The document reports the results of tests conducted to determine the binder content and aggregate grading of samples taken from a road reinstatement project in Bombay, India. Testing was conducted according to ASTM D2172-88 Method B. The binder content was determined to be 5.08% by weight. Sieve analysis found the aggregate grading to be within specified limits, with percentages retained between the lower and upper limits for each sieve size.

Uploaded by

Jun Rey Morales
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views19 pages

Asphalt Surfacing Course - 20160925

The document reports the results of tests conducted to determine the binder content and aggregate grading of samples taken from a road reinstatement project in Bombay, India. Testing was conducted according to ASTM D2172-88 Method B. The binder content was determined to be 5.08% by weight. Sieve analysis found the aggregate grading to be within specified limits, with percentages retained between the lower and upper limits for each sieve size.

Uploaded by

Jun Rey Morales
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 19

ASTM D2172-88 Method B:

Determination of Binder Content and Aggregate Grading


by Extraction
LWSSD - Improvement of Bombay Drainage System CP7 (North) and CP8 (South)

PURPOSE OF MATERIAL : Road Reinstatement, CL at K. Mulilo Road DATE SAMPLED :

BINDER CONTENT DETERMINATION


a Mass of sample before extraction, grams 1,018.20
b Mass of sample after extraction, grams 966.30
c Mass of cup, grams 18.00
d Mass of cup + fines, grams 18.20
e=d-c Mass of fines, grams 0.20
f=b+e Mass of sample after extraction + fines, grams 966.50
g=a-b-e Mass of bitumen, grams 51.70
h=g*100/a Binder Content by weight of total mixture, % 5.08%
AGGREGATE SIEVE ANALYSIS
Mass 966.5 g
Sieve Size Mass of Retained Cumulative Passing Lower Intermediate Upper
Retained
Percentage Retained Percentage
(mm) Limit Value Limit
(%) (%) (%)
(g)
13.2 0 0 0.0 100.0 100 100 100
9.5 83.7 8.7 8.7 91.3 82 91 100
4.75 233.3 24.1 32.8 67.2 54 64.5 75
2.36 185.1 19.2 52.0 48.0 35 42.5 50
1.18 159.8 16.5 68.5 31.5 27 34.5 42
0.6 87.9 9.1 77.6 22.4 18 25 32
0.3 41.2 4.3 81.8 18.2 11 17 23
0.15 46.6 4.8 86.7 13.3 7 11.5 16
0.075 75.7 7.8 94.5 5.5 4 7 10
<0.075 53.2 5.5 100.0

THE SIEVE ANALYSIS GRAPH

Sieve Size, mm
0.01 0.1 1 10 100
100
PERCENTAGE PASSING, %

90

80

70

60

50

40

30

20

10

Legend : Upper Limit


% Passing
Lower Limit

Prepared by : Noted :
JUN REY M. MORALES MA. CECILIA MORALES
Materials Engineer For the Main Contractor
SCIROCCO ENTERPRISES LIMITED
T/A Oriental Quarries
P.O. Box 31532 Lusaka 10101 ZAMBIA
Project: LWSSD - Improvement of Bombay Drainage System CP7 (North) and CP8 (South)
Main Contractor: CMC di Ravenna Engineer: UWP Consulting
Grading After Extraction : 0 - 13.2mm Aggregates Date : 12-Feb-16

SIEVE ANALYSIS
Percent Passing on Sieve Size (mm)
Binder Content
0.075 0.15 0.3 0.6 1.18 2.36 4.75 9.5 13.2 19.0
7.2 11.9 16.7 20.4 28.9 39.8 61.7 90.2 100 100 4.0%
6.9 13.4 16.9 21.2 30.1 39.7 64.1 92.3 100 100 4.5%
7.9 13.4 14.6 21.1 29.5 41.3 63.5 90.2 100 100 5.0%
5.6 9.9 14 19.7 28.6 43.7 61.3 89.8 100 100 5.5%
6.9 12.2 15.6 20.6 29.3 41.1 62.7 90.6 100.0 100.0 Average
10.0 16 23 32 42 50 75 100 100 100 Upper limit
4.0 7 11 18 27 35 54 82 100 100 Lower limit
THE SIEVE ANALYSIS GRAPH

