Methanol Plant Document Index
Methanol Plant Document Index
CONSTRUCTION APPROVAL
ü INFORMATION ORDER
ENQUIRY CERTIFIED
FILENAME : 472280592.xls
LARSEN & TOUBRO LTD.
DOCUMENT NO. REV
LTEM
DOCUMENT SFCCL-LTEM-001-PE-
1
CONTROL INDEX GN-0001
PROJ : SFCCL – 700 MTPD Methanol Plant + 100
PAGE NO. : 2 of 28
MTPD CO
CONTENTS
SYSTEM I
A GENERAL ARRANGEMENT - PRIMARY REFORMER 3
B FLUE GAS DUCT DRAWINGS 3
C COMBUSTION AIR DUCT DRAWINGS 3
D FGB DRAWINGS 4
E WHR DRAWINGS 4
F MECHANICAL COMPONENT DRAWINGS 5
G DESIGN CALCULATIONS 6
H FABRICATION SPECIFICATIONS 6
I PURCHASE REQUISITIONS/SPECIFICATIONS 7
J VENDOR DOCUMENTATION 7
J-1 INLET DISTRIBUTOR 7
J-2 INLET HAIR-PIN TUBE 8
J-3 CATALYST TUBE 8
J-4 COLD COLLECTOR 9
J-5 STEAM DRUM 10
J-6 WASTE HEAT BOILER 10
J-7 BURNER 12
J-8 INLET HAIR-PIN TUBE SPRING 13
J-9 MISC 13
J-10 REFRACTORY 13
J-11 AIR PREHEATER (APH) 15
J-12 FD FAN 15
J-13 ID FAN 16
STRUCTURAL II
A RADIANT STRUCTURE 17
B WHR STRUCTURE / CONVECTION MODULE 19
C REFORMER STACK 20
D FG BOILER 21
E J-MODULE 21
F STEAM-DRUM SUPPORTING STRUCTURE 22
G DUCT SUPPORT + PIPE RACK + APH SUPPORT +STAIRCASE 22
H COMMON DWGS AND SPECIFICATION 24
PROCESS III
A DOCUMENTS / DRAWINGS 25
PIPING IV
A PIPING LAYOUT 26
B MISC. DRAWINGS 26
C STRESS ANALYSIS 26
D ISOMETRICS 27
E GENERAL ARRAGEMENT DRAWIGS 27
F PIPING SUPPORTING 28
G MTO 28
LARSEN & TOUBRO LTD.
DOCUMENT NO. REV
LTEM
DOCUMENT SFCCL-LTEM-001-PE-
1
CONTROL INDEX GN-0001
PROJ : SFCCL – 700 MTPD Methanol Plant + 100
PAGE NO. : I
MTPD CO
SYSTEM
DOCUMENTS / DRAWINGS
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
B SCH 400.00
FLUE GAS DUCT DRAWINGS 400
ACT 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 100.00
1 GA For Flue Gas Ducting 1 SFCCL-LTEM-001-EQ-DW-0200 I 100 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 100.00
2 GA For Flue Gas Ducting 2 SFCCL-LTEM-001-EQ-DW-0201 I 100 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
3 Fabrication Detail of Flue Gas Ducting - FG1 SFCCL-LTEM-001-EQ-FD-0205 I 50 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
4 Fabrication Detail of Flue Gas Ducting - FG2 SFCCL-LTEM-001-EQ-FD-0206 I 50 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
5 Fabrication Detail of Flue Gas Ducting - FG3 SFCCL-LTEM-001-EQ-FD-0207 I 50 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
6 Fabrication Detail of Flue Gas Ducting - FG4 SFCCL-LTEM-001-EQ-FD-0208 I 50 US
ACT 0% 0.00
C SCH 500.00
COMBUSTION AIR DUCT DRAWINGS 500
ACT 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 100.00
1 GA For Combustion Air Ducting 1 SFCCL-LTEM-001-EQ-DW-0220 I 100 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 100.00
2 GA For Combustion Air Ducting 2 SFCCL-LTEM-001-EQ-DW-0221 I 100 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 100.00
3 GA For Combustion Air Ducting 3 SFCCL-LTEM-001-EQ-DW-0222 I 100 US
ACT 0% 0.00
Fabrication Detail of Combustion Air Ducting - SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
4 SFCCL-LTEM-001-EQ-FD-0225 I 50 US
CA1 ACT 0% 0.00
Fabrication Detail of Combustion Air Ducting - SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
5 SFCCL-LTEM-001-EQ-FD-0226 I 50 US
CA2 ACT 0% 0.00
Fabrication Detail of Combustion Air Ducting - SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
6 SFCCL-LTEM-001-EQ-FD-0227 I 50 US
CA3 ACT 0% 0.00
Fabrication Detail of Combustion Air Ducting - SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
7 SFCCL-LTEM-001-EQ-FD-0228 I 50 US
CA4 ACT 0% 0.00
Page 7 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
D SCH 600.00
FGB DRAWINGS 600
ACT 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 200.00
1 GA For Coil E 205 SFCCL-LTEM-001-EQ-DW-0120 I 200 Chem P&S
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 200.00
2 Coil Details for E 205 SFCCL-LTEM-001-EQ-DW-0121 I 200 Chem P&S
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 100.00
3 Header Assembly for Coil E 205 SFCCL-LTEM-001-EQ-DW-0122 I 100 Chem P&S
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 100.00
4 Header Support Details for Coil E 205 SFCCL-LTEM-001-EQ-DW-0123 I 100 Chem P&S
ACT 0% 0.00
E SCH 3390.00
WHR DRAWINGS 3390
ACT 0.00
SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 200.00
1 GA For Coil E 201 & E 202 (Upper) SFCCL-LTEM-001-EQ-DW-0130 A 200 US
ACT 0% 0.00
SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 150.00
2 Coil Details for E 201 SFCCL-LTEM-001-EQ-DW-0131 A 150 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 150.00
3 Coil Details for E 202 (Upper) SFCCL-LTEM-001-EQ-DW-0132 A 150 US
ACT 0% 0.00
SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 100.00
4 Header Assembly for Coil E 201 SFCCL-LTEM-001-EQ-DW-0133 I 100 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 100.00
5 Header Assembly for Coil E 202 (Upper) SFCCL-LTEM-001-EQ-DW-0134 I 100 US
ACT 0% 0.00
SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 100.00
6 Header Support Details for Coil E 201 SFCCL-LTEM-001-EQ-DW-0135 I 100 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 100.00
7 Header Support Details for Coil E 202 (Upper) SFCCL-LTEM-001-EQ-DW-0136 I 100 US
ACT 0% 0.00
Details of RHS Header Box for Coil E201 & E 202 SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 50.00
8 SFCCL-LTEM-001-EQ-DW-0137 I 50 US
(Upper) ACT 0% 0.00
Details of LHS Header Box for Coil E 201& E 202 SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 50.00
9 SFCCL-LTEM-001-EQ-DW-0138 I 50 US
(Upper) ACT 0% 0.00
Details of End Tubesheet for Coil E 201 & E 202 SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 50.00
10 SFCCL-LTEM-001-EQ-DW-0139 I 50 US
(Upper) ACT 0% 0.00
SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 100.00
11 Intermediate Tubesheets for Coil E 201 SFCCL-LTEM-001-EQ-DW-0140 I 100 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 100.00
