements of paragraph 3.1.1.1 and the Reliability
requirements of paragraph 3.1.3.1.
Paragraph 3.1.1.3 "Personnel and Training"
Specify personnel requirements which must be integrated into
program design. Requirements shall be the bhsis for contrac-
tor design/development decisions and for determination of
personnel training and training equipment/facility require-
ments.
Parasra~h3.1.2 "Prouram Definition"
Program definition shall include:
a. Incorporation, either directly or by reference,
of specific products of systems engineering which
portray the relationships of the items of equip-
ment to be developed.
b. Identification of the program elements of the system
each of which may include one or more contract end
items, and each of which may be assigned to a differ-
ent contractor or NASA Center for integrated develop-
ment.
EXHIBIT I

c. I d e n t i f i c a t i o n of t h e i n d i v i d u a l i t e m s of equip-
ment ( c o n t r a c t e n d i t e m s ) which m u s t b e d e v e l o p e d
and t h u s t r a n s l a t e t h e o p e r a t i o n a l r e q u i r e m e n t s
i n t o equipment development t a s k s . (Individual
i t e m s of equipment, C E I ' s , need n o t be i d e n t i f i e d
i n t h e Program S p e c i f i ~ a t i o ni f t h e y a r e more
a p p r o p r i a t e l y covered i n t h e Project/System
Specifications) .
Paragraph 3.1.2.1 " S y s t e m s E n g i n e e r i n g Documentation"

I n c o r p o r a t e , e i t h e r d i r e c t l y o r by r e f e r e n c e , t h e program
l e v e l f u n c t i o n a l s c h e m a t i c s and t h e t o p l e v e l f u n c t i o n a l
flows. Program l e v e l s y s t e m l a y o u t d r a w i n g s o r o t h e r
g r a p h i c p o r t r a y a l s which e s t a b l i s h t h e g e n e r a l r e l a t i o n -
s h i p o f p r i m a r y s y s t e m s e q u i p m e n t and f a c i l i t i e s s h a l l b e
included. A top l e v e l Specification Tree s h a l l be included
o r referenced. ( S e e F i g u r e 1.) D o c u m e n t a t i o n s h a l l b e
included t o t h e l e v e l of d e t a i l necessary t o c l e a r l y
e s t a b l i s h t h e e l e m e n t s o f t h e program a n d t h e f u n c t i o n a l
i n t e r f a c e s between t h e e l e m e n t s .

Paragraph 3.1.2.2, "Program E l e m e n t L i s t "

L i s t t h e program e l e m e n t s . ( F o r a program s p e c i f i c a t i o n a n
e l e m e n t may b e a p r o j e c t s u c h a s a l a u n c h v e h i c l e , s p a c e -
c r a f t , e t c . ) A s i n g l e d e s i g n a c t i v i t y may b e made r e s p o n -
s i b l e f o r more t h a n o n e program e l e m e n t , b u t a n e l e m e n t
c a n n o t b e s p l i t a n d made t h e r e s p o n s i b i l i t y o f more t h a n
one d e s i g n a c t i v i t y .

Paragraph 3.1.2.3, " C o n t r a c t End I t e m L i s t "

T h i s paragraph s h a l l i n c l u d e a l i s t of c o n t r a c t end i t e m s
which c o m p r i s e a p r o j e c t o r s y s t e m . The f o l l o w i n g i n f o r -
mation s h a l l be included f o r each i t e m l i s t e d :

a. CEI number

b. Nomenclature

c. The CEI i n t o which it i n s t a l l s . An a d d i t i o n a l


l i s t i n g o f m a j o r i t e m s o f government f u r n i s h e d
p r o p e r t y ( r e q u i r e m e n t s i t e m s ) which must b e
d e l i v e r e d a s p a r t of t h e system s h a l l be
i n c l u d e d h e r e i n , i d e n t i f i e d by F e d e r a l S t o c k
Number i f a p p l i c a b l e .
EXHIBIT T

Paragraph 3.1.3, "Operability"

I n c l u d e performance r e q u i r e m e n t s which a r e g e n e r a l measures


of e f f i c i e n c y of t h e program equipment.

Paragraph 3.1.3.1, "Reliability"


S p e c i f y r e l i a b i l i t y r e q u i r e m e n t s of t h e program. These
requirements s h a l l be s t a t e d i n q u a n t i t a t i v e t e r m s , defin-
i n g t h e c o n d i t i o n s u n d e r which t h e r e q u i r e m e n t s a r e t o b e
met. A r e l i a b i l i t y a p p o r t i o n m e n t model may b e i n c l u d e d
t o s u p p o r t t h e a p p o r t i o n m e n t of r e l i a b i l i t y v a l u e s .
Paragraph 3.1.3.2 "Maintainabilityy'

S t a t e t h e q u a n t i t a t i v e requirements f o r m a i n t a i n a b i l i t y .
The b a s i c approach t o m a i n t e n a n c e i n t e r m s of s e r v i c e and
a c c e s s r e q u i r e m e n t s f o r equipment s h a l l b e s p e c i f i e d : e . g . ,
" m a i n t e n a n c e on t h e l a u n c h pad i s r e s t r i c t e d t o removal
and r e p l a c e m e n t of t h e f a i l e d u n i t , " e t c . It shall
i n c l u d e ground and s p a c e v e h i c l e m a i n t e n a n c e c o n c e p t s a s w e l l
a s m a i n t e n a n c e and r e p a i r c y c l e r e q u i r e m e n t s .

Paragraph 3.1.3.3 " U s e f u.l-


L-
ife"

S p e c i f y t h e a n t i c i p a t e d u s e f u l l i f e of a program e l e m e n t
w i t h o u t r e f e r e n c e t o a n t i c i p a t e d u s e f u l l i f e of p a r t s of
a p r o j e c t o r system, e r g . , " t h e intended mission s e r v i c e
of t h e l a u n c h v e h i c l e i s one y e a r . It

Paragraph 3.1.3.4 " N a t u r a l Environment"

S t a n d a r d s of n a t u r a l e n v i r o n m e n t which a l l program e q u i p -
ment must b e d e s i g n e d t o w i t h s t a n d i f u n p r o t e c t e d from t h e
e l e m e n t s s h a l l b e s p e c i f i e d , e - g . , wind l o a d i n g , p r e c i p i -
t a t i o n , ranges i n temperature, humidity, atmospheric
p r e s s u r e , wind s h e a r , v e r t i c a l g u s t v e l o c i t i e s , t u r b u l e n c e ,
e t c . The s t a n d a r d s f o r s p a c e e n v i r o n m e n t s h a l l b e i n c l u d e d ,
i f a p p r o p r i a t e , e . g . , e n e r g y i n p u t from s o l a r r a d i a t i o n ;
p a r t i c l e mass and e n e r g y s p e c t r u m s , e t c .

Paragraph 3.1.3.5 "Transportability"

Requirements f o r t r a n s p o r t a b i l i t y which a r e common t o a l l


program equipment t o s u p p o r t m i s s i o n o p e r a t i o n s , m i s s i o n
s u p p o r t o p e r a t i o n s , and l o g i s t i c s s h a l l b e s p e c i f i e d .
EXHIBIT I

Paragraph 3.1.3.6 "Human Performance"


Human performance and e n g i n e e r i n g r e q u i r e m e n t s f o r t h e
program s h a l l b e s p e c i f i e d o r r e f e r e n c e d i n a p p l i c a b l e
documents.
Paragraph 3.1.3.7 "Safety"
Specify those s a f e t y requirements e s t a b l i s h e d a s b a s i c t o
a l l program equipment, e . g . , " a l l ordnance d e v i c e s t o b e
u s e d . a s p a r t o f t h i s program s h a l l u s e C l a s s I1 e x p l o s i v e s
a s t h e energy s o u r c e . "
Paragraph 3.1.3.8 "Dangerous M a t e r i a l s and Components"
Summarize t h e r e q u i r e m e n t s e s t a b l i s h e d due t o t h e u s e of
dangerous m a t e r i a l s such a s : l i q u i d p r o p e l l a n t s , s o l i d
p r o p e l l a n t s , e x p l o s i v e ordnance, e l e c t r o - e x p l o s i v e
d e v i c e s , t o x i c , c o r r o s i v e and/or r a d i o a c t i v e m a t e r i a l s ,
e t c . T y p i c a l r e q u i r e m e n t s a r e : e s t a b l i s h m e n t of I n t e r -
s t a t e Commerce Commission h a z a r d c l a s s i f i c a t i o n s ; d e t e r -
m i n a t i o n of c r i t e r i a f o r f o r s a f e h a n d l i n g , s t o r a g e ,
t r a n s p o r t i n g , maintenance, checkout and i n s t a l l a t i o n ;
d e t e r m i n a t i o n of s e n s i t i v i t y l e v e l s t o t h e e f f e c t of r a d i o
f r e q u e n c y and e l e c t r o m a g n e t i c f i e l d s b o t h i n t e r n a l and
e x t e r n a l t o t h e system; d e t e r m i n a t i o n o f c r i t e r i a f o r
s i t i n g of f a c i l i t i e s ; etc.
Paragraph 3.1.3.9 "Induced Environment"
S p e c i f y g e n e r a l induced environment c o n s t r a i n t s of program
equipment. For example: "The n o i s e and v i b r a t i o n l e v e l s
a s s o c i a t e d w i t h t h e system and i t s e l e m e n t s i n r e q u i r e d
combinations s h a l l b e c o n t r o l l e d under a l l s o u r c e condi-
t i o n s and usage t o l e v e l s on t o l e r a n c e t o p e r s o n n e l ,
s t r u c t u r e , equipment, and f a c i l i t i e s a s s p e c i f i e d i n
MIL-STD- 80 3. "
Paragraph 3.1.3.10 " L i f e Support"
S p e c i f y t h e r e q u i r e m e n t s and c o n s t r a i n t s o f system and
equipment d e s i g n t o m a i n t a i n a c o n t r o l l e d h e a l t h f u l and
s a f e environment and t o p r o v i d e f o r t h e s u s t e n a n c e and
w e l f a r e of p e r s o n n e l i n a c c o m p l i s h i n g o p e r a t i o n s , mainten-
a n c e , and c o n t r o l t a s k s . S t a t e s p e c i f i c q u a n t i t a t i v e l e v e l s
and l i m i t a t i o n s t o b e c o n t r o l l e d under a l l s o u r c e c o n d i t i o n s
and usage l e v e l s of t o l e r a n c e t o p e r s o n n e l f o r s u c h i t e m s
a s : n o i s e and v i b r a t i o n ; e n v i r o n m e n t a l c o n t r o l ; composition
of atmosphere; c o n c e n t r a t i o n of noxious compounds; food and
w a t e r s u p p l y ; oxygen and w a t e r r e g e n e r a t i o n ; s a n i t a t i o n ,
p e r s o n n e l hygiene and w a t e r d i s p o s a l ; a c c e l e r a t i o n , s h o c k ,
and v i b r a t i o n ; e t c .
EXHIBIT I

Paragraph 3.2 "Program Design and Construction Standards"


Specify minimum program design and construction standards
which have general applicability to program equipment and
are applicable to major classes of equipment (e.g., space
vehicle equipment, ground equipment) or are applicable to
"particular design disciplines." "Particular design disci- ,

pline" is identified with the particular speciality of an


engineer and the kind of equipment which he designs; e.g.,
mechanical, electrical, hydraulic, etc. To the maximum
extent possible, established NASA or NASA designated mili-
tary standards and specifications shall be incorporated.
Requirements which add to, but do not conflict with,
specified requirements may be included in individual$con-
tract end item specifications. Standards may include such
items as:
a. .Selection of specifications and.standards
b. Materials, parts, and processes
c. Standard, commercial and qualified parts
d. Moisture and fungus resistance
e. Corrosion of metal parts
f. Interchangeability and replaceability
g. Workmanship
h. Electromagnetic interference
i. Identification and marking
j . Storage
k. Drawing standards
1. Coordinate system standards
Design criteria requirements limited to specific disciplines
may be listed under the following titles:
a. Electrical
b. Mechanical
c. Hydraulic
d. Civil
e, "Other Disciplines", etc.
EXHIBIT I

P a r a g r a p h 3 . 3 " R e q u i r e m e n t s f o r Program E l e m e n t s "

I n c l u d e t h e r e q u i r e m e n t s f o r e a c h e l e m e n t o f t h e program.
Defined requirements f o r a n element s h a l l i n c l u d e a d i s -
c r e t e package o f performance r e q u i r e m e n t s , f u n c t i o n a l
i n t e r f a c e s and c o n t r a c t end i t e m s a l l o c a t e d t o one indus-
t r i a l o r NASA o r g a n i z a t i o n d i r e c t l y r e s p o n s i b l e f o r t h a t
e l e m e n t . An e l e m e n t may i n c l u d e u n r e l a t e d i t e m s o f e q u i p -
ment where a l l o c a t i o n s a r e made t o t a k e a d v a n t a g e o f
s p e c i a l c a p a b i l i t i e s e x i s t i n g i n o n e o r g a n i z a t i o n . The
p r i n i c p a l p u r p o s e o f program e l e m e n t s i s t o s p e c i f y a n d
f i x r e s p o n s i b i l i t i e s f o r program p e r f o r m a n c e . They s h a l l
be s o selected t h a t functional requirements p e c u l i a r t o
e a c h e l e m e n t and t h e f u n c t i o n a l i n t e r f a c e s b e t w e e n e l e m e n t s
c a n b e s p e c i f i e d . The r e q u i r e m e n t s s p e c - i f i e d i n p a r a g r a p h
3 . 2 , and s u b p a r a g r a p h s t h e r e t o , a r e common t o a l l e l e m e n t s
and s h a l l n o t b e a l l o c a t e d t o i n d i v i d u a l e l e m e n t s . R e q u i r e -
ments s p e c i f i e d i n paragraph 3 . 1 , and s u b p a r a g r a p h s t h e r e t o ,
s h a l l b e a l l o c a t e d t o a s i n g l e e l e m e n t o r a l l o c a t e d among
t h e elements.

Paragraph 3.3.1 'Requirements f o r Program E l e m e n t A"

The t i t l e o f t h i s p a r a g r a p h s h a l l i n c l u d e t h e name o f t h e
program e l e m e n t . Specify, i n appropriate subparagraphs,
t h e p e r f o r m a n c e r e q u i r e m e n t s f o r e a c h f u n c t i o n a l a r e a of t h e
e l e m e n t , e . g . , s t r u c t u r e , p r o p u l s i o n , g u i d a n c e and n a v i g a t i o n ,
e t c . These i n c l u d e r e q u i r e m e n t s a l l o c a t e d and/or budgeted
from p a r a g r a p h 3 . 1 a s w e l l a s r e q u i r e m e n t s which are p e c u l i a r
t o t h e element and cannot be r e f e r e n c e d d i r e c t l y t o r e q u i r e -
ments s p e c i f i e d i n p a r a g r a p h 3 . 1 . The i n t e r f a c e s o f t h e
element being s p e c i f i e d w i t h o t h e r elements s h a l l be s t a t e d .
I n t e r f a c e s s h a l l b e s p e c i f i e d t o t h e l e v e l o f d e t a i l neces-
s a r y t o p e r m i t c o n c u r r e n t and m u t u a l l y compatible d e s i g n
and d e v e l o p m e n t o f a l l e l e m e n t s . ( S e e 3 . 3 . 1 Example A . )

( F o r p r o j e c t / s y s t e m s s p e c i f i c a t i o n s o n l y a s e p a r a t e sub-
paragraph s h a l l r e f e r e n c e a l i s t of a l l c o n t r a c t end i t e m s
included i n t h e project/system.)

Paragraph 4.0, " Q u a l i t y Assurance"

R e q u i r e m e n t s f o r f o r m a l t e s t / v e r i f i c a t i o n of program p e r -
formance and d e s i g n c h a r a c t e r i s t i c s and o p e r a b i l i t y s h a l l b e
s p e c i f i e d . R e q u i r e m e n t s may b e i n c o r p o r a t e d by r e f e r e n c e t o
s u c h documents a s t h e A p o l l o T e s t R e q u i r e m e n t s , t h e A p o l l o
R e l i a b i l i t y and Q u a l i t y A s s u r a n c e Program P l a n and o t h e r
NASA t e s t and r e l i a b i l i t y p u b l i c a t i o n s . The c o n t e n t o f
t h i s s e c t i o n i s l i m i t e d t o t h e s p e c i f i c a t i o n of t e s t
r e q u i r e m e n t s and s h a l l n o t i n c o r p o r a t e , e i t h e r d i r e c t l y o r
by r e f e r e n c e , d e t a i l t e s t p l a n n i n g documents and i n s t r u c t i o n s .
EXHIBIT I

Test requirements shall include engineering evaluation and


test requirements which necessitate integrated project and
system testing in direct support of design and development
activity. Test requirements with respect to program relia-
bility shall be detailed as well as test requirements for
formal qualification of program equipment.
Requirements shali be specified to the level of detail
which:
a. Specifies a verification requirement and the method
for verifying such performance requirement specified
in paragraph 3.1.1 and 3.1.3. Tests/verifications to
demonstrate that requirements specified in paragraphs 3.2
and 3.3 have been met shall be added only upon specific
direction of the.procuring agency. Tests/verifications to
demonstrate compliance with requirements which are con-
tained in Section 4 of Part I of individual contract
end item specifications shall be added only at the
specific direction of the procuring agency.
b. Permits ready identification of each verification
requirement specified in Section 4 with the appro-
priate performance requirement in Section 3.
c. Specifies each requirement for verification to the
level of detail necessary to establish the scope
and accuracy of the test method.
Preparation of Seetion 5, "Preparation for Delivery"
Specify requirements for the preparation of equipment for
delivery which are peculiar to the program and are other
than standard practice. It shall include specific instruc-
tions to include such non-standard practice in appropriate
end item specifications. It may impose requirements to
comply with standard practice by referencing appropriate
NASA and military specifications and standards to be used
as the basis for preparing Section 5 of each contract end
item specification.
Preparation of Section 6, "Notes"
Any information pertinent to the program which should be
made known as background information shall be stated.
EXHIBIT I

Preparation of Section 10, "Appendix"


The Appendix or Appendices shall contain requirements which
are a part of the specification but which, for convenience
in specification maintenance, are incorporated as an
Appendix, e.g., requirements of a temporary nature or of
limited effectivity. Appendices may be bound as separate
documents for convenience of handling, e.g., when only a
few parameters of the system are classified, an appendix
containing only the classified material may be established.
Where parameters are placed in the appendix, the paragraph
of Section 10.0 shall be referenced in the main body of the
cognizant specification in the place where the parameter
would normally have been specified.
EXHIBIT I

EXAMPLE "A"

Specification No.
Dated

PERFORMANCE AND D E S I G N REQUIREMENTS S P E C I F I C A T I O N


FOR THE
( A p p r o v e d Name) /APOLLO PROGRAM

A p p r o v e d By A p p r o v e d By
(Preparing Activity) (NASA O f f i c e )

Date Date

C o n t r a c t Number
EXHIBIT I

EXAMPLE "A"

S p e c i f i c a t i o n No.
Dated
Page 1
SCOPE

T h i s s p e c i f i c a t i o n d e f i n e s t h e p e r f o r m a n c e , d e s i g n and t e s t
r e q u i r e m e n t s f o r t h e A p o l l o Program a s d e f i n e d by t h e A p o l l o
Program Development P l a n . A 1 1 e l e m e n t s and c o n t r a c t end
i t e m s of t h e A p o l l o Program s h a l l conform w i t h t h e s e r e q u i r e -
ments. A l l r e q u i r e m e n t s s h a l l b e f u l l y r e f l e c t e d i n sub-
s i d i a r y Apollo s p e c i f i c a t i o n s .

2. APPLICABLE DOCUMENTS

The f o l l o w i n g documents, of t h e e x a c t i s s u e shown, f o r m a


p a r t of t h i s s p e c i f i c a t i o n t o t h e e x t e n t s p e c i f i e d h e r e i n .
I n t h e e v e n t of c o n f l i c t between documents r e f e r e n c e d and
t h e c o n t e n t of t h i s s p e c i f i c a t i o n , t h e c o n t e n t o f t h i s
s p e c i f i c a t i o n s h a l l t a k e precedence.

SPECIFICATIONS
Federal
Military
Contractor

STANDARDS
Federal
Military
Contractor

DRAWINGS

BULLETINS

OTHER PUBLICATIONS
Manuals
Regulations
Handbooks
E t c . (Copies o f s p e c i f i c a t i o n s , s t a n d a r d s , d r a w i n g s ,
and p u b l i c a t i o n s r e q u i r e d by s u p p l i e r s i n con-
n e c t i o n w i t h s p e c i f i c procurement f u n c t i o n s
s h o u l d b e o b t a i n e d from t h e p r o c u r i n g a c t i v i t y
o r a s d i r e c t e d by t h e c o n t r a c t i n g o f f i c e r . )
EXHIBIT I

EXAMPLE "A1'

Specification No.
Dated
Page 2
3. REQUIREMENTS
3.1 Performance
3.1.1 characteristics
3.1.1.1 Mission Performance
3.1.1.2 Logistics
3.1.1.3 Personnel and Training
3.1.2 Program Definition
3.1.2.1 Systems Engineering ~ocumentation
3.1.2.2 Program Element List
3.1.2.3 Contract End Item List (Project
and Systems Specifications only)
3.1.3 Operability
3.1.3.1 Reliability
3.1.3.2 Maintainability
3.1.3.3 Useful Life
3.1.3.4 Natural Environment
3.1.3.5 ran sport ability
3.1.3.6 Human Performance
3.1.3.7 Safety
3.1.3.8 Dangerous Materials and Components
3.1.3.9 Induced Environment
3.1.3.10 Life Support
EXHIBIT I

EXAMPLE "A"

S ~ e c i f i c a t i o nNo.
~ a t e d
Page 3
3.2 Program D e s i g n a n d C o n s t r u c t i o n S t a n d a r d s

3.2.1 G e n e r a l R e q u i r e m e n t s ( I n numbered p a r a g r a p h s
a s appropriate)
S e l e c t i o n o f S p e c i f i c a t i o n and S t a n d a r d s

M a t e r i a l s . P a r t s and P r o c e s s e s

S t a n d a r d , Cornmerical and Q u a l i f i e d P a r t s

M o i s t u r e a n d Fungus R e s i s t a n c e

C o r r o s i o n of Metal P a r t s

-I. n t e r c h a n g e a b i l i t y and R e p l a c e a b i l i t y

Workmanship

Electromaanetic Interference

I d e n t i f i c a t i o n a n d Marking

Storage

3.3 R e a u i r e m e n t s f o r Proaram E l e m e n t s

3.3.1 (Program E l e m e n t A )

3.3.2 (Program Element B)

( R e p e a t a s n e c e s s a r y t o p r o v i d e a s e p a r a t e 3.3.X
p a r a g r a p h f o r e a c h Program E l e m e n t )

4. QUALITY ASSURANCE

5- PREPARATION FOR DELIYERY


6. NOTES

7. APPENDICES
4
UOUO

-3 - .*
C
a
C

% .
t r
I I s

SATURN ID U M NV
C
SATURN
ID v
SATURN uuwn uuKn SPACE~AFT
SUPPORT SUPPaT

S-IC 5-11 S-IVB I.U. CUM " GbN LEM

.
I 3
I

w- SATURN I not 1nc1ud.d.


z
.,?.
SAMPLE SPECIFICASION TREE
FIGURE 1

t i
u . I
EXHIBIT I1

PREPARATION OF CONTRACT END ITEM


DETAIL SPECIFICATION
(PRIME EQUIPMENT)
EXHIBIT I1

PREPARATION OF CONTRACT END ITEM


DETAIL SPECIFICATION
(PRIME EQUIPMENT)

CONTENTS

Paragraph Page

1. PURPOSE.................. ....................11-1
2. SCOPE .........................................
11-1
3. APPLICABILITY................................II-2

4. REFERENCE DOCUMENTS.......... ................11-2


5. EXPLANATION OF TERMS.........................11-3
6. PROCEDURAL REQUIREMENTS......................11-3

FORMATS AND ILLUSTRATIONS

Sample Format "A", CEI Specification Part I Title Page ...11-35


Sample Format "B", Part I of CEI Specification Outline ...11-36/39
Sample Format "C", CEI Specification Part I1 Title Page..II-40
Sample Format "D", Part I1 of SEI Specification ..........11-41/43
Sample Format "En, Addendum Notice.......................II-44
EXHIBIT I1

PREPARATION OF
CONTRACT END ITEM DETAIL SPECIFICATION
(PRIME EQUIPMENT)

1. PURPOSE

T h i s E x h i b i t p r o v i d e s NASA Apollo o r g a n i z a t i o n s and


c o n t r a c t o r s w i t h r e q u i r e m e n t s and guidance f o r t h e
p r e p a r a t i o n of t h e d e t a i l s p e c i f i c a t i o n f o r each
C o n t r a c t End Item (CEI) and f o r t h e addenda t h e r e t o .

2. SCOPE

These i n s t r u c t i o n s d e f i n e t h e c o n t e n t and- f o r m a t f o r
each o f t h e two p a r t s of t h e C o n t r a c t End I t e m D e t a i l
S p e c i f i c a t i o n (Prime Equipment). Also i n c l u d e d a r e
i n s t r u c t i o n s f o r t h e p r e p a r a t i o n of addenda t o t h e
CEI S p e c i f i c a t i o n.
2.1 CEI Specification

Each CEI S p e c i f i c a t i o n i s made up of two p a r t s :

Part I - Performance and Design Requirements:


This P a r t o f t h e CEI S ~ e c i f i c a t i o n
s h a l l be used t o s p e c i i y requirements
p e c u l i a r t o t h e d e s i g n , development,
t e s t , and q u a l i f i c a t i o n o f t h e c o n t r a c t
end i t e m .

P a r t 11- P r o d u c t C o n f i g u r a t i o n Requirements:
T h i s P a r t of t h e C E I S p e c i f i c a t i o n
s h a l l be used t o s p e c i f y e x a c t
configuration information p e c u l i a r
t o the production, q u a l i t y control,
a c c e p t a n c e t e s t i n g , and p r e p a r a t i o n f o r
d e l i v e r y o f each c o n t r a c t end
item.

2.2 S p e c i f i c a t i o n Addenda

An addendum t o a C E I S p e c i f i c a t i o n i s a " s h o r t form"


s p e c i f i c a t i o n t o e s t a b l i s h r e q u i r e m e n t s f o r a new
end i t e m , which i n terms of performance, d e s i g n and
c o n s t r u c t i o n i s s o much l i k e an e x i s t i n g CEI t h a t
it i s p r a c t i c a l t o r e s t r i c t d e s i g n and development
t o a "make from" b a s i s .

For f i l i n g and d i s t r i b u t i o n , an addendum s p e c i f i c a t i o n


must always be accompanied by a copy of t h e s p e c i f i c a -
t i o n t o which it r e l a t e s . See sample f o r m a t "En.
EXHIBIT I1
3. APPLICABILITY
A Contract End Item Detail Specification (Prime Equipment)
shall be prepared for each equipment or system designated
as a deliverable contract end item , which cannot be spec-
ified using the simplified formats for: (1) the Identifica-
tion Specification (see Exhibit IV), or (2) the Requirements
Specification (see Exhibit V). This Exhibit is applicable
to development/activation prime support equipment, e.g.,
test site support equipment, equipment instrumentation
and range instrumentation packages, site activation test
and checkout equipment, and Direct Support - Real Property
Installed Equipment (DS-RPIE). This Exhibit is not
applicable to contract end items which are facilities.
CEI Specifications shall be compatible with the Program
and other performance Specifications of Exhibit I.
4. REFERENCE DOCUMENTS
AFM 71-4 29 May 1968 "Packaging and Handling of
. . Dangerous Materials for
Transporting by Military
Aircraft"
DSM 4120.3-M 1 April 1966 "Standardization Policies,
Procedures and Instructions"
Exhibit X "Requirements for Configur-
ation Identification Numbers"
MIL-D-1000 1 March 1965 "Drawings, Engineering and
Associated LTststQ
10 October 1960 "Interchangeability and Replace-
ability of Component Parts
for Aircraft and Missiles"
1 November 1965 "Preservation, Methods of"

1 October 1967 "Engineering Drawing Practices"


28 December 1964 "Marking for Shipment and
Storage"

NHB 5300-4 (1B) April 1969 "Quality Provisions for Aero-


nautical and Space System
Contractorsn

NHB 8080.1 May 1964 "Apollo Test ~equirements"

NPC 200-3 April 1962 "Inspection Systems Provisions


for Suppliers of Space Mater-
ials, Parts, Components and
Services"
NPC 250-1 30 July 1963 "Reliabi.lity-P T O Pr~~i;s2ons
~ ~ ~
for Space Systems Contractors"
EXHIBIT I1

5. EXPLANATION OF TERMS

(See Exhibit XVII.)


6. PROCEDURAL REQUIREMENTS
6.1 Contract End Item Detail Specification
The CEI Specification specifies requirements for a single
CEI type-model-series. The CEI Specification is composed
of two distinct parts, each of which has a different use
in the contractual control of CEI acquisition. Each of
the two parts, when prepared in compliance with these in-
structions, is complete in content and format with respect
to its intended use. The CEI Specification is controlled
and accounted as an entity, using a single configuration
chart and a single specification change log (see Exhibit
VII). Part I is a product of a program definition phase
or requirements analysis and is the engineering instru-
ment used to contract for design and development of the
CEI. Contractor compliance with Part I is determined by
evaluation of qualification, reliability and other test
records. Part I1 of the CEI Specification is a product
of the design and development contract. Part I1 specifies
the CEI in terms of the detail product configuration require-
ments~£the item qualified (or to be qualified) under the
terms and conditions of the design and development contract.
The integrity of Part I1 must be established prior to
its acceptance by NASA.
Acceptance of equipment by Part I1 of the specification is
dependent upon the accuracy with which it specifies detail
configuration requirements of the qualified (or to be qual-
ified) CEI, and the adequacy of quality assurance require-
ments established to control the quality of each individual
unit of the CEI to be produced. The integrity of Part I1
is established -by review. The review (First Article Con-
figuration Inspection - FACI) is accomplished by cross-
comparison of the data specified in Part I1 with qualifi-
cation, reliability and other test records; and with the
configuration fabricated as the first unit to be accepted.
The configuration qualified (or to be qualified) under the
terms and conditions of the design and development contract
shall be clearly identifiable with the configuration spec-
ified in Part 11. Part I1 must be identical to the actual
configuration of the article to undergo FACI. Part I1 is
established as the valid engineering instrument to be im-
plemented contractually for direct control of the CEI.
Contractor compliance shall be determined by normal quality
control procedures. The FACI article and all subsequent
deliveries shall be accepted in accordance with Part I1 of
the Contract End Item Specification. These requirements
shall take precedence over any other requirements for ac-
ceptance which may also apply and be in conflict. For
instructions on the preparation of computer program CEI
Specifications see Exhibit XVIII.
EXHIBIT I1
e&den&a .to Contract Eric% 'Item De.ta'i
1 Speci'fi'ca't'i'ons
Origination of an addendum to a CEI detail specification
creates in effect a new specification. It is used when an
item to be designed and developed is so like an existing
CEI that it is desirable to restrict design activity to
the same criteria with additions/deletions. An addendum
changes a basic CEI detail specification by adding or dele-
ting requirements on a paragraph-by-paragraph basis. Addenda
shall be identified with a specific issue of a basic specifi-
cation. The specification so created (basic specification
plus addenda) then becomes controlled and maintained as a
separate and distinct specification, to be updated and re-
vised as necessary.
6.3 Detail Instructions for the Preparat'idn o'f C0ntra'c.t'End
Item Detai'l Speci'£'~cation~;
Parr'tI
The following instructional paragraphs are numbered or other-
wise identified to refer directly to the sample formats at-
tached. The sample formats are:
Sample Format "A" - CEI Specification Part I Title Page
Sample Format "B" - Part I of CEI Specification
General deviations from the requirements of this instruction
require prior approval of theprocuring agency. Each CEI
detail specification which deviates from the general require-
ments of this instruction shall.cite, in Section 10, "Appendix",
the procuring agency instrument authorizing the deviation.
"Title Page" - The title page shall conform to
- sample format
"A", and include the following information.
"Specification Number" An identifier unique to this
CEI. (See Exhibit XI
" Revision Identification" Sequentially assigned character(s)
to uniquely identify each re-
vision of the specification.
"Release Date" Date formally released by the
preparing agency.
"CEI Number" Contract End Item Number
(See Exhibit XI
"Approved Nomenclature" In accordance with Exhibit XI
and standard practice.
"Project and/or System List the project and/or system
Identification" or systems which the CEI is de-
signed to support. For CEI's
EXHIBIT I1

which cannot be identified


with specific systems enter
the phrase, "Not System
Equipment".
"Approval Block" The preparing activity (with
contract number) and the NASA
office with engineering respon-
sibility for the CEI shall vali-
date the specification (Center
Project Office or equivalent).
The title page shall be followed by introductory material
as appropriate, including the End Item Configuration Chart
and Specification Change Log. Such introductory material
shall be followed immediately by Part I of the specification.
Section 1, "Scope" - Begin with the opening sentence/
paragraph as shown in sample format "B". Subsequent
sentence/paragraphs, as indicated by sample format "B",
shall briefly describe the intended general use of the
CEI without direct reference to the system or equipment
to which it is related. Material included may be des-
criptive, qualitative and/or quantitative. The primary
output or use, as well as the primary input or operator
requirements of the CEI, shall be included.
Section 2, "Applicable Documents" - Begin with the lead
phrase contained in sample format "B". List those docu-
ments (specifications, standards.,drawings, bulletins,
manuals, etc.), which are applicable to paragraphs within
the body of the specification. Within the body of the
specification, reference to those documents shall be by
basic document number and/or other applicable designation.
Refer to Defense Standardization Manual 4120.3-M for
further instructions on listing of applicable documents.
Section 3, "Requirements" - Specify performance and
desiqn requirements for the CEI. Include the functional
requirements for the CEI and establish requirements
which are measures of the efficiency/effectivities of
the CEI. Define the CEI and specify design constraints
and standards necessary to assure compatibility of the
CEI with the total program project or system. For CEI's
which directly support a program, project(s) or system(s),
performance and design requirements are allocated from,
identical with, or in recognition of, requirements estab-
lished by the program, project, or system specification.
When "system engineering" procedures are a part of the
contract, the requirements appearing in this Section
shall be based on the "system engineering" documentation
developed as a result of "system engineering" procedures.
Quantitative requirements shall be included within the
principal sub-paragraphs.
EXHIBIT I1

NOTE: Referring s p e c i f i c a l l y t o C E I ' s


which s u p p o r t a p r o j e c t ( s ) o r
system(s1 , it nay be d e s i r a b l e
o r necessary t o e s t a b l i s h re-
quirements f o r performance,
d e s i g n , and c o n s t r u c t i o n which
exceed minimum requirements
imposed by t h e program. When
such u p r a t e d requirements a r e
e s t a b l i s h e d , they s h a l l c l e a r l y
be i d e n t i f i e d a s u p r a t e d r e q u i r e - .
ments. The r e l a t i o n s h i p between
t h e u p r a t e d requirements and
minimum requirements necessary
f o r t h e program c0.mpatibility s h a l l
be i n c l u d e d i n P a r t I , S e c t i o n
6 , " ~ o t e s " ,t o g e t h e r w i t h t h e r e a s o n s
theref or.
Paragraph 3.1, "Performance" - Specify C E I
performance i n terms of f u n c t i o n a l reauirements.
I n c l u d e requirements which e s t a b l i s h h e
e f fi ciency/ef f e c t i v e n e s s of t h e C E I . Re-
quirements s h a l l be s p e c i f i e d t o t h e l e v e l of
d e t a i l necessary t o e s t a b l i s h l i m i t s f o r de-
sign.
Paragraph 3.1.1, "Performance C h a r a c t e r i s t i c s " -
Specify t h e l i m i t i n g functional c h a r a c t e r i s t i c s
o? the- c o n t r a c t endcitem. This i n c l u d e s per-
formance c h a r a c t e r i s t i c s which a r e e s t a b l i s h e d
by, and a r e t h e p r o d u c t of a n a l y s i s , a s w e l l
a s performance c h a r a c t e r i s t i c s which a r e de-
termined by d e s i g n . D e s c r i p t i v e and i n t r o d u c t o r y
m a t e r i a l may be i n c l u d e d . Q u a n t i t a t i v e requirements
s h a l l be s p e c i f i e d i n t h e subparagraphs.
Paragraph 3.1.1.1, "Primary Performance C h a r a c t e r i s t i c s "
Specify t h e primary performance c h a r a c t e r i s t i c s of
t h e C E I . These requirements a r e t h e p r o d u c t of
a n a l y s i s , s t a t e d i n terms which do n o t p r e - s e l e c t
design s o l u t i o n s . Primary performance c h a r a c t e r i s t i c s
a r e t h e l i m i t i n g performance parameters which must
be s p e c i f i e d t o c o n s t r a i n design w i t h i n requirements
e s t a b l i s h e d by primary mission/use of t h e C E I , e : g . ,
f o r s p a c e c r a f t , t h i s could i n c l u d e l i m i t i n g mission
p r o f i l e s , e t c . ; f o r an e n g i n e , t h i s could i n c l u d e
t h r u s t , t h r u s t t o weight r a t i c , e t c . Requirements
s h a l l be s t a t e d i n q u a n t i t a t i v e terms, w i t h
t o l e r a n c e s , using s t a n d a r d , measurable p r o p e r t i e s
of t h e C E I i t s e l f .
EXHIBIT I1

Paragraph 3.1.1.1, "Secondary Performance


C h a r a c t e r i s t L c s " - Specify t h e secondary
performance c h a r a c t e r i s t i c s of t h e C E I .
These c h a r a c t e r i s t i c s g e n e r a l l y pre-suppose,
o r a r e recorded a f t e r , a b a s i c d e s i g n approach
h a s been e s t a b l i s h e d , and i n t h i s s e n s e a r e
a product of t h e design process. Secondary
performance c h a r a c t e r i s t i c s a r e t h o s e
parameters which a r e n o t n e c e s s a r i l y mission/
use c r i t i c a l , b u t which may be s p e c i f i e d t o
p r o p e r l y c o n s t r a i n complete .design of t h e CEI,
e . g . , f o r a s p a c e c r a f t , t h i s could i n c l u d e
such t h i n g s a s v a r i o u s emergency o p e r a t i o n
' c h a r a c t e r i s t i c s , e t c . ; f o r an e n g i n e , t h i s
could i n c l u d e maximum continuous o p e r a t i n g
time a t emergency r a t e d power, e t c . Requirements
s h a l l be s t a t e d i n q u a n t i t a t i v e terms, with
t o l e r a n c e s , u s i n g s t a n d a r d , measurable p r o p e r t i e s
of the CEI i t s e l f .
Paragraph 3.1.2, " O p e r a b i l i t y r ' - Specify o p e r a b i l i t y
requirements, i n c l u d i n g r e l i a b i l i t y , m a i n t a i n a b i l i t y ,
transportability, e t c . , as well a s a b i l i t y t o
o p e r a t e i n t h e n a t u r a l and enforced environments,
human performance f e a t u r e s , s a f e t y f e a t u r e s , e t c .
For C E I s which d i r e c t l y s u p p o r t a p r o j e c t ( s ) o r
system(s) , o p e r a b i l i t y requirementsare a l l o c a t e d
from, i d e n t i c a l w i t h , o r i n r e c o g n i t i o n o f , r e -
quirements e s t a b l i s h e d by t h e program s p e c i f i c a t i o n .
To t h e e x t e n t p r a c t i c a l , such requirements s h a l l
be i n c o r p o r a t e d by r e f e r e n c e t o t h e program
s p e c i f i c a t i o n and program documentation.
Q u a n t i t a t i v e requirements s h a l l be s p e c i f i e d i n
subparagraphs.
Paragraph 3.1.2.1, " R e l i a b i l i t y " - S p e c i f y
r e l i a b i l i t y , i n q u a n t i t a t i v e terms, w i t h t o l e r a n c e s ,
such a s mean t i m e t o f a i l u r e based on t h e system
r e l i a b i l i t y measure. A l l measures w i l l i n c l u d e
t h e d e f i n i t i o n of s u c c e s s p r o b a b i l i t y a t a s t a t e d
confidence l e v e l , and time p e r i o d s n e c e s s a r y f o r
complete demonstration of r e l i a b i l i t y r e q ~ i r e ~ n e n t s .
Paragraph- Specify
m a i n t a i n a b i l i t y requirements i n q u a n t i t a t i v e
. .
terms, with t o l e r & c e s , e g , mean time t o
r e p a i r ; maintenance man-hours p e r o p e r a t i o n
hour; e t c . I n c l u d e , where a p p l i c a b l e , ground
and a i r b o r n e maintenance c o n c e p t s , maintenance
and r e p a i r c y c l e s and s e r v i c e and a c c e s s r e -
quirements.
EXHIBIT I1

Paragraph 3.1.2.3, '"UsefulLife" - Specify


useful life requirements for the CEI. Include
requirements for shelf-life as well as operating
life, and combinations thereof.
Paragraph 3.1.2.4, "Natural Environment" - Standards
of natural environment which the CEI is to withstand
shall be specified, e.g., wind loading; precipitation;
ranges in temperature; humidity; atmospheric pressure;
wind shear; vertical gust; velocities; turbulence;
etc. For CEI's which support a program, project(s),
or system(s) specification, this paragraph shall cite
the "Environmental".paragraph of the program, pro-
ject (s) or system (s) specification, amending it for
application to this CEI. For CEI's which require an
artificial environment at all times, this paragraph
shall be marked "Not applicable -- This CEI requires
a controlled environment at all times."
Paragraph 3.1.2.5, "Transportability" - Requirements
peculiar to transportability shall be specified. Re-
quirements peculiar to "transport mode" specified in
paragraph 3.2.1.2, "Detailed Interface Definition",
shall not be redundantly specified. Specify also re-
strictions on the maximum dimensions of weight of the
CEI as crated for shipment, and include peculiar or
unusual tie-down requirements imposed by specified
methods of transportation. If mobility is a signifi-
cant feature of the CEI, include the time, in terms of
man-hours and/or elapsed time, allocated to prepare the
CEI for transport. Also specify detail requirements
for packaging and packing for shipment wherein the
packing and packaging methods themselyes re-
quire development and qualification.
Paragraph 3.1.2.6, "Human Performance" - Human per-
formance requirements for the CEI shall be specified.
For CEI's which directly support a program, project,
or system, cite the appropriate paragraph(s1 of the
program, project or system specification which estab-
lish the human performance/human engineering require-
ments for all program equipments, and incorporate
requirements peculiar to the CEI.
-
Paragraph 3.1.2.7, "Safety" Requirements for the
CEI which must be specified to preclude or limit
hazard to personnel and/or equipment shall be
specified. To the extent practical, these
requirements shall be imposed by citing established
and recognized standards. For CEI's which directly
E X H I B I T I1

s u p p o r t a program, p r o j e c t ( s ) , o r s y s t e m ( s ) ,
c i t e the appropriate paragraph(s) of t h e
program, p r o j e c t , o r system s p e c i f i c a t i o n which
e s t a b l i s h e s program s a f e t y requirements, amending
it f o r a p p l i c a b i l i t y t o t h e CEI. L i m i t i n g
personnel s a f e t y requirements p e c u l i a r t o t h e
C E I due t o unusual hazard i n i t s manufacture,
t e s t , transport, storage, operation, o r
maintenance which a r e n o t provided by s t a n d a r d
i n d u s t r i a l and NASA p r a c t i c e s and r e g u l a t i o n s ,
and n o t provided by s a f e t y requirements imposed
by t h e program, p r o j e c t , o r system s p e c i f i c a t i o n
s h a l l be s p e c i f i e d . These hazards i n c l u d e
f lamability l i m i t s , susceptibility t o accidental
e x p l o s i o n , production of noxious o r t o x i c g a s e s ,
use o r production of hazardous chemicals, e a s e of
a c c e s s and e x i t , emergency e x i t , e t c . Equipment
s a f e t y s h a l l be s p e c i f i e d by " f a i l s a f e " o r
emergency o p e r a t i o n requirements. Include r e q u i r e -
ments f o r redundancy, i n t e r l o c k s , n o i s e and v i b r a t i o n ,
emergency and s t a n d by c i r c u i t s , and o t h e r requirements
i n t e n d e d p r i n c i p a l l y t o p r e v e n t damage t o o r
recovery of t h e C E I i t s e l f i n t h e e v e n t of
f a i l u r e o r damage.

Paragraph 3.1.2.8, "Induced Environment" -


Specify t h e l i m i t i n g induced environment c r i t e r i a
a p p l i c a b l e t o t h e CEI. To t h e e x t e n t requirements
p e c u l i a r t o n o i s e and v i b r a t i o n a r e s p e c i f i e d
i n paragraph 3.1.2.7, " S a f e t y , " they s h a l l n o t
be redundantly s p e c i f i e d . Include induced environment
r e q u i r e d f o r t r a n s p o r t a b i l i t y and s t o r a g e . For
C E I ' s which s u p p o r t a program, p r o j e c t ( s ) , o r
s y s t e m ( s ) , t h e "Induced Environment" paragraph
i n t h e program s p e c i f i c a t i o n s h a l l be c i t e d ,
amending it f o r a p p l i c a t i o n t o t h i s C E I .
Paragraph' 3.2, "CEI D e f i n i t i o n " - Specify t h e
mechanical and f u n c t i o n a l r e l a t i o n s h i p o f t h e
C E I t o o t h e r e q u i p m e n t s / f a c i l i t i e s and i d e n t i f y
i n d i v i d u a l components i n c o r p o r a t e d i n t h e C E I
which r e q u i r e i n d i v i d u a l s p e c i f i c a t i o n s .
Paragraph 3.2.1, " I n t e r f a c e Requirements" -
S ~ e c i f v ,e i t h e r d i r e c t l y o r by r e f e r e n c e ,
requirements imposed on- t h e design of t h e
C E I because of i t s f u n c t i o n a l , p h y s i c a l
and procedural r e l a t i o n s h i p s t o o t h e r
equipments/facilities. This includes
schematic arrangement d a t a which e s t a b l i s h e s
l i m i t s f o r d e t a i l d e s i g n , and i s t h e product
EXHIBIT I1

of program d e f i n i t i o n . I t a l s o i n c l u d e s
d e t a i l e d i n t e r f a c e d e f i n i t i o n , which i s
i n p a r t t h e p r o d u c t of d e s i g n and i s
developed d u r i n g t h e d e s i g n and develop-
ment phase of t h e C E I . General and/or
d e s c r i p t i v e d a t a may b e i n c l u d e d i n t h e
b a s i c paragraph. Quantitative require-
ments s h a l l be i n c o r p o r a t e d i n sub-
paragraphs.

Paragraph 3 . 2 . 1 . 1 , "Schematic Arrangement" -


The r e l a t i o n s h i p of t h e CEI t o o t h e r equipments/
f a c i l i t i e s w i t h which it must i n t e r f a c e , s h a l l
be g r a p h i c a l l y p o r t r a y e d . I n c o r p o r a t e , wether
d i r e c t l y o r by r e f e r e n c e , a schematic diagram,
inboard p r o f i l e , o r equivalent engineering
drawing of t h e CEI. The g r a p h i c p o r t r a y a l of t h e
C E I s h a l l be accomplished t o t h e l e v e l of d e t a i l
n e c e s s a r y t o i d e n t i f y t h e e x i s t e n c e of p h y s i c a l
i n t e r f a c e s between t h e C E I and o t h e r i d e n t i f i e d
e q u i p m e n t s / f a c i l i t i e s and t h e n a t u r e of t h e
i n t e r f a c e , e . g . , mechanical, h y d r a u l i c , e l e c t r i c a l ,
etc.

Paragraph 3.2.1.2, " D e t a i l e d I n t e r f a c e D e f i n i t i o n u -


S p e c i f y i n q u a n t i t a t i v e terms w i t h t o l e r a n c e s , t h e
mechanical, f u n c t i o n a l , and p r o c e d u r a l r e l a t i o n s h i p
o f t h e C E I t o i n t e r f a c i n g equipment and f a c i l i t i e s ,
t o t h e l e v e l of d e t a i l n e c e s s a r y t o p e r m i t d e t a i l
d e s i g n . Mechanical r e l a t i o n s h i p of t h e CEI t o
i n t e r f a c i n g e q u i p m e n t / f a c i l i t i e s s h a l l be e x p r e s s e d
i n terms of dimensions, w i t h t o l e r a n c e s of t h e CEI
and r e l a t e d e q u i p m e n t / f a c i l i t i e s , a t t h e p o i n t ( s ) of
c o n t a c t , r e f e r e n c e d t o a common datum p l a n e o r
point. The means of mechanical c o n n e c t i o n s h a l l be
s p e c i f i e d , e . g . , b o l t c i r c l e ; t o g g l e clamp; mounting
pad; e t c . ,Tolerances s h a l l be e s t a b l i s h e d t o p e r m i t
t h e w i d e s t p r a c t i c a l l a t i t u d e i n manufacture w h i l e
m a i n t a i n i n g t h e e n g i n e e r i n g i n t e g r i t y of t h e C E I .
F u n c t i o n a l i n t e r f a c e s s h a l l s ~ e c i f yt h e i n p u t / o u t p u t
requirements of t h e CEI i n terms of v o l t a g e s ,
p r e s s u r e s , a c c e l e r a t i o n s , l i m i t i n g temperature
r a n g e s , thermal shock l i m i t a t i o n s , l o a d s , p u r i t y
requirements f o r c h e m i c a l s , e t c . They may b e t h e
r e s u l t of d i r e c t mechanical i n t e r c o n n e c t of t h e C E I
t o o t h e r e q u i p m e n t s / f a c i l f t i e s , o r t h e y may be t h e
r e s u l t of performance r e l a t i o n s h i p , e . g . , a u t o - p i l o t
g a i n and space v e h i c l e bending modes, l g n i t i o n
response and s p a c e v e h i c l e p i t c h and r o l l r a t e s , e t c .
( i n c i r c u m s t a n c e s where t h e r e a r e d i s t i n c t modes
f o r equipment, e . g . , ' s t o r a g e mode, checkout mode, t r a n s -
p o r t mode, o p e r a t i o n a l mode, emergency modes, etc.,
and t h e f u n c t i o n a l i n t e r f a c e s d i f f e r w i t h t h e change i n
mode, t h e r e q u i r e m e n t s s h a l l be s p e c i f i e d i n a manner
EXHIBIT I1

to be clearly identifiable with each mode.) Toler-


ancesestablished for functional interfaces shall be
as broad as practical to permit use of unsophisticated
equipment while maintaining the engineering integrity
of the CEI. Incorporate, either directly or by
reference, interface control drawings and/or other
engineering documentation necessary to specify
the mechanical and functional interfaces of the
CEI with other equipment/facilities. .
Paragraph 3.2.2, "Component Identification" -
Identify components, or component equivalent
items, incorporated in the CEI which, because
of their engineering or supply significance, must
be individually specified. List these items within
the categories-established and defined in sub-
paragraphs. The terms " component" and "property",
include mechanical assemblies such as motors,
drives, etc., as well as materials such as hydraulic
fluids, fuels, lubricants, bonding agents, lox,
etc., and tapes and/or decks containing computer
programs, if part of the CEI. (For instructions
on the preparation of a requirement specification
for Government-Furnished Property, see Exhibit V;
for instructions on the preparation of specifications
for components and assemblies below CEI level, see
Exhibit VI.)
Paragraph 3.2.2.1, "Government-Furnished Property
-
List"
- - List the Government-Furnished Provertv which
the CEI must be designed to incorporate. * he-.
listing shall identify the property by reference,
to its nomenclature, specification number, CEI
number and, if appropriate, its part number.
The term "Government-Furnished Property" includes
both components and materials which mu,st.be '.
incorporated into the design of the CEI.
NOTE: The GFP list is a product,of program
definition phase and shall be avail-
able prior to the acquisition (design
and development) phase.
-- Critical Corhponents
Para ra h 3.2.2.2, "Engineering
&
%
st the engineering critical components
within the CEI. Engineering critical components
shall be identified-by nomenclature, 'specificqtion
number, and, if appropriate, basic .part'.number.
Components other than those listed as engineering
critical shall be considered individually qualified,
for purposes of reprocurement to support the CEI,
upon acceptance by the procuring agency of the
CEI itself as a qualified item.
EXHIBIT I1

NOTE: The c o n t r a c t o r w i l l be r e q u i r e d t o
submit t h e s p e c i f i c a t i o n s f o r
e n g i n e e r i n g c r i t i c a l components
t o t h e p r o c u r i n g agency f o r review
and approval p r i o r t o t h e s t a r t of
q u a l i f i c a t i o n of t h e component.
The c o n t r a c t o r w i l l d e l i v e r both
t h e s p e c i f i c a t i o n and q u a l i f i c a t i o n
d a t a f o r an e n g i n e e r i n g c r i t i c a l
component t o t h e p r o c u r i n g agency
a t the t i m e of delivery of the
q u a l i f i c a t i o n d a t a f o r t h e CEI
i t s e l f . The i d e n t i f i c a t i o n o f
e n g i n e e r i n g c r i t i c a l components
i s normally accomplished d u r i n g
t h e program d e f i n i t i o n phase,
and should be a v a i l a b l e p r i o r t o
t h e design and development phase.
Paragraph 3.2.2.3, " L o g i s t i c s C r i t i c a l Components
List" - L i s t t h e l o g i s t i c s c r i t i c a l components
within the CEI . L o g i s t i c s c r i t i c a l components
s h a l l be i d e n t i f i e d - b y t h e i r nomenclatuke ,
s p e c i f i c a t i o n number and, i f a p p r o p r i a t e , p a r t
number.
NOTE: The i n d i v i d u a l s p e c i f i c a t i o n s f o r
l o g i s t i c s c r i t i c a l components w i l l
normally be d e l i v e r e d t o t h e p r o c u r i n g
agency a t t h e t i m e of d e l i v e r y of t h e
q u a l i f i c a t i o n d a t a on t h e C E I i t s e l f .
The p r o c u r i n g agency w i l l e s t a b l i s h
requirements f o r t h e s e l e c t i o n o f
l o g i s t i c s c r i t i c a l components, and f o r
t h e d e l i v e r y of s p e c i f i c a t i o n s f o r
them, a s p a r t of t h e design and develop-
ment c o n t r a c t .
This paragraph o f t h e s p e c i f i c a t i o n s h a l l be
amended t o i n c o r p o r a t e i n d i v i d u a l l o g i s t i c s
c r i t i c a l items a s they a r e i d e n t i f i e d during
t h e p r o g r e s s of design and development.
Paraqraph 3.2.3. " T e d ~ n i c a lManuals" - Reference
S e c t i o n 6 , P a r t 1 1 , which i d e n t i f i e s t h e t e c h n i c a l
manuals which can be i d e n t i f i e d with t h e CEI, and
which a r e necessary t o i t s o p e r a t i o n and maintenance.

Paragraph 3.3., "Design and C o n s t r u c t i o n " - Specify


design and c o n s t r u c t i o n requirements f o r t h e C E I .
his-includes both g e n e r a l -design f e a t u r e s , e . g. ,
dimensions and weight, a s w e l l a s d e t a i l s t a n d a r d s
and s p e c i f i c a t i o n s , which must be s a t i s f i e d by t h e
design and c o n s t r u c t i o n of t h e C E I . To t h e maximum
EXHIBIT I1

extent possible, requirements included,


other than those included in paragraph
3.3.1, shall be specified by reference to
established NASA or NASA-designated military
standards and specifications. Descriptive
material may be included in the basic
paragraph. For CEI's which directly support
a program, a project(s) or system(s), the
content of subparagraphs, with the exception
of paragraph 3.3.1, represents recognition of a
requirement established within the program,
project, or system specification. The appro-
priate paragraphs of the program, project, or
system specification shall be referenced, and
amended for applicability to the CEI. Intro-
ductory requirements specified in subparagraphs
shall include, but not be limited to, the
following:
Paragraph 3.3.1, "General Design Features" -
Specify design features and physical
characteristics of the CEI, e . g . , size,weight,
shape, individual critical dimensions, etc.
Requirements speci'fied may be descriptive, e.g.,
"access panels shall not be designed to carry
primary structural loads," or expressed in
quantitative terms, e-g., "the nominal diameter
of the command module shall not exceed 13 feet."
Requirements shall normally be verifiable by
inspection of the CEI. Arrangement drawings,
three-view drawings, list drawings, and equivalent
engineering documentation may be incorporated
either directly or by reference.
Paragraph 3.3..2, "Selection of Specifications
and Standards"
- - .-~ -~
-.
- Svecifv
~ a
- -
reauirements.. criteria.
- 2
~~ -

and constraints pertinent to the selection and


- - -

impcsition of NASA, Federal, military and


contractor specifications and standards, e.g.,
"all standards or specifications, other than
those-established and approved for use by NASA
must be approved by the procuring agency prior
to incorporation into the C E I specification."
For a list of specifications and standards,
see Federal Supply Classification Listing of DOD
Standardization Documents or NASA equivalent.
For use of specifications and standards, see DOD
Manual 4120.3-M. For selection and preparation of
drawings use MIL-D-1000 with NASA Drawin? Specifi-
cation Cover Sheet, and MIL-STD-100. Form 1, 2 or
3 drawings in accordance with MIL-D-1000 shall be
specified by the procuring agency.
EXHIBIT I1

P a r a g r a p h 3.3.3, " M a t e r i a l s , P a r t s , and


-
Proc.e'ssesW S p e c i f y r e q u i r e m e n t s f o r , o r p r o h i b i t
t h e u s e o f , i n d i v i d u a l and/or t y p e s o f m a t e r i a l s ,
p a r t s and p r o c e s s e s . ~ a t e r i a l s ip- a r t s and
processes included i n t h i s paragraph s h a l l be
i d e n t i f i e d by r e f e r e n c e t o p e r t i n e n t s p e c i f i c a t i o n s .

Paragraph 3.3.4, " S t a n d a r d and Commercial P a r t s " -


Specify requirements p e r t i n e n t t o t h e use of
s t a n d a r d and commercial p a r t s .

P a r a g r a p h 3.3.5, "Moisture and Fungus R e s i s t a n c e " -


S p e c i f y m o i s t u r e and fungus r e s i s t a n c e r e q u i r e m e n t s .

Paragraph 3.3.6, " C o r r o s i o n of Metal P a r t s " -


Specify requirements f o r t h e use of p r o t e c t i v e
c o a t i n g s , and o t h e r c o r r o s i o n c o n t r o l r e q u i r e m e n t s .
Whenever d i s s i m i l a r m e t a l s a r e i n d i r e c t c o n t a c t ,
t h e method f o r c o n t r o l l i n g e l e c t r o l y t i c c o r r o s i o n
s h a l l be s p e c i f i e d .

Paragraph 3.3.7, " I n t e r c h a n g e a b i l i t y and R e -


p l a c e a b i l i t y " - Specify requirements f o r
components, a s s e m b l i e s and p a r t s of t h e C E I
t o be i n t e r c h a n g e a b l e and r e p l a c e a b l e .
Requirements a r e f o r t h e p u r p o s e of e s t a b l i s h -
i n g a c o n d i t i o n of d e s i g n , and a r e n o t t o d e f i n e
t h e c o n d i t i o n s of i n t e r c h a n g e a b i l i t y t h a t a r e
r e q u i r e d by t h e assignment o f p a r t numbers.
For example, " a l l a c c e s s p l a t e s f o r t h e space-
c r a f t s h a l l be d e s i g n e d t o b e r e a d i l y removed
and r e p l a c e d by q u i c k d i s c o n n e c t s , and s h a l l
be i n t e r c h a n g e a b l e w i t h i n a t y p e , model, series
of t h e s p a c e c r a f t t o t h e e x t e n t r e q u i r e d by
MIL-1-8500. "

Paragraph 3 . 3 . 8 , "Workmanship" - S p e c i f y t h e
g e n e r a l r e q u i r e m e n t s f o r workmanship i n c i d e n t
t o . f a b r i c a t i o n of t h e C E I . These r e q u i r e m e n t s
s h a l l make t h e i n f o r m a t i o n a v a i l a b l e t o t h e
d e s i g n e r s o t h a t it w i l l be p r o p e r l y c a l l e d
o u t on drawings and o t h e r e n g i n e e r i n g documentation.
A sample e n t r y might r e a d : "The C E I , i n c l u d i n g
a l l p a r t s and a s s e m b l i e s , s h a l l b e c o n s t r u c t e d
and f i n i s h e d i n accordance w i t h NASA-STD
11
o r MIL-STD

P a r a g r a p h 3.3.9, " E l e c t r o m a g n e t i c I n t e r f e r e n c e " -


Specify requirements r e l a t e d t o electromagnetic
i n t e r f e r e n c e , i n terms of t h e environment which

11-14
EXHIBIT I1

t h e CEI must a c c e p t and t h e environment


which it g e n e r a t e s .

P a r a g r a p h 3.3.10, " I d e n t i f i c a t i o n and


Marking" - S p e c i f y t h e i d e n t i f i c a t i o n
and m a r k i n s r e a u i r e m e n t s f o r t h e CEI.
~ d e n t i f i c a t i o n-and Marking i n c l u d e s
c o d i n g r e q u i r e m e n t s f o r w i r i n g , plumbing,
i d e n t i f i c a t i o n and h a z a r d o u s c o n d i t i o n s ,
e t c . A sample e n t r y might r e a d : "All
e l e c t r i c a l w i r i n g c o n t a i n e d i n t h i s CEI
s h a l l be i d e n t i f i e d i n accordance with
11
NASA-STD o r MIL-STD

NOTE: I d e n t i f i c a t i o n requirements f o r
p u r p o s e s o f c o n f i g u r a t i o n manage-
ment w i l l b e made a c o n t r a c t u a l
requirement a s p a r t o f t h e configuration
management package, u s i n g E x h i b i t s X
and X I , and w i l l n o t be i n c o r p o r a t e d
i n t o the CEI specification.

P a r a g r a p h 3.3.11. "Storage" - Specify


r e a u i r e m e n t s ~ e c u l i a rt o makins t h e CEI s t o r a b l e .
This s h a l l inklude, b u t not be-limited t o ,
s p e c i f i c a t i o n o f maximum s t o r a g e d u r a t i o n ,
s t o r a g e environment, r e s t r i c t i o n s p e r t a i n i n g
t o maintenance w h i l e i n s t o r a g e , e t c . To
t h e e x t e n t t h a t s t o r a g e environment h a s
been s p e c i f i e d i n p a r a g r a p h s 3.1.2.8 and
3.2.1.2, it s h a l l n o t b e r e d u n d a n t l y s p e c i f i e d

S e c t i o n 4 , " Q u a l i t y Assurance P r o v i s i o n s " - -


Requirements s h a l l i n c l u d e a p p l i c a b l e c o n t e n t o f
"Apollo T e s t R e q u i r e m e n t s , " NHB 8080.1;
NASA Q u a l i t y P u b l i c a t i o n NPC 200-3;
and NASA R e l i a b i l i t y P u b l i c a t i o n NPC 250-1.
Requirements f o r f o r m a l v e r i f i c a t i o n o f t h e
p e r f o r m a n c e , d e s i g n , and c o n s t r u c t i o n o f . t h e
CEI s h a l l b e s p e c i f i e d . Formal v e r i f i c a t i o n
o f p e r f o r m a n c e , d e s i g n , and c o n s t r u c t i o n o f
t h e CEI s h a l l d e t e r m i n e a c c e p t a n c e o f d e s i g n
and development e n g i n e e r i n g , under t h e t e r m s
and c o n d i t i o n s o f t h e d e s i g n and development
c o n t r a c t . Formal v e r i f i c a t i o n of performance,
d e s i g n , and c o n s t r u c t i o n o f t h e CEI s h a l l d e t e r m i n e
a c c e p t a n c e o f d e s i g n and development e n g i n e e r i n g ,
under t h e terms and c o n d i t i o n s o f t h e d e s i g n
and development c o n t r a c t . Formal v e r i f i c a t i o n
requirements s h a l l be s p e c i f i e d t o a l e v e l of
d e t a i l which:
E X H I B I T I1

a. S p e c i f i e s a v e r i f i c a t i o n requirement
and method i n S e c t i o n 4 f o r each
performance and design requirement
i n S e c t i o n 3 of P a r t I . The methods
of v e r i f i c a t i o n s p e c i f i e d s h a l l i n c l u d e
i n s p e c t i o n of t h e C E I , review of
a n a l y t i c a l d a t a , demonstrations, t e s t
and review of t e s t d a t a .
b . S p e c i f i e s each requirement f o r v e r i f i c a t i o n ,
o t h e r than by i n s p e c t i o n of t h e C E I t o
t h e l e v e l of d e t a i l necessary t o c l e a r l y
e s t a b l i s h t h e scope and accuracy of t h e
t e s t method .
c. Permits ready i d e n t i f i c a t i o n of each
v e r i f i c a t i o n requirement s p e c i f i e d i n
S e c t i o n 4 with t h e a p p r o p r i a t e per-
formance/design requirement paragraphs
i n S e c t i o n 3, of P a r t I .

d. A l l o c a t e s v e r i f i c a t i o n requirements t o
t h e subparagraphs.
NOTE: Formal v e r i f i c a t i o n t o be s p e c i f i e d
s h a l l not incorporate, e i t h e r
d i r e c t l y o r by r e f e r e n c e , d e t a i l
t e s t planning documentation and
o p e r a t i n g i n s t r u c t i o n s . Re-
quirements s p e c i f i e d s h a l l be
t h e b a s i s f o r p r e p a r a t i o n and
v a l i d a t i o n of such documents.
Paragraph 4 . 1 , "Phase I T e s t / V e r i f i c a t i o n " -
The term "Phase I / T e s t V e r i f i c a t i o n , " i s d e f i n e d
t o i n c l u d e a l l t e s t and v e r i f i c a t i o n of t h e C E I ,
o t h e r than t h a t accomplished during t h e formal
Phase I1 t e s t ( s e e Paragraph 4 . 2 ) . Phase I t e s t /
v e r i f i c a t i o n i s sub-divided i n t o t h e following
broad types on t h e b a s i s of primary reasons f o r
acquiring the t e s t data:
a. Engineering T e s t and Evaluation: A n i n t e g r a l
p a r t o f t h e development p r o c e s s , o r i e n t e d
primarily t o acquire data t o support the
design and development p r o c e s s , e . g . ,
spacecraft structural t e s t , materials
test, e t c .
EXHIBIT I1

b . P r e l i m i n a r y Q u a l i fi c a t i ' o n Tes'ts : Formal


tests o r i e n t e d p r i m a r i l y t o achieve i n t e r i m
a c c e p t a n c e o f performance and d e s i g n
c h a r a c t e r i s t i c s , p r i o r t o committing t h e
CEI t o : (1) manned o p e r a t i o n , (2)
i n t e g r a t i n g t e s t i n g w i t h o t h e r equipments
and/or f a c i l i t i e s , and ( 3 ) a '

complete f o r m a l q u a l i f i c a t i o n program, e.g.,


preliminary f l i g h t r a t i n g tests f o r engines,
preliminary explosive c l a s s i f i c a t i o n tests
f o r ordnance and p r o p e l l a n t s , e t c .

c. Formal Q u a l i f i c a t i o n T e s t s : Formal tests


oriented primarily t o s a t i s f y specified
requirements f o r formal demonstration of
performance and d e s i g n adequacy o f t h e
CEI .
d. R e l i a b i l i t y T e s t s and Analyses: Formal
tests and a n a l y s e s o r i e n t e d p r i m a r i l y t o
s a t i s f y s p e c i f i e d requirements f o r -
demonstrated r e l i a b i l i t y .
NOTE: Data which i s i n c l u d e d i n r e l i a b i l i t y
a n a l y s e s comes from many s o u r c e s .
" R e l i a b i l i t y T e s t s , " a s used h e r e i n ,
a r e l i m i t e d t o t e s t i n g which would
n o t b e accomplished e x c e p t f o r t h e
need f o r r e l i a b i l i t y d a t a . R e -
q u i r e m e n t s s h a l l be s p e c i f i e d f o r
r e c o r d i n g d a t a r e s u l t i n g from
o t h e r than r e l i a b i l i t y tests f o r
r e l i a b i l i t y analysis.
e. E n g i n e e r i n g C r i t i c a l Component Q u a l i f i d a t i o n :
Formal q u a l i f i c a t i o n o f i d e n t i f i e d and
s p e c i f i e d components/assemblies which a r e
c o n t a i n e d i n , and/or a r e a p a r t o f , a CEI .
~ l r elq u i r e m e n t s f o r Phase I t e s t / v e r i f i c a t i o n
s h a l l b e i n c l u d e d i n sub-paragraphs.

Paragraph 4 . 1 . 1 , " E n q i n e e r i n g T e s t and E v a l u a t i o n "


l o r Development T e s t ) -
E n g i n e e r i n g t e s t s which
s a t i s f y one o r more o f t h e - f o l l o w i n g c r i t e r i a :
a. Require use o f Government t e s t f a c i l i t i e s ,
e . g . , v e r i f i c a t i o n of requirements
s p e c i f i e d i n paragraph 3.1.2.4,
"Environmental, " o t h e r t h a n Phase I1
testing.
EXHIBIT I1

b. Are i n t e n d e d t o b e t h e o n l y s o u r c e
of d a t a t o s a t i s f y s p e c i f i c re-
quirements i n S e c t i o n 3, e . g . , s t a t i c
t e s t of spacecraft structure t o s a t i s f y
r e q u i r e m e n t s i n p a r a g r a p h 3.1.1.1,
"Primary Performance C h a r a c t e r i s t i c s , "
and/or p a r a g r a p h 3 . 3 . 1 , " G e n e r a l Design
F e a t u r e s , " s c r e e n room t e s t i n g t o
s a t i s f y requirements i n paragraph
3.3.9, "Electromagnetic I n t e r f e r e n c e , "
etc.

c. Must b e accomplished a s p a r t o f an
i n t e g r a t e d t e s t program i n v o l v i n g o t h e r
s y s t e m / i n v e n t o r y equipment, e : g . ,
v e r i f i c a t i o n of requirements I n
p a r a g r a p h 3.2.1.2, "Detailed I n t e r f a c e
Requirements." R o u t i n e e n g i n e e r i n g and
l a b o r a t o r y tests accomplished i n s u p p o r t
o f d e s i g n and development, which do
n o t s a t i s f y o n e o r more o f t h e c r i t e r i a
above, s h a l l n o t be s p e c i f i e d .

NOTE : Requirements f o r v e r i f i c a t i o n
included i n t h e p r o j e c t o r
s y s t e m s p e c i f i c a t i o n , which a r e
d i r e c t l y r e l a t e d t o require-
ments s p e c i f i e d h e r e i n , may be
i n c o r p o r a t e d by r e f e r e n c e t o
a v o i d redundancy.

Paragraph 4.1.2, "Preliminary Q u a l i f i c a t i o n . T e s t s " -


Specify only those preliminary q u a l i f i c a t i o n t e s t s
which r e q u i r e f o r m a l r e c o g n i t i o n by NASA, e . g . ,
v e r i f i c a t i o n of requirements s p e c i f i e d i n paragraph
3.1.2.7, "Safety" p r i o r t o t h e i n t r o d u c t i o n of
t h e C E I i n t o a Government t e s t f a c i l i t y ; p r e -
l i m i n a r y f l i g h t r a t i n g t e s t s on e n g i n e s p r i o r t o
f i r s t f l i g h t and/or s t a r t o f f o r m a l q u a l i f i c a t i o n ;
e t c . P r e l i m i n a r y q u a l i f i c a t i o n t e s t i n g accomplished
by t h e c o n t r a c t o r i n s u p p o r t o f d e s i g n and de-
velopment which does n o t r e q u i r e r e c o g n i t i o n by
NASA, o t h e r t h a n t h a t i t i s w i t h i n t h e g e n e r a l
t e r m s and c o n d i t i o n s o f t h e c o n t r a c t , s h a l l n o t
b e s p e c i f i e d . Requirements f o r p r e l i m i n a r y
q u a l i f i c a t i o n s s h a l l reference s p e c i f i c re-
quirements i n Section 3 i f t h e s e t e s t s a r e t o
be t h e formal b a s i s f o r t h e v e r i f i c a t i o n t h a t
s p e c i f i c r e q u i r e m e n t s o f S e c t i o n 3 have been
satisfied.
EXHIBIT 11

P a r a g r a p h 4.1.3, "Formal Q u a l i f i c a t i o r i T e s t s " -


Specify requirements f o r formal q u a l i f i c a t i o n of
t h e CEI t o d e m o n s t r a t e a n d / o r v e r i f y t h a t e a c h
r e q u i r e m e n t e s t a b l i s h e d i n S e c t i o n 3 h a s been
satisfied. The r e q u i r e m e n t s and method o f
v e r i f i c a t i o n f o r each requirement s p e c i f i e d i n
Section 3 s h a l l be specified with t h e following
exceptions:

a. The r e q u i r e m e n t i n S e c t i o n 3 h a s been
i d e n t i f i e d w i t h , and v e r i f i c a t i o n t h a t
it h a s been s a t i s f i e d , h a s been ac-
complished b y , one o f t h e t e s t s i n -
c l u d e d i n p a r a g r a p h s 4 . 1 . 1 and 4.1.2.

b. The r e q u i r e m e n t i n S e c t i o n 3 i s p e c u l i a r
t o paragraph 3.1.2.1, " R e l i a b i l i t y . "
v e r i f i c a t i o n of r e l i a b i l i t y r e q u i r e m e n t s
s h a l l be t r e a t e d i n paragraph 4 . 1 . 4 .

c. The r e q u i r e m e n t i n S e c t i o n 3 i s p e c u l i a r
t o Phase I1 t y p e s y s t e m t e s t i n g and w i l l
b e i d e n t i f i e d i n p a r a g r a p h 4.2. ,

V e r i f i c a t i o n o f each requirement s h a l l b e accomplished


by i n s p e c t i o n , o r r e v i e w of a n a l y t i c a l d a t a , o r
by d e m o n s t r a t i o n , o r t e s t and r e v i e w o f t e s t d a t a ,
o r c o m b i n a t i o n s o f t h e s e . T h i s p a r a g r a p h may
c o n t a i n a sub-paragraph f o r e a c h o f t h e p r i n c i p a l
methods o f v e r i f i c a t i o n , and s p e c i f y t h e re-
q u i r e m e n t s o f S e c t i o n 3 t o b e v e r i f i e d by t h e
method.

