23 May 2017 1709063173B0Q0Q6XPFR, SRLIS-P1 (Optimized) PDF
23 May 2017 1709063173B0Q0Q6XPFR, SRLIS-P1 (Optimized) PDF
Phase-I
WAPCOS LIMITED
(International Consultant in water Resources
Power and Infrastructure, Development)
76-C, Sector – 18, Institutional Area, Gurgaon,
Haryana, India, Tele-fax : + 91-124-2399427
E-mail: [email protected]
TABLE OF CONTENTS
SITA RAMA LIFT IRRIGATION PROJECT, PHASE – I
PRE-FEASIBLITY REPORT
CONTENTS
Page Nos.
SALIENT FEATURES
Sl. No. Particulars Details
1 Project Name Sita Rama Lift Irrigation Project
(Phase – I), Telangana
2 Districts Benefitted Khammam, Bhadradri Kothagudem
& Mahabubabad
3 State Telangana
4 Location
Latitude 16° 45’ N - 18° 37’ N
Longitude 79° 49’ E - 81° 48’ E
5 River Godavari River
6 Average Rainfall of the Project Area 1045 mm
7 Dummugudem Anicut
a) River Godavari
b) Village Dummugudem
c) Tehsil/Block Dummugudem
d) District Bhadradri- Kothagudem
e) Location 17° 52′ 26″ N, 80° 53′ 6″ E.
f) Hydrology
i) Catchment Area 281000 Sq. Km.
ii) Water Availability at Anicut
50% Dependability 30581 MCM
75% Dependability 7696 MCM
8 Length of the Conveyor System
i) Gravity Open Channel (Km) 210
ii) Tunnel (Km) 4.65
iii) Pumping Main (Km) 8
Total (Km) 224.65
9 Command Area
Districts Khammam, Bhadradri Kothagudem
& Mahabubabad
a) New Ayacut 3,28,853 Ac./ 1,33,085 Ha
CHAPTER–1
INTRODUCTION
1.1. GENERAL
Telangana is situated on the Deccan Plateau, in the central stretch of the eastern
seaboard of the Indian Peninsula. It covers 114,800 square kilometres (44,300 sq mi).
The region is drained by two major rivers, with about 79% of the Godavari
River catchment area and about 69% of the Krishna River catchment area, but most of
the land is arid. Telangana is also drained by several minor rivers such as the Bhima,
the Manjira and the Musi between the two rivers Godavari and Krishna.
point in Telangana, is located at the northern end of the district. In 2006 the Indian
government named Khammam one of the country's 250 most backward districts (out
of a total of 640). It is one of the districts in Telangana currently receiving funds from
the Backward Regions Grant Fund Programme (BRGF).
Bhadradri- Kothagudem & Khammam Districts are endowed with Agro climatic and
soil conditions in which a wide range of horticulture crops like mango, banana,
cashew, coconut, oil palm, cocoa, pepper etc. are grown. Production and distribution
of various kinds of fruits, vegetables and flowers and their seeds are the major
activities supported by the horticulture Department. The district has only one major
irrigation project namely Nagarjuna Sagar Project (NSP) and there are some medium
irrigation projects like:
Earlier before the Bifurcation of Andhra Pradesh, two project namely (i) Rajiv
Dummugudem Lift Irrigation Scheme (ii) Indira Sagar Rudramkota Lift Irrigation
Scheme were proposed in order to harness the irrigation potential of left out ayacut
from existing irrigation schemes, which is about 6.5 Lakh Acres out of which about 2
Lakh Acres was proposed to be covered by Rajiv Dummugudem Lift Irrigation
Scheme and 1.25 Lakh Acres was proposed to be covered by Indira Sagar Lift
Irrigation Scheme. Even after execution of this scheme, about 2.55 Lakh Acres will
still remain to be covered by any future irrigation scheme (refer table below). After
bifurcation of Andhra Pradesh 7 Mandals of Khammam District were transferred to
Andhra Pradesh and it was amalgamated in West Godavari District of Andhra
Pradesh, in this process the intake structure of proposed Indira Sagar Lift Irrigation
Scheme went into administrative boundary of Andhra Pradesh. As such there is a need
for revision of the Indira Sagar Scheme in order to avoid administrative difficulties in
O&M between two adjoining states.
In view of above the present Telangana Government decided not only to integrate
earlier proposed Indira Sagar and Rajiv Sagar Lift Irrigation Scheme into one lift
irrigation scheme but also cover the Gap Ayacut which is not coming under any
present or future irrigation scheme. It is in this context the present scheme is renamed
as Sita Rama Lift Irrigation Scheme is being formulated to cover about 9.36 Lakh
Acres of Khammam, Bhadradri Kothagudem and Mahabubabad Districts. The project
has been planned to execute in two phases. Phase – I of the Sita Rama Lift Irrigation
Scheme will cover the Khammam, Bhadradri Kothagudem and Mahabubabad
Districts whereas Phase – II will cover the Khammam, Bhadradri Kothagudem and
Mahabubabad Districts. Phase – I of this scheme covers command area of 2,72,921
Ha with new ayacut of about 1,33,085 Ha and Stabilization of about 1,39,836 Ha.
The present report deals with Phase-I of the Sita Rama Lift Irrigation Scheme.
The Index map of the Phase – I of the project is given as Fig. 1.1.
TELANGANA
INDIA
PROJECT AREA
1.3. COMMUNICATION
The proposed Lift Irrigation Project is proposed to withdraw water from Godavari
River U/S of existing Dummugudem Anicut. The Dummugudem Anicut is located at
Dummugudem Mandal in Bhadradri-Kothagudem district at 17° 52′ 26″ N and 80°
53′ 6″ E.
The project area has got good network of roads and Railways. The project area is
about 350 Km from Hyderabad, 145 Km from Khammam and about 200 Km from
Warangal. Bus service is also available from Khammam and Warangal to the study
area. The nearest railway station to study area is Aswapuram which is located in and
around 10-kilometer distance. Hyderabad and Rajahmundry are the nearest Airports.
Temperature:
The project area has an average annual temperature of 28.3°C. Project Area
experiences typical Indian climatic conditions. Summer season is hot and the
temperatures can climb rapidly during the day. Monsoon season brings certain amount
of rainfall and the temperatures gradually reduce during this period. After the onset of
the monsoon day temperatures are much lower and as the winter approaches they
reduce further. The climate in the project area is generally dry and is very hot in May
with temperature rising up to 52° C. Normally the temperature varies from 41° C in
summer to 16° C in winter.
Rainfall:
The average annual rainfall of the project area is 1045 mm, monthly rainfall ranges
from 1.7 mm rainfall in December to 260.4 mm in July. July is the wettest months of
the year. The mean seasonal rainfall distribution is 805.5 mm in southwest monsoon
(June-September), 155.9 mm in northeast monsoon (Oct-Dec),12.1 mm rainfall in
winter (Jan-Feb) and 71.5 mm in summer (March – May). The percentage distribution
of rainfall, season-wise, is 77.08% in southwest monsoon, 14.92 % in northeast
monsoon, 1.16 percentage in winter and 6.84 % in summer.
The mean monthly rainfall and temperature distribution of the project area is given in
Fig 1.2.
40.4 260.4
38.3 241.7
35.8 36.7
32.6 32.8
31.8 32.6 32
29.7 30.3
29
27.5 26.9 170.2
25.7 25.1 24.6 24.7
23 23.2
133.2
20.7 119.0 20.2
18 17.4
51.5
35.2
Humidity
Humidity is low as it is not located near the ocean. Conditions are generally dry
during this period. During monsoon period, the relative humidity in the project area is
high during the months of August and September; generally exceeding 75 per cent.
The relative humidity is minimum in the month of May, which is the driest part of the
year having relative humidity lower than 60%.
Cloudiness
In the study area, June to October is the period when more than half of the sky is
covered with clouds, while only about ¼ of sky is clouded from January to March. Of
the days in July and August, skies are overcast. In clear weather months of January to
March, about 10-13 days are free of clouds.
Winds
Winds are generally light to moderate with some increase in force during the month of
May and during southwest monsoon season. During the post monsoon season and the
early half of the winter season, winds are very light and variable in direction in the
mornings and mostly northeasterly to easterly in the afternoons. During the latter half
of the winter season and in March-April, the morning winds continue to be lighter and
variable in direction; the afternoon winds being mostly easterly to southeasterly. In
May, winds are predominantly from west and in southwest monsoon season from west
to northwest. In the study area the maximum & minimum mean wind speeds are about
5.1 km/hr and 1.5 km/hr respectively.
The project is spread over one district of the state of Telangana located in Southern
peninsular India. The Project area has an average elevation of 107 metres.
The regional strike of bedding is NW-SE and the dips are mostly towards northeast up
to 30. The sullavis in the north strike N-S and dip at 25° towards the East. The
granites have steep to vertical joints trending in (i) NW-SE, (ii) WNW-ESE and (iii)
N 10° E – S 10° W, directions. The foliation of the gneissic granites trends in a N 10°
W – S 10° E direction and has a dip of 75° to the west. The granites are mostly
massive.
A number of faults have been deciphered in the area, out of which some are regional
faults. Two of the faults in the area are regional, one trending in a NW-SE direction
forming a boundary between the crystal lives and the sedimentaries and the other
trending in a NNW-SSE direction passing through Murmur. There is considerable
thinning of beds and offsetting along the faults with the development of mylonite.
The structure of present report has been briefly described in the ensuing paragraph so as
to briefly present an overview of the content of report covered in this Pre-Feasibility
Report.
Chapter-3: Interstate Aspects: It covers the interstate issues involved with Godavari
basin in Telangana and its water sharing guidelines
Chapter-5: Preliminary Design Features and Criteria for different river valley
structures: covering the basic planning and design of the various project components
required for smooth functioning of identified scheme.
Chapter-8: Cost Estimate: covering the analysis of rates for various items of work,
estimation of the quantities of various items for civil works and Electro-mechanical
works and finally estimating overall cost of the project at various sites.
Chapter-9: Benefit Cost Ratio, Financial Return & Internal Rate of Return:
covering the estimation of project benefit stream and project cost stream to evaluate
benefit-cost ratio (B/C Ratio), Internal Rate of Return (IRR) and Payback period apart
from sensitivity analysis of the B/C Ratio and IRR for various scenarios of change in
cost and benefit.
CHAPTER-2
PHYSICAL FEATURES
2.1. GENERAL
Telangana is the 29th state of India, formed on June 2nd 2014. The state has an area of
1,12,077 Sq.Km and is the twelfth largest state in India with a population of
3,52,86,757 souls as per 2011 census. Hyderabad City will serve as the joint capital of
Telangana and Andhra Pradesh States for up to the next ten years. The Telangana
region was part of the Hyderabad state from Sept 17th 1948 to Nov 1st 1956, until it
was merged with Andhra state to form the Andhra Pradesh state.
After decades of movement by the people of this region for a separate State, Telangana
was ultimately created by passing the AP State Reorganization Bill in both houses of
Parliament. Telangana is bordered by the states of Maharashtra to the north and north
west, Chhattisgarh to the north, Karnataka to the west and Andhra Pradesh to the east
and south. Its major cities include Hyderabad, Warangal, Nizamabad, Khammam,
Karimnagar and Ramagundam.
Godavari and Krishna are the two major rivers in this state, besides having numerous
lakes in this region. Telangana is also drained by other minor rivers such as Manair,
Bhima, Dindi, Kinnerasani, Manjeera, Munneru, Moosi, Penganga, Praanahita, and
Peddavagu and Taliperu. The area is divided into two main regions, the Eastern Ghats
and the Deccan Plateau.
2.2. TOPOGRAPHY
Telangana is situated on the Deccan Plateau, in the central stretch of the eastern
seaboard of the Indian Peninsula. It covers 1,12,077 Sq.Km. The region is drained by
two major rivers, with about 79% of the Godavari River catchment area and about
69% of the Krishna River catchment area, but most of the land is arid. Telangana is
also drained by other minor rivers such as Manair, Bhima, Dindi, Kinnerasani,
Manjeera, Munneru, Moosi, Penganga, Praanahita, and Peddavagu and Taliperu.
Topographically about 10% of the area in the State lies below 150 metres altitude.
About 50% lies between 150 and 500 metres and nearly 10% between 500 and 600
metres both forming the plateau surface comprising of peneplain surfaces. About 30%
of the area with an elevation above 600 metres is treated as hilly tract, in which 25%
lies between 600 and 900 metres and the remaining at more than 900 metres above the
sea level.
GEOGRAPHICAL DIVISIONS
The Deccan is a peninsular plateau located in central India that includes inland
sections of the states of Telangana, Andhra Pradesh, Kerala, Chhattisgarh,
Maharashtra and Karnataka. The Deccan Plateau makes up most of central and
southern India. The Deccan Plateau limits to the high table land between the Narbada
(Narmada) and Krishna rivers, where remnants of lava beds are to be found.
The Western Ghats mountain range is very tall and blocks the moisture from the
southwest monsoon from reaching the Deccan Plateau, so the region receives very
little rainfall. The eastern Deccan Plateau is at a lower elevation spanning the
southeastern coast of India. It is an ancient plateau made of rocks of Archaean origin.
This plateau region consists of whole Telangana region. The plateau extends largely
between 200-500 metres altitude except in Ranga Reddy, Mahbubnagar, Nizamabad,
Medak and Adilabad (West portion of Telangana region), where the plateau elevated
between 500-900 metres.
Its forests are also relatively dry but serve to retain the rain to form streams that feed
into rivers that flow into basins and then into the Bay of Bengal. Most Deccan plateau
rivers flow south. Most of the northern part of the plateau is drained by the Godavari
River and its tributaries, including the Indravati River, starting from the Western Ghats
and flowing east towards the Bay of Bengal. Most of the central plateau is drained by
the Tungabhadra River, Krishna River and its tributaries, including the Bhima River,
which also run east. The southernmost part of the plateau is drained by the Kaveri
River, which rises in the Western Ghats of Karnataka and bends south to break
through the Nilgiri Hills at the island town of Shivanasamudra and then falls into
Tamil Nadu at Hogenakal Falls before flowing into the Stanley Reservoir and the
Mettur Dam that created the reservoir, and finally emptying into the Bay of Bengal.
The river valleys are densely populated, but the dry areas lying in between the rivers
are often lightly settled. Irrigation is uneven because the rivers are rain-fed.
Nevertheless, the volcanic soil of the north lends itself to cotton cultivation. Other
cash crops include millet, oil-seeds, and wheat, and there are tea and coffee plantations
in the south. Among major Deccan cities are Poona, Hyderabad, and Bangalore.
Generally, there is scanty rainfall in the southern part. Towards the northern part, a
belt of Gondwanas, the coal deposits have been preserved along the lower Godavari
trough and most of the area is covered by dry deciduous forests.
The Eastern Ghats lies in between the coastal plains and the deccan plateau, the
Eastern Ghats begin from Khondomal-Simlipal hills of Orissa, pass through Telangana
in a South-west direction and merge with Western Ghats near Nilagiris of Tamil Nadu.
They consist of different types of hills and present themselves as a broken chain of
hills unlike Western Ghats. In between the Godavari and the Krishna rivers, there is an
almost clear break in the chain of Eastern Ghats. The Eastern Ghats in Telangana pass
through the districts of Khammam, Nalgonda and Mahabubnagar, districts.
The hills are closely formed and they rise high in the north, mostly above 750 m with a
few peaks exceeding 1500 m elevation. The highest peak in these Ghats is Sambari
Konda with an elevation of about 1530 m.
The Eastern Ghat's river valleys are one of the most fertile regions of the country with
The hills of Eastern Ghats extending from the south of the Krishna river up to the
Mahabubnagar district, are variously Nallamalais Erramalais, Lankamalais and
Seshachalam. The Nallamalais are 112 Kms long and their height is 800 m. The region
between the Nallamalais and Velikondas is a scanty rain area. There are no thick
forests in this region.
The biggest river of peninsular India and the second largest in the country, River
Godavari, flows eastwards across the Deccan Plateau from Western Ghats. It rises in
Karnataka; 1.4%
Maharashtra;
Andhra Pradesh; 48.6%
4.9%
Telangana; 18.4%
The Godavari basin, lies between latitudes 16º 16’ N and 22º 43’ N and longitudes 73º
26’ E and 83º 7’ E, extending over an area of nearly 3,12,812 square km, roughly
Chapter-2: Physical Features 2-5 WAPCOS Limited
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE- I)
about 10% of the total geographical area of India. The basin comprises areas in the
State of Maharastra, Madhya Pradesh, Telangana, Andhra Pradesh, Chhattisgarh,
Odisha and Karnataka.
The drainage basin of the Godavari comprises rolling and undulating country - a
series of ridges and valleys interspersed with low hill ranges. Large flat areas of the
type characteristics of the Indo-Gangetic plains are scarce except in the delta. The
western edge of the basin is an almost unbroken line formed by the Sahyadris range of
Western Ghats. The interior of the basin is a plateau divided into a series of valleys
sloping generally towards east. The northern boundary of the basin comprises a series
of tableland varying in elevation, which has withstood the effect of ages of denudation
better than the terrain to the north and south of them. Large stretches of plains
interspersed with hills range lie to the south. The Eastern Ghats & Bay of Bengal
forms the eastern boundary. The Eastern Ghats are not as well defined or continuous
as the Sahyadris range on the west. They rise from the plains of East Godavari and
Visakhapatnam to the level of the table land of Jeypore. The delta of the Godavari
formed by deposits at the mouth of the river over the ages, consists of a wide belt of
the river borne alluvium.
About 64 km from its source, the Godavari receives the water of Darna river and at a
short distance lower down the river, it gets out of the high rainfall zone of the Western
Ghats and there is no further significant contribution to the river flow until about 150
km below when it receives the combined waters of the Pravara and Mula rivers.
About 483 km lower, Manjra river joins from the south. The river Pranahita
conveying the combined waters of the rivers Penganga, Wardha and Wainganga falls
into the Godavari about 306 km below the Manjra confluence. About 48 km lower,
the Godavari receives the water of the Indrāvati River. Both Pranahita and Indrāvati
are major rivers in their own right. Sabari is the last major tributary which falls into
the Godavari 100 km above Rajahmundry.
The slope of the river from its source to 100 km distance is 2.7 m per km, 0.3 m per
km in the next 700 km and 1.19 m per km in the next 160 km up to the confluence of
Godavari with Pranahita. In the next reach, up to the sea, the slope is very mild, about
0.23 m per km.
The river Manjra rises in the Balaghat range in the Bhir district of Maharashtra at an
altitude of about 823 m. The river flows in a generally east and southeasterly direction
for 515 km. The total length of the river from the source to its confluence with the
Godavari, at an altitude of 329 m is about 724 km.
The Pranahita with its three principal branches, the Penganga, the Wardha and the
Wainganga is by far the most important tributary of the Godavari. The Penganga
rises at an altitude of about 686 m in the Buldana range in Maharashtra and after
flowing for a length of 676 km in a generally southeasterly and easterly direction joins
river Wardha at an elevation of 174 m. Except in its upper most reach of about 161
km which is mostly barren and hilly, the river passes through dense forests of
Yeotmal and Nanded districts and is then joined by several tributaries.
The Wardha rises at an altitude of 777 m in the Betul district of Madhya Pradesh and
enters Maharashtra about 32 km from its source. After flowing further for a distance
of 483 km in a generally southeasterly direction it joins the Wainganga at an elevation
of 145 m. For the last 42 km of its course it forms the boundary between Maharashtra
and Andhra Pradesh. Throughout its course, river flows through dense forests.
The combined waters of the Wainganga and the Wardha, now called Pranhita, flow
for 113 km along the border between Maharashtra and Andhra Pradesh before falling
into the Godavari at an elevation of 107 m.
The Indravati rises at an altitude of 914 m in the Kalahandi district of Orissa on the
western slopes of the Eastern Ghats. It flows westward through Koraput and Bastar
districts, turns south and about 531 km from its source joins the Godavari at an
elevation of about 82 m. The important tributaries of the Indravati are the Narangi,
Boardhing, Kotri and Bandia from its right and Nandiraj from its left.
The Sabari also known as the Kolab is one of the important tributaries of the
Godavari. The Sabari rises at an altitude of 1,372 m in the Sinkaram hill range of the
Eastern Ghats. After flowing for a short distance in northwesterly and westerly
direction, it turns south and joins Godavari about 418 km from its source at an altitude
of 25 m about 97 km upstream of Rajahmundry. The index map of the Godavari basin
is given at plate-2.1.
2.6. SUB-BASINS
The Godavari Basin has been divided into 12 sub- basins as per the Report of the
Godavari Water Disputes Tribunal as given below in Table 2.2.
Table 2.2 Sub-basins of Godavari Basin
Sl. No. Sub-basin Details
1. G-1: UPPER GODAVARI This sub-basin includes the reach of the river Godavari
from its source to its confluence with the Manjra. The
sub-basin excludes the catchment areas of the Pravara,
the Purna and the Manjra but includes that of all other
tributaries which fall into the Godavari in this reach.
2. G-2: PRAVARA This sub-basin includes the entire catchment of the
Pravara from the source to its confluence with the
Godavari including the catchment areas of the Mula and
other tributaries of the Pravara.
3. G-3 : PURNA This sub-basin includes the entire catchment of the
Purna and of all of its tributaries.
4. G-4: MANJRA This sub-basin includes the entire catchment of the
Manjra from its source to its confluence with the
Godavari including the catchment areas of the Tima, the
Karanja, the Haldi, the Lendi, Maner and other
tributaries.
2.7. METEOROLOGY
2.7.1. Rainfall
The Godavari Basin receives the maximum rainfall during the months of June to
September due to south west monsoon. The south-west monsoon establishes itself
over Godavari Basin by about 2nd week of June and withdraws towards end of
September. South-west monsoon rainfall accounts for about 80% of the annual
rainfall. The Godavari Basin receives annually a rainfall of about 1062 mm on the
average. The normal rainfall over the basin has a minimum of the order of 500 mm
over parts of Nasik and Ahmednagar districts of Maharashtra, the area being far away
from Bay of Bengal and the Western Ghats posing a barrier for moisture inflow from
the Arabian Sea. Westward of Nasik, the annual normal rainfall increases
progressively and is about 1600 mm over extreme western parts of the basin.
Eastward of the line connecting Ahmednagar to a point about 40 km west of
Aurangabad, the normal annual rainfall again increases gradually to more than 1500
mm over extreme eastern parts of the basin.