12 Intermediate Tubesheets for Coil E 202 (Upper) SFCCL-LTEM-001-EQ-DW-0141 I 100 US
ACT 0% 0.00
SCH 7-Jan-07 21-Feb-07 8-Mar-07 7-Apr-07 15-Feb-08 100% 200.00
13 GA For Coil E 202 (Lower) & E 203 A SFCCL-LTEM-001-EQ-DW-0150 A 200 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 150.00
14 Coil Details for E 202 (Lower) SFCCL-LTEM-001-EQ-DW-0151 A 150 US
ACT 0% 0.00
SCH 7-Jan-07 21-Feb-07 8-Mar-07 7-Apr-07 15-Feb-08 100% 150.00
15 Coil Details for E 203 A SFCCL-LTEM-001-EQ-DW-0152 A 150 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 100.00
16 Header Assembly for Coil E 202 (Lower) SFCCL-LTEM-001-EQ-DW-0153 I 100 US
ACT 0% 0.00
Page 8 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
F SCH 975.00
MECHANICAL COMPONENT DRAWINGS 975
ACT 0.00
SCH 3-Nov-06 18-Dec-06 2-Jan-07 1-Feb-07 15-Feb-08 100% 100.00
1 GA Of Hot Parts SFCCL-LTEM-001-EQ-DW-0105 A 100 US
ACT 0% 0.00
SCH 10-Nov-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
2 Radiant Peep Door SFCCL-LTEM-001-EQ-FD-0300 I 50 US
ACT 0% 0.00
SCH 10-Nov-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
3 Radiant Access Door SFCCL-LTEM-001-EQ-FD-0301 I 50 US
ACT 0% 0.00
SCH 10-Nov-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
4 Taper duct access door SFCCL-LTEM-001-EQ-FD-0302 I 50 US
ACT 0% 0.00
SCH 10-Nov-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
5 False-air damper door SFCCL-LTEM-001-EQ-FD-0303 I 50 US
ACT 0% 0.00
SCH 10-Nov-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 100.00
6 Heat shield for False-ari damper SFCCL-LTEM-001-EQ-FD-0304 I 100 US
ACT 0% 0.00
SCH 17-Nov-06 1-Jan-07 16-Jan-07 15-Feb-07 15-Feb-08 100% 50.00
7 Flue gas duct access door SFCCL-LTEM-001-EQ-FD-0305 I 50 US
ACT 0% 0.00
Page 9 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
G SCH 2000.00
DESIGN CALCULATIONS 2000
ACT 700.00
SCH 11-Oct-06 25-Nov-06 10-Dec-06 9-Jan-07 15-Feb-08 100% 500.00
1 Coil Design Calculations as per ASME Sec I SFCCL-LTEM-001-EQ-CL-0010 A 500 US
ACT 25-Aug-06 18-Sep-06 20-Sep-06 70% 350.00
SCH 11-Oct-06 25-Nov-06 10-Dec-06 9-Jan-07 15-Feb-08 100% 500.00
2 Coil Design Calculations as per API 530 SFCCL-LTEM-001-EQ-CL-0011 A 500 US
ACT 25-Aug-06 18-Sep-06 20-Sep-06 70% 350.00
SCH 31-Oct-06 15-Dec-06 30-Dec-06 29-Jan-07 15-Feb-08 100% 1000.00
3 Intermediate Tubesheet Design Calculations. SFCCL-LTEM-001-EQ-CL-0012 A 1000 US
ACT 0% 0.00
H SCH 150.00
FABRICATION SPECIFICATIONS 150
ACT 0.00
SCH 4-Jan-07 18-Feb-07 5-Mar-07 4-Apr-07 15-Feb-08 100% 50.00
1 Specification For Fabrication & Erection SFCCL-LTEM-001-EQ-SP-0016 I 50 US
ACT 0% 0.00
SCH 6-Mar-07 20-Apr-07 5-May-07 4-Jun-07 15-Feb-08 100% 50.00
2 Specification For Painting SFCCL-LTEM-001-EQ-SP-0017 I 50 US
ACT 0% 0.00
SCH 6-May-07 20-Jun-07 5-Jul-07 4-Aug-07 15-Feb-08 100% 50.00
3 Specification For Insulation SFCCL-LTEM-001-EQ-SP-0018 I 50 US
ACT 0% 0.00
Page 10 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
J SCH 14885.00
VENDOR DOCUMENTATION 14885
ACT 0.00
J-1 SCH 350.00
INLET DISTRIBUTOR 350
ACT 0.00
SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 50.00
1 Inlet Distributor Fabrication drawing SFCCL-LTEM-001-EQ-VD-8601 I 50 Chem P&S
ACT 0% 0.00
SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 100.00
2 Design Calculation for Inlet Distributor SFCCL-LTEM-001-EQ-VD-8602 I 100 Chem P&S
ACT 0% 0.00
SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 50.00
3 Fabrication Procedure for Inlet Distributor SFCCL-LTEM-001-EQ-VD-8603 I 50 Chem P&S
ACT 0% 0.00
SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 25.00
3 Pneumatic Test Procedure for Inlet Distributor SFCCL-LTEM-001-EQ-VD-8604 I 25 Chem P&S
ACT 0% 0.00
Page 11 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
Page 12 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
Page 13 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
J-5 975.00
STEAM DRUM 975
0.00
SCH 23-Sep-06 8-Oct-06 23-Oct-06 22-Nov-06 15-Feb-08 100% 100.00
1 Datasheet For Steam Drum SFCCL-LTEM-001-EQ-VD-8660 A 100 Chem P&S
ACT 0% 0.00
SCH 23-Sep-06 8-Oct-06 23-Oct-06 22-Nov-06 15-Feb-08 100% 100.00
2 Assembly of steam drum SFCCL-LTEM-001-EQ-VD-8661 A 100 Chem P&S
ACT 0% 0.00
SCH 30-Aug-06 14-Sep-06 29-Sep-06 29-Oct-06 15-Feb-08 100% 100.00
3 Foundation Load Data SFCCL-LTEM-001-EQ-VD-8662 I 100 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
4 SD- Manhole M1 & M2 SFCCL-LTEM-001-EQ-VD-8663 I 50 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
5 SD- Detail of Nozzles SFCCL-LTEM-001-EQ-VD-8664 I 50 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
6 SD- Detail of Nozzles SFCCL-LTEM-001-EQ-VD-8665 I 50 Chem P&S
ACT 0% 0.00
SCH 14-Oct-06 29-Oct-06 13-Nov-06 13-Dec-06 15-Feb-08 100% 50.00
7 SD- Internal Assembly SFCCL-LTEM-001-EQ-VD-8666 I 50 Chem P&S
ACT 0% 0.00
SCH 14-Oct-06 29-Oct-06 13-Nov-06 13-Dec-06 15-Feb-08 100% 50.00
8 SD- Saddle details SFCCL-LTEM-001-EQ-VD-8667 I 50 Chem P&S
ACT 0% 0.00
SCH 14-Oct-06 29-Oct-06 13-Nov-06 13-Dec-06 15-Feb-08 100% 50.00
9 SD- Externals SFCCL-LTEM-001-EQ-VD-8668 I 50 Chem P&S
ACT 0% 0.00
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 25.00
10 SD- HTAS name plate SFCCL-LTEM-001-EQ-VD-8669 I 25 Chem P&S
ACT 0% 0.00
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 25.00
11 SD-Manufacturer’s name plate SFCCL-LTEM-001-EQ-VD-8670 I 25 Chem P&S
ACT 0% 0.00
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 25.00
12 SD-General notes for steam drum SFCCL-LTEM-001-EQ-VD-8671 I 25 Chem P&S
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 50.00
13 Dished End For Steam Drum SFCCL-LTEM-001-EQ-VD-8672 I 50 Chem P&S
ACT 0% 0.00
SCH 16-Sep-06 1-Oct-06 16-Oct-06 15-Nov-06 15-Feb-08 100% 100.00
14 SD-Des. Report for pressure part (Part 1) SFCCL-LTEM-001-EQ-VD-8673 I 100 Chem P&S
ACT 0% 0.00