P a r a g r a p h 4 . 1 . 4 , " R e l i a b i l i t y T e s t s and A n a l y s e s " -


Requirement f o r a n a l y s e s t o v e r i f y r e q u i r e m e n t s
o f p a r a g r a p h 3 . 1 . 2 . 1 which h a v e been s a t i s f i e d ,
s h a l l be s p e c i f i e d . This shall i n c l u d e t h e s o u r c e s
o f d a t a , volume of d a t a , and a s s u m p t i o n s b a s i c
t o t h e v a l i d i t y o f raw d a t a i n p u t , and a n a l y t i c a l
method. Requirements f o r t e s t i n g which a r e t o
b e accomplished s p e c i f i c a l l y and s o l e l y t o a c q u i r e
r e l i a b i l i t y d a t a s h a l l be included t o t h e l e v e l
o f d e t a i l n e c e s s a r y t o e s t a b l i s h t h e s c o p e and
accuracy o f t h e r e l i a b i l i t y d a t a t o be acquired,
and t h e s c o p e o f t h e t e s t program.

P a r a g r a p h 4 . 1 . 5 , " E n g i n e e r i n g C r i t i c a l Component
Q u a l i f i c a t i o n " - I d e n t i f y , f o r each of t h e
e n g i n e e r i n g c r i t i c a l components l i s t e d i n
p a r a g r a p h 3 . 2 . 2 . 2 , the s p e c i f i c a t i o n which
c o n t a i n s i t s f o r m a l q u a l i f i c a t i o n t e s t re-
quirements.
EXHIBIT I1

directly support
paragraph shall
identify requirements specified in Section 3
which cannot be verified until the CEI is
assembled into or used with other project or system
equipment, and verification that the requirement
has been satisfied must be listed as a Phase I1
test requirement.
Section 5, "Preparation for Delivery1'- This Section
is not applicable to Part I of the End Item Detail
Specification. CEI requirements pertinent to the
transportation and handling of the CEI, which must
be incorporated in design, shall be specified in
paraqraph 3.1.2.5, "Transportability." CEI requirements
pertinent to transportation environment and storage
environment which must be incorporated in design shall
be specified in paragraph 3.2.1.2, "Detailed Interface -
Definition," and paragraph 3.3.11., "Storage," respectively.
Requirements' for preparation of the praduced hardware
for delivery and shipment are contained in Section 5
of Part I1 of the specification.
Section 6 , "Notes" - This Section shall include
information which is stated here for administrative
convenience only, and is not a part of the specification
for the CEI in the contractual sense, i.e., it shall
-
not include requirements which constrain design,
development, and qualification of the CEI and require
compliance by a contractor. Information of importance
to the procuring agency in using the particular
specification as a contractual instrument for acquisition
of the CEI, either initially, or for follow-on procurement
shall be included.
Para ra h 6.1, "Supplemental Informatic -
&information or rationale which will
be of assistance in understanding the specification
itself or using the CEI it specifies, may be included,
e.g., technical data and/or manual ordering instructions.
Paragraph 6.2, "Alternate Source Qualification" -
When a CEI is fabricated bv an alternate source (other
than the one who initially-developed and qualified the
CEI deslgn) formal qualification testing of the CEI
will be required to demonstrate and verify the capability
of the alternate source to produce the CEI to the require-
ments of this specification without degradation in its
performance or reliability. (See Part 11, Paragraph 10.2).
EXHIBIT I1

-
Section 10, "Appendix" Requirements specified in the
Appendix are contractually a part of the specification,
and to the extent they impose requirements on design,
development and qualification of the CEI, they must be
satisfied. This section shall include, but not be
limited to requirements which are:
a. Bound separately for convenience as in the
case of a classified appendix or a large
body of statistical data.
b. Are of a temporary nature, as in the case
of an interim performance requirement for
early test models of the CEI. (Requirements
peculiar to early test units of the CEI shall
be specified in the appendix which adds to,
deletes, changes, or establishes new re-
quirements applicable to Sections 3 and 4
of Part I.) Instrumentation requirements
for the test units of the CEI shall be
specified only to the level of detail
necessary to establish the type and total
capacity, of the instrumentation. Re-
quirements (with the exception of
instrumentation) shall be specified to the
level of detail required by the paragraph in
Section 3 and 4 of Part I to which they are
related.

6.4 -
Detailed Instructions for thepreparation of Contract
End Item Detail Specification, Part 11.
The following instructional paragraphs are numbered or
otherwise identified to refer directly to the sample
formats attached. The sample formats are:
Sample Format "C" - CEI Specification Part I1
Title Page
Sample Format "D" - Part I1 of CEI Specification
"Title Pagew- The title page shall conform to the
format of Sample Format "C". The identifying
information appearing on this page shall be
identical to the respective element of information
appearing on the CEI Specification Title Page for
Part I.
EXHIBIT I1

S e c t i o n 1, "Scope" - T h i s S e c t i o n of P a r t I1
of t h e C E I S p e c i f i c a t i o n s h a l l b e s i n w i t h t h e
opening paragraph shown i n sample-Format "D",
followed by p a r a g r a p h 1.1, " P r o d u c t Con-
f i g u r a t i o n B a s e l i n e Acceptance". Paragraph
1.1 s h a l l b e g i n w i t h t h e s t a t e m e n t shown i n
Sample Format "Dl'.

S e c t i o n 2 , " A p p l i c a b l e Documents" - T h i s
S e c t i o n of t h e C E I S p e c i f i c a t i o n s h a l l b e g i n
w i t h t h e l e a d p h r a s e c o n t a i n e d i n Sample
Format "D". C a t e g o r i z a t i o n of e n t r i e s s h a l l
conform w i t h Sample Format " D " . L i s t only those
documents ( s p e c i f i c a t i o n s , s t a n d a r d s , b u l l e t i n s ,
manuals, e t c . ) , which a r e a p p l i c a b l e t o para-
g r a p h s w i t h i n t h e body of t h e S p e c i f i c a t i o n .
Within t h e body of t h e S p e c i f i c a t i o n , r e f e r e n c e
t o t h o s e documents s h a l l b e made by r e f e r e n c e
t o t h e i r b a s i c document number o r o t h e r appro-
p r i a t e designation. R e f e r t o Defense Standard-
i z a t i o n Manual 4120.3-M f o r f u r t h e r i n s t r u c t i o n s
on l i s t i n g of a p p l i c a b l e documents.
S e c t i o n 3 , "Requirements" - T h i s S e c t i o n s h a l l spec-
i f y performance, p r o d u c t c o n f i g u r a t i o n and s t a n -
d a r d s of manufacture, manufacturing p r o c e s s e s ,
and p r o d u c t i o n which must b e v e r i f i e d a t t h e t i m e
and p l a c e of d e l i v e r y t o e s t a b l i s h t h e q u a l i t y of
t h e C E I a s manufactured. Each r e q u i r e m e n t s t o
be s p e c i f i e d must s a t i s f y t h e f o l l o w i n g c r i t e r i a :

a. There s h a l l be a d i r e c t means of t e s t i n g /
v e r i f y i n g , t h a t t h e r e q u i r e m e n t h a s been
s a t i s f i e d i n ' s e c t i o n 4 , P a r t 11.
b. The t e s t / v e r i f i c a t i o n which f o r m a l l y
demonstrates t h a t t h e requirement has
been s a t i s f i e d s h a l l be accomplished
a t t h e p l a c e of manufacture of t h e CEI.
c. The r e q u i r e m e n t s must be v e r i f i e d a t t h e
time of a c c e p t a n c e t o a s s u r e t h a t manufac-
t u r i n g c o n t r o l h a s been m a i n t a i n e d , and t h a t
t h e CEI, a s f a b r i c a t e d , w i l l f u n c t i o n t o
s a t i s f y t h e r e q u i r e m e n t s of i t s u s e .
EXHIBIT I1

d. The r e q u i r e m e n t s h a l l b e s p e c i f i e d
i n p h y s i c a l l y m e a s u r a b l e terms, w i t h
tolerances.

I n t r o d u c t o r y m a t e r i a l may b e i n c l u d e d i n b a s i c
p a r a g r a p h " S e c t i o n 3" and r e q u i r e m e n t s s h a l l b e
s p e c i f i e d i n sub-paragraphs.

P a r a g r a p h 3 . 1 , " Performance" - S p e c i f y
performance r e q u i r e m e n t s f o r t h e CEI which
are i n consonance w i t h t h e c r i t e r i a s t a t e d
i n p a r a g r a p h 3 , " R e q u i r e m e n t s . " Performance
features included herein s h a l l be s p e c i f i e d
a t e n v i r o n m e n t a l c o n d i t i o n s normal t o t h e
m a n u f a c t u r i n g p r o c e s s and/or t h e p l a c e o f
a c c e p t a n c e , and n o t a t t e m p t t o s i m u l a t e t h e
e n v i r o n m e n t i n which t h e CEI w i l l b e u s e d .
This paragraph s h a l l s p e c i f y t h o s e performance
f e a t u r e s which c a n n o t b e assumed a s t h e
n a t u r a l consequence o f drawing c o m p l i a n c e .
Requirements s h a l l b e s p e c i f i e d i n t e r m s o f
t h e CEI i t s e l f , i n terms o f p h y s i c a l l y
measurable p r o p e r t i e s , w i t h t o l e r a n c e s .
Performance r e q u i r e m e n t s may i n c l u d e f e a t u r e s
which must b e v e r i f i e d by p r e a s s e m b l y ,
s t a t i o n , o r manufacturing t e s t / v e r i f i c a t i o n .
Requirements f o r t e s t / v e r i f i c a t i o n s , which
s h a l l be accomplished p r i o r t o f i n a l assembly,
may b e s p e c i f i e d d i r e c t l y , o r by r e f e r e n c e
t o m a n u f a c t u r i n g and p r o c e s s i n g s p e c i f i c a t i o n s .
Requirements s h a l l b e t o t h e l e v e l o f d e t a i l
necessary t o e s t a b l i s h l i m i t s f o r t h e test/
v e r i f i c a t i o n method t o be s p e c i f i e d i n
S e c t i o n 4 , P a r t 11. I n d i v i d u a l r e q u i r e m e n t s
S h a l l be s p e c i f i e d i n sub-paragraphs .
Paragraph 3.2, "Product Configuration"-
Specify t h e product c o n f i g u r a t i o n requirements
f o r t h e CEI. I n c l u d e a l i s t i n g o f Government-
f u r n i s h e d p r o p e r t y i n c o r p o r a t e d i n t h e CEI
during fabrication. Specify t h e production
drawings f o r f a b r i c a t i o n of t h e CEI. Standards
and s p e c i f i c a t i o n s f o r f a b k a t i o n o f t h e CEI
which d e f i n e q u a l i t y and c o n s t r u c t i o n which
i s t o be a c o n d i t i o n o f a c c e p t a n c e o f t h e CEI
s h a l l b e i n c l u d e d . B a s i c p a r a g r a p h 3 . 2 may
include descriptive material o r material
i n c l u d e d f o r p u r p o s e s of c o n t i n u i t y . Require-
ments s h a l l b e s p e c i f i e d i n s u b - p a r a g r a p h s .
EXHIBIT I1

Para.graph 3.2.1, "Manufacturing Drawinqs" -


~ e q i nw i t h t h e s t a t e m e n t shown i n Sample
~ o i - m a t"Dl'. S p e c i f y t h e drawings which
a r e t h e b a s i s f o r c o n t r o l of production of
the CEI. The p r o d u c t i o n drawings s h a l l b e
i n c o r p o r a t e d by r e f e r e n c e t o t h e t o p drawing
f o r t h e CEI. The method of r e f e r e n c e s h a l l
c l e a r l y s p e c i f y t h a t i n c o r p o r a t i o n of t h e
t o p drawing by r e f e r e n c e i n c l u d e s a l l
drawings and e n g i n e e r i n g d a t a assembled by
t h e t o p drawing. Drawings s p e c i f i e d h e r e i n
s h a l l r e f l e c t a l l e n g i n e e r i n g changes
approved f o r i n c o r p o r a t i o n i n t o t h e CEI.

NOTE: T h i s i n c l u d e s changes approved


by t h e p r o c u r i n g agency a s
w e l l a s changes r e l e a s e d by
t h e c o n t r a c t o r which do n o t
r e q u i r e p r o c u r i n g agency a p p r o v a l .

Drawings s p e c i f i e d s h a l l i d e n t i f y by e x a c t
p a r t number, e a c h i t e m o f Government-furnished
p r o p e r t y r e q u i r e d f o r assembly i n t o t h e CEI
during t h e manufacturing process. The t o p
drawing t o be r e f e r e n c e d s h a l l b e i d e n t i f i e d
t o t h e CEI by i n c l u d i n g , on t h e drawing,
t h e CEI number, drawing number, CEI
n o m e n c l a t u r e , and code f o r t h e d e s i g n a c t i v i t y
( M a n u f a c t u r e r s Code Handbook H4-1) .Other
i d e n t i f y i n g d a t a may b e i n c l u d e d . (See
E x h i b i t X).
P a r a g r a p h 3 . 2 . 2 , "Government-Furnished Prope'rty
L i s t 1 ' - Each i t e m o f Government-furnished
property specified f o r incorporation i n t o the
CEI d u r i n g t h e m a n u f a c t u r i n g p r o c e s s , by t h e
p K o d u c t i o n drawings i n c o r p o r a t e d i n p a r a g r a p h
3.2.1, " P r o d u c t i o n Drawings," s h a l l be i d e n t i f i e d
by nomenclature and p a r t number,

P a r a g r a p h 3.2.. 3 , " S t a n d a r d s o f :Mznufacturi.na,


Manufacturing P r o c e s s e s , and P r o d u c t i o n " -
Include those s t a n d a r d s of manufacture,
m a n u f a c t u r i n g p r o c e s s e s , and p r o d u c t i o n ,
which, b e c a u s e o f t h e i r s i g n i f i c a n c e , must
be s p e c i f i c a l l y i d e n t i f i e d a s p a r t of t h e
production configuration b a s e l i n e . Specify
o n l y t h o s e s t a n d a r d s and s p e c i f i c a t i o n s
which a r e o f s u c h n a t u r e t h a t any change t o
them s h a l l b e c o n s i d e r e d a s C l a s s I e n g i n e e r i n g
EXHIBIT I1

change and r e q u i r e p r i o r a p p r o v a l of t h e
p r o c u r i n g agency, e . g . , s t a n d a r d s f o r
i d e n t i f i c a t i o n and marking o r w i r i n g and
t u b i n g , s i n c e such marking i s b a s i c t o
s a f e t y and t o t h e p r e p a r a t i o n of manuals;
s t a n d a r d s f o r a bonding p r o c e s s , where a
change may r e q u i r e a r e q u a l i f i c a t i o n of
t h e s t r u c t u r a l i n t e g r i t y of t h e C E I ; etc.
To t h e maximum e x t e n t p o s s i b l e , r e q u i r e -
ments s h a l l b e i n c o r p o r a t e d by r e f e r e n c e
t o e s t a b l i s h e d Government s t a n d a r d s approved
f o r NASA u s e . C o n t r a c t o r and/or i n d u s t r y
s t a n d a r d s must be s p e c i f i c a l l y approved
by t h e p r o c u r i n g agency p r i o r t o i n -
corporation. Requirements s h a l l be
s p e c i f i e d t o t h e l e v e l of d e t a i l n e c e s s a r y
t o clearly establish l i m i t s f o r the t e s t /
v e r i f i c a t i o n s t o be s p e c i f i e d i n S e c t i o n
4 , P a r t 11. I n d i v i d u a l requirements s h a l l
be s p e c i f i e d i n sub-paragraphs .
S e c t i o n 4 , " Q u a l i t y Assurance" - T h i s S e c t i o n s h a l l
begin w i t h t h e paragraph c o n t a i n e d i n Sample Format
"D". I t s h a l l i n c l u d e a p p l i c a b l e c o n t e n t of "Apollo
T e s t Requirements," NHB 8080.1: NASA Q u a l i t y Pub-
l i c a t i o n s NHB 5300-4(1B) and NPC 200-3, and
NASA R e l i a b i l i t y P u b l i c a t i o n NPC 250-1. Specify
only t h e s p e c i f i c t e s t / v e r i f i c a t i o n s whi'ch must
be accomplished t o s a t i s f y a l l requirements
s p e c i f i e d i n S e c t i o n 3 of P a r t 11. T e s t / v e r i f i c a t i o n s
t o a s s u r e c o n t r o l of q u a l i t y d u r i n g t h e manufacturing
p r o c e s s n o t s p e c i f i c a l l y i n c l u d e d s h a l l be ac-
complished by r o u t i n e manufacturing l e v e l s u r v e i l -
l a n c e a s r e q u i r e d by t h e l o c a l r e p r e s e n t a t i v e of
t h e p r o c u r i n g agency (NASA P l a n t R e p r e s e n t a t i v e ,
o r equivalent) . Each t e s t / v e r i f i c a t i o n s p e c i f i e d
s h a l l be w i t n e s s e d , o r t h e c o n t r a c t o r r e c o r d of t h e
t e s t / v e r i f i c a t i o n reviewed, a t t i m e of acceptance
of each u n i t of t h e C E I , hence a l l t e s t s / v e r i f i c a t i o n s
i n c l u d e d a r e i d e n t i f i e d a s acceptance t e s t
verifications. T e s t / v e r i f i c a t i o n s s h a l l be ac-
complished d u r i n g t h e manufacturing p r o c e s s , o r
a t time of d e l i v e r y , t o e s t a b l i s h t h e q u a l i t y of
t h e C E I a s f a b r i c a t e d and assembled. Each t e s t /
v e r i f i c a t i o n requirement s h a l l be s p e c i f i e d t o
t h e l e v e l of d e t a i l n e c e s s a r y t o :

a. I d e n t i f y each t e s t / v e r i f i c a t i o n w i t h
t h e requirement i n S e c t i o n 3 o f P a r t 11, which
it s a t i s f i e s .
EXHIBIT I1

b. E s t a b l i s h t h e method f o r each t e s t /
verification. Methods of t e s t /
verification include inspection,
d e m o n s t r a t i o n , t e s t o r combinations
thereof.

c. E s t a b l i s h , f o r each method r e l a t e d
t o each t e s t / v e r i f i c a t i o n , s p e c i f i c
l i m i t s which s h a l l r e p r e s e n t a c l e a r
basis f o r decision as t o the quality,
and t h e a c c e p t a b i l i t y , of t h e C E I .

d. E s t a b l i s h t h e accuracy of each t e s t /
verification. Introductory material
may be i n c l u d e d i n b a s i c p a r a g r a p h ,
Section 4. Requirements s h a l l be
s p e c i f i e d i n sub-paragraphs.

Paragraph 4 . 1 , "Product Performance' and


C o n f i g u r a t i o n Requirement/Qua'li t y Veri f c i a t i o n
Cross Reference Index" - T h i s i n d e x i d e n t i f i e s
each q u a l i t y v e r i f i c a t i o n i n S e c t i o n 4 , P a r t 11,
w i t h t h e requirement i n S e c t i o n 3 of P a r t 11,
which i t v e r i f i e s . The index s h a l l b e an
o r d e r e d l i s t of t h e requirements i n S e c t i o n 3
of P a r t 11, i n t h e o r d e r i n which t h e y a r e
s p e c i f i e d and i d e n t i f i e d by t h e paragraph number
e s t a b l i s h i n g t h e requirement.

Paragraph 4.2, " T e s t / V e r i f i c a t i ' o n s n - The t e s t /


v e r i f i c a t i o n s r e q u i r e d t o s a t i s f y each r e -
quirement i n s e c t i o n 3 of P a r t II s h a l l be
s p e c i f i e d . Each i n s p e c t i o n , demonstration
and t e s t s h a l l be s p e c i f i e d t o a l e v e l of
d e t a i l which c l e a r l y e s t a b l i s h e s t h e v a l i d i t y
and accuracy of t h e t e s t / v e r i f i c a t i o n . The
t e s t / v e r i f i c a t i o n s h a l l p e r m i t a c l e a r , non-
s u b j e c t i v e d e t e r m i n a t i o n o f t h e q u a l i t y of
the CEI. The t e s t s / v e r i f i c a t i o n s s p e c i f i e d
i n sub-paragraphs s h a l l be s p e c i f i e d t o a
l e v e l of d e t a i l - which s a t i s f i e s t h e f o l l o w i n g
criteria:

a. I n s p e c t i o n s and/or d e m o n s t r a t i o n s s h a l l
be s t a t e d t o q u a n t i t a t i v e l y s p e c i f y
and d e f i n e t h e l i m i t s f o r t h e ac-
ceptable condition. In general,
v e r i f i c a t i o n of q u a l i t y by i n s p e c t i o n
and/or demonstration i n s u p p o r t of
a c c e p t a n c e t e s t i n g s h a l l be l i m i t e d
t o v e r i f i c a t i o n of c o n s t r u c t i o n
f e a t u r e s of t h e C E I , e . g . , i n s p e c -
t i o n f o r p r o p e r w i r e coding;
d e t e r m i n a t i o n of s p e c i f i c p h y s i c a l
EXHIBIT I1

dimensions; i n s p e c t i o n o f
production records t o v e r i f y
i n s t a l l a t i o n o f Government-
furnished property; e t c .

b. Tests s h a l l be s p e c i f i e d , i n
q u a n t i t a t i v e t e r m s with tolerances,
t o t h e l e v e l of d e t a i l necessary
t o c l e a r l y e s t a b l i s h t h e test
method, t h e c r e d i b i l i t y o f t h e
t e s t method, t h e v a l i d i t y o f t h e
t e s t d a t a , and t h e a c t u a l measure-
ment v a l u e s .

c. Where r e c o r d s g e n e r a t e d d u r i n g t h e
manufacturing process a r e t o be
used a s p a r t of acceptance test/
v e r i f i c a t i o n , t h e method o f e s t a b l i s h i n g
the v a l i d i t y of t h e record, as w e l l
a s record content s h a l l be specified.

P a r a g r a p h 4 . 2 . 1 , "Drawing Compliance" - S p e c i f y
t h e method f o r v e r i f y i n g t h a t t h e CEI, a s
f a b r i c a t e d and assembled i s c o n f i g u r e d t o
conform t o t h e drawings s p e c i f i e d i n p a r a g r a p h
3 . 2 . 1 of P a r t 11, and h a s i n c o r p o r a t e d t h e
Government-furnished p r o p e r t y s p e c i f i e d i n
p a r a g r a p h 3.2.2 o f P a r t 11. To t h e e x t e n t
p r a c t i c a l , t h i s s h a l l b e a c c o m p l i s h e d by
i n s p e c t i o n a t t h e t i m e and p l a c e of ac-
c e p t a n c e o f t h e CEI. The " a s m a n u f a c t u r e d "
c o n f i g u r a t i o n o f t h e C E I ' s which c a n n o t b e
i n s p e c t e d i n f u l l y assembled c o n d i t i o n , t o
t h e l e v e l of d e t a i l n e c e s s a r y t o f u l l y
e s t a b l i s h c o n f i g u r a t i o n conformance t o t h e
drawing (complex C E I ' s h e r m e t i c a l l y s e a l e d
u n i t s , e l e c t r o n i c equipment assembled i n t o
c a b i n e t s , e t c . ) , s h a l l b e v e r i f i e d by
r e f e r e n c e t o m a n u f a c t u r i n g r e c o r d s (see
Exhibit X I I I ) .
Section 5 , "Preparation f o r Delivery" - Specify t h e
requirements f o r p r e s e r v a t i o n , packaging, packing,
marking, and o t h e r w i s e p r e p a r i n g t h e CEI f o r s h i p -
ment. The l e v e l s o f p a c k i n g , a r e a s d e f i n e d i n
F e d e r a l S t a n d a r d 102. Where approved NASA o r
NASA d e s i g n a t e d M i l i t a r y S p e c i f i c a t i o n s , o r
NASA e q u i v a l e n t , a r e a d e q u a t e t o s a t i s f y c u r r e n t
r e q u i r e m e n t s f o r t h e i t e m and components t h e r e o f ,
a r e f e r e n c e should be i n c o r p o r a t e d i n l i e u of providing
EXHIBIT I1

d u p l i c a t e d d e t a i l e d r e q u i r e m e n t s . Where s u i t a b l e
s p e c i f i c a t i o n s do n o t e x i s t , requirements p e c u l i a r
t o t h e CEI s h a l l b e s p e c i f i e d i n s u b - p a r a g r a p h s .

P a r a g r a p h 5 . 1 . " P r e s e r v a t i o n and Packaging" -


The r e q u i r e m e n t s f o r p r e s e r v a t i o n and p a c k a g i n g
s h a l l b e s p e c i f i e d and s h a l l i n c l u d e c l e a n i n g
and d r y i n g a s may b e r e q u i r e d and a p p r o p r i a t e
p r e s e r v a t i o n method s e l e c t e d from S e c t i o n 3
o f S p e c i f i c a t i o n MIL-P-116, o r a p p l i c a b l e
NASA S p e c i f i c a t i o n . S e c t i o n of proper
method s h a l l b e d e t e r m i n e d by t h e c h a r a c -
t e r i s t i c s o f t h e i t e m and a n t i c i p a t e d t r a n s i t
and s t o r a g e c o n d i t i o n s . I n c l u d e a s p a r t o f
t h e p a c k a g i n g r e q u i r e m e n t s any a p p r o p r i a t e
w r a p p i n g s , i n t e r i o r c u s h i o n i n g and u n i t
c o n t a i n e r s . ~ e q u i r e m e n t ss h a l l b e s p e c i f i e d
i n sub-paragraphs t o i n c l u d e , b u t n o t be l i m i t e d
to:

P a r a g r a p h 5 . 1 . 1 , " C l e a n i n g " - The a p p l i c a b l e


c l e a n i n g p r o c e s s from p a r a g r a p h 3.2 of
S p e c i f i c a t i o n MIL-P-116 o r NASA e q u i v a l e n t ,
s h a l l be specified.

P a r a g r a p h 5 . 1 . 2 , "Drying" - The d r y i n g p r o c e s s
a p p l i c a b l e t o t h e CEI from p a r a a r a p h 3 . 3 o f
s p e c i f i c a t i o n MIL-P-116, O ~ - N A Se~q u i v a l e n t
s h a l l be specified.

P a r a g r a p h 5 . 1 . 3 , " L e v e l s o f Packaging1' - S p e c i f y
t h e p r e s e r v a t i o n and p a c k a g i n g r e q u i r e m e n t s re-
l a t e d t o e a c h of t h e s p e c i f i c s t o r a g e p e r i o d s
d e f i n e d i n t h e following sub-paragraphs.
P a r a g r a p h 5 . 1 . 3 . 1 , "Immediate Use" - S p e c i f y
p r e s e r v a t i o n and p a c k a g i n g r e q u i r e m e n t s
i n c i d e n t t o p r e p a r i n g t h e C E I f o r shipment
and immediate u s e a t d e s t i n a t i o n . P r e s e r -
v a t i o n and p a c k a g i n g f o r immediate u s e i s
d e f i n e d t o b e t h e minimum needed t o a d e q u a t e l y
p r o t e c t t h e i t e m ( s ) a g a i n s t environmental
and p h y s i c a l h a z a r d s d u r i n g h a n d l i n g and
t r a n s i t t o d e s t i n a t i o n f o r immediate u s e .
Normally, r e q u i r e m e n t s c o m p a t i b l e w i t h MIL-
P-116 w i l l s u f f i c e f o r t h i s l e v e l u n l e s s ,
because of p e c u l i a r i t e m c h a r a c t e r i s t i c s ,
a d d i t i o n a l environmental p r o t e c t i o n i s
required.
E X H I B I T I1

Paragraph 5 . 1 . 3 . 2 , "Limited S t o r a g e " -


S p e c i f y p r e s e r v a t i o n end packaging r e -
quirements i n c i d e n t t o preparing t h e
CEI f o r shipment a s w e l l a s l i m i t e d
s t o r a g e . P r e s e r v a t i o n and packaging
requirements f o r t h i s p r o t e c t i v e l e v e l
s h a l l be s u f f i c i e n t t o p r o v i d e a d e q u a t e
p r o t e c t i o n t o t h e i t e m t s ) a g a i n s t en-
vironmental and p h y s i c a l h a z a r d s d u r i n g
h a n d l i n g and t r a n s m i t t o d e s t i n a t i o n and
f o r a s p e c i f i e d storage period.
Paragraph 5.1.3.3, "Extended S t o r a g e " -
S p e c i f y p r e s e r v a t i o n and packaging
requirements i n c i d e n t t o preparing
t h e C E I f o r shipment a s w e l l a s ex-
tended s t o r a g e . P r e s e r v a t i o n and
packaging r e q u i r e m e n t s f o r extended
s t o r a g e a h a l l be adequate t o p r o t e c t
t h e item(s) a g a i n s t environmental
and p h y s i c a l h a z a r d s d u r i n g h a n d l i n g
and t r a n s i t and under a d v e r s e s t o r a g e
c o n d i t i o n s f o r an i n d e t e r m i n a t e p e r i o d .
Paragraph 5.1.3.4, " I n t e r m e d i a t e Packagine"
Requirements f o r i n t e r m e d i a t e packaging,
i n p r e p a r i n g t h e CEI f o r shipment and/or
storage, s h a l l be s p e c i f i e d . Intermediate
packaging s h a l l c o n s i s t of p l a c i n g a
q u a n t i t y of i d e n t i c a l u n i t packages i n t o
a consolidating o r intermediate container
f o r u l t i m a t e overpacking i n t o an e x t e r i o r
shipping container.
Paragraph 5 . 2 , "Packin'g" - The r e q u i r e m e n t s
f o r packing s h a l l i n c l u d e s p e c i f i c a t i o n of
t h e appropriate e x t e r i o r shipping container
and t h e placement of a s p e c i f i e d q u a n t i t y
o f packages t h e r e i n , and s h a l l s p e c i f y o r
otherwise d e l i n e a t e the necessary blocking,
bracing, and c u s h i o n i n g r e q u i r e d . I n
i n s t a n c e s where t h e u n i t c o n t a i n e r s e r v e s
a l s o a s the e x t e r i o r shipping container,
t h e c o n t a i n e r s h a l l b e s p e c i f i e d under
"Packaging" s h a l l r e f l e c t t h e a c c e p t a b l e
u t i l i z a t i o n of t h e same c o n t a i n e r t o p r o v i d e
f o r two e x t e r i o r r e q u i r e m e n t s . Packing
r e q u i r e m e n t s s h a l l be p r o v i d e d f o r two
b a s i c nodes of t r a n s p o r t a t i o n and f o r , a s
a p p l i c a b l e , both c o n t i n e n t a l United S t a t e s
and o v e r s e a s movement. In t h e s e l e c t i o n of
a shipping c o n t a i n e r , consideration should
be given t o i n s u r i n g t h a t it i s of minimum
cube r e q u i r e d and, i n s o f a r a s p o s s i b l e ,
EXHIBIT I1

w i t h i n a 15% maximum i n tare w e i g h t .

P a r a g r a p h 5 . 2 . 1 , "Domestic Shipment" -
The t e r m " d o m e s t i c s h i p m e n t " d e n o t e s
movement w i t h i n t h e c o n t i n e n t a l United
S t a t e s . Include t h e packing re-
q u i r e m e n t s p e c u l i a r t o t h e mode o f
transport.

Paragraph 5.2.1.1, "Air" - Packing f o r


d o m e s t i c s h i ~ m e n tby a i r s h a l l b e s p e c i f i e d
and s h a l l beLt h e minimum r e q u i r e d t b a f f o r d
a d e q u a t e p r o t e c t i o n a g a i n s t h a n d l i n g and
t r a n s i t hazards normally encountered i n a i r
shipment.

Paragraph 5.2.1.2, "Surfacen- Packing f o r


d o m e s t i c s h i ~ m e n tby s u r f a c e c a r r i e r s h a l l
b e s p e c i f i e d A a n d s h a l l b e t h e minimum r e -
q u i r e d t o a f f o r d adequate p r o t e c t i o n a g a i n s t
h a n d l i n g and t r a n s i t h a z a r d s e n c o u n t e r e d i n
r a i l o r t r u c k movement.

P a r a g r a p h 5 . 2 . 2 , "Overseas Shipment" - The


term " o v e r s e a s shipment" d e n o t e s movement
from a p o i n t of o r i g i n w i t h i n t h e c o n t i n e n . t a 1
United S t a t e s t o a d e s t i n a t i o n p o i n t out-
s i d e t h e c o n t i n e n t a l United S t a t e s , o r t h e
c o n v e r s e , o r p o i n t - t o - p o i n t movement e n t i r e l y
o u t s i d e t h e c o n t i n e n t a l United S t a t e s .

P a r a g r a p h 5.2.2 . l , " A i r " - P a c k i n g f o r o v e r a e a s


shipment by a i r s h a l l b e s p e c i f i e d and s h a l l
p r o v i d e a d e q u a t e p h y s i c a l and e n v i r o n m e n t a l
p r o t e c t i o n a g a i n s t h a n d l i n g and t r a n s i t h a z a r d s
n o r m a l l y e n c o u n t e r e d i n shipment v i a m i l i t a r y
o r commercial a i r . Domestic c o n t a i n e r s u s e d
f o r shipment w i t h i n t h e c o n t i n e n t a l U n i t e d
S t a t e s w i l l generally provide t h e required
protection.

Paragraph 5.2.2.2, "Surface" - Packing f o r


o v e r s e a s s h i ~ m e n tby s u r f a c e c a r r i e r s h a l l b e
s p e c i f i e d an; s h a l l p r o v i d e maximum p r o t e c t i o n
t o c o n t e n t s a g a i n s t h a n d l i n g , t r a n s i t , and
s t o r a g e c o n d i t i o n s e n c o u n t e r e d i n shipment by
ocean g o i n g c a r r i e r s .
EXHIBIT I1

P a r a g r a p h 5 . 3 , "Shipment" - Shipment
i n f o r m a t i o n and l i m i t a t i o n s s h a l l b e
specified. This s h a l l include identi-
f i c a t i o n of s p e c i a l f e a t u r e s necessary
t o p r o t e c t i t e m s d u r i n g movement o r
storage, including, but not limited
t o , t r a i l e r s , d o l l i e s and wheeled
containers t h a t a r e designed t o
f a c i l i t a t e h a n d l i n g and i n s t a l l a t i o n
of equipment a t d e s t i n a t i o n . A l s o ,
identify the specific a i r , ship, o r
ground c a r r i e r means o f t r a n s p o r t a t i o n
i f shipment o f t h e end i t e m - i s t o be
l i m i t e d t o p a r t i c u l a r modes o f t r a n s p o r t .
Where m o d i f i c a t i o n s o f t h e t r a n s p o r t i n g
vehicle are required, t h i s specification
s h a l l s t a t e , "Required m o d i f i c a t i o n s t o
( v e h i c l e model number, F e d e r a l Stock
N u m b e r , and nomenclature) a r e t o b e i n
accordance w i t h (number and t i t l e o f
s p e c i f i c a t i o n d e s c r i b i n g t h e mod-
.
i f i c a t i o n ) " The r e q u i r e m e n t s f o r
marking s h a l l c o v e r complete i d e n t i -
f i c a t i o n of t h e p r o d u c t , b o t h on
packages and s h i p p i n g c o n t a i n e r s ,
normally a s r e q u i r e d by MIL-STD-129 and/
o r any o t h e r marking r e q u i r e m e n t s a s
d i r e c t e d . A l l p r e c a u t i o n a r y marking
r e q u i r e d by I C C o r CAB r e g u l a t i o n s ,
AFM 71-4 o r n e c e s s a r y marking f o r
s a f e t y p u r p o s e s s h a l l be s p e c i f i e d
e i t h e r i n d e t a i l o r through r e f e r e n c e
t o t h e governing documents o r d i r e c t i v e s .
S e c t i o n 6 , "Notes" - T h i s S e c t i o n o f t h e s p e c i f i c a t i o n
i s not contractually binding. It s h a l l include in-
f o n n a t i o n o f p a r t i c ; l a r importance t o t h e p r o c u r i n g
agency i n u s i n g P a r t I1 o f t h i s s p e c i f i c a t i o n a s a
c o n t r a c t u a l i n s t r u m e n t , o r a d m i n i s t r a t i v e o r back-
ground i n f o r m a t i o n , e . g . , o r d e r i n g i n s t r u c t i o n s
f o r t e c h n i c a l d a t a and/or manuals p e r t i n e n t t o t h e
CEI .
S e c t i o n 1 0 , "Appendix" - T h i s S e c t i o n o f t h e
s p e c i f i c a t i o n s h a l l i n c l u d e r e q u i r e m e n t s which a r e
part of S e c t i o n 3 and/or 4 , b u t a r e bound
..
s e p a r a t e l y f o r convenience, e g , c l a s s i f i e d
m a t e r i a l ; book form drawings o f t h e computer program
f o r a u t o m a t i c checkout equipment; e t c . Also i n c l u d e
requirements e s t a b l i s h e d f o r t e s t u n i t s of t h e CEI
o n l y . T h i s i n c l u d e s r e q u i r e m e n t s p e c u l i a r t o ac-
c e p t i n g t h e CEI i n a c o n f i g u r a t i o n i n s t r u m e n t e d
f o r test.
EXIIIBIT I1

Paragraph 10.1. "Acceptance Requ.irements


for un'i.ts.o,f'the.'CEIyn''a''Te's't -
'coh'f'i.g'u'r'a.t'ion"
During design and development of the CEI,
individual units of the CEI, in a test
configuration, must be accepted by the
procuring agency to recognize transfer
of accountability and/or permit de-
struction of the unit in test, or to
deliver the unit as Government-furnished
property to a second contractor to permit
integrated system testing. The format and
general content of a Part I1 used for /
purposes of accepting units of the CEI in
a test configuration shall conform to the
requirements established herein for a Part
I1 used to accept hardware for the mission.
Part 11's used as a basis for acceptance of
units of a CEI in a test configuration shall
satisfy the requirements for minimum
specification content contained in
paragraphs 3.2.1, 3.2.2, and 4.2.1 of
Part 11. Further detail content shall be
as defined by the procuring agency. Instru-
mentation requirements shall be included.
Instrumentation requirements specified shall
be limited to establishing the total capability
or capacity of the instrumentation to be
installed, and the quality of installation,
and shall not include details of calibration,
channel assignments, and instruments, etc.,
which change frequently and hence would make
maintenance of the specification un-
necessarily burdensome.
Paragraph 10.2 "Alternate Source Qualification" -
When a CEI is fabricated by an alternate source
(other than the one who initially developed and
qualified the CEI) verification is required of the
capability of the alternate source to produce the
CEI to the requirements of this specification with-
out degradation in its performance or reliability.
Such verification shall require the performance
of complete qua1ification testing in accordance with
paragraph 4.1.3 "Formal Qualification Tests". of
Part I of this speicification; or as otherwise
specified by the procuring agency.
EXHIBIT I1

Frequently, a requirement develops for a CEI which


is very similar to an existing CEI. When this occurs,
it is desirable to create the new CEI bp accomplishing
minimum redesign of the existing CEI. To accomplish
this, it is necessary to maintain visibility through-
out the design and development cycle of differences
in performance, design and configuration requirements
between the two CEI's. This visibility is acquired
and maintained by creating the specification for the
new CEI as an addendum to the specification for the
existing CEI.
The use of a specification addendum presents a formal
means of writing a specification for a new CEI by
changing the specification for an existing CEI in
a manner which permits ready comparison of the
exact relationship between two items of equipments.
This is accomplished by writing the new specification
by direct reference to the existing specification
on a paragraph-by-paragraph basis, recordina in the
new specification and noting each addition, deletion,
change, or where no change is necessary, the words
"no change". The paragraph numbering between the
two documents will be identical, with the exception
of paragraphs added to the new document which do
not have an exact counterpart in the existing
specification.
A specification created in this manner is a new
and complete specification in every sense. The
method of preparing a specification for a new
CEI by creating an addendum to an existing
specification shall be used when the following
considerations are satisfied:
a. There is sufficient reason to establish
direct relationship-betweenthe new CEI
and an existing CEI as a basis for design
and development, e.g., progressing from
one type, model, series of a CEI to
another; minor changes must be ac-
complished to a very limited number
of units of a CEI for a specific mission,
as is the case with space boosters.
EXHIBIT I1

b. The basic specification, to which the


addendum is prepared, compiles with
the requirements of this exhibit,
with respect to format and content.
The specification created by use of an addendum must
be identified and maintained as a separate specification.
Boththe specification created by nse of an addendum,
and the basic specification to which the addendum is
prepared shall have independent change cycles. A
specification change notice to either is not auto-
matically a change to both. Each change to either
must be reviewed, and if it is desirable to change
both the basic specification and the specification
prepared as an addendum, two separate specification
change notices must be prepared.
When a new specification is created by the preparation
of an addendum to an existing specification, an
"Addendum Notice" shall be prepared which conforms
to the format and includes the content required by
sample format "En. The "Addendum Notice" shall be
the first entry in Section 2, "Applicable Documents."
All of the data in the "Addendum Notice" refer to
the specification used as the basic document for
preparation of the addenda. Each item of data to
be entered shall be transcribed from the title
page and specification change log of the basic
specification.
Note: For filing and distribution an Addendum Speci-
fication must always be accompanied by the
specification to which it relates. See Sample
Format "E".
EXHIBIT I1

SAMPLE FORMAT '"A"

Specification No.

Revision No.
Release Date
Page 1-1

CONTRACT END ITEM DETAIL SPECIFICATION


(Prime Equipment)
PART I
PERFORMANCE AND DESIGN
REQUIREMENTS

{CEI Number)

(APPROVED NOMENCLATURE)
FOR
(PROJECT OR SYSTEM NAME)

~ p p r o v e dby Approved by
(Preparing Activity) (NASA Off ice)

Date Approval Date


Contract Number
EXHIBIT I1
SAMPLE FORMAT "B"

S p e c i f i c a t i o n No.
R e l e a s e Date
Page .I-2

1. SCOPE

T h i s p a r t of t h i s s p e c i f i c a t i o n e s t a b l i s h e s t h e r e q u i r e m e n t s
f o r performance, d e s i g n , t e s t and q u a l i f i c a t i o n of one type-model-
. s e r i e s o f equipment i d e n t i f i e d a s ( i n s e r t nomenclature and c o n t r a c t
end i t e m number). T h i s CEI i s used t o ( p r o v i d e ) (accomplish) ...
This C E I r e q u i r e s ..
2. APPLICABLE DOCUMENTS

The f o l l o w i n g documents, of e x a c t i s s u e shown, form a p a r t


of t h i s s p e c i f i c a t i o n t o the e x t e n t s p e c i f i e d herein. In the
e v e n t o f c o n f l i c t between documents r e f e r e n c e d h e r e and o t h e r
d e t a i l c o n t e n t of S e c t i o n 3 , 4 , 5 , and 1 0 , t h e d e t a i l r e -
q u i r e m e n t s o f S e c t i o n s 3, 4 , 5 , and 10 s h a l l be c o n s i d e r e d a
s u p e r s e d i n g requirement.
PROJECT AND SYSTEM DOCUMENTS
SPECIFICATIONS
Federal
Military
Contractor
STANDARDS
Federal
Military
Contractor
DRAWINGS
BULLETINS
OTHER PUBLICATIONS
Manuals
Regulations
Handbooks
Etc.

(Copies o f s p e c i f i c a t i o n s , s t a n d a r d s , drawings, b u l l e t i n s ,
and p u b l i c a t i o n s r e q u i r e d by s u p p l i e r s i n c o n n e c t i o n w i t h
s p e c i f i c procurement f u n c t i o n s s h o u l d be o b t a i n e d from
t h e p r o c u r i n g a c t i v i t y o r a s d i r e c t e d by t h e c o n t r a c t i n g
o f f i c e r .)
EXHIBIT I1

SAMPLE FORMAT "B"

S p e c i f i c a t i o n No.'
Release D a t e
Page 1-3

3. REQUIREMENTS

3 .1 Pe'r f o.rnian'ce

3.1.1 P e l f ormarice'

3.1.1.1 Primary Performance C h a r a c t e ' r i s t i c s

3.1.1.2 Secondary Performance C h a r a c t e r i s t i c s

3.1.2 Ope'rability

3.1.2.1 Rel'iability

3.1.2.2 Maintainabilitx

3.1.2.3 U s e f u l L-ife

3.1.2.4 N a t u r a l Environment

3.1.2.5 Transportabil'ity

3.1.2.6 Human P e r f o r m a n c e

3.1.2.7 Safety

3.1.2 . 8 ' I n d u c e d E n v i ronrnen t

3.2 CEI Definition

3.2.1 I n t e r f a c e Requiremen'ts

3.2.1.1 Schematic Arrangement

3 -2.1.2 Detailed Interface Definition


EXHIBIT I1

SAMPLE FORMAT "B"

S p e c i f i c a t i o n No.
R e l e a s e Date' -
Page 1-4

3.2.2 Component 1 , d e n t i fi

3.2.2.1 Government-Furni'shed P r o p e r t y L i s t

3.2.2.2 E n g i n e e r i n g C r i t i c a l Componen'ts L i ' s t

3.2.2.3 L o g i s t i c s C r i t i c a l Components L i s t
3.2.3 Technical llanuals
3.3 Deslgn and C o n s t r u c t i o n
3 . 3 . 1 G e n e r a l Design F e a t u r e s

3.3.2 . S e l e c t i o n of S p e c i f i c a t i o n s and S t a n d a r d s

3.3.3 M a t e r i a l s P a r t s and P r o c e s s e s

3.3.4 S t a n d a r d and Commerical P a r t s

3.3.5 M o i s t u r e and Fungus R e s i s t a n c e

3.3.6 Corrosion o f Metal p a r t s

3.3.7 I n t e r c h a n g e a b i l i t y and R e p l a c e a b i l i ' t y

3.3.8 Workmanship

3.3.9 Electromagnetic Interference

3.3.10 I d e n t i f i c a t i o n and Marking

3.3.11 S t o r a g e

4. QUALITY ASSURANCE PROVISIONS

4.1 Phase I , T e s t / V e r i f i c a t i o n

4.1.1 E n g i n e e r i n g T e s t and E v a l u a t i o n ( o r Development


Test)

4.1.2 Preliminary Q u a l i f i c a t i o n Tests

4.1.3 Formal Q u a l i f i c a t i o n T e s t s

4.1.4 R e l i a b i l i t y T e s t s and A n a l y s e s

E n g i n e e . r i n g C r i t i ' c a l Compo.nent Qua'li'f i'ca.tinn

4.2 Phase 11, I n t e g r a t e d T e s t Requirement


E X H I B I T I1

SAMPLE FORMAT'
. . . "B"

Specification No.
pal
*.LA.ease D a t e
P a g e 1-5

5. PREPARATION FOR DELIVERY

6. NOTES

6.1 S u p p l e m e n ' t a l I n f drniation

.
6 2 A 1 t e rn'a'te Sou'r.ce' Qiia'li'f i ca'ti'on

10. APPENDIX
E X H I B I T I1

SAMPLE FORMAT " CI'

Specification No.
R e v i s i o n No.

Release Date

P a g e 11-1

CONTRACT END ITEM D E T A I L S P E C I F I C A T I O N


(PRIME EQUIPMENT)

PART I1

PRODUCT CONFIGURATION AND ACCEPTANCE T E S T


REQUIREMENTS

(CEI Number)

(APPROVED NOMENCLATURE )

A p p r o v e d by :' A p p r o v e d by :.
(Preparing Activity) (NASA O f f i c e )

Date Approval Date:

C o n t r a c t Number-
EXHIBIT I1
SAMPLE FORMAT "D"

S p e c i f i c a t i o n No.
Release Date
Page 11-2
1. SCOPE

This p a r t of t h i s s p e c i f i c a t i o n e s t a b l i s h e s t h e r e q u i r e -
ments f o r complete i d e n t i f i c a t i o n and acceptance of a l l u n i t s of
( i n s e r t c o n t r a c t end i t e m number and nomenclature) t o be
formally accepted by t h e N a t i o n a l Aeronautics and Space
Administration.
1.1 Product Configuration B a s e l i n e Acceptance

The product c o n f i g u r a t i o n b a s e l i n e s h a l l be
e s t a b l i s h e d by FACI of s e r i e l number ( i n s e r t
C E I s e r i a l number). This u n i t and a l l sub-
sequent u n i t s , r e g a r d l e s s o f i n t e n d e d use,
s h a l l be accepted t o t h e c o n f i g u r a t i o n de-
f i n e d by s e r i a l number ( i n s e r t same s e r i a l
number) u n l e s s changes t h e r e t o have been
formally approved by t h e p r o c u r i n g agency.

2. APPLICABLE DOCUMENTS
The following documents of e x a c t i s s u e shown, form a p a r t
of t h i s s p e c i f i c a t i o n t o t h e e x t e n t s p e c i f i e d h e r e i n . I n t h e
e v e n t of c o n f l i c t between documents r e f e r e n c e d h e r e and o t h e r
d e t a i l c o n t e n t of s e c t i o n s 3 , 4 , 5 , and 10, t h e d e t a i l c o n t e n t
of S e c t i o n 3, 4 , 5, and 1 0 s h a l l be considered a superseding
requirement.
SPECIFICATIONS
Federal
Military
Contractor
STANDARDS
Federal
Military
Contractor
DRAWINGS
BULLETINS
EXHIBIT I1
SAMPLE FORMAT "Dl'

S p e c i f i c a t i o n No.
Release Date
Page 11-3

OTHER PUBLICATIONS
Manuals
Regulations
Handbooks
Etc.

(Copies o f s p e c i f i c a t i o n s , s t a n d a r d s , d r a w i n g s , b u l l e t i n s , and
p u b l i c a t i o n s r e q u i r e d by s u p p l i e r s i n c o n n e c t i o n w i t h s p e c i f i c
procurement f u n c t i o n s s h o u l d b e o b t a i n e d from t h e p r o c u r i n g
a c t i v i t y o r a s d i r e c t e d by t h e c o n t r a c t i n g o f f i c e r . )

SECTION 3. REQUIREMENTS

3.1 Performs

3.2 Product Configuration

3.2.1 M a n u f a c t u r i n g Drawings
The c o n f i g u r a t i o n of t h i s c o n t r a c t end
i t e m s h a l l b e i n a c c o r d a n c e w i t h (con-
t r a c t o r ' s t o p drawing number) , and
drawings and e n g i n e e r i n g d a t a assembled
thereunder.

3.2.2 Government F u r n i s h e d P r o p e r t y L i s t

3.2.3 Standards o f Manufacturing, Manufacturing


P r o c e s s e s and P r o d u c t i o n

3
SECTION 4. QUALITY ASSURANCE

The c o n t r a c t o r r e s p o n s i b l e f o r t h e m a n u f a c t u r e of t h i s CEI
i s r e s p o n s i b l e f o r accomplishment o f e a c h t e s t / v e r i f i c a t i o n
r e q u i r e d he r e i n .

4.1 P r o d u c t Performance and C o n f i g u r a t i o n Requirements/


Q u a l i t y V e r i f i c a t i o n Cross Reference Index

4.2. Test Verifications

4.2.1 Drawing Compliance

4.2.2 ..................
4.2.3 ..................
SAMPLE FORMAT "D" EXHIBIT I1

S p e c i f i c a t i o n No.

Release Date

Page 11-4

Etc.

SECTION 5 , PREPARATION FOR DELIVERY

5.1 P r e s e r v a t i o n and Packaging

5.1.1 Cleaning

5.1.2 Drying

5.1.3 Levels of Packaging

5.1.3.1 Immediate U s e

5.1.3.2 Limited Storage

5.1.3.3 Extended S t o r a g e

5.1.3.4 I n t e r m e d i a t e Packaging

5.2 Packing

5.2.1 Domestic Shipment

5.2.1.1 A
- ir

5.2.1.2 Surface

5.2.2 O v e r s e a s Shipment

5.2.2.1 -
A ir

5.2.2.2 Surface

5.3 Shipment

SECTION 6 . NOTES

SECTION 1 0 . APPENDIX

10.1 A c c e p t a n c e R e q u i r e m e n t s f o r U n i t s o f t h e CEI
'in a T e s t Configuration

10.2 A l t e r n a t e Source Q u a l i f i c a t i o n
11-4 3
EXHIBIT I1

SAMPLE FORMAT "E"

This Specification has been prepared as an Addendum to:

I Specification No.
I

Revision
Release Date
CEI No.

FOR

(Approved Nomenclature)

Used With

(PROJECT OR SYSTEM NAME) (PROGRAM)

This (Addendum) Specification-mustalways be accompanied


. . by the
. Specification
. (above) to which it relates.
The exact content of Specification (insert same number as
above) used as the basic document for this addendum is
the revision referenced above plus the following Specifi-
cation Change Notices to Specification (insert same number
as above).
EXHIBIT I11

PREPARATION OF
CONTRACT END ITEM DETAIL SPECIFICATION
(FACILITY)
E X H I B I T I11

PREPARATION OF
CONTRACT END ITEM DETAIL S P E C I F I C A T I O N
(FACILITY)

CONTENTS

Paragraph Page

1. PURPOSE. ........ . . . . . . . . . . . . . . .III-1


2. SCOPE. . . . . . . . . . . . . . . . . . . . . . . . .III-1
3. APPLICABILITY. . . . . . . . . . . . . . . . . . . . ,111-1
4. REFERENCE DOCUMENTS. . . . . . . . . . . . . . . . . . 111-1
5. EXPLANATION OF TERMS . . . . . . . . . . . . . . . . .III-1
6. PROCEDURAL REQUIREMENTS. . . . . . . . . . . . . . . .III-2

FORMATS AND ILLUSTRATIONS

S a m p l e F o r m a t "A", Specification orm mat T i t l e Page ... .III-9


EXHIBIT I11

PREPARATION OF

CONTRACT END ITEM DETAIL SPECIFICATION

(FACILITY)

1. PURPOSE

T h i s E x h i b i t p r o v i d e s NASA A p o l l o o r g a n i z a t i o n s a n d t h e i r
c o n t r a c t o r s w i t h r e q u i r e m e n t s and guidance f o r t h e p r e p a r a -
t i o n o f t h e d e t a i l e d s p e c i f i c a t i o n f o r each f a c i l i t y c o n t r a c t
end i t e m .

2. SCOPE

These i n s t r u c t i o n s a r e a p p l i c a b l e t o t h e s p e c i f i c a t i o n f o r
f a c i l i t y end i t e m s categorized a s independent f a c i l i t i e s .
The i n s t r u c t i o n s d e f i n e t h e c o n t e n t and f o r m a t f o r e a c h o f
two p a r t s o f t h e F a c i l i t y C o n t r a c t End I t e m D e t a i l S p e c i f i c a -
t i o n , (FCEI S p e c i f i c a t i o n . )

part I - Facility Criteria

P a r t I o f t h e FCEI S p e c i f i c a t i o n i s u s e d t o
specify requirements p e c u l i a r t o t h e design,
development and q u a l i f i c a t i o n o f t h e F a c i l i t y
C o n t r a c t End I t e m .

P a r t I1 - F a c i l i t y C o n s t r u c t i o n C o n t r a c t P l a n s and
Specifications

P a r t I1 o f t h e FCEI S p e c i f i c a t i o n i s u s e d t o
specify exact configuration information
p e c u l i a r t o t h e c o n t r a c t i n g , c o n s t r u c t i o n and
t e s t i n g / q u a l i t y c o n t r o l of t h e F a c i l i t y Contract
End I t e m .

3. APPLICABILITY

A F a c i l i t y C o n t r a c t End I t e m D e t a i l S p e c i f i c a t i o n s h a l l be
p r e p a r e d f o r e a c h f a c i l i t y d e s i g n a t e d as a n i n d e p e n d e n t c o n t r a c t
item. I n s t r u c t i o n s f o r t h e p r e p a r a t i o n of s p e c i f i c a t i o n s f o r
D i r e c t S u p p o r t - R e a l P r o p e r t y I n s t a l l e d Equipment (DS-RPIE)
a r e i n c l u d e d i n E x h i b i t 11.

4. REFERENCE DOCUMENTS
"Design C r i t e r i a and C o n s t r u c t i o n
Standards''
5. EXPLANATION OF TERMS

See E x h i b i t X V I I .
E X H I B I T I11

6 . PROCEDURAL REQUIREMENTS

The C o n t r a c t End Item ~ e t a i S


l pecification (Facility)
The FCEI S p e c i f i c a t i o n i s composed of two p a r t s , each of
which h a s d i s t i n c t and d i f f e r e n t uses i n FCEI a c q u i s i t i o n .
Each of t h e two p a r t s , when d r a f t e d t o comply w i t h t h e s e
i n s t r u c t i o n s , i s complete i n c o n t e n t and format with
r e s p e c t t o i t s intended use. The FCEI S p e c i f i c a t i o n i s
c o n t r o l l e d and accounted a s an e n t i t y , using a s i n g l e
Configuration C h a r t and a s i n g l e S p e c i f i c a t i o n Change
Log, E x h i b i t V I I . P a r t I , F a c i l i t y C r i t e r i a , i s a
product of a Program D e f i n i t i o n Phase o r requirements
a n a l y s i s , and i s t h e e n g i n e e r i n g i n s t r u m e n t used t o
c o n t r a c t f o r design and development of t h e FCEI. Compliance
w i t h P a r t I i s determined by e v a l u a t i o n of q u a l i t y , c o n t e n t ,
and completeness of t h e f a c i l i t y c r i t e r i a document. P a r t
I1 of t h e FCEI S p e c i f i c a t i o n , t h e c o n s t r u c t i o n b i d package
( c o n t r a c t , p l a n s and s p e c i f i c a t i o n ) , i s a p r o d u c t of t h e
d e s i g n (and development, i f a p p l i c a b l e ) c o n t r a c t . P a r t I1
s p e c i f i e s t h e FCEI i n terms of t h e d e t a i l e d c o n f i g u r a t i o n
requirements of t h e f a c i l i t y s u i t a b l e f o r c o n t r a c t i n g
a c t u a l f a c i l i t y c o n s t r u c t i o n . The i n t e g r i t y of P a r t I1
must be e s t a b l i s h e d p r i o r t o i t s acceptance and/or subse-
I q u e n t i s s u a n c e by t h e p r o c u r i n g agency. Acceptance and
i s s u a n c e o f P a r t I1 i s dependent upon t h e accuracy w i t h
which i t s p e c i f i e s d e t a i l c o n f i g u r a t i o n requirements of t h e
I
FCEI, and t h e adequacy of q u a l i t y of each i n d i v i d u a l u n i t
of t h e FCEI t o be produced/procured. The i n t e g r i t y of
P a r t I1 i s e s t a b l i s h e d by a u d i t . The a u d i t i s accomplished
, by cross-comparison of t h e d a t a s p e c i f i e d i n P a r t 11, with
t h e f a c i l i t y c r i t e r i a , s t a n d a r d c o n s t r u c t i o n p r a c t i c e s , and
I adherence t o governing e x h i b i t s , r e g u l a t i o n s , and codes.
I
P a r t I1 i s t h u s e s t a b l i s h e d a s t h e v a l i d e n g i n e e r i n g i n s t r u -
ment t o be implemented c o n t r a c t u a l l y f o r d i r e c t c o n t r o l of
FCEI a c q u i s i t i o n . Compliance w i t h t h e terms of P a r t I1
( b i d package) i s determined by normal c o n s t r u c t i o n c o n t r o l
procedures of t h e c o n s t r u c t i o n agency. The t i t l e page f o r
I t h e FCEI S p e c i f i c a t i o n s h a l l conform t o t h e f o l l o w i n g
I i n s t r u c t i o n s r e f e r e n c e d d i r e c t l y t o sample format "A" :
a. " S p e c i f i c a t i o n Number" - A unique i d e n t i f i e r , w i t h i n
system, t o t h i s FCEI. (See E x h i b i t X . )
b. "Revision Number" -
S e q u e n t i a l l y assigned c h a r a c t e r ( s )
t o uniquely i d e n t i f y each r e v i s i o n o f t h e s p e c i f i c a t i o n .
c. "Release Date" - Date formally r e l e a s e d by t h e procuring
agency.
I
d. "CEI" - C o n t r a c t End I t e m Number. (See E x h i b i t X . )

e. "Approved Nomenclature" - I n accordance w i t h s t a n d a r d


practice.
f. "System I d e n t i f i c a t i o n " - L i s t t h e system o r systems
.which t h e FCEI i s designed t o s u p p o r t .
EXHIBIT I11
g. "Approval Block" - The p r e p a r i n g agency and NASA
o f f i c e w i t h e n g i n e e r i n g r e s p o n s i b i l i t y f o r t h e FCEI
s h a l l validate the specification.
6.2 P r e p a r a t i o n of F a c i l i t y C o n t r a c t End Item D e t a i l
Specification, Part I, Facility Criteria
The following i n s t r u c t i o n a l paragraphs provide s p e c i f i c
d i r e c t i o n f o r t h e p r e p a r a t i o n of f a c i l i t y c r i t e r i a
documents. General d e v i a t i o n s from t h e requirements of t h i s
e x h i b i t r e q u i r e p r i o r approval of t h e p r o c u r i n g agency o r .
p r o g r a m ' o f f i c e a s a p p r o p r i a t e . F a c i l i t y c r i t e r i a , which
d e v i a t e from t h e g e n e r a l r e q u i r e m e n t s ' o f t h i s e x h i b i t ,
must c i t e , i n an appendix, t h e i n s t r u m e n t a u t h o r i z i n g t h e
d e v i a t i o n . The design requirements f a c i l i t y c o n t r a c t end
item s h a l l be s p e c i f i e d i n a f a c i l i t y c r i t e r i a document.
I n r e c o g n i t i o n of t h e scope and n a t u r e of c r i t e r i a r e q u i r e d
f o r given f a c i l i t i e s , t h e following guide s h a l l be used:
6.2.1 F a c i l i t y C a t e g o r i e s . There a r e two g e n e r a l c a t e g o r i e s
of f a c i l i t i e s which s u p p o r t systems. The f i r s t i s
one which i s f u n c t i o n a l l y i n t e g r a t e d w i t h f a c i l i t y
equipment. The second i s t h e type of f a c i l i t y which
i s used with t h e system, b u t i s f u n c t i o n a l l y
independent of t h e system. An i n t e g r a t e d f a c i l i t y
i s one which s a t i s f i e s one o r more of t h e following
criteria:
a. B a s i c s t r u c t u r a l and a r c h i t e c t u r a l f e a t u r e s a r e
designed s p e c i f i c a l l y t o accommodate t h e r e q u i r e -
ments unique t o t h e system.
b. The f a c i l i t y s e r v i c e s form one o r more complex
i n t e r f a c e s w i t h t h e system.
NOTE: A s used h e r e i n , r o u t i n e power, w a t e r , a i r
o r steam s e r v i c e connections a r e n o t
considered "complex" i n t e r f aces.
c. The t o t a l system, i n c l u d i n g f a c i l i t y , forms a
self-contained,independent e n t i t y capable of
o p e r a t i o n w i t h o u t o u t s i d e supply o r s e r v i c e s f o r
a s p e c i f i e d p e r i o d of time.
A d e t a i l e d and complete c r i t e r i a document s h a l l be
accomplished f o r each f a c i l i t y c a t e g o r i z e d a s an
i n t e g r a t e d f a c i l i t y . For a l l o t h e r system f a c i l i t i e s ,
t h e c r i t e r i a document s h a l l be l i m i t e d t o s p e c i f i c a -
t i o n of p h y s i c a l design c o n s t r a i n t s necessary t o
s u p p o r t g e n e r a l system requirements.
6.2.2 P r e p a r a t i o n of the C r i t e r i a Document. P a r t I of t h e
FCEI S p e c i f i c a t i o n s h a l l be prepared
- - t o comply
- - with
t h e foilowing i n s t r u c t i o n s :

6.2.2.1 S e c t i o n 1, "Scope". Begin a s follows:


"This p a r t of this s p e c i f i c a t i o n e s t a b l i s h e s
t h e requirements and b a s i c r e s t r a i n t s /
EXHIBIT I11

c o n s t r a i n t s imposed upon t h e develop-


ment o f a d e s i g n f o r ( i n s e r t n o m e n c l a t u r e )
f a c i l i t y i n s u p p o r t of ( i n s e r t system
.
nomenclature) " Subsequent sentence/
paragraphs s h a l l b r i e f l y d e s c r i b e t h e
i n t e n d e d p u r p o s e and g e n e r a l u s e o f t h e
f a c i l i t y with r e s p e c t t o t h e system t o
which i t i s r e l a t e d .

6.2.2.2 S e c t i o n 2, " A p p l i c a b l e Documents".


Begin a s f o l l o w s : "The f o l l o w i n q documents,
o f - t h e e x a c t i s s u e shown, form a - . p a r t of
t h i s s p e c i f i c a t i o n t o t h e extend s p e c i f i e d
herein. I n t h e e v e n t o f c o n f l i c t between
documents r e f e r e n c e d , and o t h e r d e t a i l e d
c o n t e n t s of t h i s s p e c i f i c a t i o n , t h e d e t a i l e d
requirements h e r e i n s h a l l be considered
superseding." L i s t within t h i s section
t h o s e documents which a r e a p p l i c a b l e t o
p a r a g r a p h s w i t h i n t h e body of t h e s p e c i f i -
c a t i o n . Within t h e s p e c i f i c a t i o n , r e f e r e n c e
t o t h e s e documents s h a l l be made by
r e f e r e n c e t o t h e i r b a s i c document number
o r other d e f i n i t i v e designation.

6.2.2.3 S e c t i o n 3 , "Requirements". This section


s h a l l c o n t a i n performance and d e s i g n
requirements f o r t h e f a c i l i t y . Include
t h e f u n c t i o n a l requirements f o r t h e f a c i l i t y ,
and e s t a b l i s h , r e q u i r e m e n t s which a r e measures
of t h e e f f f ciency/ef f e c t i v e n e s s of t h e
facility. Define t h e f a c i l i t y , i d e n t i f y
c r i t i c a l i n t e r f a c e s , and s p e c i f i y d e s i g n
c o n s t r a i n t s and s t a n d a r d s n e c e s s a r y t o
assure compatibility with e x i s t i n g o r
c o n t e m p l a t e d hardware. For i n t e g r a t e d
f a c i l i t i e s , performance and d e s i g n r e q u i r e -
ments a r e a l l o c a t e d from, i d e n t i c a l w i t h ,
o r i n recognition o f requirements e s t a b l i s h e d
by t h e program s p e c i f i c a t i o n . Requirements
s h a l l b e s p e c i f i e d i n terms of t h e f a c i l i t y
i t s e l f and n o t b e r e f e r e n c e d t o equipment
w i t h which the f a c i l i t y must b e c o m p a t i b l e .
The f o l l o w i n g r e p r e s e n t s a n . o u t l i n e o f
s p e c i f i c i n f o r m a t i o n r e q u i r e d i n t h e FCEI
S p e c i f i c a t i o n ; however, i t i s n o t t o b e
construed a s preventing t h e addition of
such i n f o r m a t i o n a s may b e r e q u i r e d t o
p r o p e r l y i d e n t i f y t h e p e c u l i a r system
f a c i l i t y requirements.

6.2.2.4 S e c t i o n 3.1, " G e n e r a l Concept". Describe


i n d e t a i l t h e u s e t o which t h e f a c i l i t y w i l l
b e p u t ; d e s c r i b e t h e f l o w of p e r s o n n e l ,
m a t e r i a l , and f u n c t i o n s t o b e performed i n
the f a c i l i t y , including t i m e elements, e t c . ;
i d e n t i f y t h e m a i n t e n a n c e and l o g i s t i c
EXHIBIT I11

p o l i c i e s t o b e employed; e s t a b l i s h
design-useful l i f e requirements; e s t a b -
l i s h f a c i l i t y self-sufficiency require-
ments-and s p e c i a l f a c i l i t y s u r v i v a l
requirements.

6.2.2.5 S e c t i o n 3.2. " S i t i n a and L a v o u t " .

a. P r o v i d e an a r e a p l a n showing l o c a t i o n
of f a c i l i t y with respect t o general
area.

b. P r o v i d e a d e t a i l e d s i t e p l a n showing:

(1) Access r e q u i r e m e n t s , s p e c i a l w i d t h
requirements.

(2) R e q u i r e d r e l a t i o n s h i p s between
o u t s i d e elements.

(3) Clearances.

(4) Parking, loading, r e q u i r e d s e t -


backs, paving, etc.

c. Provide a floor-plan l a y o u t of t h e
r e q u i r e d f a c i l i t y showing:

(1) Dimensional r e q u i r e m e n t s .

(2) Height requirements ( c r o s s s e c t i o n ) .

(3) Doors, w i d t h s o f e n t r a n c e s .

(4) C l e a r space requirements (no


column i n t r u s i o n a l l o w e d ) .
(5) Locate s p e c i a l e l e c t r i c a l o r
mechanical p r o v i s i o n s .

(6) B l o c k o u t s , e l e v a t i o n s , anchor
bolts, o r other provisions f o r
equipment.

6.2.2.6 Section 3.3, "General C r i t e r i a " .

a. Civil

(1) Axle o r wheel l o a d s on r o a d s

(2) S p e c i a l l a n e width of roads.

(3) Turn and w e i g h t p r o v i s i o n s f o r


special vehicles.

(4) Jack l o a d s , t r a n s f e r requirements.

(5) P a r k i n g (number of v e h i c l e s ) .
EXHIBIT I11
(6) Grades on r o a d s .

(7) S p e c i a l w a t e r and sewage


requirements. Q u a n t i t y and
n a t u r e o f w a t e r and sewage, i f
special.

(8) Special f i r e protection require-


ments ( e x t e r i o r ) .
(9) Fencing and s e c u r i t y .

(10) L o c a t i o n and t y p e s o f e x i s t i n g
u t i l i t i e s , i f any ( w a t e r , g a s ,
s e w e r , e l e c t r i c a l , storm dralnage) .
b . Architectural

(1) P e r s o n n e l occupancy, t y p e s ,
h o u r s p e r day.
(2) D e s i g n a t i o n o f use o f a r e a s w i t h i n
facility .
(3) Types o f s p e c i a l d o o r s r e q u i r e d .

(4) Floor l e v e l requirements. Floor


drainage.

(5) Window r e q u i r e m e n t s , i f any.


(6) C o n t r o l l i n g dimension r e q u i r e m e n t s .
(7) Clear c e i l i n g heights.
(8) Exterior architectural treatment
( c o n c r e t e , masonry, b r i c k , e t c . ) .
I n d i c a t e whether t r e a t m e n t i s t o
match e x i s t i n g , i f a p p l i c a b l e .
(9): E x p l o s i v e s a f e t y r e q u i r e m e n t s f o r
construction.
c. Structural

(1) Crane and h o i s t l o c a t i o n and l o a d s .


Control requirements.
(2) F l o o r and roof l o a d s . S p e c i a l
l o a d s . S e i s m i c l o a d s , wind l o a d s ,
clear i n t e r i o r heights.
(3) C l e a r span and column-free a r e a s .
(4) B l a s t l o a d s , s h i e l d i n g requirements.
(5) Personnel l a d d e r s , e l e v a t o r s .

(6) T r a n s f e r p i e r s , dock l o a d s .
E X H I B I T I11

(7) General c o n f i g u r a t i o n of building,


number o f s t o r i e s .
(8) B a r r i c a d e s and s h i e l d i n g f o r
explosive b l a s t areas.
d. Mechanical
(1) I n t e r i o r p o t a b l e w a t e r .

(2) Environment l i m i t s . ~em~erature,


humidity, v e n t i l a t i o n .
(3) Compressed a i r .
(4) F i r e protection.
(5) V i b r a t i o n and a c o u s t i c a l r e q u i r e m e n t s .
(6) Equipment c o o l i n g r e q u i r e m e n t s .
e. Electrical

(1) Power r e q u i r e m e n t s - t y p e ..and


magnitude .
(2) Light intensities.
(3) Communications r e q u i r e m e n t s .
(4) Grounding
f. Equipment ( p r o v i d e l a y o u t and l i s t each
p i e c e o f equipment)
(1) Equipment name.

(2) Units required. (number)


(3) Purpose of equipment.
(4) S i z e o f equipment ( g o v e r n i n g
dimensions, w e i g h t ) .
(5) Power requirements - h e a t g a i n ,
BTUs p e r h o u r , t y p e c o o l i n g , i n - o u t
temperatures, r e l a t i v e humidities.
(6) Minimum a c c e s s r e q u i r e m e n t s - front,
back, s i d e s .

6.2.2.7 ' Se'ction 4 , " Q u a l i t y Assurance P r o v i s i o n s " .


This section s h a l l i d e n t i f y - s -p e c i a l t e s t i n g ,
q u a l i t y c o n t r o l p r o c e d u r e s , and/or performance
v e r i f i c a t i o n requirements necessary t o a s s u r e
t h e adequacy o f s p e c i a l o r unique f a c i l i t y
provisions. Standard f a c i l i t y v e r i f i c a t i o n
r e q u i r e m e n t s s h a l l n o t be i n c l u d e d h e r e i n .
E X H I B I T 111

6.3 P r e p a r a t i o n o f F a c i l i t y C o n t r a c t End I t e m D e t a i l
S p e c i f i c a t i o n , P a r t 11, F a c i l i t y Cons.truction C o n t r a c t
P l a n s and S ~ e c i f i c a t i o n s

T h i s p a r t o f t h e FCEI S p e c i f i c a t i o n s h a l l b e b a s e d on P a r t I
of t h i s s p e c i f i c a t i o n . C o n t e n t , and s c o p e o f t h i s p o r t i o n
o f t h e s p e c i f i c a t i o n , a s w e l l as t h e a c t u a l f a c i l i t y
a c q u i s i t i o n p r o c e d u r e s and r e q u i r e m e n t s , a r e p r e p a r e d by
a r c h i t e c t u r a l / e n g i n e e r i n g a c t i v i t i e s , and t h e i r t y p e and
f o r m a t a r e n o t p r e s c r i b e d by t h i s p u b l i c a t i o n .
E X H I B I T I11

SAMPLE FORMAT "A"

S p e c i f i c a t i o n No.

R e v i s i o n No.

