0% found this document useful (0 votes)
144 views4 pages

Deviation Sheet - 142100,143100 - Elevator &escalator-Approval

This document outlines deviations from specifications for electric traction elevators for 15 towers. It lists 6 categories of deviations: 1. Shop drawings will show 2D drawings instead of plans, elevations, and sections. 2. Seismic certification for elevator equipment is optional rather than required. 3. One freight elevator per tower will have a C3 loading class with aluminum sills rather than the specified requirements. 4. Seismic requirements for lifts are optional rather than required. 5. Factory acceptance tests will have visible checks of main components rather than full checks and tests, and witnessing procedures change. 6. Regenerative inverters will be provided only for high speed lifts of 4.0m/

Uploaded by

Li Liu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
144 views4 pages

Deviation Sheet - 142100,143100 - Elevator &escalator-Approval

This document outlines deviations from specifications for electric traction elevators for 15 towers. It lists 6 categories of deviations: 1. Shop drawings will show 2D drawings instead of plans, elevations, and sections. 2. Seismic certification for elevator equipment is optional rather than required. 3. One freight elevator per tower will have a C3 loading class with aluminum sills rather than the specified requirements. 4. Seismic requirements for lifts are optional rather than required. 5. Factory acceptance tests will have visible checks of main components rather than full checks and tests, and witnessing procedures change. 6. Regenerative inverters will be provided only for high speed lifts of 4.0m/

