Automated Assembly Systems
Automated Assembly Systems
Chapter Contents
17.1 Fundamentals of Automated Assembly Systems
17.1.1 System Configurations
17.1.2 Parts Delivery at Workstations
17.1.3 Applications
17.2 Analysis of Automated Assembly Systems
17.2.1 Parts Delivery System at Workstations
17.2.2 Multistation Assembly Machines
17.2.3 Single-Station Assembly Machines
17.2.4 Partial Automation
17.2.5 What the Equations Tell Us
The term automated assembly refers to mechanized and automated devices that perform
various assembly tasks in an assembly line or cell. Much progress has been made in the
technology of assembly automation in recent years. Some of this progress has been mo-
tivated by advances in the field of robotics. Industrial robots are sometimes used as com-
ponents in automated assembly systems (Chapter 8). In this chapter, automated assembly
is discussed as a distinct field of automation. Although the manual assembly methods
described in Chapter 15 will be used for many years into the future, there are significant
opportunities for productivity gains in the use of automated methods.
Like the transfer lines discussed in the preceding chapter, automated assembly sys-
tems are usually included in the category of fixed automation. Most automated assembly
systems are designed to perform a fixed sequence of assembly steps on a specific product.
472
Sec. 17.1 / Fundamentals of Automated Assembly Systems 473
17.1.1 System Configurations
Automated assembly systems can be classified according to physical configuration. The prin-
cipal configurations, illustrated in Figure 17.1, are (a) in-line assembly machine, (b) dial-type
assembly machine, (c) carousel assembly system, and (d) single-station assembly machine.
The in-line assembly machine, Figure 17.1(a), is a series of automatic workstations
located along an in-line transfer system. It is the assembly version of the machining transfer
line. Synchronous and asynchronous transfer systems are the common means of transport-
ing base parts from station to station with the in-line configuration.
474 Chap. 17 / Automated Assembly Systems
Asby
y Aut
sb
A ut
A ut
sb
A
Asby Asby Asby Asby Asby Asby
y
Starting Completed Starting A
base parts Aut Aut Aut Aut Aut Aut assemblies base parts
Asby
Aut
Sta Sta Sta Sta Sta Sta
1 2 3 n–2 n–1 n y
sb
(a) A ut
Asby A
Aut
Completed
assemblies
(b)
y
sb Asby
Asby Asby Asby Asby Asby A ut Starting Completed
Aut Aut Aut Aut Aut A base parts Aut assemblies
Completed
assemblies (d)
(c)
Figure 17.1 Types of automated assembly systems: (a) in-line, (b) dial-type, (c) carousel,
and (d) single station.
In the typical application of the dial-type machine, Figure 17.1(b), base parts are loaded
onto fixtures or nests attached to the circular dial. Components are added and/or joined to
the base part at the various workstations located around the periphery of the dial. The dial-
indexing machine operates with a synchronous or intermittent motion, in which the cycle
consists of the service time plus indexing time. Dial-type assembly machines are sometimes
designed to use a continuous rather than intermittent motion. This is common in beverage
bottling and canning plants, but not in mechanical and electronics assembly.
The operation of dial-type and in-line assembly systems is similar to the operation
of their counterparts for processing operations described in Section 16.1.1, except that
assembly operations are performed. For synchronous transfer of work between stations,
the ideal cycle time equals the operation time at the slowest station plus the transfer time
between stations. The production rate, at 100% uptime, is the reciprocal of the ideal cycle
time. Owing to part jams at the workstations and other malfunctions, the system will al-
ways operate at less than 100% uptime.
As seen in Figure 17.1(c), the carousel assembly system represents a hybrid between
the circular work flow of the dial-type assembly machine and the straight work flow of the
in-line system. The carousel configuration can be operated with continuous, synchronous,
or asynchronous transfer mechanisms to move the work around the carousel. Carousels
with asynchronous transfer of work are often used in partially automated assembly sys-
tems (Section 17.2.4).
Sec. 17.1 / Fundamentals of Automated Assembly Systems 475
In the single-station assembly machine, Figure 17.1(d), assembly operations are per-
formed on a base part at a single location. The typical operating cycle involves the place-
ment of the base part at a stationary position in the workstation, the addition of components
to the base, and finally the removal of the completed assembly from the station. An impor-
tant application of single-station assembly is the component placement machine, widely
used in the electronics industry to populate components onto printed circuit boards. For
mechanical assemblies, the single-station cell is sometimes selected as the configuration for
robotic assembly applications. Parts are fed into the single station, and the robot adds them
to the base part and performs the fastening operations. Compared with the other three
system types, the cycle time is longer in a single-station assembly system because all of the
assembly tasks are performed sequentially instead of simultaneously. Hence, production
rates are inherently slower. Single-station assembly systems are analyzed in Section 17.2.3.
1.
Hopper. This is the container into which the components are loaded at the worksta-
tion. A separate hopper is used for each component type. The components are usu-
ally loaded into the hopper in bulk. This means that the parts are randomly oriented
in the hopper.
2.
