0% found this document useful (0 votes)
472 views38 pages

Methanol Plant Document Index

This document is a document control index for a 700 MTPD methanol plant and 100 MTPD CO project in Al Jubail, Saudi Arabia. It lists the various drawings and documents for the project across different disciplines like process, piping, structural, and vendor documentation. The vendor documentation section lists documents for equipment like the inlet distributor, catalyst tubes, steam drum, waste heat boiler, burners, and air preheaters.

Uploaded by

mahesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
472 views38 pages

Methanol Plant Document Index

This document is a document control index for a 700 MTPD methanol plant and 100 MTPD CO project in Al Jubail, Saudi Arabia. It lists the various drawings and documents for the project across different disciplines like process, piping, structural, and vendor documentation. The vendor documentation section lists documents for equipment like the inlet distributor, catalyst tubes, steam drum, waste heat boiler, burners, and air preheaters.

Uploaded by

mahesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 38

LARSEN & TOUBRO LTD.

DOCUMENT NO. REV


LTEM
DOCUMENT SFCCL-LTEM-001-PE-
1
CONTROL INDEX GN-0001
PROJ : SFCCL – 700 MTPD Methanol Plant + 100
COVER SHEET : 1 of 28
MTPD CO

OWNER : SAUDI FORMALDEHYDE CHEMICAL CO. LTD.

PROCESS LICENSOR : HALDOR TOPSOE A/S, DENMARK.

SUPPLIERS : LARSEN & TOUBRO LIMITED


HALDOR TOPSOE A/S

PROJECT : METHANOL & CO PLANT WITH ASSOCIATED


FACILITIES

LOCATION : AL JUBAIL, KINGDOM OF SAUDI ARABIA

CONTRACT REF. : ENGINEERING CONTRACT DT. 23.02.06

LTEM JOB CODE : SFCCL

UNIT : REFORMER H-201

ITEM : DOCUMENT CONTROL INDEX

LARSEN & TOUBRO LIMITED, MUMBAI.


LTEM.
PRELIMINARY FINAL AS BUILT
DOCUMENT STATUS
üISSUED FOR

CONSTRUCTION APPROVAL

ü INFORMATION ORDER

ENQUIRY CERTIFIED

SIGN.: DIPAK BHARUKA DATE: 03/10/06

1 3/10/2006 Second Issue RJP DB DB


0 9/9/2006 First Issue RJP DB DB
FILENAME : 472280592.xls
REV DATE DESCRIPTION PPD CHKD APPD
INFORMATION CONTAINED HEREIN IS OUR PROPERTY AND MUST NOT BE USED BY OR CONVEYED TO ANY PERSON WITHOUT OUR PERMISSION

FILENAME : 472280592.xls
LARSEN & TOUBRO LTD.
DOCUMENT NO. REV
LTEM
DOCUMENT SFCCL-LTEM-001-PE-
1
CONTROL INDEX GN-0001
PROJ : SFCCL – 700 MTPD Methanol Plant + 100
PAGE NO. : 2 of 28
MTPD CO

CONTENTS

ITEM DESCRIPTION PAGE NO.

SYSTEM I
A GENERAL ARRANGEMENT - PRIMARY REFORMER 3
B FLUE GAS DUCT DRAWINGS 3
C COMBUSTION AIR DUCT DRAWINGS 3
D FGB DRAWINGS 4
E WHR DRAWINGS 4
F MECHANICAL COMPONENT DRAWINGS 5
G DESIGN CALCULATIONS 6
H FABRICATION SPECIFICATIONS 6
I PURCHASE REQUISITIONS/SPECIFICATIONS 7
J VENDOR DOCUMENTATION 7
J-1 INLET DISTRIBUTOR 7
J-2 INLET HAIR-PIN TUBE 8
J-3 CATALYST TUBE 8
J-4 COLD COLLECTOR 9
J-5 STEAM DRUM 10
J-6 WASTE HEAT BOILER 10
J-7 BURNER 12
J-8 INLET HAIR-PIN TUBE SPRING 13
J-9 MISC 13
J-10 REFRACTORY 13
J-11 AIR PREHEATER (APH) 15
J-12 FD FAN 15
J-13 ID FAN 16