Uploaded by

Li Liu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

15 Towers - Deviation Sheet - 142100- ELECTRIC TRACTION ELEVATORS

Sr.
Category Latest SPEC No. Page Spec Description Deviation
No.
Shop Drawings: For each elevator. Show Shop Drawings (2D drawings): For each
elevator. Show plans, elevations, sections,
plans, elevations, sections, and large-scale
details indicating service at each landing,and large-scale details indicating service at
machine room layout, coordination with each landing, machine room layout,
SECTION 142100 - building structure, and relationships with coordination with building structure, and
ELECTRIC other construction. Indicate variations relationships with other construction.
1 Special Equipment P2
TRACTION from specified requirements, maximum Indicate variations from specified
ELEVATORS REV02 dynamic and static loads imposed on requirements, maximum dynamic and static
loads imposed on building structure at
building structure at points of support, and
locations of equipment and signals. points of support, and locations of
Include maximum and average power equipment and signals. Include maximum
demands. and average power demands.
Manufacturer Seismic Certificates: For
Manufacturer Seismic Certificates: For
elevator equipment, accessories, and
elevator equipment, accessories, and
SECTION 142100 - components, Submit a signed certificate by
components, Submit a signed certificate by
ELECTRIC the manufacturer of seismic restraints
2 Special Equipment P3 the manufacturer of seismic restraints
TRACTION certifying that the products furnished
certifying that the products furnished
ELEVATORS REV02 comply with the project specifications
comply with the project specifications
requirements. Seismic required for elevator
requirements
is optional in current offer
SECTION 142100 -
Freight elevator loading class: C3 loading
ELECTRIC
3 Special Equipment P3 Freight elevator loading class. class included for one lift in each tower
TRACTION
with aluminum sills.
ELEVATORS REV02
BS EN 81-77:2013. Safety rules for the
BS EN 81-77:2013. Safety rules for the
SECTION 142100 - construction and installations of lifts.
construction and installations of lifts.
ELECTRIC Particular applications for passenger and
4 Special Equipment P4 Particular applications for passenger and
TRACTION goods passenger lifts. Lifts subject to
goods passenger lifts. Lifts subject to
ELEVATORS REV02 seismic conditions. Seismic required for
seismic conditions.
elevator is optional in current offer
Factory acceptance tests of equipment
under this Contract are subject to be Factory acceptance tests of equipment
witnessed by the Employer / Engineer. under this Contract are subject to be
Witness test shall cover complete checking witnessed by the Employer / Engineer. The
and testing of selected units (prototypes FAT comnined elevator &escalator,
will be selected for elevator speeds exceed Witness test shall cover visible check for
3 m/sec) according to requirements of the the main components, no need for complete
specified regulations and standards as well checking and testing. Test procedures and
SECTION 142100 -
as special requirements finishes, software programs shall be submitted for approval
ELECTRIC
5 Special Equipment P5 and controls. Test procedures and programs prior to factory visit by 7 days. The
TRACTION
shall be submitted for approval prior to contractor shall include in his price the cost
ELEVATORS REV02
factory visit by at least 14 days. The of factory witness test visits at
contractor shall include in his price the cost manufacturer’s premises to cover all types
of factory witness test visits at of tests including business class air tickets,
manufacturer’s premises to cover all types five stars Hotel full accommodation,
of tests including business class air tickets, transportation and all test expenses for four
five stars Hotel full accommodation, Man visits subject to further
transportation and all test expenses for four coordination/agreement with the client.
Man visits subject to further
Power Regenerative Converter: a means
shall be provided for removing regenerated
power from the drive system. This power
Power Regenerative Converter: a means
SECTION 142100 - shall be dissipated in resistors or return to
shall be provided for removing regenerated
ELECTRIC the three-phase A.C. power supply system.
6 Special Equipment P7 power from the drive system. This power
TRACTION Regenerative inverter will be provided for
shall be dissipated in resistors or return to
ELEVATORS REV02 high speed lifts, ie speed with 4,0m/s and
the three-phase A.C. power supply system.
above. For lifts with speed up to 3,5m/s
speed, regenerative drive will be an extra
option
Gearless Machine motor insulation shall be Gearless Machine motor insulation shall be
SECTION 142100 -
Class F, and have IP 23 degree of Class F, and have IP 21 degree of
ELECTRIC