Parts feeder. This is a mechanism that removes the components from the hopper
one at a time for delivery to the assembly work head. The hopper and parts feeder
are often combined into one operating mechanism. A vibratory bowl feeder, pic-
tured in Figure 17.2, is a very common example of the hopper-feeder combination.
Feed track
Outlet
Bowl
Base
Support feet
Figure 17.3 (a) Selector and (b) orientor devices used with
parts feeders in automated assembly systems.
3.
Selector and/or orientor. These elements of the delivery system establish the proper
orientation of the components for the assembly work head. A selector is a device
that acts as a filter, permitting only parts in the correct orientation to pass through.
Incorrectly oriented parts are rejected back into the hopper. An orientor is a device
that allows properly oriented parts to pass through, and reorients parts that are not
properly oriented initially. Several selector and orientor schemes are illustrated in
Figure 17.3. Selector and orientor devices are often combined and incorporated into
one hopper-feeder system.
4.
Feed track. The preceding elements of the delivery system are usually separated
from the assembly work head by a certain distance. A feed track moves the com-
ponents from the hopper and parts feeder to the location of the assembly work
head, maintaining proper orientation of the parts during the transfer. There are
two general categories of feed tracks: gravity and powered. Gravity feed tracks
are most common. In this type, the hopper and parts feeder are located at an
elevation above that of the work head. Gravity is used to deliver the components
to the work head. The powered feed track uses vibratory action, air pressure, or
other means to force the parts to travel along the feed track toward the assembly
work head.
5.
Escapement and placement device. The escapement removes components from the
feed track at time intervals that are consistent with the cycle time of the assembly
work head. The placement device physically places the component in the correct
location at the workstation for the assembly operation. These elements are some-
times combined into a single operating mechanism. In other cases, they are two
separate devices. Several types of escapement and placement devices are pictured
in Figure 17.4.
Sec. 17.1 / Fundamentals of Automated Assembly Systems 477
Rotary indexing
table Stack of parts
Feed track
Feed track
Empty nest
Flow of
parts
Empty nest Rotary indexing
table
(a) (b)
Pick-and-place
device
Parts Feed
track
Work carriers
From
feeder
(c)
(d)
Work
carriers
From feeder
Work carriers
Pick-and-place
device
(e)
Figure 17.4 Various escapement and placement devices used in automated assembly
systems: (a) and (b) horizontal and vertical devices for placement of parts onto dial-
indexing table; (c) escapement of rivet-shaped parts actuated by work carriers; (d) and
(e) two types of pick-and-place mechanisms that use suction cups to pick up parts.
The hardware elements of the parts delivery system are illustrated schematically
in Figure 17.5. A parts selector is illustrated in the diagram. Improperly oriented parts
are returned to the hopper. In the case of a parts orientor, improperly oriented parts are
reoriented and proceed to the feed track. A more detailed description of the various ele-
ments of the delivery system is provided in Boothroyd, Poli, and Murch [3].
478 Chap. 17 / Automated Assembly Systems
Parts improperly
oriented fed
back into hopper
Selector
Hopper
Work carrier
Escapement
and
placement
17.1.3 Applications
Automated assembly systems are used to produce a wide variety of products and subas-
semblies. Table 17.1 presents a list of typical products made by automated assembly.
Table 17.2 provides a representative list of assembly processes that are performed
on automated assembly machines. It should be noted that certain assembly processes are
more suitable for automation than others. For example, threaded fasteners (screws, bolts,
and nuts), although common in manual assembly, are a challenging assembly method to
automate. This issue is discussed in Chapter 24, which also provides some guidelines for
designing products for automated assembly.
This section provides mathematical models to analyze the following topics in auto-
mated assembly: (1) the parts delivery system at workstations, (2) multistation auto-
mated assembly systems, (3) single-station automated assembly systems, and (4) partial
automation.
In the parts delivery system, Figure 17.5, the parts feeding mechanism is capable of
removing components from the hopper at a certain rate f. These components are
assumed to be randomly oriented initially, and must be presented to the selector or
orientor to establish the correct orientation. In the case of a selector, a certain propor-
tion of the components will be correctly oriented initially and these will be allowed to
pass through. The remaining components that are incorrectly oriented will be rejected
back to the hopper. In the case of an orientor, incorrectly oriented components will be
reoriented, resulting ideally in a 100% rate of components passing through the device.
In many delivery system designs, the functions of the selector and the orientor are com-
bined. Let u be the proportion of components that pass through the selector-orientor
process and are correctly oriented for delivery into the feed track. Hence the effective
rate of delivery of components from the hopper into the feed track is fu. The remaining
proportion, 11 - u2, is recirculated back into the hopper. Obviously, the delivery rate
fu of components to the work head must be sufficient to keep up with the cycle rate of
the assembly machine.
Assuming the delivery rate of components fu is greater than the cycle rate Rc of the
assembly machine, the system needs to have a means of limiting the size of the queue in
the feed track. The usual solution is to place a sensor (e.g., limit switch or optical sensor)
near the top of the feed track to turn off the feeding mechanism when the feed track is full.