2.7.2. Temperature
The Godavari Basin has a tropical climate. The mean annual surface temperature is
about 24°C in Western Ghats. It increases gradually towards east and reaches about
29°C on the eastern coasts.
The maximum temperature increases from 35°C in the Western Ghats to 40°C in the
middle of the plateau and it goes down again to about 35° C on the east coast.
The relative humidity is high in the basin during the southwest monsoon season. With
the withdrawal of the monsoon, humidity gradually decreases and in summer the air is
generally dry. The climate generally remains dry for about 7 months in the year from
November to May. The maximum relative humidity is generally recorded during July
/ August and the minimum during April / May. The maximum relative humidity in the
basin varies between 60% and 89%, the average being 83.3%. The minimum relative
humidity ranges from 15% to 29.5%, the average being 22%.
2.7.4. Evaporation
2.7.5. Evapo-Transpiration
Temperature varies from 200 C to 350 C in a year causes lot of monthly variations in
the potential evapotranspiration in the basin. Minimum potential evapotranspiration in
the basin is 30 to 100 mm during January / February and maximum goes upto 400 to
450 mm during April / May months throughout the basin.
Winds are generally light to moderate with increase in speeds in the later part of
summer and in the southwest monsoon season. Wind blows mostly from southwest to
northwest during the monsoon season and in post monsoon season wind blows from
the northwest to north direction. In the cold season the wind blows from northwest to
southwest. Maximum wind speed in the basin varies between 10.6 kmph and 22.5
kmph, the average maximum wind speed being 14.7 kmph over the basin. The
minimum wind speed varies between 1.3 kmph and 5 kmph, the average being 3.2
kmph.
2.7.7. Demography
Demographics are the quantifiable statistics of a given population. On the basis of the
2001 census, and the percentage of each district, within the basin, the total population
in the basin works out to about 60.48 million. The population density ranges from 25-
50 persons per Sq. km to 500-1000 persons per Sq. km. East Godavari, West
Godavari, Nagpur, Pune, Rangareddy and Visakhapatnam districts have higher
population density as compared to the other districts of this Basin. Nagpur is the most
important urban center in the basin. Other important towns are Nasik, Aurangabad,
Karimnagar, Warangal, Rajahmundry, Akola, Amravati, and Ahmednagar. The
industrial potential of the Godavari basin is high. There are more than 441 towns,
58072 settlements and 33 cities in the basin. There are six airports falling in the basin.
In some areas, urbanization has been a factor in increasing the overall density. The
population of the region is concentrated in plains, low lands and isolated basins which
have the coincidence of good soil cover and water. Godavari basin has a rich variety
of mineral wealth spread over vast areas.
The Godavari basin extends over an area of 3,12,813 km2, which is nearly 10% of the
total geographical area of the country and lies between latitudes 16 o 16’ N and 22o 43’
N and longitudes 73o 26’ E and 83o 07’ E. The basin comprises areas in the States of
Maharashtra, Madhya Pradesh, Chhattisgarh, Telangana, Andhra Pradesh, Karnataka
and Odisha. The State-wise distribution of the areas is given in Table 2.1. The
Godavari basin is bounded on the north by the Satmala Hills, the Ajanta Range and
the Mahadeo Hills, on the south and east by the Eastern Ghats and on the west by the
Western Ghats. It is roughly triangular in shape and the main river itself runs
practically along the base of the triangle. Except for the hills forming the watershed
around the basin, the entire drainage basin of the river Godavari comprises of
undulating country, a series of ridges and valleys interspersed with low hill ranges.
Large flat areas which are characteristic of the Indo-Gangetic plains are scarce except
in the delta. The Sahyadri ranges of Western Ghats form the western edge of the
basin. The interior of the basin is a plateau divided into a series of valleys sloping
generally towards east. The Eastern Ghats, which form the eastern boundary, are not
so well defined as the Sahyadri range on the west. The northern boundary of the basin
comprises of table lands with varying elevation. Large stretches of plains interspersed
by hill ranges lie to the south.
2.7.9. Soils
Soil is composed of minerals, mixed with some organic matter, which differ from its
parent materials in terms of its texture, structure, consistency, colour, chemical,
biological and other characteristics. The Godavari basin consists of large undulating
plains divided by low flat topped hill ranges. The important soil types found in the
basin are black soils, red soils, lateritic soils, alluvium, mixed soils and saline and
alkaline soils. The characteristics and the distribution of the soils are influenced
essentially by the nature and intensity of weathering and the mode and rapidity of
fluvial transport on the plateau. Much of the plateau region of the basin carries
Chapter-2: Physical Features 2-12 WAPCOS Limited
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE- I)
different shades, and thickness of black soil generally recognized as black cotton soil
or regur. Genetically, the black soils range between a residual soil with a mature
profile and the river-borne alluvium of the flood plains to which a large amount of
colluvium is also contributed, particularly on the margins of the river valleys where it
is likely to inter-finger with alluvium. In higher rainfall area, the chemical decay of
trap rocks gives rise to red clay, so typical of Sahyadrian zone, noticed on bare
mountain slopes and seen in the muddy ochre-colour flood waters of the tributaries.
The soils in the valleys are darker, deeper and more fertile. While the deep black soils
are confined to the valleys, the medium black soils, the most widespread in the region,
occur on the interfluves and the light black soils are found on the hill slopes in less
rainy area.
The Lateritic soils are poor in organic matter with a varying pH range of 5.5 to 6.5
often covered with forests or orchards. Major part of arable land in Eastern Ghats
contains mixed red and black soils deficient in humus, nitrogen, phosphoric acid,
potash and lime. Extremely porous and generally sedentary type of soils are formed
through the weathering of metamorphic rocks, e.g., schists and gneisses, and are
generally deficient in plant nutrients with low pH value. They are generally red with
patches of grey colour, being too shallow with very little clay content. The problem of
soil erosion is quite serious in certain areas, particularly in the Eastern Ghats and the
Bastar plateau. The alluvial soils are transported soils and have been deposited with
alternate layers of sand and silt. The older alluvium has a more clayey texture and
dark colour as compared to the recent alluvium of sandy texture and lighter colour.
Land use pattern is a fairly useful indicator in understanding the environmental set up,
socio-economic status, infrastructural facilities and climatic conditions of an area. The
basin holds a variety of land cover and land use classes. It is found that nearly 22 land
use/land cover classes exist in the basin. Major part (59.57%) of the basin is covered
with agricultural land. Forest area is about 29.78% and water bodies occupy 2.06% of
the total basin area. The north-eastern part of the basin is particularly rich in forests
with deciduous forest covering 26.16% of the total basin area. The other main
categories of land use/land cover in the basin are fallow land, Scrub land, Scrub
forest, river/stream/canal, rural, urban mining, swamp/mangrove etc.
The drier and hotter Malkangiri plateau and the adjoining area the moist deciduous
species are replaced by drier teak forests. In the Dankaranya region of the basin owing
to difficult terrain, extensive forest cover, shallow soil, the net sown area is very low.
Agriculture here is almost totally dependent on rainfall. The moist deciduous forests
stretch along the north-eastern border of the region occupying parts of Adilabad,
Karimnagar, Warangal, Khammam where the amount of normal rainfall exceeds 100
cm. Irrigation facilities have encouraged the cultivation of wheat, sugarcane, in
certain pockets, though millets, largely Jowar and Bajra, remain the principal crops.
The settlements in the valley have followed the water courses and are located on the
terraces at a safe distance from flood waters.
RISSA
)�19°
G-4( ANJRA)
17 HRA 17°
(MI DESH
�
STATEBOURDARY
BASINBOURDARY
SUB-BASINBOURDARY
RIVERS
�
160
16'
SCALE
10 0 10 20 30 40 SO 60 70 80 90 100KM
KM
15' 730
74° 75 ° 76° 77° 780 79 ° 80 ° 81 ° 82 ° g30 8 0
3. INTERSTATE ASPECTS
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE-I)
CHAPTER-3
INTER-STATE ASPECTS
3.1 GENERAL
The river Godavari is an Inter State river, involving seven of the peninsular states,
namely Maharashtra, Karnataka, Telangana, Andhra Pradesh, Chhattisgarh,
Madhya Pradesh and Odisha.
About 64 km from its source, the Godavari receives the water of Darna river and at
a short distance lower down the river, it gets out of the high rainfall zone of the
Western Ghats and there is no further significant contribution to the river flow until
about 150 km below when it receives the combined waters of the Pravara and Mula
rivers. About 483 km lower down, Manjra river joins from the south. The river
Pranahita conveying the combined waters of the rivers Penganga, Wardha and
Wainganga falls into the Godavari about 306 km below the confluence of Manjra
River. About 48 km lower, the Godavari receives the water of the Indrāvati River.
Both Pranahita and Indrāvati are major rivers in their own right. Sabari is the last
major tributary which falls into the Godavari 100 km above Rajahmundry.
The catchment of the first three sub-basins – the upper Godavari, the Pravara and
the Purna lies entirely in the State of Maharashtra. The drainage area of Manjira
sub-basin is contributed by the three states of Maharashtra, Karnataka and
Telangana. The middle Godavari sub-basin lies mainly in the state of Telangana.
The Manair sub-basin lies completely within Telangana while the drainage area of
Penganga sub-basin is contributed by Maharashtra and Telangana. Madhya
Pradesh, Maharashtra also contributes to Wardha and Pranahita sub-basins.
Telangana, Andhra Pradesh, Chhattisgarh contribute to Lower Godavari sub-basin.
The catchment area of the Indravati sub-basin lies partly in Chhattisgarh and partly
in Odisha. The last sub-basin, Sabari lies in the territories of Andhra Pradesh,
Chhattisgarh and Odisha.
The competitive claims of the riparian states for the utilization of the waters of
Godavari River System have given rise to disputes among them in sharing of the
waters. During 1951, the Planning Commission convened a conference with the
representatives of the then riparian states of Bombay, Madras, Hyderabad, Madhya
Pradesh and Mysore and brought about an agreement on the utilization of these
waters.
However, subsequently with extensive territorial changes having come into force
with the formation of new states on account of States Reorganization, the newly
formed states of Maharashtra, Karnataka, Madhya Pradesh, Chhattisgarh,
Telangana and Andhra Pradesh became the riparian states in place of the old states
of Bombay, Madras, Hyderabad, Mysore etc. In view of such territorial changes in
the basin area, non-participation of the State of Odisha in the 1951 agreement and
Chapter-3: Interstate Aspects 3-2 WAPCOS Limited
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE-I)
the growing demands towards the utilization of basin waters by the riparian states,
application for reference of the dispute to a Tribunal was made by the concerned
states. In April 1969, the Central Government constituted the Godavari Water
Disputes Tribunal and referred the disputes for adjudication.
Due to the pendency of this case before the tribunal, it was not possible for any
state to get any of its Projects on Godavari and its tributaries cleared for taking up
implementation, affecting the developmental activities in the basin. However,
while the dispute was before the Godavari water disputes tribunal, the party states
entered into a number of individual agreements from time to time for mutual
adjustment of their claims, to enable sanction of projects for the utilization of the
Godavari waters. The tribunal incorporated these agreements in their final
adjudications and award.
As per the Godavari Water Disputes Tribunal (GWDT) report, dated 06th October
1975, the State of Maharashtra and Andhra Pradesh have agreed to take up 3
projects namely (1) Lendi Project (2) Lower Penganga (3) Pranahita-Chevella
(alternatively proposed as Kaleshwaram Barrage) at appropriate time with agreed
water utilization.
The net water availability at 75% dependability at Dummugudem anicut for the
present purpose considering utilization under ongoing and planned projects as
mentioned above is 271.8 TMC and details of the same is described in Chapter 4-
Hydrology.
ANNEXURE-3.1:
ANNEXURE- 3.1
ALLOCATION OF WATER AS PER GODAVARI WATER DISPUTES TRIBUNAL REPORT (SHEET 1 OF 4)
PURNA (G-3)
ALL WATERS UPTO
3. Clause I of Agreement between _ _
SIDDES WAR DAM
Mah and AP Dtd 6-10-1975
MIDDLE GODAVARI(G-5)
Clause I of Agreement between 11.33 Mm3 (0.4 TMC) ALL REMAINING
6.
Mah AP & MP Dtd 19-12-1975 WATERS
MANER (G-6)
Clause II of Agreement between
7. ALL WATERS
Mah AP & MP Dtd 19-12-1975
ANNEXURE-3.2:
WATER AVAILABILITY TO TELANGANA + ANDHRA PRADESH AS PER GWDT REPORT (G-5 to G-12)
Utilization up to
Lower Godavari G-10 24963 6548.23 5974.12 210.97 301.76 90.79
Indira Sagar Project
PENGANGA - (G - 7)
Name of the
Existing On going Future Inter State Aspects
project
MCM TMC MCM TMC MCM TMC State Entitlement
Medium Satnala 58.00 2.05 - - 2) 255 MCM below the above sites
Telangana
State +
Mathadivagu - - 25.63 0.91 All remaining waters
Andhra
Pradesh
Sub
4.07 0.24 6.26
total
Name of the
Existing On going Future Inter State Aspects
project
MCM TMC MCM TMC MCM TMC State Entitlement
Madhya Pradesh
1) 255 MCM (9TMC) above Upper Wardha
Minor 24.00 0.85 - - 1.5 0.05
Project
Maharashtra
Bhandara Projects
Telangana
State +
All Remaining Water
Andhra
Pradesh
Sub
0.85 0.05
total
Total 0.90 TMC
Madhya Pradesh
in Wainganga Valley.
iv) All waters up toPujaritola Project
Peddavagu at Borepalli - - 20.95 0.74
on Bagh river.
v) All waters up toSitekasa dam on
Peddavagu at Wandan - - 37.37 1.32
Bawanthari
vi) All waters up toTotladoh on
Palavagu - - 27.46 0.97
Pench river
vii) 670.70 Mm3 (59 TMC) below
Peddavagu - Ada - - 243.49 8.60
above projects
i) 425 Mm3 (15TMC) regulated
Mahar
ashtra
Peddavagu - Neelawai - - 48.87 1.73
supply from MP
Sub
11.54 2.05 177.50
Total
Total 191.09 TMC
Inclusive of
Kaleshwaram Project
Major
Chhattisga
i) All water up to
rh
a) BaruNadi integrated Project.
Chhattisgarh
Tinarayavagu near village Korrapal. Lat.
18o 11' 0" N and Long. 81o 18' 56" E.
CHAPTER–4
HYDROLOGY
4.1. GENERAL
The present scheme is proposed to integrate not only the Ayacut of earlier
proposed Rajiv Sagar and Indira sagar Lift irrigation projects but also the Gap
Ayacut of Khammam District which are not being covered by any other scheme.
Besides this, the stabilization of command area of the some of the existing schemes
are also proposed to be covered under this scheme. It is in this context the present
scheme is now named as Sita Rama Lift Irrigation Scheme and is formulated to
irrigate about 9.36 Lakh Acres (including New Ayacut and Stabilization) of
Khammam, Bhadradri Kothagudem & Mahabubabad Districts of Telangana.
Sita Rama Lift Irrigation Project is proposed to withdraw water from Godavari
River U/S of existing Dummugudem Anicut which was constructed during British
regime to facilitate Navigation in the river. The Dummugudem Anicut is located at
Dummugudem Mandal in Bhadradri kothagudem district at 17°52′26″ N and
80°53′6″ E.
The project has been planned to execute in two phases. Phase – I of the Sita Rama
Lift Irrigation Scheme will cover the Khammam, Bhadradri Kothagudem &
Mahabubabad Districts whereas Phase – II will cover the same Districts. Phase – I
of this scheme covers command area of 2,72,921 Ha with new ayacut of about
1,33,085 Ha and Stabilization of about 1,39,836 Ha. The present report deals with
Phase-I of the Sita Rama Lift Irrigation Scheme.
The Godavari basin marking the sub basins as above is given as Plate 4.1. The
Schematic diagram of the Godavari river system showing Rain gauge stations,
Isohyetal map of Normal rainfall of Godavari basin and Map of Gauge and
Discharge stations in the basin are given in Plate 4.2 and Plate 4.3 respectively.
The rain gauges and hydrological observation stations that can be considered for
carrying out the hydrological studies of the project are given in Annexure 4.1 and
Annexure 4.2 respectively. The observed flow data at Perur is being used for
assessing the availability of water at project site. The observed flow (monthly) data
at Perur for the period from 1966-67 to 2012-13 (47 years) is given in Annexure
4.3.
a) Data Consistency
For this study, the flow data of the CWC hydrological observation station namely
Polavarm, Koida, Perur, Somanpally and Mancherial are used. The consistency
check has been carried out by specific flow analysis and results are as under.
Table 4.2 - Specific Flows at Perur and adjoining sites on Godavari (ltrs/sec/sq.km)
Site
Month Polavaram Koida Perur Somanpally Mancherial
June 849063 1054733 741896 70863 744961
July 6028669 6389981 4842500 492870 4762343
August 11797621 13331942 9577856 1310953 9535893
September 8466875 8628774 6919188 1303360 6624625
October 3510786 3685957 2685605 728491 2542218
November 917938 985203 692229 131444 648804
December 520585 571369 297399 57205 292174
January 368891 418548 194261 36305 180408
February 307902 367431 156317 33347 148778
March 262016 323890 111149 31618 107964
April 239875 271049 70361 17825 66069
May 225242 272569 63085 11180 53632
The graphical representation of the results is given as Fig 4.1 to Fig 4.6
Fig 4.1
Fig 4.2
Fig 4.3
Fig 4.4
Fig 4.5
Fig 4.6
As already mentioned the Perur G&D site (2,68,200 sq.km) maintained by Central
Water Commission falls in the upstream of the project site. It is decided to consider
the data at Perur for assessing the net availability of water at the project site taking
into account the utilization under ongoing and planned projects as the existing
utilization is already reflected in the observed data at Perur. The utilization likely
to take place under ongoing and planned in the sub basins above perur are as
under.
Chapter-4: Hydrology 4-5 WAPCOS Limited
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE- I)
The observed flow data at Perur (CA – 2,68,200 sq.km) has been reduced pro rata
at Dummugudem project site (CA-2,81,000 sq.km) and the 75% dependable flow
at the site is 1609 TMC (Annexure 4.4). The net water availability at
Dummugudem anicut for the present purpose considering utilization under ongoing
and planned projects as mentioned above are given in the Tabular form given
under.
4.3. SEDIMENTATION
Since the structure at Dummugudem is only an anicut, the chance of facing any
problem on account of sedimentation is quite remote and if at all encountered it is
going to be quite insignificant. Therefore, detailed sedimentation study is perhaps
not needed.
23° 23°
MADHYA PRADESH
22° 22°
N A
NH
KA
V ER
RI
A
NG
GA
N
AI
R.
W
GH
21° 21°
BA
M A H A R A S H T R A W
G-8(WARDHA)
A G-9 (PRANHITA)
A
RD CHHATTISGARH
HA
NN
R.
WU
AR
AN .
NI R
THA
KO
PU
R
N
GODAVARI RIVER A
20° R. 20°
R
G-1(UPPER GODAVARI) PENGANGA R
IVE
PE
G-3(PURNA) NG G-7(PENGANGA) NIBRA R.
AN ORISSA
GA
PRAVARA RIVER GO
DA R
VA
MA
RI
RK
G-2(PRAVARA) R
R.
AN
A
DI
RIVER G-11(INDRAVATI)
MULA
NHIT
INDRAVATI RIVER
P RA
GO S IDD
HA R
DA .
19° V 19°
AR
IR NA
IV
ER
CH ND
IN IR
G-5(MIDDLE GODAVARI) TA AJ
R. R.
MANJRA
U
RIV
LENDI
G
ER R.
PROJECT ER
OD
P ER
G-4(MANJRA) MAN
AV
TAL
G-10
AR
IR
G-6(MANER)
IV
ER
G-12 (SABARI)
R
POTTERU
RIV
VAGU
(LOWER GODAVARI) ER
RIV
A RI
18° U 18°
HA
LD ER
SIL
S AB
IR
M .