Release Date

CONTRACT END I T E M D E T A I L S P E C I F I C A T I O N

(FACILITY)

CRITERIA

AND

DESIGN

( C E I PROJECT NUMBER)

(APPROVED NOMENCLATURE)

FOR

(SYSTEM NAME) (SYSTEM)

A p p r o v e d By Approved By
(Preparing Activity) (Apollo Program
O f f i c e or
equivalent)

Date . Date
EXHIBIT IV

PREPARATION OF CONTRACT END ITEM


DETAIL SPECIFICATION
(IDENTIFICATION ITEM)
EXHIBIT I V

PREPARATION OF CONTRACT END ITEM


DETAIL SPECIFICATION
( I D E N T I F I C A T I O N ITEM)

CONTENTS

Paragraph Page

1. PURPOSE. . . . . . . . . . . . . . . . . . IV-1
r

2. S C O P E . . . . . . . . . . . . . . . . . . . . I V - 1

3. APPLICABILITY. ....... . . . . . . . . IV-1


4. REFERENCE DOCUMENTS. . . . . . . . . . . . . IV-1
5. EXPLANATION O F TERMS . . . . . . . . . . . . IV-2
6. PROCEDURAL REQUIREMENTS. . . . . . . . . . . IV- 2

FORMATS AND ILLUSTRATIONS

S a m p l e F o r m a t "A", speci£ication Format


T i t l e Page. ................. .IV-6

S a m p l e F o r m a t "B", Specification F o r m a t O u t l i n e .IV-7


EXHIBIT IV

PREPARATION OF
CONTRACT END ITEM DETAIL SPECIFICATION
(IDENTIFICATION ITEM)

1. PURPOSE
This Exhibit provides NASA Apollo organizations and contractors
with requirements and guidance for the preparation of a contract
end item (CEI) detail specification for an item of equipment
categorized as an "Identification Item".
2. SCOPE
These instructions define the content and format for a CEI
specification for a contract end item categorized as an "Identi-
fication Item".
3. APPLICABILITY
An "Identification Item" is one which satisfies the following
criteria:
a. It can be qualified by inspection and/or simple
demonstration.
b. Once in manufacturing, quality control at manufacturing
level can be the basis for verification of quality,
and acceptance can be based on verification that the
item, as fabricated and assembled, conforms to the
drawings. Acceptance testing to verify performance
will not be specified.
c. Because of its use, relationship to other end items,
and simplicity of function and design, few, if any,
design changes are anticipated once the product config-
uration baseline for the item is established.
4. REFERENCE DOCUMENTS
DSM4120.3-M 1April1966 "Standardization Policies,
Procedures and Instructions"
NHB 5300-4(1B) April 1969 "Quality Provisions 'for Aero-
nautical and Space System
Contractorsn
NHB 8080.1 May 1964 "Apollo Test Requirements"
NPC 200-3 April 1962 "Inspection Systems Provisions
for Suppliers of Space Mater-
ials, Parts, Components and
Services"
NPC 250-1 30 July 1963 "Reliability Program Provisions
for Space System Contractors"
EXHIBIT IV

5. EXPLANATION OF TERMS
See Exhibit XVII.

I 6. PROCEDURAL REQUIREMENTS
Examples of end items specified in this type of specification
are handling equipment, special tools, adapters, brackets,
mounting fixtures, dollies, work stands, reuseable containers,
off-the-shelf commercial items with minor contractor modifica-
tions, etc.
NOTE: A number of closely related items may be assembled
and controlled as piece-parts under a single draw-
ing and part number as a kit, if they are related
functionally, and will be allocated as a unit for
initially equipping the using agency. Under these
circumstances, the "kit" requires only a single
identification specification.
The format of this specification is based on the premise that
the requirements specification is a brief, concise document,
and that few changes will be required; hence, it is more econom-
ical to reissue the complete specification with a specification
change log that permits changes to individual parts of the doc- '

ument on an "add" and "delete" basis and use of the


configuration chart as the only means of recording changes to the
specification. (See Exhibit VII for specification maintenance
instructions.) All CEI specifications are prepared in two dis-
tinct parts: Part I specifies performance/design and qualifica-
tion requirements. Part I1 specifies product configuration,
quality assurance and preparation for delivery requirements.
For a detailed definition of the nature and use of each of the
two parts of a CEI specification, see Exhibit 11, paragraph 6.
The following instructional paragraphs are numbered or otherwise
identified to refer directly to sample format "A".
Specification Title Data
The title of the specification shall be "Contract End Item
Detail Specification (Identification Item) Performance/
Design/Product Configuration Requirements" and shall in-
clude the following:
"Approved Nomenclature"
I

"Project/System Name" List the project(s) or sys-


tems (s) which the CEI is de-
signed to support. For CEI's
which cannot be identified
with a project (s) or systems(s),
e.g., equipment storage cabinets,
enter the phrase "Not Project(s1
or System (s) Equipment".
EXHIBIT IV

Sp.ecifidation'Ideritification and A~~th~entic'dti'dn'~


Data
Specification identification and authentication data shall
include the following:
"Specification Number" An identifier, unique, within
a project or system, to this
CEI. (See Exhibit X. )
"Revision" Sequentially assigned character(s1
to uniquely identify each revision
of the specification number and
revision identification which may
be composed of alphabetic and/or
numeric characters, or both.
(See Exhibit X. )
"Release Date" Date formally released by the
preparing activity.
"CEI Number" Contract End Item Number.
(See Exhibit X. )
"Approval Block" The preparing activity (contractor
or Government organization pre-
paring the specification) shall
formally approve the specification,
The procuring agency (Apollo Pro-
ject Office or equivalent) shall
formally approve the specification.
6.1 Instructions for the Preparation of Pa'rtI, "Performance/
Design and Qualification Requ.irements
The following instructions are applicable to the preparation
of Part I of the specification:
6.1.1 Section 1, "Scope" This section of the specification
shall begin with opening sentence/paragraph as shown
in sample format "A". A subsequent sentence/para-
graph, as indicated be sample format "A", shall briefly
describe the intended general use of the CEI.
6.1.2 Section 2, "Applicable Documents" This section of the
CEI specification shall begin with the opening sentence/
paragraph contained in sample format "A". List those
documents (specifications, standards, drawings,
bulletins, manuals, etc.) which are applicable to
paragraphs within the body of this part of the speci-
fication (Sections 3 and 4 of Part I). Within the
body of the specification, reference to these documents
shall be made by reference to their basic document num-
ber or other definitive designation. Refer to Defense
Standardization Manual 4120.3-M for further instruc-
tions on listing of applicable documents.
EXHIBIT I V

6.1.3 S e c t i o n 3, "Requirements" Performance/design r e q u i r e -


ments s h a l l be s p e c i f i e d t o t h e l e v e l of d e t a i l neces-
s a r y t o e s t a b l i s h t h e use of t h e C E I i n s u p p o r t of
o t h e r p r o j e c t s , systems o r equipment and f a c i l i t i e s ,
and t o e s t a b l i s h t h a t t h e requirement i s unique and
cannot be s a t i s f i e d from e x i s t i n g NASA i n v e n t o r y .
Requirements s h a l l be s p e c i f i e d q u a n t i t a t i v e l y i n terms
of measurable p h y s i c a l p r o p e r t i e s with t o l e r a n c e s .
Government f u r n i s h e d p r o p e r t y t o be i n c o r p o r a t e d i n
t h e d e s i g n of t h e CEI s h a l l a l s o be s p e c i f i e d . For
C E I 1 s which s u p p o r t p r o j e c t s o r systems, i n c o r p o r a t e
e i t h e r d i r e c t l y o r . b y r e f e r e n c e t h e engineering pro-
d u c t of a n a l y s i s r e c o r d g e n e r a t e d a s a product of
analysis.
6.1.4 S e c t i o n 4 , " Q u a l i t y Assurance" This s e c t i o n s h a l l
i n c l u d e a p p l i c a b l e c o n t e n t of "Apollo T e s t Require-
ments", NHB 8080.1; NASA Q u a l i t y Assurance P u b l i c a t -
t i o n NHB 5300.4(1B) and NPC 200-3; and NASA R e l i a b i l i t y
P u b l i c a t i o n NPC 250-1. S p e c i f y t h e demonstrations/
v e r i f i c a t i o n s necessary t o e s t a b l i s h t h a t t h e i t e m ,
a s designed and developed, s a t i s f i e s each requirement
e s t a b l i s h e d i n S e c t i o n 3 of P a r t I. Accomplishment
of t h e v e r i f i c a t i o n s s h a l l c o n s t i t u t e q u a l i f i c a t i o n
of t h e C E I . For i d e n t i f i c a t i o n items, q u a l i f i c a t i o n
i s l i m i t e d t o i n s p e c t i o n and simple demonstrations.
Requirements s h a l l be s p e c i f i e d t o t h e l e v e l of de-
t a i l n e c e s s a r y t o c l e a r l y e s t a b l i s h t h e v a l i d i t y and
accuracy of t h e v e r i f i c a t i o n method.
6.1.5 S e c t i o n 5 , " P r e p a r a t i o n f o r Delivery" This s e c t i o n i s
n o t a p p l i c a b l e t o P a r t I of a CEI s p e c i f i c a t i o n . See
E x h i b i t 11, paragraph 6.
6.2 I n s t r u c t i o n s f o r t h e P r e p a r a t i o n of P a r t I1 "Product Con-
f i g u r a t i o n and Q u a l i f i c a t i o n Assurance Requirements"
The following i n s t r u c t i o n s a r e a p p l i c a b l e t o t h e p r e p a r a t i o n
of P a r t I1 of t h e s p e c i f i c a t i o n . (See Sample Format " B " . )
6.2.1 S e c t i o n 1, "Scope" Begin w i t h t h e opening sentence/
paragraph contained i n sainple format "B" . Descrip-
t i v e m a t e r i a l i d e n t i f y i n g t h e r e l a t i o n s h i p of t h i s
C E I t o o t h e r p r o j e c t s of systems equipment may be
included.
6.2.2 S e c t i o n 2, "Applicable Documents" Begin w i t h t h e
opening sentence/paragraph contained i n sample format
"Bn. The g e n e r a l i n s t r u c t i o n s f o r S e c t i o n 2 of P a r t I
a r e a p p l i c a b l e , w i t h t h e exception t h a t t h i s s e c t i o n
r e f e r e n c e s o n l y documents which a r e a p p l i c a b l e t o
S e c t i o n s 3, 4 , and 5 of P a r t 11.

6.2.3 S e c t i o n 3, "Requirements" Begin w i t h t h e opening


sentence/paragraph c o n t a i n e d i n sample format "B".
EXHIBIT IV

Normally, for identification items, this section


should be limited to a requirement to comply with
the drawing. Standards of manufacture, manufacturing
processes and production which must be verified at
time and place of delivery to establish the quality
of the CEI, shall be specified. All requirements
shall be specified at environmental conditions normal
to the place of acceptance, and shall not attempt to
simulate the environment in which the CEI shall be
used. Requirements shall be specified in physically
measureable quantitative terms, with tolerances, in
terms of the CEI itself, and without direct reference
to equipments or facilities with which the CEI must
be compatible. Requirements shall be specified to
the level of detail necessary to establish limits
for the verifications to be specified in Section 4
of Part 11.
6.2.4 Section 4, "Quality Assuran'ce" This section shall
include applicable content of "Apollo Test Require-
ments", NHB-8080.1; NASA Quality Assurance Publication
NHB 5300.4(1B) and NPC 200-3; and NASA Reliability
Publication NPC 250-1. The method of confirming
that the CEI, as fabricated and assembled, complies
with the production drawings and the verification/
demonstrations necessary to assure that the CEI, as
manufactured and assembled, satisfies the require-
ments of Section 3 of Part I1 shall be specified.
Each demonstration/verification shall be specified to
the level of detail necessary to establish the va-
lidity and accuracy of the verification method, and
present a clear, nonsubjective determination of the
quality of the CEI.
6.2.5 Section 5, "Preparation for Delivery" This section
shall specify requirements for preservation, pack-
aging, packing, and marking or otherwise preparing
the CEI for shipment. To the.extent practical this
shall be accomplished by referencing established
standards. Where established standards are inade-
quate, see Exhibit 11, Part 11, paragraph "Section 5,
Preparation for Delivery".
6.2.6 Section 6, "Notes" This section of the specification
shall include information of particular importance to
the procuring agency, i.e., ordering information for
technical data.
6.2.7 Section 10, "Appendix" This section of the CEI spec-
ification shall include requirements of limited appli-
cability, such acceptance of the CEI in an instru-
mented configuration. See Exhibit 11, Part 11, para-
graph "Section 10, Appendix".
EXHIBIT I V

SAMPLE FORMAT "A"

CONTRACT END ITEM DETAILED SPECIFICATION


( IDENTIFICATION ITEM)
PERFORMANCE/DESIGN/PRODUCT CONFIGURATION REQUIREMENTS
(APPROVED NOMENCLATURE)
for

P r o j e c t o r System Name P r o j e c t o r System

Spec. NO.

Revision

R e l e a s e Date

C E I No.

Approved ( P r e p a r i n g Agency)

C o n t r a c t Number

Approved ( P r o c u r i n g Agency)

P a r t I "Performance/Design and Q u a l i f i c a t i o n Requirements"

1. Scope

T h i s p a r t of t h i s s p e c i f i c a t i o n e s t a b l i s h e s performance/design

requirements f o r one type-model-series of an equipment i d e n t i f i e d

a s ( i n s e r t nomenclature . T h i s c o n t r a c t end

i t e m (provides (accomplishes)

2. A p p l i c a b l e Documents

The f o l l o w i n g documents of e x a c t i s s u e shown form a p a r t of t h i s

p a r t of t h i s s p e c i f i c a t i o n t o t h e e x t e n t s p e c i f i e d h e r e i n .

3. Requirements

4. Q u a l i t y Assurance
EXHIBIT IV

SAMPLE FORMAT "B"


Part 11, "Product Configuration and Quality Assurance ~equirernents"

1. Scope
This part of this specification establishes the product configuration
requirements for one type-model-series of equipment identified as
(insert nomenclature)
2. Applicable Documents
The following documents of exact issue shown form a part of this
specification to the extent specified herein.
3. Requirements
The configuration of this contract end item shall be in accordance
with contractor's top drawing number and drawing and engineering
data assembled thereunder.
4. Quality Assurance
5. Preparation for Delivery
6. Notes
10. Appendix
10.1 Acceptance of CEI in an Instrumented Configura.tion.
EXHIBIT V

PREPARATION OF
CONTRACT END ITEM DETAIL SPECIFICATION
(REQUIREMENT ITEMS)
EXHIBIT V

PREPARATION O F
CONTRACT END I T E M D E T A I L S P E C I F I C A T I O N
(REQUIREMENT ITEMS)

CONTENTS

Paragraph Page

1. PURPOSE. .................. V-1

2. SCOPE. ................... V-1

3. APPLICABILITY. ....... . . . . . ... V-1

4. REFERENCE DOCUMENTS. . . . . . . . . . ... V-1 .

5. EXPLANATION O F TERMS . . . . . . . . . ... V-2

6. PROCEDURAL REQUIREMENTS. . . . . . . . ... V-2

FORMATS AND ILLUSTRATIONS

Sample F o r m a t " A " , Specification Format


T i t l e Page ................. V-8

Sample Format " B " , Specification F o r m a t O u t l i n e . V-9

S a m p l e F o r m a t "C", Specification F o r m a t O u t l i n e . V-11


EXHIBIT V

PREPARATION OF
CONTRACT END ITEM DETAIL SPECIFICATION
(REQUIREMENT ITEMS)

1. PURPOSE
T h i s E x h i b i t p r o v i d e s NASA A p o l l o o r g a n i z a t i o n s and
c o n t r a c t o r s w i t h r e q u i r e m e n t s and guidance f o r t h e
p r e p a r a t i o n o f a C o n t r a c t End I t e m ( C E I ) d e t a i l s p e c i -
f i c a t i o n f o r i t e m s o f equipment c a t e g o r i z e d a s "Require-
ment I t e m s . "
2. SCOPE
These i n s t r u c t i o n s d e f i n e t h e c o n t e n t and f o r m a t f o r
t h e C E I s p e c i f i c a t i o n f o r c o n t r a c t end i t e m s c a t e g o r i z e d
a s "Requirement I t e m s " .
3. APPLICABILITY
A "Requirement Item" i s one which s a t i s f i e s t h e follow-
ing criteria:
a. I t h a s been developed.

b. I t i s an i t e m which i s Government F u r n i s h e d
Equipment (GFE) .
c. I t i s n e c e s s a r y t o s u p p o r t an i t e m o r i t e m s
b e i n g d e v e l o p e d , e i t h e r t o be used w i t h , o r
t o be assembled i n t o , t h e i t e m ( s ) b e i n g
developed.
4. REFERENCE DOCUMENTS

The f o l l o w i n g documents a r e t o be c o n s i d e r e d a s r e f e r -
ence m a t e r i a l f o r t h e purpose o f i n t e r p r e t i n g t h e
r e q u i r e m e n t s of t h i s e x h i b i t b u t do n o t form a p a r t o f
t h i s exhibit:
EXHIBIT V

AFM 67-1 "USAF Supply Manual, Volume I ,


( o r NASA e q u i - P a r t 11, C h a p t e r 11."
valent)

DSM 4120.3-M 1 April "Standardization Policies,


1966 P r o c e d u r e s and I n s t r u c t i o n s "

" C a t a l o g u i n g Handbook, F e d e r a l
Supply C l a s s i f i c a t i o n , P a r t I ,
Groups and C l a s s e s . "

NHB 5300-4 April " Q u a l i t y P r o v i s i o n s f o r Aero-


(1B) 1969 n a u t i c a l and Space System
Contractors"

NHB 8080.1 May i964 " A p o l l o T e s t Requirements"

NPC 200-3 April " I n s p e c t i o n Systems P r o v i s i o n s


1962 f o r S u p p l i e r s o f Space Mater-
i a l s , P a r t s , Components and
Services."

NPC 250-1 30 J u l y " R e l i a b i l i t y Program P r o v i s i o n s


1963 f o r Space System C o n t r a c t o r s "

5. EXPLANATION OF TERMS

See E x h i b i t X V I I

6. PROCEDURAL REQUIREMENTS

The r e q u i r e m e n t s s p e c i f i c a t i o n i s a s i n g l e document
which s p e c i f i e s t h e i t e m s o f equipment e x i s t i n g i n
i n v e n t o r y (see p a r a g r a p h 3b) n e c e s s a r y t o s u p p o r t
o r t o b e i n s t a l l e d i n t h e c o n t r a c t end i t e m s b e i n g
d e s i g n e d / d e v e l o p e d by a s i n g l e c o n t r a c t o r .

NOTE: C o n t r a c t end i t e m s i n development which


m u s t , d u r i n g t h e p r o g r e s s o f development,
b e t r a n s f e r r e d among c o n t r a c t o r s , a r e n o t
t o be c l a s s i f i e d a s " i n inventory" o r
c a r r i e d i n a requirement. s p e c i f i c a t i o n .

One r e q u i r e m e n t s s p e c i f i c a t i o n s h a l l b e p r e p a r e d by
e a c h c o n t r a c t o r r e s p o n s i b l e f o r development o f c o n t r a c t
end i t e m s , and s h a l l i n c l u d e a l l i n v e n t o r y i t e m s n e c e s s a r y
t o s u p p o r t t h e end i t e m s i n development.
EXHIBIT V

6.1 I n s t r u c t i o n s f o r P r e p a r a t i o n of a Requirements
Specification

The f o r m a t f o r t h e r e q u i r e m e n t s s p e c i f i c a t i o n t i t l e
page s h a l l be i n a c c o r d a n c e w i t h Sample Format "A".
The f o l l o w i n g i n s t r u c t i o n a l p a r a g r a p h s a r e numbered
o r otherwise i d e n t i f i e d t o r e f e r d i r e c t l y t o
Sample Format "B" :

6.1.1 S e c t i o n 1 "Scope" Begin w i t h t h e o p e n i n g


s e n t e n c e / p a r a g r a p h a s shown i n sampie f o r m a t
"B" . A b r i e f , d e s c r i p t i v e e n t r y s h a l l be
i n c l u d e d which e s t a b l i s h e s t h e r e l a t i o n s h i p
of t h e r e q u i r e d i t e m ( s ) t o t h e c o n t r a c t end
i t e m ( s ) and t h e p r o j e c t o r s y s t e m w i t h which
t h e y w i l l b e used. A sample e n t r y might
read: ". . . . s u p p o r t t h e guidance system
of t h e s p a c e c r a f t . "

6.1.2 S e c t i o n 2 " A p p l i c a b l e Documents" Begin w i t h


t h e o p e n i n g s e n t e n c e / p a r a g r a p h a s shown i n
sample f o r m a t "B". ~ u teo t h e n a t u r e and
use of t h i s s p e c i f i c a t i o n , r e f e r e n c e t o
i n d i v i d u a l s p e c i f i c a t i o n s and documents c i t e d
i n t h e body o f t h e s p e c i f i c a t i o n , p e c u l i a r
t o i n d i v i d u a l items of equipment, s h a l l n o t
be redundantly included.

6.1.3 S e c t i o n 3 "Requirements" Begin w i t h t h e


o p e n i n g s e n t e n c e / p a r a g r a p h a s shown i n
sample f o r m a t "B". Each s u b p a r a g r a p h s h a l l
i d e n t i f y one r e q u i r e m e n t i t e m which i s
s p e c i f i e d i n d e t a i l i n an i n d i v i d u a l
appendix t o t h i s s p e c i f i c a t i o n . Each
subparagraph s h a l l i n c l u d e t h e following:

a. Subparagraph number. (Used a s t h e b a s i c


r e f e r e n c e t o each s i n g l e appendix. )

b. F e d e r a l S t o c k C l a s s Code. (Refer t o
H-2-1 C a t a l o g u i n g Handbook F e d e r a l

NASA e q u i v a l e n t . )

P a r t number.
EXHIBIT V

d. Nomenclature.

e. Number of t h e c o n t r a c t end i t e m i n t o which


t h e requirement i t e m i n s t a l l s .

NOTE: F o r t h o s e i t e m s which a r e used


" a s d e l i v e r e d " from t h e i n v e n t o r y
a s an end i t e m , and which a r e n o t
i n s t a l l e d i n o t h e r p r o j e c t o r system/
equipment, e n t e r t h e words "Not
Applicable. "

F o r e a s e i n s p e c i f i c a t i o n m a i n t e n a n c e , no p a r t i c u l a r
s e q u e n c e , o t h e r t h a n s u b p a r a g r a p h number, s h a l l b e
established for e n t r i e s i n Section 3. Items s h a l l be
added t o t h e end o f t h e l i s t a t t h e t i m e i t i s
d e t e r m i n e d t h a t t h e i t e m s h a l l be s u p p l i e d from i n -
ventory. I f an i t e m i s c a n c e l l e d , t h e p a r a g r a p h num-
b e r s h a l l n o t b e used t o r e i d e n t i f y a new i t e m . The
word " c a n c e l l e d " and t h e d a t e o f c a n c e l l a t i o n s h a l l
be t y p e d i n t h e " p a r a g r a p h " column i n l i e u o f t h e
p a r a g r a p h number f o r t h e c a n c e l l e d i t e m , and t h e
r e s p e c t i v e a p p e n d i x removed from t h e s p e c i f i c a t i o n .
I n s t r u c t i o n s f o r t h e p r e p a r a t i o n and c o n t e n t o f t h e
appendices a r e included h e r e i n . The F e d e r a l s t o c k
c l a s s code, where a p p l i c a b l e , and t h e n o m e n c l a t u r e
f o r a c a n c e l l e d i t e m , s h a l l be p r i n t e d i n t h e i r respec-
t i v e columns. Three months a f t e r c a n c e l l a t i o n , t h e
F e d e r a l s t o c k c l a s s code and n o m e n c l a t u r e d a t a f o r a
c a n c e l l e d i t e m may be removed from t h e s p e c i f i c a t i o n ;
however, t h e p a r t i c u l a r p a r a g r a p h number of a c a n c e l l e d
i t e m s h a l l n o t be r e u s e d t o r e i d e n t i f y a n o t h e r i t e m ,
and t h e word " c a n c e l l e d " and t h e d a t e o f c a n c e l l a t i o n
s h a l l c o n t i n u e t o b e p r i n t e d i n t h e " p a r a g r a p h " column
i n a l l succeeding r e v i s i o n s t o t h e s p e c i f i c a t i o n .

6.1.4 S e c t i o n 4 " Q u a l i t y Assurance" I n c l u d e a p p l i c a b l e c o n t e n t


o f "Apollo T e s t Requirements", NHB 8080.1; NASA Q u a l i t y
P u b l i c a t i o n s NHB 5300.4 ( 1 B ) and NPC 200-3; and NASA R e l i a -
b i l i t y P u b l i c a t i o n NPC 250-1. Q u a l i t y assurance require-
ments f o r i t e m s o f equipment s h a l l i n c l u d e n e c e s s a r y
r e q u a l i f i . c a t i o n t o . a new u s e , e n v i r o n m e n t , o r u p r a t e d
performance r e q u i r e m e n t . Requirements f o r r e q u a l i f i c a t i o n
s h a l l be s p e c i f i e d f o r each i t e m i n t h e i n d i v i d u a l
appendix s p e c i f y i n g t h e i t e m . Q u a l i t y assurance require-
ments s h a l l i n c l u d e r e c e i v i n g "bench c h e c k s " o f t h e
r e q u i r e m e n t i t e m t o b e accomplished by t h e c o n t r a c t o r
preparing t h e requirement s p e c i f i c a t i o n . I f these
"bench c h e c k s " a r e complex, t h e y r e q u i r e c l o s e c o o r d i n a -
t i o n with t h e manufacturer of t h e item.

6.1.5 S e c t i o n 5 " P r e p a r a t i o n f o r D e l i v e r y " Requirements b a s i c


t o preparing each item s p e c i f i e d h e r e i n f o r d e l i v e r y
s h a l l b e i n c l u d e d i n t h e r e s p e c t i v e a p p e n d i x which
specifies the i t e m .

6.1.6 S e c t i o n 6 "Notes" A d m i n i s t r a t i v e i n f o r m a t i o n o f impor-


t a n c e t o t h e p r o c u r i n g agency i n t h e u s e o f t h i s
EXHIBIT V
s p e c i f i c a t i o n may be i n c l u d e d h e r e i n , e - g . ,
i d e n t i f i c a t i o n o f manufacturer of i n d i v i d u a l i t e m s
s p e c i f i e d which are complex and w i l l r e q u i r e t h e
c o o r d i n a t e d e f f o r t o f t h e o r i g i n a l m a n u f a c t u r e r and
the contractor preparing the requirement s p e c i f i c a t i o n
t o develop v a l i d r e c e i v i n g t e s t s o r v e r i f i c a t i o n s f o r
the i t e m .

6.1.7 S e c t i o n 1 0 "Appendix" The r e q u i r e m e n t s p e c i f i c a t i o n


s h a l l i n c l u d e an i n d i v i d u a l a p p e n d i x f o r e a c h . r e q u i r e -
ment i t e m . Each a p p e n d i x s h a l l conform t o t h e f o r m a t
i l l u s t r a t e d i n sample f o r m a t "B" and comply w i t h t h e
f o l l o w i n g i n s t r u c t i o n s which a r e numbered o r o t h e r -
w i s e i d e n t i f i e d t o r e f e r d i r e c t l y t o sample f o r m a t "B"

6.1.7.1 "Appendix" E n t e r t h e s u b p a r a g r a p h number of


t h e p a r a g r a p h i n S e c t i o n 3 which i d e n t i f i e s
the i t e m .

6.1.7.2 " F e d e r a l S t o c k C l a s s Code" E n t e r t h e F e d e r a l


s t o c k c l a s s code i n c l u d e d i n t h e r e s p e c t i v e
s u b p a r a g r a p h of S e c t i o n 3.

6.1.7.3 S e c t i o n 1 "Scope" I n c l u d e t h e o p e n i n g
s e n t e n c e / p a r a g r a p h shown i n sample f o r m a t
"B". S u b s e q u e n t i n f o r m a t i o n o f a g e n e r a l
o r d e s c r i p t i v e n a t u r e may b e i n c l u d e d .

6.1.7.4 S e c t i o n 2 " A p p l i c a b l e Documents" The


r e f e r e n c e t o t h e docurcent u s e d a s a b a s i s
f o r identifying the p a r t i c u l a r inventory
i t e m s p e c i f i e d i n t h i s appendix s h a l l b e
included e.g., technical information f i l e ,
government s p e c i f i c a t i o n , m a n u f a c t u r e r s '
s p e c i f i c a t i o n , t e c h n i c a l manual, e t c .

6.1.7.5 S e c t i o n 3 "Requirements" S p e c i f y t h e
p e r f o r m a n c e / d e s i g n r e q u i r e m e n t s which t h e
i t e m must s a t i s f y . Requirements s h a l l b e
limited t o those necessary t o e s t a b l i s h
p r o j e c t o r s y s t e m c o m p a t i b i l i t y , and t o
e s t a b l i s h t h e physical/functional interface
relationship of the i t e m t o o t h e r p r o j e c t
system/equipments f a c i l i t i e s . Requirements
s h a l l be s p e c i f i e d t o a l e v e l o f d e t a i l
n e c e s s a r y t o p e r m i t t h e NASA end i t e m manager
t o s e l e c t a l t e r n a t e items t o t h e one
s p e c i f i c a l l y i d e n t i f i e d above, t o s a t i s f y
t h i s requirement. D e s c r i p t i v e m a t e r i a l which
o u t l i n e s t h e use of t h e i t e m i n t h e p r o j e c t
o r system s h a l l be included. A l l performance/
design requirements s h a l l be s t a t e d i n
p h y s i c a l l y measurable t e r m s , with t o l e r a n c e s ,
EXIIIBIT V

i n t e r m s o f t h e i t e m i t s e l f and n o t by
r e l a t i n g it t o e q u i p m e n t / f a c i l i t i e s with
which i t must b e c o m p a t i b l e . To t h e
e x t e n t applicable, t h e product of
functional analysis, o r similar record
generated a s a product of "systems
e n g i n e e r i n g , " may b e i n c o r p o r a t e d .

6.1.7.6 S e c t i o n 4 " Q u a l i t y Assurance" Include


a p p l i c a b l e c o n t e n t o f "Apollo T e s t Require-
ments, " NHB 8080.1; NASA Q u a l i t y A s s u r a n c e
P u b l i c a t i o n s NHB 5300.4(1B) and NPC 200-3; and
NASA R e l i a b i l i t y P u b l i c a t i o n NPC 250-1.
Specify, i n subparagraphs, requirements f o r
r e q u a l i f i c a t i o n o f t h e i t e m o f equipment $0
a new u s e o f e n v i r o n m e n t , a n d / o r s p e c i f i c a t i o n
of receiving t e s t s / v e r i f i c a t i o n s t o be
accomplished by t h e c o n t r a c t o r r e c e i v i n g t h e
i n v e n t o r y i t e m f o r i n s t a l l a t i o n i n t o program
equipment.

6.1.7.7 P a r a g r a p h 4 . 1 " R e q u a l i f i c a t i o n " When a p p l i c a b l e ,


s p e c i f y t h e r e q u i r e m e n t s and methods f o r
accomplishing r e q u a l i f i c a t i o n o f t h e i t e m t o
a new u s e o r e n v i r o n m e n t . T e s t s / v e r i f i c a t i o n s
s h a l l b e s p e c i f i e d t o t h e l e v e l of d e t a i l
n e c e s s a r y t o e s t a b l i s h t h e s c o p e and a c c u r a c y
o f t h e t e s t method. Formal t e s t / v e r i f i c a t i o n s
s h a l l n o t i n c o r p o r a t e , e i t h e r d i r e c t l y o r by
r e f e r e n c e , d e t a i l t e s t planning documentation
and o p e r a t i n g i n s t r u c t i o n s . Requirements s h a l l
b e t h e b a s i s f o r p r e p a r a t i o n and v a l i d a t i o n
o f s u c h documents.

NOTE: No e n t r y s h a l l b e made i n t h i s
paragraph u n t i l t h e e x a c t i t e m
t o be used t o s a t i s f y t h e
r e q u i r e m e n t h a s been s e l e c t e d and
the related technical data
reviewed.

6.1.7.8 P a r a g r a p h 4.2 " R e c e i v i n g T e s t s " S p e c i f y


r e q u i r e m e n t s f o r t e s t s / v e r i f i c a t i o n s t o be
accomplished by t h e r e c e i v i n g c o n t r a c t o r
p r i o r t o i n s t a l l a t i o n of t h e i t e m i n t o a
c o n t r a c t end i t e m . Reference t e c h n i c a l
manuals, s p e c i f i c a t i o n s o r o t h e r t e c h n i c a l
d a t a t o b e s u p p l i e d by NASA which s p e c i f i e s
s u c h t e s t s , o r which s h a l l b e t h e b a s i s f o r
p r e p a r a t i o n of a t e s t / v e r i f i c a t i o n s p e c i f i -
c a t i o n by t h e r e c e i v i n g c o n t r a c t o r . Tests/
v e r i f i c a t i o n s s h a l l be s p e c i f i e d i n p h y s i c a l l y
measurable t e r m s , with t o l e r a n c e s , i n t e r m s
EXHIBIT V

o f t h e i t e m i t s e l f and w i t h o u t d i r e c t
r e f e r e n c e t o d e t a i l methods f o r a c c o m p l i s h i n g
the t e s t . T e s t s / v e r i f i c a t i o n s s h a l l be
s p e c i f i e d t o t h e l e v e l of d e t a i l necessary
t o c l e a r l y e s t a b l i s h t h e v a l i d i t y and a c c u r a c y
o f t h e t e s t method and p e r m i t a c l e a r , non-
s u b j e c t i v e determination of t h e q u a l i t y of
the i t e m .

6.1.7.9 Section 5 "Preparation f o r Delivery" This


parasrapn s h a l l be l i m i t e d t o d e s c r i p t i v e
info;mation t o a s s i s t NASA i n d e t e r m i n i n g
t h e n a t u r e o f p a c k i n g and p a c k a g i n g r e q u i r e -
ments f o r t h e i t e m f o r s h i p m e n t t o t h e
contractor. I t s h a l l include anticipated
l e n g t h of s t o r a g e p r i o r t o use, s t o r a g e
environment, e t c .
EXHIBIT V

SAMPLE FORMAT "A"

S p e c i f i c a t i o n No.

R e v i s i o n No.

Release Date

CONTRACT END ITEM D E T A I L S P E C I F I C A T I O N

(REQUIREMENT I T E M S )

PERFORMAN CE/DES I GN

AND

PRODUCT CONFIGURATION

RGQUIREMENTS

( C E I NUMBER)

(APPROVED NOMENCLATURE)

FOR

( P R O J E C T OR SYSTEM NAME) ( P R O J E C T OR SYSTEM)

A p p r o v e d By A p p r o v e d By
(Preparing Activity) (NASA O f f i c e )

Date Date

C o n t r a c t Number
EXHIBIT V

SAMPLE FORMAT I' B"

1. SCOPE

The i t e m s of equipment s p e c i f i e d h e r e i n must b e s u p p l i e d from

NASA i n v e n t o r y t o s u p p o r t

2. APPLICABLE DOCUMENTS

Because o f t h e n a t u r e and use o f t h i s s p e c i f i c a t i o n , r e f e r e n c e s

t o documents a p p l i c a b l e t o e a c h p a r t i c u l a r i t e m of equipment

a r e s t a t e d i n t h e p a r a g r a p h which s p e c i f i e s t h e i t e m o f e q u i p -

ment and a r e n o t r e d u n d a n t l y r e c o r d e d h e r e i n .

3. REQUIREMENT

Each o f t h e f o l l o w i n g s u b p a r a g r a p h s r e f e r e n c e an a p p e n d i x which

i d e n t i f i e s an end i t e m o f equipment t o be s u p p l i e d from NASA

inventory. I n t h e appendix, f e a t u r e s and c h a r a c t e r i s t i c s a r e

s p e c i f i e d f o r e a c h e n d i t e m of equipment which must be s a t i s f i e d

t o a s s u r e c o m p a t i b i l i t y o f performance and d e s i g n o f t h e i t e m

w i t h p r o j e c t o r system requirements.

Federal The CEI I n t o


Subparagraph Stock C l a s s Part Which I t
No. (Appendix) Code Number Nomenclature Installs

3.3

4. QUALITY ASSURANCE

Requirements f o r q u a l i t y a s s u r a n c e f o r i t e m s i n c l u d e d h e r e i n a r e

s p e c i f i e d i n t h e i r r e s p e c t i v e appendix i n S e c t i o n 1 0 , "Appendices."
EXHIBIT V

5. PREPARATION FOR DELIVERY

Requirements f o r p r e p a r a t i o n f o r d e l i v e r y of each i t e m s p e c i f i e d

h e r e i n a r e i n c l u d e d i n t h e i n d i v i d u a l appendix which s p e c i f i e s

t h e item i n d e t a i l .

6. NOTES

10. APPENDIX
SAMPLE FORMAT 'C"

Appendix F e d e r a l S t o c k C l a s s Code

1. SCOPE

T h i s appendix e s t a b l i s h e s t h e requirement f o r one i t e m o f

e q u i p m e n t f r o m NASA i n v e n t o r y i d e n t i f i e d a s ( i n s e r t

n o m e n c l a t u r e and t y p e - m o d e l - s e r i e s , and o t h e r i d e n t i f y i n g

d a t a , ) f o r t h e ( i n s e r t / p r o j e c t or system nomenclature. )

2. APPLICABLE DOCUMENTS

3. REQUIREMENTS

4. QUALITY ASSURANCE

4.1 Requalif i c a t i o n

4.2 Receiving T e s t s

5. PREPARATION FOR DELIVERY


EXHIBIT VI

PREPARATION OF DETAIL SPECIFICATION


(CRITICAL COMPONENTS)
EXHIBIT VI

PREPARATION O F DETAIL S P E C I F I C A T I O N
( C R I T I C A L COMPONENTS)

CONTENTS

Paragraph Page

1. PURPOSE. ........ . . . ........ VI-1

2. SCOPE. . . . . . . . . . . . . ........ VI-1

3. APPLICABILITY. . . . . . . . . ........ VIr$

4. REFERENCE DOCUMENTS. . . . . . ........ VI-1

5. EXPLANATION O F T E R M S . . . . . ........ VI-1

6. PROCEDURAL REQUIREMENTS. . . . ........ VI-1

FORMATS AND ILLUSTRATIONS

S a m p l e F o r m a t "A1', E n g i n q e r i n g C r i t i c a l C o m p o n e n t
S p e c i f i c a t i o n T i t l e Page. ......... VI-6
EXHIBIT VI

PREPARATION OF
DETAIL SPECIFICATIONS
(CRITICAL COMPONENTS)
1. PURPOSE
This Exhibit provides NASA Apollo organizations and contractors
with requirements and guidance for the preparation of detail
specifications for critical components which are part of a contract
end item.
2. SCOPE
Administrative and specification requirements are established for
the preparation of detail specifications for components which have
been identified in a contract end item detail specification, as:
a. Engineering critical components
b. Logistic critical components
Critical component detail specifications, with the contract end
item detail specification to which they apply, shall fully define
all qualification requirements for the contract end item (CEI).
3. APPLICABILITY
Applies to all critical component specifications which are
incorporated by reference in a contract end item (CEI) detail
specification (refer to Exhibits I1 and 111), and which are to be
approved by the procuring agency at the time the CEI has been
qualified.
4. REFERENCE DOCUMENTS
The following documents of the exact issue shown, or part thereof
as further described, form a part of this exhibit:
Exhibit I1 "Preparation of Contract End Item Detail
Specification (Prime Equipment)."
Exhibit I11 "Preparation of Contract End Item Detail
Specification (Facility)."
5. EXPLANATION OF TERMS
See Exhibit XVII.
6. PROCEDURAL REQUIREMENTS
6.1 General Requirements
NASA shall normally state the complete requirements for design
and manufacture of a contract end item in a contract end item
EXHIBIT VI
detail specification. Normally, the CEI, and all of its parts,
will be qualified as an entity, and the engineering data and
qualification test results submitted in accordance with the CEI
specification will fully provide the logistic and reprocurement
requirements. In preparing a CEI specification for large and
complex equipment, the contractor, or procuring agency, will
list therein, certain components of the CEI to be individually
specified and qualified as engineering or logistic critical
components. Components so listed in an approved CEI specifica-
tion shall be specified and processed in accordance with this
exhibit.
6.1.1 Engineering Critical Component Selection The contractor
in conjunction with NASA, shall desisnate components of
a CEI as engineering critical components when-one or
more of the following applies:
a. Qualification of the component will suffice to
qualify the entire CEI.
b. Reliability of the component is critical, i.e., it
will jeopardize crew safety, mission success or sig-
nificantly affect the ability of the CEI to perform
its overall function.
c. Technical complexity and/or producibility of the
component is sufficiently critical to warrant an
individual specification.
d. The CEI cannot be adequately qualified except by
separately qualifying the component.
The contractor shall list all engineering critical com-
ponents in Part I of the CEI specification (see Exhibits
I1 and 111). Once Part I of the CEI has been formally
approved, the contractor shall add or delete critical
components therein by submitting a design requirements
ECP. (See Exhibit IX.) The contractor shall proceed in
accordance with this exhibit when the CEI specification
, or ECP is approved.
6.1.2 Logistics Critical Component Selection The contractor,
in conjunction with NASA, shall designate components
of a CEI as logistics.critical components when one or
more of the following applies:
a. The component is an item for which the provisioning
of spares or selection of spares is required.
b. The component has been identified for multiple
sonrce procurement, by NASA.
The contractor, in conjunction with NASA, shall list
all logistic critical components in Part I of the
CEI specification. Once Part I of the CEI has been for-
mally approved, the contractor shall add or delete cri-
tical components therein by submitting a design require-
ments ECP. (See Exhibit IX.) The contractor shall pro-
ceed in accordance with this exhibit when the CEI
specification or ECP is approved.
EXHIBIT V I

6.2 P r e p a r a t i o n o f E n g i n e e r i n g C r i t i c a l Component S p e c i f i c a t i o n s

The c o n t r a c t o r s h a l l p r e p a r e t h e s e d e t a i l s p e c i f i c a t i o n s
i n a c c o r d a n c e w i t h t h e f o r m a t and i n s t r u c t i o n s c o n t a i n e d i n
E x h i b i t I1 and a s m o d i f i e d i n t h e f o l l o w i n g s u b p a r a g r a p h s .
S p e c i f i c a t i o n s f o r e n g i n e e r i n g c r i t i c a l components s h a l l
c o n t a i n b o t h a P a r t I and P a r t 11.

6.2.1 S p e c i f i c a t i o n P a r t I , S e c t i o n 3, "Requirements"
The c o n t r a c t o r s h a l l , t o t h e maximum e x t e n t p r a c t i c a l ,
abbreviate the detailed content of t h i s section.
Applicable paragraphs i n t h e p a r e n t s p e c i f i c a t i o n f o r
t h e C E I , of which t h e component i s a p a r t , s h a l l be
i n c o r p o r a t e d by r e f e r e n c e . A l l r e q u i r e m e n t s i n t h e
component s p e c i f i c a t i o n s h a l l be c o m p a t i b l e w i t h t h e
requirements i n t h e C E I s p e c i f i c a t i o n .

6.2.1.1 P a r a g r a p h 3.2 i n E x h i b i t I1 s h a l l n o t b e u s e d
i n t h e p r e p a r a t i o n o f component
specifications.

6.2.2 S p e c i f i c a t i o n P a r t I , S e c t i o n 4 , " Q u a l i t y Assurance


Provisions" Q u a l i t y assurance provisions s h a l l be
l i m i t e d t o t h e following requirements :

6.2.2.1 The q u a l i f i c a t i o n t e s t i n g r e q u i r e d f o r t h e
component s h a l l b e c o m p l e t e l y s p e c i f i e d .
(See E x h i b i t 11, S e c t i o n 4 , Q u a l i t y A s s u r a n c e
p r o v i s i o n s , and p a r a g r a p h 4.1.3, "Formal
Q u a l i f i c a t i o n Test. ")

6.2.2.2 The r e l i a b i l i t y t e s t i n g and a n a l y s i s , t o t h e


e x t e n t r e q u i r e d f o r t h e component, s h a l l b e
specified. (See E x h i b i t 11, S e c t i o n 4 ,
Q u a l i t y Assurance P r o v i s i o n s , and 4 . 1 . 4 ,
" R e l i a b i l i t y T e s t s and Analyses" .)

6.2.3 S p e c i f i c a t i o n P a r t 11, " P r o d u c t C o n f i g u r a t i o n and


~ c c e p t a n c eT e s t Requirements'' The c o n t r a c t o r s h a l l
p r e p a r e P a r t I1 o f c r i t i c a l component s p e c i f i c a t i o n s
i n a c c o r d a n c e w i t h t h e f o r m a t and i n s t r u c t i o n s c o n t a i n e d
i n E x h i b i t I1 and a s m o d i f i e d i n t h e f o l l o w i n g
subparagraphs.

6.2.3.1 The c o n t r a c t o r s h a l l complete o n l y t h o s e


s u b p a r a g r a p h s i n P a r t I1 which a r e e s s e n t i a l
f o r r e p r o c u r e m e n t o f t h e i t e m from a n o t h e r
s o u r c e ( e . g . , p r o d u c t i o n c o n t r o l and a c c e p t a n c e
t e s t i n g requirements) .
6.2.3.2 S u b p a r a g r a p h s which a r e n o t e s s e n t i a l f o r
reprocurement s h a l l be e n t e r e d with t h e
n o t a t i o n " n o t a p p l i c a b l e " o r "N/A. "
EXHIBIT V I

6.2.3.3 The r e q u i r e m e n t s f o r P a r t I1 s h a l l b e
mutually e s t a b l i s h e d with t h e procuring
agency a t t h e t i m e t h e c r i t i c a l component
i s p r o v i s i o n e d ( i . e . , p r o v i s i o n e d by
e i t h e r t h e c o n t r a c t o r o r p r o c u r i n g agency,
whoever h a s t h e l o g i s t i c s u p p o r t r e s p o n s i -
bility).

6.2.4 E n g i n e e r i n g C r i t i c a l Component S p e c i f i c a t i o n T i t l e
Page. The t i t l e page f o r e n g i n e e r i n g c r i t i c a l component
s p e c i f i c a t i o n s s h a l l be prepared i n accordance with
sample f o r m a t "A" of t h i s e x h i b i t . The s p e c i f i c a t i o n
document and t h e c r i t i c a l component s p e c i f i e d s h a l l
b e i d e n t i f i e d by s t a n d a r d c o n f i g u r a t i o n i d e n t i f i c a t i o n
numbers ( r e f e r t o E x h i b i t X ) .

6.2.4.1 The s p e c i f i c a t i o n i d e n t i f i c a t i o n number of


t h e design a c t i v i t y s h a l l be entered a s
shown. I t s h a l l include the l a t e s t revision
l e t t e r a s s i g n e d by t h e c o n t r a c t o r a t t h e
time o f i n i t i a l s u b m i t t a l f o r formal approval
by t h e p r o c u r i n g agency.

6.2.4.2 The code i d e n t i f i c a t i o n number of t h e d e s i g n


a c t i v i t y s h a l l b e e n t e r e d a s shown.

6.2.4.3 The permanent drawing number (which i s , o r i s


i n c l u d e d i n , t h e p a r t number f o r t h e c r i t i c a l
component) and n o m e n c l a t u r e f o r t h e c r i t i c a l
component, a s a s s i g n e d by t h e d e s i g n a c t i v i t y ,
s h a l l b e e n t e r e d a s shown.

6.2.4.4 The s i g n a t u r e s of t h e a u t h o r i z e d p e r s o n n e l
who approved t h e s p e c i f i c a t i o n a t t h e t i m e
o f i n i t i a l f o r m a l a p p r o v a l by t h e p r o c u r i n g
agency, s h a l l be t h e o n l y s i g n a t u r e s e n t e r e d .

6.3 P r e p a r a t i o n of L o g i s t i c C r i t i c a l Component S p e c i f i c a t i o n s

S p e c i f i c a t i o n s f o r l o g i s t i c c r i t i c a l components s h a l l be
p r e p a r e d i n a c c o r d a n c e w i t h t h e f o r m a t f o r P a r t 11, " P r o d u c t
C o n f i g u r a t i o n and Acceptance T e s t R e q u i r e m e n t s I t t o n l y , a s
d e s c r i b e d i n E x h i b i t 11.

6.4 A d m i n i s t r a t i v e Requirements

C r i t i c a l components s h a l l b e managed a t c o n t r a c t end i t e m


l e v e l s o f c o n t r o l and a s s t a t e d i n t h e s u b p a r a g r a p h s below.

6.4.1 S p e c i f i c a t i o n s and E n g i n e e r i n g Drawings. Critical


component s p e c i f i c a t i o n s s h a l l b e p r e p a r e d and main-
t a i n e d by t h e c o n t r a c t o r and s h a l l b e approved by t h e
p r o c u r i n g agency. E n g i n e e r i n g drawings f o r c r i t i c a l
components s h a l l always b e p r e p a r e d and c o n t r o l l e d a s
p a r t o f t h e drawing " t r e e s " f o r t h e C E I o f which t h e
component i s a p a r t .
EXHIBIT V I

6.4.1.1 The s p e c i f i c a t i o n s h a l l b e p r e s e n t e d f o r
preliminary approval a t t h e r e q u e s t of
t h e p r o c u r i n g agency and s u b m i t t e d f o r
f i n a l approval a t t h e completion o f
q u a l i f i c a t i o n t e s t i n g o f t h e component.

6.4.1.2 Qualification t e s t i n g s h a l l be c e r t i f i e d
a s complete on t h e t i t l e page o f t h e s p e c i -
f i c a t i o n by t h e c o n t r a c t o r o r by t h e
p r o c u r i n g agency a s d i r e c t e d by t h e C e n t e r
program o f f i c e .

6.4.1.3 S p e c i f i c a t i o n a p p r o v a i and c e r t i f i c a t i o n
s h a l l c o n s t i t u t e completion o f q u a l i f i c a t i o n
t e s t i n g , u n l e s s f u r t h e r a u t h o r i z e d by ECP.

6.4.1.4 Drawings, o r d a t a o t h e r t h a n t h e s p e c i f i c a t i o n ,
s h a l l b e s u b m i t t e d f o r c r i t i c a l components
u n l e s s o t h e r w i s e s p e c i f i e d by c o n t r a c t .

6.4.2 Q u a l i f i c a t i o n Testing. Q u a l i f i c a t i o n of c r i t i c a l
components s h a l l b e accomplished as p a r t o f t h e
q u a l i f i c a t i o n program f o r t h e CEI of which t h e y a r e
a part.

6.4.2.1 T e s t schedules s h a l l be planned f o r completion


p r i o r t o a c c e p t a n c e o f t h e f i r s t CEI t o b e
d e l i v e r e d f o r t h e i n t e n d e d u s e o f type-model-
series. Normally, t h i s w i l l b e a t t h e t i m e
o f FACI f o r t h e C E I .

6.4.2.2 T e s t d a t a s h a l l b e s u b j e c t t o r e v i e w and
s u r v e i l l a n c e by t h e l o c a l r e p r e s e n t a t i v e o f
t h e p r o c u r i n g agency.

6.4.2.3 T e s t d a t a and o t h e r r e p o r t s s h a l l b e p r e p a r e d
f o r s u b m i t t a l u n l e s s o t h e r w i s e s p e c i f i e d by
t h e p r o c u r i n g agency.
EXHIBIT VI

SAMPLE FORMAT "A"


Specification No.
Code Identification No..

ENGINEERING CRITICAL COMPONENT SPECIFICATION


PART I

PERFORMANCE/DESIGN AND
QUALIFICATION REQUIREMENTS
and
PART I1

PRODUCT CONFIGURATION AND


ACCEPTANCE TEST REQUIREMENTS
for
(Permanent Drawing Number and Nomenclature)

Approved by: Approved by:


(Designee) (Designee)
(Design Activity Contractor's (Procuring Agency's Name)
Name 1
EXHIBIT VII

SPECIFICATION MAINTENANCE
EXHIBIT VII

SPECIFICATION MAINTENANCE

CONTENTS

Paragraph Page
1. PURPOSE........ ....................................VII-1
2. SCOPE ..............................................VII-1
3. APPLICABILITY............... .......................VII-1
4. REFERENCE DOCUMENTS.. ..............................VII-1
5. EXPLANATION OF TERMS.. .............................VII-2
6. PROCEDURAL REQUIREMENTS.... ........................VII-2

FORMATS AND ILLUSTRATIONS

Sample Format "A", Specification Change Notice .........VII-7


Sample Format "B", Specification Change Log ............VII-8
Sample Format "C", Specification Configuration Chart...VII-9
Sample Format "D", Specification Identification Index..VII-10
EXHIBIT VII

SPECIFICATION MAINTENANCE

1. PURPOSE
This Exhibit provides NASA Apollo oxganizations and contractors
with requirements and guidance for the preparation of Specifica-
tion Change Notices, and for the formal recording of changes to
all specifications discussed in Exhibits I through VI.
2. SCOPE
These instructions define the format and content for the following
documents, which pertain to the preparation of Specification
Change Notices, and for the approval, control, format, and record-
ing thereof.
a. Specification Change Notice Sample Format "A"
Note: Where using agencies exercise the option of Paragraph 1.
Policy (page 1 of this document) Specification Change
Notices shall be prepared and used as specified by the
"Changes and Revisions" requirements of MIL-STD-490.
b. Specification Change Log Sample Format "B"
c. Specification Configuration Chart Sample Format "C"
d. Specification Identification Index Sample Format I'D"
3. APPLICABILITY
Contractors to NASA are responsible for the compliance of their
subcontractors, vendors and suppliers.
4. REFERENCE DOCUMENTS
The following exhibits of this document shall be considered as
reference material for the purpose of interpreting the require-
ments of this exhibit, but do not form a part of this exhibit:
Exhibit I "Preparation of Program, Project and
System Performance and Design Requirements
Specification"
Exhibit I1 "Preparation of Contract End Item Detail
Specification (prime Equipment)"
Exhibit I11 "Preparation of Contract End Item Detail
Specification (Facility)"
Exhibit IV "Preparation of Contract End Item Detail
Specification (~dentificationItem)"
EXHIBIT V I I

Exhibit V " P r e p a r a t i o n of C o n t r a c t End Item


D e t a i l S p e c i f i c a t i o n (Requirement I t e m s ) "

Exhibit V I " P r e p a r a t i o n of D e t a i l S p e c i f i c a t i o n
( C r i t i c a l Components)"

Exhibit I X " P r e p a r a t i o n of E n g i n e e r i n g Change P r o p o s a l s


f o r C o n t r a c t End Items. "

5. EXPLANATION OF TERMS

See E x h i b i t X V I I

6. PROCEDURAL REQUIREMENTS

The p r e p a r a t i o n and formal r e c o r d i n g of s p e c i f i c a t i o n change


n o t i c e s s h a l l be accomplished a s r e q u i r e d by t h i s e x h i b i t .
The f o l l o w i n g i n s t r u m e n t s a r e used t o f o r m a l l y t r a n s m i t
and/or r e c o r d changes t o approved s p e c i f i c a t i o n s , and s h a l l
be p r e p a r e d t o comply w i t h t h e f o l l o w i n g i n s t r u c t i o n s r e -
f e r e n c e d t o t h e formats a t t a c h e d :

6.1 S p e c i f i c a t i o n Change N o t i c e (SCN)

The s p e c i f i c a t i o n change n o t i c e i s used t o r e c o r d


e x a c t changes t o all approved s p e c i f i c a t i o n s . Each
ECP which changes t h e e s t a b l i s h e d b a s e l i n e s h a l l n o t e
t h e e f f e c t of t h e change on s p e c i f i c a t i o n s and s h a l l
have an SCN e n c l o s e d w i t h it. The SCN s h a l l , when
s u b m i t t e d f o r a p p r o v a l , r e f l e c t t h e change t o t h e
s p e c i f i c a t i o n t h a t w i l l r e s u l t i f t h e ECP i s approved.
B~ d e f i n i t i o n , a l l C l a s s I e n g i n e e r i n g chariges- r e q u i r e an
SCN and v i c e v e r s a . SCN's w i l l n o t be d i s t r i b u t e d t o
o t h e r a c t i v i t i e s on t h e s p e c i f i c a t i o n d i s t r i b u t i o n l i s t
u n t i l t h e SCN h a s been approved by t h e p r o c u r i n g agency.
E r r a t a changes of a minor n a t u r e t h a t c o r r e c t t y p o g r a p h i c a l
e r r o r s , p u n c t u a t i o n , e t c . , s h a l l be c o l l e c t e d and sub-
m i t t e d w i t h t h e n e x t t e c h n i c a l l y r e q u i r e d ECP and
accompanying SCN. E r r o r s i n s p e c i f i e d dimensions,
p a r a m e t e r s , t o l e r a n c e , e t c , s h a l l n o t be c l a s s e d a s
e r r a t a changes, and s h a l l r e q u i r e formal a p p r o v a l of
t h e p r o c u r i n g a c t i v i t y . Each SCN t o a s p e c i f i c a t i o n
s h a l l be i n s e r t e d i n f r o n t of t h e page it m o d i f i e s .

6 -1.1 P r e p a r a t i o n of t h e SCN. The SCN format i s


i l l u s t r a t e d i n sample format " A " The i n -
s t r u c t i o n s f o r completing t h e SCN a r e a s
.
follows :

6.1.1.1 Block Completion. A l l b l o c k s s h a l l


c o n t a i n an e n t r y . The d a t e s h a l l
correspond t o t h e d a t e e n t e r e d on
t h e r e l a t e d ECP. I f t h e i n f o r m a t i o n
EXHIBIT VII

is not available, use TBD (to be deter-


mined); if it is not applicable, use N/A.
If all data cannot be included within the
space allocated on the forms, use attach-
ments as necessary, with appropriate refer-
ences in the blocks.
6.1.1.2 Supersession. When a contractor is re-
quested to resubmit an SCN, the resubmitted
SCN shall retain the same SCN number with
a new date. An SCN may be revised and re-
submitted for the following reasons:
a. A revision to the ECP.
b. As requested by the procuring agency.
c. Contractor initiated, e.g., typograph-
ical corrections, supplying the latest
engineering information, etc.
When the revision and resubmittal of an
SCN cannot be correlated with specific
CCB direction, the contractor shall
clearly state the reason for revision in
the submittal letter. When an SCN is re-
vised and resubmitted, the resubmitted SCN
shall show that the previous dated SCN has
been superseded. The contractor shall not
cancel an SCN that has been formally sub-
mitted to the procuring organization with-
out formal approval of the procuring agency.
An SCN may be cancelled prior to submission
to the procuring agency. In such cases,
contractor records shall show that cancel-
lation was the result of "in-house" activity.
6.1.1.3 SCN Numbers. (See Exhibit X)
6.1.1.4 Preliminary/Final SCN's. Preliminary SCN's
shall be clearly marked as such. Final
SCN's shall be indicated by the completion
of block 5, citing the contractual authority,
e.g., a Contract Change Notification (CCN).
When mutually agreed between the contractor
and the procurring agency, final SCN's may
be transmitted on a periodic basis in a group
rather than individually on an as accom-
plished basis.
6.1.1.5 Effectivity (Block 6). Block 6 shall be
completed to show the Contract End Item
Serial Numbers of all articles affected
by the SCN.
6.1.1.6 Effect of Change (Block 7). Block 7 shall in-
dicate specifically the specification change
to be made. In those instances when an
EXHIBIT VII

ECP does not result in an actual change


to the text of the specification, the entry
in this block shall merely state that this
ECP is added.to the Specification Change
Log. If the change to the specification
is in the wording of a paragraph, include,
verbatim, the statement of change to the
specification, which shall call out the
paragraph and be in one of the following
fo m s :
a. Add:
b. Delete:
c. Change from to
6.2 Specification Change Log
The Specification Change Log is used with - all types of
specifications to formally record contractually authorized
Specification Change Notices to an approved revision of
the specification. Therefore, the Specification Change
Log, in addition to reflecting an identification of
applicable SCN's, shall in fact, serve as a continuation
of the specification configuration chart described in
paragraph 6.3. The contractor will be required to
submit a revised and current log, as a cover sheet, to
each final SCN submitted for approval. The Specification
.
Change Log shall be prepared to comply with sample format
II B I'
A Specification Change Log shall be prepared and
submitted with each SCN and ECP. On those ECP's that
do not affect the words and criteria in the specification
and merely change hardware, the SCN prepared will indi-
cate only that the ECP has been added to the change log.
6.3 Specification Configuration Chart
The Specification Configuration Chart shall be prepared
to comply with sample format "C". The Configuration
Chart is a summary record which identifies approved
engineering change proposals with indivual revisions
to the specification. The chart shall not be updated
by the contractor, except by means of complete revision
and updating of the entire specification, subject
to the approval of the procuring organization and
in accordance with this exhibit. The Specification
Configuration Chart shall be inserted between the
title page and the first page of the specification.
A Specification Configuration Chart shall be prepared
and submitted with each revision of a Specification.
EXHIBIT VII

A revision is defined as the reissue of the specifi-


cation, with all the SCN's incorporated in the body
of the specification. A specification shall not be
revised without specific approval of the procuring
agency. The specification revision shall incorporate
the information identified on the latest approved
Specification Change Log. Configuration charts shall
be revised to incorporate all applicable ECP entries
which were recorded in the log. At the discretion
of the CMO, the specification may be maintained
by requiring replacement pages which shall accompany
the SCN. The CMO will establish a procedure to
indicate that a replacement page has been used
and properly inserted in the applicable specification.
6.5 Specification Identification Index
6.5.1 The Specification Identification Index shall
be prepared to comply with the sample format
"D". The Specification Identification Index
is a record which identifies all specifica-
tions, and -
all approved changes thereto.
This document will be prepared by the con-
tractor. Publication and distribution of the
index will be as specified by the procuring
agency. The procuring agency, through copies
of CCB Directives, will keep the contractor
advised which SCN's will appear in the index.
There will be a separate page for each speci-
fication. The initial issue will include all
specifications which are part of the design
requirements baseline. As requirements for
additional items are established, additional
specifications will be added to the index.
6.5.1.1 Preparation of the Specification
Identification Index:
1. Nomenclature. Enter the title
of the specification being
reported.
2. Enter the number of the specifi-
cation .being reported.
3. Enter the contract end item
number assigned by the contractor
for this item of hardware.
EXHIBIT V I I

E n t e r the i n i t i a l p a r t number
a s s i g n e d t o t h e c o n t r a c t end
i t e m ( t h i s normally o c c u r s upon
r e l e a s e o f engineering) .
Enter the d a t e t h e c o n t r a c t o r has
s c h e d u l e d f o r FACI o f t h e C E I b e i n g
r e p o r t e d . E n t e r a "C" a f t e r t h e
d a t e t o i n d i c a t e a c t i o n completed.
E n t e r t h e d a t e s c h e d u l e d f o r sub-
m i t t a l o f P a r t I1 of t h e s p e c i f i c a t i o n ,
a s e s t a b l i s h e d a t t h e c r i t i c a l design
review. E n t e r a "C" a f t e r t h e d a t e t o
i n d i c a t e a c t i o n completed.
Enter t h e d a t e scheduled f o r approval
of P a r t I1 o f t h e s p e c i f i c a t i o n i n
q u e s t i o n . E n t e r a "C" a f t e r t h e d a t e
t o i n d i c a t e a c t i o n completed.
E n t e r t h e SCN number o f each approved
SCN, and t h e r e s p e c t i v e ECP number.
E n t e r t h e t i t l e o f each SCN.
E n t e r t h e s p e c i f i c a t i o n name and number
of each a s s o c i a t e c o n t r a c t o r and
s p e c i f i c a t i o n number a f f e c t e d by t h e
change.
E n t e r t h e SCN number f o r t h e a s s o c i a t e d
c o n t r a c t o r s p e c i f i c a t i o n a f f e c t e d by
t h e change.
E n t e r t h e name of t h e c o n t r a c t o r r e -
s p o n s i b l e f o r t h e CEI b e i n g r e p o r t e d .
EXHIBIT VII

ITEM EFFECTED

THIS COLUMN SHALL BE


USED TO INDICATE
END ITEM AFFECTED, PUl
AIR VEHICLE. DENTIFICATION.
OR REQUIREMENT SPECIIICATIO'
As APPLICABLE.
S P E C l F l C A T l O t l CONFIGURATION C H U T

ECP'S PRODUCTION

ILLST ALL ECP'S CONSTITUTING THE BASELINE


CONFIGURATION 1

MCORPORArED ECP'S
ECP'S APPLIED AGAINST THE END ITEM

(LIST ALL ECP'S APPLlED AGAINST THE END ITEM


SUBSEQUENT T O THE BASIC ISSUE AND CURRENT
mTH ' f F i E ~ l F s f Z Z S ~ ~ G B ~ i Z ~ ~ T a ijl;
EXHIBIT VIII

PROCEDURES FOR
PROGRAM, PROJECT AND SYSTEM
REQUIREMENTS SPECIFICATION CHANGES
EXHIBIT VIII

PROCEDURES FOR
PROGRAM, PROJECT AND SYSTEM
REQUIREMENTS SPECIFICATION CHANGES

CONTENTS

Paragraph Page

I. PURPOSE. ........ . . . . . . . . . .VIII-1

2. SCOPE. . . . . . . . . . . . . . . . . . . .VIII-1

3. APPLICABILITY. . . . . . . . . . . . . . . .VIII-1

4. REFERENCE DOCUMENTS. . . . . . . . . . . . .VIII-1

5. EXPLANATION OF TERMS . . . . . . . . . . . .VIII-2

6. PROCEDURAL REQUIREMENTS. . . . . . . . . . .VIII-2

FORMATS AND ILLUSTRATIONS

Figure 1 Configuration Control Board


Directive. ................. .VIII-5/6
EXHIBIT V I I I

PROCEDURES FOR
PROGRAM, PROJECT AND SYSTEM REQUIREMENTS
SPECIFICATION CHANGES

1. PURPOSE

T h i s E x h i b i t p r o v i d e s NASA A p o l l o o r g a i n z a t i o n s w i t h r e q u i r e -
ments and g u i d a n c e f o r u n i f o r m p r o c e d u r e s f o r p r e p a r i n g , f o r m a t i n g
and p r o c e s s i n g r e q u i r e m e n t s changes t o t h e A p o l l o Program S p e c i -
f i c a t i o n and r e q u i r e m e n t s changes t o P r o j e c t and System S p e c i f i -
c a t i o n s when t h e s e s p e c i f i c a t i o n s a r e n o t C E I S p e c i f i c a t i o n s .

2. SCOPE

T h i s E x h i b i t e s t a b l i s h e s r e q u i r e m e n t s f o r c o n f i g u r a t i o n c o n t r o l by
NASA o r g a n i z a t i o n s and f o r s u b m i t t a l o f r e q u i r e m e n t s changes which
w i l l a f f e c t t h e Apollo Program, P r o j e c t a n d / o r System S p e c i f i c a t i o n s .
T h i s E x h i b i t i n c l u d e s p r o c e d u r e s by which t h e NASA o r g a n i z a t i o n s s h a l l
document and p r o p o s e changes f o r s u b m i t t a l and r e c o r d f o r m a l
approval o r disapproval, a s required. These p r o c e d u r e s a r e b a s e d
on :

a. The u s e o f program b a s e l i n e s t o e s t a b l i s h t h e d e p a r t u r e
p o i n t s f o r c o n f i g u r a t i o n c o n t r o l o f t h e system.

b. The u s e o f a program p e r f o r m a n c e / d e s i g n r e q u i r e m e n t s
s p e c i f i c a t i o n t o d e f i n e and document t h e program r e q u i r e m e n t s
b a s e l i n e , and r e q u i r e m e n t s c h a n g e s t h e r e t o .

c. The u s e o f p r o j e c t and s y s t e m p e r f o r m a n c e / d e s i g n r e q u i r e m e n t s
s p e c i f i c a t i o n s t o d e f i n e and document t h e p r o j e c t and s y s t e p
r e q u i r e m e n t s b a s e l i n e s and r e q u i r e m e n t s changes t h e r e t o .

d. The u s e o f E n g i n e e r i n g Change P r o p o s a l (ECP) p r o c e d u r e s i n


MIL-STD-480 a s t a i l o r e d t o A p o l l o r e q u i r e m e n t s f o r program
management.

P r o p o s a l s f o r changing t h e d e s i g n , p r o d u c t i o n , t e s t , r e t r o f i t , o r
s u p p o r t of d e l i v e r a b l e c o n t r a c t end i t e m s s h a l l b e p r o c e s s e d i n
accordance with E x h i b i t I X .

3. APPLICABILITY

T h i s E x h i b i t i s a p p l i c a b l e d u r i n g t h e D e f i n i t i o n and A c q u i s i t i o n
P h a s e s o f a program.

4. REFERENCE DOCUMENTS

The f o l l o w i n g documents a r e t o b e c o n s i d e r e d a s r e f e r e n c e m a t e r i a l
f o r t h e p u r p o s e o f i n t e r p r e t i n g t h e r e q u i r e m e n t s of t h i s E x h i b i t ,
b u t do n o t form a p a r t of t h i s E x h i b i t :
EXHIBIT V I I I

MIL-STD-480 30 O c t o b e r "Configuration Control-Engineering


1969 Changes, D e v i a t i o n s and Waivers."

Exhibit I " P r e p a r a t i o n o f Program, P r o j e c t


and System Performance and Design
Requirements S e p c i f i c a t i o n s . "

Exhibit V I I " S p e c i f i c a t i o n Maintenance. "

Exhibit I X " P r e p a r a t i o n o f E n g i n e e r i n g Change


P r o p o s a l s f o r C o n t r a c t End I t e m s . "

Exhibit X "Requirements f o r C o n f i g u r a t i o n
I d e n t i f i c a t i o n Numbers. "

5. EXPLANATION O F TERMS

See E x h i b i t X V I I .

6. PROCEDURAL REQUIREMENTS

6.1 Background I n f o r m a t i o n

The D e f i n i t i o n Phase i s c h a r a c t e r i z e d by t h e c o m p l e t i o n o f
t h e A p o l l o Program S p e c i f i c a t i o n and t h e a s s o c i a t e d P r o j e c t ,
System, and End I t e m ( P a r t I ) S p e c i f i c a t i o n s . These
s p e c i f i c a t i o n s a r e b a s e d on t h e o p e r a t i o n a l r e q u i r e m e n t s t o
c a r r y o u t t h e Apollo mission. The Program S p e c i f i c a t i o n i s
t h e s i n g l e a u t h o r i t a t i v e t o p l e v e l s p e c i f i c a t i o n which
e s t a b l i s h e s r e q u i r e m e n t s which a r e a p p l i c a b l e t o a l l Program
elements. The Program S p e c i f i c a t i o n i s p r e p a r e d by t h e
Apollo Program O f f i c e . The P r o j e c t S p e c i f i c a t i o n i s t h e
s i n g l e a u t h o r i t a t i v e s e c o n d l e v e l s p e c i f i c a t i o n which
e s t a b l i s h e s r e q u i r e m e n t s which a r e a p p l i c a b l e t o a s i n g l e
P r o j e c t and d i r e c t l y s u p p o r t s t h e Program l e v e l r e q u i r e m e n t s .
The System S p e c i f i c a t i o n s a r e t h e n e x t t i e r o f s p e c i f i c a t i o n s
t h a t support t h e P r o j e c t l e v e l requirements. The P r o j e c t /
System S p e c i f i c a t i o n s a r e p r e p a r e d by t h e NASA C e n t e r s a n d / o r
c o n t r a c t o r s a s d i r e c t e d by t h e p r o c u r i n g agency. A t t h e
c o n c l u s i o n o f t h e d e f i n i t i o n p h a s e , t h e program w i l l have been
d e f i n e d i n t e r m s o f c o n t r a c t end i t e m s ( C E I s ) . The c o n t r a c t
end i t e m s p e c i f i c a t i o n s s h a l l e s t a b l i s h t h e d e s i g n r e q u i r e m e n t s
b a s e l i n e f o r each end i t e m . Thereafter, configuration control
w i l l be accomplished a t c o n t r a c t end i t e m l e v e l .