This sensor is referred to as the high-level sensor, and its location defines the active length
Lf 2 of the feed track. If the length of a component in the feed track is Lc, then the number
of parts that can be held in the feed track is nf 2 = Lf 2/Lc. The length must be measured
from a point on a given component to the corresponding point on the next component in
the queue to allow for possible overlap of parts. The value of nf 2 is the capacity of the feed
track.
Another sensor placed along the feed track at some distance from the first sen-
sor is used to restart the feeding mechanism. If the location of this low-level sensor
is defined as Lf1, then the number of components in the feed track at this point is
nf 1 = Lf 1/Lc.
The rate at which parts in the feed track are reduced when the high-level sensor
is actuated (which turns off the feeder) = Rc, which is the cycle rate of the automated
assembly work head. On average, the rate at which the quantity of parts will increase
upon actuation of the low-level sensor (which turns on the feeder) is fu - Rc. This rate of
increase will not be uniform due to the random nature of the feeder-selector operation.
Accordingly, the value of nf1 must be large enough to virtually eliminate the possibility of
a stock out after the low-level sensor has turned on the feeder. The following example il-
lustrates how these rates of decrease and increase can be used to determine the depletion
and replenishment times in the feed track.
480 Chap. 17 / Automated Assembly Systems
In this section, the operation and performance of automated assembly machines that
have several workstations are analyzed. These include dial-indexing machines, many in-
line assembly systems, and certain carousel systems. Assumptions underlying the analysis
are similar to those in the analysis of transfer lines: (1) assembly operations at the stations
have constant element times, although the times are not necessarily equal at all stations;
(2) synchronous parts transfer is used; and (3) there is no internal storage.
The analysis of an automated assembly machine with multiple stations shares much
in common with the approach used for transfer lines in Section 16.3. Some modifications
in the analysis must be made to account for the fact that components are being added at
workstations in the assembly system, whereas no components are added in transfer lines.
The operations of multistation assembly systems are depicted in Figures 17.1(a), (b), and
(c). The equations that describe these operations are based on the approach developed
by Boothroyd and Redford [2].
The typical operation at a workstation consists of a component being added and/or
joined in some fashion to an existing assembly. The existing assembly consists of a base
part plus the components assembled to it at previous stations. The base part is launched
onto the line either at or before the first workstation. The components added at each sta-
tion must be clean, uniform in size and shape, of high quality, and consistently oriented.
When the feed mechanism and assembly work head attempt to join a component that
does not satisfy this specification, the station can jam. When a jam occurs, it results in the
shutdown of the entire system until the fault is corrected. Thus, in addition to the other
mechanical and electrical failures that interrupt the operation of an automated produc-
tion line, the problem of defective components is one that specifically plagues the opera-
tion of an automatic assembly system.
Sec. 17.2 / Analysis of Automated Assembly Systems 481
1. The component is defective and causes a station jam. The probability of this event is
the fraction defect rate of the parts at the station 1qi 2 multiplied by the probability
that a defect will cause the station to jam 1mi 2. This product is the same term pi as in
the previous analysis of transfer machines in Section 16.3. For an assembly machine,
pi = miqi. When the station jams, the component must be cleared and the next com-
ponent allowed to feed and be assembled. It is assumed that the probability of two
consecutive defects is very small, equal to q2i .
2. The component is defective but does not cause a station jam. This has a probability
11 - mi 2qi. With this outcome, a bad part is joined to the existing assembly, per-
haps rendering the entire assembly defective.
3.
The component is not defective. This is the most desirable outcome and the most
likely by far (it is hoped). The probability that a part added at the station is not
defective is equal to the proportion of good parts 11 - qi 2.
The probabilities of the three possible events must sum to unity for any workstation;
that is,
miqi + 11 - mi 2qi + 11 - qi 2 = 1 (17.1)
For the special case where mi = m and qi = q for all i, this equation reduces to the
following:
mq + 11 - m2q + 11 - q2 = 1 (17.2)
Although it is unlikely that all mi are equal and all qi are equal, the equation is nev-
ertheless useful for computation and approximation purposes.
To determine the complete distribution of possible outcomes that can occur on an
n-station assembly machine, the terms of Equation (17.1) are multiplied together for all
n stations:
in the expansion becomes very large for a machine with more than two or three stations.
The exact number of terms is equal to 3n, where n = number of stations. For example,
for an eight-station line, the number of terms = 38 = 6561, each term representing the
probability of one of the 6,561 possible outcome sequences on the assembly machine.
where Pap can be thought of as the yield of good assemblies produced by the assembly
machine. If Pap = the proportion of good assemblies, then the proportion of assemblies
containing at least one defective component Pqp is given by
In the case of equal mi and equal qi, these two equations become, respectively,
Pap = 11 - q + mq2 n (17.7)
F = a pi = a miqi (17.9)
n n
i=1 i=1
In the case of a station performing only a joining or fastening operation and not adding a
part at the station, then the contribution to F made by that station is pi, the probability of
a station breakdown, where pi does not depend on mi and qi.
