DPR Format Construction Work Road
DPR Format Construction Work Road
1 C>OTAL Clearing & Grubbing Hectare 31117.00 10.40 0.00 0.00 0.00 0.00 0.00 10.40 0.00
2 D-CCTOTAL Dismantling of Cement Concrete Grade M-15 & M-20 cum 534.00 1001.95 0.00 0.00 0.00 0.00 0.00 1001.95 0.00
3 D-BCTOTAL Dismantling of Bituminious courses cum 337.00 8971.94 0.00 0.00 19.50 6571.50 19.50 8952.44 6571.50
4 D-GCTOTAL Dismantling of Granular courses cum 360.00 36258.56 0.00 0.00 322.88 116235.00 322.88 35935.68 116235.00
Dismantling Kerb Stone (Dismantling kerb stone by manual means and disposal of
5 D-KerbTOTAL metre 17.00 11888.60 0.00 0.00 0.00 0.00 0.00 11888.60 0.00
dismantled material with all lifts and up to a lead of 1000 metre)
6 D-KMSTOTAL Dismantling of Ordinary KM Stone each 380.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00
7 D-HSTOTAL Dismantling of Hectometre Stone each 76.00 64.00 0.00 0.00 0.00 0.00 0.00 64.00 0.00
8 R-GWTOTAL Credit of Scarified GSB and WMM material cum -794.38 21755.14 0.00 0.00 0.00 0.00 0.00 21755.14 0.00
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000
metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket
9 EXCTOTAL capacity including cutting and loading in tippers, trimming bottom and side slopes, in cum 44.00 59528.75 0.00 0.00 321.00 14124.00 321.00 59207.75 14124.00
accordance with requirements of lines, grades and cross sections, and transporting to the
embankment location within all lifts and lead upto 1000m)
Construction of RERW Reinforcement Zone with approved material obtained from borrow
13 RERWTOTAL pits with all lifts & leads, transporting to site, spreading, grading to required slope and cum 249.00 220592.15 0.00 0.00 0.00 0.00 0.00 220592.15 0.00
compacted to meet requirement.
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on
14 TURFTOTAL embankment slope, verges or other locations shown on the drawing or as directed by the sqm 36.00 2549.35 0.00 0.00 0.00 0.00 0.00 2549.35 0.00
engineer including preparation of ground, fetching of rods and watering)
15 S-DRAINTOTAL Unlined Drain metre 63.00 800.00 0.00 0.00 0.00 0.00 0.00 800.00 0.00
16 GSBTOTAL GSB cum 1324.00 27018.37 0.00 0.00 0.00 0.00 0.00 27018.37 0.00
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to
wet mix macadam specification including premixing the Material with water at OMC in
17 WMMTOTAL mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers cum 1941.00 36011.81 0.00 0.00 0.00 0.00 0.00 36011.81 0.00
with paver in sub- base / base course on well prepared surface and compacting with
vibratory roller to achieve the desired density.)
Construction of Median and Island with Soil Taken from Borrow Areas (Construction of
18 MEDTOTAL median and Island above road level with approved material brought from borrow pits, cum 343.00 8595.00 0.00 0.00 0.00 0.00 0.00 8595.00 0.00
spread, sloped and compacted as per clause 407)
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface
20 PCTOTAL of granular Base including clearing of road surface and spraying primer at the rate of 0.60 sqm 36.00 143841.19 0.00 0.00 12918.50 465066.00 12918.50 130922.69 465066.00
kg/sqm using mechanical means.)
Providing and applying tack coat with bitumen emulsion using emulsion pressure
21 TCTOTAL distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface sqm 7.48 166949.45 0.00 0.00 14340.50 107234.16 14340.50 152608.95 107234.16
cleaned with mechanical broom.
22 DBMTOTAL DBM cum 6424.00 10851.47 0.00 0.00 477.13 3065051.00 477.13 10374.35 3065051.00
23 BCTOTAL Bituminous Concrete cum 7658.00 5000.94 0.00 0.00 393.74 3015241.78 393.74 4607.20 3015241.78
24 REWALLTOTAL RE Wall Casting sqm 1503.00 26608.07 0.00 0.00 972.41 1461532.23 972.41 25635.66 1461532.23
25 ERRECTIONTOTAL RE Wall Errection sqm 1439.00 26608.07 0.00 0.00 1814.15 2610561.85 1814.15 24793.92 2610561.85
26 KERBTOTAL Kerb metre 453.00 6691.10 0.00 0.00 0.00 0.00 0.00 6691.10 0.00
27 S90EQTRTOTAL Sign Board 90 cm equilateral triangle each 5148.00 16.00 0.00 0.00 0.00 0.00 0.00 16.00 0.00
28 S60EQTRTOTAL Sign Board 60 cm equilateral triangle each 3172.00 40.00 0.00 0.00 0.00 0.00 0.00 40.00 0.00
29 S60CIRTOTAL Sign Board 60 cm circular each 4465.00 16.00 0.00 0.00 0.00 0.00 0.00 16.00 0.00
30 S8060RECTOTAL Sign Board 80 mm x 60 mm rectangular each 6471.00 24.00 0.00 0.00 0.00 0.00 0.00 24.00 0.00
31 S6045RECTOTAL Sign Board 60 cm x 45 cm rectangular each 4333.00 8.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00
32 S6060SQTOTAL Sign Board 60 cm x 60 cm square each 5249.00 32.00 0.00 0.00 0.00 0.00 0.00 32.00 0.00
33 S90OCTTOTAL Sign Board 90 cm high octagon each 8426.00 8.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00
34 DELTOTAL Deliniator each 4465.00 64.00 0.00 0.00 0.00 0.00 0.00 64.00 0.00
35 P-CON Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface sqm 94.00 12062.63 0.00 0.00 0.00 0.00 0.00 12062.63 0.00
with synthetic enamel paint in all shades on new plastered concrete surfaces)
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads
on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5
36 MARKTOTAL mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm Each 294.00 4318.08 0.00 0.00 0.00 0.00 0.00 4318.08 0.00
is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level,
uniform and free from streaks and holes.)
37 KSTOTAL Ordinary Kilometer stone (Precast) Each 2135.00 4.00 0.00 0.00 0.00 0.00 0.00 4.00 0.00
38 HSTOTAL Hectometer stone (Precast) Metre 611.00 40.00 0.00 0.00 0.00 0.00 0.00 40.00 0.00
39 CB-M40TOTAL Crash Barier M-40 Metre 2885.00 662.54 0.00 0.00 0.00 0.00 0.00 662.54 0.00
40 CBFS-M40 Casting M 40 grade concrete (Friction Slab) Metre 7228.00 6352.02 0.00 0.00 627.00 4531956.00 627.00 5725.02 4531956.00
41 CBFS-M40 Errection M 40 grade concrete (Friction Slab) Metre 3421.00 6352.02 0.00 0.00 151.50 518281.50 151.50 6200.52 518281.50
42 MBCB-FOOTTOTAL For fixing in Footpath each 26755.00 247.00 0.00 0.00 0.00 0.00 0.00 247.00 0.00
43 LIGHTTOTAL Lighting on Bridges (Providing and fixing Flood lighting on bridges) each 4247.00 8.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100
mm, die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense
44 REFLTOTAL reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of metre 494.32 2464.00 0.00 0.00 0.00 0.00 0.00 2464.00 0.00
60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part
4:1973)
45 PIPE600TOTAL Hume Pipe 600 mm dia metre 3171.00 272.00 0.00 0.00 0.00 0.00 0.00 272.00 0.00
46 PIPE1200TOTAL Hume Pipe 1200 mm dia metre 7864.00 162.00 0.00 0.00 0.00 0.00 0.00 162.00 0.00
47 PIPE150TOTAL PVC 150 MM km 137.00 6728.80 0.00 0.00 0.00 0.00 0.00 6728.80 0.00
48 PLANTTOTAL Planting Flowering Plants and Shrubs in Central Verge km 125073.00 3.32 0.00 0.00 0.00 0.00 0.00 3.32 0.00
49 PLANTMAINTOTAL Maintenance of Flowering Plants and Shrubs in Central Verge for one Year cum 275481.00 3.32 0.00 0.00 0.00 0.00 0.00 3.32 0.00
50 EXCSTRTOTAL Excavation for Structure cum 62.00 11357.59 0.00 0.00 0.00 0.00 0.00 11357.59 0.00
51 FPCCM15TOTAL Foundation PCC M15 cum 4926.00 2539.50 0.00 0.00 134.82 664135.64 134.82 2404.68 664135.64
52 FRCCM25TOTAL Foundation RCC M25 cum 5696.00 7978.53 37.14 0.00 0.00 0.00 0.00 0.00 7978.53 0.00
53 FRCCM30TOTAL Foundation RCC M30 cum 5701.00 1905.98 0.00 0.00 0.00 0.00 0.00 1905.98 0.00
54 FRCCM35TOTAL Foundation RCC M35 cum 5755.00 218.70 0.00 0.00 0.00 0.00 0.00 218.70 0.00
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing
55 PILEM35TOTAL and technical specifications and removal of excavated earth with all lifts and lead upto metre 9553.00 750.00 0.00 0.00 0.00 0.00 0.00 750.00 0.00
1000 m. (Pile diameter-1000 mm)
56 LTESTTOTAL Initial & Routine load test Tonne 300.00 500.00 0.00 0.00 0.00 0.00 0.00 500.00 0.00
57 LLTESTTOTAL Lateral load test tonne 5000.00 500.00 0.00 0.00 0.00 0.00 0.00 500.00 0.00
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as
58 FREINTOTAL per drawing and technical specifications tonne 58508.00 291.84 0.00 0.00 0.00 0.00 0.00 291.84 0.00
59 SUBRCCM30TOTAL Substructure RCC M30 cum 6059.00 1255.34 0.00 0.00 0.00 0.00 0.00 1255.34 0.00
60 SUBRCCM35TOTAL Substructure RCC M35 cum 6146.00 320.95 0.00 0.00 0.00 0.00 0.00 320.95 0.00
61 SUBREINTOTAL Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per tonne 58743.00 290.00 0.00 0.00 0.00 0.00 0.00 290.00 0.00
drawing and technical specifications
Providing and laying of Filter media with granular materials/stone crushed aggregates
satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a
thickness of not less than 600 mm with smaller size towards the soil and bigger size
63 FMEDIATOTAL towards the wall and provided over the entire surface behind abutment, wing wall and cum 2351.00 14965.69 0.00 0.00 562.08 1321450.08 562.08 14403.61 1321450.08
return wall to the full height compacted to a firm condition complete as per drawing and
technical specification.