SCH 16-Sep-06 1-Oct-06 16-Oct-06 15-Nov-06 15-Feb-08 100% 100.00
15 SD-Wind, seismic & saddle design (Part 2) SFCCL-LTEM-001-EQ-VD-8674 I 100 Chem P&S
ACT 0% 0.00
SCH 26-Nov-06 11-Dec-06 26-Dec-06 25-Jan-07 15-Feb-08 100% 25.00
16 WPS/PQR for SD SFCCL-LTEM-001-EQ-VD-8675 I 25 Chem P&S
ACT 0% 0.00
SCH 26-Nov-06 11-Dec-06 26-Dec-06 25-Jan-07 15-Feb-08 100% 25.00
17 QA plan for SD SFCCL-LTEM-001-EQ-VD-8676 I 25 Chem P&S
ACT 0% 0.00
J-6 1500.00
WASTE HEAT BOILER 1500
0.00
SCH 23-Sep-06 8-Oct-06 23-Oct-06 22-Nov-06 15-Feb-08 100% 100.00
1 Datasheet For WHB SFCCL-LTEM-001-EQ-VD-8680 A 100 Chem P&S
ACT 0% 0.00
SCH 23-Sep-06 8-Oct-06 23-Oct-06 22-Nov-06 15-Feb-08 100% 100.00
2 Assembly of WHB SFCCL-LTEM-001-EQ-VD-8681 I 100 Chem P&S
ACT 0% 0.00
SCH 30-Aug-06 14-Sep-06 29-Sep-06 29-Oct-06 15-Feb-08 100% 100.00
3 Foundation Load Data SFCCL-LTEM-001-EQ-VD-8682 I 100 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
4 WHB-Nozzle for shell side SFCCL-LTEM-001-EQ-VD-8683 I 50 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
5 WHB-Nozzle for channel side SFCCL-LTEM-001-EQ-VD-8684 I 50 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
6 WHB-Manhole M1 SFCCL-LTEM-001-EQ-VD-8685 I 50 Chem P&S
Page 14 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
6 WHB-Manhole M1 SFCCL-LTEM-001-EQ-VD-8685 I 50 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
7 WHB-Manhole M2 SFCCL-LTEM-001-EQ-VD-8686 I 50 Chem P&S
ACT 0% 0.00
SCH 14-Oct-06 29-Oct-06 13-Nov-06 13-Dec-06 15-Feb-08 100% 50.00
8 WHB-Tube sheet & baffle details SFCCL-LTEM-001-EQ-VD-8697 I 50 Chem P&S
ACT 0% 0.00
SCH 14-Oct-06 29-Oct-06 13-Nov-06 13-Dec-06 15-Feb-08 100% 50.00
9 WHB-Internals SFCCL-LTEM-001-EQ-VD-8698 I 50 Chem P&S
ACT 0% 0.00
SCH 14-Oct-06 29-Oct-06 13-Nov-06 13-Dec-06 15-Feb-08 100% 25.00
10 WHB-Ferrules SFCCL-LTEM-001-EQ-VD-8699 I 25 Chem P&S
ACT 0% 0.00
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 25.00
11 WHB-Det. Of refractory anchors SFCCL-LTEM-001-EQ-VD-8700 I 25 Chem P&S
ACT 0% 0.00
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 50.00
12 WHB-Saddles SFCCL-LTEM-001-EQ-VD-8701 I 50 Chem P&S
ACT 0% 0.00
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 50.00
13 WHB-Details of deflector SFCCL-LTEM-001-EQ-VD-8702 I 50 Chem P&S
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 50.00
14 WHB-Externals SFCCL-LTEM-001-EQ-VD-8703 I 50 Chem P&S
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 25.00
15 WHB-HTAS name plates SFCCL-LTEM-001-EQ-VD-8704 I 25 Chem P&S
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 25.00
16 WHB-Manufacturer’s name plate SFCCL-LTEM-001-EQ-VD-8705 I 25 Chem P&S
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 25.00
17 WHB-General notes SFCCL-LTEM-001-EQ-VD-8706 I 25 Chem P&S
ACT 0% 0.00
SCH 4-Nov-06 19-Nov-06 4-Dec-06 3-Jan-07 15-Feb-08 100% 25.00
18 Transportation Sketch for RG WHB SFCCL-LTEM-001-EQ-VD-8707 I 25 Chem P&S
ACT 0% 0.00
Spare Parts for Erection, Pre-commissioning & SCH 4-Nov-06 19-Nov-06 4-Dec-06 3-Jan-07 15-Feb-08 100% 25.00
19 SFCCL-LTEM-001-EQ-VD-8708 I 25 Chem P&S
Commissioning for RG WHB ACT 0% 0.00
SCH 4-Nov-06 19-Nov-06 4-Dec-06 3-Jan-07 15-Feb-08 100% 25.00
20 Procedure for Liquid Penetrant Examination-RGB SFCCL-LTEM-001-EQ-VD-8709 I 25 Chem P&S
ACT 0% 0.00
SCH 8-Nov-06 23-Nov-06 8-Dec-06 7-Jan-07 15-Feb-08 100% 25.00
21 Procedure for Ultrasonic Examination - RGB SFCCL-LTEM-001-EQ-VD-8710 I 25 Chem P&S
ACT 0% 0.00
SCH 8-Nov-06 23-Nov-06 8-Dec-06 7-Jan-07 15-Feb-08 100% 25.00
22 Procedure for Radiographic Testing SFCCL-LTEM-001-EQ-VD-8711 I 25 Chem P&S
ACT 0% 0.00
SCH 11-Nov-06 26-Nov-06 11-Dec-06 10-Jan-07 15-Feb-08 100% 25.00
23 Procedure for Magnetic particle examination SFCCL-LTEM-001-EQ-VD-8712 I 25 Chem P&S
ACT 0% 0.00
SCH 11-Nov-06 26-Nov-06 11-Dec-06 10-Jan-07 15-Feb-08 100% 25.00
24 Procedure for Hydrostatic testing - RGB SFCCL-LTEM-001-EQ-VD-8713 I 25 Chem P&S
ACT 0% 0.00
SCH 11-Nov-06 26-Nov-06 11-Dec-06 10-Jan-07 15-Feb-08 100% 25.00
25 Procedure for PWHT - RGB SFCCL-LTEM-001-EQ-VD-8714 I 25 Chem P&S
ACT 0% 0.00
SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 25.00
26 Weld Map - RGB SFCCL-LTEM-001-EQ-VD-8715 I 25 Chem P&S
ACT 0% 0.00
SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 25.00
27 Alkali Boil out procedure for RG WHB SFCCL-LTEM-001-EQ-VD-8716 I 25 Chem P&S
ACT 0% 0.00
SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 100.00
28 WHB-Des. Of press. Parts (Shell part1/1) SFCCL-LTEM-001-EQ-VD-8717 A 100 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 3-Dec-06 18-Dec-06 17-Jan-07 15-Feb-08 100% 100.00
29 WHB- Des. Of press. Parts (tube part1/2) SFCCL-LTEM-001-EQ-VD-8718 A 100 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 3-Dec-06 18-Dec-06 17-Jan-07 15-Feb-08 100% 100.00
30 WHB- Wind, seismic & saddle design (part 2) SFCCL-LTEM-001-EQ-VD-8719 A 100 Chem P&S
ACT 0% 0.00
Page 15 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
Page 16 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
Rad. Sec-Side Walls Shelf Support & Brick Hook SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
4 SFCCL-LTEM-001-EQ-VD-8103 I 150 US
Disposition ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
5 Rad. Sec-Side Wall Shelf Support Assembly SFCCL-LTEM-001-EQ-VD-8104 I 150 US
ACT 0% 0.00
Rad. Sec-Side Wall (Grid H&F) Lining SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
6 SFCCL-LTEM-001-EQ-VD-8105 I 150 US
Arrangement ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
7 Rad. Sec-Side Wall(Grid H&F) Stud Layout SFCCL-LTEM-001-EQ-VD-8106 I 150 US
ACT 0% 0.00
Rad. Sec-Side Wall (Grid D&G) Lining SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
8 SFCCL-LTEM-001-EQ-VD-8107 I 150 US
Arrangement ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