6.2 G e n e r a l Requirements

Requirements changes s h a l l b e processes a s r e q u i r e m e n t s


ECPs i n a c c o r d a n c e w i t h t h i s i n s t r u c t i o n . Additionally,
e a c h ECP w i l l b e accompanied by a SCN. MIL-STD-480 i s
t h e p o l i c y document used a s a g u i d e f o r p r o p o s i n g
r e q u i r e m e n t s changes. The ECP p r o c e d u r e s p r o v i d e t h e
Apollo Program Manager and C e n t e r Program Managers w i t h :
EXHIBIT V I I I
a. A uniform p r o c e d u r e f o r s u b m i t t i n g proposed changes t o
approved r e q u i r e m e n t s which have d e f i n e d t h e formal re-
q u i r e m e n t s b a s e l i n e f o r program d e f i n i t i o n , d e s i g n and
development.
b. A method f o r documenting t h e t e c h n i c a l , f i s c a l and
m i s s i o n i m p a c t o f t h e proposed change on t h e management
o f t h e program.
6.3 P r o c e s s i n g of Requirements Changes
Approved r e q u i r e m e n t s a r e documented i n an approved s p e c i f i -
c a t i o n . Changes i n t h e s e r e q u i r e m e n t s s h a l l b e documented
by S p e c i f i c a t i o n Change N o t i c e s (SCNs) o r by complete r e v i s i o n
o f t h e s p e c i f i c a t i o n a s p r o v i d e d by E x h i b i t V I I . Specific
requirements i n t h e s p e c i f i c a t i o n s h a l l be designated a s
d e f i n i n g t h e a p p r o p r i a t e requirements b a s e l i n e . T h i s base-
l i n e establishes t h e departure point f o r configuration control
of t h e requirements. Changes which a f f e c t t h e d e f i n e d base-
l i n e s h a l l be f u r t h e r approved and documented by r e q u i r e m e n t s
ECP change p r o c e d u r e s . A l l c o n t r a c t o r changes t o c o n t r a c t
end i t e m s s u b m i t t e d f o r a p p r o v a l t o t h e Program Manager's
C o n f i g u r a t i o n C o n t r o l Board (CCB) s h a l l b e reviewed f o r e f f e c t s
on s p e c i f i c a t i o n r e q u i r e m e n t s . In the event the Contractor's
ECP a f f e c t s a P r o j e c t / S y s t e m S p e c i f i c a t i o n , t h e Program Mana-
g e r ' s CCB w i l l r e q u i r e i n i t i a t i o n o f a r e q u i r e m e n t s ECP t o
change t h e s p e c i f i c a t i o n . The ECP w i l l b e p r o c e s s e d through
t h e Program Manager's CCB. A l l proposed changes t o P r o j e c t /
System S p e c i f i c a t & o n s w i l l b e reviewed f o r e f f e c t on t h e
Program S p e c i f i c a t i o n . I n t h e e v e n t a change t o a P r o j e c t /
System S p e c i f i c a t i o n a f f e c t s t h e Program S p e c i f i c a t i o n , t h e
Program Manager's CCB w i l l r e q u i r e i n i t i a t i o n o f a r e q u i r e -
ment ECP t o change t h e Program S p e c i f i c a t i o n . The ECP w i l l
be p r o c e s s e d through t h e Program Manager's CCB t o t h e Apollo
Program O f f i c e CCB. A l l proposed r e q u i r e m e n t s changes t o t h e
Apollo Program S p e c i f i c a t i o n under c o n s i d e r a t i o n by t h e Apollo
Program O f f i c e w i l l b e c o o r d i n a t e d through C o n f i g u r a t i o n Manage-
ment O f f i c e c h a n n e l s and Program Manager's CCB f o r program
impact p r i o r t o t h e i s s u a n c e o f a Program S p e c i f i c a t i o n Change.
6.4 Approval o f Requirements Changes
The Apollo Program D i r e c t o r ' s CCB s h a l l e x e r c i s e f u l l c o n t r o l
o v e r a l l d e c i s i o n s p e r t a i n i n g t o program r e q u i r e m e n t s E C P s .
The C e n t e r l e v e l Program Manager's CCB s h a l l e x e r c i s e f u l l
c o n t r o l o v e r a l l d e c i s i o n s p e r t a i n i n g t o ' p r o j e c t and Systems
Requirements ECPs. The CCB chairman i s r e s p o n s i b l e f o r making
a l l d e c i s i o n s i n accordance w i t h e s t a b l i s h e d p o l i c y and d i r e c -
t i v e s . H e w i l l f o r m a l i z e h i s d e c i s i o n s by i s s u i n g a Configura-
t i o n C o n t r o l Board D i r e c t i v e (CCBD) , (see F i g u r e 1) Each CCB .
member s h a l l f o r m a l i z e h i s o f f i c i a l p o s i t i o n r e l a t i v e t o t h e
d e c i s i o n o f t h e chairman by i n d i c a t i n g e i t h e r a c o n c u r r e n c e
o r non-concurrence on , t h e CCBD. Backup s h e e t s e x p l a i n i n g t h e s e
p o s i t i o n s where r e q u i r e d w i l l b e made a p a r t of t h e o f f i c i a l
f i l e . The CCB w i l l be d i r e c t i v e on a l l NASA o r g a n i z a t i o n s .
EXHIBIT VIII

6.4.1 A formal CCB agenda will be prepared and distri-


buted for timely action on ECPs. Routine ECPs
will normally be scheduled for 14 days of review.
Urgent ECPs will be scheduled for a 48-hour review.
Emergency ECPs will be scheduled for immediate
action.
6.4.2 CCB meetings will be held at regular intervals, or
as called by the chairman, to meet urgent or other
requirements. One of the following courses of
action will be taken:
a. The ECP may be approved as written.
b. The ECP may be disapproved, with reasons clearly
stated.
c. The ECP may be approved with specific changes
clearly stated.
d. Decision may be deferred for investigation, with
responsibility for resolution assigned to a
specific person.
e. Decision may be referred to higher headquarters
if judged to be beyond the authority of the CCB.
6.4.3 The decision or other action will be documented on
the CCBD. The CCB action shall not be complete
until all elements of the CCBD are completed and the
form signed by the CCB chairman.
6.5 Preparation of the Configuration Control Board Directive
The Configuration Control Board Directive has been prepared
for use by the Apollo Program Director's CCB and the Pro-
gram Manager's CCB. Items 3, 6, 7, 8, 9, 1'0, 12, 18 and
20 will not be used on CCB Directives related to Program,
Project and System Specification Requirements Changes.
6.6 Preparation of the ECP Form
The ECP form in MIL-STD-480 shall be used as a guide for
formal submission of requirements ECPs.
6.7 Waivers and Deviations
When an authorized departure from approved requirements is
necessary, waivers or deviations as applicable may be
processed in accordance with the procedures, and forms,
prescribed by MIL-STD-480.
EXHIBIT V I I I

NASA ORG. -
CONFIGURATION CONTROL BOARD DIRECTIVE DAY MO. YR.

I
(3) CONTRACTOR: (19) ECP TITLE SUPERSEDES DAY MO. YR.
ISSUE OF
(4) ECP N O . (4A) DATE:

(20) NOMENCLATURE, CONTRACT END ITEM


(5) SUPERSEDES ECP N O . (5A) DATE:

A. END ITEM MOD.

0. SPARES MOD.

P - PRODUCTION

S - RETROFIT

CWIRMAN PROGRAM MANAGER CCB

NASA F O R M 1238 (AUG 65) (OVER)


Figure 1
EXHIBIT VIII

ECP NUMBER DATE(Day.monthb gear)


CCB DIRECTIVE
ECP DATE DATA AMPLIFICATION SHEET PACE OF PAGES

19. CONTINUATION SECTION (Ref sr t o block number b title of date on D i r e c u s s from)

20. COMMENTS

Figure 1 (Cont'd)
EXHIBIT I X

PREPARATION O F
E N G I N E E R I N G CHANGE P R O P O S A L S
FOR
CONTRACT END I T E M S
PREPARATION O F
ENGINEERING CHANGE PROPOSALS
FOR
CONTRACT END ITEMS

CONTENTS

Paragraph Page

1. PURPOSE. ........ . . . . ........ IX-1

2. SCOPE. . . . . . . . . . . . . . ........ IX-1

3. APPLICABILITY. . . . . . . . . . ........ IX-1

4. REFERENCE DOCUMENTS. . . . . . . ........ IX-1

5. EXPLANATION O F TERMS . . . . . . ........ IX-2

6. PROCEDURAL REQUIREMENTS. . . . . ........ IX- 2

FORMATS AND ILLUSTRATIONS

Figure 1 ...................... IX-8


EXHIBIT IX

PREPARATION OF
ENGINEERING CHANGE PROPOSALS
FOR CONTRACT END ITEMS

1. PURPOSE
This Exhibit provides NASA Apollo organizations and contractors
with requirements and guidance for uniform procedures for pre-
paring, formating, and processing engineering changes to contract
end items of equipment and facilities and Direct Support Real
Property Installed Equipment (DS-RPIE).
2. SCOPE
This Exhibit establishes requirements for configuration control
and for submittal of Engineering Change Proposals (EcP's) in
accordance with MIL-STD-480. These procedures are based on:
a. The use of management baselines to establish the
departure points for configuration control of
contract end items.
b. The use of contract end item detail specifications to
define and document these baselines, and engineering
changes thereto.
c. The use of MIL-STD-480 as written for its primary'
purpose.
The procedures in this exhibit shall be used for proposing
changes in all contract end items of .equipmentand facilities
and DS-RPIE to be formally accepted by the National Aeronautics
and Space Administration for use on the Apollo Program. This
includes both system and non-system contract end items.
3. APPLICABILITY
This Exhibit is applicable to contract end item definition, design,
development, fabrication, and test phases of the program.

4. REFERENCE DOCUMENTS
4.1 Applicable Documents
The following documents of the exact issue shown, or parts
thereof as further described, form a part of this Exhibit:
MIL-STD-480 30 October 1968 "Configuration Control -
Engineering Changes, Deviations
and Waivers"
EXHIBIT I X

4.2 R e f e r e n c e Documents

The f o l l o w i n g documents a r e c o n t a i n e d i n t h e t e x t f o r
r e f e r e n c e p u r p o s e s o n l y , and do n o t form a p a r t o f t h i s
Exhibit :

E x h i b i t I1 - " P r e p a r a t i o n o f C o n t r a c t End I t e m D e t a i l
S p e c i f i c a t i o n (Prime Equipment) " .
E x h i b i t I11 - " P r e p a r a t i o n o f C o n t r a c t End I t e m D e t a i l
Specification (Facilities) " .
Exhibit I V - " P r e p a r a t i o n o f C o n t r a c t End I t e m D e t a i l
Specification (Identification I t e m ) " .
Exhibit V - " P r e p a r a t i o n o f C o n t r a c t End I t e m D e t a i l
S p e c i f i c a t i o n (Requirement I t e m s ) . "

Exhibit V I I - " S p e c i f i c a t i o n Maintenance. "


Exhibit X - "Requirements f o r C o n f i g u r a t i o n I d e n t i f i -
c a t i o n Numbers."

Exhibit X I - "Requirements f o r C o n f i g u r a t i o n I d e n t i f i -
c a t i o n and Acceptance C o n t r a c t End I t e m s
and R e l a t e d Data."

5. EXPLANATION OF TERMS

(See E x h i b i t X V I I . )

6. PROCEDURAL REQUIREMENTS

6.1 Background I n f o r m a t i o n

The A p o l l o Program Managers w i l l manage t h e a c q u i s i t i o n o f


a c o n t r a c t e n d i t e m (CEI) by t h e u s e o f c o n t r a c t end i t e m
s p e c i f i c a t i o n s i n c o n j u n c t i o n w i t h MIL-STD-480, T o g e t h e r ,
t h e s e documents e s t a b l i s h t h e b a s i s f o r c o n f i g u r a t i o n
c e n t r o l of t h e CEI. P a r t i a l c o n f i g u r a t i o n c o n t r o l i s
implemented a t t h e s t a r t o f t h e a c q u i s i t i o n p h a s e , i . e . ,
when t h e c o n t r a c t o r i s a u t h o r i z e d t o p r o c e e d w i t h d e t a i l
d e s i g n and development i n a c c o r d a n c e w i t h approved r e q u i r e -
ments i n t h e C E I s p e c i f i c a t i o n . F u l l configuration corltrol
i s implemented a t t h e t i m e o f a c c e p t a n c e o f a CEI
manufactured t o t h e c o n f i g u r a t i o n r e q u i r e d f o r a p a r t i c u l a r
s e r i e s of s p a c e v e h i c l e s . Thus, programs f o r c o n t r a c t end
i t e m s o f equipment and f a c i l i t i e s a r e d e f i n e d by d e t a i l spec-
i f i c a t i o n s a r e phased f o r p r o g r e s s i v e c o n f i g u r a t i o n c o n t r o l
t o t h e r e q u i r e m e n t s s p e c i f i e d t h e r e i n , and a r e c o n t r o l l e d t o
t h e s e r e q u i r e m e n t s by t h e a p p l i c a t i o n o f MIL-STD-480.
T h i s method o f programming and c o n f i g u r a t i o n c o n t r o l i s
i l l u s t r a t e d i n F i g u r e '1, and i s e x p l a i n e d below.
EXHIBIT I X

6.2 G e n e r a l Requirements

Formal c o n f i g u r a t i o n c o n t r o l , i n a c c o r d a n c e w i t h t h i s
E x h i b i t , s h a l l b e implemented and m a i n t a i n e d on a l l
programs i n v o l v i n g t h e f o r m a l a c c e p t a n c e o f c o n t r a c t
end i t e m s of equipment o r f a c i l i t i e s and DS-RPIE.
C o n f i g u r a t i o n c o n t r o l s h a l l be implemented and m a i n t a i n e d
by use of t h e program p h a s i n g and b a s e l i n e c o n c e p t s of
c o n f i g u r a t i o n management. These c o n c e p t s a r e i l l u s t r a t e d
i n F i g u r e 1 and a r e r e l a t e d t o t h e d e s i g n , development and
f a b r i c a t i o n a c t i v i t i e s of a t y p i c a l program. V a r i a t i o n s
i n t h e t y p i c a l program, e . g . , a program f o r t h e d e l i v e r y of
j u s t one i t e m , d o n o t a l t e r t h e n e c e s s i t y f o r t h e c o n f i g u r a -
t i o n management c o n c e p t s and e l e m e n t s shown i n F i g u r e 1.

6.2.1 D e f i n i t i o n Phase During t h e D e f i n i t i o n P h a s e , t h e


A p o l l o Program S p e c i f i c a t i o n s h a l l b e completed.
The e n d o f t h e D e f i n i t i o n Phase i s d e n o t e d a s t h e
p o i n t w h e r e i n the Program, P r o j e c t and System
s p e c i f i c a t i o n s and t h e CEI s p e c i f i c a t i o n s , P a r t I ,
a r e complete.

6.2.2 A c q u i s i t i o n Phase

6.2.2.1 Design Requirements B a s e l i n e

6.2.2.1.1 The p r o c u r i n g agency w i l l , a t


t h e s t a r t of t h e Acquisition Phase,
p e r f o r m a P r e l i m i n a r y Design
Review t o approve P a r t I of t h e
CEI s p e c i f i c a t i o n ; and w i l l
d e s i g n a t e s p e c i f i c requirements
t h e r e i n a s defining t h e design
r e q u i r e m e n t s b a s e l i n e ; and w i l l
authorize the contractor t o
p r o c e e d w i t h d e t a i l d e s i g n and
development o f t h e CEI, i n c l u d i n g
f u r t h e r development o f t h e
specification.

6.2.2.1.2 The d e s i g n r e q u i r e m e n t s b a s e l i n e
i s a defined departure point f o r
c o n f i g u r a t i o n c o n t r o l . Once a
design requirements b a s e l i n e has
been d e f i n e d and a p p r o v e d , d e s i g n
and development o f t h e C E I s h a l l
b e accomplished i n a c c o r d a n c e w i t h
b a s e l i n e requirements u n l e s s formal
a p p r o v a l t o change t h e s e r e q u i r e -
ments is o b t a i n e d from t h e p r o c u r i n g
agency. The c o n t r a c t o r may p r o p o s e
such a change and s h a l l p r o c e s s any
change t o P a r t I o f t h e C E I s p e c i -
f i c a t i o n a s a C l a s s I change when
EXHIBIT I X

t h e change a f f e c t s a r e q u i r e m e n t
i n t h e s p e c i f i c a t i o n t h a t h a s been
d e s i g n a t e d by t h e p r o c u r i n g agency
a s defining the design require-
ments' b a s e l i n e .

6.2.2.1.3 The c o n t r a c t o r s h a l l document


s p e c i f i c a t i o n c h a n g e s by
S p e c i f i c a t i o n Change N o t i c e (SCN),
o r by r e v i s i o n o f t h e s p e c i f i c a t i o n ,
a s p r o v i d e d i n E x h i b i t V I I and a s
d i r e c t e d by t h e CMO.

6.2.2.2 Product Baseline

6.2.2.2.1 The c o n t r a c t o r s h a l l , a s p a r t of
h i s d e s i g n and development e f f o r t ,
p r e p a r e a C o n t r a c t End I t e m D e t a i l
S p e c i f i c a t i o n , P a r t 11, " P r o d u c t
C o n f i g u r a t i o n and Acceptance T e s t
Requirements, " which s p e c i f i e s t h e
requirements f o r d e l i v e r y of a l l
C E I 1 s which a r e t o b e f o r m a l l y
a c c e p t e d by NASA. This includes
f i r s t a c c e p t a n c e , and a l l s u b s e q u e n t
acceptances, i r r e s p e c t i v e of
i n t e n d e d use. The s p e c i f i e d r e q u i r e -
ments o f P a r t I1 a r e a p r o d u c t o f
r e l e a s e d e n g i n e e r i n g d e s i g n and a l l
CEI1s s h a l l be manufactured i n
accordance w i t h t h i s r e l e a s e d
engineering design.

6.2.2.2.2 The c o n t r a c t o r s h a l l s u b m i t t o t h e
p r o c u r i n g agency f o r f o r m a l a p p r o v a l
a complete b a s e l i n e i s s u e o f t h e
s p e c i f i c a t i o n ( P a r t s I and 11) no
l e s s t h a n 30 d a y s p r i o r t o t h e
a c c e p t a n c e o f t h a t CEI which w i l l
f o r m a l l y implement t h e p r o d u c t
configuration baseline. This i s s u e
s h a l l be v e r i f i e d a s representing
the s t a t u s of released engineering
f o r t h a t C E I , and a s a c c u r a t e l y
documenting t h e p r o d u c t c o n f i g u r a -
t i o n of the CEI.

6.2.2.2.3 The p r o c u r i n g agency w i l l f o r m a l l y


approve t h e c o m p l e t e s p e c i f i c a t i o n
a t t h e time of acceptance o f t h a t
C E I , which e s t a b l i s h e s t h e P r o d u c t
Configuration Baseline. This w i l l
n o r m a l l y o c c u r a s p a r t o f t h e FACI
held a t the contractor's plant o r
s i t e of c o n s t r u c t i o n .
EXHIBIT IX

6.2.2.2.4 The contractor shall, after the


complete specification has been
approved, process any change to
the specification as a Class I
engineering change. Also, any
change to CEI's to be accepted
after establishing the product
configuration baseline shall be
processed in accordance with the
requirements in MIL-STD-480.
6.3 MIL-STD-480 Requirements
MIL-STD-480 shall be used, as required by this Exhibit,
for the preparation of ECP's submitted for approval to
change the design requirements or Product Configuration
baseline of a contract end item. The following subpara-
graphs supplement the standard and unless specifically
stated otherwise, MIL-STD-480 applies as written.
6.4 Processing and Approval of ECP's
The instructions in this paragraph apply to the processing
and approval of all E2P's for a contract end item. MIL-
STD-480 shall apply as written, and as supplemented in the
following subparagraphs to provide for Configuration Con-
trol Board (CCB) procedures.
6.4.1 Submittal of ECP's The contractor shall submit all
ECP's as required by MIL-STD-480. ECP's requiring
coordination shall be distributed in parallel as
follows :
a. The local Goverrment representative.
b. The Configuration Control Board.
c. The affected contractor.
6.4.2 Approval of Class I Changes Approval of ECP's for
contract end items shall be in accordance with MIL-
STD-480. ECP's shall be approved by the appropriate
Program Manager's Configuration Control Board, with
the exception of Program Performance Design Require-
ments Baseline, which will be approved by the Apollo
Program Director's CCB. The CCB is not a voting
board. The Program Manager or a CCB Chairman acting in
EXHIBIT I X

h i s b e h a l f , i s r e s p o n s i b l e f o r making a l l d e c i s i o n s
i n a c c o r d a n c e w i t h e s t a b l i s h e d p o l i c y and d i r e c t i v e s .
He w i l l f o r m a l i z e h i s d e c i s i o n s by i s s u i n g a
C o n f i g u r a t i o n C o n t r o l Board D i r e c t i v e (CCBD) which
w i l l b e d i r e c t i v e on t h e C o n t r a c t i n g O f f i c e r o f t h e
p r o c u r i n g agency. The p r o c u r i n g agency w i l l r e f l e c t
t h e e x a c t r e a u i r e m e n t s of t h e CCBD i n t h e c o n t r a c t
authorization. This a u t h o r i z a t i o n s h a l l c o n s t i t u t e
t h e s o l e a u t h o r i t y f o r t h e c o n t r a c t o r t o implement
t h e change. ECP's r e q u i r i n g a p p r o v a l of t h e A p o l l o
Program D i r e c t o r ' s CCB w i l l b e t r a n s m i t t e d t o t h e
a p p r o p r i a t e Program Manager ' s CCB . f o r i m p l e m e n t a t i o n
af ter approval.

6.4.2.1 A f o r m a l CCB agenda w i l l b e p r e p a r e d and


d i s t r i b u t e d f o r t i m e l y s u p p o r t o f sub-
m i t t e d ECP ' s. R o u t i n e ECP ' s w i l l n o r m a l l y
be s c h e d u l e d f o r 1 4 d a y s of r e v i e w . Urgent
ECP's w i l l b e s c h e d u l e d f o r a 48-hour
r e v i e w . Emergency ECP's w i l l b e s c h e d u l e d
f o r immediate a c t i o n .

6.4.2.2 CCB m e e t i n g s w i l l b e h e l d a t r e g u l a r i n t e r v a l s ,
o r a s c a l l e d by t h e Chairman, t o meet emer-
gency and o t h e r r e q u i r e m e n t s . The c o n t r a c t o r
may b e i n v i t e d t o a t t e n d CCB m e e t i n g s t o
p r e s e n t t e c h n i c a l d a t a s u p p o r t i n g h i s ECP.
One o f t h e f o l l o w i n g c o u r s e s of a c t i o n w i l l
be t a k e n :

a. The ECP may b e approved a s w r i t t e n .

b. The ECP may b e d i s a p p r o v e d , w i t h


reasons c l e a r l y s t a t e d .

c. The ECP may b e a p p r o v e d , w i t h


s p e c i f i c changes c l e a r l y s t a t e d .

d. D e c i s i o n may b e d e f e r r e d f o r
investigation, with responsibility
f o r resolution assigned t o a s p e c i f i c
person.

e. D e c i s i o n may b e r e f e r r e d t o h i g h e r head-
q u a r t e r s i f judged t o b e beyond t h e
a u t h o r i t y o f t h e C e n t e r CCB.

6.4.2.3 The Program ~ a n a g e r ' sCCB s h a l l a s s u r e t h a t


changes h a v i n g i n t r a - c e n t e r i n t e r f a c e
c o n s i d e r a t i o n s have been c o o r d i n a t e d and
agreements e s t a b l i s h e d . The i n t e r f a c e change
s h a l l b e r e c o r d e d i n t h e CCBD. The Program
Manager's CCB s h a l l c o o r d i n a t e w i t h t h e appro-
p r i a t e A p o l l o C o o r d i n a t i o n P a n e l t h o s e changes
Chat a f f e c t a n o t h e r C e n t e r ' s end i t e m . After
P a n e l a g r e e m e n t , t h e Program Manager's CCB s h a l l
i s s u e a CCBD implementing t h e i n t e r f a c e
agreement.

IX- 6
EXHIBIT I X

6.4.2.4 The d e c i s i o n o r o t h e r a c t i o n w i l l b e
documented i n t h e CCBD. (See E x h i b i t V I I I
f o r f o r m a t o f CCB D i r e c t i v e . ) Each member
w i l l f o r m a l i z e h i s c o n c u r r e n c e o r non-
c o n c u r r e n c e on t h e CCBD. The CCB a c t i o n
s h a l l n o t be completed u n t i l a l l e l e m e n t s
o f !the CCBD a r e completed, and t h e form
s i g n e d by t h e CCB Chairman.

6.4.2.5 Completed CCBD forms f o r approved ECP1s s h a l l


be f o r w a r d e d t o t h e C o n t r a c t i n g O f f i c e r who w i l l
a u t h o r i z e t h e c o n t r a c t o r t o proceed.

6.4.3 S u b m i t t a l and Approval o f C l a s s I1 c h a n g e s C l a s s I1


e n g i n e e r i n g changes s h a l l b e h a n d l e d a s r e q u i r e d i n
MIL-STD-480. I n a d d i t i o n , a l l changes i n c o r p o r a t e d
i n t h e CEI s p e c i f i c a t i o n , and which d o n o t r e q u i r e
s u b m i t t a l of an ECP, s h a l l b e s u b m i t t e d a s
follows :

6.4.3.1 The c o n t r a c t o r s h a l l s u b m i t a copy o f t h e


SCN, o r r e v i s i o n , f o r e a c h C l a s s I1 change
t o t h e d e s i g n a t e d l o c a l Government
r e p r e s e n t a t i v e o f t h e p r o c u r i n g agency a t
t h e t i m e t h e SCN, o r r e v i s i o n , i s p r e p a r e d
and a u t h o r i z e d by t h e c o n t r a c t o r .

6.4.3.2 The d e s i g n a t e d l o c a l Government r e p r e s e n t a t i v e


w i l l r e v i e w and may, w i t h i n two working d a y s
of r e c e i p t , d i s a p p r o v e t h e c l a s s i f i c a t i o n o f
t h e SCN, o r r e v i s i o n , a s a C l a s s I1 change.
I f the contractor disagrees with the
d e t e r m i n a t i o n o f t h e Government r e p r e s e n t a -
t i v e , he may s u b m i t t h e SCN t o t h e CCB f o r
f i n a l r e s o l u t i o n of t h e c l a s s i f i c a t i o n .

6.5 P r e p a r a t i o n of t h e ECP Form

The c o n t r a c t o r s h a l l u s e t h e ECP Form and/or message f o r -


mat i n MIL-STD-480 f o r t h e p r e p a r a t i o n o f - a l l ECP1s.
The r e q u i r e m e n t s of MIL-STD-480 s h a l l apply t o t h e prepara-
t i o n o f a l l ECP1s. The s t a n d a r d i d e n t i f i c a t i o n numbers i n
E x h i b i t X s h a l l b e used on a l l ECP's, o r a s d i r e c t e d by t h e
procuring a c t i v i t y .
DESIGN
REQUIREMENTS DRAWING PRODUCT

I
BASELINE BASELINE

DESIGN
START

ION
DESIGN
REVIEW

) 4-,ACQUISITION*
T
CRITICAL
DESIGN
REVIEW
COMP~ETED
FACI

ASSEMBLY
OPERATIONS
TEST, K S C ) ~

O SPEC. I O PROJECT & O FORMAL DRAWING O CEI SPEC.


O WORK STATEMENT SYSTEM SPEC. UPDATING PART I1
O CRITERIA COMPLETE O SPEC. REVISION O DRAWINGS
O CEI SPEC. O INTERFACE SPEC. O TEST DATA
PART I O INTERFACE CONTROL O HARDWARE DD-250
DRAWINGS OR EQUIVALENT

I
APOLLO PROGRAM SPEC.
COMPLETE
* ACQUISIT1O
f:iZpMENT
FABRICATION

SPAN OF CONFIGURATION CONTROL FOR TYPICAL ACQUISITION PROGRAM


Figure 1
EXHIBIT X

REQUIREMENTS FOR CONFIGURATION


IDENTIFICATION NUMBERS
EXHIBIT X

REQUIREMENTS FOR CONFIGURATION


I D E N T I F I C A T I O N NUMaERS

CONTENTS
Paragraph Page
P

1. PURPOSE. ........ . . . . . . . . . X-1


2. SCOPE. . . . . . . . . . . . . . . . . . . .X - 1
3. APPLICABILITY. . . . . . . . . . . . . . . X-1
4. REFERENCE DOCUMENTS. . . . . . . . . . . . X-1
5. EXPLANATION O F TERMS . . . . . . . . . . . X-2
6. PROCEDURAL REQUIREMENTS. . . . . . . . . . X-2

FORMATS PAD ILLUSTRATIONS

T a b l e A, C o n f i g u r a t i o n Identification Numbers. X-14

C o n s t r u c t i o n o f S p e c i f i c a t i o n and SCN N u m b e r s . X-15

E x a m p l e s of S p e c i f i c a t i o n I d e n t i f i c a t i o n
Numbers. ................... X-16

C o n s t r u c t i o n of t h e C l a s s I C h a n g e
I d e n t i f i c a t i o n Number. ............ X-17
EXHIBIT X

REQUIREMENTS FOR CONFIGURATION


IDENTIFICATION NUMBERS

1. PURPOSE

T h i s e x h i b i t p r o v i d e s NASA and c o n t r a c t o r o r g a n i z a t i o n s w i t h
r e q u i r e m e n t s f o r a s s i g n i n g and c o n t r o l l i n g c o n f i g u r a t i o n i d e n t i f i -
c a t i o n numbers.

2. SCOPE

T h i s e x h i b i t e s t a b l i s h e s a s y s t e m f o r a s s i g n i n g a c o m p l e t e set
of i d e n t i f y i n g numbers t o be used i n c o n t r o l l i n g t h e c o n f i g u r a -
t i o n o f a l l c o n t r a c t end i t e m e q u i p m e n t s , f a c i l i t i e s , s i t e s and
spares. The numbers a r e :

a. S p e c i f i c a t i o n i d e n t i f i c a t i o n numbers

b. C o n t r a c t end i t e m numbers

c. S e r i a l numbers

d. Drawing and p a r t numbers

e. Change i d e n t i f i c a t i o n numbers

f. Code i d e n t i f i c a t i o n numbers

These numbers a r e t h e o n l y i d e n t i f i e r s t o b e used t o f o r m a l l y


and p r e c i s e l y i d e n t i f y c o n f i g u r a t i o n . This e x h i b i t f u l l y d e f i n e s
t h e method o f c o n s t r u c t i o n and meaning o f t h e numbers. The s e t ,
composed and a s s i g n e d a s r e q u i r e d by t h i s e x h i b i t , s h a l l b e used
t o i d e n t i f y e q u i p m e n t s and documents a s r e q u i r e d by E x h i b i t X I .

3. APPLICABILITY

This e x h i b i t a p p l i e s t o t h e c o n f i g u r a t i o n i d e n t i f i c a t i o n of a l l
c o n t r a c t end i t e m e q u i p m e n t s , f a c i l i t i e s , and s p a r e s which a r e
f o r m a l l y a c c e p t e d by t h e p r o c u r i n g agency. It applies t o a l l
c o n t r a c t s w i t h t h e p r o c u r i n g agency f o r s y s t e m s e n g i n e e r i n g o r
system i n t e g r a t i o n i n v o l v i n g t h e s e d e l i v e r a b l e i t e m s . Contractors
t o t h e p r o c u r i n g agency s h a l l be r e s p o n s i b l e f o r t h e c o m p l i a n c e
o f t h e i r s u b c o n t r a c t o r s , v e n d o r s and s u p p l i e r s .

4. REFERENCE DOCUMENTS

4.1 A p p l i c a b l e Documents

The f o l l o w i n g documents o f t h e e x a c t i s s u e shown, o r p a r t


t h e r e o f a s f u r t h e r d e s c r i b e d , form a p a r t o f t h i s e x h i b i t :
EXHIBIT X

MIL-STD-100A 1 O c t o b e r 1967 " E n g i n e e r i n g Drawing


Practices"

MIL-STD-480 30 O c t o b e r 1968 "Configuration Control -


E n g i n e e r i n g Changes,
D e v i a t i o n s and Waivers "

5. EXPLANATION OF TERMS

See E x h i b i t X V I I .

6. PROCEDURAL REQUIREMENTS

C o n f i g u r a t i o n i d e n t i f i c a t i o n numbers a r e a s s i g n e d by c o n t r a c t o r s
r a t h e r t h a n by t h e p r o c u r i n g agency t o :

a. Assure t h e t i m e l y a v a i l a b i l i t y o f a l l r e q u i r e d c o n f i g u r a t i o n
i d e n t i f i e r s f o r c o r r e c t e n t r y on e n g i n e e r i n g d a t a when t h e s e
d a t a a r e i n i t i a l l y prepared.

b. Improve t h e e f f e c t i v e n e s s o f b o t h c o n t r a c t o r and p r o c u r i n g
agency o p e r a t i o n s by e s t a b l i s h i n g a c o m p l e t e r e s p o n s i b i l i t y
f o r i d e n t i f i c a t i o n a t t h e s o u r c e o f d e s i g n and m a n u f a c t u r e .

c. Reduce t i m e d e l a y s and c o s t s which may r e s u l t . f r o m improper


i d e n t i f i c a t i o n , m i s i n t e r p r e t a t i o n and a t t e n d a n t rework.

6.1 G e n e r a l Requirements

The f o r m a l r e q u i r e m e n t s o f c o n f i g u r a t i o n management have sub-


s t a n t i a l l y i n c r e a s e d t h e s i g n i f i c a n c e o f t h e numbers u s e d t o
i d e n t i f y t h e c o n f i g u r a t i o n of a p r o d u c t . These c o n f i g u r a t i o n
i d e n t i f i c a t i o n numbers a r e u s e d i n c o m b i n a t i o n t o p r o v i d e com-
p l e t e i d e n t i f i c a t i o n of t h e p r o d u c t a s r e q u i r e d f o r t e c h n i c a l
and c o n t r a c t u a l p u r p o s e s . T a b l e "A" a b s t r a c t s t h e prime
c h a r a c t e r i s t i c s , u s e , and r e l a t i o n s h i p s of t h e c o n f i g u r a t i o n
i d e n t i f i c a t i o n numbers.

6.1.1 Contractor Responsibility. The c o n t r a c t o r s h a l l a s s i g n


and c o n t r o l c o n f i g u r a t i o n i d e n t i f i c a t i o n numbers i n
accordance w i t h t h i s e x h i b i t w i t h o u t f u r t h e r approval
o f t h e p r o c u r i n g agency.

6.1.2 N z . Where
t h e c o n t r a c t end i t e m of a c o n t r a c t o r i n c o r p o r a t e s t h e
d e s i g n o f a Government agency o r t h e d e s i g n o f a sub-
c o n t r a c t o r , vendor o r s u p p l i e r , t h e c o n t r a c t o r s h a l l use
t h e c o n f i g u r a t i o n i d e n t i f i c a t i o n numbers a s s i g n e d by
these design a c t i v i t i e s without r e i d e n t i f i c a t i o n except
as specifically authorized i n t h i s exhibit.
EXHIBIT X

6.1.3 Use o f A d d i t i o n a l I d e n t i f i e r s . Numbers o t h e r t h a n


t h e c o n f i g u r a t i o n i d e n t i f i c a t i o n numbers d e s c r i b e d
i n t h i s e x h i b i t s h a l l n o t be u s e d f o r c o n f i g u r a t i o n
management p u r p o s e s . S p e c i f i c examples i n c l u d e :

a. R e g i s t r a t i o n numbers ( e . g . , " t a i l " numbers)


a s s i g n e d by t h e Government.

b. Type d e s i g n a t i o n s f o r t h e c o n t r a c t o r ' s c o n t r a c t
end i t e m , o r component t h e r e o f , a s s i g n e d by t h e
Government .
c. O t h e r r e f e r e n c e d e s i g n a t i o n s ( e - g . , a e r o numbers)
u s e d by t h e Government.

d. F e d e r a l Stock Number a s s i g n e d by t h e Government t o


p r o v i d e a Government I n v e n t o r y C o n t r o l .

e. " M a n u f a c t u r i n g " o r " p r o d u c t i o n l i n e " numbers u s e d


by t h e c o n t r a c t o r t o d e n o t e t h e s e q u e n c e i n which
c o n t r a c t end i t e m s a r e m a n u f a c t u r e d .

f. " S y n t h e t i c " p a r t numbers u s e d by t h e c o n t r a c t o r t o


d e n o t e a subassembly o f m a n u f a c t u r e n o t c o v e r e d by
an e n g i n e e r i n g assembly drawing.
g. M a t e r i a l c o d e s used by t h e m a n u f a c t u r e r f o r m a t e r i a l
control.

6.2 S p e c i f i c a t i o n I d e n t i f i c a t i o n Numbers

The c o n t r a c t o r s h a l l a s s i g n and c o n t r o l t h e i d e n t i f i c a t i o n
numbers f o r s p e c i f i c a t i o n s , s p e c i f i c a t i o n change n o t i c e s
(SCNs) and s p e c i f i c a t i o n r e v i s i o n s a s r e q u i r e d by t h e f o l l o w i n g
subparagraphs. These numbers s h a l l i d e n t i f y a l l s p e c i f i c a t i o n s
and s t a n d a r d s r e q u i r e d t o c o n t r o l d e s i g n o f systems/equipments
t o be f o r m a l l y a c c e p t e d by t h e p r o c u r i n g agency.

6.2.1 Composition o f S p e c i f i c a t i o n I d e n t i f i c a t i o n Numbers.

6.2.1.1 Composition o f S p e c i f i c a t i o n Numbers.


C o n t r a c t o r p r e p a r e d s p e c i f i c a t i o n documents,
s h a l l b e i d e n t i f i e d by a number c o n s i s t i n g o f
a document i d e n t i f i c a t i o n number and s u f f i x
codes i n accordance w i t h paragraph 6.2.2,
and s h a l l n o t e x c e e d a t o t a l of 1 5 c h a r a c t e r s .
(See F i g u r e 1 A )

6.2.1.2 Composition o f S p e c i f i c a t i o n Change N o t i c e


(SCN) Numbers. SCNs s h a l l b e i d e n t i f i e d by a
number c o n s i s t i n g o f an SCN number, a d a s h , a
s p e c i f i c a t i o n page number and an SCN s u f f i x
l e t t e r assigned a s required i n paragraph
6.2.3. (See F i g u r e 1 B )

6.2.1.3 Composition o f Government o r I n d u s t r y


S p e c i f i c a t i o n Numbers. Government o r
I n d u s t r y s p e c i f i c a t i o n s and s t a n d a r d s
s h a l l be i d e n t i f i e d
EXHIBIT X

by t h e number a s s i g n e d by t h e Government agency


o r industry association t o the specification
o r s t a n d a r d document. These s p e c i f i c a t i o n s and
s t a n d a r d s s h a l l n o t b e r e i d e n t i f i e d by t h e
contractor unless altered o r selected.

6.2.2 Assignment o f S p e c i f i c a t i o n Numbers. The c o n t r a c t o r


s h a l l a s s i g n one number t o e a c h s p e c i f i c a t i o n document
t o be p r e p a r e d and m a i n t a i n e d by t h e c o n t r a c t o r . The
number s h a l l b e a s s i g n e d a s f o l l o w s :

6.2.2.1 Document I d e n t i f i c a t i o n Number. The c o n t r a c t o r ' s


document i d e n t i f i c a t i o n number, i n c l u d i n g
c o m b i n a t i o n s of n u m e r a l s , l e t t e r s and d a s h e s ,
s h a l l f o l l o w t h e p r e f i x code. Once a s s i g n e d t o
an approved s p e c i f i c a t i o n , t h e number s h a l l n o t
t h e r e a f t e r b e changed o r r e a s s i g n e d t o a n o t h e r
specification.
6.2.2.1.1 The document i d e n t i f i c a t i o n number
may be c o d i f i e d i n a c c o r d a n c e w i t h
t h e c o n t r a c t o r ' s i n t e r n a l systems
and p r o c e d u r e s p r o v i d i n g t h a t such
c o d e s w i l l n o t be changed and do
n o t d u p l i c a t e t h e s u f f i x informa-
t i o n d e s c r i b e d i n p a r a g r a p h 6.2.2.2.

6.2.2.1.2 The c o n t r a c t o r s h a l l a s s i g n a new


document i d e n t i f i c a t i o n number t o
an addendum s p e c i f i c a t i o n which h a s
been c r e a t e d from an e x i s t i n g
s p e c i f i c a t i o n . An addendum s p e c i f i c a -
t i o n i s a new and c o m p l e t e s p e c i f i c a -
t i o n i n every sense. I t s h a l l be
m a i n t a i n e d by i t s own SCN and
r e v i s i o n sequence which s h a l l b e
i n d e p e n d e n t ' o f t h e change sequence
a p p l i c a b l e t o t h e s p e c i f i c a t i o n from
which t h e addendum was c r e a t e d .

6.2.2.2 S p e c i f i c a t i o n S u f f i x Code. The s u f f i x code s h a l l


f o l l o w t h e document i d e n t i f i c a t i o n number. It
s h a l l c o n s i s t o f an upper c a s e ( c a p i t a l ) l e t t e r
a s s i g n e d i n a l p h a b e t i c a l sequence t o i d e n t i f y t h e
l a t e s t approved r e v i s i o n o f t h e s p e c i f i c a t i o n .

6.2.2.2.1 When i t i s n e c e s s a r y t o r e f e r t o one


i t e m i n a requirement items s p e c i f i c a -
t i o n , t h e i t e m s h a l l b e i d e n t i f i e d by
t h e s p e c i f i c a t i o n number d e s c r i b e d i n
p a r a g r a p h 6.2.2, and an a d d i -
t i o n a l s u f f i x code c o n s i s t i n g o f t h e
p a r a g r a p h number i n S e c t i o n 3 o f t h e
s p e c i f i c a t i o n which i d e n t i f i e s t h e
i t e m ( r e f e r t o E x h i b i t V) . This i t e m
code s h a l l f o l l o w t h e r e v i s i o n l e t t e r .

6.2.2.2.2 When a component s p e c i f i c a t i o n a p p l i e s


t o more t h a n one s o u r c e , e a c h s o u r c e
EXHIBIT X

s h a l l b e i d e n t i f i e d by t h e
s p e c i f i c a t i o n number d e s c r i b e d i n
p a r a g r a p h 6.2.2 and a n
a d d i t i o n a l s u f f i x code c o n s i s t i n g
o f a s e p a r a t e d a s h number t a b u l a t i n g
each a l t e r n a t e source i n the
specification. T h i s s o u r c e code
s h a l l follow the revision l e t t e r .

6.2.2.3 Examples o f s p e c i f i c a t i o n i d e n t i f i c a t i o n
numbers a r e shown i n T a b l e B.

6.2.3 Assignment o f S p e c i f i c a t i o n Change N o t i c e (SCN) Numbers.

The c o n t r a c t o r s h a l l a s s i g n one SCN number f o r e a c h SCN


t o b e p r e p a r e d by t h e c o n t r a c t o r . One SCN i s r e q u i r e d
f o r a l l c h a n g e s , t o a s i n g l e approved s p e c i f i c a t i o n , t o
b e approved by one ECP ( r e f e r t o E x h i b i t s V I I , V I I I , and
IX). The SCN number s h a l l i d e n t i f y t h e SCN a s p a r t o f ,
and s u b o r d i n a t e t o , t h e s p e c i f i c a t i o n which i t changes.
The number s h a l l be a s s i g n e d a s f o l l o w s :

6.2.3.1 The f i r s t c h a r a c t e r ( s ) s h a l l b e a n u m e r a l ( s )
t o i d e n t i f y one SCN f o r one s p e c i f i c a t i o n and
i t s a s s i g n e d sequence w i t h i n t h a t s p e c i f i c a t i o n .
T h i s SCN number s h a l l be a s s i g n e d i n n u m e r i c a l
s e q u e n c e b e g i n n i n g w i t h t h e number 1 ( o n e ) f o r
t h e f i r s t SCN number a s s i g n e d .

6.2.3.1.1 The SCN sequence number s h a l l b e a


common i d e n t i f i e r f o r a l l SCN s h e e t s
p r e p a r e d a s p a r t o f one s p e c i f i c a t i o n
change.

6.2.3.1.2 Once an SCN h a s been s u b m i t t e d t o


t h e p r o c u r i n g a g e n c y , i t s SCN sequence
number s h a l l n o t t h e r e a f t e r b e
changed o r a s s i g n e d t o a n o t h e r SCN
w i t h i n t h e same s p e c i f i c a t i o n , even
though t h e SCN i s s u b s e q u e n t l y
disapproved.

6.2.3.2 The. SCN sequence number s h a l l b e f o l l o w e d by a


d a s h a n d , on e a c h s h e e t of t h e SCN, t h e page
number of t h e s p e c i f i c a t i o n a f f e c t e d by t h a t
s h e e t o f t h e SCN.

6.2.3.2.1 The c o n t e n t o f an SCN s h e e t i s


l i m i t e d t o one page o f a s p e c i f i c a t i o n .

6.2.3.2.2 M u l t i p l e s h e e t s i d e n t i f i e d by t h e
same SCN s e q u e n c e numbers a r e u s e d
where more t h a n one s p e c i f i c a t i o n
page i s a f f e c t e d ( S e e E x h i b i t V I I ) .

6.2.3.3 The s p e c i f i c a t i o n page number s h a l l b e f o l l o w e d


by a lower c a s e s u f f i x l e t t e r a s s i g n e d i n
a l p h a b e t i c a l sequence w i t h i n one SCN page number.
EXHIBIT X
T h i s s u f f i x s h a l l b e a p p l i e d o n l y when more
t h a n one SCN s h e e t o f one SCN i s r e q u i r e d t o
d e s c r i b e t h e change f o r a s i n g l e s p e c i f i c a t i o n
page.
6.2.3.4 Examples of SCN numbers a r e shown i n T a b l e B.

6.2.4 S p e c i f i c a t i o n I d e n t i f i c a t i o n Number Assignment Log.

The c o n t r a c t o r s h a l l e s t a b l i s h and m a i n t a i n a S p e c i f i c a -
t i o n I d e n t i f i c a t i o n Number Assignment Log of a l l
s p e c i f i c a t i o n numbers and SCN numbers a s s i g n e d t o
s p e c i f i c a t i o n s p r e p a r e d and m a i n t a i n e d by t h e c o n t r a c t o r .
The l o g s h a l l be r e a d i l y a v a i l a b l e f o r r o u t i n e
s u r v e i l l a n c e by t h e l o c a l r e p r e s e n t a t i v e o f t h e p r o c u r i n g
agency on a non-interference-with-production b a s i s .

6.2.5 Changes i n S p e c i f i c a t i o n Numbers.

The document i d e n t i f i c a t i o n number p o r t i o n o f a


s p e c i f i c a t i o n number i s a permanently a s s i g n e d non-
d u p l i c a t e d number which i d e n t i f i e s t h e b a s i c s p e c i f i c a -
t i o n document. S u b s e q u e n t changes and r e v i s i o n s t o
t h e s e documents s h a l l b e i d e n t i f i e d i n a c c o r d a n c e w i t h
t h e following subparagraphs:

6.2.5.1 Rough d r a f t s p r e p a r e d f o r c o o r d i n a t i o n p r i o r
t o f o r m a l a p p r o v a l by t h e p r o c u r i n g agency
s h a l l be i d e n t i f i e d by a document i d e n t i f i c a -
t i o n number o n l y . No r e v i s i o n l e t t e r s o r SCN
numbers s h a l l b e a s s i g n e d .

6.2.5.1.1 The r e v i s i o n l e t t e r "A" s h a l l b e


assigned t o the f i r s t issue formally
approved by t h e p r o c u r i n g agency.

6.2.5.1.2 Each s u b s e q u e n t change t o t h e s e


approved s p e c i f i c a t i o n s s h a l l b e
i d e n t i f i e d by an a s s i g n e d SCN
number u n l e s s o t h e r w i s e d i r e c t e d
by t h e p r o c u r i n g agency i n
a c c o r d a n c e w i t h p a r a g r a p h 6.2.5.1.3.

6.2.5.1.3 R e v i s i o n l e t t e r s s h a l l be a s s i g n e d
o n l y when d i r e c t e d by t h e p r o c u r i n g
agency and a s s p e c i f i c a l l y d e s c r i b e d
i n a C o n f i g u r a t i o n C o n t r o l Board
D i r e c t i v e (CCBD) t o i n c o r p o r a t e
p r e v i o u s l y approved SCNs and/or m a j o r
specification revisions.

.2.5.1.4 Component s p e c i f i c a t i o n s which a r e


c o n t r a c t u a l l y r e q u i r e d t o be formally
approved by t h e p r o c u r i n g agency
( r e f e r t o E x h i b i t V I ) s h a l l , from t h e
t i m e o f f o r m a l a p p r o v a l , be c o n t r o l l e d
by t h e u s e o f SCN numbers and r e -
v i s i o n l e t t e r s assigned i n accordancB
EXHIBIT X

w i t h p a r a g r a p h s 6.2.5.1.2 and
6.2.5.1.3. When f o r m a l a p p r o v a l
is not required the contractor
s h a l l assign revision l e t t e r s ,
SCN numbers and/or c o m p l e t e l y
r e v i s e component s p e c i f i c a t i o n s
i n a c c o r d a n c e w i t h h i s own
standard practice.

6.3 C o n t r a c t End I t e m CEI Number

The CEI number i s a permanent number a s s i g n e d by t h e


c o n t r a c t o r t o i d e n t i f y a l l u n i t s c o m p r i s i n g one c o n t r a c t
.
end i t e m f a m i l y ( t y p e - m o d e l - s e r i e s )

6.3.1 Definition o f a C o n t r a c t End I t e m Type-Model-Series.


A c o n t r a c t end i t e m t y p e - m o d e l - s e r i e s
constitutes a
b l o c k o f one o r more d e l i v e r a b l e CEI u n i t s t o which
a l l of t h e following apply:

a. The t y p e - m o d e l - s e r i e s s h a l l b e a l i n e i t e m
requirement i n a c o n t r a c t .

b. A l l u n i t s s h a l l be d e s i g n e d t o and c o n t r o l l e d
by one c o n t r a c t end i t e m d e t a i l s p e c i f i c a t i o n .

c. A l l u n i t s s h a l l be i d e n t i f i e d and documented by
one t o p drawing and a s u b o r d i n a t e s t r u c t u r e o f
i n s t a l l a t i o n , subassembly and d e t a i l drawings.

d. W i t h i n t h i s b a s i c drawing s t r u c t u r e , c o n f i g u r a t i o n
d i f f e r e n c e s i n p r o d u c t i o n between u n t i s s h a l l b e
i d e n t i f i e d and documented by a d d i n g and/or l i m i t i n g
t h e d e s i g n a p p l i c a t i o n o f p a r t s and a s s e m b l i e s
comprising t h e a f f e c t e d u n i t s .

e. Each u n i t s h a l l b e f o r m a l l y a c c e p t e d by t h e p r o c u r i n g
agency and a c c o u n t a b i l i t y t r a n s f e r r e d by means o f a
r e c e i v i n g and i n s p e c t i o n r e p o r t , DD Form 250 o r NASA
equivalent.

f. The t y p e - m o d e l - s e r i e s s h a l l b e t h e f o u n d a t i o n f o r
p r o v i s i o n i n g s p a r e s (by a c o n t r a c t o r o r t h e p r o c u r i n g
agency) and f o r t h e p r e p a r a t i o n of o p e r a t i n g and
maintenance manuals f o r t h e CEI t y p e - m o d e l - s e r i e s .

The c o n t r a c t end i t e m t y p e - m o d e l - s e r i e s , a s i d e n t i f i e d
by t h e CEI number, e s t a b l i s h e s t h e c o n t r a c t u a l i n t e r -
f a c e between t h e c o n t r a c t o r and t h e p r o c u r i n g agency,
and i s t h e l e v e l o f c o n t r o l f o r a l l d e s i g n r e q u i r e m e n t s
changes ( t o CEI d e t a i l s p e c i f i c a t i o n ) , and C l a s s I
e n g i n e e r i n g changes ( t o d e s i g n c o n f i g u r a t i o n ) t o be
f o r m a l l y approved by t h e p r o c u r i n g agency ( s e e E x h i b i t
IX). A l l C l a s s I e n g i n e e r i n g changes w i l l b e approved f o r
p r o d u c t i o n and/or r e t r o f i t i n c o r p o r a t i o n i n a l l
unexpended u n i t s w i t h i n a t y p e - m o d e l - s e r i e s o r , i f
l i m i t e d t o i n c o r p o r a t i o n on some b u t n o t a l l u n i t s ,
t h e s e r i e s designation of t h e a f f e c t e d u n i t s s h a l l be
changed t o e s t a b l i s h a new s e r i e s .
EXHIBIT X

6.3.2 Assignment and C o n t r o l o f CEI Numbers.


The CEI numSer s h a l l b e a s s i g n e d by t h e c o n t r a c t o r
a t t h e t i m e t h e document i d e n t i f i c a t i o n number of
t h e C E I s p e c i f i c a t i o n i s assigned, o r t h e f i r s t pro-
d u c t i o n drawing f o r t h e CEI i s r e l e a s e d , whichever
occurs f i r s t .

6.3.2.1 The CEI number s h a l l c o n s i s t o f a b a s i c


number f o r t h e t y p e - m o d e l - s e r i e s f o l l o w e d by
a code l e t t e r f o r t h e series.

6.3.2.2 The b a s i c number, i n c l u d i n g c o m b i n a t i o n s o f


l e t t e r s , n u m e r a l s and d a s h e s , s h a l l p r e c e d e
a series code. Once a s s i g n e d t o a c o n t r a c t
end i t e m whose d e s i g n , development and/or
m a n u f a c t u r e h a s been c o n t r a c t u a l l y a u t h o r i z e d
by t h e p r o c u r i n g agency, t h i s p o r t i o n o f t h e
C E I number s h a l l n o t t h e r e a f t e r be a s s i g n e d
t o a n o t h e r c o n t r a c t end i t e m t y p e and model.

6.3.2.3 The b a s i c number may b e , o r i n c l u d e ,


p o r t i o n s of t h e c o n t r a c t o r ' s s p e c i f i c a t i o n
document i d e n t i f i c a t i o n number and/or t o p
drawing number f o r t h e CEI, a t t h e c o n t r a c t o r ' s
option.

6.3.2.4 The l a s t d i g i t o f t h e CEI number s h a l l be t h e


s e r i e s l e t t e r "A." Once a s s i g n e d t h i s l e t t e r
s h a l l b e t h e permanent series d e s i g n a t i o n f o r
a l l c o n t r a c t e n d i t e m s c o m p r i s i n g t h e type-
m o d e l - s e r i e s , i n c l u d i n g follow-on procurement
within the s e r i e s .

6.3.2.5 A new s e r i e s d e s i g n a t i o n f o r t h e same b a s i c


number s h a l l b e a s s i g n e d o n l y when c o n t r a c t u a l l y
a u t h o r i z e d by t h e p r o c u r i n g agency w h e r e i n a l l
o f t h e following apply:

a. The new series i s s p e c i f i e d by a new c o n t r a c t


end i t e m s p e c i f i c a t i o n , o r s p e c i f i c a t i o n
addendum.

b. A l l u n i t s i n t h e new series a r e i d e n t i f i e d
by a new t o p drawing. The s u b o r d i n a t e
s t r u c t u r e o f i n s t a l l a t i o n , subassembly and
d e t a i l drawings may be made a p p l i c a b l e a s
r e q u i r e d t o t h e new s e r i e s by a common
r e l e a s e which shows d e s i g n a p p l i c a t i o n f o r
b o t h s e r i e s (see E x h i b i t s X I and X I I ) .

c. A new b a s i s f o r a c c e p t a n c e , p r o v i s i o n i n g ,
o p e r a t i o n s and maintenance i s e s t a b l i s h e d .

6.4 C o n t r a c t End I t e m S e r i a l i z a t i o n

C o n t r a c t end i t e m s e r i a l numbers a r e u s e d i n c o n f i g u r a t i o n
management t o :
EXHIBIT X

a. I d e n t i f y i n d i v i d u a l c o n t r a c t end i t e m s w i t h i n a
f a m i l y o f CEIs.

b. Establish t h i s i d e n t i t y a s a s p e c i f i c address f o r
a l l c o n t r a c t u a l a n d management a c t i o n s ; t h i s a d d r e s s
t o b e t h e same a s t h e e f f e c t i v i t y ( u s a g e ) o f
e n g i n e e r i n g d e s i g n and e n g i n e e r i n g c h a n g e s which
r e s u l t from t h e s e a c t i o n s .

c. R e l a t e t h e s p e c i f i c p a r t number c o n f i g u r a t i o n o f
each c o n t r a c t end item t o t h e i r engineering
e f f e c t i v i t y s o t h a t it w i l l b e b u i l t , a l l o c a t e d a n d
changed i n a c c o r d a n c e w i t h r e q u i r e d d e s i g n .

The c o n t r a c t o r s h a l l a s s i g n a l l s e r i a l numbers i n a c c o r d a n c e
w i t h t h i s e x h i b i t , and t h e s e s e r i a l numbers s h a l l b e t h e o n l y
s e r i a l numbers u s e d by t h e c o n t r a c t o r and t h e p r o c u r i n g
a g e n c y a s a CEI w i t i d e n t i f i c a t i o n a n d e n g i n e e r i n g
e f f e c t i v i t y f o r c o n f i g u r a t i o n management.

6.4.1 A s s i g n i n g C o n t r a c t End I t e m S e r i a l Numbers.


These numbers s h a l l b e q i n w i t h t h e n u m e r a l 1 ( o n e )
and s h a l l b e a s s i g n e d i n unbroken n u m e r i c a l p r o g r e s s i o n
w i t h i n one c o n t r a c t end i t e m type-model-series. The
CEI number a n d s e r i a l number s h a l l d e n o t e t h e e n g i n -
eering e f f e c t i v i t y of design. The CEI number a n d
s e r i a l number s h a l l b e a f f i x e d t o e a c h c o n t r a c t e n d
i t e m u n i t manufactured and a l l o c a t e d i n accordance
w i t h t h i s e n g i n e e r i n g e f f e c t i v i t y and d e s i g n ( s e e
Exhibit X I ) .

6.5 Drawing and P a r t Number

The d r a w i n g a n d p a r t number i s a s s i g n e d by t h e c o n t r a c t o r t o
i d e n t i f y , i n coriunon, a l l p a r t s and a s s e m b l i e s t h a t are i n t e r -
c h a n g e a b l e i n a l l a p p l i c a t i o n s where u s e d . A p a r t number m u s t
n o t b e changed i f i t i s s t i l l i n t e r c h a n g e a b l e a f t e r i n c o r -
p o r a t i n g a change. T h i s a c t i o n would c r e a t e e x c e s s i n v e n t o r i e s
and a r t i f i c . i a 1 s h o r t a g e s . The p r i m e f u n c t i o n o f a p a r t
number, t h e r e f o r e , i s t o c o n t r o l a s s e m b l y and r e p l a c e m e n t on
the b a s i s of interchangeability. The d e t e r m i n a t i o n o f non-
i n t e r c h a n g e a b i l i t y i s a t e c h n i c a l c o n s i d e r a t i o n . P a r t numbers
s h a l l n o t b e changed f o r any o t h e r p u r p o s e ( e . g . , t o i n d i c a t e
t h a t a n a s s e m b l y i n c l u d e s a change b u t which d i d n o t make t h e
assembly n o n - i n t e r c h a n g e a b l e ) .

6.5.1 Assignment o f Drawing and P a r t Numbers. Drawing a n d


p a r t numbers, f o r o t h e r t h a n s t a n d a r d s , s h a l l b e a s s i g n e d
by t h e c o n t r a c t o r i n a c c o r d a n c e w i t h t h e r e q u i r e m e n t s
i n MIL-STD-100

6.5.2 Changing P a r t Numbers. The c o n t r a c t o r s h a l l change t h e


p a r t number i n a c c o r d a n c e w i t h t h e r e q u i r e m e n t s i n MIL-
STD-100, and t h e f o l l o w i n g r e q u i r e m e n t s .

6.5.2.1 When a m a t e r i a l , p r o c e s s o r p r o t e c t i v e t r e a t -
ment i s changed t o s u c h a n e x t e n t t h a t any o f
t h e c o n d i t i o n s i n MIL-STD-100, e x i s t . .
EXHIBIT X

6.5.2.2 When a p h y s i c a l p a r t , component, subassembly


o r c o n t r a c t e n d i t e m is reworked i n p r o d u c t i o n
o r r e t r o f i t by a k i t i n t o a l a t e r number
v e r s i o n of t h e i t e m , and i s c o m p l e t e l y i n t e r -
c h a n g e a b l e w i t h a l l i t e m s i d e n t i f i e d by t h e
l a t e r number, t h e p h y s i c a l p a r t s h a l l b e
r e i d e n t i f i e d t o t h e number of t h e l a t e r v e r s i o n .

6.5.2.3 The c o n t r a c t o r may e s t a b l i s h a p a r t o r com-


p o n e n t f o r which t h e c o n t r a c t o r i s t h e d e s i g n
a c t i v i t y a s a company s t a n d a r d , i d e n t i f i e d by
a standard specification i d e n t i f i c a t i o n
number when a l l o f t h e f o l l o w i n g a p p l y :

a. The p a r t o r component h a s a m u l t i p l e
u s a g e and i s e x p e c t e d t o have a d e s i g n
a p p l i c a t i o n i n more t h a n o n e c o n t r a c t end
item.

b. The p a r t o r component i s n o n - r e p a i r a b l e
( t h r o w away) and w i l l n o t b e p r o v i s i o n e d
by t h e p r o c u r i n g agency o r c o n t r a c t
below the l e v e l identified by t h e
standard specification i d e n t i f i c a t i o n
number.

c. The p a r t o r component i s c o m p l e t e l y
s p e c i f i e d i n a s p e c i f i c a t i o n document,
s p e c i f i c a t i o n c o n t r o l drawing o r s o u r c e
c o n t r o l drawing w i t h r e s p e c t t o p e r f o r m a n c e ,
d u r a b i l i t y , r e l i a b i l i t y , form, f i t ,
q u a l i f i c a t i o n , and i n s p e c t i o n r e q u i r e m e n t s .

d. Unless o t h e r w i s e c o n c u r r e d i n by t h e
p r o c u r i n g a g e n c y , one o r more a l t e r n a t e
s o u r c e s i s approved and q u a l i f i e d t o
supply t h e i t e m .

6.5.3 I n i t i a t i o n o f P a r t Number Changes. E n g i n e e r i n g c h a n g e s


may b e i n c o r p o r a t e d and documented by drawing change
l e t t e r c o n t r o l o n l y ( w i t h o u t changing p a r t number) - u p
t o t h e c u t - o f f d a t e e s t a b l i s h e d by t h e c o n t r a c t o r f o r
i n c o r p o r a t i o n o f changes i n t h e f a c t o r y on t h e f i r s t
u n i t o f a CEI t y p e - m o d e l - s e r i e s , o r component t h e r e o f ,
t o b e f o r m a l l y a c c e p t e d by t h e p r o c u r i n g a g e n c y , and
p r o v i d i n g t h a t a l l s u c h changes a r e made e f f e c t i v e on
C E I s e r i a l number 1 and on. T h e r e a f t e r drawing change
l e t t e r c o n t r o l s h a l l c o n t i n u e and, i n a d d i t i o n , p a r t
numbers s h a l l b e changed a s r e q u i r e d by p a r a g r a p h
6.5.2.

6.5.4 Changes i n Higher L e v e l Assembly P a r t Numbers.


When a C E I c o n t a i n s a n o n - i n t e r c h a n g e a b l e i t e m , t h e
p a r t number of t h e n o n - i n t e r c h a n g e a b l e i t e m o f i t s
n e x t assembly, and o f a l l p r o g r e s s i v e l y h i g h e r
a s s e m b l i e s s h a l l b e changed o n l y up t o and i n c l u d i n g
t h e assembly where i n t e r c h a n g e a b i l i t y i s r e - e s t a b l i s h e d .
P a r t numbers s h a l l n o t b e changed above t h i s l e v e l o f
assembly f o r any r e a s o n .
EXHIBIT X

6.6 P a r t Number S e r i a l i z a t i o n

The c o n t r a c t o r ( o r h i s s u b c o n t r a c t e d d e s i g n a c t i v i t y ) s h a l l
s e r i a l i z e a l l engineering c r i t i c a l and l o g i s t i c c r i t i c a l
components ( r e f e r t o E x h i b i t V I ) o f a CEIby 2 r a w i n g a n d p a r t
number. The c o n t r a c t o r may a l s o s e r i a l i z e o t h e r a s s e m b l i e s o r
p a r t s o f a c o n t r a c t e n d i t e m a s h e may r e q u i r e .

6.6.1 A s s i g n i n g S e r i a l Numbers t o Components, A s s e m b l i e s


and P a r t s . The d r a w i n g number s h a l l b e t h e b a s e f o r
s e r i a l i z i n g a c r i t i c a l component, a s s e m b l y , o r p a r t .

6.6.1.1 S e r i a l numbers s h a l l b e p e r m a n e n t l y a s s i g n e d
i n n u m e r i c a l sequence w i t h i n t h e drawing
number.

6.6.1.2 A new s e r i a l number s e q u e n c e s h a l l n o t b e


a s s i g n e d when t h e p a r t number i s changed t o
i d e n t i f y a non-interchangeable design.

6.6.1.3 The s e r i a l number o f a reworked o r r e t r o f i t


- i t e m s h a l l n o t b e c h a n g e d e v e n though t h e
i t e m h a s b e e n i d e n t i f i e d by a new p a r t number.
6.7 Change I d e n t i f i c a t i o n Numbers

The c h a n g e i d e n t i f i c a t i o n number i s a p a c k a g i n g number


a s s i g n e d by t h e c o n t r a c t o r t o p a c k a g e a l l e n g i n e e r i n g d a t a
d e f i n i n g an e n g i n e e r i n g change, and i s used t o c o n t r o l , sequence
and account f o r p r o d u c t i o n and r e t r o f i t accomplishment of t h e
change. These chanqes a r e c l a s s i f i e d i n accordance w i t h
MIL-STC-.48CI. .This . c l a s s ' i f i c a t ' i o n d e t e r m i n e s ' t h e method u s e d
t o compose a change ' i d e n t i f i c a t i o n number.

6.7.1 C o m p o s i t i o n o f a C l a s s I Change I d e n t i f i c a t i o n Number.


The c o m p l e t e C l a s s I c h a n g e i d e n t i f i c a t i o n number con-
tains three basic parts. These a r e :

a. P r e f i x d e s i g n a t i o n s which r e l a t e t h e c h a n g e t o t h e
c o n t r a c t end i t e m , t o t h e c o n t r a c t o r and t o t h e
s y s t e m program a f f e c t e d by t h e C l a s s I change.

b. An e l e v e n (11) c h a r a c t e r ECP s e q u e n c e number which


i d e n t i f i e s e a c h i n d i v i d u a l C l a s s I e n g i n e e r i n g change.
The ECP i s t h e b a s i c " d e l t a " i n c r e m e n t f o r c o n f i g -
u r a t i o n c o n t r o l and a c c o u n t i n g by t h e p r o c u r i n g
agency o f t h e a p p r o v e d s y s t e m and c o n t r a c t e n d i t e m
configuration.

C. A c o r r e c t i o n c o d e t o d i s t i n g u i s h between ECP
documents c o n t a i n i n g m i n o r e d i t o r i a l c o r r e c t i o n s
and t h e o r i g i n a l copy.
EXHIBIT X

The c o n t r a c t o r s h a l l c o n s t r u c t t h e c o m p l e t e C l a s s I
change i d e n t i f i c a t i o n number i n a c c o r d a n c e w i t h t h e
p a t t e r n shown i n F i g u r e 2. The example i d e n t i f i e s
t h e 3 1 s t ECP p r o c e s s e d by c o n t r a c t o r 15802 f o r t h e
1 1 4 system. The change a f f e c t s CEI 376524B and o t h e r
CEIs produckd by t h e c o n t r a c t o r a s n o t e d by t h e ECP
d a s h number. These r e q u i r e m e n t s f o r c o n s t r u c t i n g a
C l a s s I change i d e n t i f i c a t i o n number i n c l u d e and
i n c o r p o r a t e t h e r e q u i r e m e n t s i n MIL-STD-480.

6.7.1.1 The s y s t e m d e s i g n a t i o n number w i l l b e p r o v i d e d


t o a l l c o n t r a c t o r s by t h e p r o c u r i n g agency
a t t h e b e g i n n i n g of a s y s t e m program.

6.7.1.2 The c o n t r a c t o r s h a l l a s s i g n ECP numbers


c o n s e c u t i v e l y from a s e p a r a t e series f o r
e a c h s y s t e m program ( i . e . , program i d e n t i -
f i e d by a s y s t e m d e s i g n a t i o n n u m b e r ) , o r t h e
ECP series may b e e s t a b l i s h e d i n a c c o r d a n c e
w i t h MIL-STD-480 f o r c o n t r a c t e n d i t e m s
n o t a p a r t of a s y s t e m program. The f i r s t
ECP p r o c e s s e d s h a l l b e ECP number 1 ( o n e ) .
Once a s s i g n e d t h e ECP number s h a l l b e r e t a i n e d
f o r a l l s u b s e q u e n t s u b m i s s i o n s of t h e pro-
p o s a l , and f o r a l l ECP Type, r e v i s i o n s and/
o r c o r r e c t i o n codes which may b e appended t o
t h a t number.

6.7.1.3 C l a s s I e n g i n e e r i n g changes a f f e c t i n g more


t h a n one C E I number under t h e c o g n i z a n c e o f
a s i n g l e c o n t r a c t o r s h a l l b e i d e n t i f i e d by
a b a s i c ECP number w i t h a s e p a r a t e d a s h
number a s s i g n e d f o r CEI a f f e c t e d . Each
d a s h numbered ECP must b e c o m p l e t e i n i t s e l f
f o r t h e CEI change b e i n g p r o p o s e d . The pur-
p o s e o f d a s h numbers i s t o r e l a t e a l l CEIs
a f f e c t e d by a change.

6.7.1.4 The c o n t r a c t o r s h a l l a s s i g n . o n e of t h e
f o l l o w i n g t y p e codes t o e a c h ECP. The
t y p e code may b e changed t o r e f l e c t a new
c o n d i t i o n o f t h e ECP i f it i s n e c e s s a r y on
r e s u b m i t t a l of a proposal.

Type o f ECP Type Code

Preliminary
Formal

C l a s s I ECP j u s t i f i c a t i o n codes and change


p r i o r i t i e s s h a l l be assigned i n accordance
w i t h t h e r e q u i r e m e n t s o f MIL-STD-480.
EXHIBIT X
6.7.1.5 The c o n t r a c t o r s h a l l i d e n t i f y e a c h f o r m a l
r e v i s i o n t o t h e ECP w i t h a n " R l " f o r t h e
f i r s t r e v i s i o n , "R2" f o r t h e s e c o n d r e v i s i o n ,
etc.

Note: The r e q u i r e m e n t s f o r u s i n g t h e
r e v i s i o n code a r e d e s c r i b e d i n
E x h i b i t s V I I I and I X .

6.7.1.6 The ECP s e q u e n c e number s h a l l c o n s i s t o f t h e


b a s i c ECP number f o l l o w e d b y a d a s h and d a s h
number, a t y p e c o d e , a r e v i s i o n i d e n t i f i c a t i o n
and a c o r r e c t i o n c o d e a s a p p l i c a b l e . The
t o t a l number o f c h a r a c t e r s f o r n u m e r a l s ,
dashes and l e t t e r s s h a l l n o t exceed e l e v e n
.
(11) The ECP s e q u e n c e number i s t h e number
which i s shown i n c o n f i g u r a t i o n i n d e x and
a c c o u n t i n g r e p o r t s a s t h e ECP number b e c a u s e
r e p o r t i n g formats a r e designed t o otherwise
display p r e f i x information.

6.7.1.7 The c o n t r a c t o r s h a l l d e n o t e t h a t a n ECP


document h a s b e e n c o r r e c t e d e d i t o r i a l l y b u t
n o t o t h e r w i s e changed by a " C l " f o r t h e f i r s t
c o r r e c t i o n , "C2" f o r t h e s e c o n d c o r r e c t i o n ,
e t c . The c o r r e c t i o n s e q u e n c e s h a l l b e g i n
anew f o r e a c h r e v i s i o n .

EXAMPLE: R1-C1 is the f i r s t correction of the


f i r s t r e v i s i o n ; R1-C2 2 s t h e s e c o n d
correction of t h e f i r s t revision;
R2-C1 i s t h e f i r s t c o r r e c t i o n o f t h e
second r e v i s i o n .

6.7.2 C o m p o s i t i o n o f a C l a s s 11 Change I d e n t i f i c a t i o n
Number. C l a s s I1 c h a n g e i d e n t i f i c a t i o n numbers may
b e - c o n s t r u c t e d i n accordance w i t h t h e c o n t r a c t o r ' s
i n t e r n a l s y s t e m s and p r o c e d u r e s p r o v i d i n g t h a t t h e s e
p r o c e d u r e s a r e c o m p a t i b l e w i t h MIL-STD-480.

6.8 Code I d e n t i f i c a t i o n Numbers

T h i s s h a l l b e t h e f i v e - d i g i t number o f t h e c o n t r a c t o r o r
Government a g e n c y a s shown i n C a t a l o g i n g Handbook H4-1,
" F e d e r a l S u p p l y Code f o r M a n u f a c t u r e r s . "

6.8.1 C o n t r a c t o r Code I d e n t i f i c a t i o n Numbers. Contractors


h a v i n q more t h a n o n e d i v i s i o n , e a c h h a v i n q a n H 4 - 1
c o d e , - s h a l l u s e t h e code o f t h e d i v i s i o n which i s t h e
d e s i g n a c t i v i t y , and s h a l l a l s o u s e t h e c o d e of t h e
d i v i s i o n which i s t h e m a n u f a c t u r e r when a d i f f e r e n t
division ( r e f e r t o Exhibit X I ) .

6.8.2 Government Agency Code I d e n t i f i c a t i o n Numbers. When


a Government a g e n c y i s a d e s i g n a c t i v i t y o r a manu-
f a c t u r e r , t h e H4-1 c o d e o f t h e r e s p o n s i b l e Government
agency s h a l l b e u s e d . I f n o H4-1 c o d e h a s b e e n
a s s i g n e d , t h e mnemonic a b b r e v i a t i o n o f t h e agency s h a l l
be used.
EXHIBIT X

CONFIGURATION IDENTIFICATION NUMBERS

NIlMRER C-C USE AND RELATIONSHIP


I I I I
Specification Requirements Denotes t e c h n i c a l r e q u i r e m e n t s .
Number Number I s i s used t o i d e n t i f y s y s t e m ,
c o n t r a c t e n d i t e m and component
s p e c i f i c a t i o n s and r e l a t e t h e s e
documents t o program b a s e l i n e s .
I t i s a l s o used t o i d e n t i f y com-
pany s t a n d a r d s .
-

C o n t r a c t End Permanent Denotes type-model series. I t


I t e m Number Number i s used t o i d e n t i f y t h e l e v e l a t
(CEI) which t e c h n i c a l and c o n t r a c t u a l
r e q u i r e m e n t s s h a l l b e managed.
Drawing and Transient Denotes i n t e r c h a n g e a b i l i t y and
P a r t Number Number non-interchangeability. It is
u s e d t o c o n t r o l assembly and re-
placement a t a l l l e v e l s includ-
i n g t h e c o n t r a c t end i t e m i t s e l f .
Serial Permanent Sequence 1. Used w i t h a CEI number t o
Number Number d e n o t e e a c h u n i t i n a type-model-
series and b e t h e e n g i n e e r i n g
e f f e c t i v i t y t o which a l l management
a c t i o n s a r e s p e c i f i c a l l y addressed.
2. Used w i t h a drawing and p a r t
number t o d e n o t e e a c h u n i t i n a
f a m i l y of n o n - i n t e r c h a n g e a b l e p a r t s
which, when reworked o r m o d i f i e d
t o be i n t e r c h a n g e a b l e , a r e r e i d e n t i -
f i e d t h e same.

Change Packaging Denotes t h e c o n t e n t o f a change.


Identification Number I t i s u s e d t o package, c o n t r o l ,
Number s e q u e n c e and a c c o u n t f o r a l l en-
g i n e e r i n g p r o d u c t i o n and r e t r o f i t
actions required f o r a single
change.

Code Number Denotes d e s i g n a c t i v i t y and/or ,

Identification Modifier manufacturing source. I t i s used


Number w i t h above c o n t r a c t o r a s s i g n e d
numbers t o a s s u r e u n i q u e
identification.

