SIMULATION STEP
PART PART 1 PART 2 PART 3 PART 4
STEP PROCESS APPOINTMENT PROCESS MONITORING DOCUMENTATION COMPLETION
TIMELINE ETA KAPAL 07 NOV 2019 ETB 12 NOV 2019 BERTHING 12 NOV 2019 DEPARTURE 13 NOV 2019
EST SHIPMENT 07 NOV 07 NOV – 12 NOV 12 NOV – 13 NOV 13 MAR – 14NOV
DATE
EMAIL STEP 1 Enquiry Process Send Line Up Ask Certificates Send Loading Completion
EMAIL STEP 2 Send EPDA Ask Estimate Berthing Send Certificates Ask Final BL
EMAIL STEP 3 Bargaining Process 1 Berthing Prospect Send Draft BL Send Final BL
EMAIL STEP 4 Bargaining Process 1 Feed back Approve Draft BL Ask Issuance BL
EMAIL STEP 5 Appointment Line up dan Berthing Send Berthing Update Ask Final Advance
Prospect
EMAIL STEP 6 Send The Payment Receipt
Ship Owner : SO = PT. POSEIDON SHIPPING
General Shipping Agency : GA = PT. PEMUDA BANGSA MARITIM
SHIPMENT DETAIL
SHIPMENT DETAIL MT. SANMAR V.27/19
DATA INFO
VESSEL NAME MT. SANMAR ROYAL
VOYAGE 27/19
FLAG Indonesia
ORIGIN PORT CUDDALORE, INDIA
LOADING PORT ANYER, INDONESIA
DISCHARGE PORT CUDDALORE, INDIA
GRT 5076 MT
DWT 6057.07 MT
LOA 109.99 M
DRAFT FULL LOAD 6.013 M
CARGO TYPE VCM (VINYL CHLORIDE MONOMER)
QUANTITY 5000 MT
ACTIVITY LOADING
SHIP OWNER POSEIDON SHIPPING. PTE. LTD
A. APPOINTMENT PROCESS – PART 1
PART
PART 1 PART 2 PART 3 PART 4
STEP PROCESS APPOINTMENT PROCESS MONITORING DOCUMENTATION COMPLETION
TIMELINE ETA KAPAL 07 NOV 2019 ETB 12 NOV 2019 BERTHING 12 NOV 2019 DEPARTURE 13 NOV 2019
EST SHIPMENT DATE 07 NOV 07 NOV – 12 NOV 12 NOV – 13 NOV 13 MAR – 14NOV
EMAIL STEP 1 Enquiry Process Send Line Up Ask Certificates Send Loading Completion
EMAIL STEP 2 Send EPDA Ask Estimate Berthing Send Certificates Ask Final BL
EMAIL STEP 3 Bargaining Process 1 Berthing Prospect Send Draft BL Send Final BL
EMAIL STEP 4 Bargaining Process 1 Feed back Approve Draft BL Ask Issuance BL
EMAIL STEP 5 Appointment Line up dan Berthing Prospect Send Berthing Update Ask Final Advance
EMAIL STEP 6 Send The Payment Receipt
1. Ship Owner mengirimkan Enquiry pada General Shipping Agency (ENQUIRY PROCESS)
SHIP OWNER
Email :
To : PT PEMUDA BANGSA MARITIME PANJANG
Att : Ms.Refina & Shipping Agency team
From : POSEIDON SHIPPING PTE LTD
Dear Ms. Refiana
Good day
One of our chemical tanker is nominated to call port of Anyer, Indonesia for
Loading her cargo of 5000 MT VCM 5% MOLOO with ETA NOV 07/12.00 hrs
We are considering your company as our loadport agent to handle this shipment.
Hence,In this connection kindly advise:
1) Total Estimate PDA (Port expenses) at all included
2) Extra expenses involved for shifting to 2nd loading berth, if used
3) Approx time required for loading incl approx time awaiting berth
4) If there are any physical restrictions like loa/beam/draft etc
as well as density of water if not salt
5) Any dues/taxes for owners account which are not included in d/a
6) Official working hours of the port - is work carried out during
saturdays and sundays 24 hrs round the clock
7) Any certain flags excluded/special fittings that vsl
needs to comply with
8) Suppose loading operation takes place by means of shore gear
pls comment
PLS FIND BELOW VESSEL PARTICULAR:
VESSEL : MT. TBN
LOA : 109.99M
GRT : 5,076 MT
B/M : XXX M
Depth : XXX M
SDRAFT : 6.013M
SDWT : 6,057.07 MT
FLAG : INDONESIA
CLASS : NK CLASS
BUILT : 2002
VESSEL ITINERARY
MT V27/19,
NOV 07/1200 ETA Anyer FOR LOADING
NOV 17-18 ETA Cuddalore, India TO DISCHARGE
REMARK :
- Last port CHAM PA, VIETNAM
- Next port after Anyer is Cuddalore, India
- Above schedule basis if all goes well.