Sieve Size, mm
0.010 0.100 1.000 10.000 100.000
100.0

90.0
PERCENTAGE PASSING, %

80.0

70.0

60.0

50.0

40.0

30.0

20.0

10.0

0.0

Legend : Upper Limit


Average Value
Lower Limit

Tested by : Reviewed by : Noted :

DANIEL MULENGA JUN REY M. MORALES MA. CECILIA MORALES


Laboratory Supervisor Materials Engineer For the Main Contractor
SCIROCCO ENTERPRISES LIMITED
T/A Oriental Quarries
P.O. Box 31532 Lusaka 10101 ZAMBIA

DETERMINATION OF BINDER CONTENT AND AGGREGATE GRADING BY EXTRACTION


Test Method : BS 882 : 1992
Project: LWSSD - Improvement of Bombay Drainage System CP7 (North) and CP8 (South)
Main Contractor: CMC di Ravenna Engineer: UWP Consuting

Materials : 0 - 5 mm Quarry Dust Wt. of dry aggregates : 2166 g


Date Sampled: 10 February, 2016 th
Weight after washing : 1924 g
Date Tested: 10 February, 2016 th
Loss in filler 242 g

SIEVE ANALYSIS
Retained Percentage Retained
Sieve Size Mass of Retained Cumulative Passing
Percentage Lower Intermediate UPPER
(mm) (g) (%) (%) (%) Limit Value Limit
4.75 2.2 0.1 0.1 99.9
2.36 619.5 28.6 28.7 71.3
1.18 537.2 24.8 53.5 46.5
0.6 314.1 14.5 68.0 32.0
0.3 177.6 8.2 76.2 23.8
0.15 112.6 5.2 81.4 18.6
0.075 99.6 4.6 86.0 14.0
<0.075 303.2 14.0 100

THE SIEVE ANALYSIS GRAPH

Sieve Size, mm
0.01 0.1 1 10
100
PERCENTAGE PASSING, %

90

80

70

60

50

40

30

20

10

Legend : % Passing

Tested by : Reviewed by : Noted :

DANIEL MULENGA JUN REY M. MORALES MA. CECILIA MORALES


Laboratory Supervisor Materials Engineer For the Main Contractor
SCIROCCO ENTERPRISES LIMITED
T/A Oriental Quarries
P.O. Box 31532 Lusaka 10101 ZAMBIA

DETERMINATION OF BINDER CONTENT AND AGGREGATE GRADING BY EXTRACTION


Test Method : ASTM D2172-88 Method B
Project: LWSSD - Improvement of Bombay Drainage System CP7 (North) and CP8 (South)
Main Contractor: CMC di Ravenna Engineer: UWP Consuting

Materials : 5 - 9 mm Stones Wt. of dry aggregates : 2435 g


Date Sampled: 10 February, 2016 th
Weight after washing : 2406 g
Date Tested: 10 February, 2016 th
Loss in filler 29 g

SIEVE ANALYSIS
Retained Percentage Retained
Sieve Size Mass of Retained Cumulative Passing
Percentage Lower Intermediate UPPER
(mm) (g) (%) (%) (%) Limit Value Limit
13.2
9.5 0.0 0 0 100
4.75 1670.0 68.6 68.6 31.4
2.36 725.0 29.8 98.4 1.6
1.18 0.0 0.0 98.4 1.6
0.6 0.0 0.0 98.4 1.6
0.3 0.0 0.0 98.4 1.6
0.15 0.0 0.0 98.4 1.6
0.075 22.0 0.9 99.3 0.7
<0.075 18.0 0.7 100