AN LEGEND
JR MU
A RR
R. ED RU STATEBOURDARY
R. LE
MU BASINBOURDARY
PA
DU
SUB-BASINBOURDARY
BE
UR
RIVERS
M
ANDHRA PRADESH
KARNATAKA
17° 17°
GODAVARI BASIN
SCALE L
KM 10 0 10 20 30 40 50 60 70 80 90 100 KM
A
NG
BE
F
YO
BA WAPCOS
16° 16°
73° 74° 75° 76° 77° 78° 81° 82° 83° 84°
79° 80°
PLATE 4.2
73°
74° 75° 84°
23° 76° 77° 78° 79° 80° 81° 82° 83°
23°
NEOLARI
AMARWARA
MADHYA PRADESH ROOMAL
JAMUNIA
22° CHHINDWARA SEONI DHUTI
CHAURAI DORI 22°
CHINCHBUND
KHATTANJHIRI
BALAGHAT
MULTAI
ATNER SAUSAR WARASEONI DONGARGAON
DEOLAPAR WARANAIN
CHANDPUR KHYRBUND
BARUD LANJI
SAONER RAMTEK GONDIA
MORSI BODALKASA
CHANDUR BAZAR PARSEONI
KATOL THARSA CHORKHAMARA
NAGPUR BHANDARA CHHATTISGARH
21° M A H A R A S H T R A DEORI 21°
SAKOLI
AMRAOTI ARVI KHARANGHI
KHOLAPUR
JAMNER BADNER UMRER
KHAMGAON MURTIJAPUR CHANDUR RLY PAUNI
WARDHA
PACHORA AKOLA
KALVAN DHAMANGAON TALEGAON
MALEGAON
BULDHANA
G-8(WARDHA) BRAHMAPUR
CHALISGAON NEB HINGANGHAT
PATUR CHIMUR GHORAJHERI
CHAMDOR
NAND GAON DARWHA YEDTMAL
DINDORI KANNOD SILLOD CHIKHLI G-9 (PRANHITA)
PIMPALGAON DANEGAON MANGRULPUR WARORA BHANUPRATAPUR
OZAR AERO. NIPHAD BOLTHAN SIRPUR SINDE WAHI ASOLA
20° YEOLA KHULDABAD DEOLGAONRAJA DIGRAS KESKAL
NASIK WASHIM
TRIMBAK KOLEGAON KOPARGAON PANDERKOWRA WANI NALESAR ANTAGARH 20°
AURANGABAD LONAR RISAD G-7(PENGANGA) CHANDRA PUR
SIN NAR VAIJAPUR PUSAD
IGATPURI
G-3(PURNA) HINGOLI NARAYAN PUR
SANGAMNER GANGAPUR
AKOLA KALMANOOR G-11(INDRAVATI)
NEVASA PAITHAN SIDHESHWAR UMARKHED ADILABAD
G-2(PRAVARA) SHRI RAMPUR KONADA GAON
SIRPUR
RAHURI SHEV GAON OOTNOOR ASIFABAD
GEORAI BOATH KASHIPUR
PATHARDI SWARNAPI NAVRANG PUR
G-1(UPPER MANJLEGAON PARBHANI
19° GODAVARI) NANDED G-5(MIDDLE GODAVARI)INDANAPALLI
JOWLYNALLAKHANAPUR JAGDAL PUR 19°
BHIR LINGAPUR
KANDHAR MUDHOLE DOOD GAON
MAGADI UPLOOR KADDAM BHOPAL PATNAM JEYPORE
PATODA MALEGAON JAGTIAL MANCHERIAL
MOMINABAD BILLOLI ARMOOR ANKASPUR LUXETTIPET CHINNUR BIJAPUR DANTEWARA KORAPUT
CHOWSALA NAVIPET RAMGUNDAM
SHRI GONDA NIZAMABAD
KALLAM BODHAN AMBARI PET MAHADEVPUR
CHINTAKUNTA POTANGI
SULTANABAD MANTHANI
DEGLOOR MANCHAPPA NARAYANPUR
G-4(MANJRA) BOMENDRA PALLI SIRSILLA KARIMNAGAR RAMPUR NUGURU G-12 (SABARI)
BANSWADA KESHAPATNAM SUKMA
VAGU PROJECT G-10 (LOWER MALKAN GIRI
KAMAREDDY (MANER) PALAMPET ARAKUVALLEY
GUNKAL G-6 HAZURABAD GODAVARI)
MANAIR SHAMIGARAM MULUG
18° SANTHPUR ROYANPALLI PARKAL LAKHNAVARAM PADARU
SIDDIPET HANAMKUNDA SALII VAGU CHERLA 18°
BHALKI BIDAR MEDAK PROJECT
NAGASANIPALLI ANANTAGIRI RAIWADA CAMP
WARANGAL DUMMGUDEM CHINTAPALLI
ANDOLE GAJWEL TULABADA
KINNERSANI(P) KONTA KALYANPURAM
SANGAREDDY ANKAPALLE
ZAHIRABAD BHADRACHALLAM TANDAVA DAM SITE
NARASAPUR PALANCHU NARASAPATAM
CHODYAN
BURGAMPAD
ALLIPALLI ANNAVARAM
SINGABUPALAYAM YELLAVARAM
GUNDLA
THANIKALLA
POLAVARAM PRATHIPADU
17°
ANDHRA PRA DESH GOPALPURAM PEDDAPURAM
KARNATAKA KOVVUR 17°
BOWLESHWARAM
NIDADAVOLE
CHINTAPALLI
RALLI
DUVVA RAMCHANDRA PURAM
TANUKU KOTHAPET
MUMMIDI
VARAM
BHIMAVARAM LAKSHMIPALAM
AL
NG
BE
F
YO
16° BA
16°
73°
74° 75° 84°
76° 77° 78° 79° 82° 83°
80° 81°
PLATE 4.3
73° 74° 75° 76° 77° 78° 79° 80° 81° 82° 83° 84°
23° 23°
MADHYA PRADESH 42
22° 22°
WAIN
GA
NG
41
39
A RIVER
G-9 (PRANHITA)
KA
40
AI
N
CHHATTIS GARH
NH
AN
GA
32
WA
NG
A
21° 38 21°
RI
RDH
ER V
AR
.
MAHARASHTRA
G-8(WARDHA) 37 36
31
BRA
GA
RH
I
KHO
WUN
30
NA
26
PU
G O D A V A R I R.
57 35
R
AR 34
NA
L.
28 AN
R.
20° 20°
MU
PENGAN
G-1(UPPER GODAVARI) GA
RI 25 29
VE
G-3(PURNA) G-7(PENGANGA) R
55 P EN
GA
G-2(PRAVARA) R. DU NG ORISSA
M RA DH A 24 33
UL
A A GOD NA R27
. G-11(INDRAVATI)
C.W.C. G & D SITES 56 AV AVA
MA
PR RI
1. POLAVARAM
RK
EL
A
2. KOIDA G-5 23 11 SK
AN
3. KONTA 54 51 BA
DI
GO
4. INJARAM 52 (MIDDLE
TI
NHIT
DA
10 16 18
5. POTTERU 22
VA
6. SARADAPUT
VA
GODAVARI) 15 20
PRA
RI
RA
7. SANGAM RI 13
19° 8. PERUR VE
R
19 19°
9. PATHAGUDEM 53 IND JOURNALA
10. MEDAPALLI
50 21 12
45 17
11. MEDADAPALLI MAN 46 9
12. TUMNAR JRA R
IVE
13. CHINDNAR R MANAR
14. CHERRIBEDA
AGU
15. AMABAL 49 44 43 8 BA
16. SONARPAL
RD 6
DAV
R
HA
17. JAGDALPUR 47 14
NE
18. KOSAGUMDA
PED
19. MURTHAHANDI G-12(SABARI)
MA
21.TEKRA G-6(MANER) VE
22. BHATPALLI
23. SIRPUR 48
ARI R
24. BAMNI 5
18° 25. PENGANGA BRIDGE 18°
G-10
SAB
26. MANGRUL 4
27. MARLEGOAN (LOWER
28. KANHARGAON
29. GHUGUS GODAVARI) 3
30. NANDGOAN
U
31. HIVRA
BED
32. BHISNUR
33. ASHTI 2
UR
M
34. RAJOLI
35. WAIRAGARH 7
36. SALEBARDI
37. PAUNI 1
38. SATRAPUR
39. RAMAKONA ANDHRA PRADESH
40. RAJEGON
KARNATAKA
17° 41. KUMHARI 17°
42. KEOLARI
43. SOMANPALLI
44. MANCHERIAL
45. GANDLAPET
46. BETMOGRA SCALE
47. DEGLOOR
48. SAIGAON KM 10 0 10 20 30 40 50 60 70 80 90 100 KM
L
49. BHAIKHEDA GA
50. YELLI N
51. PURNA BE
52. ZARI F
53. G.R BRIDGE
54. DHALEGAON YO
55. PACHEGAON
56. GHAR GHAON BA
57. CHASS
16° 16°
73° 84°
74° 75° 76° 77° 78° 79° 80° 81° 82° 83°
ANNEXURE - 4.1
Details of CWC G & D Sites in Godavari Basin
1 of 2
Sl.No. Site Name Code Data Available In between missing years
2 of 2
Annex 4.2
List of Raingauge Stations whose monthly rainfall data used in the study
1 of 7
IMD CAT STATE DISTRICT STATION NAME SOURCE FROM. ..TO..
NO. YEAR YEAR
318 AP EAST GODAVARI YELLAVARAM REV 1971 1979
318 AP WEST GODAVARI BHIMAVARAM 1941 1970
318 AP WEST GODAVARI BHIMAVARAM REV 1971 1994
318 AP WEST GODAVARI DUVVA 1951 1970
318 AP WEST GODAVARI DUVVA PWD 1971 1993
317 AP WEST GODAVARI KOVVUR 1941 1970
317 AP WEST GODAVARI KOVVUR REV 1971 1994
318 AP WEST GODAVARI LAKSHMIPALEM 1951 1970
318 AP WEST GODAVARI LAKSHMIPALEM PWD 1971 1994
318 AP WEST GODAVARI NIDADAVOLE OBSY 1956 1998
317 AP WEST GODAVARI POLAVARAM 1941 1970
317 AP WEST GODAVARI POLAVARAM REV 1971 1994
318 AP WEST GODAVARI TANUKU 1941 1970
318 AP WEST GODAVARI TANUKU REV 1972 1994
313 AP KARIMNAGAR AMBARIPET 1968 1970
313 AP KARIMNAGAR AMBARIPET PWD 1971 1994
313 AP KARIMNAGAR HUZURABAD PWD 1957 1994
313 AP KARIMNAGAR JACTIAL REV 1971 1994
313 AP KARIMNAGAR JAGTIAL 1941 1970
313 AP KARIMNAGAR KARIMNAGAR PWD 1957 1994
313 AP KARIMNAGAR KARIMNAGAR REV 1941 1994
313 AP KARIMNAGAR KESHAVAPATNAMVAG 1968 1970
313 AP KARIMNAGAR KESHAVAPATNAMVAG REV 1971 1994
313 AP KARIMNAGAR MAHADEVPUR 1968 1970
313 AP KARIMNAGAR MAHADEVPUR PWD 1971 1993
313 AP KARIMNAGAR MANAIR 1957 1970
313 AP KARIMNAGAR MANAIR PROJ. PWD 1971 1994
313 AP KARIMNAGAR MANTHANI 1952 1970
313 AP KARIMNAGAR MANTHANI REV 1971 1994
313 AP KARIMNAGAR RAMGUNDAM OBSY 1951 1998
313 AP KARIMNAGAR SHAMIGARAM 1968 1970
313 AP KARIMNAGAR SHAMIGARAM PWD 1971 1994
313 AP KARIMNAGAR SIRICILLA 1951 1970
313 AP KARIMNAGAR SIRICILLA REV 1971 1994
312 AP KARIMNAGAR SULTANABAD 1951 1970
312 AP KARIMNAGAR SULTANABAD REV 1972 1994
317 AP KHAMMAM ALLIPALLI 1968 1970
317 AP KHAMMAM ALLIPALLI PWD 1971 1994
317 AP KHAMMAM B'CHALAM/KOTHAGU OBSY 1971 1998
317 AP KHAMMAM BHADRACHALAM 1941 1970
317 AP KHAMMAM BHADRACHALAM OBSY 1952 1970
317 AP KHAMMAM BHADRACHALAM REV 1971 1998
317 AP KHAMMAM BURGAMPAD 1957 1970
317 AP KHAMMAM BURGAMPAD REV 1971 1994
AP KHAMMAM CHERLA REV 1991 1994
317 AP KHAMMAM GUNDALA 1968 1970
317 AP KHAMMAM GUNDALA PWD 1971 1994
317 AP KHAMMAM KINNERASAMI PWD 1971 1990
317 AP KHAMMAM KINNERASAMI 1968 1970
317 AP KHAMMAM KOTHAPALANCHA 1968 1976
317 AP KHAMMAM NUGURU 1941 1970
317 AP KHAMMAM NUGURU REV 1971 1988
317 AP KHAMMAM PALANCHA 1951 1966
317 AP KHAMMAM PALANCHA PWD 1977 1994
2 of 7
IMD CAT STATE DISTRICT STATION NAME SOURCE FROM. ..TO..
NO. YEAR YEAR
317 AP KHAMMAM SINGABUPALAYAM 1943 1970
317 AP KHAMMAM SINGABUPALAYAM PWD 1971 1994
317 AP KHAMMAM THANIKALLA 1951 1970
317 AP KHAMMAM THANIKALLA PWD 1971 1990
318 AP KRISHNA KAIKALUR 1941 1970
318 AP KRISHNA KAIKALUR REV 1971 1994
313 AP MADAK ANANTAGIRI 1943 1973
312 AP MADAK ANDOLE REV 1971 1994
312 AP MADAK ANDOLE 1951 1970
313 AP MADAK GAJWEL 1957 1970
313 AP MADAK GAJWEL REV 1971 1994
312 AP MADAK MEDAK 1941 1970
312 AP MADAK MEDAK REV 1971 1994
312 AP MADAK NAGASANIPALLI 1952 1970
312 AP MADAK NAGASANIPALLI PWD 1971 1990
312 AP MADAK NARASAPUR 1957 1970
312 AP MADAK NARASAPUR REV 1971 1994
312 AP MADAK RAYANAPALLY 1941 1970
312 AP MADAK RAYANAPALLY PWD 1971 1994
312 AP MADAK SANGAREDDI REV 1941 1994
313 AP MADAK SIDDIPET 1951 1970
313 AP MADAK SIDDIPET REV 1971 1994
312 AP MADAK ZAHIRABAD 1957 1970
312 AP MADAK ZAHIRABAD REV 1971 1994
312 AP NIZAMABAD ALISAGAR 1941 1970
312 AP NIZAMABAD ALISAGAR PWD 1971 1993
313 AP NIZAMABAD ANKASPUR 1951 1970
313 AP NIZAMABAD ANKASPUR PWD 1971 1989
313 AP NIZAMABAD ARMOOR REV 1971 1994
313 AP NIZAMABAD ARMOOR 1941 1970
312 AP NIZAMABAD BANSWADA 1951 1970
312 AP NIZAMABAD BANSWADA REV 1971 1994
313 AP NIZAMABAD BARIDPUR 1941 1970
313 AP NIZAMABAD BARIDPUR PWD 1971 1991
312 AP NIZAMABAD BHOMENDRAPALLI 1941 1970
312 AP NIZAMABAD BHOMENDRAPALLI PWD 1971 1994
312 AP NIZAMABAD BODHAN REV 1943 1994
312 AP NIZAMABAD BORLAM 1941 1970
312 AP NIZAMABAD BORLAM PWD 1971 1994
313 AP NIZAMABAD DOODGAON 1941 1970
313 AP NIZAMABAD DOODGAON PWD 1971 1992
312 AP NIZAMABAD GUNKAL 1951 1970
312 AP NIZAMABAD GUNKAL PWD 1971 1994
313 AP NIZAMABAD KAMAREDDY 1941 1970
313 AP NIZAMABAD KAMAREDDY REV 1971 1994
313 AP NIZAMABAD MAGADI 1943 1970
313 AP NIZAMABAD MAGADI PWD 1971 1988
313 AP NIZAMABAD MANCHAPPA 1941 1970
313 AP NIZAMABAD MANCHAPPA PWD 1971 1991
313 AP NIZAMABAD NAVIPET 1941 1970
313 AP NIZAMABAD NAVIPET PWD 1971 1994
313 AP NIZAMABAD NIZAMABAD 1956 1970
313 AP NIZAMABAD NIZAMABAD OBSY 1941 1998
313 AP NIZAMABAD NIZAMABAD REV 1971 1994
3 of 7
IMD CAT STATE DISTRICT STATION NAME SOURCE FROM. ..TO..
NO. YEAR YEAR
313 AP NIZAMABAD POCHAMPAD 1968 1970
313 AP NIZAMABAD POCHAMPET PROJ. PWD 1971 1994
312 AP NIZAMABAD POCHARAM 1941 1970
312 AP NIZAMABAD POCHARAM PWD 1971 1994
313 AP NIZAMABAD UPLOOR 1968 1970
313 AP NIZAMABAD UPLOOR PWD 1971 1994
318 AP SRIKAKULAM NARAYANPURAM 1968 1970
318 AP SRIKAKULAM NARAYANPURAM REV 1971 1994
317 AP VISAKHAPATNAM ARAKU VALLY REV 1979 1994
317 AP VISAKHAPATNAM ARUKU VALLY 1946 1970
317 AP VISAKHAPATNAM CHINTAPALLI 1941 1970
317 AP VISAKHAPATNAM CHINTAPALLI REV 1972 1994
318 AP VISAKHAPATNAM CHODAYAM 1951 1970
318 AP VISAKHAPATNAM CHODYAM PWD 1971 1990
318 AP VISAKHAPATNAM KALYANPURAM 1968 1990
318 AP VISAKHAPATNAM NARSIPATNAM 1941 1970
318 AP VISAKHAPATNAM NARSIPATNAM REV 1971 1994
317 AP VISAKHAPATNAM PADERU 1965 1970
317 AP VISAKHAPATNAM PADERU REV 1971 1994
318 AP VISAKHAPATNAM RAIWADA 1968 1970
318 AP VISAKHAPATNAM RAIWADA CAMP PWD 1971 1994
318 AP VISAKHAPATNAM TANDAYA DAM SITE 1968 1970
318 AP VISAKHAPATNAM TANDAYA DAM SITE PWD 1971 1994
318 AP VISAKHAPATNAM TULABADA 1941 1968
318 AP VISAKHAPATNAM TULABADA REV 1994 1994
313 AP WARANGAL HANAMKONDA 1959 1970
313 AP WARANGAL HANAMKONDA OBSY 1941 1998
313 AP WARANGAL HANAMKONDA REV 1971 1994
317 AP WARANGAL LAKNAVARAM 1959 1970
317 AP WARANGAL LAKNAVARAM PWD 1971 1994
313 AP WARANGAL MULUG 1941 1970
313 AP WARANGAL MULUG REV 1971 1994
313 AP WARANGAL PARKAL 1951 1970
313 AP WARANGAL PARKAL REV 1971 1994
313 AP WARANGAL POLAMPET PWD 1961 1994
313 AP WARANGAL RAMPUR 1968 1970
313 AP WARANGAL RAMPUR PWD 1971 1993
313 AP WARANGAL SALIVAGU PROJECT 1968 1970
313 AP WARANGAL SALIVAGU PROJECT PWD 1971 1994
313 AP WARANGAL WARANGAL 1957 1969
313 AP WARANGAL WARANGAL PWD 1972 1990
312 KAR BIDAR BHALKI 1956 1970
312 KAR BIDAR BHALKI T.O. 1971 1993
312 KAR BIDAR BIDAR OBSY 1941 1999
312 KAR BIDAR SANTHPUR 1971 1993
312 KAR BIDAR SANTHPUR 1956 1970
315 MP BALAGHAT BALAGHAT 1941 1995
315 MP BALAGHAT DHUTI 1941 1994
315 MP BALAGHAT DONGARGAON 1941 1994
315 MP BALAGHAT JAMUNIA 1941 1994
315 MP BALAGHAT KATTANJHIRI 1941 1994
315 MP BALAGHAT LANJI 1941 1995
315 MP BALAGHAT WARA MAIN 1941 1970
315 MP BALAGHAT WARAMAIN 1971 1994
4 of 7
IMD CAT STATE DISTRICT STATION NAME SOURCE FROM. ..TO..
NO. YEAR YEAR
315 MP BALAGHAT WARASEONI 1941 1995
316 MP BASTER ANTAGARH 1941 1995
316 MP BASTER BHANUPRATAPPUR 1941 1995
316 MP BASTER BHOPALPATNAM 1941 1995
316 MP BASTER BIJAPUR 1941 1995
316 MP BASTER JAGDALPUR OBSY 1941 1999
316 MP BASTER KESKAL 1941 1995
316 MP BASTER KONDAGAON 1941 1995
317 MP BASTER KONTA 1941 1995
316 MP BASTER NARAYANPUR 1941 1995
317 MP BASTER SUKMA 1941 1995
103 MP BETUL ATNER 1941 1995
103 MP BETUL MULTAI 1941 1995
315 MP CHINDWARA AMARWARA 1941 1995
315 MP CHINDWARA CHAURAI 1941 1995
315 MP CHINDWARA CHINDWARA 1941 1995
315 MP CHINDWARA CHINDWARA OBSY 1949 1999
315 MP CHINDWARA SAUSAR 1941 1995
315 MP SEONI BORI 1941 1994
315 MP SEONI CHINCHBUND 1951 1994
315 MP SEONI KEOLARI 1941 1995
315 MP SEONI ROOMAL 1941 1994
315 MP SEONI SEONI OBSY 1941 1999
311 MAH AHMEDNAGAR AKOLA 1941 1996
311 MAH AHMEDNAGAR KOPARGAON 1941 1996
311 MAH AHMEDNAGAR NEVASA 1941 1996
311 MAH AHMEDNAGAR PATHARDI 1941 1996
311 MAH AHMEDNAGAR RAHURI 1941 1996
311 MAH AHMEDNAGAR SANGAMNER 1941 1996
311 MAH AHMEDNAGAR SHEVGAON 1941 1996
311 MAH AHMEDNAGAR SHRIRAMPUR 1955 1996
103 MAH AKOLA AKOLA OBSY 1941 1999
314 MAH AKOLA MANGRULPIR 1941 1996
103 MAH AKOLA MURTAJAPUR 1941 1996
314 MAH AKOLA RISOD 1941 1996
103 MAH AKOLA SIRPUR 1941 1969
314 MAH AKOLA WASHIM 1941 1996
103 MAH AMRAOTI AMRAOTI OBSY 1941 1999
103 MAH AMRAOTI BADNERA 1941 1993
314 MAH AMRAOTI BARUD 1941 1996
103 MAH AMRAOTI CHANDUR BAZAR 1941 1996
314 MAH AMRAOTI CHANDUR RAILWAY 1941 1996
103 MAH AMRAOTI KHOLAPUR 1941 1990
314 MAH AMRAOTI MORSI 1941 1996
314 MAH AMRAOTI TALEGAON 1941 1984
311 MAH AURANGABAD AURANGABAD OBSY 1941 1983
311 MAH AURANGABAD GANGAPUR 1951 1996
311 MAH AURANGABAD KANNAD 1951 1996
311 MAH AURANGABAD KHALDABAD 1951 1996
311 MAH AURANGABAD PAITHAN 1957 1996
311 MAH AURANGABAD SILLOD 1951 1996
311 MAH AURANGABAD VIJAPUR 1971 1996
311 MAH AURANGABAD VIJAPUR(VAIJAPUR 1951 1970
315 MAH BHANDARA BHANDARA 1941 1996
5 of 7
IMD CAT STATE DISTRICT STATION NAME SOURCE FROM. ..TO..