- We will keep you update if any change and further info.
Your prompt reply is highly appreciated.
Thank you and awaiting yours
Regards,
SAM
POSEIDON SHIPPING. PTE. LTD,
Skypark,
8 Elliot Place,
Glasgow G3 8EP
United Kingdom
2. General Shipping Agency mengirim Company Profile, EPDA, dan Port Info (SEND EPDA)
GENERAL AGENCY
Email :
Dear Mr. Sam
Good day,
We thank you for your enquiry.
We will produce and estimate PDA covering all relevant cost and port
information at the earliest.
Should we require any further information or details, we will contact
you shortly.
With Kind Regards
REFIANA
PT. PEMUDA BANGSA MARITIM
Jl. DR Ide Anak Gde Agung Lot 8.6-8.7,
Kawasan Mega Kuningan, Jakarta 12950, Indonesia
Dear Mr. Sam
Good day,
We are pleased to provide you with the attached PDA which is calculated
based on the following particulars that you have provided, we hope this
PDA meets your expectations and look forward to your appointment.
Attached Port Info Anyer as your guidance, usually this type of cargo
will be loaded at Jetty 1 – PT Asahimas where one manifold size 6” has
been deployed by the Terminal Facility.
Max Draft: 10 mtr
We also provide you our company profile for your consideration.
Kindly acknowledge safe receipt.
With Kind Regards
REFIANA
PT. PEMUDA BANGSA MARITIM
Jl. DR Ide Anak Gde Agung Lot 8.6-8.7,
Kawasan Mega Kuningan, Jakarta 12950, Indonesia
Attachment : Company Profile, EPDA, Port Info
3. SO melakukan bargaining harga atau proses penawaran cost keagenan kapal (BARGAINING
PROCESS)
SHIP OWNER
Email :
Dear Ms. Refiana
Good day,
We confirm safe received your provided PDA and information with many
thanks.
As per review your PDA, we found high cost on your Agency Fee abt USD
1100.
In this regard we highly appreciate if you can re - consider the price
at USD 800 + VAT.
Please confirm above ASAP in order for us to proceed nominating your
good company soon.
With Kind Regards
SAM
Attachment : -
4. GA memberikan harga yang sesuai setelah penawaran dari SO (BARGAINING PROCESS)
GENERAL AGENCY
Email :
Dear Mr. Sam
Good day,
We just have internal discussion and our management agreed to accept
yours.
USD 800+ VAT
Kindly confirm we can receive 100% prefunding prior vessel arrival.
Looking forward to receiving appointment from you soon.
With Kind Regards
REFIANA
PT. PEMUDA BANGSA MARITIM
Jl. DR Ide Anak Gde Agung Lot 8.6-8.7,
Kawasan Mega Kuningan, Jakarta 12950, Indonesia
Attachment : -
5. Shipowner melakukan proses penunjukan (APPOINTMENT)
SHIP OWNER
Email :
To : PT PEMUDA BANGSA MARITIME PANJANG
Att : Ms.Refina & Shipping Agency team
From : POSEIDON SHIPPING PTE LTD
Dear All
Good day,
We are POSEIDON SHIPPING. PTE. LTD, the Owner of the MT Sanmar
Royal V27/19, which is calling Anyer for loading VCM abt 5000 MT 5%
MOLOO.
We would like to appoint your agency as Port Agent for for this port
call.
All expenses incurred in carrying out these duties are to be included
in your Final DA and POSEIDON SHIPPING. PTE. LTD, will arrange
payment: please revert with your Pro-Forma DA if Pre-funding is
required. Our Invoice Address is as below:
POSEIDON SHIPPING. PTE. LTD,
Skypark,
8 Elliot Place,
Glasgow G3 8EP
United Kingdom
Thanking you and kindly confirm attendance.