THE SIEVE ANALYSIS GRAPH

Sieve Size, mm
0.01 0.1 1 10 100
100
PERCENTAGE PASSING, %

90

80

70

60

50

40

30

20

10

Legend : % Passing

Tested by : Reviewed by : Noted :


DANIEL MULENGA JUN REY M. MORALES MA. CECILIA MORALES
Laboratory Supervisor Materials Engineer For the Main Contractor

SCIROCCO ENTERPRISES LIMITED


T/A Oriental Quarries
P.O. Box 31532 Lusaka 10101 ZAMBIA

DETERMINATION OF BINDER CONTENT AND AGGREGATE GRADING BY EXTRACTION


Test Method : ASTM D2172-88 Method B
Project: LWSSD - Improvement of Bombay Drainage System CP7 (North) and CP8 (South)
Main Contractor: CMC di Ravenna Engineer: UWP Consuting

Materials : 9 - 13.2 mm Stones Wt. of dry aggregates : 2435 g


Date Sampled: 10 February, 2016 th
Weight after washing : 2385 g
Date Tested: 10 February, 2016 th
Loss in filler 50 g

SIEVE ANALYSIS
Retained Percentage Retained
Sieve Size Mass of Retained Cumulative Passing
Percentage Lower Intermediate UPPER
(mm) (g) (%) (%) (%) Limit Value Limit
13.2 0 0.0 0.0 99.9
9.5 745 30.6 30.6 69.3
4.75 1625.0 66.7 97.3 2.6
2.36 8.0 0.3 97.6 2.3
1.18 10.0 0.4 98.0 1.9
0.6 0.0 0.0 98.0 1.9
0.3 0.0 0.0 98.0 1.9
0.15 0.0 0.0 98.0 1.9
0.075 35.0 1.4 99.4 0.5
<0.075 12.0 0.5 99.9

THE SIEVE ANALYSIS GRAPH

Sieve Size, mm
0.01 0.1 1 10
100
PERCENTAGE PASSING, %

90

80

70

60

50

40

30

20

10

Legend : % Passing

Tested by : Reviewed by : Noted :


DANIEL MULENGA JUN REY M. MORALES MA. CECILIA MORALES
Laboratory Supervisor Materials Engineer For the Main Contractor
SCIROCCO ENTERPRISES LIMITED
T/A Oriental Quarries
P.O. Box 31532 Lusaka 10101 ZAMBIA
Project: LWSSD - Improvement of Bombay Drainage System CP7 (North) and CP8 (South)
Main Contractor: CMC di Ravenna Engineer: UWP Consulting

ASPHALT MIX DESIGN


OPEN CONTINOUSLY GRADED ASPHALT CONCRETE MIXTURE GRADATION BUILD UP TEST
Location : Reinstatement road layers Test Date : Wednesday, February 17, 2016
Mix Type : 0- 13.2mm Continiously Graded Asphalt Test No. : 001
SIEVE ANALYSIS TEST
APERTUTRE SIZE (mm)
MATERIAL
Sieves 40mm 37.5mm 26.5mm 19.0mm 13.2mm 9.5mm 4.75mm 2.36mm 1.18mm 0.6mm 0.3mm 0.15mm 0.075mm
APELLATION
PASS PERCENT (%)
0 - 5mm : ORIENTAL 100 100 100 100 100 100 99.9 71.3 46.5 32.0 23.8 18.6 14.0
5 - 9mm : ORIENTAL 100 100 100 100 100 100 31.4 1.6 1.6 1.6 1.6 1.6 0.7
9 - 13.2mm : ORIENTAL 100 100 100 100 99.9 69.3 2.6 2.3 1.9 1.9 1.9 1.9 0.5