NO. YEAR YEAR
315 MAH BHANDARA BODALKASA 1941 1996
315 MAH BHANDARA CHANDPUR 1941 1990
315 MAH BHANDARA CHORKHAMARA 1941 1996
315 MAH BHANDARA DEORI 1944 1996
315 MAH BHANDARA GONDIA OBSY 1951 1999
315 MAH BHANDARA KHYRBUND 1941 1996
315 MAH BHANDARA PAONI 1945 1995
315 MAH BHANDARA SAKOLI 1941 1996
311 MAH BHIR BHIR OBSY 1961 1997
312 MAH BHIR CHOWSALA 1943 1996
311 MAH BHIR GEORAI 1951 1970
311 MAH BHIR GUORAI 1972 1996
311 MAH BHIR MANJLEGAON 1951 1996
311 MAH BHIR MOMINABAD 1951 1970
312 MAH BHIR PATODA 1951 1996
103 MAH BULDANA BULDANA 1971 1996
103 MAH BULDANA BULDHANA 1941 1970
314 MAH BULDANA CHIKHLI 1941 1995
311 MAH BULDANA DEOLGAON RAJA 1941 1996
103 MAH BULDANA DHAMANGAON 1941 1989
314 MAH BULDANA DONEGAON 1941 1992
103 MAH BULDANA KHAMGAON 1941 1996
311 MAH BULDANA LONAR 1990 1996
315 MAH CHANDRAPUR ASOLA 1941 1996
315 MAH CHANDRAPUR BRAMHAPURI OBSY 1956 1999
314 MAH CHANDRAPUR CHANDRAPUR OBSY 1941 1999
315 MAH CHANDRAPUR CHIMUR 1941 1996
315 MAH CHANDRAPUR KHAIREE 1941 1996
315 MAH CHANDRAPUR NALESAR 1941 1996
315 MAH CHANDRAPUR SINDEWAHI 1946 1996
314 MAH CHANDRAPUR WARORA 1941 1996
103 MAH JALGAON CHALISGAON 1941 1996
103 MAH JALGAON JAMNER 1941 1996
103 MAH JALGAON PACHORA 1941 1996
315 MAH NAGPUR NAGPUR MEYO HOSP OBSY 1941 1999
315 MAH NAGPUR PERSEONI 1941 1996
315 MAH NAGPUR RAMTEK 1941 1996
315 MAH NAGPUR SAONER 1941 1996
315 MAH NAGPUR THARSA 1941 1990
315 MAH NAGPUR UMRER 1941 1996
311 MAH NANDED BILLOLI 1951 1996
312 MAH NANDED DEGLOOR 1951 1996
311 MAH NANDED KANDHAR 1951 1996
311 MAH NANDED NANDED 1941 1996
311 MAH NASIK BOLTHAN 1941 1994
311 MAH NASIK CHANDOR 1941 1996
311 MAH NASIK DINDORI 1941 1996
311 MAH NASIK IGATPURI 1941 1996
103 MAH NASIK KALVAN 1941 1996
311 MAH NASIK KOLEGAON MAL 1955 1996
103 MAH NASIK MALEGAON OBSY 1941 1999
103 MAH NASIK NANDGAON 1941 1996
311 MAH NASIK NASIK 1941 1996
311 MAH NASIK NASIK OBSY 1941 1990
6 of 7
IMD CAT STATE DISTRICT STATION NAME SOURCE FROM. ..TO..
NO. YEAR YEAR
311 MAH NASIK NIPHAD 1941 1996
311 MAH NASIK OZAR AERO OBSY 1965 1970
311 MAH NASIK OZAR AERODROME OBSY 1971 1999
311 MAH NASIK PIMPALGAON 1941 1994
311 MAH NASIK SINNAR 1941 1996
311 MAH NASIK TRIMBAK 1941 1996
311 MAH NASIK YEOLA 1941 1996
312 MAH OSMANABAD KALLAM 1951 1996
314 MAH PARBHANI HINGOLI 1941 1996
314 MAH PARBHANI KALMANOORI 1951 1996
311 MAH PARBHANI PARBHANI OBSY 1941 1999
311 MAH PARBHANI SIDHESHWAR CAMP 1959 1996
314 MAH YEOTMAL DARWHA 1941 1996
314 MAH YEOTMAL DIGRAS 1941 1996
314 MAH YEOTMAL NER 1941 1996
314 MAH YEOTMAL PANDHERIKAWARA 1941 1994
314 MAH YEOTMAL PUSAD 1941 1996
314 MAH YEOTMAL UMERKHED 1941 1996
314 MAH YEOTMAL WANI 1941 1996
314 MAH YEOTMAL YEOTMAL 1941 1996
314 MAH WARDHA ARVI 1941 1996
314 MAH WARDHA HINGANGHAT 1941 1996
315 MAH WARDHA KHARANGHA 1967 1996
314 MAH WARDHA WARDHA 1941 1996
314 MAH WARDHA WARDHA OBSY 1966 1999
316 ORISSAKALAHANDI KASIPUR 1954 1958
317 ORISSAKORAPUT JEYPORE 1941 1992
316 ORISSAKORAPUT KORAPUT 1941 1992
316 ORISSAKORAPUT KORAPUT OBSY 1950 1984
317 ORISSAKORAPUT MALKANGIRI 1941 1992
316 ORISSAKORAPUT NAWARANGPUR 1941 1992
317 ORISSAKORAPUT POTTANGI 1941 1992
7 of 7
Annexure 4.3
Monthly Water Availablility at Perur G&D Site
CA at Perur 268200 sq.km
Unit:MCM
1966-67 605.0 12753.4 22206.6 25762.6 3371.2 1896.8 1692.6 412.9 222.0 653.5 367.0 94.5 64698.8 2284.8 5339.2 188.6 70038.0 2473.4
1967-68 3028.8 18962.9 32195.8 13206.2 5778.1 948.4 2392.4 994.5 459.0 1007.3 202.1 179.7 73171.8 2584.0 6183.5 218.4 79355.3 2802.4
1968-69 1090.5 8224.5 19517.9 14076.8 7085.7 1387.1 612.1 430.7 252.0 194.8 192.6 194.6 49995.4 1765.6 3263.8 115.3 53259.2 1880.8
1969-70 224.9 15780.9 27316.9 38613.9 4253.7 1924.0 724.1 390.4 268.4 234.6 137.4 97.3 86190.3 3043.8 3776.2 133.4 89966.5 3177.1
1970-71 5211.0 11429.1 50430.8 34364.7 6655.6 1549.0 777.5 530.6 336.9 331.0 217.3 335.2 108091.2 3817.2 4077.4 144.0 112168.7 3961.2
1971-72 3495.2 4892.1 9006.1 14939.1 8860.0 1508.5 588.0 366.6 209.7 138.7 75.1 48.2 41192.4 1454.7 2934.9 103.6 44127.3 1558.3
1972-73 682.7 13319.0 9043.5 8638.7 1719.9 899.2 424.4 174.1 97.4 74.8 55.0 39.5 33403.7 1179.6 1764.4 62.3 35168.1 1241.9
1973-74 297.5 29384.7 35071.5 18059.3 22579.2 5282.3 1213.4 679.8 428.4 272.9 175.0 187.7 105392.2 3721.9 8239.4 291.0 113631.5 4012.9
1974-75 600.3 2378.9 14646.6 2976.1 6976.1 1893.1 702.6 337.9 303.6 237.6 110.8 74.0 27577.9 973.9 3659.6 129.2 31237.5 1103.1
1975-76 4123.9 14232.5 28768.8 37769.7 14480.7 3686.3 929.2 553.5 337.5 227.3 165.7 123.8 99375.7 3509.4 6023.2 212.7 105398.9 3722.1
1976-77 175.5 24331.5 25361.3 28036.1 1764.8 883.5 554.2 311.5 227.5 181.2 139.8 241.2 79669.1 2813.5 2538.9 89.7 82208.0 2903.1
1977-78 1018.7 13410.1 22852.7 18332.9 3571.4 1666.9 1875.9 683.6 518.7 313.6 192.7 225.3 59185.9 2090.1 5476.7 193.4 64662.6 2283.5
1978-79 3781.8 26533.9 42776.5 16411.1 3584.1 1713.2 1136.7 640.5 1199.1 570.8 190.5 137.0 93087.6 3287.4 5587.9 197.3 98675.4 3484.7
1979-80 6442.0 7843.9 31825.6 7680.8 5439.4 974.5 938.5 529.5 383.4 405.2 229.8 174.8 59231.6 2091.7 3635.8 128.4 62867.4 2220.1
1980-81 3388.4 13064.0 37551.8 21859.5 2688.1 1005.5 513.0 539.9 358.0 319.0 217.4 232.5 78551.8 2774.0 3185.2 112.5 81736.9 2886.5
1981-82 1075.6 11588.9 36732.0 20774.1 10250.4 2138.8 799.9 613.7 499.3 248.6 143.3 122.7 80421.0 2840.0 4566.2 161.3 84987.2 3001.3
1982-83 953.1 6698.1 17396.9 8824.5 3982.7 1792.8 621.7 378.5 395.1 290.4 79.0 61.2 37855.3 1336.8 3618.6 127.8 41473.9 1464.6
1983-84 1797.1 10384.4 42428.1 42209.4 21898.6 1929.0 1022.1 815.9 450.9 608.9 380.2 287.9 118717.6 4192.5 5494.8 194.0 124212.4 4386.5
1984-85 1083.7 6791.6 18766.6 4195.0 2764.6 1068.2 516.6 458.8 340.6 262.8 192.6 102.4 33601.5 1186.6 2942.1 103.9 36543.6 1290.5
1985-86 1473.6 8444.0 18728.3 5580.4 5938.4 1163.3 463.8 370.1 482.6 452.8 216.6 169.2 40164.7 1418.4 3318.4 117.2 43483.1 1535.6
1986-87 2034.4 19648.2 40335.3 4791.0 1965.1 1082.3 389.8 469.2 260.7 200.5 91.4 67.8 68773.9 2428.7 2561.8 90.5 71335.7 2519.2
1987-88 388.2 5624.1 8326.4 5298.9 2015.8 1074.2 559.2 293.2 203.5 239.4 100.7 91.1 21653.4 764.7 2561.3 90.5 24214.7 855.1
1988-89 1210.2 25840.6 34619.5 30194.6 16383.5 1484.3 699.8 440.5 285.9 302.6 200.0 90.4 108248.4 3822.8 3503.4 123.7 111751.8 3946.5
1989-90 1352.1 20161.5 21137.0 15635.0 4403.8 828.8 448.3 437.5 269.8 255.8 121.0 794.1 62689.4 2213.9 3155.2 111.4 65844.6 2325.3
1990-91 8531.2 18770.5 54219.1 27270.6 20025.7 5050.2 1053.7 694.0 408.3 331.6 248.6 142.6 128817.0 4549.1 7928.8 280.0 136745.8 4829.1
1991-92 1121.4 10971.1 23123.4 4706.2 2347.9 1356.4 527.1 315.3 205.5 152.5 79.9 55.0 42270.0 1492.8 2691.7 95.1 44961.7 1587.8
1992-93 1955.9 6563.1 34484.9 14908.5 2218.5 962.6 476.1 291.6 221.5 238.2 109.9 59.6 60130.9 2123.5 2359.6 83.3 62490.5 2206.8
1993-94 431.7 7713.6 12414.1 8839.9 4611.6 1212.6 519.8 359.6 329.8 198.0 70.6 39.1 34010.9 1201.1 2729.5 96.4 36740.4 1297.5
1994-95 875.6 32042.5 26611.5 39201.2 6036.2 1806.1 1070.4 1350.8 637.9 619.2 446.4 432.8 104766.9 3699.8 6363.7 224.7 111130.6 3924.5
1995-96 772.9 15009.8 12303.1 19281.9 13234.2 2002.5 839.9 629.8 440.1 394.0 252.2 164.8 60601.9 2140.1 4723.4 166.8 65325.3 2306.9
1996-97 1334.0 4941.2 15892.4 12255.8 4232.8 1332.2 522.7 410.8 279.9 398.8 453.2 165.3 38656.1 1365.1 3563.0 125.8 42219.1 1491.0
1997-98 114.7 3523.2 13905.6 10701.8 2428.8 1865.4 2880.1 1502.9 992.4 302.0 170.0 205.5 30674.1 1083.2 7918.4 279.6 38592.5 1362.9
1998-99 945.5 7378.2 17641.7 21579.7 13062.8 3827.0 822.6 517.5 379.0 283.7 214.3 168.9 60607.8 2140.3 6212.9 219.4 66820.8 2359.8
1999-2000 3972.8 5884.6 21015.5 24928.5 12841.7 2088.4 794.3 507.3 395.6 334.6 179.8 116.7 68643.2 2424.1 4416.7 156.0 73059.9 2580.1
2000-01 2260.5 21995.3 24809.7 10899.0 2063.1 747.7 340.7 235.8 162.9 157.7 168.5 77.5 62027.7 2190.5 1890.7 66.8 63918.4 2257.3
2001-02 9008.6 12985.7 30335.3 4568.1 5619.0 1020.9 472.8 348.9 220.7 155.8 80.2 40.7 62516.7 2207.8 2340.1 82.6 64856.8 2290.4
2002-03 4236.5 2337.8 20938.3 13145.3 1819.6 595.9 363.5 224.2 148.0 108.7 69.3 39.8 42477.5 1500.1 1549.3 54.7 44026.8 1554.8
2003-04 157.6 17884.5 22813.0 13072.3 8012.1 1692.5 699.7 427.2 476.1 173.5 97.8 97.2 61939.6 2187.4 3664.0 129.4 65603.5 2316.8
2004-05 2670.0 2527.2 20055.4 3814.0 2207.8 522.0 236.7 165.8 698.4 158.0 86.0 70.3 31274.5 1104.4 1937.1 68.4 33211.6 1172.9
2005-06 95.1 18734.1 25786.2 25794.5 9327.2 2476.1 657.2 375.4 226.6 255.3 222.1 189.0 79737.2 2815.9 4401.7 155.4 84138.8 2971.3
2006-07 135.4 13654.6 49749.3 29620.5 10735.0 2980.1 813.9 492.2 289.4 171.4 137.3 106.6 103894.9 3669.0 4990.9 176.3 108885.8 3845.3
2007-08 554.3 14347.8 21207.5 18737.6 7256.0 1223.4 474.2 293.1 330.7 258.3 221.5 18.7 62103.1 2193.2 2819.9 99.6 64923.0 2292.7
2008-09 300.8 4872.8 23816.8 8388.4 1963.0 835.7 445.4 184.7 134.0 84.4 52.4 18.5 39341.7 1389.3 1755.1 62.0 41096.9 1451.3
2009-10 16.3 7801.1 6475.4 6149.5 1373.2 677.8 338.0 224.6 136.0 97.0 38.0 22.9 21815.4 770.4 1534.4 54.2 23349.7 824.6
2010-11 186.7 11962.3 35298.5 41049.1 6481.5 2846.8 1057.4 471.3 293.7 312.0 167.4 102.8 94978.1 3354.1 5251.3 185.4 100229.4 3539.6
2011-12 253.6 4532.7 14027.1 29556.1 2367.1 795.8 387.5 341.5 193.2 63.1 33.1 16.9 50736.5 1791.7 1831.1 64.7 52567.6 1856.4
2012-13 398.8 9467.6 31643.5 30172.2 5744.4 1529.4 581.8 371.1 274.9 246.4 108.1 52.3 77426.3 2734.3 3164.0 111.7 80590.3 2846.0
Average 2014.8 13022.6 25477.9 16636.0 7279.6 1752.3 755.7 492.9 380.9 278.2 172.5 147.6 64430.9 2275.4 3980.2 140.6 68411.1 2415.9
50% Dependable flow 65325 MCM 2306.9 TMC
1 of 3 75% Dependable flow 43483 MCM 1535.6 TMC
90% Dependable flow 34777 MCM 1228.1 TMC
Annexure 4.3
Monthly Gross Yield Availablility at Dummagudem G&D Site
CA at Perur 281000 sq.km
Unit:MCM
1966-67 633.8 13362.0 23266.4 26992.2 3532.1 1987.3 1773.4 432.6 232.6 684.7 384.5 99.0 67786.6 2393.9 5594.0 197.6 73380.6 2591.4
1967-68 3173.4 19867.9 33732.3 13836.5 6053.9 993.7 2506.6 1042.0 481.0 1055.4 211.7 188.2 76664.0 2707.4 6478.6 228.8 83142.6 2936.2
1968-69 1142.5 8617.0 20449.4 14748.6 7423.9 1453.3 641.3 451.2 264.0 204.1 201.8 203.9 52381.5 1849.8 3419.6 120.8 55801.1 1970.6
1969-70 235.7 16534.0 28620.6 40456.8 4456.8 2015.8 758.6 409.1 281.2 245.8 143.9 101.9 90303.8 3189.0 3956.4 139.7 94260.2 3328.8
1970-71 5459.7 11974.5 52837.6 36004.7 6973.3 1622.9 814.6 555.9 353.0 346.8 227.6 351.2 113249.9 3999.4 4272.0 150.9 117522.0 4150.2
1971-72 3662.0 5125.6 9435.9 15652.0 9282.8 1580.5 616.1 384.1 219.7 145.3 78.7 50.5 43158.3 1524.1 3075.0 108.6 46233.3 1632.7
1972-73 715.3 13954.6 9475.1 9051.0 1802.0 942.1 444.7 182.4 102.1 78.3 57.6 41.4 34997.9 1235.9 1848.6 65.3 36846.5 1301.2
1973-74 311.7 30787.1 36745.3 18921.2 23656.8 5534.4 1271.3 712.2 448.9 285.9 183.3 196.6 110422.1 3899.5 8632.6 304.9 119054.7 4204.4
1974-75 628.9 2492.5 15345.6 3118.1 7309.0 1983.4 736.1 354.1 318.1 249.0 116.1 77.5 28894.1 1020.4 3834.2 135.4 32728.3 1155.8
1975-76 4320.7 14911.8 30141.9 39572.3 15171.8 3862.2 973.5 579.9 353.6 238.1 173.6 129.7 104118.4 3676.9 6310.7 222.9 110429.1 3899.8
1976-77 183.9 25492.7 26571.7 29374.1 1849.0 925.6 580.7 326.4 238.4 189.8 146.4 252.8 83471.3 2947.8 2660.1 93.9 86131.5 3041.7
1977-78 1067.3 14050.1 23943.4 19207.9 3741.8 1746.4 1965.4 716.3 543.4 328.6 201.9 236.0 62010.6 2189.9 5738.1 202.6 67748.6 2392.5
1978-79 3962.3 27800.3 44818.1 17194.4 3755.2 1795.0 1191.0 671.0 1256.4 598.0 199.6 143.5 97530.2 3444.2 5854.5 206.8 103384.8 3651.0
1979-80 6749.4 8218.3 33344.5 8047.4 5699.0 1021.0 983.3 554.7 401.7 424.5 240.8 183.1 62058.5 2191.6 3809.3 134.5 65867.8 2326.1
1980-81 3550.2 13687.4 39344.0 22902.7 2816.3 1053.5 537.4 565.6 375.1 334.2 227.8 243.6 82300.7 2906.4 3337.2 117.9 85637.9 3024.3
1981-82 1126.9 12142.0 38485.0 21765.5 10739.6 2240.8 838.1 642.9 523.1 260.4 150.1 128.6 84259.1 2975.6 4784.1 168.9 89043.2 3144.5
1982-83 998.6 7017.8 18227.2 9245.6 4172.8 1878.3 651.4 396.5 414.0 304.2 82.7 64.2 39662.0 1400.6 3791.3 133.9 43453.3 1534.5
1983-84 1882.9 10880.0 44453.0 44223.8 22943.7 2021.1 1070.9 854.8 472.5 637.9 398.3 301.6 124383.4 4392.6 5757.1 203.3 130140.5 4595.9
1984-85 1135.4 7115.7 19662.2 4395.2 2896.6 1119.2 541.3 480.7 356.9 275.3 201.8 107.3 35205.1 1243.3 3082.5 108.9 38287.6 1352.1
1985-86 1543.9 8846.9 19622.1 5846.7 6221.8 1218.8 486.0 387.8 505.7 474.4 227.0 177.2 42081.6 1486.1 3476.7 122.8 45558.3 1608.9
1986-87 2131.4 20585.9 42260.3 5019.6 2058.9 1133.9 408.4 491.6 273.2 210.1 95.8 71.0 72056.2 2544.6 2684.0 94.8 74740.2 2639.4
1987-88 406.7 5892.5 8723.7 5551.8 2112.0 1125.5 585.8 307.2 213.2 250.8 105.6 95.4 22686.8 801.2 2683.5 94.8 25370.3 895.9
1988-89 1268.0 27073.8 36271.8 31635.6 17165.4 1555.1 733.2 461.5 299.5 317.0 209.5 94.7 113414.6 4005.2 3670.6 129.6 117085.2 4134.8
1989-90 1416.7 21123.7 22145.8 16381.1 4614.0 868.4 469.7 458.3 282.7 268.0 126.8 832.0 65681.3 2319.5 3305.8 116.7 68987.0 2436.3
1990-91 8938.3 19666.4 56806.7 28572.1 20981.4 5291.2 1104.0 727.1 427.8 347.4 260.4 149.4 134964.9 4766.2 8307.2 293.4 143272.1 5059.6
1991-92 1174.9 11494.7 24227.0 4930.8 2460.0 1421.1 552.3 330.4 215.3 159.7 83.7 57.6 44287.4 1564.0 2820.1 99.6 47107.5 1663.6
1992-93 2049.2 6876.4 36130.7 15620.0 2324.4 1008.5 498.8 305.5 232.0 249.6 115.2 62.5 63000.7 2224.8 2472.2 87.3 65472.8 2312.2
1993-94 452.3 8081.8 13006.5 9261.8 4831.7 1270.5 544.6 376.8 345.5 207.4 74.0 41.0 35634.1 1258.4 2859.8 101.0 38493.9 1359.4
1994-95 917.4 33571.7 27881.5 41072.1 6324.3 1892.3 1121.5 1415.3 668.4 648.7 467.7 453.5 109767.0 3876.4 6667.4 235.5 116434.4 4111.8
1995-96 809.8 15726.1 12890.3 20202.1 13865.8 2098.1 880.0 659.8 461.1 412.8 264.3 172.7 63494.1 2242.3 4948.8 174.8 68443.0 2417.0
1996-97 1397.6 5177.0 16650.9 12840.8 4434.8 1395.8 547.7 430.4 293.2 417.9 474.8 173.2 40501.0 1430.3 3733.0 131.8 44234.0 1562.1
1997-98 120.2 3691.4 14569.3 11212.5 2544.7 1954.4 3017.6 1574.7 1039.8 316.4 178.1 215.3 32138.0 1134.9 8296.3 293.0 40434.3 1427.9
1998-99 990.6 7730.3 18483.6 22609.6 13686.2 4009.6 861.8 542.1 397.1 297.2 224.6 176.9 63500.4 2242.5 6509.5 229.9 70009.8 2472.4
1999-2000 4162.4 6165.4 22018.5 26118.3 13454.6 2188.1 832.2 531.5 414.5 350.6 188.4 122.2 71919.2 2539.8 4627.5 163.4 76546.7 2703.2
2000-01 2368.4 23045.1 25993.8 11419.1 2161.6 783.4 356.9 247.0 170.7 165.2 176.5 81.1 64988.0 2295.0 1981.0 70.0 66969.0 2365.0
2001-02 9438.5 13605.5 31783.1 4786.2 5887.1 1069.6 495.4 365.6 231.2 163.3 84.0 42.7 65500.4 2313.1 2451.8 86.6 67952.1 2399.7
2002-03 4438.6 2449.4 21937.6 13772.6 1906.4 624.3 380.8 234.9 155.1 113.9 72.6 41.7 44504.7 1571.7 1623.2 57.3 46128.0 1629.0
2003-04 165.2 18738.0 23901.8 13696.2 8394.5 1773.3 733.1 447.6 498.8 181.8 102.5 101.8 64895.7 2291.8 3838.8 135.6 68734.5 2427.3
2004-05 2797.4 2647.8 21012.6 3996.1 2313.1 546.9 248.0 173.8 731.8 165.5 90.1 73.6 32767.0 1157.2 2029.6 71.7 34796.6 1228.8
2005-06 99.7 19628.2 27016.9 27025.6 9772.3 2594.2 688.5 393.3 237.4 267.5 232.7 198.0 83542.7 2950.3 4611.7 162.9 88154.4 3113.1
2006-07 141.9 14306.3 52123.7 31034.2 11247.3 3122.3 852.8 515.7 303.2 179.6 143.9 111.7 108853.3 3844.1 5229.1 184.7 114082.5 4028.8
2007-08 580.8 15032.6 22219.6 19631.8 7602.3 1281.8 496.8 307.1 346.5 270.7 232.1 19.6 65067.1 2297.8 2954.5 104.3 68021.5 2402.2
2008-09 315.1 5105.3 24953.5 8788.7 2056.7 875.6 466.7 193.5 140.4 88.5 54.9 19.4 41219.3 1455.6 1838.9 64.9 43058.2 1520.6
2009-10 17.1 8173.4 6784.4 6442.9 1438.7 710.1 354.2 235.3 142.5 101.7 39.8 24.0 22856.5 807.2 1607.6 56.8 24464.1 863.9
2010-11 195.7 12533.2 36983.1 43008.2 6790.8 2982.7 1107.9 493.7 307.7 326.9 175.3 107.7 99511.0 3514.2 5502.0 194.3 105012.9 3708.5
2011-12 265.7 4749.0 14696.5 30966.7 2480.1 833.8 406.0 357.8 202.4 66.1 34.7 17.7 53158.0 1877.3 1918.5 67.8 55076.5 1945.0
2012-13 417.8 9919.4 33153.7 31612.1 6018.5 1602.4 609.6 388.8 288.0 258.1 113.3 54.8 81121.5 2864.8 3315.0 117.1 84436.5 2981.8
Average 2111.0 13644.1 26693.8 17429.9 7627.1 1836.0 791.8 516.4 399.1 291.5 180.8 154.6 67505.9 2383.9 4170.2 147.3 71676.1 2531.2
50% Dependable flow 68443 MCM 2417.0 TMC
2 of 3 75% Dependable flow 45558 MCM 1608.9 TMC
90% Dependable flow 36437 MCM 1286.7 TMC
Annexure 4.4
Annual Maximum discharge with corresponding Water Level (m.s.l)
1 of 1
5. PRELIMINARY DESIGN
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE-I)
CHAPTER 5
PRELIMINARY DESIGN FEATURES AND CRITERIA
5.1. GENERAL
Earlier before the Bifurcation of Andhra Pradesh, two project namely (i) Rajiv
Dummugudem Lift Irrigation Scheme (ii) Indira Sagar Rudram kota Lift Irrigation
Scheme were proposed in order to harness the irrigation potential of left out ayacut
from existing irrigation schemes, which is about 6.5 Lakh Acres out of which about 2
Lakh Acres was proposed to be covered by Rajiv Dummugudem Lift Irrigation
Scheme and 1.25 Lakh Acres was proposed to be covered by Indira Sagar Lift
Irrigation Scheme. Even after execution of this scheme, about 2.55 Lakh Acres will
still remain to be covered by any future irrigation scheme. After bifurcation of Andhra
Pradesh 7 Mandals of Khammam District was amalgamated in West Godavari District
of Andhra Pradesh, in this process the intake structure of proposed Indira Sagar Lift
Irrigation Scheme went into administrative boundary of Andhra Pradesh. As such
there is a need for revision of the Indira Sagar Scheme in order to avoid
administrative difficulties in O&M between two adjoining states.