With Kind Regards
SAM
POSEIDON SHIPPING. PTE. LTD,
Skypark,
8 Elliot Place,
Glasgow G3 8EP
United Kingdom
Attachment : Appointment Letter
B. MONITORING – PART 2
PART
PART 1 PART 2 PART 3 PART 4
STEP PROCESS APPOINTMENT PROCESS MONITORING DOCUMENTATION COMPLETION
TIMELINE ETA KAPAL 07 NOV 2019 ETB 12 NOV 2019 BERTHING 12 NOV 2019 DEPARTURE 13 NOV 2019
EST SHIPMENT DATE 07 NOV 07 NOV – 12 NOV 12 NOV – 13 NOV 13 MAR – 14NOV
EMAIL STEP 1 Enquiry Process Send Line Up Ask Certificates Send Loading Completion
EMAIL STEP 2 Send EPDA Ask Estimate Berthing Send Certificates Ask Final BL
EMAIL STEP 3 Bargaining Process 1 Berthing Prospect Send Draft BL Send Final BL
EMAIL STEP 4 Bargaining Process 1 Feed back Approve Draft BL Ask Issuance BL
EMAIL STEP 5 Appointment Line up dan Berthing Prospect Send Berthing Update Ask Final Advance
EMAIL STEP 6 Send The Payment Receipt
1. GA mengirim Vessel Line Up pada Ship Owner (SEND LINE UP)
GENERAL AGENCY
Email :
Dear Mr. Sam
Good day,
Please find attached Vessel Line Up at Anyer port as your guidance.
With Kind Regards
REFIANA
PT. PEMUDA BANGSA MARITIM
Jl. DR Ide Anak Gde Agung Lot 8.6-8.7,
Kawasan Mega Kuningan, Jakarta 12950, Indonesia
Attachment : Vessel Line Up
2. SO membalas email, menanyakan perkiraan sandar (ASK ESTIMATE BERTHING)
SHIP OWNER
Email :
Dear Ms Refi,
Good day to you.
Could you pls advise us the latest vessel line up at Anyer and the best
Estimate berthing time for our vessel basis ETA 07/1200 hrs please ?
Due to the charterer really need this cargo, could you also pls check
if possible our vessel can berth on arrival?
Appreciate your prompt reply.
Thank you
SAM
Attachment : -
3. GA mengirim perkiraan sandar, bahwa kapal rencana langsung sandar tanpa menunggu di
pelabuhan (BERTHING PROSPECT)
GENERAL AGENCY
Email :
Dear Mr. Sam
Good day,
We confirm safe received your following mail and well noted-many
thanks.
As per checking with our local team, our good vessel Laycan on 12th
November 2019 but it will change depend on Terminal nnotice.
Please find below her schedule as your ref:
ETA 07th Nov 2019/1200LT iagwwog
ETB 12th Nov 2019/1600LT iagwwog
ETD 13th Nov 2019/PM iagwwog
Further update or any change will keep you posted.
With Kind Regards
Refiana
PT. PEMUDA BANGSA MARITIM
Jl. DR Ide Anak Gde Agung Lot 8.6-8.7,
Kawasan Mega Kuningan, Jakarta 12950, Indonesia
Attachment : -
4. SO membalas untuk memberikan feedback dan meminta untuk terus di update (FEED BACK)
SHIP OWNER
Email :
Dear Ms.Refi,
Good day.
Thanks for your info
Pls keep us update the berthing prospect of our vessel.
Regards,
SAM
Attachment : -
5. GA mengirim email perkiraan sandar, estimasi working scheduie, dan vessel line up (LINE UP AND
BERTHING PROSPECT)
GENERAL AGENCY
Email :
Dear Mr. Sam
Good day,
Please find attached Vessel Line Up at Anyer port per Today as your
guidance.
Please find below her schedule as your ref:
ETA 07th NOV 2019/1200LT iagwwog
ETB 12th NOV 2019/1600LT iagwwog
ETD 13th NOV 2019/PM iagwwog
Activity take around 25 hrs with loading rate approx. 200 MT/hrs
Further update or any change will keep you posted.
With Kind Regards
REFIANA
PT. PEMUDA BANGSA MARITIM
Jl. DR Ide Anak Gde Agung Lot 8.6-8.7,
Kawasan Mega Kuningan, Jakarta 12950, Indonesia
Attachment : Vessel Line Up dan Berthing Prospect
C. DOCUMENTATION – PART 3
PART
PART 1 PART 2 PART 3 PART 4
STEP PROCESS APPOINTMENT PROCESS MONITORING DOCUMENTATION COMPLETION
TIMELINE ETA KAPAL 07 NOV 2019 ETB 12 NOV 2019 BERTHING 12 NOV 2019 DEPARTURE 13 NOV 2019
EST SHIPMENT DATE 07 NOV 07 NOV – 12 NOV 12 NOV – 13 NOV 13 MAR – 14NOV
EMAIL STEP 1 Enquiry Process Send Line Up Ask Certificates Send Loading Completion
EMAIL STEP 2 Send EPDA Ask Estimate Berthing Send Certificates Ask Final BL
EMAIL STEP 3 Bargaining Process 1 Berthing Prospect Send Draft BL Send Final BL
EMAIL STEP 4 Bargaining Process 1 Feed back Approve Draft BL Ask Issuance BL
EMAIL STEP 5 Appointment Line up dan Berthing Prospect Send Berthing Update Ask Final Advance
EMAIL STEP 6 Send The Payment Receipt
1. GA meminta sertifikat kapal untuk perizinan memasuki perairan Indonesia (ASK CERTIFICATES)
GENERAL AGENCY
Email:
Dear Mr. Sam
Good day,
Kindly need your assistance to provide some vessel
documents/certificates in order to apply permit at SeaComm Dept. (PKKA
Permit - Foreign Flag Vessel Agency Permit) to entry Indonesia Water
and PKKA Permit must be done before vessel arrival.