MIXTURE GRADATION TEST


MINERAL Percentage APERTUTRE SIZE (mm)
AGGREGATES % 40.0mm 37.5mm 26.5mm 19.0mm 13.2mm 9.5mm 4.75mm 2.36mm 1.18mm 0.6mm 0.3mm 0.15mm 0.075mm
0 - 5mm ORIENTAL 57 57.0 57.0 57.0 57.0 57.0 57.0 56.9 40.6 26.5 18.9 13.6 10.6 8.0
5 - 9 mm ORIENTAL 32 32.0 32.0 33.0 34.0 32.0 32.0 10.0 0.5 0.5 0.5 0.5 0.5 0.2
9 - 13.2mm ORIENTAL 11 11.0 11.0 11.0 10.0 11.0 7.6 0.3 0.3 0.2 0.2 0.2 0.2 0.1
Mixture Total 100.0 100.0 100.0 100.0 100.0 96.6 67.3 41.4 27.2 19.6 14.3 11.3 8.3

UPPER LIMIT 100.0 100.0 100.0 100.0 100.0 100.0 75.0 50.0 42.0 32.0 23.0 16.0 10.0
LOWER LIMIT 100.0 100.0 100.0 100.0 100.0 82.0 54.0 35.0 27.0 18.0 11.0 7.0 4.0
MIXTURE VALUE 100.0 100.0 100.0 100.0 100.0 96.6 67.3 41.4 27.2 19.6 14.3 11.3 8.3

Tested by : Reviewed by : Noted :

DANIEL MULENGA JUN REY M. MORALES MA. CECILIA MORALES


Laboratory Supervisor Materials Engineer For the Main Contractor

SCIROCCO ENTERPRISES LIMITED


T/A Oriental Quarries
P.O. Box 31532 Lusaka 10101 ZAMBIA
Project: LWSSD - Improvement of Bombay Drainage System CP7 (North) and CP8 (South)
Main Contractor: CMC di Ravenna Engineer: UWP Consulting

ASPHALT MIXTURE GRADATION TEST


Sieve Size (mm) 40 37.5 26.5 19 13.2 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075
UPPER LIMIT 100.0 100.0 100.0 100.0 100.0 100.0 75.0 50.0 42.0 32.0 23.0 16.0 10.0
LOWER LIMIT 100.0 100.0 100.0 100.0 100.0 82.0 54.0 35.0 27.0 18.0 11.0 7.0 4.0
MIXTURE VALUE 100.0 100.0 100.0 100.0 100.0 96.6 67.3 41.4 27.2 19.6 14.3 11.3 8.3

THE SIEVE ANALYSIS GRAPH

Sieve Size, mm
0.01 0.1 1 10 100
100.0
PERCENTAGE PASSING, %

90.0

80.0

70.0

60.0

50.0

40.0

30.0

20.0

10.0

0.0

Legend : Upper Limit


Mixture Value
Lower Limit

Tested by : Reviewed by : Noted :


DANIEL MULENGA JUN REY M. MORALES MA. CECILIA MORALES
Laboratory Supervisor Materials Engineer For the Main Contractor
SCIROCCO ENTERPRISES LIMITED
T/A Oriental Quarries
P.O. Box 31532 Lusaka 10101 ZAMBIA

Project: LWSSD - Improvement of Bombay Drainage System CP7 (North) and CP8 (South)
Main Contractor: CMC di Ravenna Engineer: UWP Consulting Date: 15-Feb-16

ASPHALT MIX DESIGN CHART

STA BILITY
BITUMEN 2.540 BITUMEN
BRD STABILITY
BRD
Content Content 11.9
(g/Cm³) 2.530 (KN)
(%) (%) 11.7
2.520 11.5
4.0 2.510 2.510 4.0 11.6 11.3
11.1
4.5 2.522 2.500 4.5 11.5
10.9
2.490 10.7
5.0 2.528 5.0 10.9
3.5 4.0 4.5 5.0 5.5 6.0 10.5
BITUMEN(%) BITUMEN (%)
3.0 3.5 4.0 4.5 5.0 5.5 6.0
5.5 2.537 5.5 11.5