In view of above, Govt. of Telangana decided not only to integrate earlier proposed
Indira Sagar and Rajiv Sagar Lift Irrigation Scheme into one lift irrigation scheme but
also to cover the Gap Ayacut which is not coming under any present or future
irrigation scheme. Accordingly, the project is now renamed as Sita Rama Lift
Irrigation Scheme is being formulated to cover about 9.36 Lakh Acres of
Khammam, Bhadradri Kothagudem & Mahabubabad Districts of Telangana. The
project has been planned to execute in two phases. Phase – I of the Sita Rama Lift
Irrigation Scheme will cover the Khammam, Bhadradri Kothagudem & Mahabubabad
Districts whereas Phase – II will also cover the same districts. Phase – I of this
scheme covers command area of 2,72,921 Ha with new ayacut of about 1,33,085 Ha
and Stabilization of about 1,39,836 Ha. The present report deals with Phase-I of the
Sita Rama Lift Irrigation Scheme.
The Phase-I of Sita Rama Lift Irrigation Project envisages construction of Head
Regulator at Dummugudem Anicut and to draw water from Godavari through an
approach channel of CBL EL. 45 m. The Approach Channel has been designed 1.5
times the capacity the of required discharge i.e., with a design discharge of 382
Cumecs (13500 Cusecs)from the River with a length of 1.00 Km and then designed
as gravity canal for a length of 9.50 km thereafter the water will be lifted with a
proposed 1st pump house with a discharge of 255 Cumes (9000 cusecs) at Village
B.G.Kothuru, Aswapuram (M) from El. 43.51 m to El. 67.180 m and then water will
be flowing through a gravity canal of a length 33.100 Km crossing two major rivers
Kinnerasani and Murredu at Chainage 36.25 Kms and 38.00 Km respectively and
from proposed 2nd pump house at Ch. 43.900 Km near Village V.K.Ramavaram, H/O
Pusugudem, Mulakalapally(M), Bhadradri-Kothagudem District with a discharge of
about 250 cumecs is lifted from El. 62.464 to El 110 m to Delivery Cistern at Ch.
44.650 Km and then water will be flowing through a lined canal of about 12.575 Km
length up to proposed 3rd Pump House at Km. 57.225, Kamalapuram and then water
is lifted through the pumping main of about 1525 m from El. 108.238 m to El. 160 m
to delivery cistern at Ch. 58.750 Km with a Discharge of 209.23cumecs. From this
point, the Water conductor system consisting of Gravity canal and Tunnel has been
proposed to irrigate the earlier proposed Rajiv Sagar Ayacut, including stabilisation of
NSP, Wyra and Paleru projects with a ayacut of about 5,39,387 Ac (New ayacut of
about 1,93,853 Acres and rest under stabilization).
From the same pump house at Kamalapuram, the water is lifted to El.200 to feed
ayacut (Indira Sagar Ayacut of about 1,35,000 Acres) covering sathupally and enroute
mandals through water conductor system. Fourth pump house has been proposed at
Dibbagudem H/o Gandugulapally(V), Dammapeta(M) of Bhadradri-Kothagudem
District village in which water will be lifted from El. 197m to El. 265 m cover 60,000
Acres through a gravity canal. Second Pressure main from this pump house will take
off water and will be lifted from El. 197.00m to El. 245.00m covering an ayacut of
25000Ac.
Total Stabilization of Major and Medium projects like NSP, Wyra, Lankasagar and
Paleru is of about 2,76,660 Acres and other minor irrigation schemes and PR Tank
where is there is no assured irrigation source for an area of about 97,158 Ac. will be
also being stabilised through Phase – I of this scheme. Also, provision for Industrial
and Drinking Water Supply has also been taken into account.
Apart from this, the present scheme envisages Pump Houses, Regulators, Offtakes,
Cross Drainage and Cross Masonry works across the main Canal wherever required.
The Layout Map of Phase-I of Sita Rama Lift Irrigation Project is appended as
WAP/WRD/SRLIS/P-I/DWG/01.
The design features of the scheme are described in the ensuing paragraphs and typical
designs of the same are appended at the end of this chapter.
The Present Scheme consisting of main canal having a total length of about 210 Km
and has been designed as lined canal with 10 cm thick cement concrete with
trapezoidal sections having side slopes of 1.5(H): 1 (V). Trapezoidal canal section is
adopted for practicability and the canal has been designed by Manning’s formula.
Considerations with respect to relevant IS codes have been taken into account.
Side slope in cutting and filling is taken as 1:1 and 1.5:1 respectively depending upon
the type of the soil. Outer slope of the bank has been provided as 1.5:1. Freeboard has
been provided as per clause 6.2 of IS 4030:1982 and clause 4.3 of IS 7112:2002 for
unlined and lined canals respectively. The freeboard shall be measured from the full
supply level to the level of the top of the bank. A freeboard of 1.0 m has been
provided.
The design section has been computed by calculating velocity using Manning’s'
equation and cross sectional area (A) computed considering channel side slopes of
1.5:1 i.e. stabilized regime section of unlined channel as
2 1
R 3
S 2
V
N
Where,
V = Velocity in m/s.
R = Hydraulic mean depth = A / P in meter.
A = Sectional area of canal with side slope 1.5:1, in square metre.
P = Wetted perimeter in metre.
S = Bed slope /water surface slope
N = Coefficient of Rugosity = 0.02
The following criteria have also to be kept in view while designing the irrigation
channels
It has been adopted as per IS 7112, Annexure B. If the gradient is steep, falls / drops
are to be provided where the Canal Full Supply level touches the ground level.
b) Conveyance Losses
The water allocation (Duty) is to be taken as 1430 ha/ m3/s (100 acres/cusecs)
excluding losses.
d) Rugosity Co-efficient
The following values of rugosity co-efficient (N) are to be adopted in design of canal
system for channel with concrete lining 0.02 and for earthen channel 0.0225.
Design and drawing of the typical sections of lined canal are appended as Annexure
5.1.
A Head Regulator is a structure constructed at the head of a canal off taking from a
reservoir behind a weir/Cistern or a dam. The head regulator regulates the supply of
flow in the canal & also controls the silt entry in the canal. Head regulator also served
as a meter for measurement to the distributaries.
The Head Regulator has been designed for a discharge of 400 cumecs. There are 6
Nos. of bays of 10 m each. Breastwall has been provided to reduce the height of gates.
The sill level has been kept at El. 46.50 m and designed to pass the discharge with
water depth of 2.5 m above the sill level.
It is proposed to provide 6 (Six) sets of vertical lift wheel type 1000 mm*2500 mm
size gate for head regulator of Sita Rama existing weir. The gate shall be designed for
unbalanced head of 3.0 m corresponding to pond level & check for MWL in
accordance with the provision contained in IS:4622. These gats shall have upstream
skin plate& sealing in case of service gate. These gates shall be operated with the help
of electrically operated rope drum hoist of adequate capacity (16-ton tentative
capacity) installed on the trestle at E.L 56.5 m. Gates shall be used for regulation of
discharge to the pump house relating to lift irrigation scheme. The salient features are
as under:
It is proposed to provide one set of sliding type stop logs consisting of 2 equal size
units of 10000 mm * 1375 mm size i.e two units and the top unit as non-
interchangeable unit for the maintenance of head regulator gates. The stop logs shall
be designed for unbalanced head of 3.0 m corresponding to pond level and checked
for MWL in accordance with the provision contained in IS:5620. The stop logs shall
have downstream skin plate and sealing. Each stop logs shall be operated with the
help of lifting beam and monorail crane of adequate capacity under balance head
condition achieved with the help of a pair of filling valve to be provided in the top
unit or crack opening from the top of the weir.
CD works have been designed as per relevant IS codes. The Typical designs of
Aqueduct on the Main Canal is given as Annexure 5.3.
provided as Village Road Bridge, Major District Road Bridge, depending upon the
type of the road. Bridges in the canal system are provided based on the type of roads.
It crosses i.e. village road, district road, state highway or National highway. The
bridges are combined with irrigation structures like falls or regulators. All the bridges
across canals are designed according to IRC specifications/loadings. These are now
usually constructed with R.C.C decking and concrete substructure. The criteria for
Village Road Bridge and Major District Road Bridge are given in detailed below:
f) Electro-Mechanical works
g) Hydro-Mechanical works
The water conductor system of Sita Rama Lift Irrigation Project passes a hill due to
the topography of the project area. In this regard, a Tunnels are proposed wherever
required. The hydraulic design of tunnel at Ch. 110.475 Km with a diameter of 7.5 m
to carry a discharge of about 122 cumecs is appended as Annexure 5.6.
10 R m 3.586 3.904
1
Waterway (Length of Crest) L BW - Np*PW 60 m
400 = 2/3 * 0.577 * 59.1 * 4.41 * 0.5 ^1.5 + 0.8 * 59.18(19.62 * 0.5 )^0.5
400.00 = 35.45 + 148.09 d
3 WIDTH OF CREST :
Sharp Crested Weir will be provided so as to have minimum possible head loss. The minimum width as per IS
6531-1994 is 2/3 He
2
Downstream Floor Level has been kept same as of CBL Say 45.00 m
Keep Cistern Level at El 45 m same as bed level of canal
Froude no. q / √ (g x D13) F = 2.31
5 VERTICAL CUT-OFFS
Scour Depth 1.35 (q^2/f)^(1/3) R = 4.78 m
Downstream Maximum Scour Depth 1.5 R = 7.18 m
Level of Scour Depth below FSL = 41.82 m
Scour Depth below canal bed level = 3.18 m
The minimum depth of U/S & D/S Cut-off required for the given discharge is 5m
(i) Provide D/S Cut-off of 5m depth below D/S bed level as per exit gradient = 5.00 m
Bottom elevation of Downstream pile = 40.00 m
3
Substituting the values 1 / 4 = 1 / (pi x sqrt ( λ )) X (H / d )
or 1 / (pi x sqrt ( λ )) = 0.125
λ = 6.485
2 So, α = 11.93
λ = (1+sqrt(1+α ))/2
α = (b/d) So, Floor Length b = 59.64
Say = 60.00
U/S D/S
E1 C1 EC
Floor Length = 60.00 m
D1 D
( i ) At U/S & D/S cut off wall Total floor length (b) = 60.00 m
Depth of D/S cut off wall (d) = 5.00 m
From Khosla's equation 1/α = d/b = 0.083
α = b/d = 12.00
λ = (1 + √ (1 + α2))/2 = 6.52
ΦE = (1/pi) *Cos-1((λ - 2)/λ) = 25.62 %
ΦD = (1/pi) *Cos-1((λ - 1)/λ) = 18.00 %
ΦC1 = 100 - ΦE = 74.38 %
ΦD1 = 100 - ΦD = 82.00 %
4
8 Protection Works beyond Impervios Floor
5
Sita Rama Lift Irrigation Scheme
Annexure 5.3
Aqueduct at Kinnersani River at RD 36.250 Km
The drain/river linear water way may be provided about 50% - 80% of Lacey's Perimeter.
Hence Provide water way (assuming 80% of Lacey's Perimeter) = 315.1 m
say 320.0 m
4 Design of Transitions
Since the depth is kept constant, Mitra's transition equation is uses as:
Contraction transition Bx= (Bn.Bf.Lf)/ (Lf.Bn-x(Bn-Bf))
Bn.Bf.Lf=30x22x8 5280.000
Lf.Bn 240.000
Bn-Bf 8.000
Bx 5280/(240-8X)
At Section -4-4:-
At Section 2-2
At Section 1-1
A1=A4 187.500 2
Area m
Velocity V1=V4 1.36 m/sec
Velocity V2=V3 2.43 m/sec
2 2 0.041 m
Loss of Head in Contraction HL=0.2(V2 -V1 )/2g
RL of TEL at section 1-1= RL of TEL at 69.311+0.041 69.353 m
section2-2 + loss in transition
69.353-0.094 69.258 m
RL of Water Surface at section 1-1= RL
of TEL at section1-1 -Velocity head4-4
RL of TEL at section 1-1 = RL of water 69.258-5 64.258 m
surface - water head
6 Design of Trough :
A free board of 1m above the normal water depth of 5m is sufficient and hence, the bottom level of
bridge slab over the compartment can be kept at 5+1=6m above the bed level of the trough. The
height of the trough will therfore be kept equal to 6 m. The entire trough will be constructed in
monolithic reinforced concrete and can be designed by usual structural methods
Table-2
For various values of X lying between 0 to 12 & various value of Bx for Expansion transition
are worked out on the basis of eqn as shown below in the table-2
X 0 3 6 9 12
Bx 22.00 23.57 25.38 27.50 30.00
Plan for Canal Water Way
1 2 3 4
2 3
1 1
320m
8m 12m
1
2 3 4
Table -A
ANNEXURE: 5.4
II Design of Cistern
Cistern is to be designed for a detention period of 8 minutes so that
canal may run smoothly
a Detention Time 10 min
b Capacity required 153000 Cubic metres
c Width of Cistern 190 m
d Water Depth 6.5 m
e Length Required 123.9 m
Let us provide length, say 236 m
The RCC sidewalls are proposed with 0.3 m thickness at top and 0.5
m at the bottom. The floor with 0.15 m thick CC slab with 15 cm
thick lean concrete beneath it.
SITA RAMA LIFT IRRIGATION SCHEME
(Concrete/Metallic Volute pumps with 10% Over Load and 85% Pump Efficiency)
Power Requirement Calculations - Phase I
Location Location Location Location Location
Lift @ 10.50 Km at Lift @ 43.90 Km at Lift @ 56.65 Km at Kamalapuram Village Lift @ Dibbagudem
S.No. Description
Sitaramapuram Village Pusugudem
Pipe Losses
16 Discharge in each Delivery main (Cumecs ) 20.00 20.00 20.00 22.50 17.00
17 Friction losses in Delivery main ( m ) as per Hazen Williams Formula 0.26 1.61 2.18 3.25 9.35
18 Total losses ( m ) 8.57 8.63 9.20 10.27 16.37
19 Static Head ( m) 26.72 48.73 54.07 89.07 68.73
20 Total pump head (H) in m 35.29 57.35 63.26 99.33 85.10
Power Calculations
21 Pump efficiency (η) 0.85 0.85 0.85 0.85 0.85
22 P = (1000 x 9.81 x Q x H/η) in MW 8.15 13.24 14.60 25.79 16.70
23 over load @ 10% in MW 0.81 1.32 1.46 2.58 1.67
24 Power Required in MWs for each pump 8.96 14.56 16.06 28.37 18.37
say 9.00 15.00 16.50 28.50 18.50
25 Total Power Required in MWs for pump station 81.00 135.00 115.50 57.00 18.50
26 Installed Capacity in MWs for pump station including Standby 108.00 180.00 148.50 85.50 37.00
SITA RAMA LIFT IRRIGATION SCHEME (PHASE-I)
Annexure 5.6
HYDRAULIC DESIGN OF TUNNEL AT CH. 110.475 KM
FRICTION LOSSES
1 Shape of Tunnel Proposed D-Shaped
2 Design Discharge, Qd = 122 Cumecs
3 Length = 2000 m
4 Diameter, D = 7.5 m
5 Free Board = 1 m
6 Flow Condition = Free Flow
7.5 m
6. IRRIGATION PLANNING
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE-I)
CHAPTER – 6
IRRIGATION PLANNING
6.1. INTRODUCTION
This scheme envisages lifting of Godavari water from U/s of Dummugudem Anicut to
Irrigate upland areas of Khammam and Warangal Districts. The proposed scheme is to
integrate earlier proposed Indira Sagar and Rajiv Sagar Lift Irrigation Scheme into one
lift irrigation scheme and also to cover the Gap Ayacut which is not coming under any
present or future irrigation scheme. Accordingly, the project is now renamed as Sita
Rama Lift Irrigation Scheme is being formulated to irrigate about 9.36 Lakh Acres of
Bhadradri- Kothagudem Khammam and Mahabubabad Districts. The project has been
planned to execute in two phases. Phase – I of the Sita Rama Lift Irrigation Scheme will
cover the Khammam, Bhadradri Kothagudem & Mahabubabad Districts whereas Phase
– II will cover the Khammam, Bhadradri Kothagudem & Mahabubabad Districts. Phase
– I of this scheme covers command area of 2,72,921 Ha with new ayacut of about
1,33,085 Ha and Stabilization of about 1,39,836 Ha. The present report deals with
Phase-I of the Sita Rama Lift Irrigation Scheme.
6.2. AGRO-CLIMATE
Based on the Physiography, Soil types, crops and cropping patterns the Telangana state
has been divided into four Agro-climatic zones. The agro-climatic zones are shown in
the figure 6.1. They are
The Sita Rama Lift Irrigation scheme (Phase-I) has a new command area of about
1,33,085 Ha and Stabilization of about 1,39,836 Ha. of existing Major Projects such as
NSP, Wyra, Paleru and minor irrigation projects lies in project area of Telangana. The
project area which falls under semi-arid region receives average rainfall of 1045 mm per
annum. Out of total rainfall, about 70-75 percent is received during rainy season from
June to September. The remaining 25-30% rainfall is received in winter and summer
months.
The project area experience maximum temperature ranging from 40 oC to 47oC in the
month of May. While minimum temperature of 9oC to 17oC is experienced in
December–January but it was to 26oC to 29oC in May. Humidity in the morning is very
high exceeding 75% from July to September. In dry months of March to May it is
generally low with an average of 25 to 30 percent.
There are three distinct cropping seasons namely, Kharif, Rabi and Zaid. Kharif season
starts with onset of south-west monsoon in the month of June and terminates in
September-October. The crops are grown mainly as rainfed in Kharif season. Owing to
limited irrigation facilities Kharif is the main cropping season in this region.
Productivity of Kharif crops depends on timely rain and its distribution in the season.
The sowing of Kharif crops is mostly done in June- July but it continues upto September
in some cases. Kharif crops are harvested in October-November. The sowing of Rabi
crops starts in November as soon as the fields are vacated from Kharif crops and
continues till late December. Rabi crops are harvested by April. In Zaid season, crops
can be grown with assured irrigation facilities. Short duration crops like urad, mung or
maize can be grown from February to May-June. Some crops like paddy, maize,
sorghum, vegetables etc can be grown through out the year with assured irrigation.