TABLE A
EXHIBIT X

1 5 c h a r a c t e r s (max. )
YYYYYY - zzzzzzz

D o c u m e n t I d e n t i f i c a t i o n Number
(see p a r a . 6 . 2 . 2 . 1 )

S u f f i x Codes
(see para. 6 . 2 . 2 . 2 )
Figure 1A
S p e c i f i c a t i o n Number

XX - YYY - z

SCN S e q u e n c e Number
(see para. 6 . 2 . 3 . 1 )

S p e c i f i c a t i o n P a g e Number
( s e e para 6 . 2 . 3 . 2 )

SCN P a g e L e t t e r
(see p a r a . 6 . 2 . 3 . 3 ) I
F i g u r e 1B
S p e c i f i c a t i o n C h a n g e N o t i c e Number

CONSTRUCTION OF SPECIFICATION AND SCN NUMBERS


EXHIBIT X

SPECIFICATION DESCRIPTION OF EXAMPLE


NUMBER

123456 Specification d r a f t f o r coordination

123456A F i r s t f o r m a l l y approved i s s u e o f t h e
same s p e c i f i c a t i o n

10-40b The second SCN s h e e t t o a change


a f f e c t i n g page 40 o f s p e c i f i c a t i o n
123456A which was approved a s SCN 4/10

123456B Revised s p e c i f i c a t i o n i n c o r p o r a t i n g
t h e f i r s t r e v i s i o n d i r e c t e d by a CCBD

382159A F i r s t f o r m a l l y approved addendum


s p e c i f i c a t i o n made from 123456B and
t o b e m a i n t a i n e d by SCN's and r e v i s i o n s
independent of t h e p a r e n t s p e c i f i c a t i o n

TABLE B

EXAMPLES OF SPECIFICATION IDENTIFICATION NUMBERS


EXHIBIT X

CONSTRUCTION OF THE CLASS I

CHANGE IDENTIFICATION NUMBER

C l a s s I Change I d e n t i f i c a t i o n Number

P r e f i x Designations (11 d i g i t s max)

31-1DJ3.L
CEI Number
(see para. 6.31 I'
D e s i g n A c t i v i t y Code
(see p a r a . 6 . 8 )

S y s t e m ~ e s i g n a t i o nNumber
(see para. 6 . 7 . 1 . 1 )

ECP Number
(see p a r a . 6 . 7 . 1 . 2 . , 6.7.1.3)

ECP Type Code (see p a r a . 6.7.1.4)

ECP R e v i s i o n Code (see p a r a . 6.7.1.5)

ECP C o r r e c t i o n Code (see p a r a . 6.7.1.7)

Figure 2
EXHIBIT XI

REQUIREMENTS FOR CONFIGURATION


IDENTIFICATION AND ACCEPTANCE OF
CONTRACT END ITEMS AND
RELATED DATA
EXHIBIT X I

REQUIREMENTS FOR CONFIGURATION


I D E N T I F I C A T I O N AND ACCEPTANCE OF
CONTRACT END ITEMS AND
RELATED DATA

CONTENTS

Paragraph Page

1. PURPOSE ...................................... X I - 1
2. SCOPE ........................................ X I - 1

3. A P P L I C A B I L I T Y ................................ X I - 1

4. REFERENCE DOCUMENTS .......................... X I - 2

5. EXPLANATION OF T E W S ......................... X I - 2

6. PROCEDURAL FEQUIREFlENTS ...................... X I - 2

FORMATS AND ILLUSTRATIONS

T a b l e "A", E q u i p m e n t categories ................... X I - 1 4


Figure I , S a m p l e C o n t r a c t E n d I t e m N a m e p l a t e ...... X I - 1 5
EXHIBIT XI

REQUIREMENTS FOR CONFIGURATION


IDENTIFICATION AND ACCEPTANCE OF
CONTRACT END ITEMS AND
RELATED DATA

1. PURPOSE
This exhibit provides NASA and contractor organizations
with requirements for identifying and interrelating contract
end item equipments, facilities, spares, technical documents,
and engineering data which are to be formally accepted by the
procuring agency.
2. SCOPE
This exhibit establishes requirements for identifying con-
figuration at parts, component, subassembly and contract
end item levels of assembly of systems/equipments. It estab-
lishes the documentation relationship by which the identified
configuration will be accepted as contract end items. This
exhibit pertains to:
a. Engineering specifications, drawings, lists and
release records.
b. Acceptance documents.
c. Name plates and alternate means for the identifi-
cation and marking of hardware and containers.
d. Technical documents.
3. APPLICABILITY
This exhibit applies to contract end items and related
documents which are to be formally accepted or approved by
the procuring agency for systems programs or for any other
use. It applies to all contracts with the procuring agency
for these items and documents, and for systems engineering
and/or system integration contracts involving these items
and documents. Contractors to the procuring agency shall
be responsible for the compliance of their subcontractors,
vendors, and suppliers.
EXHIBIT X I

4. REFERENCE DOCUMENTS

4.1 A p p l i c a b l e Documen'ts

The f o l l o w i n g documents of t h e e x a c t i s s u e shown,


o r p a r t t h e r e o f a s f u r t h e r d e s c r i b e d , form a p a r t
of t h i s e x h i b i t :

Exhibit X "Requirements f o r
Configuration I d e n t i -
f i c a t i o n Numbers"

MIL-STD-100A 1 October 1967 "Engineering Drawing


Practices"

MIL-STD-129D 28 December 1964 "Marking f o r Shipment


and S t o r a g e "

MIL-STD-130C 29 September 1967 " I d e n t i f i c a t i o n Mark-


i n g of U.S. M i l i t a r y
Property"

MIL-STD-480 30 October 1968 " C o n f i g u r a t i o n Con-


t r o l - Engineering
Changes, D e v i a t i o n s
and Waivers"

5. EXPLANATION OF TERMS

(See E x h i b i t X V I I . 1

6. PROCEDURAL REQUIREMENTS

These p r o c e d u r e s a r e based on t h e p o l i c e s and p r a c t i c e s


of t h e p r o c u r i n g agency f o r c o n f i g u r a t i o n management.
I t i s recommended t h a t c o n t r a c t o r s review and u n d e r s t a n d
t h e s e p o l i c i e s and p r a c t i c e s a s a p a r t of implementing
the procedural requirements i n t h i s e x h i b i t .

6.1 General Requirements

C o n f i g u r a t i o n s h a l l be i d e n t i f i e d :

a. A t e v e r y l e v e l of assembly ( p i e c e p a r t s
through f i n a l assembly) .
EXHIBIT XI

b. On every deliverable item produced by the


contractor and formally accepted by the
procuring agency (i.e., equipments, facil-
ities, spares, technical documents).

c. By engineering drawings and specifications.


These data, as approved and formally re-
leased, shall be the source of all config-
uration requirements for the production of
all other deliverable products and docu-
ments.

d. At all times subsequent to formal accep-


tance (through later testing, assembly,
checkout, and operational usage to ulti-
mate consumption) by proper update of
engineering drawings and specifications
to cover incorporated changes.

The contractor shall identify configuration by


the set of numbers defined in Exhibit X for use as
applied in accordance with the procedural require-
ments of this exhibit. Numbers other than those
defined for use in Exhibit X shall not be used
for configuration management.

6.2 Implementation Requirements

As part of implementing this exhibit, the con-


tractor shall demonstrate to the procuring agency
that he has adequate policies, organization and
procedures for configuration management.

6.2.1 Contractor Responsibi'lities. The respon-


sibilities of the contractor for config-
uration identification are:

6.2.1.1 To compose and assign all con-


figuration identification num-
bers in accordance with Ex-
hibit X.

6.2.1.2 To apply these numbers to doc-


uments and equipments in accor-
EXHIBIT X I

dance w i t h t h e r e q u i r e m e n t s i n
t h i s exhibit.

6.2.1.3 To c o n t i n u o u s l y m a i n t a i n t h e r e l a t i o n s h i p
and c o n t i n u i t y between t h e s e documents and
equipments s o t h a t t h e development and q u a l i -
f i c a t i o n of equipment, i t ' s p r o d u c t i o n and
l o g i s t i c s u p p o r t w i l l match e n g i n e e r i n g and
contract reauirements.
6.3 E n g i n e e r i n g Drawings
The c o n t r a c t o r s h a l l u s e FIL-STD-100 and i t s d i r e c t l y r e f e r e n c e d
documents, t o c o m p l e t e l y i d e n t i f y c o n f i g u r a t i o n o n drawings.
6.3.1 I d e n t i f i c a t i o n Nunbers
6.3.1.1 A l l standard configuration i d e n t i f i c a t i o n
numbers s h a l l b e shown o n e n g i n e e r i n g draw-
ings o r i n engineering r e l e a s e records.
6.3.1.2 A l l standard configuration i d e n t i f i c a t i o n
numbers s h a l l b e on s u b m i t t e d e n g i n e e r i n g
drawings and l i s t s .
6.3.1.3 The same drawings and c o n f i g u r a t i o n i d e n t i -
f i c a t i o n numbers used f o r manufacture o r
c o n s t r u c t i o n o f , and chanae t o , d e l i v e r a b l e
equipments and f a c i l i t i e s s h a l l b e used f o r
t h e manufacture o f s p a r e s and p r e p a r a t i o n of
o p e r a t i o n s and maintenance manuals f o r t h e s e
same equipments and f a c i l i t i e s .
6.3.1.4 These same drawings and i d e n t i f i c a t i o n num-
b e r s s h a l l b e used f o r manufacturing addi-
t i o n a l a u a n t i t i e s of t h e s e same eauivments
and f a c i l i t i e s.
6.3.1.5 A l l drawings s h a l l c o n t a i n t h e code i d e n t i -
f i c a t i o n number o f t h e d e s i g n a c t i v i t y f o r
t h e drawing.
6.3.1.6 E x i s t i n g drawinas s h a l l n o t be r e v i s e d t o
retroactively incorporate t h e identification
r e q u i r e m e n t s i n E x h i b i t X. A s e x i s t i n g draw-
i n g s a r e r e - r e l e a s e d f o r a l-and-on e f f e c t i -
v i t y f o r a new c o n t r a c t end i t e m type-model-
EXHIBIT X I

s e r i e s , t h e y s h a l l be r e d r e s s e d t o be i n
accordance w i t h E x h i b i t X.

6.3.2 A p p l i c a t i o n Data. A l l p r o d u c t i o n and c o n s t r u c t ~ o n


drawings which t o g e t h e r document t h e t e c h n i c a l d e s c r i p -
t i o n o f a CEI s h a l l b e i n t e r r e l a t e d by d r a w i n g a p p l i c a -
t i o n d a t a which may be e n t e r e d on t h e d.rawings o r i n
t h e e n g i n e e r i n g r e l e a s e r e c o r d s f o r t h e d r a w i n g s , and
w i l l provide t h e information required i n t h e following
subparagraphs.

6.3.2.1 The "PART NO." c r e a t e d by t h e drawing f o r


c a l l o u t i n t h e list of m a t e r i a l s of t h e p a r t s
"NEXT ASSEMBLY. "

6.3.2.2 The "NEXT ASSEMRLY" p a r t number ( s ) o f a l l


immediate n e x t a s s e m b l i e s of e a c h "PART NO."

6.3.2.3 "REQ'D PER N/A" ( R e q u i r e d P e r Next Assembly)


s h a l l c o n t a i n t h e t o t a l number of "PART NO."
items r e q u i r e d t o make one o f e a c h "NEXT
ASSEMRLY. "

6.3.2.4 The "END ITEM NO." i n which e a c h "NEXT


ASSEMBLY" i s t o b e i n s t a l l e d .

6.3.2.4.1 I f t h e d e s i g n a c t i v i t y i s a sub-
c o n t r a c t o r , ven8or o r s u p p l i e r
whose end p r o d u c t i s a sub-
assembly p a r t o f t h e c o n t r a c t o r ' s
CEI , t h e "END ITEM NO. " w i l l b e
t h e t o p drawing number o f h i s end
product.

6.3.2.5. The "SERIAL NO. " of t h e c o n t r a c t end i t e m s


i n which e a c h "NEXT ASSEMBLY" i s t o be i n -
stalled. " X & UP" o r "X & ON" n o t a t i o n s s h a l l
be used.

6.3.2.5.1 I f t h e d e s i g n a c t i v i t y i s a sub-
c o n t r a c t o r , vendor o r s u p p l i e r
whose end p r o d u c t i s a sub-
assembly p a r t o f t h e c o n t r a c t o r ' s
C E I , t h e "SERIAL NO." w i l l b e t h e
p a r t numher s e r i a l i z a t i o n a s s i g n e d
by t h e s u p p l i e r w i t h i n t h e t o p
drawing number.

NOTE: The p r o c u r i n g agency r e g u l a r -


l y a c c e p t s c o n t r a c t end i t e m s
from one s o u r c e and s u p p l i e s
them f o r i n s t a l l a t i o n i n
equipments t o b e s u p p l i e d a s
a c o n t r a c t end i t e m by ano-
EXHIBIT X I

t h e r s o u r c e . An example
i s an e n g i n e s u p p l i e d f o r
i n s t a l l a t i o n i n a n aero-
space vehicle. In these
c a s e s t h e i n s t a l l i n g con-
t r a c t o r s h a l l always i d e n t i -
f y t h e s u p p l i e d c o n t r a c t end
i t e m i n the l i s t of material
o f h i s drawing a s ravernment
furnished.
6.3.2.6 The t o p drawing o r r e l e a s e r e c o r d o f a con-
t r a c t o r ' s C E I o r o f t h e end p r o d u c t o f a sub-
c o n t r a c t o r , vendor o r s u p p l i e r s h a l l c o n t a i n
no a p p l i c a t i o n d a t a .
6.3.3 R e v i s i o n Block. A l l p r o d u c t i o n and c o n s t r u c t i o n draw-
i n g s s h a l l c o n t a i n a r e v i s i o n b l o c k i n accordance w i t h
t h e f o r m a t i n MIL-STD-100. T h i s b l o c k s h a l l b e main-
/
tained a s follows:
6.3.3.1 Up t o t h e t i m e o f c u t o f f e s t a b l i s h e d by t h e
c o n t r a c t o r f o r chanues t o be i n c o r p o r a t e d
p r i o r t o f o r m a l a c c e p t a n c e by t h e p r o c u r i n g
agency o f t h e f i r s t C E I i n t h e type-model-
s e r i e s , t h e p r o d u c t i o n o r c o n s t r u c t i o n draw-
i n g s ' s h a l l be m a i n t a i n e d by change l e t t e r
c o n t r o l and drawing r e v i s i o n s n o t e d i n t h e
r e v i s i o n b l o c k i n accord-ance w i t h s t a n d a r d
practice.
6.3.3.2 A t and s u b s e a u e n t t o t h i s c u t o f f a l l drawing
r e v i s i o n s s h a l l be i d e n t i f i e d by a change
i d e n t i f i c a t i o n number i n a d d i t i o n t o a draw-
i n g r e v i s i o n . l e t t e r and d a t e . T h i s i d e n t i -
f i , c a t i o n s h a l l b e permanently r e t a i n e d even
i f t h e drawing is c o m p l e t e l y redrawn.
6.3.3.3 The "DESCRIPTION" column o f t h e r e v i s i o n
block s h a l l i d e n t i f y t h e change i d e n t i f i c a -
t i o n number and r e l a t e it t o t h e drawing
revision letter a s follows:
6.3.3.3.1 The c o n t r a c t o r s h a l l f i r s t e n t e r
t h e n o t e "CLASS I" o r CLASS 11"
t o indicate the classification
o f t h e change i n accordance w i t h
MIL-STD-480 ( r e f e r t o E x h i b i t s
V I I I and I X ) .
EXHIBIT X I

6.3.3.3.2 The c o n t r a c t o r s h a l l n e x t e n t e r
t h e change i d e n t i f i c a t i o n number
o f t h e C l a s s I o r C l a s s I1 change.

6.3.3.3.3 The c o n t r a c t o r s h a l l t h e n n o t e
anv o t h e r p e r t i n e n t r e v i s i o n l e t t e r
data.

6.3.3.4 Drawinus may b e changed by an a n c i l l a r y docu-


ment o f t h e drawing ( e . ~ . ,an E . O . , ECN, e t c . )
r a t h e r t h a n by drawing r e v i s i o n , i n which c a s e
t h e a n c i l l a r y d.ocument s h a l l c o n t a i n t h e d a t a
r e g u i r e d i n p a r a g r a p h s 6 . 3 . 3 . 3 . 1 and 6.3.3.3.2.

6.3.3.4.1 When a n c i l l a r y documents a r e i n -


c o r p o r a t e d i n t h e drawing, t h e d a t a
i n p a r a u r a p h s 6 . 3 . 3 . 3 . 1 and 6 . 3 . 3 . 3 . 2
s h a l l b e t r a n s c r i b e d and e n t e r e d i n
t h e r e v i s i o n b l o c k o f t h e drawing
f o r t h e appropriate revision l e t t e r .

6.3.3.5 T h e r e may h e more t h a n one c l a s s i f i e d change


p e r r e v i s i o n l e t t e r . There s h a l l n o t be
more t h a n one r e v i s i o n f o r one c l a s s i f i e d
change.

6.3.4 L i s t o f M a t e r i a l . Vendor p a r t s components and sub-


assemblies, o t h e r t h a n s t a n d a r d s , s h a l l normally be
l i s t e d by vendor p a r t number. Specification identifi-
c a t i o n numbers s h a l l b e used. o n l y u n t i l t h e vendor p a r t
number i s a s s i g n e d and o b t a i n e d .

6.3.4.1 When more t h a n one s o u r c e c a n s a t i s f y t h e


d e s i g n a p p l i c a t i o n , o n l y one s o u r c e s h a l l b e
made a r e u u i r e m e n t f o r t h e C E I u n i t t h a t i s
FACI1d ( r e f e r t o F x h i b i t X I V ) , and a l l sub-
seauent u n i t s , unless a l t e r n a t e sources a r e
form-ally approved by t h e p r o c u r i n g agency.

6.3.4.2 I f an a d d i t i o n a l s o u r c e i s approved a s an
a l t e r n a t e and i n t e r c h a n g e a b l e , t h e i t e m s h a l l
c o n t i n u e t o b e i d e n t i f i e d by one v e n d o r draw-
i n ? and p a r t number accompanied by a n a l t e r -
n a t e and i n t e r c h a n g e a b l e n o t e r e f e r e n c i n g
t h e o t h e r d r a w i n a and p a r t nurnber(s1 and t h e
g o v e r n i n g s p e c i f i c a t i o n i d e n t i f i c a t i o n number.

6.3.5 Top Drawings, S i t e s and. I n t e r c o n n e c t s . In configura-


t i o n m a n a q m e n t , a l l p r o d u c t i o n and c o n s t r u c t i o n draw-
i n g s a r e p a r t o f some- p r i m e equipment i t e m o r i d e n t i f i -
c a t i o n i t e m (see Table A ) . A l l i t e m s s h a l l have a t o p
EXHIBIT X I

drawing, s h a l l be f o r m a l l y a c c e p t e d by t h e p r o c u r i n g
agency a t t h e c o n t r a c t o r ' s p l a n t o r s i t e o f c o n s t r u c -
t i o n , and s h a l l b e c o n t r o l l e d t h e r e a f t e r a s Government
property. I n system p r o s r a m s , t h i s p r o p e r t y i s t h e n
i n s t a l l e d i n h i g h e r o r d e r c o n t r a c t end items which are
a l s o formally accepted. L a s t l y , t h e i n t e q r a t e d i n s t a l -
l a t i o n a t each l o c a t i o n i s a c c e p t e d and t u r n e d o v e r t o
a u s i n g auency.
6.3.5.1 The c o n t r a c t o r ' s t o p drawinp f o r a c o n t r a c t
end i t e m s h a l l d e f i n e t h e c o n f i g u r a t i o n i n
which it may be removed and r e p l a c e d f o r
maintenance o r m o d i f i c a t i o n .
6.3.5.2 Loose equipment is a d e l i v e r y c o n d i t i o n .
Knockdowns f o r shipment and k i t s o f i d e n t i -
f i c a t i o n i t e m s h a l l n o t b e shown on produc-
t i o n drawings.
6.3.5.3 s p e c i a l s h i p p i n g and s t o r a g e c o n t a i n e r s s h a l l
b e i d e n t i f i e d a s prime eauipment i t e m s o r
i d e n t i f i c a t i o n i t e m s (see T a b l e A ) a s d e t e r -
mined by t h e i r s p e c i f i c a t i o n s .

6.3.5.4 S i t e c o n s t r u c t i o n s h a l l he documented by a
t o p drawing a s a f a c i l i t y c o n t r a c t end i t e m
and s h a l l be f o r m a l l v a c c e p t e d by t h e pro-
c u r i n g apency a t t h e B e n e f i c i a l Occupancy
Date ( B . O . D . ) . F i e l d r u n s s h a l l be dimen-
sioned t o t h e e x t e n t required t o control
i n t e r f a c e s , provide clearance f o r future
i n s t a l l a t i o n s and d a t a f o r r e p l e n i s h i n g
spares.
6.3.5.5 quipped f a c i l i t i e s s h a l l b e a prime e u u i p -
ment c o n t r a c t end i t e m c o n s i s t i n g o f t h e s i t e
a f t e r B.O.D., i n s t a l l e d GFE ( a c c e p t e d c o n t r a c t
end i t e m s ) , FPIE and. I n t e r c o n n e c t s ( i n c l u d i n g
accepted. i d e n t i f i c a t i o n i t e m s , and/or p a r t s
c a l l e d o u t a s p a r t o f t h e f a c i l i t y t o p draw-
ing).
6.3.5.6 A complete corn-plex o r b a s e s h a l l b e a prime
equipment c o n t r a c t end i t e m documented by a
t o p drawing when r e q u i r e d t o c a l l o u t i n t e r -
site cabling, splice-ins, conduit, e t c .
6.4 Equipment I d e n t i f i c a t i o n Nameplates and. Markings

The c o n t r a c t o r s h a l l i d e n t i f y d e l i v e r a b l e c o n t r a c t end i t e m
equipments, a e r o s p a c e f a c i l i t i e s and s p a r e s by nameplates and
markings a s r e a u i r e d by t h i s S e c t i o n . Nameplates and markings
EXHIBIT XI

s h a l l be made and a f f i x e d i n accordance w i t h MIL-STD-


130, and MIL-STD-129, o r NASA e q u i v a l e n t , a s supplemented
and, i n case o f c o n f l i c t , superseded by t h e s e i n s t r u c t i o n s .
A l l c o n f i g u r a t i o n i d e n t i f i c a t i o n information on t h e s e name-
p l a t e s and markings s h a l l be t a k e n from and a g r e e w i t h pro-
d u c t i o n o r c o n s t r u c t i o n drawings and/or t h e i r e n g i n e e r i n g
re l e a s e r e c o r d s .
6.4.1 Contract End Items (CEI I s ) . The c o n t r a c t o r s h a l l
i d e n t i f y each d e l i v e r a b l e c o n t r a c t end i t e m u n i t with
a nameplate arranged a s shown i n Figure 1 and contain-
i n g t h e information shown thereon. C B I nameplates
s h a l l be l o c a t e d f o r convenient examination by s e r v i c e
and o p e r a t i n g crew9 wlien t h e CEI i s i n an o p e r a t i o n a l -
l y ready p o s i t i o n .

6.492 Engineering C r i t i c a l Components. The c o n t r a c t o r s h a l l iden-


t i f y each e n g i n e e r i n g c r i t i c a l component w i t h a nameplate
arranged a s shown i n F i g u r e l ' a n d c o n t a i n i n g t h e In-
formation shown thereon e x c e p t :

6.4.2.1 Note 1 "Leave blank."

6.4.2.2 Note 2 s h a l l be t h e p a r t s e r i a l number (not


t h e CEI s e r i a l number).

6.4.2.3 Note 3 s h a l l be t h e p a r t number of t h e c r i t i -


c a l component ( n o t t h e C E I p a r t number).

6.4.2.4 Note 4 s h a l l be t h e s p e c i f i c a t i o n and r e v i -


s i o n number of t h e c r i t i c a l component s p e c i -
f i c a t i o n ( n o t t h e CEI D e t a i l S p e c i f i c a t i o n
and r e v i s i o n number).
6.4.3 I d e n t i f i c a t i o n Items. The c o n t r a c t o r s h a l l i d . e n t i f v
each i d e n t i f i c a t i o n i t e m (see Table A ) by a nameplate
o r equivalent containing t h e w ~IDENTIFI- ~
CATION" d a t a shown i n Figure 1, n o t e s (1) throuffh ( 6 ) .

6.4.4 Requirement Items. Requirement items ( s e e Table A ) a r e


GFE. The c o n t r a c t o r s h a l l r e - i d e n t i f y GFE o n l y a s re-
q u i r e d by Modification I n s t r u c t i o n s which he accomplishes
and l o g s i n h i s t o r i c a l r e c o r d s s u p p l i e d w i t h t h e GFR.
When a requirement i t e m i s a l t e r e d o r s e l e c t e d by a
c o n t r a c t o r it s h a l l be i d e n t i f i e d as a c o n t r a c t end
i t e m by t h e c o n t r a c t o r i n accordance w i t h paragraph
6.4.1 o r 6.4.3, o r a s a p a r t t h e r e o f .

6.4.5 Minimum Marking P.equirements f o r CEI1s and Components.


The c o n t r a c t o r s h a l l mark C E I ' s and c r i t i c a l components,
which a r e t o o s m a l l f o r complete i d e n t i f i c a t i o n , w i t h
t h e following minimum k o n f i g u r a t i o n d a t a :
EXHIBIT X I

6 . 4;.,5,. . 1 . -. The
.., .. p. a. .r t. number.
-... .....
_
,
_...... .. . -:

-. '..''6.: 4 , 5.2 The k e r ' i a l - n u d e r .


' .
: . . I : . _ .. . . , - .. .
. :- .. .. . .
. . - 5 . 3 . . lie d e s i g n a c t i v i t y code i d e n t i f i c a t i o n num-
. . 6.4.;
- I
. b e r , ' a n d t h e m a n u f a c t u r e r ' s code. i. d e n t i f i -
.,..
''
. .
c a t i o n number, i f d i f f e r e n t .
6.4.6 S e r i a l i z a t i o n . T h e , c o n t r a c t o r s h a l l s e r i a l i z e al.1 con-
. , . ., .
t r a c t end i t e m s and c r i t i c a l components. O t h e r p a r t s
and a'ssemblies' may. b e s e r i a l i z e d a t . t h e c o n t r a c t o r ' s
, option. ' . . . ,

6.4.7' P a r t s and S t a n d a r d s . The c o n t r a c t o r s h a l l mark a l l


p a r t s and company s t a n d a r d s w i t h t h e i r p a r t number o r
s t a n d a r d s p e c i f i c a t i o n i d e n t i f i c a t i o n number, s e r i a l
number ( i f u s e d ) , t h e d e s i g n a c t i v i t y code i d e n t i f i -
c a t i o n number, and t h e m a n u f a c t u r e r ' s i d e n t i f i c a t i o n
number code ( i f d i f f e r e n t ) . The c o n t r a c t o r need n o t
comply w i t h t h i s p r a c t i c e when:
6.4.7.1 The p a r t i s t o o s m a l l , o r would be p h y s i -
c a l l y o r f u n c t i o n a l l y damaged by t h i s i d e n t i -
f i c a t i o n . I n t h i s s i t u a t i o n s h i p p i n g con-
tainers s h a l l earrv the required identifi-
c a t i o n ; i f . used.
'6.4.7.2 The' p a r t i s e n c a p s u l a t e d w i t h i n a n o t h e r o r
o t h e r w i s e permanently assembled and i s n o t
r e p l a c e a b l e a s a unit.,
6.4.7.3 The p a r t i s a permanent p a r t o f a c o n s t r u c t e d
., f a c i l i t...y .

6.4.8 S h i p p i n g and S t o r a s e C o n t a i n e r s . The c o n t r a c t o r s h a l l


mark shZpping and s t o r a g e c o n t a i n e r s a s r e g u i ' r e d by
. .. . . MIL-STD-129, supplemented t o i n c l u d e t h e "CONFIGURATION
IDENTIFICATION" d a t a shown i n F i g u r e l ' a s d e f i n e d i n
p a r a u r a p h s 6.4.1 t h r o u g h 6.4.7.

. . When ~ e d h n i c a lDocuments ( O p e r a t i o n s and Maintenance Manuals,


, M o d i f i c a t i o n ~ n s t r u c t i o n s ~ ; ~ l l u s t r a t e d . P aBreakdowns,
rts etc.)
a r e r e q u i r e d by t h e f i r o c u r i n g k a g e n c y . t h e c o n t r a c t o r s h a l l i n s u r e
t h a t t h e f o l l o w i n g minimum r e q u i r e m e n t s f o r r e l a f i o n s h i p and
i d e n t ' i f i c a t i o n ..a r e . s a t i s f i e d :
. .
a. The T e c h n i c a l Documents must r e l a t e t o t h e e n g i n e e r i n g
d a t a ( s p e c i f i c a t i o n s and drawings) on which t h e y a r e
based.
b. The ~ e c h n i c a lDocuments must i d e n t i f v t h e s p e c i f i c
c o n t r a c t end i t e m c o n f i q u r a t i o n ( s ) t o which t h e y
apply
EXPIBIT X I

c. The T e c h n i c a l Documents must c r o s s r e f e r e n c e changes


o r r e v i s i o n s t o t h e approved e n g i n e e r i n g change pro-
p o s a l b e i n g i n c o r p o r a t e d i n t h e c o n t r a c t end i t e m . .
6.5.1. O p e r a t i o n s an3 Maintenance Manuals. When d i f f e r e n t
p r o d u c t i o n c o n f i g u r a t i o n s of a c o n t r a c t end i t e m a r e
t o be a c c e p t e d ( a s i d e n t i f i e d by t h e p r o d u c t i o n i n c o r -
p o r a t i o n of C l a s s I c h a n g e s ) , t h e c o n t r a c t o r s h a l l
c l e a r l y o r g a n i z e t h e m a t e r i a l i n t e c h n i c a l manuals s o
t h a t t h e y may r e a d i l y b e used t o o p e r a t e and m a i n t a i n
these d i f f e r e n t configurations. This capability s h a l l
be r e t a i n e d u n t i l f u l l r e t r o f i t t o a s t a n d a r d configu-
r a t i o n h a s been accomplished.
6.5.1.1 C o n f i g u r a t i o n C h a r t . The c o n t r a c t o r s h a l l
include a configuration c h a r t , o r eauivalent
d i s p l a y , i n e a c h o p e r a t i o n s and maintenance
manual. ,.The f u n c t i o n o f t h e c o n f i g u r a t i o n
c h a r t i s t o r e l a t e t h e t e c h n i c a l manual, i t s
r e v i s i o n s and/or supplements t o t h e con£ igu-
r a t i o n s t h e y d e s c r i b e and s u p p o r t . The
recommended f o r m a t s h o u l d be s i m i l a r t o a
c h a r t used i n s p e c i f i c a t i o n s t o document
t h e i r r e v i s i o n s t a t u s , and w i l l t h e r e f o r e
p e r m i t d i r e c t comparison w i t h t h e r e v i s i o n
s t a t u s of a t e c h n i c a l manual. The con-
f i g u r a t i o n c h a r t s h a l l be i n s e r t e d immed-
i a t e l y behind t h e t i t l e page.

6.6 Acceptance by t h e P r o c u r i n g Agency


Formal a c c e p t a n c e by t h e p r o c u r i n g agency s h a l l i n c l u d e a l l
p r o c e d u r e s and d a t a n e c e s s a r y f o r i n s p e c t i o n , t e s t i n g o r
v e r i f i c a t i o n , and a p p r o v a l of c o n t r a c t end i t e m s , s p a r e s o r
o t h e r equipment o r d a t a r e w i r i n g t r a n s f e r of t i t l e t o an
a u t h o r i z e d Government agency.
6.6.1 Acceptance ~ e q u i r e m e n t s
6.6.1.1 ~ c c e n t a n c e ' t e s t i n gw i l l be conducted a s '

s p e c i f i e d i n P a r t I1 o f a CEI S p e c i f i c a t i o n
t o v e r i f y compliancs w i t h t h e f u n c t i o n a l re-
quirements i n t h e s p e c i f i c a t i o n .
6.6.1.2 I d e n t i f i c a t i o n w i l l be v e r i f i e d by i n s p e c t i o n
o f nameplates o r t h e t i t l e pages o f O p e r a t i o n s
and Y a i n t e n a n c e Manuals t o a s s u r e correspon-
dence w i t h drawings.

6.6.1.3 C e r t i f i c a t i o n s h a l l be made by t h e c o n t r a c t o r
and v e r i f i e d by t h e p r o c u r i n g agency t h a t t h e
equipment h a s been manufactured t o t h e a p p l i -
c a b l e c o n f i g u r a t i o n r e q u i r e d by e n g i n e e r i n g
EXHIBIT X I

drawings and s p e c i f i c a t i o n s ( r e f e r t o Exhi-


bit XIII) .
6.6.1.3.1 The s p e c i f i c a t i o n f o r t h e item
p r e s e n t e d f o r acceptance s h a l l be
reconciled with t h e applicable
a p ~ r o v e de n g i n e e r i n g changes
(ECP's) i n c o r p o r a t e d a s a s p e c i -
f i e d requirement.

6.6.1.3.2 The s p e c i f i c a t i o n f o r t h e accep-


t a n c e i t e ? s h a l l be reviewed t o
e n s u r e t h a t a l l waivers and/or
d e v i a t i o n s from t h e s p e c i f i c a t i o n
a r e approved and accepted by t h e
p r o c u r i n g agency.

6.6 4 1 . 4 Shortaues s h a l l be v e r i f i e d from engineering


d a t a and recorded on t h e acceptance document
( s e e paraaraph 6.6.1.8) .
6.6.1.5 An equipment h i s t o r i c a l r e c o r d w i l l be pre-
pared f o r each end item a s a v e h i c l e f o r
r e c o r d i n g t h e h i s t o r y of c a l e n d a r o r c y c l i c
l i f e components w i t h i n t h e end i t e m a s w e l l
a s f o r r e c o r d i n g approved e n g i n e e r i n g changes
i n c o r p o r a t e d i n p r o d u c t i o n (and l a t e r by
retrofit).

6.6.1.6 Technical Documents w i l l be v e r i f i e d t o t h e


e x t e n t s p e c i f i e d by t h e p r o c u r i n g aaency, on
t h e eauipment t o which thev a r e a p p l i c a b l e ,
i n d i v i d u a l l v o r a s p a r t of a system a s appro-
priate.

6.6.1.7 Engineering d a t a s h a l l be provided by t h e


c o n t r a c t o r and w i l l i n c l u d e t h e following a s
required within t h e applicable contract:
6.6.1.7.1 A n approved c o n t r a c t end i t e m
specification.

6.6.1.7.2 A complete s e t of r e l e a s e d engi-


n e e t i n g drawings prepared i n
accordance w i t h MIL-STD-100.

6.6.1.7.3 A l l a p p l i c a b l e i n t e r f a c e drawings
and/or d a t a w i t h approval completed
as d i r e c t e d by t h e p r o c u r i n g agency.
6.6.1.8 Every c o n t r a c t item accepted by NASA w i l l be
accepted by e x e c u t i o n of a M a t e r i a l Acceptance
and Receiving Report (DD Form 250 o r eauiva-
Lent) .
EXHIBIT XI

6.6.1.8.1 The DD-250 ( o r e q u i v a l e n t ) s h a l l


i d e n t i f y , bv s e r i a l number, a l l
c o n t r o l l e d s u b a s s e m b l i e s and/or
r e q u i r e m e n t i t e m s w i t h i n t h e prime
end item.
6.6.1.8.2 A l l shortages o r other departures
from c o n t r a c t u a l a c c e p t a n c e r e -
u u i r e m e n t s w i l l b e i n c l u d e d on
t h e DD-250.(or e q u i v a l e n t ) .
6.7 System Acceptance

A l l equipments, f a c i l i t i e s , s p a r e s , t e c h n i c a l documents, and


e n g i n e e r i n g d a t a comprising a svstem s h a l l h e a c c e p t e d i n
accordance w i t h t h e f o r e g o i n g p a r a g r a p h s . System a c c e p t a n c e
c o n s i s t s of s u c c e s s f u l completion o f a t e s t program a s s p e c i -
f i e d i n t h e system performance r e q u i r e m e n t s d e s i g n g e n e r a l
s p e c i f i c a t i o n . Each Apollo system programmed w i l l undergo
acceptance procedures i n accordance with t h e preceding confi-
g u r a t i o n documentation r e q u i r e m e n t s .
EXHIBIT X I

TABLE A
EQUIPMENT CATEGORIES

CONTRACT END ITEMS


REQUIm- IDENTIFI- PRIME
MENT CAT I O N EQUIPMENT
EQUIPMENT REQUIREMENTS CEI's , CEI's CEI' s

~ q u i p m e n ti s s u p p l i e d by
contractor

Contractor w i l l prepare i n d i v i - .
d u a l s p e c i f i c a t i o n s f o r each No Yes Yes
CEI

Major p r o v i s i o n i n g a c t i o n
required

Contractor w i l l prepare indivi-


d u a l t e c h n i c a l manuals f o r No No Yes
each C E I

1 0 0 % acceptance t e s t i n g re-
quired

Engineering changes a r e ex-


pected a f t e r i t e m h a s been No No Yes
formally accepted

These i t e m s a r e GFE. 2
These i t e m s a r e secondary s u p p o r t i t e m s
d e l i v e r e d by t h e c o n t r a c t o r .

These i t e m s a r e prime i t e m s . They provide 1


the basis f o r configuration control,
i n c l u d i n g t h e c o n t r o l of I d e n t i f i c a t i o n
and Requirement C E I ' s .
EXHIBIT X I

C
1

11 -CONFIGURATION IDENTIFICATION-

2
MODEL 2 5 6 7 2 6 B S E R I A L NO. 154
3
PART NO. 48B12345678-1054
5
DESIGN CODE 3 8 4 1 5 *

-SUPPLY DATA- 6

STOCK NO. 5840-480-1234 4

7 RADAR, SEARCH, LAND MOBILE


9
33 ( 6 1 4 ) - 1 2 3 4 5 MFR. CODE 2 4 8 3 1 4

MILITARY ELECTRONICS CO.


8
NASA

NOTES :
1 CONTRACT END ITEM NUMBER
2 CONTRACT END ITEM S E R I A L NUMBER
3 CONTRACT END ITEM PART NUMRER
4 CONTPACT END ITEM D E T A I L S P E C I F I C A T I O N AND REVISSON NUMBER
5 DESIGN A C T I V I T Y CODE FROM CATALOGING HANDBOOK H 4 - 1
6 FEDERAL STOCK CLASS AND FEDERAL I T E M I D E N T I F I C A T I O N NUMBER
7 NOMENCLATURE
8 MANUFACTURING CONTRACT NUMREF
9 MANUFACTURER'S CODE FROM CATALOGING HANDBOOK H 4 - 1
1 0 MANUFACTURER'S COMPANY NAME
11 GOVERNMENT OWNERSHIP SYMBOL

SAMF'LE CONTRACT END ITEM NAMEPLATE

FIGURE 1

XI-15
EXHIBIT X I 1

E N G I N E E R I N G RELEASE RECORD REQUIREMENTS


EXHIBIT X I 1

CONTENT

1. PURPOSE................................... XII-1

2. SCOPE......;.............................. XII-:

3. APPLICABILITY ............................. XII-1


4. REFERENCE DOCUMENTS ....;..................X~I-1
5. EXPLANATION OF TERMS ......................XII-2

6. PROCEDURAI, REQUIREMENTS ................... X I I - 2


EXHIBIT X I 1

E N G I N E E R I N G RELEASE RECORD REQUIREMENTS

1. PURPOSE
This E x h i b i t provides NASA and c o n t r a c t o r o r g a n i z a t i o n s
w i t h t h e minimum requirements of the. p r o c u r i n g agency f o r
achieving p r o p e r r e l a t i o n s h i p s between i d e n t i f i c a t i o n
elements i n an e n g i n e e r i n g d a t a f i l e .
2. SCOPE
This e x h i b i t e s t a b l i s h e s minimum requirements and
c a p a b i l i t i e s t o be provided by t h e c o n t r a c t o r ' s
e n g i n e e r i n g r e l e a s e system p e r t a i n i n g t o :

a. Elements o f d a t a r e q u i r e d .
b. C o n t r a c t o r ' s production r e l e a s e function31
capabilities.
c. Release of e n g i n e e r i n g changes.
d. Contractor 's f i e l d release functional
capabilities.
The e x h i b i t does n o t e s t a b l i s h , o r r e q u i r e t h e c o n t r a c t o r
t o p r o v i d e , s t a n d a r d i z e d formats f o r an e n g i n e e r i n g
r e l e a s e system.
3. APPLICABILITY
This e x h i b i t i s a p p l i c a b l e t o a l l c o n t r a c t s r e q u i r i n g
submission of e n g i n e e r i n g d a t a . C o n t r a c t o r s t o NASA
s h a l l be r e s p o n s i b l e f o r t h e compliance of t h e i r sub-
c o n t r a c t o r s , vendors and ' s u p p l i e r s .
4. REFERENCE DOCUMENTS

The following documents a r e r e f e r e n c e d i n t h e t e x t of t h i s


e x h i b i t f o r r e f e r e n c e purposes o n l y , and do n o t form a
p a r t of t h i s e x h i b i t :
Exhibit X "Requirements f o r Configuration
I d e n t i f i c a t i o n Numbers."
EXHIBIT X I 1

Exhibit XIV "Formal Configuration Management


Reviews, I n s p e c t i o n s and
Demonstrations."

5. EXPLANATION OF TERMS
See E x h i b i t X V I I .
6. PROCEDURAL REQUIREMENTS
6.1 General Requirements
The c o n t r a c t o r s h a l l p r e p a r e and maintain e n g i n e e r i n g
r e l e a s e r e c o r d s i n accordance w i t h h i s formats, systems,
and procedures, and t h e minimum requirements i n t h i s
e x h i b i t . The c o n t r a c t o r ' s formats, systems, and procedures
may i n c l u d e information i n a d d i t i o n t o t h e s e minimum
requirements p r o v i d i n g t h a t t h e p o r t i o n t h e r e o f which
c o n s t i t u t e s engineering release records:
a. Is l i m i t e d t o an e x p r e s s i o n of c o n f i g u r a t i o n
requirements d e f i n e d by e n g i n e e r i n g d a t a .
b. Does n o t r e f l e c t a hardware o r o t h e r product
c o n d i t i o n t h a t v a r i e s from t h e e n g i n e e r i n g
requirements contained i n t h e s e d a t a .
c. Does n o t r e f l e c t manufacturing s t a t u s .
Only one r e l e a s e r e c o r d (which may be m u l t i s h e e t ) s h a l l
be maintained f o r each drawing number. Drawings r e l e a s e d
by a s u b c o n t r a c t o r , vendor, s u p p l i e r , o r a n o t h e r c o n t r a c t o r
s h a l l n o t be r e - r e l e a s e d by t h e c o n t r a c t o r .

6.2 Elements of Data Required


The c o n t r a c t o r ' s e n g i n e e r i n g r e l e a s e r e c o r d s s h a l l c o n t a i n
t h e s t a n d a r d c o n f i g u r a t i o n i d e n t i f i c a t i o n numbers ( r e f e r
t o E x h i b i t X) and o t h e r elements of information l i s t e d
i n t h i s subparagraph.
6.2.1 C o n t r a c t End I t e m (CEI)Elements:
C E I Number.

C E I S e r i a l Numbers.

Top Drawing Number.


C E I S p e c i f i c a t i ~ nI d e n t i f i c a t i o n Number.

6.2.2 Drawing Elements :


EXHIBIT X I 1

Drawing N u m b e r .
Drawing Title.
Code I d e n t i f i c a t i o n Number
Number of S h e e t s .
Date of Release.
Change L e t t e r s .
Date, of Change L e t t e r Release.
~ n c i l l a r yDocument Numb'ers (ECNs, E -0.s,
variations, etc. .
S p e c i f i c a t i o n Document, S p e c i f i c a t i o n C o n t r o l
Drawing o r Source C o n t r o l Drawing Nurqber.
6.2.3 P a r t N u m b e r Elements
C o n t r o l l i n g Drawing Number.
P a r t Numbers Released.
Change L e t t e r which-created P a r t Number.
Change I d e n t i f i c a t i o n Number which c r e a t e d P a r t
Number.
6.3 C o n t r a c t o r ' s Production Release F u n c t i o n a l C a p a b i l i t i e s
To t h e e x t e n t t h a t t h e c o n t r a c t o r has d e t a i l design
r e s p o n s i b i l i t y , t h e c o n t r a c t o r ' s r e l e a s e f u n c t i o n and
documentation, i n c l u d i n g drawings and a s s o c i a t e d l i s t s ,
s h a l l be capable of determining t h e s e r e l e a s e d e n g i n e e r i n g
requirements :
6.3.1 The composition of any p a r t number a t a n y i l e v e l
i n terms of s u b o r d i n a t e p a r t numbers, e x c e p t
f o r standard p a r t s .
6.3.2 A l l n e x t h i g h e r using ( n e x t assembly) p a r t
numbers of any p a r t , e x c e p t f o r p a r t s a s s e p b l i n g
i n t o standard p a r t s .
6.3.3 The composition of any C E I i n terms of p a r t
numbers and s u b o r d i n a t e C E I numbers.
. . .. EXHIBIT X I 1

6.3.4 The CEI number and C E I s e r i a l numbers


( e f f e c t i v i t y ) on which any s u b o r d i n a t e p a r t i s
used. This does n o t apply t o s u b c o n t r a c t o r s ,
v e n d o r s , and s u p p l i e r s w h o - a r e n o t p r o d u c i n g
CEIs.

6.3.5 The C l a s s I and C l a s s I1 Change I d e n t i f i c a t i o n


Numbers, which have been p a r t i a l l y o r c o m p l e t e l y
r e l e a s e d f o r any CEI Number and CEI S e r i a l Number.
..
6.3.6 The CEI numbers and CEI s e r i a l numbers, which
c o n s t i t u t e t h e e f f e c t i v i t y o f any change
i d e n t i f i c a t i o n number.
-. .
6.3.7 The C l a s s I and C l a s s I1 change i d e n t i f i c a t i o n
numbers, which have been p a r t i a l l y o r . c o m p l e t e l y
r e l e a s e d f o r any p a r t number.

6.3,. 8,,-
The s t a n d a r d s p e c i f i c a t i o n numbers o r s t a n d a r d p a r t
-.numbers u s e d w i t h i n any n o n - s t a n d a r d p a r t number.

6.3.9 The s u b c o n t r a c t o r , v e n d o r , o r s u p p l i e r p a r t
numbers which have been a s s i g n e d i n r e s p o n s e t o
c r i t i c a l component s p e c i f i c a t i o n documents,
s p e c i f i c a t i o n c o n t r o l drawings, o r source c o n t r o l
drawings i s s u e d by.,the c o n t r a c t o r .

6.3.10 The . c o n t r a c t o r ' s s p e c i f i c a t i o n document,


s p e c i f i c a t i o n c o n t r o l drawings, o r source c o n t r o l
drawing numbers a s s o c i a t e d w i t h any s u b c o n t r a c t o r ,
vendor o r s u p p l i e r p a r t number.

6.4 R e l e a s e o f E n g i n e e r i n g Changes

The c o n t r a c t o r ' s r e l e a s e f u n c t i o n and documentation s h a l l


b e c a p a b l e o f i d e n t i f y i n g e n g i n e e r i n g changes, and of
r e t a i n i n g t h e r e c o r d of superseded. c o n f i g u r a t i o n re-
q u i r e m e n t s , a f f e c t i n g i t e m s which have been f o r m a l l y
a c c e p t e d by t h e p r o c u r i n g agency. .,
6.4.1 A l l C l a s s I and C l a s s I1 e n g i n e e r i n g changes
r e l e a s e d f o r production incorporation s h a l l be
i d e n t i f i e d by change i d e n t i f i c a t i o n numbers and
s h a l l be c o m p l e t e l y r e l e a s e d p r i o r t o f o r m a l
a c c e p t a n c e o f t h e CEI u n i t where, f i r s t i n s t a l l e d .

6.4.1.1 The c o n f i g u r a t i o n r e l e a s e d f o r
e a c h CEI u n i t a t t h e time o f i t s f o r m a l
a c c e p t a n c e s h a l l be r e t a i n e d i n r e l e a s e
r e c o r d s f o r t h e t i m e r e q u i r e d by r e -
t e n t i o n o f records requirements i n t h e
c o n t r a c t , o r a s outherwise provided i n
paragraphs 6.5 through 6.5.3.
EXHIBIT X I 1

6.4.2 A l l engineering design released f o r in-


c o r p o r a t i o n i n any CEI which h a s been
f o r m a l l y a c c e p t e d s h a l l be i d e n t i f i e d
by change i d e n t i f i c a t i o n numbers which
a r e d i f f e r e n t than those assigned i n
a c c o r d a n c e w i t h p a r a g r a p h 6 . 4 . 1 , above.

6.5 C o n t r a c t o r ' s F i e l d Release Functional C a p a b i l i t i e s

E n g i n e e r i n g d a t a d e f i n i n g f o r m a l l y a c c e p t e d equipment
which i s under t h e j u r i s d i c t i o n o f t h e c o n t r a c t o r ,
and which i s p r o g r e s s i n g t h r o u g h t e s t i n g o r through
a c t i v a t i o n programs, s h a l l be m a i n t a i n e d c u r r e n t
w i t h a l l f i e l d a c t i v i t y r e q u i r e m e n t s and r e l e a s e d
a s follows:

6.5.1 Superseded r e q u i r e m e n t s may b e r e p l a c e d by


superseding requirements i n t h e r e l e a s e records
f o r f o r m a l l y a c c e p t e d u n i t s o f a CEI t y p e ,
model, s e r i e s which a r e s u p p o r t e d by t h e
c o n t r a c t o r and which were a c c e p t e d p r i o r t o
t h e FACI ( r e f e r t o e x h i b i t X I V ) o f t h e CEI
t y p e , model, s e r i e s ; i . e . , a t t h e c o n t r a c t o r ' s
o p t i o n , s u p e r s e d e d r e q u i r e m e n t s need n o t be
retained i n the release record f o r these
units.

6.5.2 A f t e r FACI, s u p e r s e d e d r e q u i r e m e n t s s h a l l
b e r e t a i n e d ( a s a r e f e r e n c e r e l e a s e ) and
s u p e r s e d i n g r e q u i r e m e n t s added ( a s a r e q u i r e m e n t s
release) i n the r e l e a s e records f o r a l l u n i t s of
t h e CEI which h a v e been f o r m a l l y a c c e p t e d and
a r e under t h e j u r i s d i c t i o n o f t h e c o n t r a c t o r ;
i . e . , t h e m u l t i p l e r e l e a s e p r o c e d u r e s h a l l be
used.

6.5.2.1 Superseded r e q u i r e m e n t s s h a l l be r e t a i n e d
i n multiple release records u n t i l s t a t u s
accounting records i n d i c a t e superseded
c o n f i g u r a t i o n s a r e no l o n g e r i n i n v e n t o r y .

6.5.3 E n g i n e e r i n g changes t o CEIs which have been f o r m a l l y


a c c e p t e d by t h e p r o c u r i n g agency, and which a r e
n o t under t h e j u r i s d i c t i o n o f t h e c o n t r a c t o r ,
s h a l l be r e l e a s e d f o r s e r v i c e a c t i o n ; i . e . , t h e
m u l t i p l e r e l e a s e p r o c e d u r e s h a l l n o t b e used.
EXHIBIT X I 1 1

REQUIREMENTS FOR VERIFYING THE


INCORPORATION OF CLASS I ENGINEERING CHANGES
EXHIBIT X I 1 1

REQUIREMENTS F O R V E R I F Y I N G THE
I N C O R P O R A T I O N O F C L A S S I E N G I N E E R I N G CHANGES

CONTENTS

. , .

Paragraph Page

1. PURPOSE ........................... X I I I - 1
2. S C O P E .............................. X I I I - 1

3. A P P L I C A B I L I T Y ...................... X I I I - 1

4. R E F E R E N C E DOCUMENTS ................ X I I I - 1 , 2

5. EXPLANATION O F T EW . . . . . . . . . . . . . . . X I I I - 2

6. PROCEDURAL R E Q U I R E M E N T S . . .......... X I I I - 2
EXHIBIT X I 1 1

REQUIREMENTS FOR VERIFYING THE


INCORPORATION OF CLASS I E N G I N E E R I N G CHANGES

1. PURPOSE
T h i s E x h i b i t p r o v i d e s NASA Apollo o r g a n i z a t i o n s and
c o n t r a c t o r s w i t h requirements and guidance f o r i n -
s p e c t i n g and r e c o r d i n g t h e i n c o r p o r a t i o n o f C l a s s I
e n g i n e e r i n g changes i n d e l i v e r a b l e c o n t r a c t end i t e m s ,
vendor i t e m s and subassemblies which a r e p a r t o f
c o n t r a c t end items.
2. SCOPE
The r e q u i r e m e n t s i n t h i s E x h i b i t i d e n t i f y t h e c o n t r a c t o r
c a p a b i l i t 2 e s necessary t o control i n t e r n a l l y the in-
c o r p o r a t i o n of C l a s s I e n g i n e e r i n g changes ( h e r e a f t e r
r e f e r e n c e d t o a s " e n g i n e e r i n g change") i n c o n t r a c t end
items. The c o n t r a c t o r ' s i n t e r n a l system of c o n t r o l s
s h a l l be capable of:
a. R e c o n c i l i n g e n g i n e e r i n g work a u t h o r i z a t i o n s
t o c o n t r a c t requirements.

b.. V e r i f y i n g t h a t r e l e a s e d e n g i n e e r i n g and
purchase o r d e r d a t a a r e i n accordance w i t h
c o n t r a c t requirements.
c. Assuring t h a t e n g i n e e r i n g changes a r e manu-
f.actured and i n s t a l l e d a s r e q u i r e d f o r formal
acceptarlce.
d. Documenting e n g i n e e r i n g change i n c o r p o r a t i o n
a s . r e q u i r e d f o r formal a c c e p t a n c e .

3. APPLICABILITY
T h i s E x h i b i t a p p l i e s t o a l l c o n t r a c t s w i t h NASA f o r de-
l i v e r a b l e manufactured p r o d u c t s .
4. REFERENCE DOCUMENTS
The f o l l o w i n g documents of t h e e x a c t i s s u e shown, o r
p a r t t h e r e o f a s f u r t h e r d e s c r i b e d , f o r a p a r t of t h i s
exhibit:
I

NHB 5300.4 ( 1 B ) . A p r i l 1962 "Cuality Provisions


f o r ~ e r o n a u t i c a land
Space System C o n t r a c t o r s . "
NPC 200-3 A p r i l 1962 " I n s p e c t i o n System Pro-
vision f o r Suppliers of
Space M a t e r i a l s , P a r t s ,
Components, and S e r v i c e s "
EXHIBIT X I 1 1

Exhibit V I I " S p e c i f i c a t i o n Maintenance. "


Exhibit I X " P r e p a r a t i o n of Engineering
Change P r o p o s a l s f o r C o n t r a c t
End Items. "

Exhibit X I "Requirements f o r C o n f i g u r a t i o n
I d e n t i f i c a t i o n and Acceptance
o f C o n t r a c t End Items and R e l a t e d
Data. I'
Exhibit X I 1 "Engineering Release Record Re-
quirements. "
Exhibit XIV "Formal C o n f i g u r a t i o n Management
Reviews, I n s p e c t i o n s , and D e -
monstrations."
5. EXPLANATION OF TERMS

(See E x h i b i t X V I I ) .
6 . PROCEDURAL REQUIREMENTS

I t i s Apollo Program p o l i c y t h a t each e n g i n e e r i n g change w i l l be


i n c o r p o r a t e d i n a l l u n i t s w i t h i n one type-model-series
o f t h e c o n t r a c t end i t e m a f f e c t e d . Complete v e r i f i c a t i o n
o f t h e i n c o r p o r a t i o n of e n g i n e e r i n g changes i s r e q u i r e d
t o a s s u r e t h a t r e t r o f i t k i t s and s p a r e s w i l l be o r d e r e d
and shipped t o t h e p r o p e r l o c a t i o n . The requirements o f
t h i s e x h i b i t a r e based on manufacturing and q u a l i t y
c o n t r o l c a p a b i l i t i e s which t h e c o n t r a c t o r must p o s s e s s
i f he i s t o successfully conwact w i t h t h e Government,
and comply w i t h t h e requirements i n NHB 5300.4 (1B) o r
NPC 200-3 a s a p p l i c a b l e t o h i s c o n t r a c t .

6.1 V e r i f i c a t i o n Requirements
C o n t r a c t u a l a u t h o r i z a t i o n i s r e q u i r e d by t h e c o n t r a c t o r
t o design, manufacture and i n s t a l l e n g i n e e r i n g changes.
The c o n t r a c t o r s h a l l c o n t r o l t h e d e s i g n , manufacture
and i n s t a l l a t i o n o f each e n g i n e e r i n g change a s d i r e c t e d
by c o n t r a c t .
6.1.1 C o n t r a c t R e c o n c i l i a t i o n . The c o n t r a c t o r s h a l l
a s s u r e t h a t h i s ECP has been prepared i n ac-
cordance w i t h E x h i b i t I X , and t h a t t h e ECP
and o t h e r e n g i n e e r i n g work a u t h o r i z a t i o n s a r e
i n accordance w i t h c o n t r a c t u a l a u t h o r i t y .
EXHIBIT X I 1 1

6.1.2 Technical V e r i f i c a t i o n . The c o n t r a c t o r s h a l l


v e r i f y by an e n g i n e e r i n g r e l e a s e r e c o r d (having
t h e c a p a b i l i t i e s r e q u i r e d by E x h i b i t X I I ) t h a t t h e
e f f e c t i v i t i e s of a l l e n g i n e e r i n g d a t a f o r a
C l a s s I e n g i n e e r i n g change a r e compatible w i t h
c o n t r a c t u a l a u t h o r i z a t i o n s which approved and
a u t h o r i z e d t h e change.
The c o n t r a c t o r s h a l l a l s o v e r i f y t h a t :

6.1.2.1 The e n g i n e e r i n g r e l e a s e i n c l u d e s
t h e r e l e a s e of a f i n a l S p e c i f i c a t i o n
Change Notice (SCN) o r r e v i s i o n
a s approved w i t h t h e ECP s p e c i f i c a t i o n .
( r e f e r t o E x h i b i t V I I .)

6.1.2.2 NO q u a l i f i c a t i o n requirements a r e
e s t a b l i s h e d o r changed by e n g i n e e r i n g
data unless specifically authorized
by c o n t r a c t and/or c o n t r a c t change.

6.1.2.3 Any changes i n acceptance t e s t re-


quirements have been converted t o
procedures, and t h a t t h e s e pro-
cedures a r e w i t h i n t h e s p e c i f i c a t i o n s ,
s c h e d u l e s , and c o s t s a u t h o r i z e d by
c o n t r a c t and/or c o n t r a c t change.
6.1.2.4 Vendor purchase o r d e r s and change
n o t i c e s a r e i n accordance w i t h
s p e c i f i c a t i o n s , schedules and
c o s t s a u t h o r i z e d by c o n t r a c t and/
o r c o n t r a c t change.
6.1.2.5 Manufacturing requirements a r e i n
accordance w i t h t h e s p e c i f i c a t i o n s ,
schedules and c o s t s a u t h o r i z e d by
c o n t r a c t and/or c o n t r a c t change.
Note: Any r e v i s i o n i n p r e v i o u s l y
approved s p e c i f i c a t i o n s ,
effectivity, delivery
schedule o r i n c r e a s e i n
cost w i l l require prior
approval of t h e p r o c u r i n g
agency b e f o r e proceeding
with production.

6.2 Production c a p a b i l i t y Requirements.


The c o n t r a c t o r s h a l l v e r i f y t h a t a l l c o n t r a c t end
items a r e manufactured i n accordance w i t h r e l e a s e d
e n g i n e e r i n g d a t a by a s s u r i n g t h a t :
EXHIBIT X I 1 1 -

6.2.1 P a r t Numbers a r e n o t changed e x c e p t a s r e q u i r e d


by approved and r e l e a s e d e n g i n e e r i n g d a t a which have
i d e n t i f i e d a non-interchangeable c o n d i t i o n .

6.2.2 S y n t h e t i c numbers o r codes a r e e i t h e r c l e a r l y


marked "Manufacturing D e s i g n a t i o n Only," o r
a r e removed b e f o r e a c c e p t a n c e of equipment by
NASA.

6.2.3 M a t e r i a l c o n t r o l s a r e capable of v e r i f y i n g t h a t
any s p e c i f i c e n g i n e e r i n g changes which a r e r e -
q u i r e d a s a r e s u l t o f t h e C l a s s I change have
been i n c o r p o r a t e d i n s p e c i f i c u n i t s of e i t h e r
i n t e r c h a n g e a b l e o r non-interchangeable vendor i t e m s .

6.2.4 Manufacturing c o n t r o l s a r e c a p a b l e of i d e n t i f y i n g
t h e s p e c i f i c e n g i n e e r i n g changes which have been
i n c o r p o r a t e d i n s p e c i f i c u n i t s of e i t h e r i n t e r -
changeable o r n o n - i n t e r c h a n g e a b l e "bench" and
l o t produced sub-assemblies.

6.2.5 Manufacturing c o n t r o l s a r e e s t a b l i s h e d t o
p r o p e r l y r o u t e vendor i t e m s and sub-assemblies
c o n t a i n i n g e n g i n e e r i n g changes t o t h e c o n t r a c t
end i t e m s on which t h e s e e n g i n e e r i n g changes
a r e t o b e i n s t a l l e d a s . . r e q u i r e d by r e l e a s e d
engineering data.

6.3 I n p s e c t i o n , Audit and S u r v e i l l a n c e

The c o n t r a c t o r ' s q u a l i t y c o n t r o l f u n c t i o n , independent


of h i s t e c h n i c a l and p r o d u c t i o n f u n c t i o n s , s h a l l :

6.3.1 Audit manufacturing o r d e r s a s r e q u i r e d t o v e r i f y


complete conversion of e n g i n e e r i n g d a t a f o r each
e n g i n e e r i n g change t o shop a c t i o n e x a c t l y a s re-
l e a s e d and a s s u r e t h a t t h e manufacturing and q u a l i t y
c o n t r o l documentation used by t h e c o n t r a c t o r is
auditable t o released engineering data.

6.3.2 I n s p e c t m a t e r i a l c o n t r o l , manufacturing c o n t r o l and


assembly o p e r a t i o n s ( a s d e s c r i b e d i n paragraph 6.2)
and v e r i f y t h a t each change i s completely i n c o r p o r a t e d
i n t h e c o n t r a c t end i t e m u n i t f o r which it f i r s t
a p p l i e s o r t h a t any m i s s i n g p a r t of t h e change i s
l i s t e d as a shortage.

6.3.3 V e r i f y t h a t t h e requirements f o r subsequent


i n c o r p o r a t i o n s of each change a r e c o n t a i n e d i n pro-
d u c t i o n o r d e r s ; t h a t r o u t i n e m a t e r i a l and man-
ufacturing controls w i l l suffice t o assure t h a t
t h e s e i n s t a l l a t i o n s w i l l be accomplished a s re-
q u i r e d by r e l e a s e d e n g i n e e r i n g , o r w i l l be shown
as shortages.
EXHIBIT X I 1 1

6.3.4 M a i n t a i n an a d e q u a t e s u r v e i l l a n c e i n accordance
w i t h approved s t a n d a r d p r a c t i c e s t o a s s u r e t h e
p r o p e r i n c o r p o r a t i o n and documentation of sub-
s e q u e n t i n s t a l l a t i o n s o f each e n g i n e e r i n g change.
6.4 Documentation of I n c o r p o r a t e d E n g i n e e r i n g Changes
The c o n t r a c t o r s h a l l m a i n t a i n e n g i n e e r i n g change i n -
c o r p o r a t i o n r e c o r d s , p r o v i d e d by h i s i n t e r n a l system
o f c o n t r o l s having t h e c a p a b i l i t i e s d e s c r i b e d by t h e
subparagraphs below:
6.4.1 An i n s p e c t i o n f i l e showing, by an i n s p e c t o r ' s
a c c e p t a n c e o f shop t r a v e l l e r s , r e c e i v i n g r e p o r t s ,
e t c . , t h e p a r t numbers and s e r i a l numbers man-
u f a c t u r e d which a r e on t h e c o n t r a c t end i t e m
u n i t where each e n g i n e e r i n g change i s f i r s t
installed.
6.4.2 A r e c o r d f o r each c o n t r a c t end i t e m u n i t i n which
an e n g i n e e r i n g change i s f i r s t i n s t a l l e d . T h i s
r e c o r d s h a l l show t h a t t h e r e q u i r e d s u b a s s e m b l i e s ,
by p a r t number and s e r i a l number, were i n s t a l l e d .
CAUTION: The l e v e l of assembly where an
e n g i n e e r i n g change i s i n s t a l l e d and
related t o a particular contract
end i t e m u n i t may be above t h e l e v e l
of assembly where i n t e r c h a n g e a b i l i t y
was r e e s t a b l i s h e d . T h e r e f o r e , p a r t
number i d e n t i f i c a t i o n , a l o n e , w i l l
n o t v e r i f y t h a t a change h a s been
incorporated.
6.4.3 A Break of I n s p e c t i o n ( B O I ) r e c o r d f o r each c o n t r a c t
end i t e m u n i t t o document any d e m o d i f i c a t i o n a c t i o n s
r e s u l t i n g from removals and r e p l a c e m e n t s a f t e r t h e
i n i t i a l i n s t a l l a t i o n h a s been a c c e p t e d by t h e
inspector.
6.4.4 A s h o r t a g e r e p o r t f o r each c o n t r a c t end i t e m u n i t
t o r e c o r d any p a r t o f any e n g i n e e r i n g change which
h a s n o t been i n s t a l l e d
6.5 NASA Acceptance
NASA a c c e p t a n c e o f c o n t r a c t end i t e m s w i l l b e accomplished
a t t h e c o n t r a c t o r ' s p l a n t ( o r site of construction i n t h e
c a s e of f a c i l i t i e s ) i n accordance w i t h :
6.5.1 The terms and c o n d i t i o n s o f t h e c o n t r a c t .
6.5.2 The r e q u i r e m e n t s f o r formal i d e n t i f i c a t i o n and
acceptance (see Exhibit X I ) .
EXHIBIT X I 1 1

6.5.3 Formal agreements reached a t previous


Configuration Management reviews and
demonstrations ( s e e E x h i b i t X I V ) .
6.5.4 The c o n t r a c t o r ' s i n s p e c t i o n acceptance
f i l e s , Change I n c o r p o r a t i o n Records ( C I R ' s ) ,
B O I ' s and s h o r t a g e r e p o r t s a s r e c o n c i l e d
a t t h e time of acceptance.
EXHIBIT X I V

FORMAL CONFIGURATION MANAGEMENT


R E V I E W S , I N S P E C T I O N S AND DEMONSTRATIONS
EXHIBIT XIV

FORMAT, CONFIGURAITON MANAGEMENT


F E V I E W S , I N S P E C T I O N S AND DEMONSTRATIONS

CONTENTS

Paragraph Page

1. PURPOSE ............................. X I V - 1
2. S C O P E ............................... X I V - 1

3. A P P L I C A B I L I T Y ....................... X I V - 1

4. REFERENCE DOCUMENTS ................. X I V - 1

5. EXPLANATION O F TERMS ................ X I V - 1


6. PROCEDURAL R E Q U I R E M E N T S . . . . . . . . . . . . . XIV-1
EXHIBIT XIV

FORMAL CONFIGURATION MANAGEMENT


REVIEWS, INSPECTIONS AND DEMONSTRATIONS

1. PURPOSE
This e x h i b i t provides NASA and c o n t r a c t o r o r g a n i z a t i o n s
w i t h t h e o b j e c t i v e s of j o i n t c o n t r a c t o r / p r o c u r i n g agency
formal c o n f i g u r a t i o n management reviews and i n s p e c t i o n s
and d e f i n e s c o n t r a c t o r t a s k s and r e s p o n s i b i l i t i e s
a s s o c i a t e d with t h e s e reviews, demonstrations and i n -
spections.
2. SCOPE
This e x h i b i t d e f i n e s t h e product of each of t h e reviews
r e l a t e d t o c o n f i g u r a t i o n management. The t h r e e important
reviews a s s o c i a t e d w i t h c o n f i g u r a t i o n management a r e t h e
Preliminary Design Review (PDR) , t h e C r i t i c a l Design
Review ( C D R ) , and t h e F i r s t A r t i c l e C o n f i g u r a t i o n In-
s p e c t i o n (FACI) .
3. APPLICABILITY
This e x h i b i t i s a p p l i c a b l e t o NASA MSF Centers and c o n t r a c t o r s
r e s p o n s i b l e f o r t h e accomplishment o f c o n f i g u r a t i o n management
reviews.
4. REFERENCE DOCUMENTS
None
5. EXPLANATION OF TERMS

See E x h i b i t X V I I
6. PROCEDURAL REQUIREMENTS

The a d m i n i s t r a t i v e a s p e c t s of t h e Preliminary Design Review,


C r i t i c a l Design Review and F i r s t A r t i c l e C o n f i g u r a t i o n In-
s p e c t i o n a r e common. The following paragraphs e s t a b l i s h
responsibilities f o r the organization, representation
and:conduct of t h e s e reviews, and t h e b a s i c p o l i c y
which s h a l l govern t h e output/products of t h e s e reviews.
I t i s emphasized t h a t o t h e r reviews may be performed d u r i n g
any phase of t h e program a t t h e d i s c r e t i o n of NASA. By
mutual agreement o f t h e p r o c u r i n g agency and t h e c o n t r a c t o r ,
t h e review of s e v e r a l C E I ' s may be accomplished a t a s i n g l e
review. R e p r e s e n t a t i v e s o f c o n t r a c t o r s r e s p o n s i b l e f o r t h e
design/development of e q u i p m e n t / f a c i l t i e s which i n t e r f a c e w i t h
t h e CEI i n review may p a r t i c i p a t e i n t h e review. Par-
t i c i p a t i o n i n a review o r acceptance of a r e p o r t of a review
EXHIBIT XIV

by r e p r e s e n t a t i v e s of t h e p r o c u r i n g agency s h a l l n o t be
i n t e r p r e t e d a s approval of t h e design approach f o r o r
acceptance of t h e CEI. The r e p r e s e n t a t i v e s of t h e pro-
c u r i n g agency d e s i g n a t e d t o p a r t i c i p a t e i n t h e review
o r a c c e p t r e p o r t s s h a l l submit a formal r e p o r t t o t h e
P r o j e c t D i r e c t o r s t a t i n g recommendations f o r p o s t -
review a c t i o n . Normally, a l l reviews s h a l l be ac-
complished a t t h e c o n t r a c t o r ' s f a c i l i t y .
6,l Procuring Agency R e s p o n s i b i l i t i e s

The Procuring Agency i s r e s p o n s i b l e f o r conducting


each review and s h a l l :
a. E s t a b l i s h t h e time, p l a c e and agenda f o r each
review.

b. Chair each review.


c. Schedule a PDR, CDR, and FACI f o r each c o n t r a c t
end i t e m ( c a t e g o r i z e d a s e i t h e r prime equipment
items o r i d e n t i f i c a t i o n i t e m s ) .
d. Formally acknowledge t h e accomplishment o f each
review and formally n o t i f y t h e c o n t r a c t o r of
requirements f o r post-review a c t i o n .
6.2 Contractor Responsibilities
The c o n t r a c t o r w i l l p a r t i c i p a t e i n each review and
shall:
a. Have a v a i l a b l e a l l end items and a s s o c i a t e d
documentation r e q u i r e d f o r performance of t h e
review.

b. Prepare and d i s t r i b u t e minutes of each review


t o t h e p r o c u r i n g agency.
6.3 Conducting Preliminary Design Review

The Preliminary Design Review i s a formal t e c h n i c a l


review of t h e b a s i c desicrn approach f o r a c o n t r a c t
end i t e m . T h e PDR i s accomplished p r i o r t o , o r
very e a r l y i n , t h e d e t a i l design phase t o e s t a b l i s h
t h e system c o m p a t i b i l i t y of t h e design approach.
The primary product of a p r e l i m i n a r y design review
i s formal i d e n t i f i c a t i o n of s p e c i f i c e n g i n e e r i n g
documentation which e s t a b l i s h e s t h e p h y s i c a l and
f u n c t i o n a l i n t e r f a c e r e l a t i o n s h i p of t h e C E I t o
EXHIBIT X I V

o t h e r system (or i n v e n t o r y ) e q u i p m e n t / f a c i l i t i e s .
P r i o r t o t h e p r e l i m i n a r y design review, t h e i n t e r -
f a c e r e l a t i o n s h i p of t h e C E I t o o t h e r system ( o r
i n v e n t o r y ) e q u i p m e n t / f a c i l i t i e s s h a l l be e s t a b l i s h e d
t o t h e l e v e l of d e t a i l necessary t o i d e n t i f y t h e
n a t u r e of each i n t e r f a c e . The schedule f o r t h e
o r i g i n a t i o n of d e t a i l e d i n t e r f a c e c o n t r o l drawings
s h a l l be e s t a b l i s h e d a t t h e p r e l i m i n a r y design
review. The PDR s h a l l be accomplished when t h e
b a s i c design approach has been s e l e c t e d by t h e
c o n t r a c t o r and p r e l i m i n a r y documentation has been
accomplished. The s p e c i f i c documementation t o
be reviewed, and d e t a i l a c t i o n t o be accomplished,
a t a given PDR s h a l l be determined by t h e procuring
agency a t t h e t i m e t h e agenda f o r t h e review i s
e s t a b l i s h e d . The following s h a l l b e accomplished
a s a p a r t of each PDR:
a. The c o m p a t i b i l i t y of t h e s e l e c t e d design
approach w i t h P a r t I o f t h e d e t a i l spec-
i f i c a t i o n f o r t h e C E I s h a l l be e s t a b l i s h e d .
b. The c o m p a t i b i l i t y of t h e C E I w i t h o t h e r system
e q u i p m e n t / f a c i l i t i e s s h a l l be e s t a b l i s h e d .
This s h a l l be accomplished by review of pre-
design drawings, schematic diagrams, l a y o u t
drawings, envelope drawings, inboard p r o f i l e s ,
review of performance c h a r a c t e r i s t i c s f o r
f u n c t i o n a l c o m p a t i b i l i t y , e t c . S i n c e system
e n g i n e e r i n g w i l l be accomplished, system com-
p a t i b i l i t y of t h e C E I s h a l l b e e s t a b l i s h e d
by review of t h e schematic block diagrams,
f u n c t i o n a l block diagrams and o t h e r system
e n g i n e e r i n g documentation.
c.. The i n t e g r i t y o f t h e s e l e c t e d design approach
s h a l l be e s t a b l i s h e d . This s h a l l be accomplished
by review of a n a l y s e s , breadboard models, mockups,
c i r c u i t l o g i c diagrams, packaging t e c h n i q u e s , e t c .
This i s accomplished by t h e c o n t r a c t o r a s t h e
b a s i s f o r s e l e c t i o n of t h e design approach p r e s e n t e d
d. The p a r t s of t h e design t o be s u b j e c t e d t o d e t a i l e d
value e n g i n e e r i n g a n a l y s i s s h a l l be i d e n t i f i e d .
e. The p r o d u c i b i l i t y d t h e s e l e c t e d d e s i g n s h a l l be
e s t a b l i s h e d . This s h a l l be accomplished by review
of requirements f o r s p e c i a l t o o l s and f d c i l i t i e s
necessary t o manufacture t h e CEI i n t h e q u a n t i t i e s
required.
EXHIBIT X I V

6.4 Conducting C r i t i c a l Design Review

The C r i t i c a l Design Review i s a f o r m a l t e c h n i c a l


review o f t h e d e s i g n o f a c o n t r a c t end i t e m (CEI) .
The CDR i s accomplished when t h e d e t a i l d e s i g n i s
e s s e n t i a l l y complete, t o formally e s t a b l i s h t h e
design a s t h e b a s i s f o r supporting a c t i v i t i e s , e . g . ,
p r e p a r a t i o n o f s p a r e s s e l e c t i o n documentation,
p r e p a r a t i o n o f t e c h n i c a l d a t a , e t c . The p r i m a r y
p r o d u c t o f t h e CDR i s f o r m a l i d e n t i f i c a t i o n of
s p e c i f i c e n g i n e e r i n g documentafbn, which d e f i n e s
t h e d e s i g n of t h e CEI, and which w i l l be r e l e a s e d
f o r m a n u f a c t u r e o f t h e u n i t which e s t a b l i s h e s t h e
product configuration b a s e l i n e ( " F i r s t A r t i c l e " o r
e q u i v a l e n t ) . The e n g i n e e r i n g documentation i d e n t i f i e d
by t h e r e v i e w , and u p d a t e d u n t i l f i r s t , a r t i c l e con-
f i g u r a t i o n i n s p e c t i o n , s h a l l be t h e b a s i s f o r sup-
p o r t i n g a c t i v i t i e s which must p r e c e d e a c c e p t a n c e o f t h e
f i r s t a r t i c l e which normally o c c u r s a t t h e f i r s t a r t i c l e
configuration inspection. P r i o r t o t h e CDR, t h e
e x a c t i n t e r f a c e r e l a t i o n s h i p o f t h e CEI t o o t h e r
system ( o r i n v e n t o r y ) e q u i p m e n t / f a c i l i t i e s s h a l l
b e e s t a b l i s h e d , and s h a l l a p p e a r on approved
i n t e r f a c e drawings which f i x t h e p h y s i c a l i n t e r -
f a c e s f o r t h e CEI, o r i n approved e n g i n e e r i n g
documentation which f i x t h e f u n c t i o n a l i n t e r f a c e s
f o r t h e CEI. The CDR s h a l l b e accomplished
immediately p r i o r t o committing t h e d e s i g n t o
m a n u f a c t u r e o f t h e u n i t which e s t a b l i s h e d t h e
product configuration baseline ( F i r s t A r t i c l e ) .
The s p e c i f i c documents t o b e r e v i e w e d , and
a c t i o n t o be accomplished, a t a g i v e n CDR s h a l l
b e d e t e r m i n e d by t h e p r o c u r i n g agency a t t h e
t i m e t h e agenda f o r t h e review i s e s t a b l i s h e d .
The f o l l o w i n g s h a l l b e accomplished a s p a r t
o f each CDR:

a. The c o m p a t i b i l i t y o f t h e CEI, a s d e s i g n e d ,
with P a r t I of t h e d e t a i l s p e c - i f i c a t i o n f o r
t h e CEI s h a l l b e e s t a b l i s h e d . .

b. The s y s t e m c o m p a t i b i l i t y o f t h e completed
d e s i g n s h a l l be e s t a b l i s h e d , T h i s . s h a l l be
a c c ~ m p l i s h e ?by~ comparison o f t h e i n t e r f a c e
c o n t r o l d r a w i n g s . w i t h t h e e n g i n e e r i n g drawings
f o r t h e CEI. Since system engineering o r
f u n c t i o n a l a n a l y s i s w i l l b e accomplished, s c h e m a t i c
b l o c k d i a g r a m s , f u n c t i o n a l - b l o c k d i a g r a m s , and
o t h e r s y s t e m e n g i n e e r i n g documentation s h a l l b e
u s e d t o s u p p o r t t h e i n t e r f a c e c o n t r o l drawings
.
i n e s t a b l i s h i n g s y s t e m c o m p a t i b i l i t y o f t h e CEI
EXHIBIT X I V

c. The i n t e g r i t y o f t h e d e s i g n s h a l l b e e s t a b l i s h e d
by review of a n a l y t i c a l and t e s t d a t a . By
mutual agreement o f t h e p r o c u r i n g agency and
t h e c o n t r a c t o r , t h e c r i t i c a l d e s i g n review o f
s e v e r a l C E I ' s may b e accomplished a t a s i n g l e
re'view meeting. R e p r e s e n t a t i v e s o f c o n t r a c t o r s
, r e s p o n s i b l e f o r t h e design/development o f equipment/
f a c i l i t i e s which i n t e r f a c e w i t h t h e C E I i n review
may p a r t i c i p a t e i n t h e CDR.