Sec. 17.2 / Analysis of Automated Assembly Systems 483
Tp = Tc + a miqiTd (17.11)
n
i=1
where Tc = ideal cycle time of the assembly machine, which is the longest assembly task
time on the machine plus the indexing or transfer time, min; and Td = average downtime
per occurrence, min. For the case of equal mi and qi,
Tp = Tc + nmqTd (17.12)
The production rate is the reciprocal of average actual production time:
1
Rp = (17.13)
Tp
This is the same relationship as Equation (16.9) for transfer lines. However, the operation
of assembly machines is different from processing machines. In an assembly machine,
unless mi = 1.0 for all stations, the production output will include some assemblies with
one or more defective components. Accordingly, the production rate should be corrected
to give the rate of acceptable product, that is, those that contain no defects. This is simply
the yield Pap multiplied by the production rate
q 11 - qi + miqi 2
n
Pap i=1
Rap = PapRp = = (17.14)
Tp Tp
where Rap = production rate of acceptable product, units/min. When all mi are equal and
all qi are equal, the corresponding equation is
Pap 11 - q + mq2 n
Rap = PapRp = = (17.15)
Tp Tp
Equation (17.13) gives the production rate of all assemblies made on the system, includ-
ing those that contain one or more defective parts. Equations (17.14) and (17.15) give
production rates for good product only. The problem still remains that the defective
products are mixed in with the good units. This issue of inspection and sortation is con-
sidered in Chapter 21.
Line efficiency is calculated as the ratio of ideal cycle time to average actual produc-
tion time. This is the same ratio as defined in Chapter 16, Equation (16.11),
Rp Tc
E = = (17.16)
Rc Tp
where Tp is calculated from Equation (17.11) or Equation (17.12). The proportion down-
time D = 1 - E, as before. No attempt has been made to correct line efficiency E for the
yield of good assemblies. The efficiency of the assembly machine and the quality of units
produced by it are treated here as separate issues.
484 Chap. 17 / Automated Assembly Systems
On the other hand, the cost per assembled product must take account of the output
quality. Therefore, the general cost formula given in Equation (16.14) in the previous
chapter must be corrected for yield, as
Cm + CoTp + Ct
Cpc = (17.17)
Pap
where Cpc = cost per good assembly, $>pc; Cm = cost of materials, which includes the
cost of the base part plus components added to it, $>pc; Co = operating cost of the assem-
bly system, $>min; Tp = average actual production time, min>pc; Ct = cost of disposable
tooling, $>pc; and Pap = yield from Equation (17.5). The effect of the denominator is to
increase the cost per assembly; as the quality of the individual components deteriorates,
the average cost per good quality assembly increases.
In addition to the traditional ways of indicating line performance (production rate,
line efficiency, cost per unit), there is the additional metric of yield. While the yield of
good product is an important issue in any automated production line, it can be explicitly
included in the formulas for assembly machine performance by means of q and m.
The results of Example 17.3 show that as fraction defect rate q increases (meaning
that component quality gets worse) all five measures of performance suffer. Production
rate drops, yield of good product is reduced, proportion uptime decreases, and cost per
unit increases.
The effect of m (probability that a defect will jam the work head and cause the as-
sembly machine to stop) is less obvious. At low values of m 1m = 02 for the same com-
ponent quality level 1q = 0.012, production rate and machine efficiency are high, but
yield of good product is low. Instead of interrupting the assembly machine operation and
causing downtime, all defective components pass through the assembly process to become
part of the final product. At m = 1.0, all defective components are removed before they
become part of the product. Therefore, yield is 100%, but removing the defects takes
time, adversely affecting production rate, efficiency, and cost per unit.
Tc = Th + a Tej (17.18)
ne
j=1
certain fraction defect rate, qj, and there is a certain probability that a defective compo-
nent will jam the workstation, mj. When a jam occurs, the assembly machine stops, and
it takes an average Td to clear the jam and restart the system. The inclusion of downtime
resulting from jams in the machine cycle time gives
Tp = Tc + a qj mj Td (17.19)
ne
j=1
For elements that do not include the addition of a component, the value of qj = 0 and mj
is irrelevant. This might occur, for example, when a fastening operation is performed with
no part added during element j. In this type of operation, a term pjTd would be included in
the above expression to allow for a downtime during that element, where pj = the prob-
ability of a station failure during element j. For the special case of equal q and equal m
values for all components added, Equation (17.19) becomes
Tp = Tc + nmqTd (17.20)
Determining yield (proportion of assemblies that contain no defective components) for
the single-station assembly machine makes use of the same equations as for the multiple
station systems, Equations (17.5) or (17.7). Uptime efficiency is computed as E = Tc >Tp
using the values of Tc and Tp from Equations (17.18) and (17.19) or (17.20).
Time to load the base part is 3 sec and time to unload the completed assembly
is 4 sec, giving a total load/unload time of Th = 7 sec. When a jam occurs, it
takes an average of 1.5 min to clear the jam and restart the machine. Determine
(a) production rate of all product, (b) yield of good product, (c) production
rate of good product, and (d) uptime efficiency of the assembly machine.