Telangana is endowed with mild climate which is suitable for growing majority of crops
where irrigation facilities are available. Khammam district of the region will prosper
with development of irrigation potential through the Phase-I of the present scheme.
Cotton, Sugarcane and Tobacco. Average area covered by different crops in Kharif
season comes to 4,00,000 hectares and in Rabi season to 1,00,000 hectares. But during
2013-2014, actual area covered by different crops was 3,88,152 hectares in Kharif and
1,03,942 hectares in Rabi season (Table 6.1).
Rice is a major crop covering 33.9% of the total cropped area in Kharif and 8.6% area in
Rabi. Therefore, rice alone covers more than 40% of the total cropped area. Being a
crop with high water requirement its area needs to be replaced by more remunerative
crops in Rabi when it is grown as an irrigated crop. Maize is another cereal crop
occupying about 6.8 % area both in Kharif as well as in Rabi. Jowar occupies about
14.2% area in Rabi and very little area (0.4%) in Kharif. Bajra is grown on very limited
area in Kharif season.
Among pulses, maximum area (17.9% in Kharif and 9.5% in Rabi) is occupied by green
gram, followed by blackgram (0.5% in Kharif and 18.5% in Rabi). Redgram is another
important pulse crop occupying more than 10% of total cropped area mainly in Kharif
season. Horsegram, bengalgram and cowpea are grown only in Rabi season on a limited
scale.
Groundnut, sesamum, castor and sunflower are being grown in Project Area. Among
oilseed crops, groundnut and sesamum occupy a total of 8.6 and 8.0 percent area both in
Kharif and Rabi put together respectively, while castor and sunflower occupy less than
1% area. Chillies is important crop in Project area which occupies more than 15% area
(4.2% in Kharif and 10.9% in Rabi). Sugarcane and tobacco are also being grown
covering about 2.5 and 5.1 percent cropped area, respectively.
Cotton is most important cash crop which is grown only in Kharif season and covers
about 25% of the cropped area in Kharif season. Area wise, cotton occupies second rank
in the project area while first rank is occupied by rice crop.
Data in Table 6.1 reveal that the cropped area in Kharif season in Project area is about
3.88 lakh hectare while cropped area in Rabi season is only about 1.04 lakh hectare.
This indicates that only about 25% area is covered by Rabi crops and the remaining area
remains fallow. It is mainly because in Kharif season crops are grown as rainfed, which
is not feasible in Rabi season. Once the irrigation facilities are developed through Sita
Rama lift irrigation project, the cropped area in Rabi can be increased by about 4-fold.
This will result not only in increased production but will also provide an opportunity to
grow some new more remunerative crops like pulses, oilseeds, vegetables, fruits,
flowers, spices, medicinal and aromatic plants etc. Also, there will be ample scope to
increases the area of existing crops in Rabi season like chillies, tobacco and sugarcane.
At present crops are not being grown in Zaid season in project area but with availability
of irrigation water, crops like greeengram, blackgram, maize etc can be grown in
summer season also.
The data on productivity (Table 6.1) reveal that among cereals, maximum productivity
is obtained from Sugar Cane (9728 kg/ha) followed by Chillies (4179 kg/ha). Another
important cereal is Rice and Jowar, which gives 2994 Kg/ha and 956 kg/ha. Pulses have
much lower productivity than cereals. Redgram showed productivity of 573 kg/ha while
greengram produced only 798 Kg/ha. Important oilseeds in Project Area are groundnut
Chapter-6: Irrigation Planning 6-5 WAPCOS Limited
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE-I)
and sesamum with productivity of 1663 kg/ha and 248 kg/ha, respectively. Cotton is
widely grown as cash crop and has productivity of 393 kg/ha, while chillies produce
about 4179 kg/ha.
The productivity of Kharif crops depends on amount and distribution of rainfall because
Kharif crops are grown as rainfed but productivity of Rabi crops depends on availability
of irrigation at critical stages. With development of irrigation facilities, the productivity
of Rabi crops can be enhanced. There will also be option of replacing low productivity
crops with high value productivity crops.
In Kharif season, there may be sufficient rains to grow crops from June to September
but after mid-September, Kharif crops also need irrigation at reproductive stage. This
project will store excess rain water in July-August to be used for irrigation in later part
of Kharif season in September-October. Most of the Kharif crops are harvested in
November. The productivity of Kharif crops will increase due to availability of
irrigation at maturity stage.
Project Area has different sources of irrigation including major and medium irrigation
projects and wells along with other minor sources. Total irrigated area in the project area
is estimated at 2,27,396 hectares. Out of the total irrigated area about 40% is contributed
by Nagarjuna Sagar project (Table 6.2). Bore wells contribute about 30% of the
irrigated area. Other minor sources also contribute about 15% irrigated area. Therefore,
all other medium size irrigation projects put together contribute about 15% of irrigated
area in the district.
Table 6.2 Irrigation Projects in the Bhadradri- Kothagudem and Khammam Districts of
Telangana
SNo. Source of Irrigation Area Irrigated (ha) Percent
1 Nagarjuna Sagar Project 91904 40.0
2 Wyra 6965 3.0
3 Thaliperu 9880 4.3
4 Bayyaram 2880 1.3
5 Bathupally 2080 0.9
Several schemes are also being implemented in the district for welfare of the farmers.
Some of such schemes are listed here.
1. Distribution of seed on 33% subsidy during Kharif season. This scheme is a relief
measure to farmers suffering from severe drought conditions.
2. Distribution of seed on 50% subsidy during Rabi 2015-16. In this programme, seeds
of maize, jowar, blackgram, redgram, greengram, bengalgram, groundnut, cowpea
and sunflower was distributed to farmers.
3. Green manure seed distribution on 50% subsidy. To improve the fertility of the soil
seed of Dhaincha was distributed to farmers.
4. The subsidy to the tune of about Rs. 15 Crores was made available to the farmers in
Khammam.
5. On-farm extension demonstrations were conducted by adopting latest production
technology on different crops. Large number of farmers benefited by adopting latest
technology on their farms.
6. Farmers field schools were organized to train 30 farmers in each school about
various expects of crop production and integrated nutrient and pest management.
The cropping pattern in a particular area is governed by its climate including maximum
and minimum temperature, rainfall and its distribution, soil type and topography,
availability of irrigation facilities, supply of agricultural inputs and capacity of farmers
to buy them, and ultimately marketing support to the agricultural produce associated
with its demand. The availability of irrigation water through this project is likely to
bring perceptible change in existing crop scenario in the district.
At present, rice occupies about 34% cropped area in Kharif season and another 8.6%
area in Rabi season. During Kharif season rice is mainly grown as rainfed crop and it
does not make use of irrigation water. But in Rabi season rice is grown as irrigated crop.
Rice having higher water requirement than other crops utilizes sizable amount of
irrigation water which can other wise be used to grow other crops like pulses oil seeds
and cash crops including vegetables, fruits and spices in much larger area. Thus, if rice
crop is replaced by more remunerative crops in Rabi season like vegetables, fruits,
pulses and oilseeds, it can fetch a better price and bring about prosperity to the farmers
in the district. It is therefore suggested that rice cultivation may be restricted to Kharif
season and replaced by other crops in Rabi season with lesser water requirements. For
instance, wheat is not a popular crop in Khammam district, but wheat can replace rice in
Rabi season. At present, pulses are being grown in about 27.5% area in Kharif and
38.5% area in Rabi season. Pulse production in Rabi season can be increased by about
5%, if 5.6% area occupied by rice in Rabi season is spared. The area under oilseeds is
only 3.0% in Kharif and 14.3% in Rabi season. Minor adjustments can be made in
oilseed area depending upon its economics vis-à-vis rice and other crops.
Cotton being important cash crop occupies about 23.2% area in Kharif season. With
availability of improved varieties and pest management techniques the risk factor in
cotton cultivation may be reduced and its area enhanced for cultivation. Among
vegetables/spices, chillies occupies 4.2% area in Kharif and 10.9% area in Rabi. Its area
may be readjusted and other vegetables, fruits and spice crops may be introduced with
availability of irrigation facilities. Sugarcane and tobacco are other cash crops grown on
very limited scale. Its needs a closer look to decide their area under changed conditions
keeping economic considerations in view.
Flower cultivation can also be taken on small scale to start with and extended later
depending upon demand and market support. Flowers like marigold, gladiolus, rose etc
can be grown where irrigation facilities are available. It may have scope near cities
particularly in festival season.
About 48% of the area in Khammam district is occupied by forests. Agro-forestry can
be introduced in some of the area where irrigation facilities are developed. Some
perennial trees like poplar eucalyptus etc. may be planted and annual crop like rice,
pulse oilseeds may be grown in between the rows of trees. In addition, shade loving
plants like turmeric may be grown under the trees. Cultivation of medicinal and
aromatic plants like mentha, lemongrass, cytronella, palmrose, ashwagandha,
sarpgandha etc can be introduced in some of the areas where assured irrigation facilities
are available. These plants along with field crops can supplement income of the farmers.
These plants can also provide raw material for industries in the nearby areas. The
Central Institute of Medicinal and Aromatic Plants (CIMAP) located at Maulali, Bod
Uppal and Hyderabad can provide technical know how and feasibility guidelines for
suitability of medicinal and aromatic plant cultivation in the district.
1. Paddy- Bengalgram
2. Maize- Greengram/Wheat
3. Jowar- Blackgram
4. Bajra- Ground nut
5. Groundnut+ Bajra- Chillies
6. Redgram-Vegetables
7. Cotton-Greengram
8. Cotton-Blackgram
9. Cotton-Cowpea
10. Sesamum-Tobacco
11. Chillies-Sugarcane
12. Paddy-Maize
The data in Table 6.1 indicates that in Project Area, farmers are growing only Kharif
and Rabi season crops. In Rabi season, also the cropped area is quite limited and comes
to about 25% of Kharif season. With development of irrigation facilities, not only the
area of Rabi can be increased 3-4-fold, but it would be feasible and advisable to grow
certain crops in Zaid (summer) season also. Under assured irrigation facilities, crops like
greengram, blackgram, maize, mentha etc. can be grown quite successfully to augment
the income of the farmers. It will also provide an opportunity for proper utilization of
farm labour throughout the year.
Data in Table 6.2 reveals that at present the irrigation potential in district is about 2.27
lakh hectare. Therefore, the present potential is sufficient only to irrigate about 0.76 lakh
hectare area thrice in Rabi season. It is less than the actual area of Rabi crops indicating
that all the cropped area received less than 3 irrigations in the season. It can be
therefore, inferred that the area of Rabi can be increased only with enhanced irrigation
potential in the district. About 70 TMC water lifted from Godavari will be utilized under
Phase-I of this Scheme.
It may be worthwhile to mention that the total demand of Sita Rama LIS, Phase-I is of
the order of 70 TMC. Therefore, in the area mentioned below the existing benefit has
been taken as rainfed while future benefit has been taken for irrigated condition.
Therefor present analysis the CCA of the project is taken as 2,72,921 ha. In the Present
situation, the entire area of 2,72,921 ha was rainfed, which would be irrigated during the
post project situation.
The Existing cropping pattern of the Project Area been taken as follows:
Crop water requirement is defined as the depth of water needed to meet the water loss
through evapotranspiration of crop growing in large fields under non-restricting soils,
water and nutrient availability and achieving full production potential under the given
growing environment. The success of this objective depends on matching the water
availability at river source with the quantum of water required for various crops in the
command area for sustainable agricultural production. In the present study, procedure
adopted for calculation of crop water requirements and irrigation requirements are
mainly based on methodologies presented in FAO Irrigation and Drainage papers No. 24
“Crop Water Requirements” and No. 33 “Yield response to water” The software
“CROPWAF 5.7” based on revised method for estimating reference crop
evapotransipiration, adopting the approach of Penman-Monteith as recommended by the
FAO Expert consultation held in 1990 in Rome has been used for calculation ETo and
crop water requirements for the selected crops
Efficient use of water in crop production can only be attained when the planning, design
and operation of water supply and distribution system is geared towards meeting
requirements in quantity and time during the periods of water shortage, for optimum and
high yields of crops. For effective application in planning, design and operation of
irrigation system, it is necessary to analyse the effect of water supply on growth of
crops. The relationship between crop yield and water supply can be evaluated when crop
water requirements and crop water deficits on one hand and maximum and actual crop
yield on the other can be quantified. Deficit in water and the resulting water stress on the
plant, have an effect on crop evapotranspiration and crop yield.
The following are the main factors which play an important role in determining crop
water requirements.
There are several methods for computing crop water requirements using climatological
and physiological approaches. The most practical and comprehensive method for
computing crop water requirements based on climatological approach is “Modified
Penman’s method”, which has been used to compute crop water requirements for this
project. The step-by-step procedure for computing crop water requirement is
summarized below:
Based on the studies of the climate and measured grass evapotranspiration data from
various research stations in the world, Dooven bas and Pruitt (1977) proposed method
known as modified Penman’s method for estimating reference crop evapotransipiration
(ETo) and gave tables for computations.
For the present study, the climatological data of Khammam with latitude of 17° - 15’ N,
Longitude 80° - 09’ E and elevation of 112 m MSL for Khammam District is used.
However, for rainfall the data of various stations falling within the project command
were considered for finding out the 75% dependable rainfall. It is to be noted that the
rainfall significantly influences the irrigation requirements.
ETC = ETO x KC
Where,
ETC = Crop evapotranspiration, mm/day.
Actually ETC is defined as crop water requirement or consumptive use of crop which is
defined as the depth of water needed to meet the water loss through evapotransipiration
(ET crop) of a disease-free crop, growing in large fields under non-restricting soil
conditions including soil water, fertility and achieving full production potential under
the given growing environment.
KC = Crop co-efficient which varies with the crop genotype and growth stages. More
explicitly it is the function of crop canopy coverage. The KC of crop at younger age is
lower than that at full maturity stage.
The crop coefficient is the ratio of ETC/ETO. Whereas ETC is the crop
evapotransipiration of a crop and ETO is the reference evapotransipiration of grass crop.
With respect to type of crop the KC values of fully developed with large leaf area of a
crop like banana are higher than the KC values of fully developed with its small leaf
area such as gram crop. In fact, the KC values are directly related to extent of
transpiration. KC value also differs with growth stage of a crop. For instance, the KC
values of initial growth stage are much smaller than that of a full-grown crop. The
climate influences the duration of the total growing period and various growth stages.
For example, in a cool climate, certain crop will grow slower than in warm climate.
1. Crop genotype i.e. type of crop as cereal, vegetables, pulses, fiber crop etc.
2. The total growing period of each crop
3. Crop growth stages
The total growing period of a crop has been divided into four growth stages:
1. The initial growth stage: this is the period from sowing or transplanting when the
crop covers about 10% of the ground.
2. The crop development stage: this period starts at the end of the initial growth
stage and lasts until the full ground cover has been reached (ground cover about 70-
80%).
3. The mid-season stage: this period starts at the end of the crop development stage
and lasts until maturity; it includes flowering and grain-setting.
4. The late season stage: this period starts at the end of the mid season stage and lasts
until the last day of the harvest; it includes ripening.
In the present study, the crop coefficient values for the crops under consideration as
recommended by FAO have been used and KC values interpolated for 10 daily intervals
are given in the tables containing crop evapotransipiration and irrigation requirements
data.
The entire water received from rainfall is not utilized by the growing crop, a part of it
may be lost by surface runoff, deep percolation or evaporation. Only a portion of heavy
and high intensive rains can enter and be stored in the root zone. A part of stored water
is utilized by crop to meet its evapotransipiration. In the present study, in the present
“effective rainfall” has been computed using USBR method. The monthly effective
rainfall is given Annexure-6.1.
v) Irrigation Efficiencies
For the purpose of cropping pattern and crop water requirement the following
efficiencies are taken into consideration
Crop water requirement (CWR) in practice are governed not only by the agro-climatic
conditions (temperature, humidity, wind velocity and bright sunshine hours) and crop
physiology i.e. crop coefficients (KC values) but also effective rooting depth and soil
moisture condition i.e. water depletion level affecting the growth period. For design
purposes, CWR is based on the assumption that no restrictive conditions arising out of
soil on water stress would apply. The ETC was accordingly computed using KC factor
values for particular crops and the ETO values as computed by Penman – Monteith
method.
For computing net irrigation requirement (NIR) effective rainfall using as calculated by
USBR method is accounted for and monthly net irrigation requirement for various crops
has been worked out and summarized in Annexure 6.2. The gross irrigation
requirements were determined for project development using assumed water use
efficiencies. The Gross requirement at plant root and canal head for Project area of Sita
Rama Lift Irrigation Project, Phase-I is given as Annexures 6.3.
The overall summary of irrigation requirement at canal head for the Project area of Sita
Rama Lift Irrigation Project, Phase-I is given as Annexures 6.3. The Overall demand
for crop wise is given hereunder and detail breakup is given as Annexure 6.4.
On considering the local conditions of the Project areas, the following soil properties are
considered as class determining factors. These includes:
i) Effective soil cover (soil depth)
ii) Soil texture
iii) Water holding capacity
iv) Basic infiltration rate
v) Saturated hydraulic conductivity
vi) Soil drainability
vii) Soil erodability
viii) Electrical conductivity of saturation extract
ix) Exchangeable sodium percentage (ESP)
x) Macro land gradient and
xi) Rock out-crop
The critical limits of each above class determining factors will be based on the
requirement of the various crops to be grown in the area, cultural and social practices
adopted by the irrigators. The critical limits of class determining factors for suggested
probable cropping system in Project are given in Table – 6.7.