64 FFBEARTOTAL Free Flot Bearing (SPFF-350 MT) tonne 228.00 1400.00 0.00 0.00 0.00 0.00 0.00 1400.00 0.00
65 FBEARTOTAL Fixed Bearing (SPFX-350 MT) tonne 235.00 2800.00 0.00 0.00 0.00 0.00 0.00 2800.00 0.00
66 SGBEARTOTAL Slide Guide Bearing (SPSG-350 MT) tonne 337.00 1400.00 0.00 0.00 0.00 0.00 0.00 1400.00 0.00
67 SUPSLAB10TOTAL M-30 Concrete for Slab 5m to 10 m Height cum 7179.01 1957.60 0.00 0.00 0.00 0.00 0.00 1957.60 0.00
68 SUPSLAB5TOTAL M-30 Concrete for Slab upto 5 m Height cum 8122.00 921.76 0.00 0.00 0.00 0.00 0.00 921.76 0.00
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per
69 SUPREINTOTAL tonne 60561.00 310.98 0.00 0.00 0.84 51121.96 0.84 310.14 51121.96
drawing and technical specifications
70 HTSTRANDTOTAL High tensile steel wires/strands including all accessories for stressing, stressing operations tonne 142159.00 18.17 0.00 0.00 0.00 0.00 0.00 18.17 0.00
and grouting complete as per drawing and Technical Specifications
Mastic Asphalt (Providing and laying 12 mm thick mastic asphalt wearing course on top of
deck slab excluding prime coat with paving grade bitumen meeting the requirements given
in table 500-29, prepared by using mastic cooker and laid to required level and slope after
cleaning the surface, including providing antiskid surface with bitumen precoated fine
71 MASPHTOTAL sqm 277.00 3956.32 0.00 0.00 0.00 0.00 0.00 3956.32 0.00
grained hard stone chipping of 9.5 mm nominal size at the rate of 0.005cum per 10 sqm and
at an approximate spacing of 10 cm center to center in both directions, pressed into
surface when the temperature of surfaces not less than 100 deg. C, protruding 1 mm to 4
mm over mastic surface, all complete as per clause 515.)
72 SPOUTTOTAL Drainage Spouts complete as per drawing and Technical specification each 1458.00 36.00 0.00 0.00 0.00 0.00 0.00 36.00 0.00
73 ASLABPCCM15TOTAL PCC M15 Grade leveling course below approach slab complete as per drawing and Technical cum 3588.00 104.00 0.00 0.00 0.00 0.00 0.00 104.00 0.00
specification
Reinforced cement concrete (M-30 Grade) approach slab including reinforcement and
74 ASLABRCCM30TOTAL formwork complete as per drawing and Technical specification cum 8647.00 206.42 0.00 0.00 0.00 0.00 0.00 206.42 0.00
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to
maximum horizontal movement upto 70 mm, complete as per approved drawings and
75 SSEXPJTOTAL standard specifications to be installed by the manufacturer/supplier or their authorised metre 5613.00 81.00 0.00 0.00 0.00 0.00 0.00 81.00 0.00
representative ensuring compliance to the manufacturer's instructions for installation.)
On Grid Solar Power System including PCU, and istallation every thing (Make in India, ISI
76 SOLARTOTAL KW 84899.00 40.00 0.00 0.00 0.00 0.00 0.00 40.00 0.00
Mark)
77 D-HumeTOTAL Removing of Hume Pipe meter 280.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
78 D-GRTOTAL Guard Rail Dimantling meter 103.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Upto Previous
Sl No Plant Description UOM Day Today For The Month Cum. Till Date Upto Previous Today For The Month Cum. Till Date Stock as on date
Upto Previous
Sl No Bulk Material UOM Day Today FTM Upto Previous Today For The Month Cum. Till Date Stock as on date
Cumula
Unskilled Upto Semi-skilled Upto Skilled Upto Semi-Skilled Unskilled This Semi Skilled This Cumulative tive
Sl No UOM Labour Supply Agency Unskilled Today Skilled Today Skilled This Month Cumulative Skilled
Previous Day Previous Day Previous Day Today Month Month Unskilled Semi-
Skilled
1 Nos. Rakesh Enterprises Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
2 Nos. Subodh Kumar Mahto Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
3 Nos. Rajinder Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4 Nos. Ganga Ram Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
5 Nos. Pankaj Kumar Tiwari Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
6 Nos. Neha Construction Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
7 Nos. SMT Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
8 Nos. Local Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
PreCast Detail
Sl No Pre-Cast Details Total Qty UOM Upto Previous Today FTM Cumu. Till Date
Month
1 RE Panel 26608 Sqm -
2 Girder 123 Nos -
3 Friction Slab 44 Nos -
4 Drain Cover Slab 9600 Nos -
Non BoQ (Non Payable) Items / Works
1 Erection and commissioning of batching plant at Ramgarh and Silani completed
2 Mobilisation of plant & machinery and manpower completed
3 Construction of labour hutment, Laboratory , office, store, cement godown, steel yard, aggregate yard, internal road are completed
4 Construction of diversion at Dujana Chowk Completed
5
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana
Skylark Infra Engineering Pvt
Ltd Physical Daily Progress Report
Page 3 of 54
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana
Skylark Infra Engineering Pvt
Ltd Physical Daily Progress Report
EXCTOTAL
EXC Dujana 15,215.59
EXC Silani 17,284.66
EXC Ramgarh 13,613.50
EXC Khalilpur 13,415.00
Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of
unserviceable soil including excavation, loading and disposal upto 1000 metres lead but
3.2 excluding replacement by suitable soil which shall be paid separately as per clause 305.) cum - -
Page 4 of 54
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana
Skylark Infra Engineering Pvt
Ltd Physical Daily Progress Report
Page 5 of 54
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana
Skylark Infra Engineering Pvt
Ltd Physical Daily Progress Report
Dujana 800.37
Silani 1,372.80
Ramgarh 891.58
Khalilpur 891.58
Total Amount of Bill no. - 05 28,430,153.61 32,058,470.12 27,515,784.44 26,429,357.31 114,433,765.48 -
BILL NO.-6 - -
CEMENT CONCRETE PAVEMENTS - -
Total Amount of Bill no. - 06 - -
BILL NO.-7 - -
GEOSYNTHETICS AND REINFORCED EARTH - -
Reinforced Earth Retaining Wall (Reinforced earth retaining walls have four main
components as under: a) Excavation for foundation, foundation concrete and cement
concrete grooved seating in the foundation for facing elements (facia material). b) Facia
7.1 material and its placement. c) Assembling, joining with facing elements and laying of the - -
reinforcing elements. d) Earthfill with granular material which is to be retained by the wall.)