F L O W (m m )
A IR V O ID S

BITUMEN BITUMEN
Air Voids FLOW
Content Content
(%) (mm)
(%) 7.0 (%) 4.0
6.0 3.9
5.0 3.8
4.0 6.0 4.0 3.4 3.7
4.0
3.0 3.6
4.5 4.5 2.0 4.5 3.4 3.5
1.0 3.4
5.0 4.0 0.0 5.0 3.6 3.3
3.0 3.5 4.0 4.5 5.0 5.5 6.0 3.2
BITUMEN (%) 3.5 BITUMEN
4.0 4.5 5.0(%)5.5 6.0
5.5 3.4 5.5 3.7

Tested by : Reviewed by : Noted :


DANIEL MULENGA JUN REY M. MORALES MA. CECILIA MORALES
Laboratory Supervisor Materials Engineer For the Main Contractor

SCIROCCO ENTERPRISES LIMITED


T/A Oriental Quarries
P.O. Box 31532 Lusaka 10101 ZAMBIA

Project: LWSSD - Improvement of Bombay Drainage System CP7 (North) and CP8 (South)
Main Contractor: CMC di Ravenna Engineer: UWP Consulting Date: 15-Feb-16

ASPHALT MIX DESIGN CHART


80.0
BITUMEN 15.0 BITUMEN
VMA
VMA VFB

VFB
Content Content 75.0
(%) 14.8 (%)
(%) (%) 70.0
14.6
65.0
4.0 14.4 14.4 4.0 58.6
60.0
4.5 14.4 14.2 4.5 68.9 55.0
14.0 50.0
5.0 14.7 3.5 4.0 4.5 5.0 5.5 6.0 5.0 72.9
BITUMEN (%) 3.5 4.0 4.5 5.0 5.5 6.0
BITUMEN (%)
5.5 15.0 5.5 77.1

MSG 6.5
BITUMEN MSG 6.0
Content (%) (g/Cm³)
5.5
5.0
4.0 6.0 4.5
4.0
4.5 4.5 3.5
3.0
5.0 4.0 3.5 4.0 4.5 5.0 5.5 6.0
BITUMEN (%)
5.5 3.4
Tested by : Reviewed by : Noted :

DANIEL MULENGA JUN REY M. MORALES MA. CECILIA MORALES


Laboratory Supervisor Materials Engineer For the Main Contractor
SCIROCCO ENTERPRISES LIMITED
T/A Oriental Quarries
P.O. Box 31532 Lusaka 10101 ZAMBIA
Project: LWSSD - Improvement of Bombay Drainage System CP7 (North) and CP8 (South)
Main Contractor: CMC di Ravenna Engineer: UWP Consuting

THE MAXIMUM THEORETICAL RELATIVE DENSITY OF ASPHALT MIXES


Test Method : AASHTO T209-64
TRIAL MIX DESIGN ASPHALT PREMIX 0-13.2mm
Date : 15-Feb-16 BITUMEN @ 4.0 %
PYK + WATER (g) @ 25°C (D ) 3824.0 g
PYK + MATERIAL (g) X1 2798.2 g
EMPTY PYK (g) X2 1567.2 g
MATERIAL DRY @ 25°c X1 - X2 = (A) 1231.0 g
PKY + MATERIAL + WATER @ 25° (E ) 4593.7 g
M.S.G. g /m³ A/((A+D)-E) 2.669 g / cm³

TRIAL MIX DESIGN ASPHALT PREMIX 0-13.2mm


Date : 15-Feb-16 BITUMEN @ 4.5 %
PYK + WATER (g) @ 25°C (D ) 3824.0 g
PYK + MATERIAL (g) X1 3011.3 g
EMPTY PYK (g) X2 1567.2 g
MATERIAL DRY @ 25°c X1 - X2 = (A) 1444.1 g
PKY + MATERIAL + WATER @ 25° (E ) 4721.0 g
M.S.G. g /m³ A/((A+D)-E) 2.640 g / cm³