Table - 6.7
Critical Limits of Class Determining Factors for arable cropping system for Project Area
5 Electrical 0 -4 4 -8 8 - 12 12 – 16 > 16
conductivity of
saturated soil sample
(ds/m at 25oC)
6 Exchangeable < 10 10 – 20 20 -35 > 35 > 35
Sodium Percentage
(ESP)
Sodium Absorption <8 8 – 18 18 - 38 > 38 > 38
ratio (SAR)
7 Susceptibility to slight High severe Severe severe
erosion hazard none
8 Rock outcrop none None none slightly stony
stony
9 Land slope 0 - 0.5 0.5 - 1.0 1-5 5 – 10 > 10
Station: Khammam
District: Khammam
State: Telangana
Month Min Temp Max Temp Humidity Wind Sun Rad ETo
°C °C % km/day hours MJ/m2/day mm/day
10 Vegetables X10 1st July 100 days 2.1 9.1 14.6 7.5 6.3 8.6
12 Black Gram X12 1st July 90 days 1.7 14.4 19.5 11.3
Rabi
13 Maize X13 16th Nov 120 days 1.2 4.2 7.9 18.0 30.5 35.7 37.4 43.8 41.1 35.3 21.5 19.8
14 Sunflower X14 16th Oct 120 days 0.6 9.0 17.7 26.3 32.9 37.4 34.5 35.6 41.0 29.5 18.3 3.3
15 Blackgram X15 16th Oct 90 days 0.5 4.6 17.5 28.3 32.9 34.0 34.8 19.8 3.5
16 Chillies X16 1st Nov 165 days 2.3 4.2 6.5 11.2 17.2 20.2 25.3 34.8 36.6 38.6 33.1 46.9 50.8 48.2 12.2
17 Cotton X17 16th Oct 190days 0.5 5.3 12.2 19.4 26.1 35.2 36.4 37.7 44.2 41.8 44.1 37.9 52.1 51.1 51.4 40.4 34.7 21.6
18 Sugarcane X18 1st Jan 365 days 12.1 12.7 14.2 15.6 21.3 22.3 38.0 48.0 62.7 61.5 63.4 64.7 68.6 71.3 68.4 49.1 39.9 30.7 19.3 8.7 17.4 16.7 18.9 23.5 15.5 14.4 18.4 21.6 23.0 26.7 23.0 23.6 22.7 22.4 22.4 23.1
19 Sorghum X19 1st Nov 125 days 2.3 7.6 15.8 23.5 31.8 29.8 30.8 35.9 32.1 27.4 18.7 11.4
Ten Daily Crop Water Requirement
For
Sita Rama LIS, Phase-I
Unit: MCM
S.No Crop Code Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
T1 T2 T3 T1 T2 T3 T1 T2 T3 T1 T2 T3 T1 T2 T3 T1 T2 T3 T1 T2 T3 T1 T2 T3 T1 T2 T3 T1 T2 T3 T1 T2 T3 T1 T2 T3 Annual Total
Kharif
1 Paddy I X1 0.0 30.4 66.2 5.7 2.0 5.1 5.0 5.9 7.5 4.7 4.3 5.8 7.1 7.7 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 162.3
2 Paddy II X2 0.0 0.0 22.3 47.0 25.2 5.9 5.8 6.7 8.6 5.5 5.0 6.8 8.9 10.2 11.9 10.4 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 181.7
3 Paddy III X3 0.0 0.0 0.0 0.0 6.3 21.6 1.7 2.0 2.6 1.6 1.5 2.1 2.7 3.2 3.9 3.5 3.6 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 59.2
4 Maize X4 0.0 0.0 0.0 0.0 0.0 0.0 0.8 1.0 1.2 0.7 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.9
5 Groundnut X5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.3 0.3 0.4 0.6 0.6 0.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.3
6 Cotton X6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.5 0.7 0.8 1.0 1.0 1.0 1.0 0.9 0.8 0.8 0.6 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.8
7 Chillies X7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.6 0.8 1.0 1.0 1.1 0.8 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.7
8 Sorghum X8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.1 0.1 0.2 0.3 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7
9 Soyabean X9 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.4 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6
10 Vegetables X10 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.7 1.1 0.6 0.5 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.7
11 Green Gram X11 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.1
12 Black Gram X12 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2
Rabi
13 Maize X13 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.8 1.6 3.6 6.1 7.1 7.5 8.7 8.2 7.0 4.3 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 59.2
14 Sunflower X14 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.0 1.9 2.8 3.5 4.0 3.7 3.8 4.4 3.1 1.9 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.5
15 Blackgram X15 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.2 4.7 7.5 8.8 9.0 9.3 5.3 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 46.8
16 Chillies X16 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.6 0.9 1.1 1.3 1.9 1.9 2.1 1.8 2.5 2.7 2.6 0.6 0.0 0.0 0.0 0.0 0.0 20.7
17 Cotton X17 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.5 0.7 0.9 1.0 1.0 1.2 1.1 1.2 1.0 1.4 1.4 1.4 1.1 0.9 0.6 0.0 0.0 0.0 15.8
18 Sugarcane X18 0.2 0.3 0.3 0.3 0.4 0.4 0.8 1.0 1.3 1.2 1.3 1.3 1.4 1.4 1.4 1.0 0.8 0.6 0.4 0.2 0.3 0.3 0.4 0.5 0.3 0.3 0.4 0.4 0.5 0.5 0.5 0.5 0.5 0.4 0.4 0.5 22.5
19 Sorghum X19 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.8 1.6 2.3 3.2 3.0 3.1 3.6 3.2 2.7 1.9 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 26.7
Total CWR at plant Root (MCM) 0.2 30.7 88.8 52.9 33.9 33.1 15.0 18.6 24.5 15.5 13.5 18.0 22.3 25.0 25.2 18.3 14.3 16.6 17.0 20.8 25.5 22.0 18.0 20.2 17.9 15.2 9.6 9.4 4.5 4.5 2.2 1.4 1.0 0.4 0.4 0.5 657.3
Total Requirement at Canal Head (MCM) 0.5 62.6 177.0 99.2 64.5 66.5 29.4 36.6 48.5 30.6 26.6 35.5 43.9 49.0 49.2 35.4 28.9 33.9 34.7 42.4 52.1 45.0 36.8 41.2 36.6 31.1 19.7 19.2 9.2 9.1 4.5 2.8 2.1 0.9 0.9 0.9 1307.0
Total Requirement at Canal Head (TMC) 0.0 2.2 6.3 3.5 2.3 2.3 1.0 1.3 1.7 1.1 0.9 1.3 1.6 1.7 1.7 1.2 1.0 1.2 1.2 1.5 1.8 1.6 1.3 1.5 1.3 1.1 0.7 0.7 0.3 0.3 0.2 0.1 0.1 0.0 0.0 0.0 46.2
Crop Water Requirement
For
Sita Rama LIS, Phase-I (New Ayacut)
KHARIF
1.0 Paddy I X1 July1- Nov 31 1st July 150 days 451.6 27.0 35933 162.3 331.2 11.7
2.0 Paddy II X2 July15 - Dec 15 15th July 150 days 433.4 31.5 41922 181.7 336.5 11.9
3.0 Paddy III X3 Aug 1 - Dec 30 1st Aug. 150 days 468.0 9.5 12643 59.2 120.8 4.3
4.0 Maize X4 June 1 - Sep 30 1st Jun 120 days 63.0 4.7 6255 3.9 8.0 0.3
5.0 Groundnut X5 July1- Nov 15 1st July 140 days 118.8 2.1 2795 3.3 6.8 0.2
6.0 Cotton X6 July1- Jan1 1st July 190 days 295.8 2.5 3327 9.8 20.1 0.7
7.0 Chillies X7 Jul 1 - Dec 1 1st Aug. 165 days 143.8 3.0 3993 5.7 11.7 0.4
8.0 Sorghum X8 Jul 1 - Nov 1 1st July 125 days 51.6 2.5 3327 1.7 3.5 0.1
9.0 Soyabean X9 Jul1 - Sep1 1st July 90 days 59.7 2.0 2662 1.6 3.2 0.1
10.0 Vegetables X10 Jul 1 - Oct 1 1st July 100 days 48.2 5.7 7586 3.7 7.5 0.3
11.0 Green Gram X11 Jul1- Sep1 1st July 60 days 40.3 2.0 2662 1.1 2.2 0.1
12.0 Black Gram X12 Jul1-Sep3 1st July 90 days 46.9 2.0 2662 1.2 2.5 0.1
Sub Total 94.5 125765 435.3 854.0 30.2
RABI
13.0 Maize X13 Nov 16 - Feb 28 16th Nov 120 days 296.4 15.0 19963 59.2 120.8 4.3
14.0 Sunflower X14 Oct 1 - Feb 1 16th Oct 120 days 286.1 8.0 10647 30.5 62.2 2.2
15.0 Blackgram X15 Oct 1 - Jan2 16th Oct 90 days 175.9 20.0 26617 46.8 95.5 3.4
16.0 Chillies X16 Nov 1 - Mar 3 1st Nov 165 days 388.1 4.0 5323 20.7 42.2 1.5
17.0 Cotton X17 Oct 1 - Apr 1 16th Oct 190days 592.1 2.0 2662 15.8 32.2 1.1
18.0 Sugarcane X18 Jan 1 - Dec 31 1st Jan 365 days 1125.8 1.5 1996 22.5 45.9 1.6
19.0 Sorghum X19 Nov1 - Mar1 1st Nov 125 days 267.1 7.5 9981 26.7 54.4 1.9
Sub Total 58.0 77189.3 222.0 453.1 16.0
GRAND TOTAL ANNUAL CWR* 152.5 202955 657.3 1307.0 46.2
* Crop Water Requirement
Crop Water Requirement
For
Sita Rama LIS, Phase-I (Stabilisation)
KHARIF
1.0 Paddy I X1 July1- Nov 31 1st July 150 days 451.6 27.0 37756 170.5 348.0 12.3
2.0 Paddy II X2 July15 - Dec 15 15th July 150 days 433.4 31.5 44048 190.9 353.5 12.5
3.0 Paddy III X3 Aug 1 - Dec 30 1st Aug. 150 days 468.0 9.5 13284 62.2 126.9 4.5
4.0 Maize X4 June 1 - Sep 30 1st Jun 120 days 63.0 4.7 6572 4.1 8.5 0.3
5.0 Groundnut X5 July1- Nov 15 1st July 140 days 118.8 2.1 2937 3.5 7.1 0.3
6.0 Cotton X6 July1- Jan1 1st July 190 days 295.8 2.5 3496 10.3 21.1 0.7
7.0 Chillies X7 Jul 1 - Dec 1 1st Aug. 165 days 143.8 3.0 4195 6.0 12.3 0.4
8.0 Sorghum X8 Jul 1 - Nov 1 1st July 125 days 51.6 2.5 3496 1.8 3.7 0.1
9.0 Soyabean X9 Jul1 - Sep1 1st July 90 days 59.7 2.0 2797 1.7 3.4 0.1
10.0 Vegetables X10 Jul 1 - Oct 1 1st July 100 days 48.2 5.7 7971 3.8 7.8 0.3
11.0 Green Gram X11 Jul1- Sep1 1st July 60 days 40.3 2.0 2797 1.1 2.3 0.1
12.0 Black Gram X12 Jul1-Sep3 1st July 90 days 46.9 2.0 2797 1.3 2.7 0.1
Sub Total 94.5 132145 457.3 897.3 31.7
RABI
13.0 Maize X13 Nov 16 - Feb 28 16th Nov 120 days 296.4 15.0 20975 62.2 126.9 4.5
14.0 Sunflower X14 Oct 1 - Feb 1 16th Oct 120 days 286.1 8.0 11187 32.0 65.3 2.3
15.0 Blackgram X15 Oct 1 - Jan2 16th Oct 90 days 175.9 20.0 27967 49.2 100.4 3.5
16.0 Chillies X16 Nov 1 - Mar 3 1st Nov 165 days 388.1 4.0 5593 21.7 44.3 1.6
17.0 Cotton X17 Oct 1 - Apr 1 16th Oct 190days 592.1 2.0 2797 16.6 33.8 1.2
18.0 Sugarcane X18 Jan 1 - Dec 31 1st Jan 365 days 1125.8 1.5 2098 23.6 48.2 1.7
19.0 Sorghum X19 Nov1 - Mar1 1st Nov 125 days 267.1 7.5 10488 28.0 57.2 2.0
Sub Total 58.0 81104.9 233.3 476.1 16.8
GRAND TOTAL ANNUAL CWR* 152.5 213250 690.6 1373.3 48.5
* Crop Water Requirement
Annexure 6.4
Croppong
Area Under Area Under Area Under Total Requirement at Canal Head (including surface
S.No. Crop Name Intensity
Crop (ha) Crop (ha) Crop (ha) scheme) in TMC
(in %)
CHAPTER 7
7.1 GENERAL
The Sita Rama Lift Irrigation Project, Phase-I envisages construction of the
followings:
(i) Construction of Head Regulator at Dummugudem Anicut
(ii) Construction of Lined Canal
(iii) Construction of Four Pump Houses
(iv) Delivery Cisterns
(v) Laying of Pumping Main
(vi) Cross Drainage works across Main Canal.
(vii) Road Bridges wherever required.
(viii) Cross Regulators and Offtakes etc.
(ix) Tunnels
(x) Railway Crossing
The objective of the Phase-I of Sita Rama Lift Irrigation Project is to divert
Godavari water from U/s of Dummugudem Anicut to irrigate 6.74 Lakh Acres
(New Ayacut- 3,28,853 Ac. and Stabilisation 3,45,535 Ac.) of Bhadradri-
Kothagudem, Khammam and Mahabubabad Districts of Telangana, covering
enroute tanks and villages as well as nearby command areas. In this context, some
of the structural interventions in the form of storage structures, water conductor
system, pump houses, Tunnels, CM and CD works etc. are proposed for this
purpose. The present consultancy assignment is for confirming the feasibility of
the proposed scheme providing targeted quantum of water for irrigation of new
command as well as en-route tanks, villages, towns and supplement some of the
existing/proposed irrigation schemes.
Phasing of Works:
To facilitate construction activity and its management and quality control, the
project components will be distributed in different packages.
Initial one year would be utilized for preconstruction activities including site
clearance, establishment of site organization, approach roads, bridges and CD
works, buildings, stores, construction power, labs and workshop etc.
A) (Pre-Construction Works)
S.No. Pre-Construction Activity Duration
1. Land Acquisition 6 Months
2. Road Construction
a.) Upgrading of Existing Roads 6 Months
b.) Construction of New Roads
3. Site Installation and Temporary camps at the site 6 Months
4. Tender and Contractors of Main works 6 Months
5. Arrangement for Construction/Alternate Power 4 to 6 Months
6. Mobilization of Men and Machines 6 Months
Some of the works like residential and non-residential buildings & acquisition of
land etc. would be continue along with the construction of main works.
All the works whether it is Civil, Electro-mechanical in nature, are grouped into
various packages. Due to limited availability of working season in a year, it would
be necessary to achieve the maximum progress in the stipulated time frame.
There will be One Chief Engineer, One S.E. (Civil), one S.E (E&M), one S.E.
(Finance and Accounts), one S.E. (Admin) along with relevant supporting staff.
Besides this, CE will also be supported by S.E. (HQ & Monitoring) who will be
Each SE (Civil) will be assisted by three Executive Engineers (Civil) and they
will be entrusted with construction and installation works.
SE (Finance and Accounts) will be supported by one Senior Accounts officer and
accounts officer along with supporting staff responsible for managing finance and
accounts works.
SE (Admin) will deal with administration and public health and security assisted
by one administrative officer and one Security officer. There will be a fire
fighting unit and a para medical unit attached to Admin officer to attend the first
aid treatment cases.
The major works for execution of the project include head regulator, channel,
pump house complex and electro-mechanical works. To facilitate construction
activity and its management and quality control, all these works are logically
divided and classified into following contract packages which an independent
nature wise and have manageable interface problems which are serially tabulated
with corresponding duration wise order:
The program and progress of the project will be reviewed every month. The
program report would highlight the program vis-à-vis its financial and cost
aspects besides highlighting the problem area experienced. Suitable remedial
steps and corrective measures will be taken from time to time to resolve/ sort out
the problems confronted on the basis of suggestions offered by the eminent
experts of the Technical Review Board.
The construction methodology and equipment planning for various works is based
on site conditions prevailing in the project area. Construction activities are
planned in such a way that the project will be completed in the shortest possible
time period. Following assumptions have been made in this regard for equipment
planning and construction methodology of the project.
For almost all types of construction activities, mechanized construction has been
planned so as to achieve consistent quality at a faster progress rate. Special
attention has been paid to the equipment planning for the excavation and laying of
the same as materials quantities are involved and interdependence of various
construction activities make this exercise very critical. The sequence of
construction activities, wherever possible, has been attempted in such a way that
equipment from one activity on its completion can be shifted to the other activity.
This way, the total requirement of equipment at a time would be reduced and also
7.7 COMMUNICATION:
The infrastures like roads, approach roads to different sites of works have to be
completed before start of main works. Stores at different sites to store materials
such as steel, cement, machines, Equipments and other construction materials will
be constructed before construction of main works.
The construction stage surveys and investigations, detail designs are proposed to
be taken up simultaneously along with the work. In order to derive full benefits at
the end of proposed construction period, the erection, testing and commissioning
aspects would be required to be planned judiciously.
In addition to main construction work at site, the project staff is also required for
planning, monitoring and control, construction and maintenance of buildings and
roads, quality control, procurement stores, mechanical works, electrical works,
geology personnel and administration, financial and accounts, vigilance and other
related works. Category requirement of different staff is shown in Annexure-7.2
and Annexure 7.3.
Consultants:
Consultants are engaged for carrying out various studies for the project and for
preparing Feasibility Study Report, Socio-economic and Environment monitoring
and EIA Report and Detailed Project Report etc. During project construction
stage, the requirement of the project management consultants shall be examined
and if the requirement is established, a competent project management consultant
shall be engaged as per the approved procedure of the contracting agency.
In addition, the contracting agency may also engage experts from reputed
institution on need basis if required during the project construction.
It is proposed to provide the following facilities to staff and workers. The staff
may consist of regular, work charged or daily wagers employed on the project.
All the existing infrastructural facilities like access roads, buildings and civic
amenities already available near the Project.
Additional facilities such as, construction of new roads, remodelling of
existing roads, installation of water supply pipelines and sewerage system for
staff quarters / colony located at the project site and other sites as well as
Distribution Power line for smooth power supply to staff quarters/colony.
Medical Dispensaries at Pump House and project site locations.
Recreation activities viz. clubs etc. for the staff.
Suitable arrangements shall be made by the Contractor/Construction Agency
on their own for providing accommodation to their personnel including
workers as well as water supply, power, sanitation, recreation and other
facilities.
1. Quality Management
2. Management of Information System
3. Safety/Security aspects
Concrete is the most versatile construction material used on various works of this
project namely including Pump House, Canal lining, pipe line network etc.
Quality control of concrete would involve the followings:
Standards for concreting and its various ingredients are universally standardized
and the specifications would be in conformity with the same.
C) Safety Organisation
SNo. Name of Equipment Unit 1st Year 2nd Year 3rd Year
V. Inspection & Transport vehicles
(a) Staff Car No. 1 1 1
(b) Jeep No. 8 8 8
(c) Truck 10 Tonnes No. 2 2 2
(d) Mini Truck No. 2 2 2
(e) School/Staff Bus No. 1 1 1
(f) Ambulance No. 1 1 1
VI. Miscellaneous Equipment
(b) Mobile Crane - 18 Tonnes No. 1 1 1
(c) Mobile Crane – 10 Tonnes No. 1 1 1
(d) DG Sets 500 kVA No. 2 2 2
(e) Welding Sets No. 4 4 4
(f) Tractor Trailor No. 2 2 2
(g) Explosive van 10 Tonnes No. 1 1 1
(h) Weigh Bridge – 20 Tonnes No. 2 2 2
(i) Pumps 5 HP No. 8 8 8
(j) Pumps 10 HP No. 8 8 8
(k) Pumps 40 HP No. 2 2 2
VII Workshop Equipment
(a) Central lathe Machines No. 1 1 1
(b) Shaper Machine No. 1 1 1
(c) Hydraulic Press No. 1 1 1
(d) Bench drilling Machine No. 1 1 1
(e) Grinder No. 2 2 2
(f) Drill Steel Grinder No. 2 2 2
(g) Power Hacksaw No. 2 2 2
(h) Hydraulic Jack No. 4 4 4
(i) Engine Repair shop No. 1 1 1
(j) Auto electric repair shop No. 2 2 2
(k) Battery charger No. 2 2 2
(l) Compressor for tyre inflation No. 2 2 2
(m) Gas cutting sets No. 2 3 3
(n) Greasing Plant No. 2 2 2
(o) Unforeseen items L.S. 10 10 10
MAY
MAY
MAY
MAR
MAR
MAR
NOV
NOV
NOV
AUG
AUG
AUG
OCT
OCT
OCT
DEC
DEC
DEC
APR
APR
APR
JAN
JUN
JAN
JUN
JAN
JUN
FEB
FEB
FEB
JUL
JUL
JUL
SEP
SEP
SEP
1 Pre-Construction work INFRASTRUCTURE DEVELOPMENT
Main Construction
2 MAIN WORKS
work
CHAPTER - 8
COST ESTIMATE
The main purpose of the proposed project is not only to integrate earlier proposed
Indira Sagar and Rajiv Sagar Lift Irrigation Scheme into one lift irrigation scheme but
also cover the Gap Ayacut which is not coming under any present or future irrigation
scheme. It is in this context the present scheme is renamed as Sita Rama Lift Irrigation
Project is being formulated to cover about 9.36 Lakh Acres (including New Ayacut
and Stabilization) of Bhadradri- Kothagudem, Khammam and MahabubabadDistricts.
The project has been planned to execute in two phases. The Present report deals with
Phase-I of the Scheme covers Bhadradri- Kothagudem, Khammam and Mahabubabad
Districts. Phase – I of this scheme covers command area of 2,72,921 Ha with new
ayacut of about 1,33,085 Ha and Stabilization of about 1,39,836 Ha.
8.2 GENERAL
Cost estimation of Sita Rama Lift Irrigation Project (Phase-I), Telangana has been
worked out by calculating the quantities of different items of work involved and
multiplying the respective items with the applicable unit rates. The applicable unit
rates, in turn are based upon cost of material, cost of transportation as prevailing in the
state of Telangana and the labour rates. Most of the rates adopted in the estimate have
been taken from the schedule of rates (SOR) 2015-16 for works of Irrigation and CAD
Works, Part- I, Telangana and are expressed in INR.
The total estimated cost of the project including direct and indirect changes is
Rs 11,931.73 crores.
UNIT- I : Headworks
UNIT-II : Canal Network
Under this head provisions have been made for various structures of the project as
detailed here under: -
Summary
I Works Rs. 10722.93 crores
II Establishment Rs. 953.99 Crores
III Tools and Plants Rs. 107.23 crores
IV Suspense -
V Receipts and recoveries on capital account -
Total Direct Charges in Lakhs Rs. 11784.15 crores
Total Indirect Charges in Lakhs Rs 147.58 crores
A-Preliminary
This head includes provisions for surveys & investigations, model studies etc. to be
conducted to arrive at the optimum project components. Provision also includes
expenditure on investigation work already done. A provision of Rs 57.33 crore has
been provided under this head.
B-Land
This covers the provision for acquisition of land for Submergence area coming under
head works, Canal network and its various structures, colonies, roads, the R&R
settlement cost etc. A provision of Rs. 1182.98 crores have been made.
Chapter-8: Cost Estimate 8-2 WAPCOS Limited
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE-I)
C-works
This sub head covers the cost of civil structures of Head works, Pump House
including cost of civil works, pumps, motors etc. The quantities indicated in the
estimates are calculated from the preliminary design and rate as per experience of
other ongoing or commissioned projects. A provision of Rs. 2454.06 crores have
been made to frame the estimate of this project.
D-Regulator
A provision of Rs. 83.20 crores have been made under this sub head.
In this subhead, a provision of Rs. 785.81 crores have been made for the various
cross drainage structures coming under the canal network.
G-Bridges
A total estimate of Rs. 642.93 crores have been made under this subhead.
K-Buildings
Buildings, both residential & non-residential have been grouped separately under
permanent and temporary construction. Included under the permanent category are all
those buildings which will be subsequently utilized for running and maintenance of
project utilities. The cost has been taken on plinth area basis as per experience of other
ongoing or commissioned projects. The total cost has been worked out as Rs.114.66
crores
L1 –Earthwork
A total of Rs. 2399.70 crores have been worked out under this subhead.
L2 –Lining
An estimate of Rs. 391.37 crores have been worked out in this subhead.
L3- Tunnel
A provision of Rs. 577.50 crores have been worked out in this subhead.
M- Plantation
A provision of Rs. 28.66 crores have been made under this subhead
O-Miscellaneous
Provision under this head has been made to cover the cost of the following
miscellaneous works:
a) Capital cost of electrification, water supply, sewage disposal, firefighting
equipment etc.
b) Repair and maintenance of electrification, water supply, sewage disposal,
medical assistance, recreation, post office, telephone & telegraph office, security
arrangements, firefighting, inspection vehicles, schools, transport of labouretc.
c) Other services such as laboratory testing, R&M of Guest House and transit
camps, community centre, retrenchment compensation, photographic instruments
as well as R & M charges etc. A provision of Rs. 14.33 crores have been
provided under this head.
The provision under this head has been made to cover the residual value of the
equipment to be used for infrastructure works only re-capital cost of equipment less
the credit due to resale or transfer of equipments and life of machinery used in works.
A chargeable amount of Rs 50.00 crores is allocated tentatively under this subhead.
R-Communication
Provision of Rs. 14.33 crores under this head covers the cost of construction and
improvement of approach and connecting roads etc in the project area. Widening
ofroad have been planned to cater for the anticipated traffic including movement of
heavy trailers.
Provision of Rs. 1346.00 crores have been worked out in this subhead.
A provision of Rs. 134.60 crores have been worked out in this subhead.
A provision of Rs. 409.43 crores under this head has been made for environment and
impact mitigation measures including compensatory afforestation, public health
measures to control water and soil borne diseases, restoration of land etc.
Y-Losses on Stock
Under this sub head is made at 0.25% of the I works excluding A-preliminary works,
B- land, O-miscellaneous, M-plantation, Q-special Tools, X-environment and Ecology
as provided in CWC guidelines for preparation of cost estimates for River Valley
Projects.
Indirect Charges
These charges cover the cost towards fees for audit and accounts which has been
taken as 1% of I-works as per norms. Provision has also been made for capitalization
abatement of land revenue @ 5% of cost of cultivable land.
II – Establishment
Provisions for establishment have been made @ 10% of less B-Land for Unit-I and
unit- II.
This provision is distinct from that under Q-special T&P and is meant to cover cost of
survey instruments, camp equipment & other small tools and plants. The outlay is
provided at 1% of cost of I-works.
