Subcontractor Performance Evaluation per Project
Subcontractor : Subcontract No.:
Project Name : Subcontract Type:
Regional Operation : Original Value:
Project Location : Final Value:
Contract No. : Original Completion Date:
Project No. : Actual Completion Date:
Manhours : Direct: Indirect: Evaluation Date:
Overall Rating (*): 2.5
Scope of Work Description:
Key to Ratings: 5 = Exemplary 3 = Average 1 = Poor
4 = Above Average 2 = Below Average 0 = Unacceptable
Rating Parameters:
1. Adherence to Specification/Requirements
2. Adherence to Schedule Requirements
3. Adherence to Price
4. Quality of Workmanship
5. Overall Crafts Productivity
6. Planning/Scheduling/Coordination of Craft Labour
7. Planning/Scheduling/Coordination of Materials
8. Planning/Scheduling/Coordination of Equipment
9. Planning/Scheduling/Coordination of Subcontractors
10. Cooperation/Coordination with other Contractors
11. Responsiveness of Office Construction Management Support
12. Quality/Quantity of Field Supervision
13. Quality of Technical Knowledge
14. Decision Making in Field Activities
15. Safety at Jobsite
16. Housekeeping at Jobsite
17. Overall Cost Control
18. Timely Notification of Cost Additions
19. Promptness/Adequacy - Pricing Additional Work
20. Promptness/Adequacy - Field Changes and Time Sheets
21. Availability of Adequate Equipment/Tools
22. QA/QC follow up
23. Management
24. Site Manager
Total Rating:
Average Overall: (*) (Enter above)
RB25017.doc www.red-bag.com Sheet 1 of 2
Subcontractor Performance Evaluation per Project
Overall Evaluation:
1. Would you recommend this subcontractor for future work?
Yes No
2. Should this subcontractor be considered for larger, smaller or the
same size work?? Larger Smaller Same size
3. Name the Contractor’s Field Superintendent
4. Subcontractors
5. Unsuccessful Bidders
Comments regarding rating: (Attach additional sheets if necessary)
Evaluation completed by:
Title:
Telephone No.:
Date:
dc: Project Manager
Procurement Manager
RB25017.doc www.red-bag.com Sheet 2 of 2