Solution: (a) The ideal cycle time of the assembly machine is
Tc = 7 + 14 + 3 + 4 + 7 + 52 = 30 sec = 0.5 min
Frequency of downtime occurrences is
F = 0.0211.02 + 0.0110.62 + 0.01510.82 + 0.0211.02 + 0.012 = 0.07
Sec. 17.2 / Analysis of Automated Assembly Systems 487
As the analysis suggests, increasing the number of elements in the assembly machine
cycle results in a longer cycle time, decreasing the production rate of the machine.
Accordingly, applications of a single-station assembly machine are limited to lower volume,
lower production rate situations. For higher production rates, one of the multistation
assembly systems is generally preferred.
17.2.4 Partial Automation
Many assembly lines in industry contain a combination of automated and manual work-
stations. These cases of partially automated production lines occur for two main reasons:
1.
Automation is introduced gradually on an existing manual line. Suppose demand for
the product made on a manually operated line increases, so the company decides to
increase production and reduce labor costs by automating some or all of the stations.
The simpler operations are automated first, and the transition toward a fully auto-
mated line is accomplished over a long period of time. Until then, the line operates as
a partially automated system. (See Automation Migration Strategy, Section 1.4.3.)
2.
Certain manual operations are too difficult or too costly to automate. Therefore,
when the sequence of workstations is planned for the line, certain stations are
designed to be automated while the others are designed as manual stations.
Examples of operations that might be too difficult to automate are assembly pro-
cedures or processing steps involving alignment, adjustment, or fine-tuning of the work
unit. These operations often require special human skills and/or senses to carry out. Many
inspection procedures also fall into this category. Defects in a product or part that can be
easily perceived by a human inspector are sometimes difficult for an automated inspec-
tion device to detect. Another problem is that the automated inspection device can only
check for the defects for which it was designed, whereas a human inspector is capable of
sensing a variety of unanticipated imperfections and problems.
488 Chap. 17 / Automated Assembly Systems
Tp = Tc + a piTd (17.21)
i ∈ na
where the summation applies to the na automated stations only. For those automated sta-
tions that perform assembly operations in which a part is added,
pi = miqi
If all pi, mi, and qi are equal, respectively, to p, m, and q, then the preceding equations
reduce to
Tp = Tc + na pTd (17.22)
and p = mq for those stations that perform assembly consisting of the addition of a part.
Given that na is the number of automated stations, then nw = the number of sta-
tions operated by workers, and na + nw = n, where n = the total station count. Let
Casi = cost to operate automatic workstation i, $/min; Cwi = cost to operate manual
workstation i, $/min; and Cat = cost to operate the automatic transfer mechanism. Then
the total cost to operate the line is given by
where Co = cost of operating the partially automated production system, $/min. For all
Casi = Cas, and all Cwi = Cw, then
Co = Cat + naCas + nwCw (17.24)
Now the total cost per unit produced on the line can be calculated as
Cm + CoTp + Ct
Cpc = (17.25)
Pap
Sec. 17.2 / Analysis of Automated Assembly Systems 489
where Cpc = cost per good assembly, $/pc; Cm = cost of materials and components being
processed and assembled on the line, $/pc; Co = cost of operating the partially automated
production system by either of Equations (17.23) or (17.24), $/min; Tp = average actual
production time, min/pc; Ct = any cost of disposable tooling, $/pc; and Pap = proportion
of good assemblies by Equations (17.5) or (17.7).
The equations derived in this section reveal several practical guidelines for the design and
operation of automated assembly systems and the products made on such systems.
• The parts delivery system at each station must be designed to deliver components
to the assembly operation at a net rate (parts feeder multiplied by pass-through
proportion of the selector/orientor) that is greater than or equal to the cycle rate of
the assembly work head. Otherwise, assembly system performance is limited by the
parts delivery system rather than the assembly process technology.
490 Chap. 17 / Automated Assembly Systems
References
[1] Andreasen, M. M., S. Kahler, and T. Lund, Design for Assembly, IFS (Publications) Ltd.,
UK, and Springer-Verlag, Berlin, FRG, 1983.
[2] Boothroyd, G., and A. H. Redford, Mechanized Assembly, McGraw-Hill Publishing
Company, Ltd., London, 1968.
[3] Boothroyd, G., C. Poli, and L. E. Murch, Automatic Assembly, Marcel Dekker, Inc., New
York, 1982.
[4] Boothroyd, G., P. Dewhurst, and W. Knight, Product Design for Manufacture and
Assembly, Marcel Dekker, Inc., New York, 1994.
[5] Delchambre, A., Computer-Aided Assembly Planning, Chapman & Hall, London, UK, 1992.
[6] Gay, D. S., “Ways to Place and Transport Parts,” Automation, June 1973.
[7] Groover, M. P., M. Weiss, R. N. Nagel, and N. G. Odrey, Industrial Robotics: Technology,
Programming, and Applications, McGraw-Hill Book Company, New York, 1986, Chapter 15.