IV- Suspense
2 Indirect Charges
Capital Value of abatement of land revenue (5% of 4035.13
a)
Culturable land revenue of B- Land)
b) Audit & Account Charges @ 1% of cost of I-Works 10722.93
Total Indirect Charges (a+b) 14758.05
Total Direct & Indirect Charges (Rs. In Lakhs) 1193173.27
Total cost (Rs. in crore) 11931.73
9. ECONOMIC BENEFITS AND JUSTIFICATION
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE-I)
CHAPTER - 9
9.1 INTRODUCTION
It is natural for any investments, to search for a measure of the benefits likely to be
derived from investments in the project. Thus, the main purpose of undertaking the
financial and economic analysis appraisal of a project is to assess its capacity to
maximize the efficient use of natural resources.
In the analytical system followed for this project, the “with” and “without” situations
are compared based on constant prices at current levels both for financial and
economic analysis.
The purpose of the economic analysis is to assess the real costs and benefits without
distortions due to taxes, subsidies, quotas or other factors influencing the value of the
products and services. The financial analysis is based not on economic values or
shadow prices but on the prices observed on the market. As such the purpose of
financial analysis is to assess the benefit of the project from the point of view of
farmer or individuals directly getting the benefits, whereas the economic analyses
focus on the society as whole.
A wide variety of appraisal criteria (or evaluation methods) have been suggested in
literature to judge the wothehileness of the investment in the projects. The important
and popular in use can be classified into two broad categories as (i) Discounting and
(ii) Non Discounting criteria.
The important discounting criteria are: Net Present Value, Benefit Cost Ratio and
internal rate of Return. The popular non-discounting criteria are Payback period and
Accounting rate of return.
The Net present value of a project is equal to the sum of the present value of all the
cash flows (inflows as well as outflows) associated with it.
The discounted benefit – cost ratio is defined as ratio of present value of benefit and
present value of cost at social discount rate.
The Payback period is the length of time required to recover the initial cash outlay on
the project.
The accounting rate of return also referred to, as the average rate of return, is a
measure of profitability, which relates income to investments both measure in
accounting terms. It is the ratio average income and initial investment.
The internal Rate of return (IRR) is defined as the rate of interest, at which, the
discounted benefits and the discounted cost over the stipulated life of the project are
equal. The IRR based on financial prices are denoted as FIRR and that based on
economical prices are denoted as EIRR.
1. The financial and economic viability of a project stipulates that the discounted
benefits, accruing as a result of the project developments, should exceed the
discounted costs. This is generally done by either estimating net present value
(NPV) of the project i.e. net present value of benefit minus net present value of
cost or by determining the internal rate of return (IRR). The particular discount
rate, at which, the NPV of the project works out to be zero or little higher than
zero, should not be lower than the opportunity cost of capital, i.e the
appropriate social discounts rate.
2. The BCR must be equal to or higher than unity with a discount rate as
enumerated in (i) above.
3. The IRR must be equal to or higher than the appropriate social discount rate, or
the opportunity cost of capital.
5. The accounting rate of return should exceed a certain cut off rate of return
From the theoretical point of view, the net present value method is clearly superior to
all other methods. For larger projects accounting rate of return and in more recent
years, discounted cash flow method are more commonly employed. For smaller
projects the Payback period method appears to be popular. In U.S, Internal rate of
return, Net Present value, Accounting Rate of return and Payback period are the most
popular methods of project appraisal.
For the financial and economical appraisal of the irrigation scheme, a series of
budgets for various crops of the designed cropping pattern have been prepared.
Financial and Economic crop budgets have been prepared for both the “Future
Without” (FWOP) and “Future With” (FWP) project situation. These crops budgets
include estimation of the gross value of the production and all direct production costs.
The objective of working out the crop budgets is to estimate the net return per ha of a
cropped area.
Since there is a great deal of fluctuations in the market prices of various products and
Govt. regulate prices of certain inputs and outputs, the minimum support price where
ever available and the administered prices of above inputs have been taken into
consideration for evaluating cost of inputs and value of outputs for the entire post
project period, for those items like bi-products, the prevailing market price of the bi-
product in the locality or its opportunity cost as a substitute of other item, have been
taken into consideration. The input prices of seeds, fertilizers (with subsidy + taxes)
have been adopted from while the prices of other input like organic manure, wages of
animal labour have been obtained from the locality. The labour wage has been taken
as Rs.100/- per day which is minimum statutory prescribed by the Govt. Changes in
prices over time due to over all changes in prices have been ignored as these will
equally affect the input prices and output prices. Besides the fact that the installments
payment of loans and interest does not change over time due to changes in price level
adds credence to these assumptions.
Crop budgets were prepared for assessing the crop benefits which can be expected
under “without” as well as under “with” Project conditions. Crop budgets were first
prepared in financial price terms and then converted to economic terms, for selected
crops as per the envisaged cropping pattern of the project The Crops and their
cropping pattern under present and future both for “without” and “with” Project
situations are given in Table No 9.1
9.5.1 ASSUMPTIONS
b. The gross crop value includes the value of the main produce and by-products.
The crop yield for main product , By-product, and seed requirement and their
price as adopted in the present study are given in Table 9.2 (a) and 9.2 (b).
c. That the prices of input and output of various crops will remain constant. The
justification of this lies in that the increase input and output prices will be
counterbalanced by inflation.
f. Shift from the present use of local seeds under “without” Project situation,
HYVs (High Yielding Varieties) of seeds in the “with” Project future situation is
envisaged in cereals, pulses, and oil seeds, vegetable and other cash crops with
improvement in cultivation practices ,improved technology and management.
j. That necessary institutional support and services will be available from various
departments concerned with supply of inputs and disposal of the outputs so that
the farmers adopt full package of practices and take full benefits from assured
water supply.
k. At present the use of animal power is minimal, and depends upon the agricultural
practices being followed and the type of crops grown. With the advent of modern
technology, coupled with mechanized agriculture, the use of animal power is
likely to continue to decline.
l. Presently the use of machine power is at a low level and is going to increase in
future.
m. Depreciation has been considered only with respect to small tools and
implements. Certain items of storage, marketing payments to artisans etc., were
considered as miscellaneous expenses.
n. That all extension activities will be geared to educate the farmers for making
optimum utilization of irrigation potential created and that the full projected level
of output, income and employment will be attained by the 8th year of initiation of
the project.
o. That there will be hardly any changes in the exogenous factors (although not
realistic) influencing agricultural production.
q. That the productivity of crops will be as envisaged in Table 9.2 (a) and 9.2 (b)
with and without modernization of the project respectively.
i) Value of seed
ii) Value of fertilizers
iii) Value of manure (FYM)
iv) Value of plant protection chemicals
v) Value of human labour (owned and hired)
vi) Value of animal power
vii) Value of machine power
viii) Value of water (only for “with” Project situation)
ix) Land revenue
x) Depreciation and Maintenance
xi) Transport cost
xii) Interest on working capital & miscellaneous expenditures
Costs of production per hectare of different crops are calculated by the Directorate of
Economics & Statistics, Govt. of India (GOI), starting from the lowest cost,
representing actual expenses in cash and kind incurred in production by the owner, or
operator, under the heading of operational costs, to the highest level, including all the
values of the imputed costs. The primary intention of these calculations is to estimate
the cost of production per quintal for principal crops, so as to assist the Commission
of Cost and Prices (CAC&P) in advising the GOI how to establish procurement and
support prices.
The practice of World Bank which is followed in the preparation of Staff Appraisal
Reports (SARS) on irrigation projects, only the expenses in cash and kind actually
incurred by the farmers are generally considered. However items of operational costs,
like depreciation on machinery and implements, land revenue, miscellaneous
expenditures, interest on working capital and expenditures like taxes etc. which are
generally not considered in the World Bank SARs, have been considered in preparing
the crop budgets for the present study.
The input application without project has been gleaned from the past experience based
on some survey and extrapolated for some similar crops not covered in the survey.
The input application for the post project period have been obtained from the relevant
Farm Planning and Guide Book and agricultural practice manual which represents full
package of practices under assured water supply.
The current area under various crops representing the situation without project has
been extrapolated. The area under various crops in future situation has been derived
from cropping pattern optimization. The details irrigated and un-irrigated area under
“Present”, “Future without Project” and “Future with Project” are given in Table No
9.1.
Both financial and economic crop budgets, for the “without” and the “with” project
situations were developed for the present study. A summary of the financial and
economic crop budget covering yield, gross return, cost of production and net return
computed for different crops for present as well as future both for the “without” and
“with” situations are presented, Table- 9.3 to Table-9.4. Financial and Economic crop
prices used for preparing crop budgets both for “without” and “with” project situations
are given in Table No – 9.2 (a) and 9.2(b). The Financial crop presented in Annexure
9.1 respectively
In order to derive incremental net financial economic benefit streams for agricultural
the methodology described in the earlier paras, has been used. On the basis of net
return per ha of cropped area the benefit for one ha of net cultivated area was worked
out under “Without” and “With “ project situations. Taking into account the cropping
pattern the incremental benefit from the project area has been estimated. Since the
construction of dam and other works will be completed in the 3rd year itself, the partial
irrigation will be available from the 4th year onwards.
The farmer has already cultivating the land in command area and is well aware of crop
production. It has been assumed that full development of crop production except
orange will be achieved in 7th year of the project.
The year wise incremental income from the project is presented in Table No 9.4 and
9.5 for financial and economical analysis respectively. It has been assumed that once
the project reaches its full development stage in 8th year the benefits will remain the
same for the project life.
9.6 PRICES
The entire analysis was done on constant prices. To estimate the gross return per
hectare for agricultural produce, various kinds of prices, such market prices (retail and
wholesale), farm-gate prices and administered prices (procurement and support) could
be considered. For the purpose of present analysis, the farm gate (post-harvest) prices
were used. The farm gate prices were obtained from the Season and Crop report of
Directorate of Economics & Statistics, for the years 2015-16 as well as obtained from
field survey conducted in the project command areas. For the agricultural by-products,
the prices prevailing in the producing areas during 2015-16 have been taken as the
basis, because, first, there is no Government procurement of agricultural by-products,
and second, the produced is assumed to be consumed locally, obviating the necessity
for any adjustment of transport cost and loss in transit.
The financial prices of different inputs and outputs of different crops are based on the
observed prices in the local markets and are generally those reportedly paid or received
by the farmers. These financial prices were adjusted where necessary to reflect the
opportunity cost to the society, thus expressing the economic prices of inputs and
outputs. For those items are internally traded or substituting items traded on the
international market, economic prices were based on the World Bank's Commodity
Price Projections given in the Global Economic Prospects. Crop inputs or outputs not
traded on the international market were priced on the basis of their financial prices.
The derivation of various financial and economic prices used in the analysis and their
detailed calculations are presented in Tables 9.7 to 9.9.
For economic analysis purposes, the costs and benefits of the Phase-I of Sita Rama Lift
Irrigation Project have to be evaluated at world market prices so as to measure
correctly net economic benefits from this project. These require certain adjustments,
since, many items are not traded on the world market and others are affected by tariffs
and trade restrictions.
The benefits of the operation are evaluated at world market prices, i.e. they measure
what India would have to pay for imports or receive for exports. Most of the costs,
however, are for items that are not traded on the world market. Tariffs and trade
restrictions introduce a distortion in the price relationship between traded goods —
valued at world market prices — and non—traded goods — valued at local prices.
Thus, the costs are not directly comparable with the benefits. In order to make them
compared, an SCF is applied to the price of non—traded goods and consumption.
The effect of using the shadow exchange rate is to make traded items relatively more
expensive in terms of domestic currency, by the amount of foreign exchange premium.
This method is often used, and the relationship between the official and the estimated
exchange rates constitutes what is called the Standard Conversion Factor (SCF).
In the absence of trade restrictions, the SCF can be approximately calculated using the
formula:
X M
SCF
X Sx M T m
Where,
X = fob value of exports at the official exchange rate (OER);
M = CIF value of imports at OER;
S = export subsidies;
Tm = import duties.
For India, SCF was assessed at 0.80 in 1980s, and subsequently at 0.85, to take
account of the real evolution of the economy and the Indian Rupee.
The rupee has now become a convertible currency, at the cost of substantial
devaluation and an overseas trade which is subject to less and less taxes, restrictions or
subsidies. This means that exchange rate of the Rupee, when compared with foreign
currencies, is a fairly close reflection of the shadow price of the foreign currencies, and
therefore the SCF can be taken as equal to one.
The economic prices for traded goods such as rice, wheat, cotton, groundnuts, and
sugarcane are based on their border prices at the official exchange rate (OER). The
domestic cost components (i.e. local transport and marketing charges) are adjusted by
Chapter-9: Economic Benefits and Justification 9-10 WAPCOS Limited
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE-I)
the SCF of 0.80. The economic prices for non - traded food grains (sorghum, maize
and pulses are assumed to be non—traded) are derived by applying a food grain
conversion factor (FCF) to the financial price. The FCF can be estimated with the
following formula:
FCF = [(Q rice x PE rice) ÷ (Q wheat x PE wheat)]/ [(Q rice x PF rice) + (Q wheat x
PF wheat)]
Where Q: production
Prices for traded items for which projections are not made, and for non-traded items,
were calculated by adjusting the financial prices. Local costs, excluding those for
unskilled labour, were adjusted by applying the Standard Conversion Factor of 1. Cost
of unskilled labour was adjusted by both the SCF and by the Shadow Wage Factor
(SWF) of 0.50. The Economic Conversion Factor (ECF) for unskilled labour is thus
0.50. The market wage rate is considered to be a true reflection of the opportunity cost
of skilled labour. The economic price of skilled labour is valued at 100 percent of the
market or financial rate.
The schemes would be constructed using a mixture of equipment, skilled and unskilled
labor. For the economic analysis, the CCF is estimated as follows:
Chapter-9: Economic Benefits and Justification 9-11 WAPCOS Limited
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE-I)
(a) Traded Component: This component includes capital intensive works which
require imported materials. Since it is traded, the conversion factor is 1.00. It is
estimated that about 15% of the construction costs fall under this category.
(b) Non-Traded Component: This component includes works that require skilled
labor and locally manufactured materials. The SCF of 0.80 is used as the
conversion factor for these works. About 30% of the construction Costs are
included in this category.
(c) Unskilled Labor: A minimum wage is in force. Since daily workers virtually
never are paid above the minimum wage, it is likely that this wage is higher than
the wage at which the workers would be willing to work (i.e. their supply price).
Civil works construction is harder physical work than farming, and experience
from similar areas in India indicates that the laborers require a premium of 25%—
30% to shift from agriculture to construction work. By comparison with
agricultural wages in the State, it is estimated that the construction laborers’
supply price is about 15% to 20% below the minimum wage. This gives a shadow
wage factor which is l0%—20% below the SCF, or approximately equal to 0.65. It
is estimated that unskilled labor constitutes about 55% of the construction cost.
Conversion Factor
The resultant conversion factor for project construction costs i.e. 85%. This is the
factor by which the financial cost of the works expressed at the market price was
multiplied to obtain the shadow price for these works.
Costs of the operation include the cost of resettling families from villages submerged
by the reservoirs. The economic cost of resettlement is calculated by multiplying the
financial cost by the construction conversion factor (CCF). Where the cost of land
acquisition is concerned, the real cost to society is the opportunity cost, that is, the
production foregone by the submersion of the land in the reservoirs and the loss of
lands acquired for the construction of the distribution system. The per ha value of
production in the future “without project” situation was taken to represent this
opportunity cost and deducted from the benefit stream.
Conversion factors for O & M involve two components which are (i) employment of
unskilled labour and (ii) materials and equipment with traded and non-traded
components. The Conversion Factors (CF) derived for O&M was also multiplied by
85%.
The first 7 years of the project have been reckoned as construction period. Hence the
cropping pattern in vogue remains the same as in the current period. Commencing with
the 8th year the farmer will start reaping the full benefit of assured water supply. The
extension activities should be geared from the very 1st year of construction to motivate
the farmers to switch on to the proposed cropping pattern and adopt modern
technology so that they follow the recommended practices and take full benefit of
assured water supply. To attain this objective, CADA, Agriculture Department may
conduct one experiment in each panchayat in the farmers’ field on the benefits of full
package of practices where irrigation is available and impart certain training to farmers
on water management. Since these are part and parcel of the activities of CADA works
and Agriculture Department, no separate budgetary provision need be made in the
project for this work. There should be a vigorous extension effort by the district
authorities to produce biofertiliser, Rhyzobium culture, compost manure, agricultural
machinery, pesticides, and distribute inputs like high yielding variety of paddy, seeds,
fertilizers etc. Further programmes have been made for imparting certain on farm
training to the farmers on different aspects of agriculture. It is expected that all these
efforts will boost up agricultural production and full package of practices will be
adopted with the commencement of the 8th year.
The quantum of various resources used in raising different crops during the Kharif and
Rabi seasons in the pre-project period have been adopted from the information
available for the project area.
The development of the project would allow intensive farming of 272921 Ha of area
under cultivation. In the present situation the entire area of 272921 Ha is experiencing
rainfed like condition, which would be irrigated during the future with project
situation. Irrigation will also allow full use of the land which is not cultivated under
current farming practices. The incremental production of crops from the developed
land would be the benefit to the society. In addition, extra production will contribute
to local food grains supplies and reduce regional and national food grains deficits. The
actual and incremental production of cereal, oilseed and other crops due to project are
summarized below:
This impact of project outcome occurring from several indirect and secondary non-
farm benefits may originate from the production aspect of the project as the value
added and employment opportunity generated by processing and new marketing
activities, like transportation and storage services.
The impact is also felt in the increase in family working hours and increase in
employment opportunities of the wage earners, the latter get employment during slack
season and higher wages during peak load period. Besides a great deal of indirect
employment opportunities in the processing storage, transportation and marketing
fields will also be generated in the non-farm activities, emanating from the output
enhancement of the agricultural sector.
Other employment opportunity may emerge from the secondary or side effect of the
project in the form of providing services for recreation, health, power, education
facilities in the area.
Other social benefits are redistribution of income, eradication of poverty and increase
in standard of living in the rural areas. This will also reduce the tendency of migration
of rural people to urban areas.
The inclusion of indirect and secondary costs and benefits is very important element in
economic justification of the project where physical resources are either idle or
underutilized and where one of the most important purpose of the project is to absorb
the unused and under used factors of production and increase their efficiencies.
Most of these impact effects are of subjective nature and difficult to measure
quantitatively. However, it is now time for the economist to derive input output,
coefficients for these indirect and secondary costs and benefits to gauge the full
outcome of the project. This will satisfy the advocate suggesting realization of full cost
of the irrigation works from the farming community by levying irrigation taxes. In a
nutshell, the indirect, secondary cost and benefit accruing from the project cannot be
overlooked for the purpose of measuring the full impact of the project and for
expressing a judgment on its social worthiness.
Improved crop production through the commissioning of the irrigation scheme will
increase farm income in the project area. Food supply will increase and there will be
cash income available for food or other purchases.
Project Districts Administration vis–a-vis State Govt. risks are considerably reduced
through irrigation and the higher cropping intensities will protect the authorities
against shortfall in crop production. With the existing population structure and its
rapid growth in the project area, the long term benefits from irrigation are even more
important. Reliable water supplies along with improved package of agricultural
practices may encourage farmers to go for round the year crop production to take
advantage of market conditions.
Increased cash income resulting from increased crop production and employment
opportunities would result in higher per capita consumption of a greater variety of food
items. This in turn will improve the nutrition levels of the people in the project area.
v) Environmental Facility
The irrigation scheme will improve the overall environmental and ecological situations
in the project area which in turn will reduce the health hazard.
Supply and distribution of input will not also pose any problem as there are a number
of retail outlets for supply and distribution of all agricultural inputs in the rural area.
The minimum support prices of agriculture commodities are announced by the
Agricultural price Commission well ahead of the commencement of the cropping
season. These support prices based on the survey, through cost accounting method, on
the cost of production of various major crops in various parts of the country. The
prices of some of the important input like fertilizer; seeds etc. are regulated by the
Government. It is expected that these regulatory activities will prevail throughout the
post project period, notwithstanding the liberalization policy of the Govt.
The total financial cost of the project is Rs.119317.3 Million. The 70 % expenditure
will be incurred during the first two years and the remaining 30 % amount shall be
paid to the contractor in 3rd year. Operation and Maintenance (O & M) cost at the rate
of 1175 per ha has been assumed from 6th year onward. The year wise project cost and
O & M have also been given in the Table No 9.5 for financial analysis.
The economic cost includes capital investment and O & M cost of the proposed
irrigation scheme. The economic cost has been obtained after adjusting the financial
cost for opportunity cost, taxes and standard conversion factor. The same parameters
have been applied for estimating economic cost, as has been applied foe estimating the
economic benefits. Details for estimating economic prices and standard conversion
factor are given in the earlier para and results are given in Table 9.6.
Project analysis has been carried out to cover as total period of 100 years from the year
of the start of the construction of the project. The year wise net incremental return in
the “with” project situation over “without” project situation has been computed as
under and given under 9.5.
Net Incremental Return = Net return in “with” Project situation minus Net return in
the “without” Project situation.
The flow of costs and benefits has been discounted at base discount rates (10%) to
formulate discounted cash flow streams. The Table–9.5 gives the year wise project
investment costs, O&M costs, and total investment costs. The table 9.5 gives the
financial IRR calculation with project net incremental return and net cash flow stream
calculated at the base discount rate. It also gives the FIRR i.e. discount rate, at which
with the stream of cash flow, will give zero Net Project Value or Net Project Value
tends to zero at the end year of the evaluated period. The Financial Internal Rate of
Return (FIRR) for this project is found to be 20.18 % percent and NPV value at 10%
discount rate works out to be Rs. 135761 million.
The sensitivity analysis was carried out both for financial and economic cash flows
with various increases in cost as well as with various decreases in benefit. The result
of the same is given in table below.
Sensitivity of Financial Analysis
Accounting
Discounted Pay Back
IRR NPV rate of
B/C Ratio Period
Return
A. No Change in Cost &
20.18% 2.34 135761 7.2 26.6%
Benefit
B. Changes in Cost only
1. Cost increase by 5.0 % 19.42% 2.23 130684 7.4 26.6%
2. Cost increase by 10.0 % 18.73% 2.12 125608 7.6 26.5%
Chapter-9: Economic Benefits and Justification 9-18 WAPCOS Limited
Pre-Feasibility Report
SITA RAMA LIFT IRRIGATION PROJECT (PHASE-I)
The conventional B-C Ratio as per CWC guidelines was observed to be 1.8 as given
below.
2. Annual Cost
i Interest on capital @10% of total cost 11932