Vessel Documents Required:
- Ship Particular
- Tonnage Certificate
- ISSC Certificate
- Registry Certificate
- List Port of Calls
- Crew List
- Class Certificate
- IOPP Certificate
- Fitness Certificate (if any)
- Q88
- CAS (if any)
- Ship Security Officer Certificate
- Company Security Officer Certificate
Please take a note that PKKA Permit issued approx 2-3 working days.
Also kindly advise for following:
-Last Port
-Next Port
-Voyage No
-If vessel have transit cargo on board, if available please forward
copy BL/Manifest for custom purpose only
-If vessel have Indonesia Health Book/Green Book on board, if you don’t
have it so please informs us in order we can instruct local agent to
arrange it when vessel arrival because its compulsory for in/out
clearance arrangement.
-If vessel have derrating and medicine certificate on board, if you
don’t have it so please informs us in order we can instruct local agent
to arrange it when vessel arrival because its compulsory for in/out
clearance arrangement.
Note:
-Please ensure no supernumerary on board to avoid any problem with
immigration.
-Please ensure total crew on immigration crew list when departure is
same amount on crew list when arrival
-Please make sure vessel have valid certificate on board and for expiry
date of certificate should not less than six (6) months from date of
vessel arrival
-All crew passports expiry date should not less than six (6) months
from date of vessel arrival
-For PSC certificate the last inspection date should not less than six
(6) months from date of vessel arrival
-The PSC certificate must be issued by member of Tokyo MOU
-Last port clearance must be declared Panjang / Lampung as next port
Kindly acknowledge safe receipt of this email.
With Kind Regards
REFIANA
PT. PEMUDA BANGSA MARITIM
Jl. DR Ide Anak Gde Agung Lot 8.6-8.7,
Kawasan Mega Kuningan, Jakarta 12950, Indonesia
Attachment : -
2. SO mengirim sertifikat kapal dan menanyakan kemungkinan sandar (SEND CERTIFICATES)
SHIP OWNER
Email :
Dear Ms.Refi,
Good day.
Pls find attached the pre-arrival docs for your kind perusal.
Kindly confirm if all in order.
Thank you and awaiting yours.
SAM
Attachment : Vessel Certificates (Crewlist, Company Security Officer, Ship Security Officer,
Tonnage, Class, Register, ISSC, Fitness)
3. GA mengirim draft BL untuk meminta advise dari isi BL yang sudah disiapkan (SEND DRAFT BL)
GENERAL AGENCY
Email :
Dear Mr. Sam
Good day,
Herewith attached draft BL for your kind perusal.
Kindly advise whether content is in good order.
Awaiting yours.
With Kind Regards
REFIANA
PT. PEMUDA BANGSA MARITIM
Jl. DR Ide Anak Gde Agung Lot 8.6-8.7,
Kawasan Mega Kuningan, Jakarta 12950, Indonesia
Attachment : Draft BL
4. SO menyetujui Draft BL saat ini sudah dibuat GA (APPROVE DRAFT BL)
SHIP OWNER
Email :
Dear Ms.Refi,
Good day.
We confirm the BL draft,
Pls send us the Final Draft proceed first once the loading figure is
available.
We wil send out the Final BL instruction once we confirm by charterer.
Thank you
Regards,
Sam
Attachment : -
5. GA mengirim update jadwal kedatangan kapal, update kapal sandar, loading, dan estimasi
departure (SEND BERTHING UPDATE)
GENERAL AGENCY
Email :
Dear Mr. Sam
Good day,
Please find below her schedule as your ref:
ETA 07th NOV 2019/1200LT iagwwog
ETB 12th NOV 2019/1600LT iagwwog
ETD 13th NOV 2019/PM iagwwog
Activity take around 25 hrs with loading rate approx. 200 MT/hrs
Further update or any change will keep you posted.