REWALLTOTAL A With reinforcing elements of synthetic geogrids (CASTING) sqm 1,503.00 6,958.27 7,934.35 5,902.20 5,813.25 26,608.07 39,991,926.16
REWALL Dujana 6,958.27
REWALL Silani 7,934.35
REWALL Ramgarh 5,902.20
REWALL Khalilpur 5,813.25
ERRECTIONTOTAL B With reinforcing elements of synthetic geogrids (ERRECTION) sqm 1,439.00 6,958.27 7,934.35 5,902.20 5,813.25 26,608.07 38,289,009.81
ERRECTION Dujana 6,958.27
ERRECTION Silani 7,934.35
ERRECTION Ramgarh 5,902.20
ERRECTION Khalilpur 5,813.25
Over All Rate with geostrips including excaation /coping/erection / facia etc
sqm - -
complete
Total Amount of Bill no. - 07 20,471,218.16 23,342,857.70 17,364,278.62 17,102,581.50 78,280,935.97 -
BILL NO.-8 - -
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES - -
Cast in Situ Cement Concrete M20 kerb (Construction of cement concrete kerb with top
and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10
8.1 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, - -
kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete
as per clause 408)
A Using Concrete Mixer metre - -
B Using Concrete Batching and Mixing Plant metre - -
Cast in Situ Cement Concrete M 20 Kerb with Channel (Construction of cement
concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250
8.2 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 - -
mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with
channel laid with kerb laying machine, foundation concrete laid manually, all complete as
A perUsing
clauseConcrete
408) Mixer metre - -
KERBTOTAL B Using Concrete Batching and Mixing Plant metre 453.00 2,313.62 1,480.40 1,446.68 1,450.40 6,691.10 3,031,067.19
KERB Dujana 2,313.62
KERB Silani 1,480.40
KERB Ramgarh 1,446.68
KERB Khalilpur 1,450.40
Printing new letter and figures of any shade (Printing new letter and figures of any
8.3 shade with synthetic enamel paint black or any other approved colour to give an even - -
shade)
Hindi ( Matras commas and the like not to be measured and paid for Half letter shall be cm height
(i) counted as half ) 1.36 - -
per letter
English and Roman cm height
(ii) 1.00 - -
per letter
Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective
8.4 sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a - -
mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of
properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60
cm below ground level as per approved drawing)
S90EQTRTOTAL (i) 90 cm equilateral triangle each 5,148.00 4.00 4.00 4.00 4.00 16.00 82,368.00
S90EQTR Dujana 4.00
S90EQTR Silani 4.00
S90EQTR Ramgarh 4.00
S90EQTR Khalilpur 4.00
Page 6 of 54
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana
Skylark Infra Engineering Pvt
Ltd Physical Daily Progress Report
Khalilpur
2,248.36
Painting on Steel Surfaces (Providing and applying two coats of ready mix paint of
8.9 approved brand on steel surface after through cleaning of surface to give an even shade) sqm 83.00 - -
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass
Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic
8.13 compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, sqm 294.00 809.74 1,468.87 1,240.90 798.57 4,318.08 1,269,515.89
thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The
MARKTOTAL finished surface to be level, uniform and free from streaks and holes.)
MARK Dujana 809.74
MARK Silani 1,468.87
MARK Ramgarh 1,240.90
MARK Khalilpur 798.57
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard
8.14 design as per IRC:8-1980, fixing in position including painting and printing etc) - -
Page 7 of 54
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana
Skylark Infra Engineering Pvt
Ltd Physical Daily Progress Report
8.28 Lighting on Bridges (Providing and fixing Flood lighting on bridges) each 4,247.00 2.00 2.00 2.00 2.00 8.00 33,976.00
LIGHTTOTAL
Dujana
2.00
LIGHT
Silani
2.00
LIGHT
Ramgarh
2.00
LIGHT
Khalilpur
2.00
LIGHT
Cable Duct Across the Road (Providing and laying of a reinforced cement concrete pipe
duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts
and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a
minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997,
bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer
8.29 distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and - -
triple row ducts, joints to be made leak proof, invert level of duct to be above higher than
ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved
drawings.)
Page 8 of 54
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana
Skylark Infra Engineering Pvt
Ltd Physical Daily Progress Report
Providing and laying of a 150 mm dia PVC pipe duct, across/along the Crash Barrier,
9.29 metre 137.00 1,732.20 1,732.20 1,632.20 1,632.20 6,728.80 921,845.60
Footpath & Median Kerbs imbeded in PCC/RCC as per approved
PIPE150TOTAL
PIPE150 Dujana 1,732.20
PIPE150 Silani 1,732.20
PIPE150 Ramgarh 1,632.20
PIPE150 Khalilpur 1,632.20
Total Amount of Bill no. - 09 602,355.40 846,139.40 973,991.40 635,839.40 3,058,325.60 -
CHAPTER-10 - -
MAINTENANCE OF ROADS - -
Total Amount of Bill no. - 10 - -
BILL NO.-11 - -
HORTICULTURE - -
PLANTTOTAL 11.8 a) Planting Flowering Plants and Shrubs in Central Verge km 125,073.00 0.81 0.92 0.75 0.84 3.32 414,674.15
PLANT Dujana 0.81
PLANT Silani 0.92
PLANT Ramgarh 0.75
PLANT Khalilpur 0.84
b) Maintenance of Flowering Plants and Shrubs in Central Verge for one Year
(b) km 275,481.00 0.81 0.92 0.75 0.84 3.32 913,345.40
PLANTMAINTOTAL
Dujana
0.81
PLANTMAIN
Silani
0.92
PLANTMAIN
Ramgarh
0.75
PLANTMAIN
Khalilpur
0.84
PLANTMAIN
Total Amount of Bill no. - 11 322,849.67 369,068.77 298,936.91 337,164.20 1,328,019.55 -
BILL NO.-12 - -
FOUNDATIONS - -
Excavation for Structures (Earth work in excavation of foundation of structures as per
drawing and technical specification, including setting out, construction of shoring and
12.1 bracing, removal of stumps and other deleterious matter, dressing of sides and bottom - -
and backfilling with approved material.)
I Ordinary soil - -
B Mechanical Means - -
EXCSTRTOTAL (i) Depth upto 3 m cum 62.00 2,514.04 4,241.38 2,517.19 2,084.98 11,357.59 704,170.53
EXCSTR Dujana 2,514.04
EXCSTR Silani 4,241.38
EXCSTR Ramgarh 2,517.19
EXCSTR Khalilpur 2,084.98
Plain/Reinforced cement concrete in open foundation complete as per drawing and
12.8 technical specifications - -
FPCCM15TOTAL A PCC Grade M15 cum 4,926.00 648.77 705.29 561.57 623.87 2,539.50 12,509,571.38
FPCCM15 Dujana 648.77
FPCCM15 Silani 705.29
FPCCM15 Ramgarh 561.57
FPCCM15 Khalilpur 623.87
B PCC Grade M20 cum - -
C RCC Grade M20 - -
Case I Using concrete mixer cum - -
Case II With Batching Plant, Transit Mixer and Concrete Pump cum - -
D RCC Grade M25 - -
FRCCM25TOTAL Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5,696.00 1,906.21 2,372.32 1,825.00 1,875.00 7,978.53 45,445,682.24
FRCCM25 Dujana 1,906.21
FRCCM25 Silani 2,372.32
FRCCM25 Ramgarh 1,825.00
FRCCM25 Khalilpur 1,875.00
E RCC Grade M30 - -
FRCCM30TOTAL Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 5,701.00 562.19 671.89 671.89 1,905.98 10,865,991.13
FRCCM30 Dujana 562.19
FRCCM30 Silani
FRCCM30 Ramgarh 671.89
FRCCM30 Khalilpur 671.89
F RCC Grade M35 - -
Page 9 of 54
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana
Skylark Infra Engineering Pvt
Ltd Physical Daily Progress Report
PILEM35TOTAL
PILEM35 Dujana
PILEM35 Silani 750.00
PILEM35 Ramgarh
PILEM35 Khalilpur
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per
drawing and technical specifications and removal of excavated earth with all lifts
and lead upto 1000 m. (Pile diameter-1200 mm)
12.25 metre 12,233.00 - -
12.37 Pile load test on single vertical pile in accordance with IS:2911(Part-IV) - -
LTESTTOTAL A Initial & Routine load test Tonne 300.00 500.00 500.00 150,000.00
LTEST Dujana
LTEST Silani 500.00
LTEST Ramgarh
LTEST Khalilpur
LLTESTTOTAL B Lateral load test Tonne 5,000.00 500.00 500.00 2,500,000.00
LLTEST Dujana
LLTEST Silani 500.00
LLTEST Ramgarh
LLTEST Khalilpur
Cement concrete for reinforced concrete in pile cap complete as per drawing and
12.38 - -
Technical Specification
A RCC Grade M25 - -
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum - -
B RCC Grade M30 - -
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 5,791.00 - -
C RCC Grade M35 - -
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 5,885.00 - -
12.39 Levelling course for Pile cap cum 4,702.00 - -
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation
12.40 tonne 58,508.00 56.22 101.24 67.19 67.19 291.84 17,075,090.86
FREINTOTAL complete as per drawing and technical specifications
FREIN Dujana 56.22
FREIN Silani 101.24
FREIN Ramgarh 67.19
FREIN Khalilpur 67.19
Total Amount of Bill no. - 12 20,703,794.78 34,246,873.43 21,079,164.10 21,644,042.33 97,673,874.64 -
BILL NO.-13 - -
SUB-STRUCTURE - -
Plain/Reinforced cement concrete in sub-structure complete as per drawing and
13.5 - -
technical specifications
A RCC Grade M20 - -
(p) Height upto 5m - -
Case II With Batching Plant, Transit Mixer and Concrete Pump cum - -
(q) Height 5m to 10m - -
Case II With Batching Plant, Transit Mixer and Concrete Pump cum - -
B RCC Grade M25 - -
(p) Height upto 5m - -
Case II With Batching Plant, Transit Mixer and Concrete Pump cum - -
(q) Height 5m to 10m - -
Case II With Batching Plant, Transit Mixer and Concrete Pump cum - -
C RCC Grade M30 - -
(p) Height upto 5m - -
SUBRCCM30TOTAL Case II With Batching Plant, Transit Mixer and Concrete Pump cum 6,059.00 348.03 432.37 474.94 1,255.34 7,606,091.89
SUBRCCM30 Dujana 348.03
SUBRCCM30 Silani
SUBRCCM30 Ramgarh 432.37
SUBRCCM30 Khalilpur 474.94
(q) Height 5m to 10m - -
Case II With Batching Plant, Transit Mixer and Concrete Pump cum - -
D RCC Grade M35 - -
(p) Height upto 5m - -
SUBRCCM35TOTAL Case II With Batching Plant, Transit Mixer and Concrete Pump cum 6,146.00 320.95 320.95 1,972,575.91
SUBRCCM35 Dujana
SUBRCCM35 Silani 320.95
SUBRCCM35 Ramgarh
SUBRCCM35 Khalilpur
(q) Height 5m to 10m - -
Case II With Batching Plant, Transit Mixer and Concrete Pump cum - -
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as
13.6 tonne 58,743.00 58.96 97.43 63.53 70.08 290.00 17,035,371.37
SUBREINTOTAL per drawing and technical specifications
SUBREIN Dujana 58.96
SUBREIN Silani 97.43
SUBREIN Ramgarh 63.53
SUBREIN Khalilpur 70.08
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing
wall/return wall with 100 mm dia AC pipe, extending through the full width of the
13.8 structure with slope of 1V :20H towards drawing foce. Complete as per drawing and each 167.00 278.00 336.00 369.00 983.00 164,161.00
WEEPTOTAL Technical specifications
WEEP Dujana 278.00
WEEP Silani
WEEP Ramgarh 336.00
WEEP Khalilpur 369.00
Back filling behind abutment, wing wall and return wall complete as per drawing and
13.9 Technical specification - -
Page 10 of 54
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana
Skylark Infra Engineering Pvt
Ltd Physical Daily Progress Report
FMEDIATOTAL
FMEDIA Dujana 3,403.47
FMEDIA Silani 4,918.77
FMEDIA Ramgarh 3,282.54
FMEDIA Khalilpur 3,360.90
Supplying, fitting and fixing in position true to line and level sliding plate bearing
with PTFE surface sliding on stainless steel complete including all accessories as
tonne
13.13 per drawing and Technical Specifications and BS: 5400, section 9.1 & 9.2 (for PTFE) 12.00 - -
capacity
and clause 2004 of MoRTH Specifications.