7 Special Equipment P8 protection to IEC 60529, Motor noise shall protection to IEC 60529, Motor noise shall
TRACTION
not exceed 60 dB (A) at 1 meter outside the not exceed 60 dB (A) at 1 meter outside the
ELEVATORS REV02
machine room. machine room.
Motor Acceleration and Jerk: Motors
Motor Acceleration and Jerk: Motors
shall produce a smooth constant
SECTION 142100 - shall produce a smooth constant
acceleration/deceleration and not less than
ELECTRIC acceleration/deceleration and not less than
8 Special Equipment P8 0.8 m/sec2 with an initial ramp between 0.5
TRACTION 0.8 m/sec2 with an initial ramp between 0.5
and 0.75 second. Sustained jerk rate shall
ELEVATORS REV02 and 0.75 second. Sustained jerk rate shall
not exceed 1.5 m/sec3. Except 0.5 m/sec2-
not exceed 1.5 m/sec3.
0.8 m/sec2 for lifts @ 1.0m/s
15 Towers - Deviation Sheet - 142100- ELECTRIC TRACTION ELEVATORS
Sr.
Category Latest SPEC No. Page Spec Description Deviation
No. Ventilation and Lighting: Fan shall be
provided to bring air into car through the
Ventilation and Lighting: Fan shall be
ventilation slots near the wall base and to
provided to bring air into car through the
exhaust through the ceiling. Fan shall be 2-
ventilation slots near the wall base and to
speed to provide at least 1 air change a
exhaust through the ceiling. Fan shall be 1-
minute at low speed and 1.5 air change a
SECTION 142100 - speed. A screen grill over the fan shall be
minute at high speed. A screen grill over
ELECTRIC provided for mechanical protection of fan.
9 Special Equipment P9 the fan shall be provided for mechanical
TRACTION Lighting type and arrangement is subject to
protection of fan. Lighting type and
ELEVATORS REV02 Engineer’s approval. Battery shall be
arrangement is subject to Engineer’s
provided to operate one emergency lighting
approval. Battery shall be provided to
fixtures and alarm bell for at least one hour.
operate fan and two of the lighting fixtures
Batteries shall be rechargeable with 3 year
for at least one hour. Batteries shall be
life expectancy
rechargeable with 10 year minimum life
SECTION 142100 - expectancy
Car Horizontal Acceleration: Lateral Car Horizontal Acceleration: Lateral
ELECTRIC
10 Special Equipment P10 quaking, peak to peak, shall not exceed 15 quaking, peak to peak, shall not exceed 20
TRACTION
milli-g. milli-g.
ELEVATORS REV02
Loading Class: One service elevators with
SECTION 142100 - Loading Class: Freight & Service elevators
maximun travel shall have loading class C3
ELECTRIC shall have loading class C3 unless loading
11 Special Equipment P10 with aluminum sills unless loading class
TRACTION class C1or C2 are specified in elevator
C1or C2 are specified in elevator
ELEVATORS REV02 schedules.
schedules.
LED Info/multimedia screen: Provide and
install color LED Info/multimedia screen in
the elevator car at the front wall, to display
elevator-related data such as the next stop,
SECTION 142100 -
as well as news, weather, advertising, and LED Info/multimedia screen are cancelled
ELECTRIC
12 Special Equipment P11 building announcements. The information subject to the meeting with client and
TRACTION
can include text, images and video. The consultant
ELEVATORS REV02
Info Screen can be used to inform and
entertain, and to guide passengers for
smoother and safer people flow in the
building
Online type, flush mounted, wide screen
(15 inches) size, display area should be
SECTION 142100 - maximized to be at least 70% of the overall
LED Info/multimedia screen are cancelled
ELECTRIC dimensions of the screen, full HD
13 Special Equipment P11 subject to the meeting with client and
TRACTION resolution 1024 x 768 pixels, 80°
consultant
ELEVATORS REV02 horizontal viewing angle, 60° vertical
viewing angle, polarized surface to be anti-
glare, flash memory 8 GB.
B. Guide Shoes: shall be rolling type for B. Guide Shoes: shall be rolling type for
SECTION 142100 - speeds exceeding 1 m/sec and sliding type speeds exceeding 2 m/sec and sliding type
ELECTRIC for speeds 1 m/sec and below. Guide shoes for speeds 2 m/sec and below. Guide shoes
14 Special Equipment P11
TRACTION shall be adjustable, renewable, and fastened shall be adjustable, renewable, and fastened
ELEVATORS REV02 to top and bottom of car and counterweight to top and bottom of car and counterweight
frames. frames.
Guide Rails: highest quality steel T-
sections with tongue and grove joints for
the car and counterweight. Guide rails
sections shall be
connected with machine fish plates. Unless
otherwise indicated, use car and
SECTION 142100 -
counterweights guide rails with a suitable
ELECTRIC Contractor considered guiderail brackets
15 Special Equipment P11 rail sizes to BS EN 81-20/50 and profiles as
TRACTION fixing with expander bolts
per ISO standards rail sections. When rail
ELEVATORS REV02
length exceeds 30 m means shall be
provided to absorb rail expansion and
structural settlement. Guide rail fixings
shall be heavy steel brackets using metal C-
inserts in concrete walls. Guide rail and
