The weather chart summarizes weather conditions over a 30 day period for a construction project. It includes a grid with time of day along one axis and days of the month along the other to indicate whether the weather was fair, cloudy, with rain showers or heavy rain at different times. The chart was prepared by the project engineer for the contractor and reviewed by the project engineer for the DPWH.

Uploaded by

Gera Mel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views1 page

Sample Weather Chart Blank

The weather chart summarizes weather conditions over a 30 day period for a construction project. It includes a grid with time of day along one axis and days of the month along the other to indicate whether the weather was fair, cloudy, with rain showers or heavy rain at different times. The chart was prepared by the project engineer for the contractor and reviewed by the project engineer for the DPWH.

Uploaded by

Gera Mel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

WEATHER CHART

PROJECT NAME & LOCATION:


________________________________________________________________________________________________
________________________________________________________________________________________________

CONTRACTOR: _______________________________________________
PERIOD COVERED: __________________

1 2 3 4 5

6 7 8 9 10

11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

26 27 28 29 30

Prepared By:
TIME OF THE DAY
FAIR 11PM
12MN
1PM
N

2PM
10PM
_____________________
12N

CLOUDY
Project Engineer (Contractor)
31 9PM
9AM
31 3AM
3PM

Reviewed/Checked By:
RAIN SHOWER
6AM

8PM 4PM

7PM 5PM
HEAVY RAIN 6PM ___________________
Project Engineer (DPWH)
DAY OF THE MONTH