Supplying, fitting and fixing in position true to line and level elastomeric bearing
conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications cubic
13.14 complete including all accessories as per drawing and Technical Specifications. 1.00 - -
centimetre
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing
consisting of a metal piston supported by a disc or unreinforced elastomer confined
within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against
stainless steel mating surface, completre assembly to be of cast steel/fabricated
tonne
13.16 structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II - -
capacity
respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause
2006 of MoRTH Specifications complete asper drawing and approved technical
specifications.
FFBEARTOTAL Free Flot Bearing (SPFF-350 MT) 228.00 1,400.00 1,400.00 319,200.00
FFBEAR Dujana
FFBEAR Silani 1,400.00
FFBEAR Ramgarh
FFBEAR Khalilpur
FBEARTOTAL Fixed Bearing (SPFX-350 MT) 235.00 2,800.00 2,800.00 658,000.00
FBEAR Dujana
FBEAR Silani 2,800.00
FBEAR Ramgarh
FBEAR Khalilpur
SGBEARTOTAL Slide Guide Bearing (SPSG-350 MT) 337.00 1,400.00 1,400.00 471,800.00
SGBEAR Dujana
SGBEAR Silani 1,400.00
SGBEAR Ramgarh
SGBEAR Khalilpur
Total Amount of Bill no. - 13 13,620,052.06 20,708,645.37 14,125,182.18 14,957,646.95 63,411,526.56 -
BILL NO.-14 - -
SUPER-STRUCTURE - -
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure
14.1 - -
as per drawing and Technical Specification
A RCC Grade M20 - -
Case
Using Batching Plant, Transit Mixer and Concrete Pump - -
II
(i) For solid slab super-structure, 20-30% of (a+b+c) - -
(p) Height upto 5m cum - -
(q) Height 5m to 10m cum - -
(ii) For T-beam & slab, 25-35% of (a+b+c) - -
(p) Height upto 5m cum - -
(q) Height 5m to 10m cum - -
B RCC Grade M25 - -
Case
Using Batching Plant, Transit Mixer and Concrete Pump - -
II
(i) For solid slab super-structure, 20-30% of (a+b+c) - -
(p) Height upto 5m cum - -
(q) Height 5m to 10m cum - -
(ii) For T-beam & slab, 25-35% of (a+b+c) - -
(p) Height upto 5m cum - -
(q) Height 5m to 10m cum - -
C RCC Grade M 30 - -
Case
Using Batching Plant, Transit Mixer and Concrete Pump. - -
II
(i) For solid slab super-structure, 20-30% of (a+b+c) - -
(p) Height upto 5m cum - -
SUPSLAB10TOTAL (q) Height 5m to 10m cum 7,179.01 611.52 673.04 673.04 1,957.60 14,053,620.18
SUPSLAB10 Dujana 611.52
SUPSLAB10 Silani
SUPSLAB10 Ramgarh 673.04
SUPSLAB10 Khalilpur 673.04
(ii) For T-beam & slab, 25-35% of (a+b+c) - -
(p) Height upto 5m cum - -
(q) Height 5m to 10m cum - -
D RCC/PSC Grade M35 - -
Case
Using Batching Plant, Transit Mixer and Concrete Pump - -
II
(i) For solid slab super-structure, 18-28% of (a+b+c) - -
(p) Height upto 5m cum -
(q) Height 5m to 10m cum - -
(ii) For T-beam & slab, 23-33% of (a+b+c) - -
(p) Height upto 5m cum - -
(q) Height 5m to 10m cum - -
(iii) For box girder and balanced cantilever, 38-58% of cost of concrete. - -
(p) Height upto 5m cum - -
(q) Height 5m to 10m cum - -
E PSC Grade M-40 - -
Case
Using Batching Plant, Transit Mixer and Concrete Pump - -
II
(i) For solid slab super-structure, 18-28% of (a+b+c) - -
(p) Height upto 5m cum - -
(q) Height 5m to 10m cum - -
(ii) For T-beam & slab, 23-33% of (a+b+c) - -
Page 11 of 54
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana
Skylark Infra Engineering Pvt
Ltd Physical Daily Progress Report
MASPHTOTAL
MASPH Dujana 800.37
MASPH Silani 1,372.80
MASPH Ramgarh 891.58
MASPH Khalilpur 891.58
SPOUTTOTAL 14.9 Drainage Spouts complete as per drawing and Technical specification each 1,458.00 8.00 12.00 8.00 8.00 36.00 52,488.00
SPOUT Dujana 8.00
SPOUT Silani 12.00
SPOUT Ramgarh 8.00
SPOUT Khalilpur 8.00
PCC M15 Grade leveling course below approach slab complete as per drawing and
14.10 cum 3,588.00 23.94 26.73 26.67 26.67 104.00 373,156.94
ASLABPCCM15TOTAL Technical specification
ASLABPCCM15 Dujana 23.94
ASLABPCCM15 Silani 26.73
ASLABPCCM15 Ramgarh 26.67
ASLABPCCM15 Khalilpur 26.67
Reinforced cement concrete (M-30 Grade) approach slab including reinforcement
14.11 and formwork complete as per drawing and Technical specification cum 8,647.00 51.53 51.84 51.53 51.53 206.42 1,784,895.56
ASLABRCCM30TOTAL
Dujana
51.53
ASLABRCCM30
Silani
51.84
ASLABRCCM30
Ramgarh
51.53
ASLABRCCM30
Khalilpur
51.53
ASLABRCCM30
Painting on concrete surface (Providing and applying 2 coats of water based cement
14.16 paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, metre 38.00 - -
efflorescence and applying paint @ of 1 litre for 2 Sq.m. )
Asphaltic Plug joint (Providing and laying of asphaltic plug joint to provide for horizontal
movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to
100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a
14.19 closure plate of 200mm x 6mm of wieldable structural steel conforming to IS: 2062, metre - -
asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size
aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as
per approved drawings and specifications.)
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to
maximum horizontal movement upto 70 mm, complete as per approved drawings and
14.22 standard specifications to be installed by the manufacturer/supplier or their authorised metre 5,613.00 - 81.00 81.00 454,653.00
representative ensuring compliance to the manufacturer's instructions for installation.)