fixings
Inserts: shall withstand
coordinate withsudden application
builder's works to
furnish required concrete inserts and
SECTION 142100 - similar
ELECTRIC anchorage devices for the installation of Contractor considered guiderail brackets
16 Special Equipment
TRACTION guide rails, machinery, and other fixing with expander bolts
ELEVATORS REV02 components of lift work where installation
of devices is indicated as work. Provide
necessary shop drawings for the required
15 Towers - Deviation Sheet - 142100- ELECTRIC TRACTION ELEVATORS
Sr.
Category Latest SPEC No. Page Spec Description Deviation
No.
SECTION 142100 -
Sills shall be made of solid stainless steel Sills shall be made of aluminum with
ELECTRIC
17 Special Equipment P15 grade 316 with rubbish disposal halls for rubbish disposal halls for freight elevators
TRACTION
freight elevators with loading class C3. with loading class C3.
ELEVATORS REV02
SECTION 142100 -
ELECTRIC Precise closed-loop speed, regulated to less Precise closed-loop speed, regulated to less
19 Special Equipment P16
TRACTION than ± 1% by frequency compensation. than ± 10% by frequency compensation.
ELEVATORS REV02
Diagnostic record of the history of the lift
SECTION 142100 - Diagnostic record of the history of the lift
operating conditions, from the instant of
ELECTRIC operating conditions, from the instant of
20 Special Equipment P16 the last fault occurrence back 30 days
TRACTION the last fault occurrence back 100 item, and
minimum, and to include the following as a
ELEVATORS REV02 to include the following as a minimum:
minimum:
SECTION 142100 -
ELECTRIC SEISMIC , BUILDING SWAY AND Seismic required for elevator is optional in
21 Special Equipment P17
TRACTION STACK EFFECT MITIGATION current offer
ELEVATORS REV02
SECTION 142100 -
Key operated priority service switch for
ELECTRIC Key operated priority service switch for
22 Special Equipment P19 isolation purposes, Toggle switch can be
TRACTION isolation purposes
accepetd also.
ELEVATORS REV02
Additional Car Features: provide two-car Additional Car Features: provide one-car
SECTION 142100 - control stations in all passenger and control stations in all passenger and
ELECTRIC service/freight lifts with through type service/freight lifts with through type
23 Special Equipment P19
TRACTION entrance and passenger lifts above 1000 kg entrance and passenger lifts above 1000 kg
ELEVATORS REV02 capacity .Equip only one with required capacity .Equip only one with required
keyed control switches (if any). keyed control switches (if any).
Card-Reader Operation: System uses card
readers at car-control stations and hall
Card-Reader Operation: System uses card
push-button stations if needed to authorize
readers at car-control stations and hall
calls. Security system determines which
push-button stations if needed to authorize
landings and at what times calls require
calls. Security system determines which
SECTION 142100 - authorization by card reader. Provide
landings and at what times calls require
ELECTRIC required conductors in traveling cable and
25 Special Equipment P21 authorization by card reader. Provide
TRACTION panel in machine room for interconnecting
required conductors in traveling cable and
ELEVATORS REV02 card readers, other security access system
panel in machine room for interconnecting
equipment, and elevator controllers. Allow
card readers, other security access system
space as indicated for card reader in
equipment, and elevator controllers. Allow
car.Not comply when use DSC, DSC card
space as indicated for card reader in car.
reader should install in DSC terminal,
normal operation comply
When sprinklers are installed in the
When sprinklers are installed in the
hoistway, control closet, or machinery
SECTION 142100 - hoistway, control closet, or machinery
spaces, a means to automatically
ELECTRIC spaces, a means to automatically
26 Special Equipment P22 disconnect the main line power supply of
TRACTION disconnect the main line power supply of
the affected elevator prior to theapplication
ELEVATORS REV02 the affected elevator prior to theapplication
of water is to be provided. No sprinklers
of water is to be provided.
are required in the hoistway.
SECTION 142100 - Counterweight displacement detector not
ELECTRIC Counterweight displacement detector to applicable,according to seismic code clause
27 Special Equipment P22
TRACTION stop elevator safely. 8.4.10.1. which doesnot requires
ELEVATORS REV02 displacement detector.
SECTION 142100 - IP intercom system is to be provided as an
ELECTRIC IP intercom system is to be provided as an optional subject to Engineer approval. Also
28 Special Equipment P25
TRACTION optional subject to Engineer approval. as optional price items not included in
ELEVATORS REV02 current offer.
Fixing Elevator Guide Rails: Keep rails in
Fixing Elevator Guide Rails: Keep rails in
proper alignment using steel splice plates
proper alignment using steel splice plates
SECTION 142100 - of