With Kind Regards
REFIANA
PT. PEMUDA BANGSA MARITIM
Jl. DR Ide Anak Gde Agung Lot 8.6-8.7,
Kawasan Mega Kuningan, Jakarta 12950, Indonesia
Attachment : Vessel Line Up
D. COMPLETION – PART 4
PART
PART 1 PART 2 PART 3 PART 4
STEP PROCESS APPOINTMENT PROCESS MONITORING DOCUMENTATION COMPLETION
TIMELINE ETA KAPAL 07 NOV 2019 ETB 12 NOV 2019 BERTHING 12 NOV 2019 DEPARTURE 13 NOV 2019
EST SHIPMENT DATE 07 NOV 07 NOV – 12 NOV 12 NOV – 13 NOV 13 MAR – 14NOV
EMAIL STEP 1 Enquiry Process Send Line Up Ask Certificates Send Loading Completion
EMAIL STEP 2 Send EPDA Ask Estimate Berthing Send Certificates Ask Final BL
EMAIL STEP 3 Bargaining Process 1 Berthing Prospect Send Draft BL Send Final BL
EMAIL STEP 4 Bargaining Process 1 Feed back Approve Draft BL Ask Issuance BL
EMAIL STEP 5 Appointment Line up dan Berthing Prospect Send Berthing Update Ask Final Advance
EMAIL STEP 6 Send The Payment Receipt
1. GA pengiriman jadwal eksisting penyelesaian muat dan loading documents (SEND LOADING
COMPLETION)
GENERAL AGENCY
Email :
Dear Mr. Sam
Good day,
Herewith attached Cargo Document as your ref.
Kindly confirm safe receipt.
With Kind Regards
REFIANA
PT. PEMUDA BANGSA MARITIM
Jl. DR Ide Anak Gde Agung Lot 8.6-8.7,
Kawasan Mega Kuningan, Jakarta 12950, Indonesia
Attachment : Time sheet, BL, Cargo Manifest, Mate Receipt
2. SO meminta final Draft BL setelah proses muat (ASK FINAL BL)
SHIP OWNER
Email :
Dear Ms.Refi,
Well received the loading docs.
Further, could you pls also send us the final BL draft please?
Awaiting yours promptly.
Thank you
Regars,
Sam
Attachment : -
3. GA mengirim Final Draft BL (SEND FINAL BL)
GENERAL AGENCY
Email :
Dear Mr. Sam
Good day,
Herewith attached Final Draft B/L for your kind perusal.
Kindly confirm whether content is in good order as our ref to issue the
OBL.
Awaiting yours.
With Kind Regards
REFIANA
PT. PEMUDA BANGSA MARITIM
Jl. DR Ide Anak Gde Agung Lot 8.6-8.7,
Kawasan Mega Kuningan, Jakarta 12950, Indonesia
Attachment : Final Draft BL
4. SO meminta untuk menerbitkan / melakukan issue pada Final Draft BL (ASK ISSUANCE BL)
SHIP OWNER
Email :
Dear Ms.Refi,
Well received the Final BL Draft.
Pls proceed to issue 3 Original BL +3 Copy Non Negotiable and send us the scanned copy first before
courrier the hardcopy original to owner address refer to my signature below.
Thank you and awaiting yours.
SAM
POSEIDON SHIPPING. PTE. LTD,
Skypark,
8 Elliot Place,
Glasgow G3 8EP
United Kingdom
Attachment : -
5. GA meminta final pembayaran/advance (ASK FINAL ADVANCE)
GENERAL AGENCY
Email :
Dear Mr. Sam
Good day,
kindly be inform you that our good vessel has been sailing on 13th NOV
2019/2055LT.
could you be so kind to advise us status pre-funding for the vessel?
Please note that we should remit the payment also to port authority.
Kindly send us slip bank remittance once available.
Awaiting yours.
With Kind Regards
REFIANA
PT. PEMUDA BANGSA MARITIM
Jl. DR Ide Anak Gde Agung Lot 8.6-8.7,
Kawasan Mega Kuningan, Jakarta 12950, Indonesia
Attachment : -
6. SO mengirim bukti pembayaran pada GA (SEND THE PAYMENT RECEIPT)
SHIP OWNER
Email :
Dear Ms.Refi,
Good day yo you.
Pls find attached the bank slip for EPDA at Anyer for your perusal.
Kindly check and confirm safe received the fund.
Thank you
Regards,
Sam
Attachment : Advance Payment