TRIAL MIX DESIGN ASPHALT PREMIX 0-13.2mm


Date : 15-Feb-16 BITUMEN @ 5.0 %
PYK + WATER (g) @ 25°C (D ) 3824.0 g
PYK + MATERIAL (g) X1 2907.3 g
EMPTY PYK (g) X2 1567.2 g
MATERIAL DRY @ 25°c X1 - X2 = (A) 1340.1 g
PKY + MATERIAL + WATER @ 25° (E ) 4655.1 g
M.S.G. g /m³ A/((A+D)-E) 2.633 g / cm³

TRIAL MIX DESIGN ASPHALT PREMIX 0-13.2mm


Date : 15-Feb-16 BITUMEN @ 5.5 %
PYK + WATER (g) @ 25°C (D ) 3824.0 g
PYK + MATERIAL (g) X1 2862.1 g
EMPTY PYK (g) X2 1567.2 g
MATERIAL DRY @ 25°c X1 - X2 = (A) 1294.9 g
PKY + MATERIAL + WATER @ 25° (E ) 4626.0 g
M.S.G. g /m³ A/((A+D)-E) 2.627 g / cm³

Tested by : Reviewed by : Noted :


DANIEL MULENGA JUN REY M. MORALES MA. CECILIA MORALES
Laboratory Supervisor Materials Engineer For the Main Contractor
SCIROCCO ENTERPRISES LIMITED
T/A Oriental Quarries
P.O. Box 31532 Lusaka 10101 ZAMBIA
Project: LWSSD - Improvement of Bombay Drainage System CP7 (North) and CP8 (South)
Main Contractor: CMC di Ravenna Engineer: UWP Consuting

THE DETERMINATION OF THE AGGREGATE SPECIFIC GRAVITY


Test Method : AASHTO T 209-90

TRIAL MIX DESIGN Material : 0 - 5mm Quarry Dust


Date : 12-Feb-16 Source : Oriental Quarries
PYK + WATER (g) @ 25°C (D ) 3829.7 g
PYK + MATERIAL (g) X1 2645.3 g
EMPTY PYK (g) X2 1568.0 g
MATERIAL DRY @ 25°c X1 - X2 = (A) 1077.3 g
PKY + MATERIAL + WATER @ 25° (E ) 4524.4 g
M.S.G. g /m³ A/((A+D)-E) 2.816 g / cm³

TRIAL MIX DESIGN Material : 5 - 9mm Stones


Date : 12-Feb-16 Source : Oriental Quarries
PYK + WATER (g) @ 25°C (D ) 3829.7 g
PYK + MATERIAL (g) X1 3093.5 g
EMPTY PYK (g) X2 1568.0 g
MATERIAL DRY @ 25°c X1 - X2 = (A) 1525.5 g
PKY + MATERIAL + WATER @ 25° (E ) 4809.7 g
M.S.G. g /m³ A/((A+D)-E) 2.797 g / cm³

TRIAL MIX DESIGN Material : 9 - 13.2mm Stones


Date : 12-Feb-16 Source : Oriental Quarries
PYK + WATER (g) @ 25°C (D ) 3829.7 g
PYK + MATERIAL (g) X1 2915.3 g
EMPTY PYK (g) X2 1568.0 g
MATERIAL DRY @ 25°c X1 - X2 = (A) 1347.3 g
PKY + MATERIAL + WATER @ 25° (E ) 4701.6 g
M.S.G. g /m³ A/((A+D)-E) 2.834 g / cm³

Tested by : Reviewed by : Noted :