[8] Groover, M. P., Fundamentals of Modern Manufacturing: Materials, Processes, and Systems,
5th ed., John Wiley & Sons, Inc., Hoboken, NJ, 2013.
[9] Murch, L. E., and G. Boothroyd, “On-off Control of Parts Feeding,” Automation, August
1970, pp. 32–34.
[10]
Nof, S. Y., W. E. Wilhelm, and H.-J. Warnecke, Industrial Assembly, Chapman & Hall,
London, UK, 1997.
Problems 491
[11]
Riley, F. J., Assembly Automation, Industrial Press Inc., New York, 1983.
[12]
Schwartz, W. H., “Robots Called to Assembly,” Assembly Engineering, August 1985,
pp. 20–23.
[13]
Warnecke, H. J., M. Schweizer, K. Tamaki, and S. Nof, “Assembly,” Handbook of Industrial
Engineering, Institute of Industrial Engineers, John Wiley & Sons, Inc., New York, 1992,
pp. 505–562.
[14]
www.atsautomation.com
[15]
www.autodev.com
[16]
www.magnemotion.com
[17]
www.setpointusa.com
Review Questions
17.1
Name three of the four conditions under which automated assembly technology should be
considered.
17.2
What are the four automated assembly system configurations listed in the text?
17.3
Name the typical hardware components of a workstation parts delivery system.
17.4
Name six typical products that are made by automated assembly.
17.5
Considering the assembly machine as a game of chance, what are the three possible events
that might occur when the feed mechanism attempts to feed the next component to the
assembly work head at a given workstation in a multistation system?
17.6
Name some of the important performance measures for an automated assembly system.
17.7
Why is the production rate inherently lower on a single-station assembly system than on a
multistation assembly system?
17.8
What are two reasons for the existence of partially automated production lines?
17.9
What are the effects of poor quality parts, as represented by the fraction defect rate, on the
performance of an automated assembly system?
Problems
Parts Feeding
17.1
(A) The feeder-selector device at one of the workstations of an assembly machine has a
feed rate of 56 components/min and provides a throughput of one part in five. The ideal
cycle time of the assembly machine is 6 sec. The low-level sensor on the feed track is set at
10 components, and the high-level sensor is set at 25 components. (a) How long will it take
for the supply of components to be depleted from the high-level sensor to the low-level
sensor once the feeder-selector device is turned off? (b) How long will it take for the com-
ponents to be resupplied from the low-level sensor to the high-level sensor, on average,
after the feeder-selector device is turned on? (c) What are the time proportions that the
feeder-selector device is turned on and turned off?
17.2
Solve Problem 17.1 but use a feed rate of 50 parts/min. How does the reduced feed rate of
the feeder-selector affect the operation of the assembly machine?
492 Chap. 17 / Automated Assembly Systems
17.3
The ideal cycle time of an assembly machine is 5 sec. The parts feeder at one of the work-
stations has a feed rate of 75 components/min and the probability that the components will
pass through the selector is 18%. The active length of the feed track (where the high-level
sensor is located) is 350 mm. The low-level sensor on the feed track is located 100 mm from
the station work head. The components have a length of 12.5 mm in the feed track direc-
tion, and there is no overlapping of parts. (a) How long will it take for the supply of parts
to be depleted from the high-level sensor to the low-level sensor once the feeder-selector
device is turned off? (b) How long will it take for the parts to be resupplied from the low-
level sensor to the high-level sensor, on average, after the feeder-selector device is turned
on? (c) What are the time proportions that the feeder-selector device is turned on and
turned off?
17.4
An assembly machine has eight stations and must produce at an average rate of 500 completed
assemblies/hr. Average downtime per breakdown is 2.5 min. When a breakdown occurs,
all subsystems (including the feeder) stop. The frequency of breakdowns of the assembly
machine is once every 55 parts. Average downtime per breakdown is 2.0 min. One of the
stations is an automatic assembly operation that uses a feeder-selector. Components fed into
the selector have a 20% probability of passing through. Parts rejected by the selector are fed
back into the hopper. What minimum rate must the feeder deliver components to the selec-
tor during system uptime in order to keep up with the assembly machine?
17.5
(A) A 10-station assembly machine has an ideal cycle time of 6 sec. The fraction defect
rate at each station is 0.005 and a defect always jams the affected station. When a break-
down occurs, it takes 1.2 min, on average, for the system to be put back into operation.
Determine (a) the hourly production rate for the assembly machine, (b) yield of good
product (final assemblies containing no defective components), and (c) proportion uptime
of the system.
17.6
Solve Problem 17.5 but assume that defects never jam the workstations. Other data are the
same.
17.7
Solve Problem 17.5 but assume that m = 0.5 for all stations. Other data are the same.
17.8
A six-station dial-indexing machine assembles components to a base part. The operations,
element times, q and m values for components added are given in the table below (NA
means q and m are not applicable to the operation). The indexing time is 2 sec. When a
jam occurs, it requires 1.5 min to release the jam and put the machine back in operation.
