Erection Tank Settlement Check Schedule 103 110 165

The document outlines a field leak and settlement inspection schedule for three tanks: a 103-T-501 solvent storage tank, 110-T-501 caustic tank, and 165-T-501 spent caustic storage tank. It involves filling each tank with water in stages from 25% to 100% capacity and inspecting for settlement at various elevation levels. The tanks will be drained, cleaned, and reinstated after inspection. The schedules span May and June 2014 and include estimated water volumes and projected daily progress for each tank.

Uploaded by

hrdsby
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
140 views8 pages

Erection Tank Settlement Check Schedule 103 110 165

The document outlines a field leak and settlement inspection schedule for three tanks: a 103-T-501 solvent storage tank, 110-T-501 caustic tank, and 165-T-501 spent caustic storage tank. It involves filling each tank with water in stages from 25% to 100% capacity and inspecting for settlement at various elevation levels. The tanks will be drained, cleaned, and reinstated after inspection. The schedules span May and June 2014 and include estimated water volumes and projected daily progress for each tank.

Uploaded by

hrdsby
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

FIEL

NO DESCRIPTION

1 103-T-501 SOLVENT STORAGE TANK ɸ 4000 X 3000 H


1.1 Temporary facilities installation
1.2 Water Filling :
* Water Filling 25%
* Water Filling 50%
* Water Filling 75%
* Water Filling 100%
1.3 Holding Time and Settlement Inspection
* Elevation : 0 ~ 750 mm ( 25% )
* Elevation : 0 ~ 1500 mm ( 50% )
* Elevation : 0 ~ 2250 mm ( 75% )
* Elevation : 0 ~ 3000 mm ( 100% )
1.4 Water Drain
1.5 Inside Cleaning
1.6 Re-instatement

2 110-T-501 CAUSTIC TANK ɸ 4400 X 4600 H


2.1 Temporary facilities installation
2.2 Water Filling :
* Water Filling 25%
* Water Filling 50%
* Water Filling 75%
* Water Filling 100%
2.3 Holding Time and Settlement Inspection
* Elevation : 0 ~ 1150 mm ( 25% )
* Elevation : 0 ~ 2300 mm ( 50% )
* Elevation : 0 ~ 3450 mm ( 75% )
* Elevation : 0 ~ 4600 mm ( 100% )
2.4 Water Drain
2.5 Inside Cleaning
2.6 Re-instatement

3 165-T-501 SPENT CAUSTIC STORAGE TANK ɸ 4400 X 7800 H


2.1 Temporary facilities installation
2.2 Water Filling :
* Water Filling 25%
* Water Filling 50%
* Water Filling 75%
* Water Filling 100%
2.3 Holding Time and Settlement Inspection
* Elevation : 0 ~ 1950 mm ( 25% )
* Elevation : 0 ~ 3900 mm ( 50% )
* Elevation : 0 ~ 5850 mm ( 75% )
* Elevation : 0 ~ 7800 mm ( 100% )
2.4 Water Drain
2.5 Inside Cleaning
2.6 Re-instatement
FIELD LEAKS AND SETTLEMENT INSPECTION SCHEDULE
FOR TANK ERECTION TANK : 103/110/165-T-501

WORKING SCHEDULE MAY


Q'TY
DAYS
START FINISH 1 2 3 4
38 M3 18
3 1-Aug 3-Aug

9.5 M3 1 4-Aug 4-Aug


9.5 M3 1 6-Aug 6-Aug
9.5 M3 1 8-Aug 8-Aug
9.5 M3 1 10-Aug 10-Aug

5-Aug 5-Aug
1 7-Aug 7-Aug
1 9-Aug 9-Aug
3 11-Aug 13-Aug
2 14-Aug 15-Aug
2 16-Aug 17-Aug
2 18-Aug 19-Aug

70 M3 18
3 1-Aug 3-Aug

17.5 M3 1 4-Aug 4-Aug


17.5 M3 1 6-Aug 6-Aug
17.5 M3 1 8-Aug 8-Aug
17.5 M3 1 10-Aug 10-Aug

1 5-Aug 5-Aug
1 7-Aug 7-Aug
1 9-Aug 9-Aug
2 11-Aug 12-Aug
2 13-Aug 14-Aug
2 15-Aug 16-Aug
2 17-Aug 18-Aug

119 M3 12
1 1-Jun 1-Jun

29.75 M3 1 2-Jun 2-Jun


29.75 M3 1 7-Jun 7-Jun
29.75 M3 1 9-Jun 9-Jun
29.75 M3 1 11-Jun 11-Jun

1 3-Jun 3-Jun
1 8-Jun 8-Jun
1 10-Jun 10-Jun
1 12-Jun 12-Jun
1 13-Jun 13-Jun
1 14-Jun 14-Jun
1 15-Jun 15-Jun
EDULE
750 1150 1950 REV. NO.
liter 9420 17477.24 29635.32 DATE
PDAM 2.355 4.36931 7.40883

JUNE JULY

1 2 3 4 1 2 3 4
:0
: 8 MAY, 2014

REMARKS