DANIEL MULENGA JUN REY M. MORALES MA. CECILIA MORALES
Laboratory Supervisor Materials Engineer For the Main Contractor
SCIROCCO ENTERPRISES LIMITED
T/A Oriental Quarries
P.O. Box 31532 Lusaka 10101 ZAMBIA
Project: LWSSD - Improvement of Bombay Drainage System CP7 (North) and CP8 (South)
Main Contractor: CMC di Ravenna Engineer: UWP Consulting
MARSHALL TEST
Test Method : ASTM D1559-89
Location : ORIENTAL QUARRIES ASPHALT PLANT Lab. Test No. 001 Date Sampled : 15-Feb-2016
BITUMEN HEIGHT IN IN Suface Dry Bulk Relative MAXIMUM Air STABILITY FLOW Voids in Voids Filled Stability/ Aggregate
SPEC. Average
CONTENT (mm) AIR WATER Briguettte Density Theoretical VOIDS (KN) (mm) Min .AGG. With Flow Specific
(mm)
NO. (%) 1 2 3 (g) (g) (g) (g/Cm³ ) Density (%) (%) Bitumen (% ) Gravity
1 4.0 62.5 62.5 62.5 62.5 1239.8 749.7 1241.9 2.511 2.669 5.96 11.17 3.45 14.41 58.64 3.46 2.816
2 4.0 62.5 62.5 62.5 62.5 1231.9 743.5 1234.7 2.508 2.669 5.96 12.89 3.01 14.41 58.64 3.46 2.816
3 4.0 62.5 62.5 62.5 62.5 1240.1 748.7 1242.3 2.512 2.669 5.96 10.71 3.58 14.41 58.64 3.46 2.816
4 4.0 62.5 62.5 62.5 62.5
Average 62.5 62.5 62.5 62.5 2.510 2.669 5.96 11.59 3.35 14.41 58.64 3.46 2.816

1 4.5 62.5 62.5 62.5 62.5 1230.9 745.9 1233.7 2.523 2.640 4.47 11.04 2.97 14.36 68.87 3.39 2.816
2 4.5 62.5 62.5 62.5 62.5 1235.2 749.3 1238.4 2.525 2.640 4.47 12.32 3.69 14.36 68.87 3.39 2.816
3 4.5 62.5 62.5 62.5 62.5 1229.1 745.1 1233.0 2.519 2.640 4.47 11.01 3.47 14.36 68.87 3.39 2.816
4 4.5 62.5 62.5 62.5 62.5
Average 62.5 62.5 62.5 62.5 2.522 2.640 4.47 11.46 3.38 14.36 68.87 3.39 2.816

1 5.0 62.5 62.5 62.5 62.5 1241.0 752.7 1243.6 2.528 2.633 3.99 10.99 3.51 14.71 72.88 3.03 2.816
2 5.0 62.5 62.5 62.5 62.5 1237.6 750.0 1239.9 2.526 2.633 3.99 11.7 3.49 14.71 72.88 3.03 2.816
3 5.0 62.5 62.5 62.5 62.5 1240.7 752.5 1243.1 2.529 2.633 3.99 9.88 3.77 14.71 72.88 3.03 2.816
4 5.0 62.5 62.5 62.5 62.5
Average 62.5 62.5 62.5 62.5 2.528 2.633 3.99 10.86 3.59 14.71 72.88 3.03 2.816

1 5.5 62.5 62.5 62.5 62.5 1229.8 747.7 1232.9 2.535 2.627 3.43 12.11 3.55 14.95 77.06 3.15 2.816
2 5.5 62.5 62.5 62.5 62.5 1240.7 755.8 1244.6 2.538 2.627 3.43 10.99 3.68 14.95 77.06 3.15 2.816
3 5.5 62.5 62.5 62.5 62.5 1230.1 751.3 1235.7 2.539 2.627 3.43 11.43 3.71 14.95 77.06 3.15 2.816
4 5.5 62.5 62.5 62.5 62.5
Average 62.5 62.5 62.5 62.5 2.537 2.627 3.43 11.51 3.65 14.95 77.06 3.15 2.816

Tested by : Reviewed by : Noted :

DANIEL MULENGA JUN REY M. MORALES MA. CECILIA MORALES


Laboratory Supervisor Materials Engineer For the Main Contractor