9 Rad. Sec-Side Wall (Grid D&G) Stud Layout SFCCL-LTEM-001-EQ-VD-8108 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
10 Rad. Sec.-Cross Section SFCCL-LTEM-001-EQ-VD-8109 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
11 Rad. Sec.-Sectional Plan - 1 SFCCL-LTEM-001-EQ-VD-8110 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
12 Rad. Sec.- Sectional Plan - 2 SFCCL-LTEM-001-EQ-VD-8111 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
13 Rad. Sec.- End wall Lining Arrangement SFCCL-LTEM-001-EQ-VD-8112 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
14 Rad. Sec.-Arch Lining Arrangement SFCCL-LTEM-001-EQ-VD-8113 I 150 US
Page 17 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
14 Rad. Sec.-Arch Lining Arrangement SFCCL-LTEM-001-EQ-VD-8113 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
15 Rad. Sec.-Floor Lining Arrangement SFCCL-LTEM-001-EQ-VD-8114 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
16 Rad. Sec-End Wall Access Door Cover Lining Det. SFCCL-LTEM-001-EQ-VD-8115 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
17 Taper Duct - Arch & Floor Lining SFCCL-LTEM-001-EQ-VD-8116 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
18 Taper Duct - Wall Lining SFCCL-LTEM-001-EQ-VD-8117 I 100 US
ACT 0% 0.00
CONVECTION
Refractory lining detail - convection section SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 200.00
19 SFCCL-LTEM-001-EQ-VD-8118 I 200 US
modules ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
20 Flue gas duct (FG1 - Taper duct to Convection) SFCCL-LTEM-001-EQ-VD-8119 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
21 Flue gas duct (FG2 - Convection to Convection) SFCCL-LTEM-001-EQ-VD-8120 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
22 Flue gas duct (FG3 - Convection to ID fan) SFCCL-LTEM-001-EQ-VD-8121 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
23 Flue gas duct (FG4 - ID fan to Stack) SFCCL-LTEM-001-EQ-VD-8122 I 100 US
ACT 0% 0.00
STACK
COLD COLLECTOR
Hot Parts Insulation - Hairpin tubes, Catalyst tubes SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
27 SFCCL-LTEM-001-EQ-VD-8126 I 100 US
inlet/outlet ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
28 Hot Parts Insulation - Inlet Distributor SFCCL-LTEM-001-EQ-VD-8127 I 100 CHEM P&S
ACT 0% 0.00
DOORS
Page 18 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
MISC.
Det of Cerachem Blanket Z-Blok 1425°C lining SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
35 SFCCL-LTEM-001-EQ-VD-8134 I 50 US
Det. ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
36 Det of Cerablanket Z-Blok 1260°C lining Det. SFCCL-LTEM-001-EQ-VD-8135 I 50 US
ACT 0% 0.00
Monolithic CF module (No folded module) corner SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
37 SFCCL-LTEM-001-EQ-VD-8136 I 50 US
module details ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
38 VF Peep Hole Block 1425°C-560x300 side Wall SFCCL-LTEM-001-EQ-VD-8137 I 50 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
39 VF Peep Hole Block 1425°C-460x460 End Wall SFCCL-LTEM-001-EQ-VD-8138 I 50 US
ACT 0% 0.00
Peep Hole Block JM 26 Bricks 560x300 for Side SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
40 SFCCL-LTEM-001-EQ-VD-8139 I 50 US
Wall ACT 0% 0.00
SCH 30-Jan-07 16-Mar-07 31-Mar-07 30-Apr-07 15-Feb-08 100% 50.00
41 Lining anchors Refractory - Reformer Package SFCCL-LTEM-001-EQ-VD-8140 I 50 US
ACT 0% 0.00
Cold Collector -Lining Anchors / Studs / Vapour SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
42 SFCCL-LTEM-001-EQ-VD-8141 I 50 US
borrics ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
43 Product Datasheets for Refractory materials SFCCL-LTEM-001-EQ-VD-8142 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
44 Refractory Dry Out Procedure SFCCL-LTEM-001-EQ-VD-8143 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
45 Lining Installation instructions SFCCL-LTEM-001-EQ-VD-8144 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 25.00
46 Storage instructions / shelf life SFCCL-LTEM-001-EQ-VD-8145 I 25 US
ACT 0% 0.00
Refractory lining design basis & Instructions for SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 25.00
47 SFCCL-LTEM-001-EQ-VD-8146 I 25 US
Temperature measurement ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
48 Lining Description - Reformer Package SFCCL-LTEM-001-EQ-VD-8147 I 100 US
ACT 0% 0.00
SCH 300.00
J-11 AIR PREHEATER (APH) 300
ACT 0.00
SCH 16-Oct-06 31-Oct-06 15-Nov-06 15-Dec-06 15-Feb-08 100% 100.00
1 APH Datasheet SFCCL-LTEM-001-EQ-VD-8160 A 100 US
ACT 0% 0.00
SCH 23-Oct-06 7-Nov-06 22-Nov-06 22-Dec-06 15-Feb-08 100% 100.00
2 APH General Assembly with load data SFCCL-LTEM-001-EQ-VD-8161 A 100 US
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 50.00
3 APH Detail 1 SFCCL-LTEM-001-EQ-VD-8164 I 50 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 50.00
4 APH Detail 2 SFCCL-LTEM-001-EQ-VD-8165 I 50 US
ACT 0% 0.00
Page 19 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
3 Fan start-up curve SFCCL-LTEM-001-EQ-VD-8182 I 50 US
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 100.00
4 FD Fan Motor Datasheet SFCCL-LTEM-001-EQ-VD-8185 I 100 US
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 100.00
5 FD Fan Actuator Datasheet SFCCL-LTEM-001-EQ-VD-8180 I 100 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 100.00
6 FD Fan General Assembly SFCCL-LTEM-001-EQ-VD-8195 I 100 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 50.00
7 Fan Detail Drawing SFCCL-LTEM-001-EQ-VD-8197 I 50 US
ACT 0% 0.00
SCH 11-Nov-06 26-Nov-06 11-Dec-06 10-Jan-07 15-Feb-08 100% 100.00
8 FD Fan Motor Gneral Assembly SFCCL-LTEM-001-EQ-VD-8211 I 100 US
ACT 0% 0.00
SCH 18-Nov-06 3-Dec-06 18-Dec-06 17-Jan-07 15-Feb-08 100% 50.00
9 Fan Damper drawing SFCCL-LTEM-001-EQ-VD-8215 I 50 US
ACT 0% 0.00
Page 20 of 38
LARSEN & TOUBRO LTD.