SSEXPJTOTAL
SSEXPJ Dujana
SSEXPJ Silani 81.00
Page 12 of 54
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana
Skylark Infra Engineering Pvt
Ltd Physical Daily Progress Report
C Test -
Drilling of 150mm dia boreholes through soil upto maximum 12m depth including conducting SPT
i including analysis for liquefaction
No. - - - -
ii Conducting static cone penetration test (10 T) in between stone column forquality assurance No. - - - -
Conduction load test on group of 3 stone columns using a 1m x 1m size test plae upto maximum
iii loading intensity of40 T/m2
No. - - - -
On Grid Solar Power System including PCU, and istallation every thing (Make in
16.2 India, ISI Mark) KW 84,899.00 10.00 10.00 10.00 10.00 40.00 3,395,960.00
SOLARTOTAL
SOLAR Dujana 10.00
SOLAR Silani 10.00
SOLAR Ramgarh 10.00
SOLAR Khalilpur 10.00
Net Amount (from Bill no.-2 to Extra Item) 172,461,063.21 218,507,071.99 164,389,783.94 165,019,624.18 720,377,543 720,377,543
Page 13 of 54
er COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana Date: 5-Apr-20
Page 14 of 54
er COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana Date: 5-Apr-20
Page 15 of 54
er COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana Date: 5-Apr-20
Page 16 of 54
er COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana Date: 5-Apr-20
Page 17 of 54
er COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana Date: 5-Apr-20
Page 18 of 54
er COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana Date: 5-Apr-20
Page 19 of 54
er COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana Date: 5-Apr-20
Page 20 of 54
er COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana Date: 5-Apr-20
Page 21 of 54
er COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana Date: 5-Apr-20
Page 22 of 54
er COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana Date: 5-Apr-20
Page 23 of 54
er COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana Date: 5-Apr-20
Page 24 of 54
23-Mar PRIME COAT Payable PC Sqm 439970 440030 LHS 1 60
23-Mar FILTER MEIDA Payable FMEDIA CUM 439900 439990 LHS 1 90.00
Skylark Infra Engineering Pvt Ltd
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853
RE Panel ERRECTION DPR
Date 4/4/2020
S. No.
UOM
Area
###
ID
10-Mar-2020
11-Mar-2020
12-Mar-2020
13-Mar-2020
14-Mar-2020
3-Mar-2020
4-Mar-2020
5-Mar-2020
6-Mar-2020
7-Mar-2020
8-Mar-2020
9-Mar-2020
S. No.
UOM
Area
ID
1 A4 3.2 Nos. 6
2 A5 3.2 Nos. 6
3 A6 3.2 Nos. 6
4 A7 3.2 Nos.
5 A9 3.2 Nos.
6 B2 1.6 Nos. 13 12
7 B3 1.6 Nos. 11 4 13
8 B4 1.6 Nos. 19
9 TA2 1.42 Nos.
10 TB2 1.22 Nos.
11 TC/2/2/3 4.22 Nos.
12 TC3/2/3 4.22 Nos.
13 TC6 4.22 Nos. 1
14 TC7 4.22 Nos.
15 TD6 4.02 Nos.
16 TD7 4.02 Nos.
17 TE6 3.82 Nos.
18 TE7 3.82 Nos.
19 TF6 3.62 Nos.
20 TF7 3.62 Nos.
21 TG6 3.42 Nos.
22 TJ4 3.02 Nos.
23 TK4 2.82 Nos.
24 TL4 2.62 Nos.
25 TM4 2.42 Nos.
26 TN4 2.22 Nos.
27 TP4 2.02 Nos.
28 TH4 3.22 Nos.
29 TR4 1.82 Nos.
30 TS2 1.62 Nos.
31 TS3 1.62 Nos.
24 23 0 0 0 0 0 0 0 25 0 19
38.40 36.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 0.00 61.82
71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853) under NHDP - III in the state of Haryana
15-Mar-2020
16-Mar-2020
17-Mar-2020
18-Mar-2020
19-Mar-2020
20-Mar-2020
21-Mar-2020
22-Mar-2020
23-Mar-2020
24-Mar-2020
25-Mar-2020
26-Mar-2020
27-Mar-2020
28-Mar-2020
29-Mar-2020
2
10
6 8
4 9
6
2
9 10
12 6 17 16 0 15 0 0 0 0 0 0 0 0 0
38.40 19.20 40.00 32.00 0.00 48.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pannel for this
30-Mar-2020
31-Mar-2020
month
8 25.6
16 51.2
20 64
13 41.6
6 19.2
25 40
30 48
38 60.8
0 0
0 0
0 0
0 0
1 4.22
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0 157 354.62
ID
Area
UOM
###
Date
S. No.
ID
Area
UOM
SILANI LHS SILANI RHS
CH. INNER OUTTER DIFF. CH. INNER OUTTER
396+800 7
396+810 7
396+820 7
396+830 11.400 23 7.000 396+830 11.300 23
396+840 11.200 23 7.000 396+840 11.300 23
396+850 11.200 22.7 11.500 396+850 11.300 22.7
396+860 11.200 22.1 10.900 396+860 11.300 22.1
396+870 11.300 21.5 10.200 396+870 11.300 21.5
396+880 11.300 20.9 9.600 396+880 11.300 20.9
396+890 11.300 20.3 9.000 396+890 11.300 20.3
396+900 11.300 19.7 8.400 396+900 11.300 19.7
396+910 11.300 19.1 7.800 396+910 11.300 19.1
396+920 11.400 18.5 7.100 396+920 11.200 18.5
396+930 11.400 18.5 7.100 396+930 11.300 18.5
396+940 11.400 18.5 7.100 396+940 11.200 18.5
396+950 11.400 18.5 7.100 396+950 11.100 18.5
396+960 11.400 18.5 7.100 396+960 11.100 18.5
396+970 11.400 18.5 7.100 396+970 11.000 18.5
396+980 11.400 18.5 7.100 396+980 11.000 18.5
396+990 11.500 18.5 7.000 396+990 10.900 18.5
397+000 11.500 18.5 7.000 397+000 10.800 17.818
397+010 11.500 17.818 6.318 397+010 10.800 16.45
397+020 11.500 16.45 4.950 397+020 10.800 15.091
397+030 11.400 15.091 3.691 397+030 10.700 13.727
397+040 11.400 13.727 2.327 397+040 12.364
397+050 11.100 12.364 1.264 397+050 11
397+060 10.500 11 0.500 397+060
0.2
0.5
0.4
0.7
2.1
2.8
3.1
3.4
3.8
4.5
5
5.5
6.1
6.7
7
7.1
SILANI RHS SILANI LHS
DBM BC
395+710 1 NO BC 395+860 7 7
395+720 1.2 NO BC 395+850 7 7
395+730 1.7 NO BC 395+840 7 7
395+740 2.6 NO BC 395+830 7 7
395+750 2.5 NO BC 395+820 7 7
395+760 3 NO BC 395+810 7 7
395+770 3.7 NO BC 395+800 6.5 6.5
395+780 4.5 NO BC 395+790 6.1 6.1
395+790 5 NO BC 395+780 4.9 4.9
395+795 6.1 6.1 395+770 4.3 4.3
395+810 6.7 6.7 395+760 3.9 3.9
395+820 6.9 6.9 395+750 3.6
395+830 7 7 395+740 3.2
395+840 7.1 7.1 395+730 2.6
395+720 3.2
395+710 1.9
395+700 1.7
NIMIDASS (DUZANA ) NIMIDASS ( Silani )Dumper
SL. NO DATE NO. OF SOIL TRIP QTY REMARKS SL. NO DATE NO. OF SOIL TRIP
1 11/1/2019 0 1 11/1/2019
2 11/2/2019 0 2 11/2/2019
3 11/3/2019 0 3 11/3/2019
4 11/4/2019 0 4 11/4/2019
5 11/5/2019 0 5 11/5/2019
6 11/6/2019 0 6 11/6/2019
7 11/7/2019 0 7 11/7/2019
8 11/8/2019 0 8 11/8/2019
9 11/9/2019 0 9 11/9/2019