STRUCTURAL II
A RADIANT STRUCTURE 17
B WHR STRUCTURE / CONVECTION MODULE 19
C REFORMER STACK 20
D FG BOILER 21
E J-MODULE 21
F STEAM-DRUM SUPPORTING STRUCTURE 22
G DUCT SUPPORT + PIPE RACK + APH SUPPORT +STAIRCASE 22
H COMMON DWGS AND SPECIFICATION 24

PROCESS III
A DOCUMENTS / DRAWINGS 25

PIPING IV
A PIPING LAYOUT 26
B MISC. DRAWINGS 26
C STRESS ANALYSIS 26
D ISOMETRICS 27
E GENERAL ARRAGEMENT DRAWIGS 27
F PIPING SUPPORTING 28
G MTO 28
LARSEN & TOUBRO LTD.
DOCUMENT NO. REV
LTEM
DOCUMENT SFCCL-LTEM-001-PE-
1
CONTROL INDEX GN-0001
PROJ : SFCCL – 700 MTPD Methanol Plant + 100
PAGE NO. : I
MTPD CO

SYSTEM

DOCUMENTS / DRAWINGS
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

A GENERAL ARRANGEMENT - PRIMARY SCH 1800.00


1800
REFORMER ACT 0.00
SCH 3-Oct-06 17-Nov-06 2-Dec-06 1-Jan-07 15-Feb-08 100% 300.00
1 General Arrangement Plan SFCCL-LTEM-001-EQ-DW-0100 A 300 US
ACT 0% 0.00
SCH 3-Oct-06 17-Nov-06 2-Dec-06 1-Jan-07 15-Feb-08 100% 300.00
2 General Arrangement Elevation SFCCL-LTEM-001-EQ-DW-0101 A 300 US
ACT 0% 0.00
SCH 3-Oct-06 17-Nov-06 2-Dec-06 1-Jan-07 15-Feb-08 100% 300.00
3 General Arrangement Side View - I SFCCL-LTEM-001-EQ-DW-0102 A 300 US
ACT 0% 0.00
SCH 3-Oct-06 17-Nov-06 2-Dec-06 1-Jan-07 15-Feb-08 100% 300.00
4 General Arrangement Side View - II SFCCL-LTEM-001-EQ-DW-0103 A 300 US
ACT 0% 0.00
SCH 25-Oct-06 9-Dec-06 24-Dec-06 23-Jan-07 15-Feb-08 100% 300.00
5 General Arrangement For WHR - I SFCCL-LTEM-001-EQ-DW-0110 A 300 US
ACT 0% 0.00
SCH 25-Oct-06 9-Dec-06 24-Dec-06 23-Jan-07 15-Feb-08 100% 300.00
6 General Arrangement For WHR - II SFCCL-LTEM-001-EQ-DW-0111 A 300 US
ACT 0% 0.00

B SCH 400.00
FLUE GAS DUCT DRAWINGS 400
ACT 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 100.00
1 GA For Flue Gas Ducting 1 SFCCL-LTEM-001-EQ-DW-0200 I 100 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 100.00
2 GA For Flue Gas Ducting 2 SFCCL-LTEM-001-EQ-DW-0201 I 100 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
3 Fabrication Detail of Flue Gas Ducting - FG1 SFCCL-LTEM-001-EQ-FD-0205 I 50 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
4 Fabrication Detail of Flue Gas Ducting - FG2 SFCCL-LTEM-001-EQ-FD-0206 I 50 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
5 Fabrication Detail of Flue Gas Ducting - FG3 SFCCL-LTEM-001-EQ-FD-0207 I 50 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
6 Fabrication Detail of Flue Gas Ducting - FG4 SFCCL-LTEM-001-EQ-FD-0208 I 50 US
ACT 0% 0.00

