The document provides an overview of the key steps in the SAP MM (Materials Management) procurement process. These include: 1) determining material requirements through a purchase requisition, 2) identifying possible supply sources like existing contracts or supplier info records, 3) creating a request for quotation if needed, 4) selecting a vendor based on their response, and 5) generating a purchase order to procure the material from the chosen vendor. Screens shots illustrate examples of creating a material master, vendor master, purchase requisition, source list, and request for quotation.

Uploaded by

AMIT AMBRE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views36 pages

SAP MM Process Flow Document PDF

The document provides an overview of the key steps in the SAP MM (Materials Management) procurement process. These include: 1) determining material requirements through a purchase requisition, 2) identifying possible supply sources like existing contracts or supplier info records, 3) creating a request for quotation if needed, 4) selecting a vendor based on their response, and 5) generating a purchase order to procure the material from the chosen vendor. Screens shots illustrate examples of creating a material master, vendor master, purchase requisition, source list, and request for quotation.

Uploaded by

AMIT AMBRE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 36

By SAP MM Consultant

GANESH, Collabera Software Pvt Ltd, Bangalore

SAP MM Process Flow Document

Create Material: T – Code MM01

Select Organizational Views


The basic organization views are
1. Basic data 1 / 2
2. Sales organization data 1 /2
3. Purchasing
4. MRP 1/2/3/4 if required
5. Account data 1 / 2
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Select organizational data Plant/Storage Location/sales Organization/Distributing


channel
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Basic data 1 screen


By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

The above screen shows the mandatory field required to create material which is
shown in Arrow Marks.
Basic Data 2 screen
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Sales organization data 1 screen


By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Sales organization data 2 screen


By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

General Plant screen


By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Required Mandatory fields are shown in arrow mark

Purchasing view screen


By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

If Automatic PO required in Purchase then the parameter Auto PO marked as


mandatory shown in arrow mark.

MRP 1/2/3 views as shown in below screen shot. The arrow marks shows the
mandatory fields. If materials is under planning these MRP views are mandatory
for creating Material in SAP MM.
MRP View 1
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

MRP View 2
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

MRP View 3
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Plant data View


By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Plant data 2 view


By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Accounting data view screen


By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

In accounting data view Valuation class is mandatory to create Material which is


shown in above screen shot. Maintain Price like Standard Price or Moving
Average for Material in this view as shown
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

SAP System will ask for saving the date for creating Material Finished Product
say ‘YES’
And save the document
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

CREATING VENDOR: T – Code XK01

Vendor is mandatory for creating Purchase order in SAP MM. One who supplies
the materials/goods to the company is called vendor. The below screen shots
flow shows how to create vendor.
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Marinating Vendor address


By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Reconciliation account is mandatory field in Vendor creation as shown in screen


shot

Select the required order of currency for India it is INR in the mark as shown in
screen shot.
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

After this screen entry you can able to create vendor with some number range

The basic Purchasing documents are required to create Purchase order is as


follows:

1. Material Master – MM01


2. Vendor Master – XK01
3. RFQ (Request for Quotation) – ME41
4. Info record – ME11
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

5. Source List – ME01


6. Purchase requisition – ME51

Creating Purchase Requisition T – code ME51N

Create PR for the material with Plant

Create Info Record – T-Code ME11 with the combination vendor and
Material
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Creating Source List T- Code ME01


Create Source list for Material and Plant and enter validity date

Save the Source list

Creating RFQ (Request for Quotation) T – Code ME41


By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Enter quotation deadline in the above screen as shown

The Basic Flow of SAP MM Process


One of the main areas covered by MM module is Purchasing/Procurement. The
purchasing process is initially started when there is a requirement of
material/service from a user. If the material/service can not be obtained from
company’s internal resource, the responsible person of that company must find
the vendor/supplier which can provide it on the required date. The purchasing
process is ended when the payment processing to the vendor that supply the
material/service has been done.

In this post, I will explain about the basic of the purchasing/procurement process,
which usually known as Procurement Cycle as the following steps.
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

1. Determination of Requirements
In this step, there is a requirement of material or service, which must be
procured externally, from the user. The requirement must be recorded as
Purchase Requisition (PR) document in SAPMM.
Purchase Requisition (PR) is an internal purchasing document in
SAP ERP that is used to give notification to responsible department about
the requirement of material/service and to keep track of such requirement.
PR must contain clear information about the description and quantity of
the material/service, the required date, and other information.
PR can be created directly in SAP MM module with ME51N t-code, or
indirectly by another SAP component, such as: materials planning,
maintenance order of PM module, production order of PP module, network
activity of PS module, etc. We have explained this in the previous article
about MM integration with other modules.

2. We can set in SAP that the PR must be approved or released before it can
be passed to the next step of purchasing processes. We have explained
about the PR Release Strategy in the previous article.
3. Determination of the source of supply

After the PR has been created (and released if needed) in the previous
step, the responsible department (usually purchasing/procurement
department of the company) must process it. The buyer of the
procurement department must determine the possible sources of supply of
the material/service specified in the PR.
With ME57 t-code, the buyer can check in the SAP whether the
material/service needed can be obtained from the existing outline
agreement (contract or scheduling agreement) documents or not. If there
is no existing outline agreement, the buyer can also check whether there
is an existing info record documents (which contain information about the
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

price and delivery conditions of the material/service agreed with vendor in


the last Purchase Order/PO) that still can be used(valid) as a reference to
create new PO to the same vendor.
If there is no valid info record at that time, the buyer can create Request for
Quotation (RFQ) documents to one or some prospective vendors. The buyer
can access the procurement history of the material/service specified in the PR,
so he can see which vendors that have provided it to the company before. He
can also create the RFQ to the new prospective vendor that might have never
provided the material/service to the company before.