10 11/10/2019 0 10 11/10/2019
11 11/11/2019 0 11 11/11/2019
12 11/12/2019 0 12 11/12/2019
13 11/13/2019 0 13 11/13/2019
14 11/14/2019 5 70 14 11/14/2019
15 11/15/2019 0 15 11/15/2019
16 11/16/2019 0 16 11/16/2019
17 11/17/2019 0 17 11/17/2019
18 11/18/2019 15 210 18 11/18/2019
19 11/19/2019 0 0 19 11/19/2019
20 11/20/2019 13 182 20 11/20/2019
21 11/21/2019 16 224 21 11/21/2019
22 11/22/2019 49 686 22 11/22/2019
23 11/23/2019 5 70 PLUS 15 23 11/23/2019
ECXAVATED
24 11/24/2019 30 420 SOIL 24 11/24/2019
( SKYLARK)
25 11/25/2019 32 448 25 11/25/2019
26 11/26/2019 36 504 26 11/26/2019
27 11/27/2019 24 336 27 11/27/2019
28 11/28/2019 26 364 28 11/28/2019
29 11/29/2019 40 560 5TH LAYER 29 11/29/2019
30 11/30/2019 0 30 11/30/2019
31 12/1/2019 32 448 31 12/1/2019
32 12/2/2019 40 560 32 12/2/2019
33 12/3/2019 35 490 33 12/3/2019
34 12/4/2019 30 420 34 12/4/2019
35 12/5/2019 32 448 35 12/5/2019
36 12/6/2019 45 630 36 12/6/2019
37 12/7/2019 0 37 12/7/2019
38 12/8/2019 0 38 12/8/2019
39 12/9/2019 0 39 12/9/2019
40 12/10/2019 12 168 40 12/10/2019
41 12/11/2019 16 224 41 12/11/2019
42 12/12/2019 28 392 42 12/12/2019
43 12/13/2019 30 420 43 12/13/2019
44 12/14/2019 30 420 44 12/14/2019
45 12/15/2019 40 560 45 12/15/2019
46 12/16/2019 55 770 46 12/16/2019
47 12/17/2019 40 560 47 12/17/2019
48 12/18/2019 42 588 48 12/18/2019
49 12/19/2019 45 630 49 12/19/2019
50 12/20/2019 65 910 50 12/20/2019
51 12/21/2019 66 924 51 12/21/2019
52 12/22/2019 0 52 12/22/2019
53 12/23/2019 31 434 53 12/23/2019
54 12/24/2019 30 420 54 12/24/2019
55 12/25/2019 46 644 55 12/25/2019
56 12/26/2019 51 714 56 12/26/2019
57 12/27/2019 41 574 57 12/27/2019
58 12/28/2019 38 532 58 12/28/2019
59 12/29/2019 0 59 12/29/2019
60 12/30/2019 19 266 60 12/30/2019
61 12/31/2019 0 61 12/31/2019
62 1/1/2020 0 62 1/1/2020
63 1/2/2020 0 63 1/2/2020
64 1/3/2020 50 700 64 1/3/2020
65 1/4/2020 52 728 65 1/4/2020
66 1/5/2020 43 602 66 1/5/2020
67 1/6/2020 42 588 67 1/6/2020
68 1/7/2020 66 924 68 1/7/2020
69 1/8/2020 66 924 69 1/8/2020
70 1/9/2020 37 518 70 1/9/2020
71 1/10/2020 61 854 71 1/10/2020
72 1/11/2020 70 980 72 1/11/2020
73 1/12/2020 64 896 73 1/12/2020
74 1/13/2020 52 728 74 1/13/2020
75 1/14/2020 71 994 75 1/14/2020
76 1/15/2020 75 1050 76 1/15/2020
77 1/16/2020 65 910 77 1/16/2020
78 1/17/2020 54 756 78 1/17/2020
79 1/18/2020 43 602 79 1/18/2020
80 1/19/2020 45 630 80 1/19/2020
81 1/20/2020 46 644 81 1/20/2020
82 1/21/2020 64 896 82 1/21/2020
83 1/22/2020 56 784 83 1/22/2020
84 1/23/2020 75 1050 84 1/23/2020
85 1/24/2020 76 1064 85 1/24/2020
86 1/25/2020 0 86 1/25/2020
87 1/26/2020 0 87 1/26/2020
88 1/27/2020 0 88 1/27/2020
89 1/28/2020 0 89 1/28/2020
90 1/29/2020 15 210 90 1/29/2020
91 1/30/2020 60 840 91 1/30/2020
92 1/31/2020 31 434 92 1/31/2020
93 2/1/2020 14 196 93 2/1/2020
94 2/2/2020 63 882 94 2/2/2020
95 2/3/2020 49 686 95 2/3/2020
96 2/4/2020 50 700 96 2/4/2020
97 2/5/2020 50 700 97 2/5/2020
98 2/6/2020 32 448 98 2/6/2020
99 2/7/2020 50 700 99 2/7/2020
100 2/8/2020 56 784 100 2/8/2020
101 2/9/2020 60 840 101 2/9/2020
102 2/10/2020 0 102 2/10/2020
103 2/11/2020 51 714 103 2/11/2020
104 2/12/2020 63 882 104 2/12/2020
105 2/13/2020 65 910 105 2/13/2020
106 2/14/2020 66 924 106 2/14/2020
107 2/15/2020 0 107 2/15/2020
108 2/16/2020 62 868 108 2/16/2020
109 2/17/2020 65 910 109 2/17/2020
110 2/18/2020 68 952 110 2/18/2020
111 2/19/2020 58 812 111 2/19/2020
112 2/20/2020 56 784 112 2/20/2020
113 2/21/2020 72 1008 113 2/21/2020
114 2/22/2020 70 980 114 2/22/2020
115 2/23/2020 59 826 115 2/23/2020
116 2/24/2020 62 868 116 2/24/2020
117 2/25/2020 56 784 117 2/25/2020
118 2/26/2020 40 560 118 2/26/2020
119 2/27/2020 0 119 2/27/2020
120 2/28/2020 66 924 120 2/28/2020
121 2/29/2020 59 826 121 2/29/2020
122 3/1/2020 50 700 122 3/1/2020
123 3/2/2020 20 280 123 3/2/2020
124 3/3/2020 62 868 124 3/3/2020
125 3/4/2020 59 826 125 3/4/2020
126 3/5/2020 66 924 126 3/5/2020
127 3/6/2020 37 518 127 3/6/2020
128 3/7/2020 0 128 3/7/2020
129 3/8/2020 0 129 3/8/2020 57
130 3/9/2020 0 130 3/9/2020
131 3/10/2020 0 131 3/10/2020
132 3/11/2020 0 132 3/11/2020 72
133 3/12/2020 22 308 133 3/12/2020
134 3/13/2020 0 134 3/13/2020
135 3/14/2020 0 135 3/14/2020
136 3/15/2020 28 392 136 3/15/2020 21
137 3/16/2020 73 1022 137 3/16/2020
138 3/17/2020 24 336 138 3/17/2020 25
139 3/18/2020 20 280 139 3/18/2020
140 3/19/2020 3 42 140 3/19/2020
141 3/20/2020 65 910 141 3/20/2020
142 3/21/2020 50 700 142 3/21/2020
143 3/22/2020 0 143 3/22/2020
144 3/23/2020 0 144 3/23/2020
145 3/24/2020 0 145 3/24/2020
146 3/25/2020 0 146 3/25/2020
147 3/26/2020 0 147 3/26/2020
148 3/27/2020 0 148 3/27/2020
149 3/28/2020 0 149 3/28/2020
150 3/29/2020 0 150 3/29/2020
151 3/30/2020 0 151 3/30/2020
152 3/31/2020 0 152 3/31/2020
65100
SOIL DUMPING
ilani )Dumper K C Yadav (Ramgarh) DUMPER K C Yadav (Ram
QTY REMARKS SL. NO DATE NO. OF SOIL TRIP QTY REMARKS SL. NO
0 1 11/1/2019 0 1
0 2 11/2/2019 0 2
0 3 11/3/2019 0 3
0 4 11/4/2019 0 4
0 5 11/5/2019 0 5
0 6 11/6/2019 0 6
0 7 11/7/2019 0 7
0 8 11/8/2019 0 8
0 9 11/9/2019 0 9
0 10 11/10/2019 0 10
0 11 11/11/2019 0 11
0 12 11/12/2019 0 12
0 13 11/13/2019 0 13
0 14 11/14/2019 0 14
0 15 11/15/2019 0 15
0 16 11/16/2019 0 16
0 17 11/17/2019 0 17
0 18 11/18/2019 9 126 18
0 19 11/19/2019 18 252 19
0 20 11/20/2019 23 322 20
0 21 11/21/2019 0 21
0 22 11/22/2019 0 22
0 PLUS 15 23 11/23/2019 23 322 23
ECXAVATED
0 SOIL 24 11/24/2019 19 266 24
( SKYLARK)
0 25 11/25/2019 0 25
0 26 11/26/2019 16 224 26
0 27 11/27/2019 29 406 27
0 28 11/28/2019 38 532 28
0 5TH LAYER 29 11/29/2019 42 588 29
0 30 11/30/2019 32 448 30
0 31 12/1/2019 32 448 31
0 32 12/2/2019 36 504 32
0 33 12/3/2019 45 630 33
0 34 12/4/2019 41 574 34
0 35 12/5/2019 16 224 35
0 36 12/6/2019 27 378 36
0 37 12/7/2019 0 37
0 38 12/8/2019 35 490 38
0 39 12/9/2019 47 658 39
0 40 12/10/2019 40 560 40
