The document outlines the testing schedule for generator and generator bay protections at the NTPC Simhadri power plant. It details the objectives to prevent equipment faults, proposes a classification system for different types of faults and corresponding trip responses, and lists the necessary services and safety precautions for testing. The testing will check that the protections are sufficient to protect the generator and generator transformer from faults.

Uploaded by

stark2006
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views3 pages

Prot Testing Schedules

The document outlines the testing schedule for generator and generator bay protections at the NTPC Simhadri power plant. It details the objectives to prevent equipment faults, proposes a classification system for different types of faults and corresponding trip responses, and lists the necessary services and safety precautions for testing. The testing will check that the protections are sufficient to protect the generator and generator transformer from faults.

Uploaded by

stark2006
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500- SHEET 1 OF 3

NTPC REF NO: SIM/1/TS/ /

PLANT AREA : ELECTRICAL SYSTEM

TESTING SCHEDULE : GENERATOR,GENERATOR BAY PROTECTION

1. PLANT DETAILS
THIS SYSTEM CONSISTS OF 4 MAIN CONTROL LABLES
TO PROVIDE CLASS A,B ,C TRIPS OF GENERATOR AND
GENERATOR TRANSFORMER & ITS BAY AND GIVE
ANNUNICATIONS TO CONTROL ROOM MONITORING .
NAME PLATE DETAILS
MAKE: ALSTOM PROTECTION FOR GENERATOR,
GENERATOR TRANSFORMER & UNIT TRANSFORMER

2. TESTING OBJECTIVE
TO PREVENT THE GENERATOR ,ITS TRANSFORMER AND ITS AUX
FROM FAULTS.

3.PROPOSAL
TRIPPING OF EQUIPMENTS ARE CARRIED OUT IN THREE
CLASSES DEPENDING UPON THEIR SEVERITY IN SPREADING&DAMAGING
AND OCCURRENCE PERIOD/DURATION.
CLASS A TRIPS
TRIPPING OF GENERATOR AND TURBINE ARE TO BE SIMULTANEOUSLY
CARRIED OUT WHEN THIS TYPE OF FAULT OCCURS.
CLASS B TRIPS
TRIPPING OF TURBINE SHOULD BE AT FIRST AND GENERATOR MUST
BE SUBSEQUENTLY TRIPPED ON REVERSE POWER PROTECTION WHEN
THIS TYPE OF FAULT OCCURS.
CLASS C TRIPS
TRIPPING OF GENERATOR ONLY REQUIRED WHEN THIS TYPE OF FAULT
OCCURS.

4.SERVICES REQUIRED
220 V DC SUPPLY,240 V 1 PHASE 50 Hz AC SUPPLY, GENERATOR
SYSTEM AND GENERATOR & UNIT TRANSFORMER .

5.0 SAFETY PRECAUTIONS


I) FIRE EXTINGUISHER SYSTEM’S READINESS
II) ‘PROTECTION PANEL CHARGED’ CAUTION BOARD TO BE FIT
III) MEN & MATERIALS TO BE KEPT AWAY FROM PROTECTION
PANEL
IV) IN CASE OF POWER SUPPLY FAILURE,EMERGENCY PROTECTION
OF EQUIPMENTS MUST BE ENSURED.

C:\Users\MPPGCL\Downloads\PROT TESTING SCHEDULES.doc


STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500- SHEET 2 OF 3
NTPC REF NO: SIM/1/TS/ /

PLANT AREA : ELECTRICAL SYSTEM

TESTING SCHEDULE : GENERATOR,GENERATOR BAY PROTECTION

6. EMERGENCY PROCEDURE
SUPPLY TO THE PANELS TO BE ISOLATED.
7. STATE OF THE PLANT
POWER SUPPLY MUST BE EXTENDED AT FIRST.ALL INPUT &
OUTPUT CONTACTS TO BE CHECKED. SETTINGS OF ALL RELAYS ARE
TO BE KEPT AS RECOMMENDED. ALL RELAYS AND METERS ARE TO BE
TESTED/CALIBRATED. PROTECTIONS MUST BE CHECKED OFFLINE & ON
LINE.
8. COMMISSIONING PROCEDURE
POWER SUPPLY CABLES & CONNECTIONS ARE TO BE MEGGERED.
PANEL IS TO BE THOROUGHLY CHECKED AGAINST SHORTING OR
MIXING OF POWER SUPPLIES. PRIMARUY INJECTION MUST BE
CARRIED OUT TO ENSURE INTERCONNECTIONS.
THE FOLLOWING TRIPS ARE ENVISAGED FOR THIS PLANT OTHER THAN
CUSTOMER’S CHOICE OF ONE COMMON TRIP. THEY MUST BE CHECKED
ONE-BY-ONE BEFORE SYNCHRONISATION.
CLASS A TRIPS
I) 1. GT PRV OPERATED (R,Y,B)
2. GT FIRE PROT TRIP (R,Y,B)
3. GT OLTC OIL SURGE OPERATED(R,Y,B)
4. GT HV & OVERHEAD LINE CONNECTION DIFF PROT (R,Y,B)
5. GENERATOR DIFF PROT OPTD (R,Y,B)
6. GEN OVERHEAD CONN DIFFERENTIAL (R,Y,B)
7. UT OLTC OIL SURGE OPERATED (TRF 1 & 2)
8. UT PRV OPERATED (TRF 1 &2)
9. UT DIFF (R,Y,B) OPERATED
II) 1. GENERATOR LOW FORWARD POWER
2. GENERATOR OVERVOLTAGE
3. GENERATOR STATOR EARTHFAULT
4. GENERTOR POLE SLIPPING
5. GENERATOR OVERFLUXING
6. GENERATOR FIELD FAILURE
7. GENERATOR DIFFERENTIAL PROTECTION
8. NEGATIVE PHASE PROTECTION
9. GEN PROTECTION (UF,OV,ROTOR E/F & 100 % STATOR E/F)

9. COMPLETION CRETERIA
GENERATOR & ITS BAY PROTECTIONS ARE SUFFICIENT FOR
PROTECTING GENERATOR AND GENERATOR TRANSFORMER FROM
FAULTS.

C:\Users\MPPGCL\Downloads\PROT TESTING SCHEDULES.doc


STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500- SHEET 3 OF 3
NTPC REF NO: SIM/1/TS/ /

PLANT AREA : ELECTRICAL SYSTEM

TESTING SCHEDULE : GENERATOR,GENERATOR BAY PROTECTION

10. APPENDICES

DRAWINGS: O & M MANUAL OF GENERATOR,GENERATOR


TRANSFORMER AND ITS BAY PROTECTIONS
LOG SHEETS : I) AC,DC SUPPLY EXTENSION TO
PANEL
II) TEST REPORT OF PTs,CTs
III) READINESS OF AUX SYSTEMS

C:\Users\MPPGCL\Downloads\PROT TESTING SCHEDULES.doc