Request for Quotation (RFQ) is an external purchasing document


that usually used as bidding process invitation. RFQ is sent by a company
to the prospective vendor to request the vendor to provide a quotation
which contains information about the price and delivery conditions, terms
of payment, etc that the vendor formally agree in case it is appointed to
provide the material/service to the company.
In the RFQ, the buyer must include the information about the
material/service needed from the vendors (can be copied from the PR),
the latest submission date of the quotation, the preferred term of delivery,
term of payment, currency, etc.
4. Vendor Selection

If in the previous step, there are some outline agreements or info record
documents that can be used as references to create a PO, the buyer can
select or choose which vendor that will be appointed to provide the
material/service at this time.
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

If there is no outline agreement or info record documents that can be used


as references to create PO, in the previous steps, the buyer will send the
RFQ documents to one or some vendors. The vendors will send their
quotations which include the information about the price, delivery terms,
terms of payment, etc that they offered to the company. The buyer can
input that information into SAP with ME47 t-code. With ME49 t-code, the
buyer can compare the offering of all vendors that have sent their
quotation. The comparison can be used to determine which vendor should
be appointed to provide the material/service to the company.

SAP ERP can also create rejection letters to the vendors that are not
selected as the supplier of the material/service.

5. PO Processing
In the previous step, the buyer has selected the vendor which will provide
the material/service needed in PR. In this step, the buyer creates a
Purchase Order (PO) based on the PR and the reference document
(that can be an outline agreement, an info record, or a quotation).
Purchase Order (PO) is a legally binding document that issued by a
company to a vendor which contains information about description,
quantity, delivery date, agreed prices, terms of delivery, and terms of
payment for material or service the vendor will provide to the company.
6. POMonitoring

After the PO has been sent to the vendor, the buyer has the responsibility
to monitor whether the vendor delivers the material/service at the right
time on the right place. The buyer can monitor whether the
material/service has been received by the person responsible (such as the
warehouse man) online with PO history function in the PO document. If
the warehouse man or anyone else has received the material/service and
posted the Goods Receipt/Service acceptance document, the PO history
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

will be updated in a real-time basis.


SAP ERP can also has a functionality to give the reminder to the buyer if
the PO item has not been GR in the specified period in respect of the
delivery date agreed with vendors.

7. GoodsReceipt

When the vendor delivers the material or perform the service, the
responsible person of the company must perform the goods receipt
(GR) or service acceptance (SA) transaction. The GR/SA will update
the PO history. If the PO item is an inventory material, the GR will
increase the stock level of the material.
When we perform the GR for the PO item for the first time, SAP will
propose the quantity to be GR as the PO order quantity. Depends on the
delivery terms agreed with the vendor, the vendor might deliver the
material partially. We can post the GR partially too, so when the next
material delivery is received, SAP will propose the quantity to be GR as
the remaining quantity that has not been GR yet.

8. InvoiceVerification
After the vendor delivered the material/service; it will send the invoice to
the person responsible in the company.
Invoice is a formal document issued by a vendor to the company to
request the payment for the material or service that the vendor has
already provide to the company according to the terms of payment agreed
in the PO. An invoice is usually attached with the delivery note (goods
receipt) document.
The person responsible, usually an accounting staff, will perform the three
way matches. He will check whether the invoice information (such as
price, terms of payment, etc) is the same with the PO, and whether the PO
item has been received (GR/SA). If yes, then he will post the Invoice
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Receipt (IR) transaction in MM module. The IR transaction will credit the


account payable of the vendor which specified in the "pay to" partner
function in the PO.
9. PaymentProcessing
After the IR transaction has been posted, the vendor’s account payable
will increase and the company must process the payment to that vendor
as stated in the terms of payment of the PO. The payment transaction will
be performed in FI module. After the payment has been posted, the
vendor’s account payable will be debited and the cash or bank account
will be credited.
In the next article I will explain the 1st step of the procurement cycle in more
details: The Determination of Requirement. You can get alert when I post new
article if you subscribe

Create Purchase order: T- Code ME21N


By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Maintain the basic parameters to create Purchase order like,


Plant/Material/Vendor/Net Price/Organization data/ Invoice Tax code/PR
number/RFQ Number/ PO Document Type/Currency as shown in the arrow
marks in screen shots.
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Maintain the Tax Code in invoice at Item details.

Save the Purchase order.

Goods Receipt: T –Code MIGO


Create Goods Receipt for the Purchase order and check by using tick mark
button and save the document.
By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Check Item OK. And Post the GR


By SAP MM Consultant
GANESH, Collabera Software Pvt Ltd, Bangalore

Enter the Purchase order number for Goods Receipt


The Display of the Material document is shown in the below screen shot

You might also like