DOCUMENT NO. REV
LTEM
DOCUMENT SFCCL-LTEM-001-PE-
1
CONTROL INDEX GN-0001
PROJ : SFCCL – 700 MTPD Methanol Plant + 100
PAGE NO. : II
MTPD CO
STRUCTURAL
DOCUMENTS / DRAWINGS
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
A 8325.00
RADIANT STRUCTURE 8325
30.00
SCH 31-Aug-06 15-Sep-06 30-Sep-06 30-Oct-06 15-Feb-08 100% 25.00
1 Structural design basis of radiant section SFCCL-LTEM-001-SE-SP-5050 I 25 US
ACT 25-Aug-06 25-Sep-06 70% 17.50
SCH 20-Dec-06 4-Jan-07 19-Jan-07 18-Feb-07 15-Feb-08 100% 500.00
2 Structural design calculation of radiant section SFCCL-LTEM-001-SE-CL-5001 I 500 US
ACT 0% 0.00
SCH 30-Sep-06 15-Oct-06 30-Oct-06 29-Nov-06 15-Feb-08 100% 250.00
3 Foundation load data for Reformer SFCCL-LTEM-001-SE-DW-5100 I 250 US
ACT 8-Sep-06 5% 12.50
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 250.00
4 Radiant section GA ELEVATION -1 SFCCL-LTEM-001-SE-DW-5400 I 250 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 100.00
5 Radiant section Connection details - 1 SFCCL-LTEM-001-SE-DW-5401 I 100 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 250.00
6 Radiant section GA ELEVATION - 2 SFCCL-LTEM-001-SE-DW-5404 I 250 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 100.00
7 Radiant section Connection details - 2 SFCCL-LTEM-001-SE-DW-5405 I 100 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 250.00
8 Radiant section GA ELEVATION - 3 SFCCL-LTEM-001-SE-DW-5408 I 250 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 100.00
9 Radiant section Connection details - 3 SFCCL-LTEM-001-SE-DW-5409 I 100 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 250.00
10 Radiant section GA ELEVATION - 4 SFCCL-LTEM-001-SE-DW-5412 I 250 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 100.00
11 Radiant section Connection details - 4 SFCCL-LTEM-001-SE-DW-5413 I 100 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 250.00
12 Radiant section GA ELEVATION - 5 SFCCL-LTEM-001-SE-DW-5416 I 250 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 100.00
13 Radiant section Connection details - 5 SFCCL-LTEM-001-SE-DW-5417 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
14 Radiant section GA ELEVATION - 6 SFCCL-LTEM-001-SE-DW-5420 I 250 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 100.00
15 Radiant section Connection details - 6 SFCCL-LTEM-001-SE-DW-5421 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
16 Radiant section GA ELEVATION - 7 SFCCL-LTEM-001-SE-DW-5424 I 250 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 100.00
17 Radiant section Connection details - 7 SFCCL-LTEM-001-SE-DW-5425 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
18 Radiant section GA ELEVATION - 8 SFCCL-LTEM-001-SE-DW-5428 I 250 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 100.00
19 Radiant section Connection details - 8 SFCCL-LTEM-001-SE-DW-5429 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
20 Radiant section GA ELEVATION - 9 SFCCL-LTEM-001-SE-DW-5432 I 250 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 100.00
21 Radiant section Connection details - 9 SFCCL-LTEM-001-SE-DW-5433 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
22 Radiant section GA ELEVATION - 10 SFCCL-LTEM-001-SE-DW-5436 I 250 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 100.00
23 Radiant section Connection details - 10 SFCCL-LTEM-001-SE-DW-5437 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
24 Radiant section GA ELEVATION - 11 SFCCL-LTEM-001-SE-DW-5440 I 250 US
ACT 0% 0.00
Page 23 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
Page 24 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
B 2700.00
WHR STRUCTURE / CONVECTION MODULE 2700
7.50
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 50.00
1 Structural design basis of WHR section SFCCL-LTEM-001-SE-SP-5051 I 50 US
ACT 22-Sep-06 5% 2.50
SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 500.00
2 Structural design report of WHR section SFCCL-LTEM-001-SE-CL-5002 I 500 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 100.00
3 Foundation load data for WHR SFCCL-LTEM-001-SE-DW-5102 I 100 US
ACT 22-Sep-06 5% 5.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 200.00
4 WHR GA dwg SFCCL-LTEM-001-SE-DW-5600 I 200 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 150.00
5 GA WHR module A SFCCL-LTEM-001-SE-DW-5601 I 150 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 100.00
6 Detail of WHR module A dwg SFCCL-LTEM-001-SE-DW-5602 I 100 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 150.00
7 GA WHR module B SFCCL-LTEM-001-SE-DW-5605 I 150 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 100.00
8 Detail of WHR module B dwg SFCCL-LTEM-001-SE-DW-5606 I 100 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 150.00
9 GA WHR module C SFCCL-LTEM-001-SE-DW-5609 I 150 US
ACT 0% 0.00
Page 25 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
C SCH 775.00
REFORMER STACK 775
ACT 8.75
SCH 30-Sep-06 15-Oct-06 30-Oct-06 29-Nov-06 15-Feb-08 100% 25.00
1 Structural design basis of Stack SFCCL-LTEM-001-SE-SP-5052 I 25 US
ACT 21-Sep-06 5% 1.25
SCH 17-Oct-06 1-Nov-06 16-Nov-06 16-Dec-06 15-Feb-08 100% 150.00
2 Structural design report of Stack SFCCL-LTEM-001-SE-CL-5019 I 150 US
ACT 21-Sep-06 5% 7.50
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 50.00
3 Foundation load data for STACK SFCCL-LTEM-001-SE-DW-5106 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 150.00
4 Stack GA SFCCL-LTEM-001-SE-DW-5900 I 150 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
5 Stack details -1 SFCCL-LTEM-001-SE-DW-5901 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
6 Stack details -2 SFCCL-LTEM-001-SE-DW-5904 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
7 Stack platform -1 SFCCL-LTEM-001-SE-DW-5907 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
8 Stack platform -2 SFCCL-LTEM-001-SE-DW-5909 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
9 Stack platform grating -1 SFCCL-LTEM-001-SE-DW-5911 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
10 Stack platform grating -2 SFCCL-LTEM-001-SE-DW-5913 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
11 Lifting and Shipping and transportation dwg -1 SFCCL-LTEM-001-SE-DW-5915 I 50 US
ACT 0% 0.00
Page 26 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
D SCH 1025.00
FG BOILER 1025
ACT 6.25
SCH 31-Aug-06 15-Sep-06 30-Sep-06 30-Oct-06 15-Feb-08 100% 25.00
1 Structural design basis of FG-Boiler SFCCL-LTEM-001-SE-SP-5053 I 25 Chem P&S
ACT 22-Sep-06 5% 1.25
SCH 30-Nov-06 15-Dec-06 30-Dec-06 29-Jan-07 15-Feb-08 100% 250.00