Determine (a) hourly production rate for the assembly machine, (b) yield of good product
(final assemblies containing no defective components), and (c) proportion uptime of the
system.
17.9
A six-station automatic assembly line runs 4,000 hr/yr and has an ideal cycle time of 10 sec.
Downtime occurs for two reasons. First, mechanical and electrical failures cause line stops
Problems 493
that occur with a frequency of once per 120 cycles. Average downtime for these causes is
3.0 min. Second, defective components also result in downtime. The fraction defect rate of
each of the six components added to the base part at the six stations is 1.0%, and the prob-
ability that a defective component will cause a station jam is 0.5 for all stations. Downtime
per occurrence for defective parts is 2.0 min. Determine (a) total number of assemblies
produced in one year, (b) number of assemblies with at least one defective component, and
(c) number of assemblies with all six defective components.
17.10
(A) An eight-station automatic assembly machine has an ideal cycle time of 6 sec.
Downtime is caused by defective parts jamming at the individual assembly stations. The
average downtime per occurrence is 2.5 min. Fraction defect rate is 0.2% and the probabil-
ity that a defective part will jam at a given station is 0.6 for all stations. The cost to operate
the assembly machine is $95.00/hr and the cost of components being assembled is $0.73 per
unit assembly. Ignore other costs. Determine (a) yield of good assemblies, (b) average
hourly production rate of good assemblies, (c) proportion of assemblies with at least one
defective component, and (d) unit cost of the assembled product.
17.11
An automated assembly machine has four stations. The first station presents the base
part, and the other three stations add components to the base. The ideal cycle time for
the machine is 3 sec, and the average downtime when a jam results from a defective com-
ponent is 1.5 min. The fraction defective rates (q) and probabilities that a defective com-
ponent will jam the station (m) are given in the table below. Quantities of 100,000 for each
of the bases, brackets, pins, and retainers are used to stock the assembly line for operation.
Determine (a) proportion of good product to total product coming off the line, (b) hourly
production rate of good product coming off the line, (c) total number of final assemblies
produced, given the starting component quantities. Of the total, how many are good prod-
uct, and how many are products that contain at least one defective component? (d) Of the
number of defective assemblies determined in part (c), how many will have defective base
parts? How many will have defective brackets? How many will have defective pins? How
many will have defective retainers?
17.12
A six-station automatic assembly machine has an ideal cycle time of 6 sec. At stations 2
through 6, parts feeders deliver components to be assembled to a base part that is added
at the first station. Each of stations 2 through 6 is identical and the five components are
identical. That is, the completed product consists of the base part plus five identical compo-
nents. The base parts have zero defects, but the other components are defective at a rate q.
When an attempt is made to assemble a defective component to the base part, the machine
stops 1m = 1.02. It takes an average of 2.0 min to make repairs and start the machine up
after each stoppage. Since all components are identical, they are purchased from a supplier
who can control the fraction defect rate very closely. However, the supplier charges a pre-
mium for better quality. The cost per component is determined by the following equation:
cost per component = 0.1 + 0.0012/q, where q = fraction defect rate. Cost of the base
part is 20 cents. Accordingly, the total cost of the base part and the five components is:
product material cost = 0.70 + 0.006/q. The cost to operate the automatic assembly ma-
chine is $150.00/hr. The problem facing the production manager is this: As the component
quality decreases (q increases), downtime increases which drives production costs up. As
the quality improves (q decreases), material cost increases because of the price formula
494 Chap. 17 / Automated Assembly Systems
used by the supplier. To minimize total cost, the optimum value of q must be determined.
Determine the value of q that minimizes the total cost per assembly. Also, determine the
associated cost per assembly and hourly production rate. (Ignore other costs.)
17.13
A six-station dial-indexing machine is designed to perform four assembly operations at
stations 2 through 5 after a base part has been manually loaded at station 1. Station 6 is
the unload station. Each assembly operation involves the attachment of a component to
the existing base. At each of the four assembly stations, a hopper-feeder is used to deliver
components to a selector device that separates components that are improperly oriented
and drops them back into the hopper. The system was designed with the operating pa-
rameters for stations 2 through 5 as given in the table below. It takes 2 sec to index the
dial from one station to the next. When a component jams, it takes an average of 2 min to
release the jam and restart the system. Line stops due to mechanical and electrical failures
of the assembly machine are not significant and can be neglected. The foreman says the
system was designed to produce at a certain hourly rate, which takes into account the
jams resulting from defective components. However, the actual delivery of finished as-
semblies is far below that designed production rate. Analyze the problem and determine
the following: (a) The designed average hourly production rate that the foreman alluded
to. (b) What is the proportion of assemblies coming off the system that contain one or
more defective components? (c) What seems to be the problem that limits the assembly
system from achieving the expected production rate? (d) What is the hourly production
rate that the system is actually achieving? State any assumptions that you make in deter-
mining your answer.