of adequate strength. Verticality of rail
ELECTRIC adequate strength. Verticality of rail shall
29 Special Equipment P31 shall be within 0.2% tolerance. Space
TRACTION be within 0.2% tolerance. Space fixing
fixing brackets to minimize rail vibration
ELEVATORS REV02 brackets
during operation, and at not more than 2 m
to minimize rail vibration during operation,
centres.
and at not more than 2 5 m centres
15 Towers - Deviation Sheet - 142100- ELECTRIC TRACTION ELEVATORS
Sr.
Category Latest SPEC No. Page Spec Description Deviation
No.
Factory Tests: Upon completion of
equipment manufacture and before
Factory Tests: Upon completion of
shipping, perform all required tests by the
equipment manufacture and before
standards (refer to EN 81-20/50). Results
shipping, perform all required tests by the
of all tests performed shall be conveyed to
standards (refer to EN 81-20/50). Results
the Employer / Engineer at least 21 days
of all tests performed shall be conveyed to
SECTION 142100 - before the inspection test to be carried out
the Employer / Engineer at least 21 days
ELECTRIC in the presence of the Engineer, the
30 Special Equipment P31 before the inspection test to be carried out
TRACTION Employer representatives and the
in the presence of the Engineer, the
ELEVATORS REV02 Authorities having jurisdiction. Tests are to
Employer representatives and the
be carried out by an EN approved
Authorities having jurisdiction. Tests are to
Authority assigned by Employer/ Engineer
be carried out by an EN approved
(If required), The cost of third party should
Authority. The Employer/Engineer shall
be with the consultant or clients as normal
approve the third party nomination.
practice. The Employer/Engineer shall
approve the third party nomination.
After installation is complete and before
hand-over, carry out acceptance tests as
After installation is complete and before
required and recommended by the
hand-over, carry out acceptance tests as
standards (refer to EN 81-20/50 and
required and recommended by the
inspection check list which shall be
standards (refer to EN 81-20/50 and
submitted by the elevator supplier subject
inspection check list which shall be
to be reviewed and approved by the
submitted by the elevator supplier subject
SECTION 142100 - engineer) and governing regulations and
to be reviewed and approved by the
ELECTRIC authorities. Carry out any other tests the
31 Special Equipment P31 engineer) and governing regulations and
TRACTION Engineer may require to check safety and
authorities. Carry out any other tests the
ELEVATORS REV02 compliance of installation with the
Engineer may require to check safety and
Specification. Tests are to be witnessed by
compliance of installation with the
the Engineer, the approved testing agency
Specification. Tests are to be witnessed by
which assigned by Employer/ Engineer (If
the Engineer, the approved testing agency
required), The cost of third party should be
and, if required, by the concerned
with the consultant or clients as normal
Authority.
practice. and, if required, by the concerned
Authority.
SECTION 142100 -
ELECTRIC St steel hairline 304 finish is offered for
32 Special Equipment P32 Elevator Schedules: refer to annex A.
TRACTION cabin and door finsih
ELEVATORS REV02
Factory acceptance tests of equipment
under this Contract are subject to be
witnessed by the Employer / Engineer.
Witness test shall cover complete checking
and testing of selected units according to
requirements of the specified regulations
and standards as well as special
requirements, finishes, software and The FAT comnined elevator &escalator
SECTION 143100 - controls. Test procedures and programs only supply the visible check for the main
33 Special Equipment P5
ESCALATORS shall be submitted for approval prior to components, no need for complete
factory visit by at least 14 days. The checking and testing with maximun 7 days.
contractor shall include in his price the cost
of factory witness test visits at
manufacturer’s premises to cover all types
of tests including business class air tickets,
five stars Hotel full accommodation,
transportation and all test expenses for four
Man visits subject to further coordination/
Visible sides and underside of each Visible sides and underside of each
escalator shall be cladded with [etched] escalator shall be cladded with [hairline]
[hairline] stainless steel panels of 1.5 mm stainless steel 304 panels of 1.5 mm
SECTION 143100 -
34 Special Equipment P7 thickness. Joints of these cladding-panels thickness. Joints of these cladding-panels
ESCALATORS
shall be in line with joints of balustrade shall be in line with joints of balustrade
panels. Finish shall be according to the panels. Finish shall be according to the
Engineer’s choice. Engineer’s choice.
SECTION 143100 - St steel hairline 304 finish is offered for
35 Special Equipment P16 Escalator Schedules: refer to annex A.
ESCALATORS escalator

You might also like