6.5 CONDUCTING FIRST ARTICLE CONFIGURATION INSPECTION

The F i r s t A r t i c l e C o n f i g u r a t i o n I n s p e c t i o n i s a formal
t e c h n i c a l review t o e s t a b l i s h t h e P r o d u c t C o n f i g u r a t i o n
B a s e l i n e f o r t h e C E I . The primary o b j e c t i v e s o f a FACI
a r e t o f o r m a l l y a c c e p t t h e P a r t I1 C E I d e t a i l s p e c i f i c a t i o n
a s an a u d i t e d and approved document, t o e s t a b l i s h t h e
' s i m i l a r i t y between t h e manufactured hardware and t h e r e -
l e a s e d e n g i n e e r i n g and i d e n t i f y t h e d i f f e r e n c e s and t o
e s t a b l i s h a p r e c i s e l y known b a s e l i n e a g a i n s t which changes
may be proposed and a d e q u a t e l y e v a l u a t e d . FACI's a r e
t o b e performed w i t h o u t r e g a r d t o whether i t w i l l
perform i t s i n t e n d e d f u n c t i o n . A t t h i s p o i n t i n time
t h e primary concern i s t o d e t e r m i n e i f t h e i t e m
h a s been b u i l t t o r e l e a s e d e n g i n e e r i n g and t e s t e d t o
approved documentation. I n t h e e v e n t t h e i t e m i s
found t o be i n c o m p a t i b l e o r n o t c a p a b l e o f b e i n g used
a s o r i g i n a l l y i n t e n d e d through o t h e r a s s o c i a t e d t e s t
programs, ( i e . Q u a l i f i c a t i o n T e s t , Environmental T e s t ,
I n t e g r a t e d System T e s t , e t c . ) o r i n a c t u a l u s e , t h e FACI
i s t h e f i r m b a s e l i n e f o r e v a l u a t i n g change p r o p o s a l s .
During t h e FACI i t i s i m p o r t a n t t o perform an
. examination and review of the c o n t r a c t o r s e n g i n e e r i n g ,
. manufacturing and q u a l i t y a s s u r a n c e methods, d i s c i p l i n e s ,
and documentation t o i n s u r e t h a t ;
a. Engineering
1. S p e c i f i c a t i o n , drawings and p a r t numbers comply
with t h i s document and C e n t e r supplements.
. . -4

2. Drawings a r e checked and approved p r i o r


f o r e l e a s e t o manufacturing .
. . 3. Drawing r e l e a s e system i s a d e q u a t e .
i .

4. E .O. ' s a r e h a n d l e d l i k e drawings, and drawings


i n c o r p o r a t e E.O.'s on a t i m e l y b a s i s .
EXHIBIT X I V

b. Manufacturing
1. Changes cannot be i n c o r p o r a t e d independently of
engineering.
2. Planning p a p e r , job s h e e t s , k r a v e l e r s etc.
r e f l e c t only r e l e a s e d e n g i n e e r i n g , approved
production methods and p r o c e s s e s .

3. B l u e p r i n t c r i b s have t h e l a t e s t r e l e a s e d
e n g i n e e r i n g on f i l e .

4. Hardware " a s b u i l t " i s i n f a c t i d e n t i c a l t o


"as released" engineering.
c. Q u a l i t y Assurance
1. " I n p r o c e s s " i n s p e c t i o n s t e p s a r e adequate
and any s t e p s r e q u i r i n g i n s p e c t i o n a r e
verified.
'r

2. A l l i n s p e c t i o n s a r e accomplished a g a i n s t
r e l e a s e d engineering.
3. Issuance o f i n s p e c t o r stamps a r e r i g i d l y
control led.
4. Accomplishment of t e s t s a g a i n s t t h e P a r t I1
s p e c i f i c a t i o n a r e v a l i d a t e d and t e s t r e s u l t s
certified.

P a r t I1 of t h e CEI d e t a i l s p e c i f i c a t i o n , once a u d i t e d and


, accepted a t t h e FACI, s e r v e s a s t h e b a s i c documentation f o r
c o n f i g u r a t i o n management o f t h e C E I f o r t h e remainder of t h e
a c q u i s i t i o n phase. A l l changes t o t h e CEI, once t h e FACI h a s
been accomplished, s h a l l be implemented only t o r e f l e c t approved
changes t o P a r t I1 of t h e C E I d e t a i l s p e c i f i c a t i o n . A major
e n g i n e e r i n g change (new type-mdel-Serie~) , o r an i n d i c a t i o n
t h a t t h e c o n f i g u r a t i o n b e i n g produced does n o t a c c u r a t e l y
r e f l e c t r e l e a s e d e n g i n e e r i n g , may r e q u i r e reaccomplishment
of t h e complete FACI. The s p e c i f i c documenfation and hard-
ware t o be reviewed and d e t a i l a c t i o n s t o be accomplished
a t t h e time t h e agenda f o r t h e review i s e s t a b l i s h e d . The
following s h a l l be accomplished a s a p a r t of each FACI:

a. The c o n f i g u r a t i o n of a s e l e c t e d u n i t of t h e CEI,
a s documented by r e l e a s e d e n g i n e e r i n g , s h a l l be
compared d i r e c t l y w i t h t h e as-manufactured con-
f i g u r a t i o n of t h e same u n i t , a s documented by
p a r t numbers and s e r i a l numbers appearing on t h e
manufactured p a r t s and assemblies, and i n man-
uf a c t u r i n g r e c o r d s . When n e c e s s a r y , t h e as-
manufactured p a r t s s h a l l be compared d i r e c t l y
with t h e e n g i n e e r i n g drawing. The r e l e a s e d
EXHIBIT XIV

engineering for the selected unit shall be the


drawings and documents assembled by the top
drawing number specified in Part I1 of the
CEI detail specification. Differences between
the Configuration specified in Part I1 of the
CEI specification and the as-manufactured
configuration presented for review shall be
documented on the DD Form 250 "Material Inspec-
tion and Receiving Report" (.orNASA equivalent).
b. The coniiguration of the CEI qualified (or to be
qualified), as documented by released engineering
and/or manufacturing records, shall be directly
compared to the configuration of the unit of the
CEI FACI'ed, as documented by released engineering
and/or manufacturing records. Differences be-
tween the configuration of the CEI qualified and the
CEI FACI'ed shall be made a matter of record in the
minutes of the FACI. (The unit qualified should be
identical to the unit FACI'ed modified only to per-
mit installation of instrumentation if required.)
c. The validity of acceptance testing, as specified in
Part I1 of the CEI detail specification, shall be
verified by direct comparison of the test method and
test data with the performance/design requirements
for the CEI. The comparison shall be accomplished
to the level of detail necessary to establish that
the methods and instrument readings, as required
by the contractors internal test procedures,
satisfy Part I1 of the detail specification and
are adequate to verify the quality of the CEI.
If changes to the acceptance testing as specified
in Part I1 of the detail specificati.on prove to be
necessary, the specification change notice shall
be prepared and a copy attached to the minutes of
the FACI. The formal specification change shall
be processed through normal procedure.
d. Where the procuring agency has ordered delivery of
engineering drawings of the CEI, the initial submittal
of these drawings shall be those audited at the FACI,
or later revisions of those audited at the FACI.
Drawings to be used at the FACI should have all
approved changes incorporated.
e. Where the procuring agency has ordered delivery of
specific records of the baseline configuration of
the CEI, e.g., entries to be forwarded for inclusion
in a system configuration index, such data shall be
audited by direct comparison with released engineering.
EXHIBIT X I V

f. I f circumstances w a r r a n t , t h e c o n k r a c t o r s e n g i n e e r i n g
r e l e a s e system ,and change c o n t r o l procedures s h a l l
be reviewed and v a l i d a t e d . The p r o c u r i n g agency
r e s e r v e s the p r e r o g a t i v e t o reaccomplish a l l o r any
p o r t i o n of t h e r e q u i r e d a u d i t s , i n s p e c t i o n s and
t e s t s . P r o c u r i n g agency a c t i o n t o a c c e p t o r
r e j e c t t h e u n i t of t h e C E I p r e s e n t e d f o r F A C I
w i l l be accomplished by t h e a p p r o p r i a t e agency i n
accordance with normal acceptance procedures.
The p r o c u r i n g agency w i l l forward t o t h e C o n t r a c t o r
a FACI r e p o r t summarizing the r e s u l t s of t h e i n -
spection.

XIV- 8
EXHIBIT XV

CONFIGURATION MANAGEMENT AUDITS

XV- i
EXHIBIT XV

CONFIGURATION MANAGEMENT AUDITS

CONTENTS

Paragraph Page

1. PURPOSE. . .. . . ... . . . . . XV-1


2. SCOPE. . . . . . . . . . . . . . . XV-1
3. REFERENCE DOCUMENTS. . . . . . . . XV-1
4. EXPLANATION OF TERMS . . . . . . . XV-1
5. PROCEDURAL REQUIREMENTS AND
RESPONSIBILITIES . . . . . . . . . XV-1
6. AUDIT CHECKLIST. . . . . . . . . . XV-6
EXHIBIT XV

CONFIGURATION MANAGEMENT AUDITS

1. PURPOSE
Configuration Management Audits may be ordered by t h e
p r o c u r i n g agency a t any time o r p l a c e t o v e r i f y t h e
adequacy of Configuration Management procedures and
implementation a s p r a c t i c e d by NASA and c o n t r a c t o r
o r g a n i z a t i o n s , and t o determine needed c o r r e c t i v e a c t i o n .

2. SCOPE
T h i s e x h i b i t provides NASA and c o n t r a c t o r o r g a n i z a t i o n s w i t h
requirements and r e s p o n s i b i l i t i e s f o r t h e conduct and t h e
product of Configuration Management Audits. Although it i s
d i r e c t e d towards t h e s u r v e i l l a n c e of major program elements,
i t does n o t p r e c l u d e o r usurp c e n t e r o r c o n t r a c t o r a u t h o r i t y
t o conduct comparable a u d i t s f o r l e s s e r program elements.

3. REFERENCE DOCUMENTS
None
4. EXPLANATION OF TERMS
See E x h i b i t X V I I
5. PROCEDURAL REQUIREMENTS AND RESPONSIBILITIES

The following paragraphs d e f i n e t h e requirements and e s t a b l i s h


t h e p o l i c i e s and r e s p o n s i b i l i t i e s f o r C o n f i g u r a t i o n Management
Audits. They w i l l e s t a b l i s h an organized, s y s t e m a t i c approach
t o adequate a u d i t s i n consonance w i t h NASA and Apollo Program
Documentation.
5.1 Policies
The Apollo Program O f f i c e Configuration Management O f f i c e
(CMO) o r t h e Center Program O f f i c e CMO, a s a p p r o p r i a t e ,
w i l l be r e s p o n s i b l e f o r t h e e s t a b l i s h m e n t of p o l i c i e s , t h e
assignment of r e s p o n s i b i l i t i e s , and t h e development and
implementation of procedures f o r C o n f i g u r a t i o n Management
a u d i t s i n t h e i r r e s p e c t i v e a r e a s of i n t e r e s t . In general,
t h e Apollo Program O f f i c e CMO w i l l conduct a u d i t s of Center
Configuration Management systems while t h e Center Program
O f f i c e CMO's w i l l conduct a u d i t s a t P r o j e c t and C o n t r a c t o r
l e v e l . This does n o t p r e c l u d e t h e Apollo Program O f f i c e
from conducting a c o n f i g u r a t i o n management a u d i t a t P r o j e c t
o r C o n t r a c t o r l e v e l when warranted.

5.2 Organization
The a p p r o p r i a t e CMO w i l l be r e s p o n s i b l e f o r t h e determina-
t i o n of t h e need f o r an a u d i t and f o r t h e o r g a n i z a t i o n of
t h e a u d i t team.

xv- 1
EXHIBIT XV

5.3 Representation

The r e s p o n s i b l e CMO w i l l d e s i g n a t e a chairman f o r


e a c h a u d i t team. The team chairman w i l l a p p o i n t o t h e r
p e r s o n n e l t o t h e team from APO, NASA C e n t e r , o r
supporting contractor o r g a n i z a t i o n s a s may b e
appropriate.

5.4 Planning

The team chairman w i l l be r e s p o n s i b l e f o r development,


r e l e a s e , and d i s t r i b u t i o n o f a d e t a i l e d p l a n and agenda
f o r t h e c o n d u c t of e a c h C o n f i g u r a t i o n Management Audit.

5.4.1 A p r e l i m i n a r y m e e t i n g o f t h e a u d i t team members


s h a l l be c a l l e d a s d i r e c t e d by t h e Team Chair-
man. A l l p e r s o n n e l h a v i n g an i n t e r e s t i n o r
p o s s e s s i n g p e r t i n e n t knowledge o f t h e a u d i t
s u b j e c t s h a l l be i n v i t e d t o a t t e n d t h i s p r e l i m i n a r y
meeting. A t t h i s preliminary meeting, t h e
f o l l o w i n g a c t i v i t i e s s h a l l be performed:

a. D i s c u s s i o n o f t h e p u r p o s e , n e e d s and c a u s e s
t h a t i n i t i a t e d the audit action.

b. Perform a breakdown o f a u d i t e l e m e n t s and


assign individual responsibilities t o the
team members by t h e chairman.

c. E v a l u a t e t h e s c o p e of t h e a u d i t , manhours
a v a i l a b l e , and e s t a b l i s h t i m e s c h e d u l e s
f o r performance o f p r e - a u d i t a c t i o n s and
the audit i t s e l f .

5.4.2 An i n d i v i d u a l r e v i e w s h a l l b e performed by
e a c h team member of background d a t a and i n -
formation concerning h i s assigned e l e m e n t ( s )
of responsibility. T h i s review s h a l l i n c l u d e
t h e c o m p i l a t i o n of s p e c i f i c i n f o r m a t i o n and
a u d i t p l a n d e t a i l s t o be used i n t h e performance
of the audit.

5.4.3 A pre-audit m e e t i n g of t h e team members s h a l l


b e c a l l e d by t h e chairman a f t e r completion of
t h e i n d i v i d u a l r e v i e w s and p r i o r t o " a u d i t
notification." A t t h i s meeting, p l a n s w i l l
be f i n a l i z e d c o n c e r n i n g t h e pending a u d i t .
A l l p e r t i n e n t d a t a which may s i g n i f i c a n t l y
a f f e c t schedule, elements of t h e a u d i t , f a c i l i t i e s ,
personnel, e t c . , s h a l l be presented a t t h i s
m e e t i n g f o r d i s c u s s i o n and r e s o l u t i o n o r d e c i s i o n .
EXHIBIT XV

5.4.4 The f i n a l d r a f t of t h e a u d i t p l a n w i l l
b e made a v a i l a b l e t o a l l members of t h e
team and t o s u p p o r t i n g o r g a n i z a t i o n s a t
t h e t i m e of a u d i t n o t i f i c a t i o n .

5.5 A u d i t S c h e d p l i n g and N o t i f i c a t i o n

A C o n f i g u r a t i o n Management A u d i t w i l l b e s c h e d u l e d
f o r e a c h major program and c o n t r a c t o r . A u d i t s of
l e s s e r program e l e m e n t s may b e d i r e c t e d and s c h e d u l e d
by t h e A p o l l o Program O f f i c e CMO o r C e n t e r Program
O f f i c e CMO where a problem i s known o r s u s p e c t e d t o
exist.

5.5.1 A master a u d i t schedule w i l l be e s t a b l i s h e d


by t h e r e s p o n s i b l e CMO. This schedule w i l l
be updated a s r e q u i r e d .

5.5.2 Once t h e p l a n s f o r c o n d u c t i n g t h e a u d i t a r e
c o m p l e t e , n o t i f i c a t i o n s h a l l b e made t o t h e
a f f e c t e d p a r t i e s a t l e a s t t h i r t y days p r i o r
t o t h e a u d i t . The n o t i f i c a t i o n w i l l b e made
by t h e Chairman of t h e a u d i t team. The
n o t i f i c a t i o n s h a l l include t h e following a s
applicable:

a. Audit s u b j e c t

b. I n c l u s i v e d a t e s of a u d i t

c. A u d i t team members

d. S i t e of a u d i t

e. Copy of t h e a u d i t p l a n

f. Request f o r c o n f e r e n c e room s p a c e ,
o r g a n i z a t i o n a l c h a r t s , documentation,
telephone f a c i l i t i e s , etc.

5.6 Conduct of t h e A u d i t

The a u d i t s h a l l b e conducted i n a c c o r d a n c e w i t h
the following:

5.6.1 Conduct a p r e - a u d i t c o n f e r e n c e a t which


team members w i l l meet w i t h a p p r o p r i a t e
p e r s o n n e l a t t h e s i t e . The team chairman
w i l l explain a l l objectives, plans
p r o c e d u r e s , r e s p o n s i b i l i t i e s , and p e r s o n n e l
a r e a a s s i g n m e n t s of t h e e v a l u a t i o n £*or t h e
u n d e r s t a n d i n g of a l l c o n c e r n e d .

5.6.2 Conduct t h e a u d i t u t i l i z i n g t h i s manual and


o t h e r a p p l i c a b l e documents.
E X H I B I T XV

5.6.3 Conduct a d a i l y meeting of a l l p a r t i c i p a t i n g


p a r t i e s , o r i n d i v i d u a l s , a s t h e chairman s e e s
f i t , a t t h e end of each day t o review t h e day' s
a c t i v i t i e s , a d j u s t s c h e d u l e s a s needed, and
t o coordinate t h e following day's a c t i v i t i e s .
5.6.4 Consolidate d a i l y r e s u l t s i n preparation
for exit critique .
5.6.5 Conduct e x i t c r i t i q u e w i t h c e n t e r p e r s o n n e l ,
and d i s c u s s t h e p r e l i m i n a r y r e s u l t s of t h e
e v a l u a t i o n . The c e n t e r p e r s o n n e l s h o u l d b e
g i v e n an o p p o r t u n i t y t o e x p l a i n any unusual
o r d i s c r e p a n t information obtained. This
c r i t i q u e w i l l normally b e h e l d t h e day
f o l l o w i n g completion o f t h e a u d i t and w i l l
c o n t i n u e u n t i l t h e team chairman s i g n i f i e s
adjournment .
5.7 A u d i t r e c o r d s and R e p o r t s
Each team member s h a l l b e r e s p o n s i b l e f o r p r o v i d i n g
and m a i n t a i n i n g a c c u r a t e r e c o r d s of c o n d i t i o n s found
within h i s assigned area.
5.7.1 A p r e l i m i n a r y r e p o r t which summarizes f i n d i n g s
s h a l l b e p r e s e n t e d t o t h e team chairman by
e a c h team member p r i o r t o t h e e x i t c r i t i q u e - .
T h i s r e p o r t s h o u l d c o n t a i n an a c c u r a t e d e s c r i p t i o n
o f i n d i v i d u a l non-conformances i n s u f f i c i e n t
d e t a i l a s t o provide conclusive evidence o f
t h e e x i s t i n g s i t u a t i o n . These p r e l i m i n a r y
r e p o r t s should be t h e b a s i s f o r discussion
during t h e e x i t c r i t i q u e .
5.7.1.1 F i n d i n g s s h o u l d b e worked i n t h e
f o l l o w i n g format:

a. Finding: A statement o f the f a c t ( s )


identifying t h e p a r t i c u l a r problem
a r e a w i t h o u t embellishment.
b. D e t e r m i n a t i o n ; Based upon d a t a
a v a i l a b l e , an a n a l y s i s i s made
and c o n c l u s i o n s a r e drawn.
c. Recommendation@: C o r r e c t i v e a c t i o n ( s )
required a t the center o r its f i e l d
operation.
EXHIBIT XV

5.7.2 Maintenance o f minutes w i l l b e t h e


r e s p o n s i b i l i t y of t h e a u d i t team
chairman. This r e s p o n s i b i l i t y en-
compasses a l l o f f i c i a l g a t h e r i n g s
of a u d i t p e r s o n n e l , and s p e c i f i c a l l y ,
t h e p r e l i m i n a r y meeting, p r e - a u d i t
meeting, p r e - a u d i t conference, d a i l y
a u d i t meetings, and e x i t c r i t i q u e .
5.7.3 A f i n a l a u d i t r e p o r t w i l l be prepared by
t h e team and p u b l i s h e d a s soon a s p r a c t i c a l
a f t e r t h e conclusion of t h e a u d i t . This
r e p o r t s h a l l be a c o n s o l i d a t i o n - o f t h e
p r e l i m i n a r y r e p o r t s submitted by t h e
team members and a summarization of
minutes o f meetings. This r e p o r t w i l l
c o n t a i n a complete d e s c r i p t i o n o f a u d i t
a c t i o n s u s i n g t h e f o l l o w i n g elements a s
an o r g a n i z a t i o n a l guide:
i. Contents
ii. Summary
I. General
a . Audit T i t l e
. P a r t i c i p a t i n g Organization
c. Audit S u b j e c t
d . Audit S i t e
e. I n c l u s i v e d a t e s of a u d i t
f . P a r t i c i p a t i n g Personnel
11. Introduction
a. Reasons f o r a u d i t
b. O b j e c t i v e s and scope
c . Background Information
111. Planning
a. S e l e c t i o n of Team
b . P r e l i m i n a r y Meeting
IV. Performance
a. Areas of I n v e s t i g a t i o n
b .
P r e l i m i n a r y Meeting

V. Conclusions
a . Items recorded f o r information only
b. Action Items r e p o r t e d
1. Items c o r r e c t e d d u r i n g a u d i t
2. Items f o r which formal c o r r e c t i v e
a c t i o n i s (has been) r e q u e s t e d .
c. Corrective action responsibilities
and assignments
E X H I B I T XV

5.7.4 The Apollo Program O f f i c e CMO w i l l


a s s i g n an a p p r o p r i a t e i d e n t i f y i n g
number t o t h e a u d i t r e p o r t .

5.7.5 The a u d i t team chairman w i l l t r a n s m i t


c o p i e s of a l l f i n a l a u d i t r e p o r t s t o
a p p r o p r i a t e c e n t e r , and Apollo Program
Off i c e (OMSF) p e r s o n n e l .

Audit Follow-up

The r e s p o n s i b l e CMO w i l l p r e p a r e a d i r e c t i v e o r
l e t t e r of i n s t r u c t i o n from t h e Apollo Program
D i r e c t o r o r Center D i r e c t o r , a s a p p r o p r i a t e , t o
implement c o r r e c t i v e a c t i o n f o r d e f i c i e n c i e s
i d e n t i f i e d d u r i n g t h e a u d i t . The C M O ' s w i l l
a l s o t a k e a l l p r o p e r follow-up a c t i o n ( i n c l u d i n g
a repeat a u d i t i f necessary) t o v e r i f y t h a t
d i r e c t e d c o r r e c t i v e a c t i o n s a r e implemented.

AUDIT CHECKLIST

The f o l l o w i n g q u e s t i o n s cover a wide range of d a t a t o


i l l u s t r a t e t h e type of i n f o r m a t i o n which may be of
concern t o an a u d i t team. Some of them may be d e l e t e d ,
and o t h e r q u e s t i o n s may be added t o s a t i s f y t h e need
of each p a r t i c u l a r a u d i t .

6.1 Organization

Is t h e r e a c u r r e n t o r g a n i z a t i o n c h a r t ?
Where i n t h e o r g a n i z a t i o n i s t h e c o n f i g u r a t i o n
management o f f i c e e s t a b l i s h e d ?
How mapy p e r s o n n e l a r e i n CMO? C i v i l S e r v i c e ?
Contractor support?
How many p e r s o n n e l a r e t h e r e i n t h e C o n t r a c t o r ' s
CMO?
A r e t h e r e o r g a n i z a t i o n c h a r t s o f t h e CMO?
A r e there c u r r e n t w r i t e u p s of t h e i n d i v i d u a l
job r e s p o n s i b i l i t i e s ?
How do t h e s e w r i t e u p s compare w i t h t h e a c t u a l
job r e s p o n s i b i l i t i e s ?
Is t h e r e a flow c h a r t showing t h e implementation
of approved e n g i n e e r i n g changes?
Is t h e r e a flow c h a r t showing t h e approval of
e n g i n e e r i n g changes?
Does C o n f i g u r a t i o n Management have t h e a p p r o v a l
of t o p management?
Are t h e r e e x i s t i n g p o l i c i e s and/or procedures
f o r implementing con£i g u r a t i o n management?
Is i n t e r f a c e . c o n t r o l a p a r t of t h e C o n f i g u r a t i o n
Management f u n c t i o n s ?
EXHIBIT XV

6.2 Training
a. Is t h e r e a c o n f i g u r a t i o n management t r a i n i n g course?
b. What personnel t a k e t h e course?
c. Have a l l e n g i n e e r i n g management personnel taken
t h e course?
d. How o f t e n i s t h e course given?
e. h i a t written material is u t i l i z e d i n giving
t h e course?
6.3 Configuration Management O f f i c e Functions

Do Configuration Management P l a n s , Manuals,


Procedures, Flow C h a r t s , Requirements, Doc-
uments, e t c . e x i s t and a r e they implemented and
followed?
Do f i l e s c o n t a i n a l l s p e c i f i c a t i o n s ?
Are s p e c i f i c a t i o n s adequate?
Are s p e c i f i c a t i o n s up-to-date?
Is t h e r e a s p e c i f i c a t i o n t r e e ?
Is t h e r e a s p e c i f i c a t i o n index?
Do t h e p r o j e c t personnel have i n s t r u c t i o n s on
how t o p r e p a r e s p e c i f i c a t i o n s ?
Are s t a n d a r d t e c h n i c a l requirements
( s t a n d a r d i z a t i o n , humidity, packing, e t c . )
enumerated f o r s p e c i f i c a t i o n s ?
I f a d e v i a t i o n o c c u r s , what procedure i s followed?
Is t h e r e a P a r t I1 C E I S p e c i f i c a t i o n ?
Was t h e P a r t I1 C E I S p e c i f i c a t i o n approved
a t FACI? A r e m a t e r i a l and p r o c e s s s p e c i f i c a t i o n s
used?
Do change (ECP) f i l e s c o n t a i n a l l a p p l i c a b l e
change paper?
Are meaningful agendas and minutes published
f o r CCB meetings?
Are changes pre-coordinated with o t h e r CCB/
CMO when i n t e r f a c e i s a f f e c t e d ?
Are C C B D 1 s a c c u r a t e , c o n c i s e and do t h e y
have proper d e s c r i p t i o n s of r e q u i r e d a c t i o n s
when a p p r o p r i a t e ?
Does an adequate Configuration I d e n t i f i c a t i o n and
Accounting Index e x i s t ?
Does a change t r a c k i n g system e x i s t which follows
a change from i n i t i a t i o n t o i n c o r p o r a t i o n ?
Does L5e a f f e c t e d C o n t r a c t s o f f i c e implement
C C B D 1 s a s d i r e c t e d thereby? .
A r e C l a s s I1 changes monitored?
Does Q u a l i t y Assurance monitor c o n f i g u r a t i o n ?
Are "process specs" c o n t r o l l e d where necessary
(Approval and changes by CCB a c t i o n ) ?
Are formal ECP's submitted f o r waivers and
deviations?
Are ECP ' s adequate, d e s c r i p t i v e and t i m e l y ?
Does t h e CMO p a r t i c i p a t e i n Design Reviews
and I n s p e c t i o n s ? To what e x t e n t ?
Are s p e c i f i c a t i o n s and a l l SCN 's/ECP I s
approved by CCBD ' s ?
EXHIBIT XV
Are adequate Acceptance Data Packages r e q u i r e d
and maintained a t a11 s i t e s and c e n t e r s ?
Are f i e l d "make-work" changes fed-back t o a l l
r e q u i r e d a r e a s ? Are a f f e c t e d drawings updated
and subsequent e f f e c t i v i t i e s covered by ECP's?
bb . A r e MRB a c t i o n s monitored t o e n s u r e Configuration
changes do n o t occur by MRB a c t i o n s ?
CC. Do l i k e s o l u t i o n s ( P a r t I1 s p e c s ) e x i s t f o r a l l
requirements f o r subsequent e f f e c t i v i t i e s unPess
bhanged by approved ECP a f t e r t h e s p e c i f i c a t i o n
i s b a s e l i n e d ? Does c o n t r a c t o r ' s r e l e a s e system
s t o p EO r e l e a s e by c l o s i n g o u t i n t e r n a l
a u t h o r i z i n g paper (such a s M C R ' s ) u n l e s s an ECP
i s approved?
Is t h e r e a drawing manual. Is i t followed?
Is t h e r e a procedure which d e s c r i b e s t h e
r e l e a s e f u n c t i o n ? Is i t e f f e c t i v e l y followed?
ff. Does t h e r e l e a s e system r e l e a s e only approved
drawings and documents?
gg A r e r e v i s i o n s t o drawings and documents r e l e a s e d
only upon approval by c o g n i z a n t change a u t h o r i t y ?
Do C o n t r a c t i n g Off i c e f u n c t i o n s implement CCBD' s
completely and i n a t i m e l y manner?
6.4 Configuration C o n t r o l Board
Is t h e r e a change c o n t r o l system?
Is it i n w r i t i n g ?
Is t h e procedure w e l l d i s t r i b u t e d ?
Is t h e procedure followed?
How m q y C C B ' s a r e t h e r e ? What l e v e l s ?
Do a l l changes go through t h e CCB?
Is approval a u t h o r i t y l i m i t e d t o t h e
chairman of t h e CCB?
How i s a change p r e s e n t e d t o the.CCB?
How does t h e CCB document t h e i r d e c i s i o n s ?
Is t h e r e a l o g of ECP numbers?
To whom does t h e chairman of t h e CCB r e p o r t ?
Are a l l a f f e c t e d o r g a n i z a t i o n s r e p r e s e n t e d on
t h e CCB and do t h e y r e g u l a r l y a t t e n d meetings?
Is approval a u t h o r i t y d e l e g a t e d by t h e CCB
Chairman? To whom and t o what e x t e n t ?
Does t h e CCB meet on a r e g u l a r l y scheduled b a s i s ?
Are C C B D ' s signed a t meetings?
Does t h e CCB approve " P r o d u c t Improvement"
changes which do n o t have s i g n i f i c a n t c o s t o r
performance g a i n s ?
I s t h e r e a follow-up system t o a s s u r e compliance w i t h
published p o l i c i e s and procedures?
6.5 Design Reviews' and ~ n s ~ e d t i o n s
a. Do p l a n s e x i s t f o r conduct o f PDR, CDR and FACI?
b. A r e reviews scheduled?
c. Are minutes k e p t which a r e d e s c r i p t i v e of t h e
conduct?
d. A r e s p e c i f i c a t i o n s b a s e l i n e d (approved) by
CCBD's a t a p p r o p r i a t e p o i n t s ?
EXHIBIT XV

e. A r e CCBD ' s c o n t r a c t u a l l y ' implemented?


f. Do P a r t I Requirements and P a r t I1 Design
D e f i n i t i o n c h a n g e s r e q u i r e ECP1s t o b e sub-
m i t t e d ( f o r m a l change c o n t r o l implemented)
a f t e r approval?
g. A t FACI:

1. Was t h e R e l e a s e s y s t e m checked f o r adequacy?


2. Was t h e p a r t number s y s t e m checked?
3. Were a l l approved ECP's checked f o r i n c o r -
poration?
4. Was m a n u f a c t u r i n g d o c u m e n t a t i o n checked t o
ensure i n c o r p o r a t i o n of l a t e s t engineering
drawing changes?
5. Did a c t u a l hardware conf i g u r a t i o n a g r e e
w i t h t h e r e l e a s e d e n g i n e e r i n g drawings?
6. Did follow-up o c c u r which c l o s e d o u t open
C o n f i g u r a t i o n Management a c t i o n i t e m s ?

6.6 ~ardware/SoftwareModifications Requiring R e t r o f i t


by K i t

a. Is t h e r e a t r a c k i n g s y s t e m f o r approved m o d i f i -
cations?
b. How a r e t h e s e m o d i f i c a t i o n s p i c k e d up?
c. How a r e t h e s e m o d i f i c a t i o n s c l o s e d o u t ?
d. When a r e t h e s e m o d i f i c a t i o n s c l o s e d o u t ?
e. Can t h e number of open m o d i f i c a t i o n s be
d e t e r m i n e d a t any t i m e ?
f. Is t h e r e a means o f d e t e r m i n i n g w h e t h e r a m o d i f i c a -
t i o n w i l l d e l a y a l a u n c h o r d e l i v e r y by l a t e
completion?
EXHIBIT XVI

CONFIGURATION IDENTIFICATION
AND ACCOUNTING REPORTS REQUIREMENTS
E X H I B I T XVI

CONFIGURATION I D E N T I F I C A T I O N
AND ACCOUNTING REPORTS REQUIREMENTS

CONTENTS

Paragraph P age

1. PURPOSE....................... .XV 1.1

2. SCOPE . . . . . . . . . . . . . . . . . . . . . . . . .XV 1.1

3. REFERENCES . . . . . . . . . . . . . . . . . . . . . .XV 1-1

4 . RESTRICTIONS . . . . . . . . . . . . . . . . . . . . .XV 1.1

5. APPLICABILITY . . . . . . . . . . . . . . . . . . . . .XV 1.1

6. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . .XV 1.1

7 . CONFIGURATION MANAGEMENT REPORTS . . . . . . . . . . .XV 1.2

8 . REPORT FORMATS . . . . . . . . . . . . . . . . . . . .XV 5


.
1
EXHIBIT XVI

CONFIGURATION IDENTIFICATION
AND ACCOUNTING REPORTS REQUIREMENTS

1. PURPOSE
This exhibit establishes the requirements for generating and
maintaining the necessary information for preparation of the
Configuration Identification Index Report (CIIR) and the Con-
figuration Status Accounting Report (CSAR). These two reports
may be combined into a single report: Configuration Identifi-
cation and Accounting Index.
2. SCOPE
This exhibit identifies and defines the data elements necessary
for the generation of these reports. The requirements set
forth herein are considered the minimum for Apollo config-
uration management, and may be added to as Center needs require.
Any format which contains these minimum reporting requirements
and satisfies the Center's needs will be acceptable.
3. REFERENCES
Exhibit XVII "Explanation of Terms"
MIL-STD-480 30 October 1968 "Configuration Control -
Engineering Changes, Deviations
and Waivers "
4. RESTRICTIONS
This exhibit shall not be used by a contractor as authorization
to acquire Automatic Data Processing System (ADPS) equipment,
personnel, other equipment or facilities without specific
authorization from the contracting officer through formal chan-
nels.
5. APPLICABILITY
This exhibit applies to all Apollo organizations, NASA or con-
tractor, responsible for the preparation of Configuration Identi-
fication Indexes and Configuration Status Accounting Reports, and
to all organizations and contractors providing the data elements
described herein. Each contractor under contract to the procuring
agency shall be responsible for the compliance of his subcon-
tractors, vendors, or suppliers to the extent his subcontractors,
vendors or suppliers are involved in configuration management
reporting.
6. RESPONSIBILITIES
The responsibility for publication of reports and/or data sub-
mittal to the publishing agency shall be as directed by the
procuring agency.
EXHIBIT X V I
7. CONFIGURATION MANAGEmNT MPORTS

C o n f i g u r a t i o n I d e n t i f i c a t i o n Index Report ( C I I R )

The C o n f i g u r a t i o n I d e n t i f i c a t i o n Index Report i s t h e one


a u t h o r i t a t i v e document which d e p i c t s t h e approved
c o n f i g u r a t i o n o f a l l c o n t r a c t end i t e m s and, a s s u c h ,
must c o n t a i n t h e f o l l o w i n g i n f o r m a t i o n a s a minimum.

7.1.1 IJpon completion o f t h e f i r s t a r t i c l e configu-


r a t i o n i n s p e c t i o n , b u t no l a t e r t h a n t h e s i g n i n g
of t h e DD250 ( o r NASA e q u i v a l e n t ) , t h e f o l l o w i n g
b a s e l i n e i n f c r m a t i o n s h a l l be p r e p a r e d and sub-
mitted f o r inclusion i n the C I I R .

a. Contractor
b. End i t e m nomenclature
c. S p e c i f i c a t i o n number
d. End i t e m i d e n t i f i c a t i o n number
e. B a s e l i n e p a r t number
f. S e r i a l number

7.1.2 After establishing the baseline configuration


a t FACI, a l l changes s h a l l be p r o c e s s e d i n
accordance w i t h MIL-STD-480 a s implemented
by t h e C e n t e r s . Upon a p p r o v a l of ECP's by t h e
NASA, t h e f o l l o w i n g i n f o r m a t i o n s h a l l b e
p r e p a r e d and s u b m i t t e d f o r i n c l u s i o n i n t h e
CIIR.

Contractor
CCBD number
ECP number
ECP t i t l e
Effectivity
New p a r t number
M o d i f i c a t i o n i n s t r u c t i o n number
E s t i m a t e d man-hours f o r i n c o r p o r a t i o n
Contractual authority

C o n f i g u r a t i o n S t a t u s Accounting Report (CSAR)

To i n s u r e a d e q u a t e c o n t r o l arid t i m e l y m o d i f i c a t i o n
of d e l i v e r e d hardware, and t o p r e p a r e a document
which w i l l s e r v e a s an a u t h o r i t a t i v e s o u r c e f o r
t h e a c t u a l c o n f i g u r a t i o n of a l l d e l i v e r e d hardware,
t h e f o l l o w i n g i n f o r m a t i o n s h a l l be p r e p a r e d and
s u b m i t t e d , a s a v a i l a b l e and on a s c h e d u l e a s
a g r e e d t o by t h e p r o c u r i n g agency, f o r i n c l u s i o n
i n t h e CSAR.

Contractor
ECP number
ECP t i t l e
End i t e m i d e n t i f i c a t i o n number
Effectivity
Contractual authority
CCB d i r e c t i v e
M o d i f i c a t i o n i n s t r u c t i o n numbers
EXHIBIT XVI

N e w p a r t number
A f f e c t e d end i t e m s
~ o c ai ot n
K i t i d e n t i f i c a t i o n number
Incorporation date (production)
Scheduled k i t d e l i v e r y d a t e
Actual k i t d e l i v e r y d a t e
Incorporation date ( r e t r o f i t )
End i t e m s e r i a l number ( s p a r e s / c h a s s i s )
Old p a r t number ( s p a r e s )
N e w p a r t number ( s p a r e s )
K i t i d e n t i f i c a t i o n number ( s p a r e s )
Scheduled k i t i n c o r p o r a t i o n d a t e ( s p a r e s )
Actual k i t incorporation d a t e ( s p a r e s )
Location ( s p a r e s )

7.3 D e c i n i t i o n of Data Elements

7.3.1 Contractor. The name of t h e c o n t r a c t o r who


has cognizance o v e r t h e end item.

7.3.2 End Item Nomenciature. The o f f i c i a l name,


t i t l e o r d e s i g n a t i o n of t h e end item.

7.3.3 S p e c i f i c a t i o n Number. The number of t h e


s p e c i f i c a t i o n t o which t h e end i t e m was b u i l t .

7.3.4 End Item I d e n t i f i c a t i o n Number. Numeric


d e s i g n a t i o n o r i d e n t i f y i n g number a s s i g n e d t o
t h e end item.

7.3.5 B a s e l i n e P a r t Number. The i n i t i a l o r o r i g i n a l


p a r t number a s s i g n e d t o t h e b a s e l i n e d end item.
(Same a s drawing number. )

7.3.6 S e r i a l Number. A l l s e r i a l numbers a s s i g n e d t o


t h e end item.

7.3.7 ECP Number. The number a s s i g n e d by t h e


c o n t r a c t o r t o t h e ECP.

7.3.8 ECP T i t l e . S h o r t t i t l e i n d i c a t i n g n a t u r e of
change.

7.3.9 Effectivity. S e r i a l number of t h o s e i t e m s t h a t w i l l


be r e t r o f i t t e d and t h o s e t h a t w i l l have t h e chanqe
incorporated i n production.

7.3.10 New P a r t Number. The new p a r t number t h a t w i l l be


a s s i g n e d t o t h e end i t e m a f t e r t h e i n c o r p o r a t i o n
of t h e ECP.

7.3.11 M o d i f i c a t i o n I n s t r u c t i o n Number. The c o n t r a c t o r ' s


r e t r o f i t number a s s o c i a t e d w i t h f i e l d changes. Not
required f o r E C P ' s t h a t a f f e c t production only.
EXHIBIT XVI

7.3.12 Contractual Authority. The number of t h e


c o n t r a c t u a l change n o t i c e t h a t a u t h o r i z e d
t h e c o n t r a c t o r t o i n c o r p o r a t e t h e change.

7.3.13 C o n f i g u r a t i o n C o n t r o l Board D i r e c t i v e .
A l l changes a f t e r b a s e l i n i n g a r e approved
by c o g n i z a n t C o n f i g u r a t i o n C o n t r o l Boards by
means of C o n f i g u r a t i o n C o n t r o l Board
Directives. I n t h e c a s e of new I C D s o r
changes t o I C D s ( I R N s ) CCB a p p r o v a l w i l l
occur a f t e r panel t e c h n i c a l approval p r i o r
t o c o n t r a c t u a l implementation.

7.3.14 A f f e c t e d End I t e m s . The i d e n t i f i c a t i o n numbers


of a l l end i t e m s a f f e c t e d by an ECP, i n c l u d i n g
t h e end i t e m s of a n o t h e r c o n t r a c t o r .

7.3.15 Location. The g e o g r a p h i c a l l o c a t i o n where t h e


r e t r o f i t change w i l l be i n c o r p o r a t e d i n t h e
end i t e m .

7.3.16 K i t I d e n t i f i c a t i o n Number. Identification


number of t h e r e t r o f i t k i t t o be used f o r
i n c o r p o r a t i n g t h e ECP i n a p a r t i c u l a r s e r i a l
number of t h e end i t e m . Not r e q u i r e d f o r
p r o d u c t i o n changes.

7.3.17 I n c o r p o r a t i o n Date. The s c h e d u l e d d a t e by which


t h e change i s e x p e c t e d t o have been i n c o r p o r a t e d
i n t h e end i t e m and approved by Q u a l i t y C o n t r o l .

7.3.18 Spare/Chassis End I t e m S e r i a l Number. The s e r i a l


numbers of t h e s p a r e s o r c h a s s i s e f f e c t e d by t h e
ECP .
7.3.19 Old P a r t Number ( S p a r e s ) . The p a r t number of t h e
s p a r e / c h a s s i s e f f e c t e d by t h e ECP .
7 - 3 - 2 0 N e w P a r t Number ( S p a r e s ) . The new p a r t number
-
which an e x i s t i n s s p a r e / c h a s s i s w i l l become upon
i n c o r p o r a t i o n of - t h e EC-P.

7.3.21 K i t I d e n t i f i c a t i o n and I n t e r n a l C o n t r o l Number


(Spares) . The c o n t r a c t o r ' s i d e n t i f i c a t i o n numbers
a s s o c i a t e d w i t h t h e r e t r o f i t k i t s t h a t w i l l be
used f o r r e t r o f i t of s p a r e s .

7.3.22 I n c o r p o r a t i o n Date ( S p a r e s ). The s c h e d u l e d d a t e


by which t h e chanqe i s e x p e c t e d t o have been
i n c o r p o r a t e d i n t h e s p a r e - a n d approved by Q u a l i t y
C o n t r o l , and/or t h e a c t u a l d a t e when i t was
incorporated.

7.3.23 L o c a t i o n ( S p a r e s ) . Geographical l o c a t i o n where t h e


r e t r o f i t change w i l l be i n c o r p o r a t e d i n t h e s p a r e .
EXHIBIT X V I

7.4 Source of Data

A predominant amount of t h e d a t a r e q u i r e d by
p a r a g r a p h 7.0 i s o b t a i n e d from t h e ECP package,
FACI package, e n g i n e e r i n g r e l e a s e package, c o n t r a c t
change n o t i c e , e t c . However, c e r t a i n d a t a e l e m e n t s
s h o u l d be d e r i v e d o r o b t a i n e d from a c e r t a i n s o u r c e
o r i n a p a r t i c u l a r manner i n o r d e r t o m a i n t a i n
effective control.

7.4.1 C o n f i g u r a t i o n C o n t r o l Board. When a


c o n t r a c t o r ' s ECP e f f e c t s o r r e q u i r e s a
change i n a n o t h e r c o n t r a c t o r ' s end i t e m s , i t i s
e s s e n t i a l t h a t t h e s e i n t e r f a c e changes n o t o n l y
be t e c h n i c a l l y c o o r d i n a t e d and approved b u t
t h a t the Configuration I d e n t i f i c a t i o n
and Accounting Index a c c u r a t e l y r e f l e c t s t h e
r e l a t i o n s h i p and t i e s t o g e t h e r t h e s e changes.
The s i n g l e a u t h o r i t a t i v e document t h a t i n d i c a t e s
c o o r d i n a t i o n and approved t h e i n t e r f a c e changes
must b e r e f e r e n c e d i n t h e Index w i t h t h e
c o r r e s p o n d i n g ECP's; t h u s , changes i n c o r p o r a t e d
by i n t e r f a c i n g c o n t r a c t o r s can be r e l a t e d back
t o a s i n g l e approving a u t h o r i t y . Two i n t e r f a c e
c o n d i t i o n s a r e d i s c u s s e d below t o i n d i c a t e what
c o n s t i t u t e s t h e p r o p e r d a t a element f o r t h e
C o n f i g u r a t i o n C o n t r o l Board D i r e c t i v e e n t r y .

7.4.1.1 Two I n t e r f a c i n g C o n t r a c t o r s Under


C o n t r a c t t o t h e Same NASA Center.
The Program Manager's CCB would a s s u r e
t h a t the required interface coordination
and agreements have been accomplished.
I n t h i s case, t h e approval f o r t h e i n t e r -
f a c e change would be c o n t a i n e d i n t h e
CCB ~ i r e c t i v e . Thus, a l l ECP's r e q u i r e d
by t h e c o n t r a c t o r s t o comply w i t h t h i s
i n t e r f a c e change must r e f e r e n c e t h e CCB
Directive as the interface authority.

7.4.1.2 Two I n t e r f a c i n g C o n t r a c t o r s Under C o n t r a c t


t o D i f f e r e n t NASA C e n t e r s : I n t h i s c a s e
t h e n e c e s s a r v i n t e r f a c e c o o r d i n a t i o n and
agreements would be accomplished by t h e
a p p r o p r i a t e i n t e r - c e n t e r Coordination Panels
w i t h agreements r e f l e c t e d on t h e i n t e r -
f a c e documentation by a p p r o v a l s i g n a t u r e s .
Each Program Manager's CCB would implement
t h e s e agreements by i s s u i n g CCB D i r e c t i v e s .
I n t h i s c a s e t h e changes a r e b e i n g imple-
mented t o comply w i t h an i n t e r - c e n t e r P a n e l
agreement, t h u s any s u b s e q u e n t ECP's s h a l l
r e f e r e n c e t h e a u t h o r i z i n g CCBD.

8. REPORT FORMATS

8.1 The format f o r t h e s e r e p o r t s , s h a l l b e a s d e f i n e d and


d i r e c t e d by t h e p r o c u r i n g agency and s h a l l c o n t a i n a s a
minimum t h e i n f o r m a t i o n r e q u i r e d by t h i s e x h i b i t .
EXHIBIT X V I I

EXPLANATTON O F TERMS
EXHIBIT XVII

EXPLANATION OF TERMS

CONTENTS

P araqraph Page

1. PURPOSE................................... XVII-1
2. SCOPE ..................................... XVII-1
3. APPLICABILITY ............................. XVII-1
4 . EXPLANATION OF TERMS ...................... XVII-1
EXHIBIT X V I I

EXPLANATION OF TERMS

1. PURPOSE
T h i s E x h i b i t p r o v i d e s c o n t r a c t o r s and Government a g e n c i e s w i t h
e x p l a n a t i o n s of t h e words, terms and p h r a s e s which c h a r a c t e r i z e
t h e terminology used throughout t h e Apollo C o n f i g u r a t i o n Manage-
ment Manual.
2. SCOPE

The terms s e l e c t e d f o r i n c l u s i o n i n t h i s E x h i b i t a r e t h o s e which


a r e most f r e q u e n t l y encountered. While t h e s e t e r m s a r e e x p l a i n e d
i n a p p l i c a b l e e x h i b i t s , t h e y a r e r e p e a t e d h e r e i n f o r emphasis and
t h e u s e r ' s convenience.
3. APPLICABILITY
T h i s e x h i b i t i s a p p l i c a b l e t o NASA a g e n c i e s and c o n t r a c t o r s , and
s h a l l be a p p l i e d i n c o n j u n c t i o n w i t h o t h e r e x h i b i t s of t h e manual
when made a c o n t r a c t u a l requirement.
4. EXPLANATION OF TERMS
4.1 A c q u i s i t i o n Engineering
The e n g i n e e r i n g r e q u i r e d f o r development, procurement, manu-
f a c t u r i n g , i n s t a l l a t i o n and checkout, d u r i n g t h e A c q u i s i t i o n
Phase of systems/equipment.
4.2 A c q u i s i t i o n Phase
The p e r i o d s t a r t i n g a f t e r t h e e s t a b l i s h m e n t of t h e Design
Requirements B a s e l i n e (end of t h e D e f i n i t i o n Phase) u n t i l
t h e acceptance by t h e u s e r of t h e l a s t o p e r a t i n g u n i t i n a
c e r t a i n s e r i e s , and a l l r e q u i r e d u p d a t i n g changes r e s u l t i n g
from t h e t e s t i n g have been i d e n t i f i e d , approved, and i n c o r -
p o r a t e d , whichever o c c u r s l a t e r .

4.3 Aerospace Ground Equipment (AGE)


A l l equipments r e q u i r e d on t h e ground t o make a system, com-
mand and c o n t r o l system, s u p p o r t system, subsystem, o r end
i t e m of equipment o p e r a t i o n a l i n i t s i n t e n d e d environment.
T h i s i n c l u d e s a l l equipment r e q u i r e d to i n s t a l l , launch,
a r r e s t , guide, c o n t r o l , d i r e c t , i n s p e c t , test (other than
development t e s t s ) , a d j u s t , c a l i b r a t e , a p p r a i s e , gauge,
measure, assemble, d i s a s s e m b l e , h a n d l e , t r a n s p o r t , s a f e g u a r d ,
s t o r e , a c t u a t e , s e r v i c e , r e p a i r , o v e r h a u l , m a i n t a i n , o r oper-
a t e t h e system, subsystem, end i t e m o r component. T h i s d e f -
i n i t i o n a p p l i e s r e g a r d l e s s of t h e method of development,
funding o r procurement.
EXHIBIT XVlI

4.4 Apollo Program Specification


This specification is formated to include all system and
functional area design, development, test and qualification
requirements including software in a single document. This
specification is the basic reference for control of the
technical scope of the total system.
4.5 Change Proposal (See Exhibit 1x1
The document which proposes system/equipment changes in
accordance with applicable bulletins, regulations, and other
directives.
4.6 Change Proposal/Number (See Exhibit X)
The sequence number assigned to the change proposal in accor-
dance with the project office instructions.
4.7 Configuration
The complete technical description required to fabricate,
test, accept, operate, maintain, and logistically support
systems and equipment.
4.8 Configuration Accounting
Act of reporting and documenting changes made to systems/
equipment subsequent to the establishment of a baseline
configuration in order to maintain a configuration status.
Configuration Control
Systematic evaluation, coordination, and approval or dis-
approval of proposed changes to any baseline.
4.10 Configuration Control Board (CCB)
The functional body within the CMO of the Project Office
or equipment directorate, responsible for configuration
control. These boards will be chaired by the project
director or his designated representative. It is not a
voting board. The Program Director or a CCB chairman act-
ing on his behalf, is responsible for making all decisions
4.11 Configuration Identificatiz
The technical documentation defining the approved config-
uration of systems/equipment under design, development,
test and manufacturing.
EXHIBIT XVII

4.12 Configuration Identification Index


A document prepared initially during the design and devel-
opment period of system/equipment development, and continued
through the acquisition phase. The document is arranged in
tabular form and has provisions for inclusion of all changes
which result from contractor or program office action.
4.13 Configuration Iden'tificationNutnbers
The relationship of numbers which, individually or in combin-
ation, permit accurate selection of the configuration required
to perform a given function.
These numbers are:
a. CEI numbers
b. Part numbers
c. Change numbers
d. Manufacturer's code identification numbers
4.14 Configuration Management
The formal set of procedural concepts by which a uniform sys-
tem of configuration identification, control, and accounting
is established and maintained for all NASA systems/equipment
and components thereof.
4.15 Configuration Management Office (CMO)
The organization within the Project Office or equipment direc-
torate, which is responsible for the formalization, issuance
and maintenance of the three aspects of configuration manage-
ment - configuration identification, control, and accounting;
for the administration of the CCB; for the direction and super-
vision of the specification program; and for the transfer of
all configuration documentation as applicable.
4.16 Configuration Status
The official NASA documented indication of the actual config-
uration of a serially numbered system or equipment at any given
time in relation to an approved configuration.
4.17 Contract End Item (CEI)
An arbitrary designation for the portions of a system/equip-
ment identifiaction as a result of a formal functional anal-
ysis. It is a functional entity physically related and sel-
ected for the purpose of system development, procurement,
and logistics. The following criteria shall be used in the
selection of an end item:
EXHIBIT XVII

a. An end item shall be procurable by the government


to a single specification.
b, An end item shall be identified by a single top
drawing which has been prepared in conformance with
appropriate military specifications.
c. An end item shall be identified by a separate and
distinct part number and serial number.
d. The physical and functional characteristics of an
end item shall be such that its configuration can
be controlled and documented economically regard-
less of the number of changes approved and/or incor-
porated therein.
e. The location of the distinct/separate parts of an
end item should be such that they are not remotely
located with respect of one part to another, i.e.,
black boxes should be located in the same area AVE
system compartment, same maintenance area, etc.
f. By definition, magnetic tapes and card decks used
with checkout equipment are classified as end items
and subject to change control.
4.18 Contract End Item ~etailSpecification (Facility) (See
Exhibit 111)
The FCEI specification is composed of two distinct parts,
each of which has distinct and different uses in FCEI ac-
quisition. Part I, facility criteria, is a product of a
Program Definition Phase or requirements analysis, and is
the engineering instrument used to contract for design and
development of the FCEI. Part I1 of the FCEI specification,
the construction bid package (contract, plans and specifi-
cation), is a product of the design and development contract.
Part I1 specifies the FCEI in terms of the detailed product
configuration requirements of the facility suitable for
contracting actual facility construction.
4.19 Contract End Item Detail Specification (Identification
Item) (See Exhibit IV)
A CEI specification is prepared for each end item of equip-
ment categorized as an identification item. An "identifica-
tion item" is one which satisfies the following criteria:
a. It can be qualified by inspection and/or simple
demonstration.
b. Quality control at the production level can be the
basis for verification of quality, and acceptance
can be based on verification that the item conforms
to the drawings.
EXHIBIT XVII

c. Because of its use and simplicity of function and


design, few design changes are anticipated once
the product configuration baseline for the item is
established.
4.20 Contract End Item Detail Specification (Prime Equipment)
(See Exhibit 11)
The CEI (prime equipment) specification specifies designs,
development, test and acceptance requirements for a single
CEI type-model-series, which cannot be defined be the sim-
plified formats of an identification specification or a
requirements specification. The CEI specification is com-
posed of two distinct parts each of which has distinct and
different uses in the contractual control of CEI acquisi-
tion. Part I is a product of a Program Definition Phase
or requirements analysis, and is the engineering instrument
used to contract for design and development of the CEI.
Part I1 of the CEI specification is a product of the design
and development contract. Part I1 specifies the CEI in
terms of the detail product configuration requirements of
the item qualified (or to be qualified) under the terms and
conditions of the design and development contract.
4.21 Contract End Item Detail Specification (Requirement Items)
(See Exhibit V)
A CEI specification is prepared for each end item of equip-
ment categorized as a requirement item. A "requirement
item" is one which satisfies the following criteria:
a. It has been developed.
b. It is in NASA inventory.
c. It is required to support an item or items being devel-
oped, either to be used with, or to be assembled into,
that itern(s1.
Contract End Item Number
The CEI number is a permanent number assigned by the con-
tractor to identify a contract end item,
4.23 Critical Design Review (CDR)
The critical design review is a formal technical review of
the design of a contract end item (CEI). The CDR is accom-
plished when the detail design is essentially complete in
order to formally establish the design as the basis for
supporting activities, e.g., preparation of provisioning
documentation preparation of technical manuals, actual pro-
visioning of initial spares, etc. The primary product of
the CDR is formal identification and NASA approval of speci-
fic engineering documentation which defines the design of
the CEI, and which will be released for manufacturing of the
unit that establishes the product configuration baseline
("first article", or equivalent).
EXHIBIT XVII

4.24 Definition Phase


The period preceding the Acquisition Phase, during which
the Apollo Program Specification is completed and Part I
of the end item specification is completed.
4.25 Design Requirements Baseline
The design requirements baseline is established at the
beginning of the Acquisition Phase and consists of the com-
posite of design requirements for a single contract end item
contained in an approved Part I to the detail specification
for the CEI. Part I of the specification for essentially
all CEI's is available at a single point in time, the design
requirements baseline for all CEI's can be clearly identified
as a system baseline.
4.26 Detail Specification (Critical Components) (See Exhibit VI)
Detail specifications are required for components which have
been identified in a contract end item detail specification
as "engineering critical components" and/or "logistic criti-
cal components".
4.27 Direct Support Real Property Installed ~quipment (DS-RPIE)
Individual RPIE items of equipment, systems or subsystems that
are essential to the launching and guidance of a space vehicle,
the absence of which would preclude the system's performing
its assigned mission.
4.28 Effectivity
The specific contract end item family and serial number(s)
to which part numbers, ECP's, CCN's, DD 250's waiver docu-
ments, etc., are addressed.
4.29 Engineering Critical Components
Components of a CEI are designated engineering critical.
when :
a. Qualification of the component will suffice to
qualify the entire CEI.
b. Reliability of the component is critical, i.e., it
will jeopardize crew safety, mission success, or
significantly affect the ability of the CEI to per-
form its overall functions.
c. Technical complexity and/or producibility is suffi-
ciently critical to warrant an individual specifica-
tion, and the CEI cannot be adequately qualified
except by separately qualifying the component.
EXHIBIT X V I I

4.30 Engineering Data


Engineering documents such a s s p e c i f i c a t i o n s , drawings,
s t a n d a r d s , l i s t s , o r o t h e r i n f o r m a t i o n prepared by a d e s i g n
a c t i v i t y r e l a t i n g t o t h e d e s i g n , manufacture, procurement,
reprocurement, t e s t , o r i n s p e c t i o n of items and s e r v i c e s .

4.31 Engineering R e l e a s e Record


The o f f i c i a l d a t a f i l e which r e c o r d s and i n t e r r e l a t e s
e n g i n e e r i n g d a t a , and changes t h e r e t o , which t e c h n i c a l l y
d e s c r i b e and a r e t o b e o r have been used t o b u i l d , o p e r a t e
and m a i n t a i n equipments, f a c i l i t i e s and systems.
4.32 F i e l d Release
The r e l e a s e of e n g i n e e r i n g d a t a which changes f o r m a l l y
accepted equipment which i s under t h e j u r i s d i c t i o n of a
c o n t r a c t o r and i s p r o g r e s s i n g through f i e l d t e s t i n g o r an
a c t i v a t i o n program.
4.33 F i r s t A r t i c l e c o n f i g u r a t i o n I n s p e c t i o n (FACI)
The F i r s t A r t i c l e C o n f i g u r a t i o n I n s p e c t i o n (FACI) i s a formal
t e c h n i c a l review which e s t a b l i s h e s t h e p r o d u c t c o n f i g u r a t i o n
b a s e l i n e f o r t h e c o n t r a c t end i t e m . The primary p r o d u c t of
t h e FACI i s formal a c c e p t a n c e , by t h e p r o c u r i n g agency, of
P a r t I1 of t h e end i t e m d e t a i l s p e c i f i c a t i o n a s an a u d i t e d
and approved document.
Ground I n s t r u m e n t a t i o n Equipment ( G I E )
That equipment used f o r a c q u i r i n g and r e c o r d i n g any measure-
ment parameter concerning performance and environmental d a t a
of t h e Space V e h i c l e Equipment.
4.35 Interface
A r e g i o n common t o two o r more e l e m e n t s , systems, p r o j e c t s
o r programs, c h a r a c t e r i z e d by mutual p h y s i c a l , f u n c t i o n a l
and p r o c e d u r a l p r o p e r t i e s . S p e c i f i c a l l y , an Apollo ( I n t e r -
C e n t e r ) i n t e r f a c e i s r e s t r i c t e d t o Apollo/Saturn Space Vehi-
cles and s u p p o r t i n g equipment; i s c o n t r o l l e d by an Apollo
I n t e r - C e n t e r C o o r d i n a t i o n P a n e l and a f f e c t e d Center Level I1
C o n f i g u r a t i o n C o n t r o l Boards ( C C B v s ) ; and a f f e c t s t h e concerned
i n t e r f a c i n g C e n t e r s and/or t h e i r c o n t r a c t o r s .
I n t e r f a c e C o n t r o l Documents ( I C D v s )

I C D ' s a r e e i t h e r drawings o r documentation t h a t r e c o r d t h e


compatible d e s i g n r e l a t i o n s h i p s between two o r more i n t e r -
f a c i n g end-item d e s i g n s .
EXHIBIT X V I I

4.37 I n t e r f a c e Revision Notice ( I R N )

A n I R N i s a s t a n d a r d form used by t h o s e o r g a n i z a t i o n s respon-


s i b l e f o r I C D completion o r maintenance t o r e c o r d changes t o
an approved I C D o r I R N .
4.38 L o g i s t i c C r i t i c a l Components
Components of a CEI a r e d e s i g n a t e d l o g i s t i c c r i t i c a l when:

a. Replacement o r r e p a i r of t h e component i s complicated


by s h o r t supply o r long l e a d time.
b. A t a s p a r e s s e l e c t i o n conference, NASA i d e n t i f i e s t h e
component f o r m u l t i p l e s o u r c e procurement o r r e p r o -
curement .
4.39 Maintenance Support Equipment (MSE)

That AGE r e q u i r e d t o r e s t o r e a system o r end i t e m t o opera-


t i n g c o n d i t i o n . MSE i n c l u d e s equipment t o perform such func-
t i o n s a s i n s p e c t , a d j u s t , c a l i b r a t e , h a n d l e , t r a n s p o r t , remove,
i n s t a l l , r e p a i r , assemble, and disassemble.
4.40 Modification
A m o d i f i c a t i o n i s a change t o systems/equipment and s p a r e s
approved a f t e r t h e u p d a t i n g changes a r e i d e n t i f i e d , approved,
and p l a c e d on c o n t r a c t .
4.41 M u l t i p l e Release
An e n g i n e e r i n g r e l e a s e r e c o r d o r a c t i n which superseded and
superseding i n f o r m a t i o n a r e both r e t a i n e d . E f f e c t i v i t i e s
f o r superseded p a r t s a r e coded a s a r e f e r e n c e r e l e a s e (no
manufacture o r procurement) and r e t a i n e d on t h e r e c o r d along
with t h e e f f e c t i v i t i e s f o r s u p e r s e d i n g p a r t s , coded a s a
requirements r e l e a s e (manufacture o r procurement r e q u i r e d ) .
The sum of l i m i t e d e f f e c t i v i t i e s f o r superseded p a r t s and
t h e e f f e c t i v i t i e s of t h e s u p e r s e d i n g p a r t should e q u a l t h e
o r i g i n a l complete e f f e c t i v i t y .
4.42 NASA Engineering R e s p o n s i b i l i t y
A c c o u n t a b i l i t y f o r t h e i n t e g r i t y of d e s i g n , development,
and performance of NASA systems/equipment.

4.43 Operating Support Equipment (OSE)

That Aerospace Ground Equipment (AGE) which i s a f u n c t i o n a l


p a r t of a system which o p e r a t e s w i t h t h e Space V e h i c l e (SVE)
o r end i t e m a s an e s s e n t i a l o p e r a t i n g element t h e r e o f . OSE
a l s o i n c l u d e s i d e n t i c a l equipment r e q u i r e d i n t h e f a c t o r y t o
check o u t t h e Space V e h i c l e .
EXHIBIT XVII

Operational Engineering
The engineering required to evaluate and resolve problems
revealed by operational flight missions.
Operational Phase
The period from acceptance by the user of the first opera-
ting unit until launch. The operational phase overlaps
the acquisition phase.
Operational Use
For the purpose of this manual, applying to the items of
systems/equipment necessary to fulfill mission requirements.
Preliminary ~esignReview (PDR)
This is a formal, technical review of the basic design ap-
proach for a contract end item. The PDR is accomplished
prior to, or very early in, the detail design phase in order
to establish the system compatibility of the design approach.
The primary product of a preliminary design review is formal
identification of specific engineering documentation which
establishes the physicial and functional interface relation-
ship of the CEI to other system equipment/facilities.
Preliminary Interface Revision Notice (PIRN)
An IRN is "preliminary" (PIRN) until approved by Inter-Center
Panel Co-Chairmen and by affected Center Level I1 CCB's through
officially issued CCBD's. It then becomes an official change
to the parent ICD.
Prime Equipment Item
The more complex contractor designed contract end items that
require extensive functional tests while in the assembled
condition.
Product Configuration Baseline
The technical description comprised of the CEI specification
and applicable engineering drawings, against which the First
Article Configuration Inspection (FACI) is performed, will,
upon satisfactory completion of the inspection, constitute
the product configuration baseline for the CEI series.
Production Release
The engineering release of a production or construction
drawing for manufacture, construction or procurement of the
items thereon, and for their incorporation in CEI's by other
than service action.
EXHIBIT X V I I

4-52 Program Element

A p o r t i o n of a system which performs a s i n g l e major func-


t i o n i n c l u d i n g one o r more c o n t r a c t end items, and i s norm-
a l l y a s s i g n e d a s i n g l e c o n t r a c t o r f o r i n t e g r a t e d d e s i g n and
development, e . g . , p r o p u l s i o n , guidance, f a c i l i t i e s , commun-
ication, etc.
4.53 Real P r o p e r t y I n s t a l l e d Equipment (RPIE)
Non-expendable equipment which has been purchased and i n s t a l l e d
by t h e c o n s t r u c t i o n c o n t r a c t o r through Government C o n s t r u c t i o n
A p p r o p r i a t i o n s and i n c l u d e d i n o r on r e a l p r o p e r t y .
4.54 Reference Release

A n e n g i n e e r i n g r e l e a s e r e c o r d o r a c t i n which t h e i t e m re-
l e a s e d i s coded t o i n d i c a t e t h a t no manufacture o r procure-
ment i s r e q u i r e d . Used f o r s p e c i f i c a t i o n s , i n t e r f a c e drawings
and o t h e r i t e m s which a r e p a r t of t h e e n g i n e e r i n g documLentation
b u t which do n o t r e q u i r e p r o d u c t i o n , and f o r m u l t i p l e r e l e a s e s .
4.55 Released Engineering

The c u r r e n t and t o t a l s e t of drawings and s p e c i f i c a t i o n s f o r


a p r o d u c t which have been completed, f o r m a l l y r e c o r d e d , and
made a v a i l a b l e f o r manufacturing and/or procurement.
4.56 Requirements ECP
An ECP which proposes changes t o t h e requirements c o n t a i n e d
i n s p e c i f i c a t i o n s p r e p a r e d i n accordance w i t h E x h i b i t I .
4.57 Requirements Release

An e n g i n e e r i n g r e l e a s e r e c o r d o r a c t i n which t h e items re-


l e a s e d a r e coded t o i n d i c a t e t h a t manufacture o r procurement
i s r e q u i r e d a s a u t h o r i z e d by c o n t r a c t .
4.58 Space Vehicle Equipment (SVE)

That equipment which becomes a i r b o r n e a f t e r a launch and


i n c l u d e s t h e launch v e h i c l e , a s w e l l a s t h e s p a c e c r a f t .
4.59 S y n t h e t i c Number o r Code
A number o r code a s s i g n e d t o a p r o d u c t i o n assembly, s t a t i o n ,
o r s t a t u s , which i s o t h e r t h a n a p a r t o r assembly d e f i n e d
and i d e n t i f i e d on an e n g i n e e r i n g drawing.
EXHIBIT X V I I

4.60 System Requirements B a s e l i n e

T h i s b a s e l i n e i s d e f i n e d by t h e A p o l l o Program S p e c i f i c a t i o n .
The approved performance r e q u i r e m e n t s c o n t a i n e d i n t h e Pro-
gram S p e c i f i c a t i o n s h a l l e s t a b l i s h t h e system r e q u i r e m e n t s
b a s e l i n e f o r t h e D e f i n i t i o n Phase.