2 Structural design report of FG-Boiler SFCCL-LTEM-001-SE-CL-5004 I 250 Chem P&S
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 100.00
3 Foundation load data for FGB SFCCL-LTEM-001-SE-DW-5103 I 100 Chem P&S
ACT 22-Sep-06 5% 5.00
SCH 7-Apr-07 22-Apr-07 7-May-07 6-Jun-07 15-Feb-08 100% 150.00
4 FG Boiler Dwg -1 SFCCL-LTEM-001-SE-DW-5700 I 150 Chem P&S
ACT 0% 0.00
SCH 7-Apr-07 22-Apr-07 7-May-07 6-Jun-07 15-Feb-08 100% 150.00
5 FG Boiler Dwg -2 SFCCL-LTEM-001-SE-DW-5701 I 150 Chem P&S
ACT 0% 0.00
SCH 7-Apr-07 22-Apr-07 7-May-07 6-Jun-07 15-Feb-08 100% 150.00
6 FG Boiler Dwg -3 SFCCL-LTEM-001-SE-DW-5704 I 150 Chem P&S
ACT 0% 0.00
SCH 7-Apr-07 22-Apr-07 7-May-07 6-Jun-07 15-Feb-08 100% 100.00
7 FG Boiler platform Dwg - 1 SFCCL-LTEM-001-SE-DW-5706 I 100 Chem P&S
ACT 0% 0.00
SCH 30-Apr-07 15-May-07 30-May-07 29-Jun-07 15-Feb-08 100% 50.00
8 Grating dwg SFCCL-LTEM-001-SE-DW-5720 I 50 Chem P&S
ACT 0% 0.00
SCH 16-May-07 31-May-07 15-Jun-07 15-Jul-07 15-Feb-08 100% 50.00
9 Lifting and Shipping and transportation dwg -1 SFCCL-LTEM-001-SE-DW-5725 I 50 Chem P&S
ACT 0% 0.00
E SCH 12675.00
J-MODULE 1125
ACT 0.00
SCH 22-Oct-06 6-Nov-06 21-Nov-06 21-Dec-06 15-Feb-08 100% 10875.00
1 Structural design basis of J-Module SFCCL-LTEM-001-SE-SP-5054 I 25 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 900.00
2 Structural design report of J-Module SFCCL-LTEM-001-SE-CL-5003 I 200 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 100.00
3 Foundation load data for J- Module SFCCL-LTEM-001-SE-DW-5101 I 100 US
ACT 0% 0.00
SCH 6-Mar-07 21-Mar-07 5-Apr-07 5-May-07 15-Feb-08 100% 200.00
4 J-Module GA -1 SFCCL-LTEM-001-SE-DW-5500 I 200 US
ACT 0% 0.00
SCH 6-Mar-07 21-Mar-07 5-Apr-07 5-May-07 15-Feb-08 100% 200.00
5 J-Module GA -2 SFCCL-LTEM-001-SE-DW-5503 I 200 US
ACT 0% 0.00
SCH 6-Mar-07 21-Mar-07 5-Apr-07 5-May-07 15-Feb-08 100% 50.00
6 J-Module fabrication details -1 SFCCL-LTEM-001-SE-DW-5510 I 50 US
ACT 0% 0.00
SCH 6-Mar-07 21-Mar-07 5-Apr-07 5-May-07 15-Feb-08 100% 50.00
7 J-Module fabrication details -2 SFCCL-LTEM-001-SE-DW-5513 I 50 US
ACT 0% 0.00
SCH 31-Mar-07 15-Apr-07 30-Apr-07 30-May-07 15-Feb-08 100% 100.00
8 GA plan -1 SFCCL-LTEM-001-SE-DW-5520 I 100 US
ACT 0% 0.00
Page 27 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
F 5600.00
STEAM-DRUM SUPPORTING STRUCTURE 1575
0.00
SCH 30-Sep-06 15-Oct-06 30-Oct-06 29-Nov-06 15-Feb-08 100% 25.00
1 Structural design basis of Steam drum supporting structure SFCCL-LTEM-001-SE-SP-5055 I 25 US
ACT 20-Sep-06 5% 0.00
SCH 16-Dec-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 250.00
2 Structural design report of Steam drum supporting structure. SFCCL-LTEM-001-SE-CL-5005 I 250 US
ACT 0% 0.00
SCH 30-Nov-06 15-Dec-06 30-Dec-06 29-Jan-07 15-Feb-08 100% 100.00
3 Foundation load data for Steam Drum SFCCL-LTEM-001-SE-DW-5107 I 100 US
ACT 20-Sep-06 5% 0.00
SCH 10-Apr-07 25-Apr-07 10-May-07 9-Jun-07 15-Feb-08 100% 250.00
4 GA - steam drum supporting structure dwg- 1 SFCCL-LTEM-001-SE-DW-5800 I 250 US
ACT 0% 0.00
SCH 10-Apr-07 25-Apr-07 10-May-07 9-Jun-07 15-Feb-08 100% 250.00
5 GA - steam drum supporting structure dwg- 2 SFCCL-LTEM-001-SE-DW-5803 I 250 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
6 Fabrication Details dwg -1 SFCCL-LTEM-001-SE-DW-5810 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 4075.00
7 Fabrication Details dwg -2 SFCCL-LTEM-001-SE-DW-5811 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
8 Fabrication Details dwg -3 SFCCL-LTEM-001-SE-DW-5820 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
9 Fabrication Details dwg -4 SFCCL-LTEM-001-SE-DW-5821 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
10 Fabrication Details dwg -5 SFCCL-LTEM-001-SE-DW-5822 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
11 Fabrication Details dwg -6 SFCCL-LTEM-001-SE-DW-5823 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
12 Fabrication Details dwg -7 SFCCL-LTEM-001-SE-DW-5824 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
13 Fabrication Details dwg -8 SFCCL-LTEM-001-SE-DW-5825 I 50 US
ACT 0% 0.00
SCH 31-May-07 15-Jun-07 30-Jun-07 30-Jul-07 15-Feb-08 100% 100.00
14 Platform layout-1 SFCCL-LTEM-001-SE-DW-5835 I 100 US
ACT 0% 0.00
SCH 31-May-07 15-Jun-07 30-Jun-07 30-Jul-07 15-Feb-08 100% 100.00
15 Platform details -2 SFCCL-LTEM-001-SE-DW-5836 I 100 US
ACT 0% 0.00
SCH 31-May-07 15-Jun-07 30-Jun-07 30-Jul-07 15-Feb-08 100% 100.00
16 Platform details -3 SFCCL-LTEM-001-SE-DW-5837 I 100 US
ACT 0% 0.00
G 3475.00
Duct support + Pipe Rack + APH support +Staircase 3475
0.00
Structural design basis for Duct support + Pipe Rack + APH SCH 20-Sep-06 25-Sep-06 30-Sep-06 30-Oct-06 15-Feb-08 100% 50.00
1 SFCCL-LTEM-001-SE-SP-5056 I 50 US
support ACT 0% 0.00
Structural design report for Bypass Duct support between SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 150.00
2 SFCCL-LTEM-001-SE-CL-5007 I 150 US
WHR & APH ACT 0% 0.00
SCH 21-Apr-07 6-May-07 21-May-07 20-Jun-07 15-Feb-08 100% 150.00
3 Bypass duct support between WHR & APH , Dwg-1 SFCCL-LTEM-001-SE-DW-5850 I 150 US
ACT r 5% 0.00
Page 28 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
Page 29 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
H 800.00
COMMON DWGS AND SPECIFICATION 800
0.00
SCH 8-Jan-07 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 100.00
1 Fabrication specification SFCCL-LTEM-001-SE-SP-5060 I 100 US
ACT 0% 0.00
SCH 3-Oct-06 18-Oct-06 2-Nov-06 2-Dec-06 15-Feb-08 100% 200.00
2 Foundation layout dwg-1 SFCCL-LTEM-001-SE-DW-5885 I 200 US
ACT 0% 0.00
SCH 3-Oct-06 18-Oct-06 2-Nov-06 2-Dec-06 15-Feb-08 100% 200.00
3 Foundation layout dwg-2 SFCCL-LTEM-001-SE-DW-5887 I 200 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
4 Standered splice plate detail dwg -1 SFCCL-LTEM-001-SE-DW-5888 I 50 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
5 Standered splice plate detail dwg -2 SFCCL-LTEM-001-SE-DW-5890 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 25.00
6 Stair tread & typ grating clamp details dwg SFCCL-LTEM-001-SE-DW-5892 I 25 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 25.00
7 Hand rails and sectional details dwg SFCCL-LTEM-001-SE-DW-5894 I 25 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 25.00
8 standered ladder dwg-1 SFCCL-LTEM-001-SE-DW-5896 I 25 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 25.00
9 standered ladder dwg-2 SFCCL-LTEM-001-SE-DW-5898 I 25 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 100.00
10 General notes dwg SFCCL-LTEM-001-SE-DW-5899 I 100 US
ACT 0% 0.00
Page 30 of 38
LARSEN & TOUBRO LTD.