17.14
For Example 17.4, which deals with a single-station assembly system, suppose that the
sequence of assembly elements were to be accomplished on a seven-station assembly system
with synchronous parts transfer. Each element is performed at a separate station (stations
2 through 6) and the assembly time at each respective station is the same as the element
time given in the example. Assume that the handling time is divided evenly (3.5 sec each)
between a load station (station 1) and an unload station (station 7). The transfer time is
2 sec, and the average downtime per downtime occurrence is 2.0 min. Determine (a) hourly
production rate of all completed units, (b) yield, (c) production rate of good quality com-
pleted units, and (d) uptime efficiency.
17.15
(A) A single-station assembly machine is to be considered as an alternative to the dial-
indexing machine in Problem 17.8. Use the data given in that problem to determine (a)
hourly production rate, (b) yield of good product (final assemblies containing no defective
components), and (c) proportion uptime of the system. Handling time to load the base part
and unload the finished assembly is 7 sec and the downtime averages 1.5 min every time a
component jams. Why is the proportion uptime so much higher than in the case of the dial-
indexing machine in Problem 17.8?
17.16
A single-station robotic assembly system performs a series of five assembly elements, each
of which adds a different component to a base part. Each element takes 3.5 sec. In addition,
Problems 495
the handling time needed to move the base part into and out of position is 4.5 sec. The
fraction defect rate is 0.003 for all components, and the probability of a jam by a defec-
tive component is 0.7. Average downtime per occurrence is 2.5 min. Determine (a) hourly
production rate, (b) yield of good product in the output, and (c) uptime efficiency. (d)
What proportion of the output contains a defective component from the third of the five
elements performed in the work cycle?
17.17
A single-station assembly cell uses an industrial robot to perform a series of assembly op-
erations. The base part and parts 2 and 3 are delivered by vibratory bowl feeders that use
selectors to insure that only properly oriented parts are delivered to the robot for assem-
bly. The robot cell performs the elements in the table below (also given are feeder rates,
selector proportion u, element times, fraction defect rate q, and probability of jam m, and,
for the last element, the frequency of downtime incidents p). In addition to the times given
in the table, the time required to unload the completed subassembly is 4 sec. When a line
stop occurs, it takes an average of 1.8 min to make repairs and restart the cell. Determine
(a) yield of good product, (b) average hourly production rate of good product, and
(c) uptime efficiency for the cell. State any assumptions you must make about the opera-
tion of the cell in order to solve the problem.
Partial Automation
17.18
(A) A partially automated production line has three mechanized and three manual work-
stations, a total of six stations. The ideal cycle time is 57 sec, which includes a transfer
time of 3 sec. Data on the six stations are listed in the table below. Cost of the transfer
mechanism is $0.10/min, cost to run each automated station is $0.12/min, and labor cost to
operate each manual station is $0.17/min. It has been proposed to substitute an automated
station in place of station 5. The cost of this new station is estimated at $0.25/min and its
breakdown rate = 0.02 per cycle, but its process time would be only 30 sec, thus reducing
the overall cycle time of the line from 57 sec to 36 sec. Average downtime per breakdown
of the current line, as well as for the proposed configuration, is 3.0 min. Determine the
following for the current line and the proposed line: (a) hourly production rate, (b) propor-
tion uptime, and (c) cost per unit. Assume that when an automated station stops, the whole
line stops, including the manual stations. Also, in computing costs, neglect material and
tooling costs.
17.19
A manual assembly line has six stations. The service time at each manual station is 60 sec.
Parts are transferred by hand from one station to the next, and the lack of discipline in this
method adds 12 sec to the cycle time. Hence, the current cycle time is 72 sec. The following
two proposals have been made: (1) Install a mechanized transfer system to pace the line;
and (2) automate one or more of the manual stations using robots that would perform the
same tasks as humans only faster. The second proposal requires the mechanized transfer
system of the first proposal and would result in a partially- or fully automated assembly
line. The transfer system would have a transfer time of 6 sec, thus reducing the cycle time
on the manual line to 66 sec. Regarding the second proposal, all six stations are candidates
for automation. Each automated station would have an assembly time of 30 sec. Thus if all
six stations were automated the cycle time for the line would be 36 sec. There are differ-
ences in the quality of parts added at the stations; these data are given in the table below
for each station (q = fraction defect rate, m = probability that a defect will jam the sta-
tion). Average downtime per station jam at the automated stations is 3.0 min. Assume that
the manual stations do not experience line stops due to defective components. Cost data:
Cat = $0.10/min; Cw = $0.20/min; and Cas = $0.15/min. Determine if either or both of
the proposals should be accepted. If the second proposal is accepted, how many stations
should be automated and which ones? Use cost per piece as the criterion for your deci-
sion. Assume for all cases considered that when an automated station stops, the whole line
stops, including the manual stations.
Station qi mi Station qi mi
1 0.005 1.0 4 0.020 1.0
2 0.010 1.0 5 0.025 1.0
3 0.015 1.0 6 0.030 1.0
17.20
Solve Problem 17.19, except that the probability that a defective part will jam the auto-
mated station is m = 0.5 for all stations.