4.61 T r a i n i n g Equipment (TRE)

TRE i s d e f i n e d a s t h e equipment r e q u i r e d t o t r a i n government


( i n c l u d i n g a s t r o n a u t s ) and/or c o n t r a c t o r p e r s o n n e l i n o r d e r
t h a t t h e y can perform t h e i r f u n c t i o n s i n accomplishing m i s -
sion objectives.

4.62 Uniform S p e c i f i c a t i o n

The complete c o n t r a c t end i t e m t e c h n i c a l d e s c r i p t i o n used


f o r p r o d u c t i o n r e l e a s e and c o n f i g u r a t i o n management. It
w i l l i n c l u d e t h e r e f e r e n c e d m i l i t a r y and c o n t r a c t o r s p e c i f i -
c a t i o n s , documents, e n g i n e e r i n g drawings, p r o d u c t i o n t e s t
r e q u i r e m e n t s , and c o r r e s p o n d i n g p r o d u c t i o n tests. These
s p e c i f i c a t i o n s w i l l r e s u l t from t e c h n i c a l d a t a c r e a t e d i n
t h e development program.

4,63 Uniform S p e c i f i c a t i o n Program (See E x h i b i t s I through V I I )

The c o n c e p t of t h e Uniform S p e c i f i c a t i o n Program (USP) i s


based on t h e f a c t t h a t t h e system/equipment i s n o t procured
by s i n g l e i d e n t i f i a b l e s y s t e m s , b u t r a t h e r by s e p a r a t e end
i t e m s of c o n t r a c t o r p e c u l i a r i t e m s , and commercial " o f f t h e
s h e l f " items. I t i s r e c o g n i z e d t h a t an end i t e m s p e c i f i c a -
t i o n program must be c o r r e l a t e d w i t h system procurement
programs and methods. T h e r e f o r e , a b a s i c a c t i o n of t h e USP
i s t h e p r e p a r a t i o n of c o n t r a c t end i t e m d e t a i l s p e c i f i c a t i o n s
f o r each p r o v i s i o n a l end i t e m of t h e program. The u t i l i z a -
t i o n of t h e c o n t r a c t end item d e t a i l s p e c i f i c a t i o n t h u s de-
r i v e d s h a l l be a s follows:

a. D e t e r m i n a t i o n of o v e r a l l system performance f o r
operational use.
b. R i g i d c o n t r o l by t h e C o n f i g u r a t i o n C o n t r o l Board
(CCB) .
c. Acceptance of end i t e m s by NASA.
d. Complete i d e n t i f i c a t i o n of s p e c i f i c a t i o n s c o v e r i n g
a l l end i t e m s r e q u i r e d t o s u p p o r t t h e program.
e. S u p p o r t reprocurement of i d e n t i c a l end items where
r e q u i r e d , o r s i m i l a r end i t e m s i f e x a c t d u p l i c a t i o n
of performance i s n o t c r i t i c a l .
EXHIBIT X V I I I

PREPARATION OF
CONTRACT END I T E K DETAIL SPECIFICATION
(COMPUTER PROGRAM)
EXHIBIT X V I I I

PREPARATION O F
CONTRACT END I T E M DETAIL S P E C I F I C A T I O N
(COMPUTER PROGRAM)

CONTENTS

Paragraph Page

1. PURPOSE .............................X V I I I - 1
2. SCOPE ............................... X V I I I - 1
3. APPLICABILITY.......................XVIII-2
4. APPLICABLE DOCUMENTS................XVIII-2
5. EXPLANATION O F TERMS................XVIII-2
6. PROCEDURAL REQUIREMENTS .............X V T I I - 2

- ILLUSTRATIONS
FO-PJWTS AND
Sample F o r m a t "A", C o n t r a c t E n d I t e m D e t a i l Speci-
fication (Computer Program) .........
XVIII-15
Sample F o r m a t " B " , C o n t r a c t E n d I t e m D e t a i l Speci-
fication (Computer Program) ......... XVIII-16
S a m p l e F o r m a t " C " , G e n e r a l O u t l i n e of C P C E I Speci-
f i c a t i o n P a r t I.....................XVIII-17
S a m p l e F o r m a t "D" , G e n e r a l O u t l i n e of C P C E I Speci-
f i c a t i o n P a r t II....................XVIII-28
Sample F o r m a t "En, C o n t r a c t End I t e m D e t a i l S p e c i -
.........
fication (Computer Program)
S a m p l e F o r m a t "F" . Addendum
XVIII-29
N o t i c e . .... . X V I I I - 3 2
EXHIBIT X V I I I

PREPARATION OF
CONTRACT END ITEM DETAIL SPECIFICATION
(COMPUTER PROGRAM)

1. PURPOSE

T h i s e x h i b i t p r o v i d e s i n s t r u c t i o n s f o r t h e p r e p a r a t i o n of t h e
d e t a i l e d s p e c i f i c a t i o n f o r e a c h computer program c o n t r a c t end
i t e m (CPCEI) and f o r any n e c e s s a r y addenda t h e r e t o .

2. SCOPE

These i n s t r u c t i o n s a r e a p p l i c a b l e t o t h e s p e c i f i c a t i o n
f o r end i t e m s c a t e g o r i z e d a s "computer program". The
i n s t r u c t i o n s c o n t a i n e d h e r e i n d e f i n e t h e c o n t e n t and
f o r m a t f o r e a c h of t h e two p a r t s of t h e CPCEI d e t a i l
s p e c i f i c a t i o n . Aiso included a r e i n s t r u c t i o n s f o r t h e
p r e p a r a t i o n o f addenda t o t h e CPCEI s p e c i f i c a t i o n .

2.1 CPCEI S p e c i f i c a t i o n

The computer program c o n t r a c t end i t e m (CPCEI)


s p e c i f i c a t i o n i s t h e d e t a i l e d s p e c i f i c a t i o n of
computer programs which have been d e s i g n a t e d a s
end i t e m s by t h e p r o c u r i n g agency. The two p a r t s
t o t h e CPCEI s p e c i f i c a t i o n a r e :

Part I - Performance and Design Requirements:

This paxt i s used t o s p e c i f y require-


ments p e c u l i a r t o t h e d e s i g n , development,
t e s t , and q u a l i f i c a t i o n o f t h e CPCEI.
P a r t I i s u s u a l l y a p r o d u c t of t h e
d e f i n i t i o n p h a s e and i s u s e d t o c o n t r a c t
f o r t h e d e s i g n and development of t h e CPCEI.

P a r t I1 - Computer Program T e c h n i c a l ~ e s c r i p t i o n :

The P a r t I1 s p e c i f i c a t i o n i s t h e d e t a i l e d
t e c h n i c a l d e s c r i p t i o n of a CPCEI a s
a c t u a l l y implemented by t h e c o n t r a c t o r .
The P a r t I1 s p e c i f i c a t i o n i s a p r o d u c t
o f a program a c q u i s i t i o n p h a s e and i s one
of t h e i n s t r u m e n t s u s e d f o r CPCEI
acceptance. The P a r t I1 s p e c i f i c a t i o n
d e f i n e s t h e product c o n f i g u r a t i o n base-
EXHIBIT XVIII

line. It also serves as an instrument for sub-


sequent use by in service and/or contractor
personnel in diagnosing trouble, making adap-
tation changes, and designing modifications to
the CPCEI .
2.2 Specification Addenda
An addendum to a CPCEI specification establishes requirements
for a new end item which, in terms of performance and design,
is so much like an existing CPCEI that it is desirable to
refer to an existing specification on an "add" and "delete"
basis.
3. APPLICABILITY
This exhibit is applicable to NASA agencies and NASA contractors
responsible for the development of computer programs which are
classified as end items. Guidelines for the selection of end items
are given in Exhibit XI. Each contractor to the Goverpent shall
be responsible for compliance by his subcontractors, vendors, and
suppliers to the extent that his subcontractors, vendors, and sup-
pliers participate in the preparation of this type of specification.
4. APPLICABLE DOCUMENTS
DSM 4120.3-M 1 April 1966 "Standardization Policies, Pro-
cedures and Instructions"
Exhibit X "Requirements for Configuration
Identification Numbers"
MIL-STD-480 30 October 1968 "Configuration Control - Engineerinc
Changes, Deviations and Waivers"
5. EXPLANATION OF TERMS
(See Exhibit XVII)
6. PROCEDURAL REQUIREMENTS
These procedures are based on the policies and practices of the
procuring agency for configuration management. It is recommended
that contractors review these policies and practices as part of
implementing the procedural requirements in this exhibit.
6.1 Computer Program Contract End Item Detail Specification
The CPCEI specification defines requirements for a computer
program that has been identified as a CPCEI. The CPCEI speci-
fication is composed of two distinct parts. Each of which has
distinct and different uses in the contractual control of CPCEI ac-
quisition. Each of the two parts, when prepared to comply with
EXHIBIT X V I I I

t h e s e i n s t r u c t i o n s , i s complete i n c o n t e n t and f o r m a t w i t h
r e s p e c t t o i t s i n t e n d e d u s e . The CPCEI s p e c i f i c a t i o n
i s c o n t r o l l e d and accounted a s an e n t i t y , u s i n g a s i n g l e
end i t e m c o n f i g u r a t i o n c h a r t , and a s i n g l e s p e c i f i c a t i o n
change l o g . (See E x h i b i t V I I )
P a r t I i s a p r o d u c t of a program d e f i n i t i o n phase o r
r e q u i r e m e n t s a n a l y s i s and i s t h e t e c h n i c a l r e q u i r e m e n t s
document used t o c o n t r a c t f o r d e s i g n and development of
t h e CPCEI. C o n t r a c t o r compliance w i t h P a r t I i s d e t e r -
mined by e v a l u a t i o n of q u a l i f i c a t i o n and o t h e r t e s t
r e c o r d s . The P a r t I s p e c i f i c a t i o n d e s c r i b e s i n
m a t h e m a t i c a l , l o g i c a l , and o p e r a t i o n a l language a l l
of t h e d e t a i l n e c e s s a r y t o i n i t i a t e and c a r r y o u t t h e
d e s i g n of a r e q u i r e d computer program c o n t r a c t end i t e m .
I n a d d i t i o n t o p r o v i d i n g t h e primary " d e s i g n t o " g u i d e
f o r t h e computer programming d e s i g n and development
e f f o r t d u r i n g t h e a c q u i s i t i o n p h a s e , t h i s document pro-
v i d e s ( a ) t h e b a s i s f o r a p p r o v a l by t h e p r o c u r i n g and
u s i n g a g e n c i e s of t h e f i n e d e t a i l of t h e performance of
t h e computer programs t o b e d e v e l o p e d , ( b ) t h e i n s t r u m e n t
which d e f i n e s a l l e s s e n t i a l i n t e r f a c e s w i t h o t h e r com-
p u t e r programs, equipment, and communications l i n k s ,
( c ) t h e d i r e c t b a s i s f o r t h e development of s u p p o r t
documentation a s s o c i a t e d w i t h o p e r a t i o n and u s e of t h e
computer program, and (d) t h e b a s i c v e h i c l e f o r con-
f i g u r a t i o n c o n t r o l o f t h e d e s i g n o f t h e CPCEI t h r o u g h o u t
a c q u i s i t i o n and o p e r a t i o n a l p h a s e s of t h e system c y c l e .
P a r t I1 of t h e CPCEI s p e c i f i c a t i o n i s a p r o d u c t of t h e
a c q u i s i t i o n phase. I t p r o v i d e s a complete t e c h n i c a l
d e s c r i p t i o n of t h e CPCEI f u n c t i o n s , s t r u c t u r e s , o p e r a t i n g
environment, and c o n s t r a i n t s , d a t a o r g a n i z a t i o n , diagram-
m a t i c / n a r r a t i v e f l o w s , and s o u r c e statement/machine
language l i s t i n g s . P a r t I1 must be i d e n t i c a l t o t h e
a c t u a l CPCEI which r e s u l t s from t h e c o n t r a c t o r ' s develop-
mental work d u r i n g t h e a c q u i s i t i o n p h a s e , and which i s
q u a l i f i e d ( o r t o be q u a l i f i e d ) under t h e t e r m s and con-
d i t i o n s of t h e c o n t r a c t a s meeting t h e d e t a i l e d performance
r e q u i r e m e n t s i n i t i a l l y s p e c i f i e d i n P a r t I of t h e C P C E I
d e t a i l S p e c i f i c a t i o n . The i n t e g r i t y of P a r t I1 i s e s t a b -
l i s h e d by F i r s t A r t i c l e C o n f i g u r a t i o n I n s p e c t i o n (FACI)
p r i o r t o i t s a c c e p t a n c e by t h e p r o c u r i n g agency. Accep-
t a n c e i s dependent upon t h e a c c u r a c y and completeness w i t h
which i t d e s c r i b e s b o t h t h e g r o s s and d e t a i l e d s t r u c t u r e
and f u n c t i o n i n g of t h e computer program.

6.2 Addenda t o Computer Program C o n t r a c t End I t e m D e t a i l


Specifications
EXHIBIT X V I I I

O r i g i n a t i o n of an addendum t o a CPCEI d e t a i l s p e c i f i c a -
t i o n c r e a t e s a new s p e c i f i c a t i o n . I t i s u s e d when a n
i t e m t o be d e s i g n e d and d e v e l o p e d i s s o l i k e an e x i s t i n g
CPCEI t h a t it i s d e s i r a b l e t o r e s t r i c t d e s i g n a c t i v i t y
t o " e n g i n e e r t o t h e same c r i t e r i a , w i t h t h e s e a d d i t i o n s /
deletions." An addendum changes a b a s i c CPCEI d e t a i l
s p e c i f i c a t i o n by a d d i n g o r . d e l e t i n g r e q u i r e m e n t s on a
paragraph-by-paragraph b a s i s . Addenda s h a l l be i d e n -
t i f i e d w i t h a s p e c i f i c i s s u e of a b a s i c s p e c i f i c a t i o n .
The s p e c i f i c a t i o n s o c r e a t e d ( b a s i c s p e c i f i c a t i o n p l u s
addenda) t h e n becomes c o n t r o l l e d and m a i n t a i n e d a s a
s e p a r a t e and d i s t i n c t s p e c i f i c a t i o n , t o be u p d a t e d and
r e v i s e d a s n e c e s s a r y , i n d e p e n d e n t of changes t o t h e
b a s i c s p e c i f i c a t i o n from which it was c r e a t e d .

6.3 D e t a i l e d I n s t r u c t i o n s f o r t h e P r e p a r a t i o n o f t h e CPCEI
Specification

The c o n t e n t s of t h e CPCEI S p e c i f i c a t i o n s h a l l b e a r r a n g e d
i n a c c o r d a n c e w i t h t h e f o r m a t and p a r a g r a p h h e a d i n g s
g i v e n i n 6 . 3 . 1 ( P a r t I ) and 6.3.2 ( P a r t 11) . General
d e v i a t a t i o n s from t h e r e q u i r e m e n t s of t h i s e x h i b i t r e q u i r e
p r i o r a p p r o v a l of t h e p r o c u r i n g agency. Each CPCEI
d e t a i l s p e c i f i c a t i o n which d e v i a t e s from t h e g e n e r a l r e -
q u i r e m e n t s of t h i s e x h i b i t s h a l l c i t e , i n S e c t i o n 10
"Appendix", t h e p r o c u r i n g agency i n s t r u m e n t a u t h o r i z i n g
t h e d e v i a t i o n . F o r c o n v e n i e n c e i n d e s c r i b i n g t h e minimum
e s s e n t i a l c o n t e n t , t h e p a r a g r a p h s o u t l i n e d i n 6 . 3 . 1 and
6.3.2 a r e a r r a n g e d i n a f o r m a t which s h a l l a p p l y i f t h e
s p e c i f i c a t i o n i s t o b e i s s u e d a s a s i n g l e document. How-
e v e r , e a c h p a r t of t h e s p e c i f i c a t i o n r e q u i r e d f o r a l a r g e
computer program i s t y p i c a l l y t o o complex and b u l k y
t o b e p u b l i s h e d and d i s t r i b u t e d p h y s i c a l l y i n one bound
volume. I n t h i s c a s e , e a c h p a r t may b e a r r a n g e d
i n t o s e p a r a t e volumes c o r r e s p o n d i n g t o i n d i v i d u a l
f u n c t i o n a l e l e m e n t s , o r a s d e t e r m i n e d by m u t u a l a g r e e -
ment between t h e c o n t r a c t o r and t h e p r o c u r i n g agency
t o m e e t t h e r e q u i r e m e n t s of a p a r t i c u l a r s y s t e m .

Note: I n t h e d e s c r i p t i o n s t o f o l l o w , t h e t e r m "computer
program component" (CPC) i s u s e d t o d e n o t e t h e s e p a r a t e l y
produced subprograms which c o m p r i s e a CPCEI. These sub-
programs a r e u s u a l l y s e p a r a t e l y c o m p i l a b l e , p e r f o r m a
s p e c i f i e d f u n c t i o n o r s e t of f u n c t i o n s t h a t a r e r e l a t e d ,
and a r e produced by a s i n g l e programmer. The P a r t I1
S p e c i f i c a t i o n c o n t a i n s a d e t a i l e d d e s c r i p t i o n of each
CPC i n a CPCEI and d e n o t e s t h e r e l a t i o n s h i p between them.
EXHIBIT X V I I I

6.3.1 CPCEI P a r t I S p e c i f i c a t i o n

his s u b p a r a g r a p h c o n t a i n s a d e s c r i p t i o n o f
t h e p a r a g r a p h h e a d i n g s of a CPCEI P a r t I
Specification.

r e f e r e n c e d t o Sample Format "A" :

" S p e c i f i c a t i o n Number" An i d e n t i f i e r u n i q u e , w i t h i n
t h e s y s t e m , t o t h i s CPCEI.
(See E x h i b i t X. ) For
CPCEI's, t h e f i r s t two ( 2 )
c h a r a c t e r s ( t h e p r e f i x code)
s h a l l be "CG".

"Revision I d e n t i f i c a t i o n " Sequentially assigned character (s)


t o uniquely i d e n t i f y each re-
v i s i o n of t h e s p e c i f i c a t i o n .
" R e l e a s e Date" Date f o r m a l l y r e l e a s e d by t h e
p r e p a r i n g agency,.

Note: The s p e c i f i c a t i o n number and r e v i s i o n i d e n t i f i c a t i o n may


be composed of e i t h e r , o r b o t h , a l p h a and/or numeric c h a r -
a c t e r s . Under no c i r c u m s t a n c e s s h a l l t h e combination o f
s p e c i f i c a t i o n number and r e v i s i o n i d e n t i f i c a t i o n exceed 15
characters. (See E x h i b i t X ) .
C o n t r a c t End I t e m Number.
(See E x h i b i t X . )

"Approved Nomenclature" I n accordance w i t h E x h i b i t X


and s t a n d a r d p r a c t i c e .

"System I d e n t i f i c a t i o n " L i s t t h e s y s t e m o r s y s t e m s which


t h e CPCEI i s d e s i g n e d t o s u p p o r t .
F o r CPCEIs which c a n n o t be i d e n -
t i f i e d with s p e c i f i c systems, e n t e r
t h e p h r a s e "Not System Computer
Programs".

The t i t l e page s h a l l be f o l l o w e d by i n t r o d u c t o r y m a t e r i a l a s
a p p r o p r i a t e , i n c l u d i n g t h e End I t e m C o n f i g u r a t i o n C h a r t and t h e
S p e c i f i c a t i o n Change Log.
EXHIBIT XVIII

Intro.du.ctdryPag.e."- (Par.tI''o'fCPCEI''Spec.if'i'c'a't'i'on
) -
The introductory- page
- -
shall conform to the format of
Sample Format "B". The identifying information appear-
ing on this page shall be identical to the respective
element of information appearing on the CEI specifi-
cation title page. The preparing activity and the
NASA office with computer program responsibility for
the CPCEI shall validate the basic Part I in the ap-
proval blocks. A general outline of the following
paragraphs is given in Sample Format "C".

Section'l, "Scope" - This section of the CPCEI specifi-


cation shall begin with the following opening phrase:
"This part of this specification establishes the re-
quirements for performance, design, test, and qualifi-
cation of a CPCEI identified as (insert nomenclature
and contract end item number). This CPCEI is used to
(provide) (accomplish) ....
This CPCEI requires
...." Subsequent sentence-paragraph(s) shall contain
a summary of the purpose of the specification, a brief
description of the functions to be performed, and a
brief summary of the content and composition of the
specification.

Section 2, "Applicable Documents" - This section of


the CPCEI specification shall begin with the following
lead phrase: "The following documents, of exact issue
shown, form a part of this specification to the extent
specified herein. In the event of conflict between
documents referenced here and the detailed content of
Sections 3, 4, and 10, the detailed requirements in
Sections 3, 4, and 10 shall be considered superseding
requirements." Those documents (specifications,
standards, drawings, bulletins, manuals, etc.) which
are applicable to paragraphs within other sections
of the specifications shall be listed. Within the
body of the specification, reference to those docu-
ments shall be by reference to their basic document
number or other definitive designation. The format
in listing the applicable documents shall comply with
the Defense Standardization Manual 4120.3-M.

Section 3, '"Requirement's"- This section shall con-


tain performance and design requirements for the
CPCEI: This section shail include the functional
requirements for the CPCEI and establish those
requirements which will be used for verifica-
EXHIBIT X V I I I

tiion d u r i n g test. T h i s s e c t i o n s h a l l d e f i n e t h e CPCEI and


s p e c i f y d e s i g n c o n s t r a i n t s and s t a n d a r d s n e c e s s a r y t o a s s u r e
c o m p a t i b i l i t y of t h e CPCEI w i t h o t h e r computer programs and
equipments. Performance and d e s i g n requirements i n c l u d e d
h e r e i n a r e a l l o c a t e d from, i d e n t i c a l w i t h , o r i n r e c o g n i t i o n
o f , requirements e s t a b l i s h e d by t h e system s p e c i f i c a t i o n .
Requirements i n c l u d e d i n t h e system s p e c i f i c a t i o n , which
a r e d i r e c t l y r e l a t e d t o requirements s p e c i f i e d h e r e i n , s h a l l
be i n c o r p o r a t e d by r e f e r e n c e . Requirements s h a l l be s p e c i -
f i e d t o t h e l e v e l of d e t a i l n e c e s s a r y t o e s t a b l i s h l i m i t s
f o r d e s i g n . Q u a n t i t a t i v e requirements s h a l l be s p e c i f i e d
w i t h i n t h e t h r e e p r i n c i p a l subparagraphs i n c l u d e d h e r e i n .
General and d e s c r i p t i v e m a t e r i a l may,be i n c l u d e d i n t h e
b a s i c S e c t i o n 3.
Paragraph 3.1, "Performance" - T h i s paragraph s h a l l s p e c i f y
t h e f u n c t i o n a l r e a u i r e m e n t s of t h e CPCEI. Q u a n t i t a t i v e re-
quirements s h a l l 6e s p e c i f i e d w i t h i n t h e p r i n c i p a l sub-
paragraphs i n c l u d e d h e r e i n . General and d e s c r i p t i v e m a t e r i a l
may be i n c l u d e d i n b a s i c paragraph 3.1. B

Paragraph 3.1.1, "System Requirements" - T h i s paragraph s h a l l


s p e c i f y t h e l i m i t s and/or c a p a c i t i e s of t h e CPCEI performance.
Requirements s p e c i f i e d h e r e i n a r e t h e p r o d u c t of a n a l y s i s ,
a s w e l l a s t h o s e c o n t a i n e d i n t h e system s p e c i f i c a t i o n . These
c h a r a c t e r i s t i c s a r e t h e performance parameters which must be
s p e c i f i e d t o c o n s t r a i n d e s i g n w i t h i n requirements e s t a b l i s h e d
by primary mission/use of t h e CPCEI, e . g . , f o r a s p a c e t r a c k -
i n g system; t h i s could i n c l u d e t r a c k c a p a c i t y , number and t y p e
of i n p u t s p r o c e s s e d , e t c . Requirements i n c l u d e d h e r e i n s h a l l
be s t a t e d i n q u a n t i t a t i v e t e r m s , w i t h t o l e r a n c e s where a p p l i -
cable.
Paragraph 3.1.2, " O p e r a t i o n a l Requirements" - This paragraph
s h a l l s p e c i f y , i n subparagraphs d e f i n e d below, t h e o p e r a t i o n a l
requirements of t h e CPCEI. Requirements s h a l l be s t a t e d i n
q u a n t i t a t i v e t e r m s , w i t h t o l e r a n c e s where a p p l i c a b l e . General
and d e s c r i p t i v e m a t e r i a l may be i n c l u d e d i n b a s i c paragraph
3.1.2, which s h a l l i n c o r p o r a t e , e i t h e r d i r e c t l y o r by r e f e r e n c e ,
a f u n c t i o n a l block diagram o r e q u i v a l e n t r e p r e s e n t a t i o n of t h e
CPCEI. The g r a p h i c p o r t r a y a l s h a l l be accomplished t o t h e l e v e l
o f d e t a i l n e c e s s a r y t o i l l u s t r a t e t h e f u n c t i o n a l o p e r a t i o n of t h e
C P C E I , t h e r e l a t i o n s h i p s between t h e s e f u n c t i o n s , and t h e
r e l a t i o n s h i p s between t h e f u n c t i o n s and o t h e r i d e n t i f i e d
system f u n c t i o n s . This diagram i s n o t i n t e n d e d t o be re-
s t r i c t i v e on computer program d e s i g n i n any way.

Requirements f o r s e p a r a t e l y i d e n t i f i e d CPCEI f u n c t i o n s s h a l l
be d e s c r i b e d i n subsequent paragraphs a s a p p r o p r i a t e . A
EXHIBIT X V I I I

subparagraph s h a l l be i n c l u d e d f o r e a c h o p e r a t i o n a l f u n c t i o n ,
p l u s s p e c i a l f u n c t i o n s such a s sequencing c o n t r o l , d i s p l a y s ,
e r r o r d e t e c t i o n and r e c o v e r y , i n p u t and o u t p u t c o n t r o l , r e a l -
time d i a g n o s t i c s , o p e r a t i o n a l d a t a r e c o r d i n g , e t c . The des-
c r i p t i o n s o f t h e s e CPCEI f u n c t i o n a l r e q u i r e m e n t s s h a l l i n c l u d e
t h e r e l a t i v e sequencing, p e r i o d i c i e s , o p t i o n s , and o t h e r
i m p o r t a n t r e l a t i o n s h i p s of e a c h a s a p p r o p r i a t e .

Paragraph 3.1.2.1, "Function 1 " - The b a s i c paragraph s h a l l


b e g i n w i t h d e s c r i p t i v e and i n t r o d u c t o r y m a t e r i a l which d e f i n e s
t h e f u n c t i o n and i t s r e l a t i o n s h i p t o o t h e r f u n c t i o n s . Then,
t h e following t h r e e subparagraphs s h a l l s p e c i f y t h e q u a n t i t a -
t i v e requirements concerning t h e function,

P a r a g r a p h 3.1.2.1.1, "Source and Type of I n p u t s " - T h i s p a r a -


graph s h a l l s p e c i f y t h e s o u r c e ( s ) and t y p e ( s ) of i n p u t informa-
t i o n a s s o c i a t e d w i t h t h i s f u n c t i o n of t h e CPCEI. T h i s s h a l l
i n c l u d e a d e s c r i p t i o n o f t h e i n f o r m a t i o n , i t s s o u r c e ( s ) and, i n
q u a n t i t a t i v e t e r m s , u n i t s of measure, l i m i t s and/or r a n g e s of
u n i t s of measures, a c c u r a c y / p r e c i s i o n r e q u i r e m e n t s , frequency
of a r r i v a l i n f o r m a t i o n , e t c . , where a p p l i c a b l e .

Paragraph 3.1.2.1.2, " D e s t i n a t i o n and Types of Outputs" - T h i s


p a r a g r a p b s h a l l s p e c i f y t h e d e s t i n a t i o n (s) and t y p e ( s ) of
o u t p u t i n f o r m a t i o n a s s o c i a t e d w i t h t h i s f u n c t i o n - o f t h e CPCEI
a s a r e s u l t of t h e p r o c e s s i n g d e s c r i b e d i n paragraph 3.1.2.1.3.
T h i s s h a l l i n c l u d e a d e s c r i p t i o n of t h e i n f o r m a t i o n , i t s d e s t i -
n a t i o n ( s ) and, i n q u a n t i t a t i v e t e r m s , u n i t s of measure,
a c c u r a c y / p r e c i s i o n r e q u i r e m e n t s , f r e q u e n c y of o u t p u t i n f o r m a t i o n ,
e t c . , where a p p l i c a b l e .

Paragraph 3 . 1 . 2 . 1 . 3 , "Information Processing" - This para-


graph s h a l l s p e c i f y t h e i n f o r m a t i o n p r o c e s s i n g a s s o c i a t e d
w i t h t h i s f u n c t i o n . The p a r a g r a p h s h a l l i n c o r p o r a t e a d e t a i l e d
p r o s e and mathematical d e s c r i p t i o n , i n c l u d i n g n e c e s s a r y l o g i c a l
c o n c e p t s , t i m i n g r e q u i r e m e n t s , mathematical t e c h n i q u e s , re-
q u i r e d accuracies with t o l e r a n c e s , d a t a manipulation considera-
t i o n s , and o p t i o n s . A g r a p h i c p o r t r a y a l of t h i s f u n c t i o n s h a l l
be i n c l u d e d f o r c l a r i t y a s a p p r o p r i a t e .

Paragraph 3.1.2.n, "Function n u -

Paragraph 3.1.2.n.1, "Source and Type of I n p u t s " -


Paragraph 3.1.2.n.2, " D e s t i n a t i o n and Types of O u t p u t s " -
Paragraph 3.1.2.n.3, "Information Processing" -
EXHIBIT X V I I I

Paragraph 3 . 1 . 3 , "Data Base Requirements" - T h i s p a r a g r a p h


s h a l l s p e c i f y , i n d e s c r i p t i v e and q u a n t i t a t i v e t e r m s , t h e
r e q u i r e m e n t s f o r a l l p a r a m e t e r s which a f f e c t t h e d e s i g n of t h e
CPCEI. The d e t a i l e d d e f i n i t i o n of p a r a m e t e r s s h a l l i n c l u d e
a d e s c r i p t i o n of t h e d a t a and q u a n t i t a t i v e d e f i n i t i o n s of u n i t s
of measure, r a n g e s of u n i t s of measure, and a c c u r a c y / p r e c i s i o n
r e q u i r e m e n t s where a p p l i c a b l e . I n a d d i t i o n , wherever a p p l i c a b l e ,
t h i s paragraph s h a l l s p e c i f y t h e methods n e c e s s a r y t o c o n v e r t
t h e s e p a r a m e t e r s i n t o a form s u i t a b l e f o r u s e by t h e computer
program. I n t h e c a s e of a m u l t i - s i t e system i n which t h e
a c t u a l d a t a v a l u e s of c e r t a i n p a r a m e t e r s w i l l v a r y among s i t e
i n s t a l l a t i o n s , t h e complete s e t of such s i t e a d a p t a t i o n p a r a -
m e t e r s s h a l l be i d e n t i f i e d e i t h e r d i r e c t l y i n a s e p a r a t e sub-
p a r a g r a p h o r by r e f e r e n c e.
Paragraph 3.1.4, "Human Performance" - Human performance/
human e n g i n e e r i n q requixements f o r t h e CPCEI s h a l l be s p e c i f i e d
i n t h i s p a r a g r a p h ; f o r example, minimum t i m e s f o r human- d e c i s i o n
making, maximum time f o r program r e s p o n s e s , maximum d k s p l a y - -

d e n s i t i e s o E information, c l a r i t y requirements f o r d i s p l a y s ,
etc. For CPCEIs which d i r e c t l y s u p p o r t a s y s t e m ( s ) , t h i s
p a r a g r a p h s h a l l c i t e t h e a p p r o p r i a t e p a r a g r a p h ( s ) of t h e
system s p e c i f i c a t i o n which e s t a b l i s h t h e human performance/
human e n g i n e e r i n g r e q u i r e m e n t s f o r a l l system equipment, and
i n c o r p o r a t e r e q u i r e m e n t s p e c u l i a r t o t h i s CPCEI on an add
and/or d e l e t e b a s i s .

Paragraph 3.2, "CPCEI D e f i n i t i o n " - T h i s paragraph s h a l l , i n


subparagraphs i n c l u d e d h e r e i n , s p e c i f y t h e f u n c t i o n a l r e l a -
t i o n s h i p of t h e CPCEI t o o t h e r e ~ u i p m ~ n t / c o m p u t eprograms
r
and i d e n t i f y government f u r n i s h e d computer programs i n c o r -
p o r a t e d i n t h e CPCEI. General and/or d e s c r i p t i v e m a t e r i a l
may be i n c l u d e d i n b a s i c paragraph 3.2.

Paragraph 3.2.1, " I n t e r f a c e Requirements" - T h i s p a r a g r a p h


s h a l l s p e c i f y , e i t h e r d i r e c t l y o r by r e f e r e n c e , r e q u i r e m e n t s
imposed on t h e d e s i g n of t h e CPCEI because of i t s r e l a t i o n -
s h i p t o o t h e r equipment/computer programs. It s h a l l also include
d e t a i l e d i n t e r f a c e d e f i n i t i o n s r e s u l t i n g from c o n t r a c t o r
a n a l y s i s and r e q u i r e m e n t s c o n t a i n e d i n t h e system specifics- '

tion. General and/or d e s c r i p t i v e m a t e r i a l may be i n c l u d e d i n


b a s i c p a r a g r a p h 3.2.1. Q u a n t i t a t i v e r e q u i r e m e n t s s h a l l be
i n c l u d e d i n t h e subparagraphs i n c l u d e d h e r e i n .

Note: Interfaces defined i n t h i s section s h a l l include, a t


a minimum, a l l r e l e v a n t c h a r a c t e r i s t i c s of t h e computer, s u c h
a s memory s i z e , word s i z e , a c c e s s and o p e r a t i o n t i m e s , i n t e r r u p t
c a p a b i l i t i e s , and s p e c i a l hardware c a p a b i l i t i e s . I f t h e
compiler/assembler i s a n o t h e r , o r p a r t of a n o t h e r , CEI, t h e
computer program l a n g u a g e ( s ) t o be employed s h a l l be s p e c i f i e d
EXHIBIT X V I I I

a s one of t h e i n t e r f a c e s i n subparagraph 3.2.1.2. I f the


compiler/assembler i s a Government-furnished component t o be
i n c o r p o r a t e d i n t o t h & s CPCEI, it s h a l l be r e f e r e n c e d i n sub-
paragraph 3.2-2. I f t h e compiler/assembler i s t o be c o n s t r u c t e d
a s p a r t of t h e development of t h i s CPCEI, t h e language c h a r a c t e r -
i s t i c s a r e t o be d e f i n e d under paragraph 3.1, " O p e r a t i o n a l Re-
quirements ".
Paragraph 3.2.1.1, " I n t e r f a c e Block Diagram" - The r e l a t i o n -
s h i p of t h e CPCEI t o o t h e r equipment/computer programs w i t h
which i t must i n t e r f a c e s h a l l be g r a p h i c a l l y p o r t r a y e d i n
t h i s paragraph. T h i s paragraph s h a l l i n c o r p o r a t e , i n sub-
paragraphs a s a p p r o p r i a t e , e i t h e r d i r e c t l y o r by r e f e r e n c e ,
a f u n c t i o n a l block diagram o r e q u i v a l e n t r e p r e s e n t a t i o n of
t h e i n t e r f a c e requirements o f t h e CPCEI. The g r a p h i c por-
t r a y a l o f t h e CPCEI s h a l l be accomplished t o t h e l e v e l of
d e t a i l n e c e s s a r y t o i d e n t i f y t h e f u n c t i o n a l i n t e r f a c e s be-
tween t h e C P C E I and o t h e r i d e n t i f i e d equipment/computer
programs.
Paragraph 3.2.1.2, " D e t a i l e d I n t e r f a c e D e f i n i t i o n " - T h i s
paragraph s h a l l s p e c i f y , i n subparagraphs a s a p p r o p r i a t e ,
t h e f u n c t i o n a l r e l a t i o n s h i p of t h e CPCEI t o i n t e r f a c i n g
equipment and computer programs. T h i s i n f o r m a t i o n s h a i l be
given i n q u a n t i t a t i v e t e r m s , w i t h t o l e r a n c e s where a p p l i c a b l e ,
t o t h e l e v e l of d e t a i l n e c e s s a r y t o p e r m i t d e s i g n of t h e CPCEI.
Functional i n t e r f a c e s s h a l l specify the input/output require-
ments of t h e CPCEI i n terms of d a t a r a t e , message f o r m a t , e t c .
I n a d d i t i o n , t h i s paragraph s h a l l s p e c i f y d e s i g n requirements
imposed upon o t h e r equipment/computer programs a s a r e s u l t
of t h e d e s i g n o f t h i s CPCEI, e . g . , c a r d f o r m a t s , o p e r a t o r
c o n s o l e equipment, d i s p l a y f o r m a t s , e t c . T h i s paragraph
s h a l l i n c o r p o r a t e , e i t h e r d i r e c t l y o r by r e f e r e n c e , i n t e r f a c e
drawings and/or o t h e r documentation n e c e s s a r y t o s p e c i f y t h e
f u n c t i o n a l i n t e r f a c e s of t h i s CPCEI w i t h o t h e r equipment/
computer programs.
Paragraph 3.2.2, "Government-Furnished P r o p e r t y L i s t " - T h i s
paragraph s h a l l l i s t t h e government-furnished computer programs
which t h e CPCEI must be designed t o i n c o r p o r a t e . The l i s t i n g
s h a l l i d e n t i f y t h e programs by nomenclature, s p e c i f i c a t i o n
number, model number i f a p p r o p r i a t e , and a s s o c i a t e d documenta-
tion.

Paragraph 3.3, "Design Requirements" -


This paragraph s h a l l
s p e c i f y , i n a p p r o p r i a t e subparagraphs, requirements which
a f f e c t t h e d e s i g n of t h e CPCEI and a r e d i s t i n g u i s h a b l e fnom
t h e performance requirements of paragraph 3.1. These re-
quirements r e s u l t from g e n e r a l c o n s i d e r a t i o n s of CPCEI use-
EXHIBIT X V I I I

a b i l i t y . These may i n c l u d e b u t a r e n o t l i m i t e d t o r e q u i r e -
ments f o r :
a . The use of programming s t a n d a r d s t o a s s u r e com-
p a t i b i l i t y among computer program components (CPC-
subprograms o r groups of f u n c t i o n a l l y r e l a t e d sub-
programs) .
b. Program o r g a n i z a t i o n , such a s o v e r a l l program
segmentation.
c. Program d e s i g n r e s u l t i n g from c o n s i d e r a t i o n of
m o d i f i c a t i o n s t o t h e CPCEI d u r i n g o p e r a t i o n ; f o r
example, o n - s i t e m o d i f i c a t i o n requirements and
th,e p e r m i s s i b l e amount of o p e r a t i o n a l d e g r a d a t i o n
allowed d u r i n g i n s t a l l a t i o n of m o d i f i c a t i o n s may
be s p e c i f i e d .
d. S p e c i a l f e a t u r e s , t o f a c i l i t a t e t h e t e s t i n g of
t h e CPCEI. For example, s p e c i a l procedures f o r
t h e d e s i g n of oomputer program component i n t e r -
f a c e s , requirements f o r i n t e r m e d i a t e p r i n t o u t s ,
and commentary on t h e program l i s t i n g may be r e -
quired.
e. E x p a n d a b i l i t y , t o f a c i l i t a t e t h e growth of t h e CPCEI.
S e c t i o n 4 , " Q u a l i t y Assurance Prosrisions" - Requirements f o r
formal v e r i f i c a t i o n of t h e performance of t h e CPCEI i n accord-
ance w i t h t h e requirements o f S e c t i o n 3 of t h i s s p e c i f i c a t i o n
s h a l l be s p e c i f i e d i n t h i s paragraph. Formal v e r i f i c a t i o n of
performance of t h e CPCEI s h a l l determine acceptance of t h e
CPCEI. This paragraph s h a l l s p e c i f y formal v e r i f i c a t i o n re-
quirements t o a l e v e l of d e t a i l which:
a. Designates v e r i f i c a t i o n requirements and methods
i n S @ c t i o n 4 f o r performance and d e s i g n r e q u i r e -
ments i n S e c t i o n 3 . The methods of v e r i f i c a t i o n
t o be s p e c i f i e d h e r e i n may i n c l u d e i n s p e c t i o n of
t h e CPCEI, review of a n a l y t i c a l d a t a , demonstration
h e s t s , and review of t e s t d a t a .
b. S p e c i f i e s requirements f o r v e r i f i c a t i o n t o t h e l e v e l
of d e t a i l n e c e s s a r y t o c l e a r l y e s t a b l i s h t h e scope
and accuracy of t h e t e s t method.
c. P e r m i t s ready i d e n t i f i c a t i o n of each v e r i f i c a t i o n
requirement s p e c i f i e d i n S e c t i o n 4 w i t h t h e appro-
p r i a t e performance/design requirement paragraph i n
Section 3 .

d. A l l o c a t e s v e r i f i c a t i o n requirements t o t h e sub-
paragraphs i n c l u d e d h e r e i n .
EXHIBIT X V I I I

-
Note: This s e c t i o n s h a l l n o t i n c o r p o r a t e , e i t h e r d i r e c t l y o r by
r e f e r e n c e , d e t a i l e d t e s t p l a n n i n g documentation and o p e r a t i n g
instructions. Requirements s p e c i f i e d h e r e i n s h a l l be t h e b a s i s
f o r p r e p a r a t i o n and v a l i d a t i o n of such documents. A l l t e s t /
v e r i f i c a t i o n requirements s h a l l be s p e c i f i e d w i t h i n t h e sub-
paragraphs i n c l u d e d h e r e i n .
Paragraph 4 . 1 , "Implementation T e s t Requirements" - The term
"Implementation T e s t " i s d e f i n e d t o i n c l u d e a l l tests of t h e
CPCEI o t h e r t h a n t h a t accomplished d u r i n g t h e i n t e g r a t i o n
tests ( s e e paragraph 4 . 2 ) . The implementation t e s t r e q u i r e -
ments s h a l l be s p e c i f i e d i n t h e f o l l o w i n g subparagraphs.

Subparagraph 4 . 1 . 1 , "Design and Development T e s t i n g " - This


subparagraph s h a l l s p e c i f y t h e requirements f o r computer
program component and program t e s t s conducted i n t h e a c q u i s i -
t i o n phase p r i o r t o t h e p r e l i m i n a r y q u a l i f i c a t i o n t e s t s .
These a r e t e s t s performed on t h e i n d i v i d u a l computer program
components and groups of components t o e s t a b l i s h t h a t t h e
C P C E I i s ready f o r p r e l i m i n a r y q u a l i f i c a t i o n t e s t i n g .
These requirements s h a l l be s p e c i f i e d i n s u f f i c i e n t d e t a i l
t o permit d e s i g n of such t e s t s and t o s e r v e a s a guide t o
t h e programmers i n computer progEarn component debugging.

Note: V e r i f i c a t i o n requirements i n c l u d e d i n a h i g h e r l e v e l
s p e c i f i c a t i o n ( e , g . , system s p e c i f i c a t i o n ) nay be i n c o r p o r a t e d
by r e f e r e n c e t o avoid d u p l i c a t i o n .
Subparagraph 4.1.2, " P r e l i m i n a r y Q u a l i f i c a t i o n T e s t i n g " -
T h i s subparagraph s h a l l i d e n t i f y t h e requirements f o r pre-
l i m i n a r y q u a l i f i c a t i o n t e s t i n g . - These tests s h a l l v e r i f y each
requirement of S e c t i o n 3, which can be t e s t e d i n a s i m u l a t e d
environment. They a r e t y p i c a l l y h e l d a t t h e c o n t r a c t o r ' s
development f a c i l i t y and may s e r v e a s t h e b a s i s f o r t r a n s f e r
of t h e C P C E I t o t h e u s e r ' s f a c i l i t y .
T h i s subparagraph s h a l l s p e c i f y only t h o s e p r e l i m i n a r y
q u a l i f i c a t i o n requirements which r e q u i r e formal r e c o g n i t i o n
by t h e p r o c u r i n g agency. I t s h a l l s p e c i f y , t o whatever
e x t e n t i s p o s s i b l e , t h e l o c a t i o n and r e l a t i v e s c h e d u l i n g of
t h e t e s t s , t h e computer-based system components which w i l l
n o t be a v a i l a b l e (and hence must be s i m u l a t e d o r i g n o r e d ) ,
t h e o b j e c t i v e s of t h e t e s t s , and t h e program f u n c t i o n s t o be
tested.
Subparagraph 4.1.3, " S p e c i a l T e s t Requirements" - I n t h i s
subparagraph a l l s p e c i a l v e r i f i c a t i o n t e s t requirements, i f
any, n o t i n c l u d e d i n t h e above two subparagraphs s h a l l be
EXHIBIT XVIII

Paragraph 4.2, "Integration Test Requirements" - This para-


graph shall identify requirements specified in Section 3
which cannot be verified until the CPCEI is assembled into or
used with the computer-based system environment and other
CPCEI's. Final verification that all requirements in Section 3
have been satisfied shall be considered here.
Integration test requirements shall be specified in the
following subparagraphs.
-
Subparagraph 4.2.1, "General" This subparagraph shall
specifiy CPCEI tests which are required in direct support of
system integration, i.e., integration of the CPCEI, hardware,
external environment (communication lines, etc.) and operating
personnel into an operative computer-based system. Considera-
tion should be given to the impact of training on CPCEI test
design. Such tests, prior to formal acceptance tests, usually
involve attempting to run parts of the CPCEI functions on a
limited basis as components of the computer-based system are
installed sequentially. This subparagraph shall identify
each performance/design requirement to be verified in each
test.
Subparagraph 4.2.2, "Acceptance/Qualification Test" - This
sub~araara~h shall s~ecifivrequirements for formal qualifi-
cation of the integrated CPCEI -to demonstrate and/or -verify
that the requirements established in Seetion 3 have been
satisfied. This paragraph shall, in subparagraphs as appro-
priate, specify the requirement and method of verification
for the requirements specified in Section 3.
Verification of the requirements may be accomplished by
inspection, or review of analytical data, or by demonstration,
or test and review of test data, or combinations of these.
Section 5, "Preparation for Delivery" - This section is not
amlicable to Part I of the CPCEI specification. Requirements
fb; preparation of the CPCEI for shipment and deliveGy are con-
tained in Section 5, Part Ii of this specification.
Section 6, "Notes" - This section shall include information
which is stated here for administrative convenience only and
is not a part of the specification for the CPCEI in the con-
tractual sense, i.e., it shall not include requirements which
constrain design, development, and qualification of the CPCEI
and require compliance by the contractor.
This section of the specification shall include information
of particular importance to the procuring agency in using
this particular specification as a contractual instrument for
acquisition of the CPCEI, either initially or for follow-on
procurement.
EXHIBIT X V I I I

Background i n f o r m a t i o n o r r a t i o n a l e which w i l l be of a s s i s t a n c e
i n understanding t h e s p e c i f i c a t i o n i t s e l f o r u s i n g t h e CPCEI
i t s p e c i f i e s may be i n c l u d e d h e r e i n , e . g . , t e c h n i c a l d a t a
ondering i n s t r u c t i o n s .
S e c t i o n 1 0 , ?Appendixn - Requirements s p e c i f i e d i n t h e appendix
a r e c o n t r a c t u a l l y a p a r t of t h e s p e c i f i c a t i o n , and t o t h e
e x t e n t t h e y impose requirements on d e s i g n , development, and
q u a l i f i c a t i o n of t h e CPCEI, t h e y must be s a t i s f i e d . This
s e c t i o n may i n c l u d e , b u t n o t be l i m i t e d t o , requirements which
are:

a. Bound s e p a r a t e l y f o r convenience, a s i n t h e c a s e of
a c l a s s i f i e d appendix o r a l a r g e body of s t a t i s t i c a l
data.
b. Of a temporary n a t u r e , a s i n t h e c a s e of an i n t e r i m
performance requirement p e c u l i a r t o e a r l y t e s t models
of t h e CPCEI. Requirements p e c u l i a r t o e a r l y t e s t
a r t i c l e s of t h e CPCEI s h a l l be s p e c i f i e d i n an
appendix which adds t o , d e l e t e s , changes, o r e s t a b -
l i s h e d new requirements a p p l i c a b l e t o S e c t i o n 3 o r 4
of P a r t I.
I n s t r u m e n t a t i o n requirements f o r t e s t a r t i c l e s o f t h e CPCEI
s h a l l be s p e c i f i e d only t o t h e l e v e l of d e t a i l n e c e s s a r y t o
e s t a b l i s h t h e t y p e and t o t a l c a p a c i t y of t h e i n s t r u m e n t a t i o n .
Requirements s p e c i f i e d h e r e i n (with t h e e x c e p t i o n of i n s t r u -
m e n t a t i o n ) s h a l l be s p e c i f i e d t o t h e l e v e l of d e t a i l r e q u i r e d
by t h e paragraphs i n S e c t i o n s 3 and 4 of P a r t I t o which t h e y r e l a t e .
I f any terms, symbols, and a b b r e v i a t i o n s a r e used i n t h e body
of t h i s s p e c i f i c a t i o n whose meanings a r e n o t widely known,
t h e y may be d e f i n e d i n a Glossary i n t h i s s e c t i o n .
EXHIBIT X V I I I

SAMPLE FORMAT "A"

S p e c i f i c a t i o n No.

R e v i s i o n No.

Release Date

CONTRACT END I T E M D E T A I L S P E C I F I C A T I O N
(COMPUTER PROGRAM)

PERFORMANCE/DESIGN
AND
PRODUCT CONFIGURATION
REQUIREMENTS

(CEI Number)

(APPROVED NOMENCLATURE)

FOR

(PROJECT OR SYSTEM NAME) (PROJECT OR SYSTEM)

A p p r o v e d by A p p r o v e d by
(Preparing Activity) (NASA O f f i c e )
Date Approval Date

C o n t r a c t Number
EXHIBIT X V I I I

SAMPLE FORHAT "B"

S p e c i f i c a t i o n No.

R e v i s i o n No.

Release Date

CONTRACT END ITEM DETAIL SPECIFICATION


(COMPUTER PROGRAM)

PART I

PERFORMANCE/DESIGN
REQUIREMENTS

(CEI Number)

(APPROVED NOMENCLATURE)

FOR

(PROJECT OR SYSTEM NAME) (PROJECT OR SYSTEM)

A p p r o v e d by A p p r o v e d by
(Preparing Activity) (NASA O f f i c e : .
Date Approval Date

C o n t r a c t Number
EXHIBIT X V I I I

SAMPLE FORMAT "C"

GENERAL OUTLIKE OF CPCEI SPECIFICATION PART I

T I T L E PAGE ( O v e r a l l CPCEI S p e c i f i c a t i o n )

INTRODUCTORY PAGE ( P a r t I )

1. SCOBE
2. APPLICABLE DOCUMENTS

3. REQUIREMENTS

3.1 Performance

3.1.1 System Requirements

3.1.2 Operational Requirements

3.1.2.1 Function 1

3.1.2.1.1 S o u r c e a n d T y p e of I n p u t s

3.1.2.1.2 ~ e s t i n a t i o na n d T y p e s of O u t p u t s

3.1.2.1.3 Information Processing

3.1.2.2 Function 2

3.1.2.n Function -
n

3.1.3 Data Base Requirements

3.1.4 Human P e r f o r m a n c e

3.2 CPCEI ~ e f i n i t i o n

3.2.1 I n t e r f a c e Requirements

3.2.1.1 I n t e r f a c e Block Diagram

3.2.1.2 Detailed Interface Definition

3.2.2 Government-Furnished P r o p e r t y L i s t

3.3 Design Requirements

XVIII-17
EXHIBIT X V I I I

4. QUALITY ASSURANCE PROVISIONS

4.1 Implementation T e s t Requirements

4.1.1 D e s i g n and D e v e l o p m e n t T e s t i n g

4.1.2 Preliminary Qualification Test

4.1.3 S p e c i a l T e s t Requirements

4.2 I n t e g r a t i o n T e s t Requirements

4.2.1 General

4.2.2 Acceptance/Qualification T e s t
6. NOTES

1 0 . APPENDIX
EXHIBIT X V I I I

6.3.2 C P C E I P a r t I1 S p e c i f i c a t i o n

This subparagraph d e s c r i b e s t h e paragraph headings


of a CPCEI P a r t I1 S p e c i f i c a t i o n .
The o v e r a l l o u t l i n e of t h e CPCEI S p e c i f i c a t i o n P a r t I1 i s con-
t a i n e d i n Sample Format "D" w i t h a l l major paragraphs and sub-
paragraph headings l i s t e d .
Throughout t h e P a r t I1 S p e c i f i c a t i o n , t h e p h r a s e "Computer Program
Component" i s used t o r e f e r t o subprograms ( s e p a r a t e l y compilable
groups of computer program i n s t r u c t i o n s and d a t a ) o r groups
("packages") of f u n c t i o n a l l y r e l a t e d subprograms.
A d i s c u s s i o n of t h e c o n t e n t s of t h e s e major paragraphs and sub-
paragraphs f o l l o w s .
" I n t r o d u c t o r y Page" - ( P a r t I1 of CPCEI S p e c i f i c a t i o n ) The -
i n t r o d u c t o r y page s h a l l conform t o t h e format of Sample For-
mat "EM. The i d e n t i f i c a t i o n appearing on this page s h a l l be
i d e n t i c a l t o t h e r e s p e c t i v e elements of i n f o r m a t i o n appearing
on t h e CPCEI s p e c i f i c a t i o n t i t l e page. The p r o c u r i n g agency
s h a l l v a l i d a t e t h e b a s i c P a r t I1 i n t h e approval b l o c k s .
S e c t i o n 1, "Scope" - T h i s s e c t i o n s h a l l c o n t a i n t h e follow-
i n g lead phrase: "This s p e c i f i c a t i o n e s t a b l i s h e s t h e r e q u i r e -
ments f o r complete i d e n t i f i c a t i o n and acceptance of ( i n s e r t
c o n t r a c t end i t e m number and nomenclature) t o be f o r m a l l y
accepted by t h e p r o c u r i n g agency, subsequent t o e s t a b l i s h e m n t
of t h e p r o d u c t c o n f i g u r a t i o n b a s e l i n e . The p r o d u c t c o n f i g u r a t i o n
b a s e l i n e s h a l l be e s t a b l i s h e d by F i r s t A r t i c l e C o n f i g u r a t i o n
I n s p e c t i o n (FACI) f o r s e r i a l number ( i n s e r t C P C E I s e r i a l
number) .
S e c t i o n 2, "Applicable Documents"
T h i s s e c t i o n of t h e s p e c i f i c a t i o n s h a l l begin w i t h t h e f o l l o w i n g
l e a d phrase: "The f o l l o w i n g documents, of e x a c t i s s u e
shown, form a p a r t of t h i s s p e c i f i c a t i o n t o t h e e x t e n t
s p e c i f i e d h e r e i n . I n t h e e v e n t of c o n f l i c t between
documents r e f e r e n c e d h e r e and t h e d e t a i l c o n t e n t of
S e c t i o n s 3 , 4 , 5, and 1 0 , t h e d e t a i l c o n t e n t s of S e c t i o n s
3, 4 , 5 , and 10 s h a l l be c o n s i d e r e d a s u p e r s e d i n g r e q u i r e -
ment." L i s t t h o s e documents ( s p e c i f i c a t i o n s , s t a n d a r d s ,
b u l l e t i n s , manuals, e t c . ) which a r e a p p l i c a b l e t o paragraphs
w i t h i n o t h e r s e c t i o n s of t h e s p e c i f i c a t i o n . Within t h e body
of t h e s p e c i f i c a t i o n , r e f e r e n c e t o t h e s e documents s h a l l be
by r e f e r e n c e t o t h e i r b a s i c document number o r o t h e r d e f i n -
i t i v e designation.
EXHIBIT X V I I I

S e c t i o n 3, "Requirements"

T h i s s e c t i o n s h a l l s p e c i f y t h e d e t a i l e d c o n f i g u r a t i o n of t h e
CPCEI. T h i s s e c t i o n s h a l l c o n t a i n a complete t e c h n i c a l
d e s c r i p t i o n of t h e CPCEI s t r u c t u r e and f u n c t i o n s , t h e d a t a
b a s e , and t h e i n d i v i d u a l CPC's. General and/or d e s c r i p t i v e
m a t e r i a l may be i n c l u d e d i n b a s i c S e c t i o n 3 l e a d p a r a g r a p h .

Paragraph 3.1, "CPCEI C h a r a c t e r i s t i c s "

T h i s paragraph s h a l l c o n t a i n a d e s c r i p t i o n of t h e o v e r a l l
s t r u c t u r e and f u n c t i o n s of t h e CPCEI. T h i s d e s c r i p t i o n s h a l l
include: t h e a l l o c a t i o n of f u n c t i o n s t o t h e CPCfs t h a t com-
p r i s e t h e CPCEI; flow c h a r t s ; t i m i n g and sequencing c h a r a c t e r -
i s t i c s of t h e CPCEI; and a g r a p h i c p o r t r a y a l of s t o r a g e
allocation, T h i s d e s c r i p t i o n s h a l l be g i v e n i n t h e f o l l o w i n g
paragraphs.

Paragraph 3.1.1, "Functional Allocation"

The r e l a t i o n s h i p of each computer program component (CPC) t o


t h e performance and d e s i g n r e q u i r e m e n t s of t h e P a r t I D e t a i l
S p e c i f i c a t i o n s h a l l be s p e c i f i e d i n t h i s p a r a g r a p h . T h i s
r e l a t i o n s h i p w i l l be s p e c i f i e d t o t h e l e v e l of d e t a i l n e c e s s a r y
t o i d e n t i f y how t h e computer program components a r e a s s o c i a t e d
w i t h t h e r e q u i r e m e n t s of t h e f u n c t i o n s s p e c i f i e d i n t h e P a r t I
specification. I f t h e CPCfs a r e grouped i n t o f u n c t i o n a l e n t i t i e s
( " p a c k a g e s " ) f o r s e p a r a t e s t a g e s of development and checkout,
t h i s grouping s h a l l be d e l i n e a t e d .

Paragraph 3 . 1 . 2 , "CPCEI Flow C h a r t "

T h i s paragraph s h a l l g r a p h i c a l l y p o r t r a y t h e o p e r a t i o n s p e r -
formed by t h e CPCEI. T h i s s h a l l be done by a ( s e r i e s o f ) flow
c h a r t ( s ) ' which d e p i c t ( s ) t h e p r o c e s s i n g b e i n g performed, t h e
sequence of o p e r a t i o n s and t h e d e c i s i o n p o i n t s . A " t o p - l e v e l " flow
c h a r t s h a l l be used t o d e p i c t i n a s i n g l e f i g u r e t h e o v e r a l l
i n f o r m a t i o n flow of t h e CPCEI. T h i s diagram s h a l l r e f e r e n c e
lower l e v e l flow c h a r t s i n c l u d e d i n t h i s p a r a g r a p h , a s
a p p r o p r i a t e , t o p r o v i d e more d e t a i l e d i n f o r m a t i o n . The l o w e s t
l e v e l flow c h a r t s s h a l l be t h o s e which i d e n t i f y a s f u n c t i o n a l
e n t i t i e s t h e computer program components d e s c r i b e d i n S e c t i o n
3 below. A l l symbols used i n t h e flow c h a r t s h a l l be d e f i n e d
e i t h e r d i r e c t l y i n t h i s p a r a g r a p h , o r on t h e i n d i v i d u a l flow
c h a r t s h e e t s , o r by r e f e r e n c e t o a documented s e t of s t a n d a r d s .

Paragraph 3.1.3, "CPCEI Timing and Sequencing"

T h i s p a r a g r a p h s h a l l d e s c r i b e t h e t i m i n g and sequencing of oper-


a t i o n s of t h e computer program components r e l a t i v e t o each o t h e r .
I f t h e sequencing i s dynamically c o n t r o l l e d d u r i n g t h e CPCEI's
o p e r a t i o n s , t h i s d e s c r i p t i o n s h a l l i n c l u d e t h e method
EXHIBIT X V I I I

f o r sequence c o n t r o l and t h e l o g i c and i n p u t c o n d i t i o n s of


t h a t method. Such f a c t o r s a s t i m i n g v a r i a t i o n s , p l u s such
i n t e r n a l o p e r a t i o n s .as d a t a t r a n s f e r s i n and o u t of c o r e , d i s c ,
drum, o r t a p e memory, s e n s i n g of d i s c r e t e i n p u t s i g n a l s , and
t h e t i m i n g r e l a t i o n s h i p s between i n t e r r u p t o p e r a t i o n s w i t h i n
t h e CPCEI, s h a l l be i n c l u d e d .

Paragraph 3.1.4, ''Storage A l l o c a t i o n "

The r e l a t i o n s h i p of t h e CPCEI s t o r a g e r e q u i r e m e n t s t o t h e t o t a l
computer equipment s t o r a g e c a p a b i l i t y s h a l l b e g r a p h i c a l l y
p o r t r a y e d i n t h i s p a r a g r a p h . T h i s paragraph s h a l l i n c o r p o r a t e ,
i n subparagraphs a s a p p r o p r i a t e , e i t h e r d i r e c t l y o r by r e f e r e n c e ,
a s c h e m a t i c diagram, o r e q u i v a l e n t r e p r e s e n t a t i o n . This
g r a p h i c p o r t r a y a l of t h e CPCEI s h a l l be accomplished t o t h e l e v e l
of d e t a i l n e c e s s a r y t o i d e n t i f y such r e q u i r e m e n t s a s : Data b a s e
a l l o c a t i o n , computer program a l l o c a t i o n , computer temporary
memory a l l o c a t i o n , and s p a r e s t o r a g e a l l o c a t i o n . I f alloca-
t i o n s cannot be s p e c i f i e d p r e c i s e l y o r p o r t r a y e d g r a p h i c a l l y i n
a manner meaningful f o r program d e s i g n , t h e a l g o r i t h m s used t o
a l l o c a t e s t o r a g e w i l l be described.

Paragraph 3.1.5, "Data Base C h a r a c t e r i s t i c s "

T h i s p a r a g r a p h s h a l l i n c l u d e a d e t a i l e d d e f i n i t i o n of t h e c o n t e n t
and s t o r a g e l o c a t i o n of each f i l e , t a b l e , and i t e m w i t h i n e a c h
t a b l e t h a t i s i n c o r p o r a t e d i n t h e CPCEI d a t a b a s e , a s w e l l a s
t h e s t o r a g e l o c a t i o n of e a c h computer program component con-
t a i n e d i n t h e CPCEI. T h i s paragraph s h a l l c o n t a i n t h e f o l l o w i n g :
1. " F i l e D e s c r i p t i o n " . A l i s t of f i l e s t h a t have been
i n c o r p o r a t e d i n t h e computer program d a t a b a s e s h a l l
be i n c l u d e d . T h i s s h a l l i n c l u d e a d e s c r i p t i v e t i t l e
f o r each f i l e , l e n g t h of f i l e , and f o r m a t , e t c .

2. "Table D e s c r i p t i o n " . A l i s t of t a b l e s t h a t have been


i n c o r p o r a t e d i n t h e computer program d a t a b a s e s h a l l
be i n c l u d e d . T h i s s h a l l i n c l u d e a d e s c r i p t i v e t i t l e
f o r each t a b l e , method of i n d e x i n g t h e t a b l e , l e n g t h
of t a b l e , and b l o c k format f o r i t e m s and i t e m l e s s t a b l e s ,
etc.

3.
" I t e m D e s c r i p t i o n " . A l i s t of a l l i t e m s c o n t a i n e d i n
t h e computer program d a t a b a s e s h a l l be i n c l u d e d .
This s h a l l include f o r each i t e m , a d e s c r i p t i v e t i t l e ,
most s i g n i f i c a n t b i t , number of b i t s , coding t y p e ,
s c a l i n g f a c t o r , and, i f a p p r o p r i a t e , u n i t s and i t e m
value, e t c .

4. "Graphic Table D e s c r i p t i o n " . The r e l a t i o n s h i p of t h e


i t e m s s p e c i f i e d i n 3 above " I t e m D e s c r i p t i o n " t o t h e
EXHIBIT X V I I I

t a b l e s l i s t e d i n 2 above and t h e r e l a t i o n s h i p of t a b l e s
s p e c i f i e d i n 2 above t o t h e f i l e s l i s t e d i n 1 above w i l l
be g r a p h i c a l l y p o r t r a y e d . This s h a l l incorporate,
i n subparagraphs a s a p p r o p r i a t e , e i t h e r d i r e c t l y o r
by r e f e r e n c e , a diagram o r e q u i v a l e n t r e p r e s e n t a t i o n .
The g r a p h i c p o r t r a y a l of each t a b l e s h a l l be accomplished
t o t h e l e v e l of d e t a i l n e c e s s a r y t o i d e n t i f y words p e r
b l o c k , untagged i t e m s , b i t s / i t e m s , b i t a l l o c a t i o n ,
number of b l o c k s and t y p e of t a b l e c o n s t r u c t i o n .
5. "Data O r g a n i z a t i o n " . A d e f i n i t i o n of t h e r e l a t i o n s h i p
of t h e i t e m s , t a b l e s , and f i l e s contained w i t h i n t h e
d a t a base and t h e computer program components d e s c r i b e d
i n Paragraph 3.2, t o l o c a t i o n s i n computer s t o r a g e ,
s h a l l be i n c l u d e d . T h i s paragraph s h a l l i n c o r p o r a t e
such i n f o r m a t i o n a s t h e following:
a. A l i s t of f i l e s , s p e c i f y i n g f o r each f i l e
t h e a d d r e s s i n s t o r a g e and number of t a b l e s
contained i n t h e f i l e , e t c .
b. A l i s t o f t a b l e s , s p e c i f y i n g f o r each t a b l e
t h e l o c a t i o n w i t h i n t h e f i l e and number of
words c o n t a i n e d i n t h e t a b l e , e t c .
c. A l i s t of i t e m s , i d e n t i f y i n g i t e m l o c a t i o n
w i t h i n t h e t a b l e , number of b i t s , i t e m t y p e ,
scaling, etc.
d. A l i s t of computer program components,
s p e c i f y i n g f o r each t h e s t o r a g e a d d r e s s and
number of words a l l o c a t e d .
6. "CPCEI Constants". A l i s t of a l l c o n s t a n t s ( e . g . , f i x e d
v a l u e s a s s i g n e d t o t h e parameters d e f i n e d i n
t h e P a r t I CPCEI s p e c i f i c a t i o n ) contained i n
t h e CPCEI, o t h e r t h a n t h o s e which a r e d e f i n e d a s "Adapta-
t i o n Data" below, s h a l l be i n c l u d e d . The l i s t c o n t a i n e d
h e r e i n s h a l l i n c l u d e , a s a minimum, a d e s c r i p t i o n of each
c o n s t a n t and i t s a c t u a l numerical o r coded v a l u e .
7. "Adaptation DATA". For m u l t i - s i t e computer based
systems, t h e a c t u a l d a t a r e q u i r e d t o a d a p t t h e CPCEI
t o t h e environment a s s o c i a t e d w i t h each s i t e s h a l l be
l i s t e d . For convenience, t h i s i n f o r m a t i o n may be
c o n t a i n e d i n S e c t i o n 1 0 , "Appendix".
8. " R e l a t i o n s h i p of Computer Program Components t o Data
Base". The r e l a t i o n s h i p of t h e v a r i o u s computer program
components t o t h e v a r i o u s t a b l e s and i t e m s c o n t a i n e d
i n t h e CPCEI d a t a base s h a l l be g r a p h i c a l l y p o r t r a y e d .
This paragraph s h a l l i n c o r p o r a t e , i n subparagraphs a s
a p p r o p r i a t e , e i t h e r d i r e c t l y o r by r e f e r e n c e , a
diagram o r e q u i v a l e n t r e p r e s e n t a t i o n . T h i s g r a p h i c
EXHIBIT X V I I I

p o r t r a y a l of t h e r e l a t i o n s h i p of CPC's t o t h e d a t a b a s e
hall be accomplished t o t h e l e v e l of d e t a i l n e c e s s a r y
t o i d e n t i f y t h e t a b l e s and i t e m s w i t h i n t h e t a b l e s
r e q u i r e d by each computer program component t o t h e
r e l a t i o n s h i p of t h e CPC t o each t a b l e / i t e m ( e . g . , sets t h e
item, uses t h e item, e t c . ) . The u s e of such t a b l e s
and i t e m s by each CPC s h a l l be f u l l y d e s c r i b e d i n t h e
a p p r o p r i a t e subparagraph under paragraph 3.2.

Paragraph 3 . 2 , "Computer Program Component C h a r a c t e r i s t i c s "


The i n d i v i d u a l computer program - - components (CPC's) s h a l l be
described i n s e p a r a t e paragraphs a s W r e q u i r e d . This d e s c r i p t i o n
s h a l l be g i v e n a t a l e v e l of d e t a i l t h a t w i l l d e f i n e t h e d e s i g n
and c o n f i g u r a t i o n of t h e CPC s u f f i c i e n t l y t o a l l o w f o r CPC
m o d i f i c a t i o n and a d a p t i o n i n t h e o p e r a t i o n phase. Each CPC
s h a l l b e d e s c r i b e d i n words, flow c h a r t s , and w i t h a l i s t i n g of
t h e i n s t r u c t i o n s used. The b a s i c p a r a g r a p h 3.2 s h a l l c o n t a i n
the following lead phrase: "This p a r a g r a p h c o n t a i n s t h e d e t a i l e d
t e c h n i c a l d e s c r i p t i o n s of t h e computer program components
i d e n t i f i e d i n Paragraph 3 . 1 of t h i s s p e c i f i c a t i o n . The
i n s t r u c t i o n l i s t i n g s c o n t a i n e d h e r e i n by i n c l u s i o n o r r e f e r e n c e
s p e c i f y t h e e x a c t c o n f i g u r a t i o n of t h e (name of CPCEI). . .I'

The f o l l o w i n g p a r a g r a p h s w i l l be r e p e a t e d f o r each CPC.

Note: The c o n t e n t s of p a r a g r a p h s 3.2.1-3.2.n t o follow


r e p r e s e n t i n f o r m a t i o n t h a t c o r r e s p o n d s i n g e n e r a l t o "program-
ming s p e c i f i c a t i o n s " normally produced by a n a l y s t s , and "coding
s p e c i f i c a t i o n s " normally produced by programmers, d u r i n g t h e
a c q u i s i t i o n phase. The f o r m a t d e s c r i b e d below i s i n t e n d e d t o
a l l o w f o r u s e of such t e c h n i c a l documentation d i r e c t l y a s
p o r t i o n s of t h e P a r t I1 CPCEI s p e c i f i c a t i o n , t h u s e l i m i n a t i n g t h e
need f o r redocumentation. O t h e r f o r m a t s may be allowed a t t h e
d i s c r e t i o n of t h e p r o c u r i n g agency i f t h e y meet t h i s i n t e n t .

Paragraph 3 . 2 . 1 , "Computer Program Component #I"

The b a s i c paragraph s h a l l i d e n t i f y t h e CPC by i n c l u d i n g a s a


minimum t h e t i t l e , t a g (symbolic c o d e ) , and component i d e n t i f i c a -
t i o n number. I t s h a l l a l s o i n c l u d e a b r i e f a b s t r a c t of t h e
f u n c t i o n s of t h e CPC, t h e l a n g u a g e ( s ) i n which it i s w r i t t e n , and
i t s major f u n c t i o n a l i n t e r f a c e s . The CPC s h a l l t h e n be d e s c r i b e d
i n d e t a i l i n subparagraphs a s f o l l o w s :

Subparagraph 3.2.1.1, "CPC No. 1 Description"


T h i s p a r a g r a p h s h a l l d e s c r i b e i n words, f i g u r e s , e q u a t i o n s ,
and r e f e r e n c e s t o t h e f l o w c h a r t ( s ) of Subparagraph 3.2.1.2,
t h e f u n c t i o n s and d e s i g n o f t h e CPC.

T h i s subparagraph s h a l l c o n t a i n , a s a p p r o p r i a t e , a d e s c r i p t i o n o f :
t h e program l o g i c and d a t a flow; e q u a t i o n s t o be s o l v e d ;
a l g o r i t h m s used t o s o l v e t h e s e e q u a t i o n s ; t i m i n g and accuracy
EXHIBIT X V I I I

c h a r a c t e r i s t i c s ; and any s p e c i a l c o n d i t i o n s f o r o p e r a t i o n
of t h e CPC. The d e s c r i p t i o n s h a l l be s u f f i c i e n t l y d e t a i l e d t o
f a c i l i t a t e u n d e r s t a n d i n g o f , and m o d i f i c a t i o n t o , t h e l i s t i n g
g i v e n i n subparagraph 3.2.1. Equation d e r i v a t i o n s and
numerical a n a l y s i s s h a l l n o t be i n c l u d e d h e r e i n , b u t may be
i n c l u d e d i n S e c t i o n 6 , "Notes".

Subparagraph 3 . 2 . 1 . 2 , "CPC N o . 1 Flow C h a r t "


T h i s subparagraph s h a l l g r a p h i c a l l y p o r t r a y t h e o p e r a t i o n s
performed by t h e CPC. T h i s s h a l l be done by a ( s e r i e s o f ) flow
c h a r t ( s ) which d e p i c t t h e p r o c e s s i n g d e s c r i b e d i n subparagraph
3 . 2 . 1 . 1 , i n c l u d i n g t h e sequence of o p e r a t i o n s and d e c i s i o n
p o i n t s , i n t h e CPC. The " h i g h e s t l e v e l " flow c h a r t s h a l l
d e p i c t on a s i n g l e s h e e t t h e o v e r a l l i n f o r m a t i o n flow of t h e
CPC and s h a l l r e f e r e n c e t h e flow c h a r t ( s ) i n paragraph 3.1.2
t h a t i d e n t i f i e s t h e CPC. I n g e n e r a l , t h e l o w e s t l e v e l flow
c h a r t i d e n t i f i e s a l l d e c i s i o n p o i n t s i n t h e CPC and r e f e r e n c e s
h i g h e r l e v e l c h a r t s a s a p p r o p r i a t e . A l l flow c h a r t s s h a l l
u s e d e s c r i p t i v e symbols and s h a l l r e f e r e n c e t h e program l i s t i n g
of t h e CPC by u s e of s t a t e m e n t l a b e l s o r t a g s . A l l symbols
used i n t h e flow c h a r t s h a l l be d e f i n e d i n t h i s subparagraph, o r
by r e f e r e n c e t o paragraph 3.1.2 above, o r by r e f e r e n c e t o a
documented s e t of s t a n d a r d s , o r on t h e i n d i v i d u a l f l o w c h a r t s h e e t s .