0 41 12/11/2019 40 560 41
0 42 12/12/2019 42 588 42
0 43 12/13/2019 0 43
0 44 12/14/2019 5 70 44
0 45 12/15/2019 5 70 45
0 46 12/16/2019 14 196 46
0 47 12/17/2019 28 392 47
0 48 12/18/2019 34 476 48
0 49 12/19/2019 13 182 49
0 50 12/20/2019 5 70 50
0 51 12/21/2019 24 336 51
0 52 12/22/2019 32 448 52
0 53 12/23/2019 17 238 53
0 54 12/24/2019 18 252 54
0 55 12/25/2019 26 364 55
0 56 12/26/2019 29 406 56
0 57 12/27/2019 21 294 57
0 58 12/28/2019 27 378 58
0 59 12/29/2019 39 546 59
0 60 12/30/2019 0 60
0 61 12/31/2019 0 61
0 62 1/1/2020 0 62
0 63 1/2/2020 0 63
0 64 1/3/2020 0 64
0 65 1/4/2020 0 65
0 66 1/5/2020 0 66
0 67 1/6/2020 0 67
0 68 1/7/2020 0 68
0 69 1/8/2020 37 518 69
0 70 1/9/2020 43 602 70
0 71 1/10/2020 16 224 71
0 72 1/11/2020 23 322 72
0 73 1/12/2020 12 168 73
0 74 1/13/2020 24 336 74
0 75 1/14/2020 0 75
0 76 1/15/2020 0 76
0 77 1/16/2020 0 77
0 78 1/17/2020 23 322 78
0 79 1/18/2020 0 79
0 80 1/19/2020 0 80
0 81 1/20/2020 27 378 81
0 82 1/21/2020 32 448 82
0 83 1/22/2020 20 280 83
0 84 1/23/2020 0 84
0 85 1/24/2020 50 700 85
0 86 1/25/2020 0 86
0 87 1/26/2020 0 87
0 88 1/27/2020 0 88
0 89 1/28/2020 0 89
0 90 1/29/2020 0 90
0 91 1/30/2020 0 91
0 92 1/31/2020 32 448 92
0 93 2/1/2020 44 616 93
0 94 2/2/2020 109 1526 94
0 95 2/3/2020 49 686 95
0 96 2/4/2020 16 224 96
0 97 2/5/2020 14 196 97
0 98 2/6/2020 10 140 98
0 99 2/7/2020 10 140 99
0 100 2/8/2020 0 100
0 101 2/9/2020 0 101
0 102 2/10/2020 0 102
0 103 2/11/2020 0 103
0 104 2/12/2020 9 126 104
0 105 2/13/2020 6 84 105
0 106 2/14/2020 35 490 106
0 107 2/15/2020 107 1498 107
0 108 2/16/2020 52 728 108
0 109 2/17/2020 47 658 109
0 110 2/18/2020 53 742 110
0 111 2/19/2020 17 238 111
0 112 2/20/2020 0 112
0 113 2/21/2020 32 448 113
0 114 2/22/2020 48 672 114
0 115 2/23/2020 50 700 115
0 116 2/24/2020 25 350 116
0 117 2/25/2020 12 168 117
0 118 2/26/2020 55 770 118
0 119 2/27/2020 46 644 119
0 120 2/28/2020 48 672 120
0 121 2/29/2020 0 894 121
0 122 3/1/2020 48 672 122
0 123 3/2/2020 51 714 123
0 124 3/3/2020 49 686 124
0 125 3/4/2020 23 322 125
0 126 3/5/2020 36 504 126
0 127 3/6/2020 36 504 127
0 128 3/7/2020 102 1428 128
798 129 3/8/2020 130 1820 129
0 130 3/9/2020 0 130
0 131 3/10/2020 0 131
1008 132 3/11/2020 0 132
0 133 3/12/2020 107 1498 133
0 134 3/13/2020 47 658 134
0 135 3/14/2020 102 1428 135
294 136 3/15/2020 74 1036 136
0 137 3/16/2020 72 1008 137
350 138 3/17/2020 65 910 138
0 139 3/18/2020 108 1512 139
0 140 3/19/2020 96 1344 140
0 141 3/20/2020 71 994 141
0 142 3/21/2020 38 532 142
0 143 3/22/2020 0 143
0 144 3/23/2020 82 1148 144
0 145 3/24/2020 0 145
0 146 3/25/2020 0 146
0 147 3/26/2020 0 147
0 148 3/27/2020 0 148
0 149 3/28/2020 0 149
0 150 3/29/2020 0 150
0 151 3/30/2020 0 151
0 152 3/31/2020 0 152
2450 514500 49798
PING
K C Yadav (Ramgarh) TRACTOR K C Yadav (Khalilpur) DUMPER
DATE NO. OF SOIL TRIP QTY REMARKS SL. NO DATE NO. OF SOIL TRIP QTY
11/1/2019 0 1 11/1/2019 0
11/2/2019 0 2 11/2/2019 0
11/3/2019 0 3 11/3/2019 0
11/4/2019 0 4 11/4/2019 0
11/5/2019 0 5 11/5/2019 0
11/6/2019 0 6 11/6/2019 0
11/7/2019 0 7 11/7/2019 0
11/8/2019 0 8 11/8/2019 0
11/9/2019 0 9 11/9/2019 0
11/10/2019 0 10 11/10/2019 0
11/11/2019 0 11 11/11/2019 0
11/12/2019 0 12 11/12/2019 0
11/13/2019 0 13 11/13/2019 0
11/14/2019 0 14 11/14/2019 0
11/15/2019 0 15 11/15/2019 0
11/16/2019 0 16 11/16/2019 0
11/17/2019 0 17 11/17/2019 0
11/18/2019 36 126 18 11/18/2019 0
11/19/2019 40 140 19 11/19/2019 0
11/20/2019 42 147 20 11/20/2019 0
11/21/2019 0 21 11/21/2019 0
11/22/2019 0 22 11/22/2019 0
11/23/2019 38 133 23 11/23/2019 0
11/24/2019 42 147 24 11/24/2019 0
11/25/2019 0 25 11/25/2019 0
11/26/2019 16 56 26 11/26/2019 0
11/27/2019 35 122.5 27 11/27/2019 0
11/28/2019 42 147 28 11/28/2019 0
11/29/2019 58 203 29 11/29/2019 0
11/30/2019 0 30 11/30/2019 0
12/1/2019 43 150.5 31 12/1/2019 0
12/2/2019 42 147 32 12/2/2019 0
12/3/2019 42 147 33 12/3/2019 0
12/4/2019 48 168 34 12/4/2019 12 168
12/5/2019 32 112 35 12/5/2019 25 350
12/6/2019 42 147 36 12/6/2019 4 56
12/7/2019 0 37 12/7/2019 0
12/8/2019 43 150.5 38 12/8/2019 4 56
12/9/2019 52 182 39 12/9/2019 19 266
12/10/2019 52 182 40 12/10/2019 0
12/11/2019 40 140 41 12/11/2019 0
12/12/2019 18 63 42 12/12/2019 6 84
12/13/2019 0 43 12/13/2019 0
12/14/2019 10 35 44 12/14/2019 41 574
12/15/2019 10 35 45 12/15/2019 48 672
12/16/2019 0 46 12/16/2019 43 602
12/17/2019 0 47 12/17/2019 47 658
12/18/2019 0 48 12/18/2019 32 448
12/19/2019 20 70 49 12/19/2019 35 490
12/20/2019 18 63 50 12/20/2019 37 518
12/21/2019 0 51 12/21/2019 44 616
12/22/2019 0 52 12/22/2019 49 686
12/23/2019 23 80.5 53 12/23/2019 0
12/24/2019 0 54 12/24/2019 49 686
12/25/2019 32 112 55 12/25/2019 40 560
12/26/2019 42 147 56 12/26/2019 31 434
12/27/2019 54 189 57 12/27/2019 49 686
12/28/2019 46 161 58 12/28/2019 42 588
12/29/2019 34 119 59 12/29/2019 38 532
12/30/2019 10 35 60 12/30/2019 8 112
12/31/2019 0 61 12/31/2019 0
1/1/2020 0 62 1/1/2020 16 224
1/2/2020 0 63 1/2/2020 17 238
1/3/2020 27 94.5 64 1/3/2020 31 434
1/4/2020 23 80.5 65 1/4/2020 65 910
1/5/2020 0 66 1/5/2020 35 490
1/6/2020 21 73.5 67 1/6/2020 28 392
1/7/2020 21 73.5 68 1/7/2020 29 406
1/8/2020 42 147 69 1/8/2020 0
1/9/2020 37 129.5 70 1/9/2020 0
1/10/2020 23 80.5 71 1/10/2020 7 98
1/11/2020 0 72 1/11/2020 30 420
1/12/2020 16 56 73 1/12/2020 38 532
1/13/2020 0 74 1/13/2020 5 70
1/14/2020 0 75 1/14/2020 0
1/15/2020 0 76 1/15/2020 0
1/16/2020 0 77 1/16/2020 0
1/17/2020 30 105 78 1/17/2020 0
1/18/2020 0 79 1/18/2020 10 140
1/19/2020 0 80 1/19/2020 0
1/20/2020 0 81 1/20/2020 0
1/21/2020 0 82 1/21/2020 0
1/22/2020 0 83 1/22/2020 0
1/23/2020 0 84 1/23/2020 0
1/24/2020 60 210 85 1/24/2020 2 28
1/25/2020 0 86 1/25/2020 0
1/26/2020 0 87 1/26/2020 0
1/27/2020 0 88 1/27/2020 0
1/28/2020 0 89 1/28/2020 0
1/29/2020 70 245 90 1/29/2020 16 224
1/30/2020 107 374.5 91 1/30/2020 35 490