DOCUMENT NO. REV
LTEM
DOCUMENT SFCCL-LTEM-001-PE-
1
CONTROL INDEX GN-0001
PROJ : SFCCL – 700 MTPD Methanol Plant + 100
PAGE NO. : III
MTPD CO
PROCESS
DOCUMENTS / DRAWINGS
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
CATEGORY
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
A SCH 1700.00
DOCUMENTS / DRAWINGS 1700
ACT 27.50
SCH 25-Nov-06 5-Dec-06 10-Dec-06 9-Jan-07 15-Feb-08 100% 200.00
1 CFD for combustion air circuit (Analysis by TIC) SFCCL-LTEM-001-PC-CL-1200 I 200
ACT 0% 0.00
SCH 19-Nov-06 29-Nov-06 4-Dec-06 3-Jan-07 15-Feb-08 100% 200.00
2 Hydraulic calculation for fuel gas lines SFCCL-LTEM-001-PC-CL-1201 I 200
ACT 0% 0.00
Summary of hydraulic calculation for other critical SCH 15-Nov-06 25-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 400.00
3 SFCCL-LTEM-001-PC-CL-1202 I 400
lines ACT 19-Sep-06 5% 20.00
SCH 9-Oct-06 19-Oct-06 24-Oct-06 23-Nov-06 15-Feb-08 100% 50.00
4 Line list updation (Reformer area) SFCCL-LTEM-001-PC-LI-1110 I 50
ACT 22-Sep-06 5% 2.50
SCH 11-Oct-06 21-Oct-06 26-Oct-06 25-Nov-06 15-Feb-08 100% 150.00
5 P&ID for steam generation system SFCCL-LTEM-001-PC-UI-1050 A 150
ACT 0% 0.00
SCH 11-Oct-06 21-Oct-06 26-Oct-06 25-Nov-06 15-Feb-08 100% 150.00
6 P&ID for reformer SFCCL-LTEM-001-PC-PI-1001 A 150
ACT 0% 0.00
SCH 11-Oct-06 21-Oct-06 26-Oct-06 25-Nov-06 15-Feb-08 100% 150.00
7 P&ID for waste heat recovery SFCCL-LTEM-001-PC-PI-1002 A 150
ACT 0% 0.00
Updation of process datasheets for reformer SCH 9-Nov-06 19-Nov-06 24-Nov-06 24-Dec-06 15-Feb-08 100% 100.00
8 SFCCL-LTEM-001-PC-SP-1010 I 100
instruments ACT 0% 0.00
SCH 23-Feb-07 5-Mar-07 10-Mar-07 9-Apr-07 15-Feb-08 100% 200.00
9 Updation of operating manual (Reformer) SFCCL-LTEM-001-PC-SP-1020 I 200
ACT 0% 0.00
SCH 10-Sep-06 20-Sep-06 25-Sep-06 25-Oct-06 15-Feb-08 100% 50.00
10 Utility consumption (Reformer) SFCCL-LTEM-001-PC-LI-1120 I 50
ACT 20-Sep-06 5% 2.50
SCH 10-Sep-06 20-Sep-06 25-Sep-06 25-Oct-06 15-Feb-08 100% 50.00
11 Power consumption (Reformer) SFCCL-LTEM-001-PC-LI-1130 I 50
ACT 21-Sep-06 5% 2.50
Page 33 of 38
LARSEN & TOUBRO LTD.
DOCUMENT NO. REV
LTEM
DOCUMENT SFCCL-LTEM-001-PE-
1
CONTROL INDEX GN-0001
PROJ : SFCCL – 700 MTPD Methanol Plant + 100
PAGE NO. : IV
MTPD CO
PIPING
DOCUMENTS / DRAWINGS
SUPPLIER : L&T UNIT SYSTEM/ SFCCL-LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
A SCH 200.00
PIPING LAYOUT 200
ACT 2.50
Piping layout( plan and elevation) & loading for SCH 5-Oct-06 20-Oct-06 4-Nov-06 4-Dec-06 15-Feb-08 100% 50.00
1 SFCCL-LTEM-001-PP-GA-4901 A 50 CHEM P&S
reformer ACT 1-Sep-06 5% 2.50
SCH 25-Sep-06 10-Oct-06 25-Oct-06 24-Nov-06 15-Feb-08 100% 50.00
2 Piping layout & loading for WHR SFCCL-LTEM-001-PP-GA-4902 A 50 CHEM P&S
ACT 0% 0.00
SCH 23-Jan-07 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 50.00
3 Piping layout & loading for steam drum SFCCL-LTEM-001-PP-GA-4903 A 50 CHEM P&S
ACT 0% 0.00
SCH 1-Jan-07 16-Jan-07 31-Jan-07 2-Mar-07 15-Feb-08 100% 50.00
4 Piping layout & loading for FGB SFCCL-LTEM-001-PP-GA-4904 A 50 CHEM P&S
ACT 0% 0.00
B SCH 100.00
MISC. DRAWINGS 100
ACT 0.00
SCH 2-Dec-06 16-Jan-07 31-Jan-07 2-Mar-07 15-Feb-08 100% 50.00
1 Piping paltform/grating cutout dwg. SFCCL-LTEM-001-PP-GA-4905 I 50 CHEM P&S
ACT 0% 0.00
SCH 2-Dec-06 16-Jan-07 31-Jan-07 2-Mar-07 15-Feb-08 100% 50.00
2 Piping pedestal loading layout. SFCCL-LTEM-001-PP-GA-4906 I 50 CHEM P&S
ACT 0% 0.00
C SCH 5200.00
STRESS ANALYSIS 4400
ACT 0.00
SCH 5-Oct-06 19-Nov-06 4-Dec-06 3-Jan-07 15-Feb-08 100% 200.00
1 Stress report in reformer area ( fuel gas line ) SFCCL-LTEM-001-PP-CL-4001 A 200 CHEM P&S
ACT 0% 0.00
Stress report in WHR area ( K 431/203 to E 203B SCH 25-Oct-06 9-Dec-06 24-Dec-06 23-Jan-07 15-Feb-08 100% 1000.00
2 SFCCL-LTEM-001-PP-CL-4002 A 200 CHEM P&S
inlet ) ACT 0% 0.00
Stress report in WHR area ( E 203B outlet to E203 SCH 25-Oct-06 9-Dec-06 24-Dec-06 23-Jan-07 15-Feb-08 100% 200.00
3 SFCCL-LTEM-001-PP-CL-4003 A 200 CHEM P&S
A inlet ) ACT 0% 0.00
Stress report in WHR area ( E 203 A outlet to SCH 25-Oct-06 9-Dec-06 24-Dec-06 23-Jan-07 15-Feb-08 100% 200.00
4 SFCCL-LTEM-001-PP-CL-4004 A 200 CHEM P&S
R201) ACT 0% 0.00
Stress report in WHR area ( R 202 outlet to E201 SCH 25-Oct-06 9-Dec-06 24-Dec-06 23-Jan-07 15-Feb-08 100% 200.00
5 SFCCL-LTEM-001-PP-CL-4005 A 200 CHEM P&S
Inlet) ACT 0% 0.00
Stress report in WHR area ( E201 Outlet to H-201 SCH 25-Oct-06 9-Dec-06 24-Dec-06 23-Jan-07 15-Feb-08 100% 200.00
6 SFCCL-LTEM-001-PP-CL-4006 A 200 CHEM P&S
Inlet) ACT 0% 0.00
Stress report in Steam Drum area(B 201 to E202 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
7 SFCCL-LTEM-001-PP-CL-4007 A 200 CHEM P&S
Inlet) ACT 0% 0.00
Stress report in Steam Drum area( E202 Outlet to SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
8 SFCCL-LTEM-001-PP-CL-4008 A 200 CHEM P&S
Piperack) ACT 0% 0.00
Stress report in Steam Drum area( E202 Outlet to SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
9 SFCCL-LTEM-001-PP-CL-4009 A 200 CHEM P&S
Piperack) ACT 0% 0.00
Stress report in Steam Drum area( FG Boiler E205 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
10 SFCCL-LTEM-001-PP-CL-4010 A 200 CHEM P&S
Riser 1) ACT 0% 0.00
Stress report in Steam Drum area( FG Boiler E205 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
11 SFCCL-LTEM-001-PP-CL-4011 A 200 CHEM P&S
Riser 2) ACT 0% 0.00