Subparagraph 3.2.1.3, "Interfaces"

T h i s subparagraph s h a l l d e s c r i b e t h e r e l a t i o n s h i p of t h e CPC t o
o t h e r CPC's t o t h a t p a r t of t h e d a t a b a s e e x t e r n a l t o t h e
CPC, and, t o o t h e r CPCEI's where a p p l i c a b l e . A p p r o p r i a t e
subparagraphs s h a l l i n c l u d e :

(a) The e x a c t f o r m a t , c o n t e n t and s o u r c e of a l l i n p u t d a t a .

(b) The e x a c t f o r m a t , c o n t e n t and d e s t i n a t i o n of a l l o u t p u t


data.

(c) A l i s t of t h e s u b r o u t i n e s c a l l e d by t h e CPC.

(dl A l i s t of o t h e r CPC's which c a l l t h e CPC.

(e) A l i s t of e x t e r n a l ( t o t h e CPC) t a b l e s , b u f f e r s , con-


s t a n t s , and c o n t r o l r e g i s t e r s used by t h e CPC.
Subparagraph 3.2.1.4, "CPC Data O r g a n i z a t i o n "

T h i s p a r a g r a p h s h a l l c o n t a i n , o r r e f e r t o a p o r t i o n of
subparagraph 3.2.1.6 i f a p p r o p r i a t e , a l i s t and d e s c r i p t i o n
of a l l d a t a i t e m s and t a b l e s which a r e unique t o and i n c l u d e d
w i t h i n t h e CPC, and s h a l l d e s c r i b e t h e a r e a s of memory a v a i l a b l e
f o r temporary s t o r a g e . T h i s l i s t s h a l l i n c l u d e a l l i n t e r n a l l y
EXHIBIT X V I I I

d e f i n e d symbols and t h e i r e q u i v a l e n c e and meaning.

Subparagraph 3.2.1.5, "Limitations"


T h i s subparagraph s h a l l summarize any known o r a n t i c i p a t e d
l i m i t a t i o n s of t h e CPC. A l i s t i n g of a l l r e s t r i c t i o n s and con-
s t r a i n t s which a p p l y t o t h e CPC s h a l l be p r o v i d e d , i n c l u d i n g t i m i n g
r e q u i r e m e n t s , l i m i t a t i o n s of a l g o r i t h m s and formulas u s e d ,
l i m i t s o f i n p u t and o u t p u t d a t a , a s s o c i a t e d e r r o r c o r r e c t i o n
s e n s i n g , and t h e e r r o r checks programmed i n t o t h e r o u t i n e s .

Subparaqraph 3.2.1.6, "Listing"


T h i s subparagraph s h a l l c o n t a i n a complete l i s t i n g of i n s t r u c -
t i o n s c o n t a i n e d i n t h e computer program component ( s ) .The
t y p e of l i s t i n g p r o v i d e d i n t h i s paragraph s h a l l b e e s t a b l i s h e d
between t h e c o n t r a c t o r and t h e p r o c u r i n g agency. The l i s t i n g
w i l l show t h e r e l a t i o n s h i p t o t h e flow diagrams above by appro-
p r i a t e u s e of s t a t e m e n t l a b e l s o r t a g s . For convenience, t h e
l i s t i n g may be i n c l u d e d i n S e c t i o n 1 0 , "Appendix".

Paragraph 3.2.2, "Computer Program Component #2"

Paragraph 3.2 . E l "Computer Program Component ":#

Section 4, " Q u a l i t y Assurance"

T h i s s e c t i o n s h a l l s p e c i f y t h e tests which must be accomplished


t o demonstrate t h a t Bhe CPCEI performance and c o n f i g u r a t i o n i s
a s s p e c i f i e d i n S e c t i o n 3 of P a r t I1 of t h i s s p e c i f i c a t i o n .

Paragraph 4 . 1 , " T e s t S p e c i f i c a t i o n s Cross Reference Index"

I n t h i s p a r a g r a p h , a l l T e s t P l a n and T e s t S p e c i f i c a t i o n documents
s h a l l be r e f e r e n c e d , w i t h c r o s s i n d e x i n g t o t h e CPCEI f u n c t i o n s
b e i n g t e s t e d and t h e CPCEI components and o t h e r computer programs
required f o r the t e s t s . T h i s paragraph s h a l l a l s o d e s c r i b e o r
EXHIBIT X V I I I

reference s p e c i a l simulation c a p a b i l i t i e s required f o r test/


v e r i f i c a t i o n of t h e CPCEI.

Paragraph 4.2, "Other Q u a l i t y Assurance P r o v i s i o n s "

T h i s p a r a g r a p h s h a l l r e f e r e n c e a p p l i c a b l e s t a n d a r d s and/or
s p e c i f y t h e t e s t / v e r i f i c a t i o n r e q u i r e m e n t s , methods and p r o c e d u r e s
which a p p l y t o d u p l i c a t i o n of t h e computer program ( e - g . , t a p e s
and/or c a r d d e c k s ) which a r e covered by t h e s p e c i f i c a t i o n .

S e c t i o n 5, " P r e p a r a t i o n f o r D e l i v e r y "

T h i s s e c t i o n s h a l l s p e c i f y , i n subparagraphs a s a p p r o p r i a t e , t h e
r e q u i r e m e n t s f o r packaging, marking and o t h e r w i s e p r e p a r i n g t h e
CPCEI f o r shipment. Where approved e x i s t i n g Government S p e c i -
f i c a t i o n s a r e adequate t o s a t i s f y c u r r e n t r e q u i r e m e n t s f o r t h e
i t e m and components t h e r e o f , t h e s e s h a l l be i n c o r p o r a t e d by
r e f e r e n c e i n l i e u of p r o v i d i n g d u p l i c a t e d e t a i l e d r e q u i r e m e n t s
i n t h i s s e c t i o n . Where s u i t a b l e s p e c i f i c a t i o n s do n o t e x i s t ,
r e q u i r e m e n t s p e c u l i a r t o t h e CPCEI s h a l l be s p e c i f i e d i n a p p r o p r i a t e
subparagraphs i n c l u d e d h e r e i n .

Paragraph 5.1, "Delivery Procedures"

T h i s p a r a g r a p h s h a l l d e s c r i b e t h e d e l i v e r y p r o c e d u r e s of t h e
completed CPCEI. D e l i v e r y p r o c e d u r e s i n c l u d e a d e s c r i p t i o n of
t h e p r o d u c t packaging ( c a r d d e c k s , t a p e s , manuals) i n v o l v e d ,
where t h e y s h a l l be s t o r e d o r d e l i v e r e d t o , and t h e c o n t r a c t o r s
r e s p o n s i b i l i t i e s f o r , d u r i n g , and a f t e r d e l i v e r y .

Paragraph 5 . 2 , "Markings"

T h i s s e c t i o n s h a l l c o n t a i n subparagraphs s p e c i f y i n g i n d e t a i l t h e
i d e n t i f i c a t i o n markings t o a p p e a r on e v e r y s e p a r a b l e p o r t i o n of
t h e CPCEI t o be d e l i v e r e d by t h e c o n t r a c t o r and f o r m a l l y a c c e p t e d
by t h e p r o c u r i n g agency.

S e c t i o n 6, "Notes"

T h i s s e c t i o n of t h e s p e c i f i c a t i o n i s n o t c o n t r a c t u a l l y b i n d i n g .
I t s h a l l i n c l u d e i n f o r m a t i o n of p a r t i c u l a r importance t o t h e
p r o c u r i n g agency i n u s i n g P a r t I1 of t h i s s p e c i f i c a t i o n a s a
c o n t r a c t u a l i n s t r u m e n t , o r a d m i n i s t r a t i v e o r background i n f o r -
mation, e . g . , o r d e r i n g i n s t r u c t i o n s f o r t e c h n i c a l ' d a t a p e r t a i n i n g
t o t h e computer program, o r s p e c i f i c informatLon r e l a t e d t o t h e
use of t h e program i n f u t u r e assembly and i n t e g r a t i o n t e s t i n g .
I t s h a l l n o t i n c l u d e r e q u i r e m e n t s which c o n s t r a i n d e s i g n , develop-
ment, o r q u a l i f i c a t i o n of t h e CPCEI. It s h a l l reference the
t e c h n i c a l manuals which can be s i n g u l a r l y and p e c u l i a r l y i d e n t i f i e d
w i t h t h e CPCEI, and which a r e n e c e s s a r y t o i t s o p e r a t i o n and
maintenance.
EXHIBIT X V I I I

For each CPC t h i s paragraph s h a l l i n c l u d e any p e r t i n e n t i n f o r m a t i o n


n o t i n c l u d e d i n t h e above subparagraphs, such a s r e j e c t e d
a l t e r n a t i v e CPC d e s i g n s , t h e r a t i o n a l e behind t h e d e s i g n , r e f e r e n c e
m a t e r i a l i n s u p p o r t of t h e a l g o r i t h m s used, and s u g g e s t i o n s f o r
f u t u r e m o d i f i c a t i o n s t o t h e CPC i f changes i n requirements should
materialize. I t s h a l l a l s o describe as appropriate the pertinent
tests which were performed t o v e r i f y t h e f i n a l implementation of
t h e CPC, w i t h key t e s t r e s u l t s i n c l u d e d o r r e f e r e n c e d .
Section 1 0 , "Appendix"
This s e c t i o n of t h e s p e c i f i c a t i o n may c o n t a i n requirements which
a r e p a r t of S e c t i o n 3 and/or of S e c t i o n 4 , b u t a r e bound s e p a r a t e l y
f o r convenience. Examples a r e computer-produced l i s t i n g s , m u l t i -
s i t e a d a p t a t i o n requirements, e t c .
EXHIBIT X V I I I

SAMPLE FORMAT "D"


GENERAL OUTLINE OF CPCEI SPECIFICATION PART I1

INTRODUCTORY PAGE (PART I I )


1. SCOPE
2, APPLICABLE DOCUMENTS
3. REQUIREMENTS
3.1 CPCEI ~ h a r a c C e r i s t i c s
3.1.1 Functional Allocation
3.1.2 CPCEI F l o w C h a r t
3.1.3 CPCEI T i m i n g a n d S e q u e n c i n g
3.1.4 Storage Allocation
3.1.5 Data Base C h a r a c t e r i s t i c s
3.2 Computer Program Component C h a r a c t e r i s t i c s
3.2.1 Computer Program Component # 1
3.2.1.1 Description
3.2.1.2 Flow C h a r t s
3.2.1.3 Interfaces
3.2.1.4 CPC D a t a O r g a n i z a t i o n
3.2.1.5 Limitations
3,2.1,6 Lisfinqs
3.2.2 C o m p u t e r F r o g r a m C o m p o n e n t #2

3 . 2 . ~ Computer Program Cgmponent # 2


4. QUALITY ASSURANCE
4.1 T e s t Specifications Cross Reference Index
4.2 Other Quality Assurance Provisions
5. PREPARATION FOR DELIVERY
5.1 Delivery Procedures
5.2 Markings
6. NOTES
1 0 . APPENDIX
EXHIBIT X V I I I

SAMPLE FOl3?IAT "E"

S p e c i f i c a t i o n No.

R e v i s i o n No.

Release Date

CONTRACT END ITEM DETAIL SPECIFICATION

(COMPUTER PROGRAM)

PART I1

COMPUTER PROGRAM

DESIGN

( C E I NUMBER)
EXHIBIT X V I I I

6.3.3 CPCEI S p e c i f i c a t i o n Addenda


F r e q u e n t l y , a r e q u i r e m e n t develops f o r a CPCEI which
i s v e r y s i m i l a r t o an e x i s t i n g CPCEI. When t h i s o c c u r s , it i s
d e s i r a b l e t o c r e a t e t h e new CPCEI by accomplishing minimum re-
d e s i g n of t h e e x i s t i n g CPCEI. To accomplish t h i s , it i s n e c e s s a r y
t o m a i n t a i n v i s i b i l i t y , t h r o u g h o u t t h e d e s i g n and development
c y c l e , of d i f f e r e n c e s i n performance, d e s i g n , and c o n f i g u r a t i o n
r e q u i r e m e n t s between t h e two CPCEIts. T h i s v i s i b i l i t y can o f t e n
b e a c q u i r e d and m a i n t a i n e d by c r e a t i n g t h e s p e c i f i c a t i o n f o r t h e
new CPCEI a s an addendum t o t h e s p e c i f i c a t i o n f o r t h e e x i s t i n g
CPCEI.

The u s e of a s p e c i f i c a t i o n addendum p r e s e n t s a f o r m a l
means of w r i t i n g a s p e c i f i c a t i o n f o r a new CPCEI, by changing
t h e s p e c i f i c a t i o n f o r an e x i s t i n g CPCEI i n a manner which p e r m i t s
r e a d y comparison of t h e e x a c t r e l a t i o n s h i p between t h e two CPCEI's.
T h i s i s accomplished by w r i t i n g t h e new s p e c i f i c a t i o n by d i r e c t
r e f e r e n c e t o t h e e x i s t i n g s p e c i f i c a t i o n on a paragraph-by-paragraph
b a s i s , r e c o r d i n g i n t h e new s p e c i f i c a t i o n s p e c i f i c r e f e r e n c e s t o
e a c h paragraph i n t h e e x i s t i n g s p e c i f i c a t i o n and n o t i n g each
a d d i t i o n , d e l e t i o n , o r change. Where no change i s n e c e s s a r y , t h e
p h r a s e "no change" s h a l l be u s e d . The paragraph numbering between
t h e two documents s h a l l be i d e n t i c a l , w i t h t h e e x c e p t i o n of
p a r a g r a p h s added t o t h e new document which do n o t have an e x a c t
counter-part i n t h e e x i s t i n g s p e c i f i c a t i o n .

A s p e c i f i c a t i o n c r e a t e d i n t h i s manner i s a new
and complete s p e c i f i c a t i o n i n e v e r y s e n s e . The method of
p r e p a r i n g a s p e c i f i c a t i o n f o r a new CPCEI by c r e a t i n g an
addendum t o an e x i s t i n g s p e c i f i c a t i o n s h a l l be u s e d when t h e
following conditions a r e s a t i s f i e d :

(a) There i s s u f f i c i e n t r e a s o n t o e s t a b l i s h a d i r e c t
r e l a t i o n s h i p between t h e new CPCEI and an e x i s t i n g
CPCEI a s a b a s i s f o r d e s i g n and development, e . g . ,
p r o g r e s s i n g from one t y p e , model, s e r i e s of a
CPCEI t o a n o t h e r ; o r when minor changes must be
accomplished t o a v e r y l i m i t e d number of components
of a CPCEI f o r a s p e c i f i c m i s s i o n .

(b) The b a s i c s p e c i f i c a t i o n , t o which t h e addendum i s


p r e p a r e d , complies w i t h t h e r e q u i r e m e n t s of t h i s
e x h i b i t w i t h r e s p e c t t o f o r m a t and c o n t e n t .

The s p e c i f i c a t i o n c r e a t e d by u s e of an addendum must


b e i d e n t i f i e d and m a i n t a i n e d a s a s e p a r a t e s p e c i f i c a t i o n .
Both t h e s p e c i f i c a t i o n c r e a t e d by u s e of an addendum, and
t h e b a s i c s p e c i f i c a t i o n t o which t h e addendum i s p r e p a r e d , s h a l l
have independent change c y c l e s . A s p e c i f i c a t i o n change n o t i c e
t o e i t h e r i s n o t a u t o m a t i c a l l y a change t o b o t h . Each change
EXHIBIT X V I I I

ta e i t h e r must be reviewed, and i f it i s d e s i r a b l e t o change


b o t h t h e b a s i c s p e c i f i c a t i o n and t h e s p e c i f i c a t i o n p r e p a r e d
a s an addendum, two s g p a r a t e s p e c i f i c a t i o n change n o t i c e s
must b e p r e p a r e d .

When a new s p e c i f i c a t i o n i s c r e a t e d by t h e p r e p a r a t i o n
of an addendum t o an e x i s t i n g s p e c i f i c a t i o n , anaddendum N o t i c e
s h a l l be p r e p a r e d which conforms t o t h e f o r m a t and i n c l u d e s t h e
c o n t e n t r e q u i r e d by sample f o r m a t F. The Addendum N o t i c e s h a l l
b e t h e f i r s t e n t r y i n S e c t i o n 2 , " A p p l i c a b l e Documents". A l l
of t h e e n t r i e s i n t h e Addendum N o t i c e r e f e r t o t h e o r i g i n a l CPCEI
s p e c i f i c a t i o n a s t h e b a s i c document f o r p r e p a r a t i o n of t h e addenda
CPCEI. Each e n t r y s h a l l be t r a n s c r i b e d from t h e t i t l e page and
s p e c i f i c a t i o n change l o g of t h e b a s i c s p e c i f i c a t i o n .

Note: For f i l i n g and d i s t r i b u t i o n , an addendum s p e c i f i -


c a t i o n must always b e accompanied by a copy of t h e
s p e c i f i c a t i o n t o which it r e l a t e s . See Sample
Foxmat "I?" .
EXHIBIT XVIII

SAMPLE FORMAT "F"

This Specification has been prepared as an Addendum to:

Speci fication No.


Revision
Release Date
CEI No.

FOR

(Approved Nomenclature)

Used With

(PROJECT OR SYSTEM NAME) (PROJECT OR SYSTEM)

This (addendum) specification must always be accompanied by the


specification (above) to which it relates.

The exact content of specification (insert same number as above)


used as the basic document for this addendum is the revision
referenced above plus the following specification change notices
to specification (insert same number as above) .
EXHIBIT XIX

COMPUTER PROGRAM IDENTIFICATION,


CONTROL & ACCOUNTING
EXHIBIT XIX

COMPUTER PROGRAM IDENTIFICATION,


CONTROL & ACCOUNTING

CONTENTS
Paragraph Page

PURPOSE....................................XIX-1
SCOPE.......................................XIX-l
APPLICABILITY................................XIX-l
REFERENCE DOCUMENTS........................XIX-1
GENERAL GUIDELINES..........e-.~.~....e....XIX-2
SELECTION OF CPCEI'S.. .....................
XIX-4
CONFIGURATION IDENTIFICATION...............XIX-6
CONFIGURATION CONTROL......................XIX-8
TECHNICAL REVIEWS AND INSPECTIONS..........XIX-10
CONFIGURATION ACCOUNTING.........9 .........
XIX-13
EXHIBIT X I X

COMPUTER PROGRAM IDENTIFICATION,


CONTROL & ACCOUNTING

1. PURPOSE

T h i s E x h i b i t p r o v i d e s r e q u i r e m e n t s t o i n s u r e t h a t Computer
Program C o n t r o l End I t e m s (CPCEI's) a r e p r o p e r l y s e l e c t e d ,
i d e n t i f i e d , c o n t r o l l e d , reviewed and accounted f o r . In
a d d i t i o n , g e n e r a l i n f o r m a t i o n and guidance i s p r o v i d e d
t o a l l o w adequate i n t e g r a t i o n of CPCEI r e q u i r e m e n t s i n t o
t h e o v e r a l l c o n f i g u r a t i o n management p r o c e s s .

2. SCOPE

The r e q u i r e m e n t s of t h i s E x h i b i t p r o v i d e t h e b a s i s f o r
managing and c o n t r o l l i n g computer program development i n
t h e following areas :
a. S e l e c t i o n of CPCEI's.
b. I d e n t i f i c a t i o n and marking.
c. C o n f i g u r a t i o n and change c o n t r o l .
d. T e c h n i c a l Reviews and I n s p e c t i o n s .
e. C o n f i g u r a t i o n Accounting.

3. APPLICABZLITY

This Exhibit i s applicable during t h e d e f i n i t i o n , a c q u i s i t i o n


and o p e r a t i o n of computer programs d e s i g n , development, t e s t
and u p d a t i n g .

4. REFERENCE DOCUMENTS

The f o l l o w i n g e x h i b i t s of t h i s document, and o t h e r documents


shown form a p a r t o f t h i s E x h i b i t :

Exhibit V I I " S p e c i f i c a t i o n Maintenance"

Exhibit I X " P r e p a r a t i o n of E n g i n e e r i n g
Change P r o p o s a l s f o r C o n t r a c t
End Items"

MIL-STD-480 30 October "Configuration Control -Engi-


196 8 n e e r i n g Changes, D e v i a t i o n s ,
and Waivers"
EXHIBIT X I X

5. GENERAL GUIDELINES
5.1 Computer Program C o n t r a c t End I t e m
A computer program i s t h e o r d e r e d s e t o f i n s t r u c t i o n s and
d a t a r e q u i r e d t o c o n t r o l t h e o p e r a t i o n of a d i g i t a l
computer. The end p r o d u c t of t h e p r o c e s s r e q u i r e d t o
produce a program i s u s u a l l y a punched deck o f c a r d s ,
magnetic t a p e s , o r o t h e r p h y s i c a l media c o n t a i n i n g t h e
o r d e r e d s e t i n a form s u i t a b l e f o r i n s e r t i o n i n t o a
d i g i t a l computer. Under c o n t r o l of t h e i n s t r u c t i o n s , t h e
computer a c t s upon t h e d a t a t o perform a s e t of w e l l -
d e f i n e d and l o g i c a l l y r e l a t e d f u n c t i o n s . A computer
program c o n t r a c t end i t e m ( C P C E I ) i s d e f i n e d i n t h i s
e x h i b i t a s a computer programming end p r o d u c t whose
development, a s d e s i g n a t e d by t h e p r o c u r i n g agency,
i s s u b j e c t t o c o n f i g u r a t i o n management.
5.2 D e f i n i t i o n Phase

A computer programming t a s k u s u a l l y r e q u i r e s t h e develop-


ment o f s e v e r a l programs and t h e d a t a e s s e n t i a l t o o t h e r
end i t e m s , t h e d e s i g n c o n s t r a i n t s and p r a c t i c e s t o b e
followed i n i t s development, and requirements f o r i t s
q u a l i f i c a t i o n . These i t e m s a r e documented i n a CPCEI
Part I Specification. I f the Part I Specification is
produced by a c o n t r a c t o r , i t i s reviewed by t h e
p r o c u r i n g agency. Upon s a t i s f a c t o r y completion o f t h i s
review t h e P a r t I S p e c i f i c a t i o n i s e s t a b l i s h e d a s t h e
-
Design Requirements B a s e l i n e f o r u s e i n t h e a c q u i s i t i o n
phasg. I t s i n i t i a l f u n c t i o n i s t o govern t h e d e s i g n ,
development and t e s t i n g of computer programs throughout
t h e a c q u i s i t i o n phase. I t s c o n t i n u i n g f u n c t i o n throughout
t h e system l i f e c y c l e i s t o s e r v e a s t h e b a s e l i n e a g a i n s t
which t h e impact o f proposed performance and d e s i g n
changes i s a s s e s s e d .
5.3 A c q u i s i t i o h Phase
The a c t i v i t i e s o f t h e d c q u i s i t i o n phase r e s u l t i n t h e
development of a f u l l y assembled CPCEI t h a t h a s been q u a l i -
f i e d i n a s i m u l a t e d environment p r i o r t o i n t e g r a t i o n
i n t o t h e computer based system. I t can be c o n v e n i e n t l y
d i v i d e d i n t o two subphases:
5.3.1 The ~ e s i g nSubphase
The d e s i g n proc&sb b e g i n s With a d e f i n i t i o n o f
t h e s t r u c t u r e of t h e computer program a s a whole,
i n terms o f f u n c t i o n s a l l o c a t e d t o i n d i v i d u a l
subprograms, s t o r a g e a l l o c a t i o n , computer program
o p e r a t i n g sequences, and t h e format of t h e d a t a
base. The p r e l i m i n a r y d e s i g n approach i s re-
EXHIBIT X I X

viewed a t t h e P r e l i m i n a r y Design Review (PDR)


w i t h r e s p e c t t o t h e requirements of t h e P a r t I
S p e c i f i c a t i o n . S u c c e s s f u l completion of t h i s
review i s p r e r e q u i s i t e t o t h e d e t a i l e d d e s i g n
of t h e computer program components (CPC's) which
comprise t h e CPCEI. The d e s i g n of each CPC o r
convenient groups of C P C 1 s i s documented i n a
programming s p e c i f i c a t i o n which i s s u f f i c i e n t l y
d e t a i l e d t o e n a b l e a programmer t o code and
debug t h e CPC. The CPC d e s i g n i s t h e n reviewed
by t h e p r o c u r i n g agenqy i n a C r i t i c a l Design
Review ( C D R ) . S u c c e s s f u l completion of t h i s
review i s p r e r e q u i s i t e t o coding t h e CPC. Other
a c t i v i t i e s i n t h e d e s i g n subphase i n c l u d e t h e
development of a t e s t p l a n based on t h e q u a l i t y
a s s u r a n c e requirements of t h e P a r t I S p e c i f i c a t i o n ,
development of a programming s t a n d a r d s manual based
i n p a r t on t h e d e s i g n requirements of t h e P a r t I
S p e c i f i c a t i o n , and t h e i n i t i a t i o n of formal
change c o n t r o l and accounting of t h e P a r t I
Specification.
5.3-2 The Implementation Subphase
During t h i s subphase t h e c o n t r a c t o r codes and
debugs a l l C P C ' s produces d e t a i l e d t e s t s p e c i -
f i c a t i o n s , tests t h e CPC1s i n groups u n t i l a l l
t h e C P C ' s have been assembled t o g e t h e r , demonstrates
t h e v a l i d i t y of t h e C P C E I by means of a p r e l i m i n a r y
q u a l i f i c a t i o n t e s t i n a s i m u l a t e d environment,
and completes t h e documentation of t h e CPCEI. The
completed t e c h n i c a l d e s c r i p t i o n i s documented i n
t h e P a r t II CPCEI S p e c i f i c a t i o n which c o n t a i n s t h e
d e s c r i p t i o n of t h e o v e r a l l d e s i g n , t h e program-
ming s p e c i f i c a t i o n s , flow c h a r t s , and l i s t i n g s .
Other documents such a s o p e r a t o r handbooks, p r o g r e s s
r e p o r t s , and PERT r e p o r t s a r e produced a s appro-
p r i a t e i n t h e subphase. The t e r m i n a t i n g m i l e s t o n e
f o r t h e implementation subphase i s F i r s t A r t i c l e
C o n f i g u r a t i o n I n s p e c t i o n (FACI). The primary
o b j e c t i v e s of FACI a r e t o determine i f t h e CPCEI
i s p r o p e r l y marked and documented, and t o e s t a b l i s h
t h e completed P a r t 11 S p e c i f i c a t i o n a s t h e P r o d u c t
C o n f i g u r a t i o n B a s e l i n e . The P a r t I1 S p e c i f i c a t i o n
then s e r v e s i n t h e o p e r a t i o n phase a s an i n s t r u -
ment f o r use by government o r c o n t r a c t o r p e r s o n n e l
i n d i a g n o s i n g t r o u b l e s , a d a p t i n g t h e computer
program t o environmental and o p e r a t i n g requirements
of s p e c i f i c s i t e l o c a t i o n s , and d e s i g n i n g minor o r
major changes t o t h e computer program system.
EXHIBIT X I X

5.4 O p e r a t i o n a l Phase
I n t h i s phase t h e CPCEI i s i n t e g r a t e d w i t h t h e hardware
and p e r s o n n e l of t h e computer based s y s t e m , q u a l i f i e d
and/or f o r m a l l y a c c e p t e d i n t h e system, and m a i n t a i n e d
between u s e s . The CPCEI may be modified f o r u s e i n
s e v e r a l i n s t a l l a t i o n s o r f o r u s e on a mission-by-
mission b a s i s . Change C o n t r o l and a c c o u n t i n g f o r b o t h
t h e P a r t I and P a r t I1 S p e c i f i c a t i o n i s e f f e c t e d through-
o u t t h e o p e r a t i o n a l phase.

6. SELECTION OF CPCEI's

The CPCEI i s t y p i c a l l y a computer program which i s one of


many e l e m e n t s i n a l a r g e system. I n Apollo many of t h e r e q u i r e d
computer programs do n o t f a l l i n t o t h i s c a t e g o r y . For example,
a t r a j e c t o r y s i m u l a t i o n program may work o n l y w i t h i n a
computer and n o t w i t h o t h e r equipment used d u r i n g a m i s s i o n . It
i s t h e r e f o r e n e c e s s a r y t h a t some broad i n t e r p r e t a t i o n s be g i v e n
i n t h e programs t o be i d e n t i f i e d a s CPCEI's. The d e s i g n a t i o n of
which computer programs a r e t o b e s u b j e c t e d t o t h e formal
r e q u i r e m e n t s of t h i s e x h i b i t i s l e f t t o t h e d i s c r e t i o n of t h e
p r o c u r i n g agency. The d e s i g n a t i o n s h o u l d be made on t h e b a s i s of
c r i t i c a l i t y , c o s t , and need f o r f o r m a l c o n t r o l , s u b j e c t t o t h e
following guidelines:
a . A t a minimum, o p e r a t i o n a l programs used i n d i r e c t
r e a l - t i m e s u p p o r t of a m i s s i o n ( i n c l u d i n g t r a i n i n g
and p r e l a u n c h c h e c k o u t ) s h o u l d be c l a s s i f i e d a s
CPCEI' s.

I n t h i s c o n t e x t , " d i r e c t r e a l - t i m e s u p p o r t " means


t h a t t h e r e s u l t s of computer p r o c e s s i n g a r e used t o
monitor o r c o n t r o l t h e c o u r s e of t h e m i s s i o n o r
training exercise.

b. C e r t a i n n o n - r e a l - t i m e o r o f f l i n e programs, such a s
s u p p o r t and u t i l i t y programs a s s o c i a t e d w i t h a CPCEI,
o r d a t a p r o c e s s i n g programs used f o r t e l e m e t r y
d e d u c t i o n , may be d e s i g n a t e d a s CPCEI's i f :

1. t h e s t a t u s of t h e program d i r e c t l y a f f e c t s
mission schedules;

2 . changes t o t h e c o n f i g u r a t i o n of t h e program
d i r e c t l y a f f e c t s t h e c o n f i g u r a t i o n of d e s i g n a t e d
end i t e m s ; o r

3 . t h e programming e f f o r t r e q u i r e s a l a r g e expendi-
t u r e of r e s o u r c e s . I n t h e s e c a s e s i t may be
d e s i r a b l e t o a c h i e v e a h i g h l e v e l of management
procedures.
EXHIBIT X I X

The i d e n t i f i c a t i o n of CPCEI's i s complicated by t h e m u l t i -


mission use of computer programs;in t h e Apollo program. Many
systems r e l y on programmable d i g i t a l computers t o provide
t h e f l e x i b i l i t y r e q u i r e d t o s u p p o r t a r a p i d s u c c e s s i o n of
d i v e r s e m i s s i o n s . A computer program s u p p o r t i n g a p a r t i c u l a r
r e a l - t i m e f u n c t i o n may change r a d i c a l l y from mission t o mission.
T h i s c h a r a c t e r i s t i c must be recognized i n e s t a b l i s h i n g con-
f i g u r a t i o n management f o r t h e l i f e c y c l e of t h e system.
6.1 I d e n t i f i c a t i o n Guidelines
The degree t o which a program, performing t h e same
g e n e r a l f u n c t i o n on a mission-to-mission b a s i s , can
change f o r each mission use may v a r y g r e a t l y . I n some
c a s e s only d a t a may change; i n o t h e r c a s e s s l i g h t
program r e v i s i o n s may be r e q u i r e d ; i n s t i l l o t h e r c a s e s
e x t e n s i v e m o d i f i c a t i o n s may r e s u l t . I t i s d i f f i c u l t t o
e s t a b l i s h r i g i d r u l e s t o determine i f a program used i n
a p a r t i c u l a r mission should be c l a s s i f i e d a s a new
C P C E I o r be c o n s i d e r e d a s a change t o an e x i s t i n g CPCEI.
The f o l l o w i n g g u i d e l i n e s , however, should be followed i n
determining whether o r n o t a program i s t o be r e - i d e n t i -
f i e d a s a new end i t e m ( i . e . , given a new i d e n t i f i c a t i o n
number and d e f i n e d i n a new s p e c i f i c a t i o n ) :
6 . 1 . 1 A program o r i g i n a l l y used i n a p a r t i c u l a r mission
may be modified and used w i t h o u t r e - i d e n t i f i c a t i o n
f o r a succeeding mission i f :
a ) changes t o i t s d e s i g n a r e minor enough s o
t h a t new d e s i g n reviews a r e n o t r e q u i r e d .
b) t h e e x i s t i n g s p e c i f i c a t i o n can be c o n v e n i e n t l y
modified by t h e u s e of S p e c i f i c a t i o n Change
N o t i c e s (SCN's) .
C) t h e o r i g i n a l program w i l l n o t be used a g a i n .
6.1.2 A program should be r e - i d e n t i f i e d f o r use i n
succeeding m i s s i o n s i f :
a ) new d e s i g n reviews a r e r e q u i r e d .
b ) new s u b f u n c t i o n s r e q u i r i n g a d d i t i o n a l sub-
programs a r e r e q u i r e d .
C) a cljange of computing equipment c a u s e s a
s i g n i f i c a n t reprogramming e f f o r t .
d ) a new s p e c i f i c a t i o n is r e q u i r e d t o i n c o r -
p o r a t e e x t e n s i v e m o d i f i c a t i o n s made o v e r a
p e r i o d of t i m e .
e ) s l i g h t changes a r e r e q u i r e d , b u t t h e o r i g i n a l
program w i l l be used a g a i n .

A s e r i e s of programs which a r e r e - i d e n t i f i e dfor


each m i s s i o n u s e may be given t h e same CPCEI number
and d i f f e r e n t i a t e d by t h e use of a unique s e r i e s
EXHIBIT X I X

i d e n t i f i e r l e t t e r . Since some p a r t of t h e
program may be s i m i l a r from mission t o mission
i t may n o t be n e c e s s a r y t o produce a completely
new s p e c i f i c a t i o n f o r each mission. A s p e c i f i c a t i o n
addendum r e f e r e n c e d t o some p r e v i o u s s p e c i f i c a -
t i o n may be s u f f i c i e n t f o r a p a r t i c u l a r mission.
I n some i n s t a n c e s i t may be d e s i r a b l e t o i d e n t i f y
p o r t i o n s o f a program a s s e p a r a t e end i t e m s .
An e x e c u t i v e r o u t i n e , f o r example, may be mission
h d e p e n d e n t , while t h e a p p l i c a t i o n programs it
c o n t r o l s may change g r e a t l y from mission t o mission.
A s i n g l e s p e c i f i c a t i o n may t h e r e f o r e be ade-
q u a t e f o r t h e development of t h e e x e c u t i v e , while
a s e r i e s of s p e c i f i c a t i o n s may be needed f o r t h e
t e s t programs. The i d e n t i f i c a t i o n of t h e
e x e c u t i v e and t e s t programs a s s e p a r a t e end
i t e m s would f a c i l i t a t e management c o n t r o l of
t h i s t y p e of e f f o r t .
I n a l l c a s e s , it i s t h e p r o c u r i n g a g e n c y " ~
r e s p o n s i b i l i t y t o i d e n t i f y which programs a r e new
end i t e m s . The requirements of c o n f i g u r a t i o n
management a r e such t h a t some degree of
f l e x i b i l i t y i s allowed i n t h i s p r o c e s s t o account
f o r d i f f e r e n c e s i n t h e n a t u r e of computer
programming t a s k s .
CONFIGURATION IDENTIFICATION

A CPCEI i s i d e n t i f i e d by a d e t a i l e d s p e c i f i c a t i o n and s e t of i d e n t i -
f i c a t i o n numbers.
7.1 CPCEI S p e c i f i c a t i o n
The format and c o n t e n t f o r a CPCEI S p e c i f i c a t i o n i s given i n
exhibit XVIII. A s f o r hardware CEI's t h e s p e c i f i c a t i o n i s
d i v i d e d i n t o two p a r % s ; P a r t I i s t h e "design t o " document
r e s u l t i n g from t h e requirements anaJiysis i n t h e d e f i n i t i o n
phase; P a r t I1 i s thq "yesponse t o " document d e s c r i b i n g
t h e p r o d u c t a s produced i n t h e a c q u i s i t i o n phase.
The P a r t I S p e c i f i c a t i o n c o n t a i n s performance r e q u i r e m e n t s ,
d e s i g n c o n s t r a i n t s , i n t e r f a c e s p e c i f i c a t i o n s , and t e s t
r e q u i r e m e n t s , a l l of which a r e e s s e n t i a l i n p u t s t o t h e
c o n t r a c t o r s d e s i g n e g f o r t s ; t h e P a r t I1 S p e c i f i c a t i o n
c o n t a i n s t h e o v e r a l l d e s i g n approach, programming
s p e c i f i c a t i o n s , flow q h a r t s and program l i s t i n g s - informa-
t i o n which i s needed f o r t h e c o n t r o l of t h e d e s i g n p r o c e s s ,
and e v e n t u a l l y t o d e s c r i b e t h e completed C P C E I .
EXHIBIT XIX

7.2 Identification Numbers and Markings


Numbers must be assigned to a CPCEI, its parts, and
its specifications to assure that these items may be
properly identified.
The selection of a numbering system must be consistent and
provide unique identifiers for all items. The detailed
requirements for the numbering system used in NASA are given
in EXHIBIT X.
The required CPCEI numbers are:
7.2.1 Specification Number: consisting of a prefix code,
a document identifier number, and a suffix code
indicating the latest approved version of the
document,
7.2.2 End Item Number: the unique reference number by
which the end item can always be identified. It
is assigned in the definition phase as soon as
the end item is identified. The end item number
consists of a unique end item identifier plus a
series number to distinguish end items within a
series.
7.2.3 Part Number: a number for each identified "part"
which is within the end item. For a CPCEI, a
"part" is defined to be the card decks, magnetic
tapes, etc., in which the program is contained.
A physical part as defined above may in many cases
correspond to a logical part, a computer program
component (CPC). To facilitate identification:
a) Each card deck containing a CPC is given a
header card and a trailer card. Each card
contains the name and number of the CPCEI
and the name and part number of the subprogram.
These cards are treated as comment cards by
the assembler or compiler; that is, they have
no program functions other than identifying
a particular card deck.
b) Each card is marked by a printed CPCEI number
and a punched sequence number identifying its
location within the deck. In a large enough
project it is recommended that the CPCEI numbers
be preprinted on the cards for convenience.
The punched sequence number not only serves as
a unique card identifier (when coupled with the
CPCEI number) but also allows the computer or
AD]? equipment to be used in ordering a "shuffled'
deck of cards.
EXHIBIT X I X

c) Each CPC c a r d deck i s color-coded f o r e a s y


identification. The band o r c a s e of
each subprogram deck i s marked by t h e CPCEI
number and p a r t number.
d) Each t a p e r e e l , t a p e c a n n i s t e r , d i s c , o r
o t h e r s t o r a g e medium used i s marked w i t h
t h e CPCEI number and p a r t number. Where
appropriate, t h e information i s included
i n machine r e a d a b l e form f o r example, a s
a t a p e header block.
8. CONFIGURATION CONTROL

CPCEI C o n f i g u r a t i o n c o n t r o l i s t h e e s t a b l i s h m e n t of t e c h n i c a l c o n t r o l
p o i n t s c a l l e d " b a s e l i n e s " and t h e s y s t e m a t i c e v a l u a t i o n , coordina-
t i o n , and d i s p o s i t i o n of a l l proposed changes t o t h e s e b a s e l i n e s .
The CPCEI S p e c i f i c a t i o n i s used t o document t h e b a s e l i n e s f o r
a CPCEI. There a r e two b a s e l i n e s f o r m a l l y e s t a b l i s h e d f o r t h e
a c q u i s i t i o n and o p e r a t i o n o f a computer program: t h e design
requirements b a s e l i n e , and t h e p r o d u c t c o n f i g u r a t i o n b a s e l i n e .
The Design Requirements B a s e l i n e
The d e s i g n requirements b a s e l i n e , (DRB) i s e s t a b l i s h e d
a t t h e beginning of t h e a c q u i s i t i o n phase by p r o c u r i n g
agency approval of t h e performance, d e s i g n and q u a l i -
f i c a t i o n requirements i n t h e P a r t I S p e c i f i c a t i o n .
Once e s t a b l i s h e d , i t becomes t h e c o n t r o l l i n g document
f o r t h e d e s i g n and t e s t i n g a c t i v i t i e s of t h e c o n t r a c t o r .
Any change o r a d d i t i o n t o i t must be submitted a s a
d e s i g n requirements change and must be f o r m a l l y approved
b e f o r e t h e change can be designed and developed by t h e
c o n t r a c t o r . The DRB f u n c t i o n s throughout both t h e
a c q u i s i t i o n and o p e r a t i o n phase, although u s u a l l y t h e
volume of requirements changes w i l l diminish i n t h e
o p e r a t i o n phase. A l l approved changes t o t h e D m must be
r e f l e c t e d i n s u p p o r t i n g t e c h n i c a l documentation and i n t h e
end i t e m i t s e l f . A l l proposed changes a r e f o r m a l l y sub-
m i t t e d a s Engineering Change P r o p o s a l s ( E C P ) .
8.2 The Product C o n f i g u r a t i o n B a s e l i n e
The P a r t I1 S p e c i f i c a t i o n i s e s t a b l i s h e d a s t h e p r o d u c t
c o n f i g u r a t i o n b a s e l i n e a f t e r s u c c e s s f u l completion of t h e
F i r s t A r t i c l e Configuration Inspection ( F A C I ) . A t t h i s
time P a r t I1 i s a u d i t e d t o determine i f i t a d e q u a t e l y
d e s c r i b e s t h e fully-assembled CPCEI. From t h i s p o i n t
on, a l l changes t o t h e P a r t I1 S p e c i f i c a t i o n must be
f o r m a l l y accounted f o r and c o n t r o l l e d .

XIX- 8
EXHIBIT X I X

The t e r m "change" r e f e r s t o any a l t e r a t i o n t o an


e s t a b l i s h e d CPCEI b a s e l i n e .

8.3.1 Change C l a s s i f i c a t i o n

Changes t o an e s t a b l i s h e d b a s e l i n e a r e c o n s i d e r e d
t o be e i t h e r of two t y p e s , C l a s s I o r C l a s s 11.

8.3.1.1 C l a s s I changes: changes which, because


of t h e i r c r i t i c a l i t y , r e q u i r e f o r m a l
p r o c u r i n g agency a p p r o v a l b e f o r e a
c o n t r a c t o r can e f f e c t them. Changes a r e
d e s i g n a t e d a s C l a s s I whenever one o r more
of t h e f o l l o w i n g i s a f f e c t e d :
a ) Operational c a p a b i l i t y a s s p e c i f i e d
i n t h e b a s e l i n e d P a r t I CPCEI
specification.
b ) Contract p r i c e o r schedule.
c) Systems equipment, computer programs,
o r f a c i l i t i e s produced by o t h e r
contractor(s) t o the extent t h a t the
a f f e c t e d o t h e r c o n t r a c t o r ( s ) must
accomplish a change t o m a i n t a i n
compatibility a t the i n t e r f a c e (s) .
8.3.1.2 C l a s s I1 changes: Changes which t h e c o n t r a c t o r
may e f f e c t w i t h o u t p r i o r a p p r o v a l by t h e
p r o c u r i n g agency and a t no a d d i t i o n a l
c o s t t o t h e p r o c u r i n g agency. Such changes
may i n c l u d e :
a ) Changes t o c o r r e c t e d i t o r i a l e r r o r s .
b ) changes t o c o r r e c t computer program
errors.
c) Other changes of a minor n a t u r e , w i t h i n
c a t e g o r i e s s p e c i f i c a l l y d e f i n e d by t h e
p r o c u r i n g agency, e . g . , a d a p t a t i o n d a t a
o r re-compiling w i t h i n s p e c i f i e d l i m i t s .

The c r i t e r i a g i v e n above a r e d e r i v e d mainly


from change p r o c e s s i n g r e q u i r e m e n t s g i v e n
i n MIL-STD-4 80. The major d i f f e r e n c e
i s i n t h e c l a s s i f i c a t i o n of computer program
e r r o r changes a s C l a s s I1 changes. Under
s t r i c t i n t e r p r e t a t i o n of MIL-STD-480
a computer program change of any t y p e a f t e r
FACI would be c l a s s i f i e d a s a C l a s s I change,
because t h e c o r r e s p o n d i n g p r o d u c t c o n f i g u r a -
t i o n b a s e l i n e would a l s o have t o be changed.
EXHIBIT X I X

I n a computer programming e f f o r t ,
t h e number of t h e s e changes can be
l a r g e even a f t e r FACI. The c o n t r a c t o r
must be given leeway i n making such
changes w i t h o u t having t o w a i t f o r t h e
approval of t h e p r o c u r i n g agency. To
avoid unnecessary d e l a y s , t h e c o n t r a c t o r
hay make t h e changes immediately. The
c o n t r a c t o r must update t h e P a r t I1
S p e c i f i c a t i b n t o r e f l e c t t h e change and
n o t i f y t h e p r o c u r i n g agency of t h e change.
8.3.2 Change P r o c e s s i n g
The c o n t r a c t o r i n i t i a l l y c l a s s i f i e s a l l proposed
changes which r e s u l t from h i s e f f o r t s . The i n i t i a l
d e t e r m i n a t i o n i s made according t o g u i d e l i n e s given
above and i s s u b j e c t t o review by a r e p r e s e n t a t i v e
of t h e p r o c u r i n g agency. C l a s s I changes a r e
documented i n an Engineering Change Proposal (ECP) a s
defined i n Exhibit I X .
9. TECHNICAL RIiTVIEWS AND INSPECTIONS

9.1 P r e l i m i n a r y Design Review


The purpose of t h e PBR i s t o e v a l u a t e t h e c o n t r a c t o r ' s i n i t i a l
d e s i g n approach p r i o r t o t h e implementation of t h i s approach.
T h i s review g i v e s t h e p r o c u r i n g agency t h e o p p o r t u n i t y t o
determine e a r l y i n t h e programming p r o c e s s i f t h e c o n t r a c t o r
i s designing a product t h a t a c t u a l l y s a t i s f i e s t h e require-
ments of t h e P a r t I S p e c i f i c a t i o n . It also serves as a
check on t h e c o m p a t i b i l i t y of t h e CPCEI i n t e r f a c e s w i t h
o t h e r end i t e m s . The o u t p u t of t h e review i s e i t h e r
concurrence by t h e p r o c u r i n g agency of t h e d e s i g n approach o r
a s e t of a c t i o n i t e m s t o be a c t e d on by t h e c o n t r a c t o r .

The PDR i s h e l d when t h e c o n t r a c t o r ' s d e s i g h a c t i v i t y


h a s p r o g r e s s e d t o t h e p o i n t where f u n c t i o n s have been
a l l o c a t e d t o i n d i v i d u a l computer program components (CPC's)
and flow c h a r t s showing t h e d a t d flow between a l l C P C ' s
have been produced. T h i s o c c u r s e a r l y i n t h e d e s i g n subphase
of t h e a c q u i s i t i o n phase. The f o l l o w i n g i s accomplished
i n t h e PDR:
a) The c o m p a t i b i l i t y of t h e s e l e c t e d d e s i g n approach
w i t h P a r t I of t h e CBCEI S p e c i f i c a t i o n i s e s t a b l i s h e d .
T h i s i s accomplished by review of flow c h a r t s , s t o r a g e
a l l o c a t i o n c h a r t s , t i k i n g e s t i m a t e s , d e s c r i p t i o n s of
s i g n i f i c a n t a l g o r i t h m s , and o t h e r e n g i n e e r i n g documents
a s r e q u i r e d by t h e p r o c u r i n g agency. An i n i t i a l
p r e s e n t a t i o n of t h e infoxmation r e q u i r e d i n s e c t i o n
3 . 1 of t h e P a r t I1 S p e c i f i c a t i o n may be used a s t h e
EXHIBIT X I X

b a s i s f o r t h i s review.
b) The i n t e g r i t y of t h e d e s i g n approach i s e s t a b l i s h e d .
T h i s i s accomplished by review of a l g o r i t h m s , proposed
programming t e c h n i q u e s , d e s i g n s i m u l a t i o n r e s u l t s ,
e s t i m a t e d s t o r a g e requirements, e t c .
c) The c o m p a t i b i l i t y of t h e CPCEI w i t h o t h e r computer
programs, o r equipment e x t e r n a l t o t h e computer i n
which t h e CPCET i s used, i s e s t a b l i s h e d . T h i s i s
accomplished by review pf proposed d a t a f o r m a t s ,
t i m i n g c o n s t r a i n t s , i n t e r f a c e drawings, and o t h e r
systems e n g i n e e r i n g documents a s determined by t h e
p r o c u r i n g agency.
9.2 C r i t i c a l Design Review (CDR)
A f t e r a p p r o v a l of t h e p r e l i m i n a r y d e s i g n approach, t h e
c o n t r a c t o r w i l l d e s i g n , i n d e t a i l , each computer program
component i d e n t i f i e d a t t h e PDR. This d e s i g n a c t i v i t y
r e s u l t s i n programming s p e c i f i c a t i o n s which a r e t h e b a s i s
f o r d e t a i l e d flow c h a r t i n g , coding, and t e s t i n g f o r t h e
CPC's. P r i o r t o " r e l e a s e " t o a programmer, t h e program-
ming s p e c i f i c a t i o n must be reviewed by t h e p r o c u r i n g agency
t o determine i f t h e CPC has been p r o p e r l y designed accord-
i n g t o t h e requirements of t h e P a r t I S p e c i f i c a t i o n . The
s u c c e s s f u l completion of t h i s review, t h e C r i t i c a l Design
Review ( C D R ) , i s p r e ~ e q u i s i t et o coding of t h e CPC by t h e
c o n t r a c t o r ( e x c e p t f o r any coding which may be r e q u i r e d f o r
t h e purposes of t h e CDR).
I n a l a r g e system s e v e r a l CDR'? may be r e q u i r e d , s i n c e t h e
i n d i v i d u a l CPCts w i l l be designed over a p e r i o d of time.
I t i s t h e r e s p o n s i b i l i t y of t h e p r o c u r i n g agency t o
schedule t h e C D R k s s o t h a t t h e c o n t r a c t o r ' s d e s i g n
a c t i v i t i e s can be e x p e d i t e d . S e v e r a l CPC's may be reviewed
a t a s i n g l e CDR. A p a r t i c u l a r CDR may be accomplished
s o l e l y by a review of t e c h n i c a l documents o r may r e q u i r e
t h e p a r t i c i p a t i o n of c o n t r a c t o r p e r s o n n e l depending on t h e
complexity and c r i t i c a l i t y of t h e C P C ' s . I n a l l cases t h e
c o n t r a c t o r must have a v a i l a b l e a s a minimum:
a) documents which e s t a b l i s h t h e i n t e r f a c e r e l a t i o n s h i p
between t h e CPC and i r s environment; and
b) t h a t p o r t i o n of S e c t i o n 3 . 2 of t h e CPCEI S p e c i f i c a t i o n
P a r t I1 which p e r t a i n s t o t h e CPC. This i n f o r m a t i o n ,
which may be i n d r a f t form when approved, w i l l s e r v e a s
t h e programming s p e c i f i c a t i o n bor t h e CPC,
Other i n f o r m a t i o n t h a t may be r e q u i r e d , i n c l u d e s :
a) test r e s u l t s f o r s e l e c t e d algorithms, o r
b) s i m u l a t i o n r e s u l t s i n d i c a t i n g t h e f e a s i b i l i t y and
i n t e g r i t y of t h e CPC d e s i g n approach.
EXHIBIT X I X

The C D R ' s a r e h e l d p r i o r t o committing t h e CPC d e s i g n t o


coding and debugging. The f o l l o w i n g i s accomplished a s
a p a r t of t h e C D R ' s :
a ) The c o m p a t i b i l i t y of t h e CPC d e s i g n with t h e requirements
t e s t e d i n t h e P a r t I CPCEI S p e c i f i c a t i o n i s e s t a b l i s h -
ed, and t h e i n t e g r i t y of t h e d e s i g n i s e v a l u a t e d .
b ) The system c o m p a t i b i l i t y of t h e CBC d e s i g n i s
e s t a b l i s h e d by comparison of a p p l i c a b l e i n t e r f a c e
c o n t r o l documents.
The r e s u l t of a CDR i s e i t h e r approval by t h e p r o c u r i n g
agency of t h e CPC d e s i g n o r a s e t of a c t i o n i t e m s r e q u i r i n g
e f f o r t by t h e c o n t r a c t o r .
9.3 F i r s t A r t i c l e C o n f i g u r a t i o n I n s p e c t i o n (FACI)
FACI e s t a b l i s h e s t h e adequacy of t h e P a r t I1 S p e c i f i c a t i o n
a s an a c c u r a t e and complete d e s c r i p t i o n of t h e CPCEI. The
primary p r o d u c t of FACI i s formal acceptance by t h e p r o c u r i n g
agency of P a r t I1 of t h e CPCEI S p e c i f i c a t i o n a s an a u d i t e d and
approved document which c o n s t i t u t e s t h e p r o d u c t c o n f i g u r a t i o n
b a s e l i n e . During F A C I , t h e a u d i t i s accomplished by
e s t a b l i s h i n g t h e e x a c t r e l a t i o n s h i p of t h e CPCEI t o i t s d e t a i l -
e d t e c h n i c a l d e s c r i p t i o n i n t h e P a r t I1 CPCEI S p e c i f i c a t i o n .
I n g e n e r a l , FACI i s h e l d upon completion of t h e P a r t I1
CPCEI S p e c i f i c a t i o n and p r e l i m i n a r y q u a l i f i c a t i o n t e s t i n g
of t h e CPCEI i n a s i m u l a t e d environment. I f t h e CPCEI
i s developed a t t h e c o n t r a c t o r ' s f a c i l i t y f o r subsequent
shipment t o t h e u s e r ' s f a c i l i t y , FACI should be h e l d p r i o r
(and p r e r e q u i s i t e ) t o t h i s shipment. I f t h e CPCEI i s
developed a t t h e u s e r ' s f a c i l i t y , FACI s h o u l d be h e l d
p r i o r t o f i n a l q u a l i f i c a t i o n t e s t i n g of t h e computer
based system. The c o n t r a c t o r must have a v a i l a b l e a t FACI:
a) The P a r t I1 C P C E I S p e c i f i c a t i o n ;
b) t h e c a r d decks, t a p e s , e t c . , p r o p e r l y marked, which
c o n t a i n t h e CPCEI;
C) t h e r e s u l t s of p r e l i m i n a r y q u a l i f i c a t i o n tests; and
d) a d d i t i o n a l e n g i n e e r i n g documents a s r e q u i r e d by t h e
p r o c u r i n g agency.
The f o l l o w i n g i s accomplished a s a p a r t of each FACI f o r
CPCEI ' s :
a) The c o n f i g u r a t i o n of t h e CPCEI as evidenced by
i d e n t i f i c a t i o n markings on t h e t a p e s and c a r d decks
involved compares d i r e c t l y t o t h e P a r t I1 C P C E I
S p e c i f i c a t i o n . The e x i s t e n c e of each program component
( i . e . , subprograms) and p a r t ( t a p e s , c a r d deck, e t c . )
of t h e implemented CPCEI i s v e r i f i e d .
EXHIBIT X I X

b) The completeness of t h e P a r t I1 S p e c i f i c a t i o n i s
v e r i f i e d ( i . e . , P a r t I1 must be complete and must
d e s c r i b e t h e CPCEI t o t h e p r o c u r i n g a g e n c y ' s s a t i s *
f a c t i o n ) . A l l changes r e s u l t i n g from PAC1 m u s t
be i n c o r p o r a t e d b e f o r e P a r t I1 i s approved. The
a u d i t e d P a r t I1 S p e c i f i c a t i o n t h e n becomes t h e
product configuration baseline.
C) The r e s u l t s of p r e l i m i n a r y a c c e p t a n c e t e s t i n g
( t e s t s of t h e e n t i r e CPCEI i n a s i m u l a t e d e n v i r o n -
ment) a r e a u d i t e d t o d e t e r m i n e :
1. t h e s t a t u s o f t h e CPCEI a s a working system e l e m e n t ,
2. t h e v a l i d i t y of t h e q u a l i f i c a t i o n t e s t r e s u l t s ,
3 . i f a l l m o d i f i c a t i o n s r e s u l t i n g t h e r e f r o m have been
i n c o r p o r a t e d i n t h e P a r t I1 CPCEI S p e c i f i c a t i o n .
d) Where t h e p r o c u r i n g agency h a s o r d e r e d d e l i v e r y o f
s p e c i f i c c o n f i g u r a t i o n management r e c o r d s of t h e
CPCEI, such d a t a i s a u d i t e d by d i r e c t comparison of
t h e i n f o r m a t i o n c o n t a i n e d i n t h e P a r t I1 S p e c i f i c a t i o n .
e) The c o n t r a c t o r ' s computer program r e l e a s e system and
change c o n t r o l p r o c e d u r e s a r e reviewed and v a l i d a t e d .

Post-FACI Reviews

The p r o c u r i n g agency may r e q u i r e a s e r i e s of post-FACI


reviews. These reviews a r e h e l d t o :
a ) e n s u r e t h a t a l l changes t o t h e CPCEI s i n c e FACI have
been p r o p e r l y i n c o r p o r a t e d and accounted f o r ; and
b ) d e t e r m i n e i f t h e CPCEI can be c e r t i f i e d a s ready f o r
use i n a mission. T h i s i s accomplished by review of any
major d e s i g n changes s i n c e FACI and by review of f i n a l
qualification test results.

The manner, t y p e and number of t h e s e reviews i s l e f t t o t h e


d i s c r e t i o n o f t h e p r o c u r i n g agency; b u t , a s a minimum, one
review s h a l l be h e l d p r i o r t o u s e i n a m i s s i o n . The end r e s u l t of
t h i s review i s a c c e p t a n c e of t h e CPCEI f o r m i s s i o n u s e . This
review i s u s u a l l y h e l d a s p a r t of an o v e r a l l review f o r t h e system
i n which t h e CPCEI o p e r a t e s .

10. CONFIGURATION ACCOUNTING

I n o r d e r t o m a i n t a i n CPCEI C o n f i g u r a t i o n S t a t u s t o t h e d e g r e e
necessary f o r e f f e c t i v e configuration c o n t r o l , t h e contractor
must p r e p a r e and u p d a t e change documentation, keep an i n d e x of
a l l m a i n t a i n e d i t e m s , and a d e s c r i p t i o n of t h e components of
t h e CPCEI. See E x h i b i t s V I I and I X .

1 0 . 1 Version D e s c r i p t i o n Document
A v e r s i o n D e s c r i p t i o n Document i s used t o accompany t h e
EXHIBIT X I X

r e l e a s e of a CPCEI o r any p a r t t h e r e o f . It contains


t h e i d e n t i f i c a t i o n of t h e computer program element
d e l i v e r e d , and i n c l u d e s p e r t i n e n t a d d i t i o n a l informa-
t i o n r e l a t i n g t o s t a t u s , and usage. T h i s i n c l u d e s :
a) element i d e n t i f i c a t i o n (by name and number) ;
b) i n v e n t o r y of m a t e r i a l c o n t a i n e d ( e . g . , t a p e s ,
decks of t h e CPCEI, a b i l i t y programs, s u p p o r t
problems, documentation);
C) a l i s t of a l l C l a s s I and I1 changes;
d) i n t e r f a c e c a p a b i l i t y and a d a p t a t i o n i n s t r u c t i o n s ;
e) o p e r a t i o n a l d e s c r i p t i o n ; and
f) installation instructions.
10.2 CPCEI Maintenance
I n a d d i t i o n t o change paper g e n e r a t e d f o r each e r r o r
c o r r e c t i o n ( a £t e r FACI) , t h e f o l l o w i n g accounting
procedures a r e r e q u i r e d t o p r o t e c t t h e CPCEI and e n s u r e
t h a t t h e P a r t I1 S p e c i f i c a t i o n a d e q u a t e l y r e f l e c t s t h e
c o n f i g u r a t i o n of t h e CPCEI.
a) Each time a p a r t (subprogram c a r d deck, master
program t a p e , permanent memory, e t c . ) i s modified,
and s u c c e s s f u l l y reassembled o r recompanied, t h e
s u f f i x a f i t s p a r t number must be i n c r e a s e d by one.
I n t h i s manner t h e s u f f i x s e r v e s a s a v e r s i o n number
f o r t h e p a r t . A m o d i f i c a t i o n may encompass s e v e r a l
program changes and may be r e p o r t e d a t p e r i o d i c
i n t e r v a l s t o minimize paper work.
b) The a p p r o p r i a t e documents ( i n c l u d i n g t h e l i s t i n g s )
must be updated t o r e f l e c t t h e number and c o n f i g u r a t i o n
of t h e modified p a r t .
C) Where a p p r o p r i a t e , one m a s t e r c a r d deck and two
cop,ies of t h e l a t e s t v e r s i o n of t h e CPCEI master
t a p e s s h a l l be maintained. I n a d d i t i o n , t h e two
p r e v i o u s v e r s i o n s of t h e m a s t e r t a p e ( s ) shall. be
maintained w i t h a p p r o p r i a t e l i s t i n g s .
EXHIBIT XX

PREPARATION OF
INTERFACE CONTROL DOCUMENTATION
AND INTERFACE REVISION NOTICES
E X H I B I T XX

PREPARATION O F -

INTERFACE CONTROL DOCUMF,NTATION


AND INTERFACE R E V I S I O N N O T I C E S

CONTENTS

Paragraph Page

1. PURPOSE. . . . . . . . . . . . . . . . . . . XX-1
2. S C O P E . . . . . . . . . . . . . . . . . . . . XX-1
3. A P P L I C A B I L I T Y . . . . . . . . . . . . . . . . XX-1

4. REFERENCE DOCUMENTS. . . . . . . . . . . . . XX-1

5. EXPLANATION O F TERMS . . . . . . . . . . . . XX-2

6. PROCEDURAL REQUIREMENTS. .......... XX-2

XX- i i
PWPARATION OF INTERFACE CONTROL
DOCUMENTATION AND INTERFACE
REVISION NOTICES

1. PURPOSE

T h i s E x h i b i t p r o v i d e s NASA Apollo o r g a n i z a t i o n s and c o n t r a c t o r s


w i t h r e q u i r e m e n t s and guidance f o r t h e p r e p a r a t i o n o f Apollo
Program I n t e r f a c e C o n t r o l Documentation ( I C D ) and r e v i s i o n s
t h e r e t o , I n t e r f a c e R e v i s i o n N o t i c e s (IRNs) .
2. SCOPE

These i n s t r u c t i o n s d e f i n e t h e c o n t e n t of t h e f o l l o w i n g
documentation which p e r t a i n s t o Apollo Program I n t e r f a c e
Management and f o r i t s c o o r d i n a t i o n a p p r o v a l and implementation.

a. I n t e r f a c e C o n t r o l Documentation ( I C D )

b. I n t e r f a c e Revision N o t i c e ( I R N )

An I n t e r f a c e C o n t r o l Document ( I C D ) s h a l l b e p r e p a r e d and
implemented f o r e a c h Apollo Program i n t e r f a c e , Each I C D s h a l l
i n c l u d e b o t h s i d e s of e a c h i n t e r f a c e and s h a l l be p h y s i c a l l y ,
f u n c t i o n a l l y and p r o c e d u r a l l y compatable between i n t e r f a c i n g
c e n t e r s , a p p l i c a b l e c o n t r a c t o r s and a p p l i c a b l e s p e c i f i c a t i o n s e
T h i s E x h i b i t i s a p p l i c a b l e t o a l l NASA c e n t e r s and t h e i r con-
tractors.

4. REFERENCE DOCUMENTS

EXHIBITS: I P r e p a r a t i o n of Program, P r o i e c t and System


Performance and Design Requirements
Specifications

II P r e p a r a t i o n of C o n t r a c t End I t e m D e t a i l
S p e c i f i c a t i o n (Prime Equipment)

I11 P r e p a r a t i o n of C o n t r a c t End I t e m D e t a i l
Specification (Facility)

IV P r e p a r a t i o n of C o n t r a c t End I t e m D e t a i l
S p e c i f i c a t i o n ( I d e n t i f i c a t i o n item)

V P r e p a r a t i o n of C o n t r a c t End I t e m D e t a i l
S p e c i f i c a t i o n (Requirement I t e m s )

VI P r e p a r a t i o n of D e t a i l S p e c i f i c a t i o n
( C r i t i c a l Components )

IX P r e p a r a t i o n of E n g i n e e r i n g Change P r o p o s a l
f o r C o n t r a c t End Items

XX- 1
EXHIBIT XX
XI Requirements f o r C o n f i g u r a t i o n I d e n t i f i -
c a t i o n and Acceptance o f C o n t r a c t End
Items and R e l a t e d Data

XIV Formal C o n f i g u r a t i o n Management Reviews,


I n s p e c t i o n , and Demonstrations

XVI C o n f i g u r a t i o n I d e n t i f i c a t i o n and Accounting


Reports Requirements

XVII Explanation of I ' t e m s

5. EXPLANATION OF TERMS

See E x h i b i t X V I I

6. PROCEDURAL REQUIREMENTS

6.1 Background I n f o r m a t i o n

I n t e r f a c e a r e a s a r e normally i d e n t i f i e d d u r i n g p r e p a r a t i o n
o f P a r t I o f t h e a p p l i c a b l e s p e c i f i c a t i o n ( s ) . They a r e
documented, t e c h n i c a l l y c o o r d i n a t e d t o a s s u r e t h a t
c o m p a t a b i l i t y e x i s t s between t h e i n t e r f a c i n g a r e a s , approved
t e c h n i c a l l y and by C o n f i g u r a t i o n C o n t r o l Board (CCB) a c t i o n ,
i n c o r p o r a t e d by r e f e r e n c e i n P a r t I of t h e a p p l i c a b l e
s p e c i f i c a t i o n s , implemented by a f f e c t e d c e n t e r s and con-
t r a c t o r s , and a r e s u b j e c t t o C l a s s I change c o n t r o l upon
approval.

6.2 General Requirements

6.2.1 Type of I n t e r f a c e s A l l p h y s i c a l i n t e r f a c e s , and


r e l a t e d f u n c t i o n a l and p r o c e d u r a l i n t e r f a c e
r e q u i r e m e n t s a r e t o be r e f l e c t e d w i t h i n each
interface area identified. Technical a n a l y s i s
of the c o n d i t i o n s w i t h i n e a c h a r e a s h a l l determine
t h e i n t e r f a c e s t o be c o n t r o l l e d .

6.2.1.1 Physical Interfaces are those interfaces


i n v o l v i n g t h e mechanical assembly and
s p a t i a l r e l a t i o n s h i p between i n t e r c o n -
n e c t i n g p a r t s of I n t e r - C e n t e r C o n t r a c t
End Items (CEI' s ) . The r e q u i r e m e n t s
i n c l u d e p h y s i c a l and c l e a r a n c e e n v e l o p e s
t h a t a r e e s t a b l i s h e d t o avoid i n t e r f e r e n c e s
and t o p e r m i t a c c e s s .

6.2.1.2 Functional I n t e r f a c e s a r e those i n t e r f a c e s


r e l a t e d t o physical interfaces involving
s p e c i f i c system d e s i g n c h a r a c t e r i s t i c s .
The r e q u i r e m e n t s i n c l u d e s t r u c t u r a l l o a d s ,
f l u i d f l o w s , and e l e c t x $ c a l c i r c u i t
characteristics; a s well a s those inter-
faces involving the i n t e r a c t i o n o r
i n f l u e n c e of c o n d i t i o n s imposed by one
system o r component upon a n o t h e r , o r from
EXHIBIT XX

e x t e r n a l s o u r c e s , e . g . , shock, v i b r a t i o n ,
heat transfer, acoustics, pressure,
r a d i a t i o n , atmospheric a b b e r a t i o n s , e t c .

6.2.1.3 Procedural I n t e r f a c e s a r e those i n t e r f a c e s


r e l a t e d t o physical i n t e r f a c e s involving
t h e sequence o f e v e n t s o c c u r i n g i n t h e
assembly, a l i g n m e n t , s e r v i c e , maintenance,
t e s t and o p e r a t i o n Of r e l a t e d systems,
hardware, and domputer programs.

6.2.2 Preparation - I n t e r f a c e C o n t r o l Documentation o r


r e v i s i o n s t h e r e t o , s h a l l be p r e p a r e d s o a s t o
include only t h e e s s e n t i a l information required
t o completely d e f i n e t h e i n t e r f a c e . The f o l l o w i n g
c r i t e r i a s h a l l be used t o d e f i n e t h e n e c e s s a r y
information t o be included:

6.2.2.1 A l l d e s i g n c r i t e r i a and d e s i g n r e q u i r e -
ments which e s t a b l i s h t h e o v e r a l l t e c h -
n i c a l d i r e c t i o n f o r hardware and s o f t -
ware i n t e r f a c e d e s i g n , d e s c r i b i n g t h e
g e n e r a l p a r a m e t e r s and c o n s t r a i n t s ,
i n c l u d i n g l i m i t s and t o l e r a n c e s , under
which t h e hardware and s o f t w a r e must
function.

6.2.2.2 P h y s i c a l and f u n c t i o n a l d e s i g n d e t a i l s ,
and o p e r a t i o n a l and p r o c e d u r a l r e q u i r e -
ments i n c l u d i n g t h e i r l i m i t s and t o l e r -
a n c e s , t h e changing o f which w i l l have
an impact on hardware o r s o f t w a r e , p e r -
formance, c o s t o r Schedule accomplish-
ments, ( i n f o r m a t i o n t h a t must be
c o n t r o l l e d through CCB ' s a t a l l a f f e c t e d
C e n t e r s t o a s s u r e t h a t a l l s i d e s of t h e
i n t e r f ace a r e f u l l y coordinated) .
6.2.2.3 The I C D s h a l l n o t i n c l u d e i n f o r m a t i o n
Such as o p e r a t i o n a l o r p r o c e d u r a l r e q u i r e -
rrlents t h a t by n a t u r e normally v a r y up
u n t i l t h e launch d a t e , and does n o t make
c o n t r o l between C e n t e r s p r a c t i c a l o r n e c e s s a r y .

6.2.3 Originaki,on and Changes

6.2.3.1 Origination of I C D s - An I n t e r f a c e Control


Document, o r changes t h e r e t o , may b e
o r i g i n a t e d a t any C e n t e r o r by any of i t s
contractors. When o r i g i n a t e d by a con-
t r a c t o r i t s h a l l b e a p a r t o f an E n g i n e e r i n g
Change P r o p o s a l (ECP) .
6.2.3.2 Changes t o I C D s - C o n t r a c t o r o r i g i n a t e d
changes w i l l be s u b m i t t e d a s P r e l i m i n a r y
I n t e r f a c e Revision N o t i c e s (PIRN ' s ) and
r e c e i v e d a s a p a r t of an ECP change pack-
age by t h e a p p l i c a b l e C e n t e r C C B ' s . A l l

XX- 3
EXHIBIT XX
PIRN's shall be routed by the CCB to the
organization Panel Chairman or Co-Chair-
man (at the Center receiving the ECP)
for review and evaluation. A copy of
the ECP (s) shall accompany the PIRN1s
and the change(s1 shall be handled as a
package. Approved PIRN's may become
IRN's.
6.2-3.3 Effectivities - Effectivities for ICD1s/
IRN's shall be assigned to, and on, each
ICD/IRN for the Apollo Program end items
for which the Center is responsible.
Where effectivities cover "subsequent"
items, the ICD/IRN shall note all appli-
cable effectivities.
6.2.3.4 Approval - Each ICD or IRN shall be sub-
mitted to the appropriate Panel Co-Chair-
men or Senior Representatives. The Panel
Chairman first receiving the document will
apply the Apollo Interface Control Document
form decal, which provides a signature
block for the approval signatures of the
Panel Co-Chairmen or Senior Representatives.
Differences must be worked out by the Co-
Chairmen and Senior Representatives until
all concerned have evidenced their approval
by signature, or the document is invali-
dated and returned to the originator with
appropriate comment. The Panel Co-Chairmen
will forward approved documents to each
affected Center Level I1 CCB(s) for approval/
disapproval and implementation by CCBD,
6.2.4 Implementation - Once approved by the affected Apollo
Program Manager (Center) CCB1s (and forwarded to the
Repository for release) ICD's and approved changes
(IRN's) thereto shall be unilaterally implemented by
the appropriate Center/Project contracts office
against the affected contractor(s). Contractor im-
pact response shall be in the form of ECP's submitted
to affected CCB1s thru established contractual
channels. Where major impacts might be expected,
the Centers, unless implementation is directed by
the Apollo Program Director CCB, may request con-
tractor (s) impact (s) in the form of an ECP (s) and
resolve Inter-Center incompatibilities thru joint
Apollo Program Management, CCB action, or by forwarding
recommendations to the Apollo Program Director CCB
for resolution prior to implementation.
6.2,5 Interface Revision Notice (IRN) Processing - Inter-
face Revision Notices (IRN's) shall be used to doc-
ument approved changes against an approved ICD.
EXHIBIT XX

T e c h n i c a l and program a p p r o v a l of an I R N w i l l
r e s u l t i n i n c o r p o r a t i o n of t h e I R N i n a subse-
q u e n t r e v i s i o n of t h e I C D .

6.2.5.1 I n t e r f a c e C o n t r o l Document R e v i s i o n s
s h a l l be p r e p a r e d t o i n c o r p o r a t e o n l y
approved I R N ' s i n an I C D . Each r e v i s i o n
s h a l l be a l p h a - d e s i g n a t e d and s h a l l i n d i -
c a t e t h e i d e n t i t y of t h e change.

6.2.5.2 A f t e r P a n e l a p p r o v a l , I R N ' s and r e v i s e d


I C D ' s s h a l l be s u b m i t t e d f o r a p p r o v a l t o
a f f e c t e d C C B ' s i n accordance w i t h e s t a b -
l i s h e d change p r o c e d u r e s .

6.2.6 I C D Maintenance - A r e v i s i o n t o an I C D s h a l l be
made t o i n c o r p o r a t e approved IRN's when a maximum
of s i x approved I R N ' s a r e o u t s t a n d i n g o r any I R N
i s o u t s t a n d i n g f o r 90 days.

XX- 5

e U.S. GOVERNMENT PRINTING OFFICE : 1970 0 - 372-783

You might also like