1/31/2020 93 325.5 92 1/31/2020 18 252
2/1/2020 98 343 93 2/1/2020 0
2/2/2020 85 297.5 94 2/2/2020 0
2/3/2020 87 304.5 95 2/3/2020 60 840
2/4/2020 47 164.5 96 2/4/2020 24 336
2/5/2020 0 97 2/5/2020 20 280
2/6/2020 0 98 2/6/2020 0
2/7/2020 0 99 2/7/2020 0
2/8/2020 0 100 2/8/2020 20 280
2/9/2020 10 35 101 2/9/2020 26 364
2/10/2020 75 262.5 102 2/10/2020 29 406
2/11/2020 30 105 103 2/11/2020 30 420
2/12/2020 0 104 2/12/2020 15 210
2/13/2020 87 304.5 105 2/13/2020 34 476
2/14/2020 48 168 106 2/14/2020 32 448
2/15/2020 98 343 107 2/15/2020 0
2/16/2020 89 311.5 108 2/16/2020 31 434
2/17/2020 0 109 2/17/2020 20 280
2/18/2020 0 110 2/18/2020 4 56
2/19/2020 25 87.5 111 2/19/2020 6 84
2/20/2020 0 112 2/20/2020 15 210
2/21/2020 0 113 2/21/2020 0
2/22/2020 60 210 114 2/22/2020 0
2/23/2020 119 416.5 115 2/23/2020 0
2/24/2020 80 280 116 2/24/2020 15 210
2/25/2020 95 332.5 117 2/25/2020 18 252
2/26/2020 95 332.5 118 2/26/2020 20 280
2/27/2020 160 560 119 2/27/2020 30 420
2/28/2020 0 120 2/28/2020 30 420
2/29/2020 47 164.5 1435 121 2/29/2020 40 560
3/1/2020 0 122 3/1/2020 0
3/2/2020 0 123 3/2/2020 35 490
3/3/2020 0 124 3/3/2020 40 560
3/4/2020 0 125 3/4/2020 35 490
3/5/2020 97 339.5 126 3/5/2020 0
3/6/2020 78 273 127 3/6/2020 0
3/7/2020 140 490 128 3/7/2020 0
3/8/2020 147 514.5 129 3/8/2020 0
3/9/2020 0 130 3/9/2020 0
3/10/2020 0 131 3/10/2020 0
3/11/2020 0 132 3/11/2020 0
3/12/2020 137 479.5 133 3/12/2020 0
3/13/2020 107 374.5 134 3/13/2020 30 420
3/14/2020 137 479.5 135 3/14/2020 0
3/15/2020 147 514.5 136 3/15/2020 0
3/16/2020 142 497 137 3/16/2020 0
3/17/2020 137 479.5 138 3/17/2020 0
3/18/2020 147 514.5 139 3/18/2020 0
3/19/2020 137 479.5 140 3/19/2020 44 616
3/20/2020 92 322 141 3/20/2020 14 196
3/21/2020 55 192.5 142 3/21/2020 0
3/22/2020 0 143 3/22/2020 0
3/23/2020 67 234.5 144 3/23/2020 20 280
3/24/2020 0 145 3/24/2020 0
3/25/2020 0 146 3/25/2020 0
3/26/2020 0 147 3/26/2020 0
3/27/2020 0 148 3/27/2020 0
3/28/2020 0 149 3/28/2020 0
3/29/2020 0 150 3/29/2020 0
3/30/2020 0 151 3/30/2020 0
3/31/2020 0 152 3/31/2020 0
17059 25508
) DUMPER K C Yadav (Khalilpur) Tractor
REMARKS SL. NO DATE NO. OF SOIL TRIP QTY REMARKS
1 11/1/2019 0
2 11/2/2019 0
3 11/3/2019 0
4 11/4/2019 0
5 11/5/2019 0
6 11/6/2019 0
7 11/7/2019 0
8 11/8/2019 0
9 11/9/2019 0
10 11/10/2019 0
11 11/11/2019 0
12 11/12/2019 0
13 11/13/2019 0
14 11/14/2019 0
15 11/15/2019 0
16 11/16/2019 0
17 11/17/2019 0
18 11/18/2019 0
19 11/19/2019 0
20 11/20/2019 0
21 11/21/2019 0
22 11/22/2019 0
23 11/23/2019 0
24 11/24/2019 0
25 11/25/2019 0
26 11/26/2019 0
27 11/27/2019 0
28 11/28/2019 0
29 11/29/2019 0
30 11/30/2019 0
31 12/1/2019 0
32 12/2/2019 0
33 12/3/2019 0
34 12/4/2019 0
35 12/5/2019 5 17.5
36 12/6/2019 0
37 12/7/2019 0
38 12/8/2019 1 3.5
39 12/9/2019 18 63
40 12/10/2019 0
41 12/11/2019 0
42 12/12/2019 0
43 12/13/2019 0
44 12/14/2019 35 122.5
45 12/15/2019 50 175
46 12/16/2019 0
47 12/17/2019 0
48 12/18/2019 15 52.5
49 12/19/2019 5 17.5
50 12/20/2019 0
51 12/21/2019 0
52 12/22/2019 0
53 12/23/2019 0
54 12/24/2019 0
55 12/25/2019 0
56 12/26/2019 0
57 12/27/2019 0
58 12/28/2019 0
59 12/29/2019 15 52.5
60 12/30/2019 5 17.5
61 12/31/2019 0
62 1/1/2020 0
63 1/2/2020 20 70
64 1/3/2020 15 52.5
65 1/4/2020 0
66 1/5/2020 0
67 1/6/2020 0
68 1/7/2020 0
69 1/8/2020 0
70 1/9/2020 0
71 1/10/2020 0
72 1/11/2020 0
73 1/12/2020 10 35
74 1/13/2020 0
75 1/14/2020 0
76 1/15/2020 0
77 1/16/2020 0
78 1/17/2020 0
79 1/18/2020 25 87.5
80 1/19/2020 0
81 1/20/2020 0
82 1/21/2020 0
83 1/22/2020 0
84 1/23/2020 0
85 1/24/2020 0
86 1/25/2020 0
87 1/26/2020 0
88 1/27/2020 0
89 1/28/2020 0
90 1/29/2020 0
91 1/30/2020 0
92 1/31/2020 0
93 2/1/2020 0
94 2/2/2020 0
95 2/3/2020 0
96 2/4/2020 0
97 2/5/2020 0
98 2/6/2020 0
99 2/7/2020 0
100 2/8/2020 34 119
101 2/9/2020 30 105
102 2/10/2020 0
103 2/11/2020 27 94.5
104 2/12/2020 18 63
105 2/13/2020 0
106 2/14/2020 0
107 2/15/2020 0
108 2/16/2020 0
109 2/17/2020 0
110 2/18/2020 0
111 2/19/2020 0
112 2/20/2020 18 63
113 2/21/2020 0
114 2/22/2020 0
115 2/23/2020 0
116 2/24/2020 0
117 2/25/2020 0
118 2/26/2020 0
119 2/27/2020 0
120 2/28/2020 0 T D
519 121 2/29/2020 0 127 1562 1413
122 3/1/2020 0 5467 19782
123 3/2/2020 0 4292330 25249
124 3/3/2020 0
125 3/4/2020 0
126 3/5/2020 0
127 3/6/2020 0
128 3/7/2020 0
129 3/8/2020 0
130 3/9/2020 0
131 3/10/2020 0
132 3/11/2020 0
133 3/12/2020 0
134 3/13/2020 0
135 3/14/2020 0
136 3/15/2020 0
137 3/16/2020 0
138 3/17/2020 0
139 3/18/2020 0
140 3/19/2020 0
141 3/20/2020 47 164.5
142 3/21/2020 0
143 3/22/2020 0
144 3/23/2020 58 203
145 3/24/2020 0
146 3/25/2020 0
147 3/26/2020 0
148 3/27/2020 0
149 3/28/2020 0
150 3/29/2020 0
151 3/30/2020 0
152 3/31/2020 0
1579
Chainage Chainage
SR. NO Description Code Unit Side No. Length width
from to
1 Road Marking RLINE Sqm 380+000 380+450 LHS 1 450 0.15
2 Road Marking RLINE Sqm 380+000 380+440 RHS 1 440 0.15
3 Road Marking RLINE Sqm 380+683 381+120 LHS 1 437 0.15
4 Road Marking RLINE Sqm 380+704 381+120 RHS 1 416 0.15
5 Road Marking RLINE Sqm 395+819 396+350 RHS 1 531 0.15
6 Road Marking RLINE Sqm 395+798 396+380 LHS 1 582 0.15
7 Road Marking RLINE Sqm 396+496 397+060 LHS 1 564 0.15
8 Road Marking RLINE Sqm 396+440 397+050 RHS 1 610.5 0.15
Total
Qty. site
135.00 Dujana
132.00 Dujana
131.10 Dujana
124.80 Dujana
159.30 Silani
174.60 Silani 3590 7180.00 0.5
169.20 Silani 32607 7180.00 4.54
183.15 Silani 10000 3448.28 2.90
1209.15 Sqm. 42607 10628.28 4.01
Skylark Infra Engineering Pvt Ltd
Construction of 4 Nos. of VUP under COS for four laning of Rohtak – Bawal section of NH – 71 from KM 363.300 (Design Km 363.300) to Km 450.800 (Design Km 445.853
RE Panel ERRECTION DPR
Date 4/4/2020
17-Oct-2019
S. No.
UOM
Area
ID
1 A4 3.2 Nos.
2 A5 3.2 Nos.
3 A6 3.2 Nos.
4 A7 3.2 Nos.
5 A9 3.2 Nos.
6 B2 1.6 Nos.
7 B3 1.6 Nos. 2
8 B4 1.6 Nos. 3