Stress report in Steam Drum area( FG Boiler E205 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
12 SFCCL-LTEM-001-PP-CL-4012 A 200 CHEM P&S
Riser 3) ACT 0% 0.00
Stress report in Steam Drum area( FG Boiler E205 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
13 SFCCL-LTEM-001-PP-CL-4013 A 200 CHEM P&S
Downcomer 1) ACT 0% 0.00
Stress report in Steam Drum area( FG Boiler E205 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
14 SFCCL-LTEM-001-PP-CL-4014 A 200 CHEM P&S
Downcomer 2) ACT 0% 0.00
Page 36 of 38
SUPPLIER : L&T UNIT SYSTEM/ SFCCL-LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
Stress report in Steam Drum area( FG Boiler E205 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
15 SFCCL-LTEM-001-PP-CL-4015 A 200 CHEM P&S
Downcomer 3) ACT 0% 0.00
Stress report in Steam Drum area( RG Boiler E210 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
16 SFCCL-LTEM-001-PP-CL-4016 A 200 CHEM P&S
Riser 1) ACT 0% 0.00
Stress report in Steam Drum area( RG Boiler E210 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
17 SFCCL-LTEM-001-PP-CL-4017 A 200 CHEM P&S
Riser 2) ACT 0% 0.00
Stress report in Steam Drum area( RG Boiler E210 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
18 SFCCL-LTEM-001-PP-CL-4018 A 200 CHEM P&S
Riser 3) ACT 0% 0.00
Stress report in Steam Drum area( RG Boiler E210 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
19 SFCCL-LTEM-001-PP-CL-4019 A 200 CHEM P&S
Downcomer 1) ACT 0% 0.00
Stress report in Steam Drum area( RG Boiler E210 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
20 SFCCL-LTEM-001-PP-CL-4020 A 200 CHEM P&S
Downcomer 2) ACT 0% 0.00
Stress report in Steam Drum area( RG Boiler E210 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
21 SFCCL-LTEM-001-PP-CL-4021 A 200 CHEM P&S
Downcomer 3) ACT 0% 0.00
Stress report in Steam Drum area( Recycled Co2 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
22 SFCCL-LTEM-001-PP-CL-4022 A 200 CHEM P&S
from K205) ACT 0% 0.00
D SCH 500.00
ISOMETRICS 500
ACT 0.00
SCH 18-Feb-07 4-Apr-07 19-Apr-07 19-May-07 15-Feb-08 100% 100.00
1 Piping Isometric extraction for reformer SFCCL-LTEM-001-PP-IS-4201 I 100 CHEM P&S
ACT 0% 0.00
SCH 24-Mar-07 8-May-07 23-May-07 22-Jun-07 15-Feb-08 100% 100.00
2 Piping Isometric extraction for WHR SFCCL-LTEM-001-PP-IS-4301 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-Apr-07 7-Jun-07 22-Jun-07 22-Jul-07 15-Feb-08 100% 100.00
3 Piping Isometric extraction for Steam Drum SFCCL-LTEM-001-PP-IS-4401 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Jun-07 6-Aug-07 21-Aug-07 20-Sep-07 15-Feb-08 100% 100.00
4 Piping Isometric extraction for other area SFCCL-LTEM-001-PP-IS-4501 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Jun-07 6-Aug-07 21-Aug-07 20-Sep-07 15-Feb-08 100% 100.00
5 Piping isometric control index. SFCCL-LTEM-001-PP-IS-4200 I 100 CHEM P&S
ACT 0% 0.00
E SCH 2400.00
GENERAL ARRAGEMENT DRAWIGS 2400
ACT 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
1 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4101 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
2 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4102 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
3 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4103 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
4 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4104 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
5 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4105 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
6 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4106 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
7 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4107 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
8 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4108 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
9 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4109 I 100 CHEM P&S
ACT 0% 0.00
Page 37 of 38
SUPPLIER : L&T UNIT SYSTEM/ SFCCL-LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20
WEIGHTAGE
DWG / DOC
REVISION
% PROG.
LATEST
Drafting Issued For Issued For
REMARK /
SCH /
SR DRAWING/ DOC. WTD APPROVAL
ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
F SCH 0.00
PIPING SUPPORTING 400
ACT 0.00
SCH 20-Dec-06 3-Feb-07 18-Feb-07 20-Mar-07 15-Feb-08 0% 0.00
1 Pipe Support Design (special support sketches ) SFCCL-LTEM-001-PP-DW-4801 I 100 CHEM P&S
ACT 0% 0.00
SCH 20-Dec-06 3-Feb-07 18-Feb-07 20-Mar-07 15-Feb-08 0% 0.00
2 Pipe Support Design (spring specification ) SFCCL-LTEM-001-PP-DW-4802 I 100 CHEM P&S
ACT 0% 0.00
SCH 20-Dec-06 3-Feb-07 18-Feb-07 20-Mar-07 15-Feb-08 0% 0.00
3 Pipe support design ( vessel clit with loading ) SFCCL-LTEM-001-PP-DW-4803 I 100 CHEM P&S
ACT 0% 0.00
SCH 7-Jun-07 22-Jul-07 6-Aug-07 5-Sep-07 15-Feb-08 0% 0.00
4 Pipe Support Design Finish SFCCL-LTEM-001-PP-DW-4804 I 100 CHEM P&S
ACT 0% 0.00
G SCH
MTO 300
ACT
SCH 2-Dec-06 16-Jan-07 31-Jan-07 2-Mar-07 15-Feb-08 0% 0.00
1 First MTO ( preliminary) SFCCL-LTEM-001-PP-BQ-4101 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 0% 0.00
2 Second MTO SFCCL-LTEM-001-PP-BQ-4102 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Jun-07 6-Aug-07 21-Aug-07 20-Sep-07 15-Feb-08 0% 0.00
3 Final MTO SFCCL-LTEM-001-PP-BQ-4103 I 100 CHEM P&S
ACT 0% 0.00