C SCH 500.00
COMBUSTION AIR DUCT DRAWINGS 500
ACT 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 100.00
1 GA For Combustion Air Ducting 1 SFCCL-LTEM-001-EQ-DW-0220 I 100 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 100.00
2 GA For Combustion Air Ducting 2 SFCCL-LTEM-001-EQ-DW-0221 I 100 US
ACT 0% 0.00
SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 100.00
3 GA For Combustion Air Ducting 3 SFCCL-LTEM-001-EQ-DW-0222 I 100 US
ACT 0% 0.00
Fabrication Detail of Combustion Air Ducting - SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
4 SFCCL-LTEM-001-EQ-FD-0225 I 50 US
CA1 ACT 0% 0.00
Fabrication Detail of Combustion Air Ducting - SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
5 SFCCL-LTEM-001-EQ-FD-0226 I 50 US
CA2 ACT 0% 0.00
Fabrication Detail of Combustion Air Ducting - SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
6 SFCCL-LTEM-001-EQ-FD-0227 I 50 US
CA3 ACT 0% 0.00
Fabrication Detail of Combustion Air Ducting - SCH 5-Mar-07 19-Apr-07 4-May-07 3-Jun-07 15-Feb-08 100% 50.00
7 SFCCL-LTEM-001-EQ-FD-0228 I 50 US
CA4 ACT 0% 0.00

Page 7 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

D SCH 600.00
FGB DRAWINGS 600
ACT 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 200.00
1 GA For Coil E 205 SFCCL-LTEM-001-EQ-DW-0120 I 200 Chem P&S
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 200.00
2 Coil Details for E 205 SFCCL-LTEM-001-EQ-DW-0121 I 200 Chem P&S
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 100.00
3 Header Assembly for Coil E 205 SFCCL-LTEM-001-EQ-DW-0122 I 100 Chem P&S
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 100.00
4 Header Support Details for Coil E 205 SFCCL-LTEM-001-EQ-DW-0123 I 100 Chem P&S
ACT 0% 0.00

E SCH 3390.00
WHR DRAWINGS 3390
ACT 0.00
SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 200.00
1 GA For Coil E 201 & E 202 (Upper) SFCCL-LTEM-001-EQ-DW-0130 A 200 US
ACT 0% 0.00
SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 150.00
2 Coil Details for E 201 SFCCL-LTEM-001-EQ-DW-0131 A 150 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 150.00
3 Coil Details for E 202 (Upper) SFCCL-LTEM-001-EQ-DW-0132 A 150 US
ACT 0% 0.00
SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 100.00
4 Header Assembly for Coil E 201 SFCCL-LTEM-001-EQ-DW-0133 I 100 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 100.00
5 Header Assembly for Coil E 202 (Upper) SFCCL-LTEM-001-EQ-DW-0134 I 100 US
ACT 0% 0.00
SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 100.00
6 Header Support Details for Coil E 201 SFCCL-LTEM-001-EQ-DW-0135 I 100 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 100.00
7 Header Support Details for Coil E 202 (Upper) SFCCL-LTEM-001-EQ-DW-0136 I 100 US
ACT 0% 0.00
Details of RHS Header Box for Coil E201 & E 202 SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 50.00
8 SFCCL-LTEM-001-EQ-DW-0137 I 50 US
(Upper) ACT 0% 0.00
Details of LHS Header Box for Coil E 201& E 202 SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 50.00
9 SFCCL-LTEM-001-EQ-DW-0138 I 50 US
(Upper) ACT 0% 0.00
Details of End Tubesheet for Coil E 201 & E 202 SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 50.00
10 SFCCL-LTEM-001-EQ-DW-0139 I 50 US
(Upper) ACT 0% 0.00
SCH 9-Dec-06 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 100.00
11 Intermediate Tubesheets for Coil E 201 SFCCL-LTEM-001-EQ-DW-0140 I 100 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 100.00
12 Intermediate Tubesheets for Coil E 202 (Upper) SFCCL-LTEM-001-EQ-DW-0141 I 100 US
ACT 0% 0.00
SCH 7-Jan-07 21-Feb-07 8-Mar-07 7-Apr-07 15-Feb-08 100% 200.00
13 GA For Coil E 202 (Lower) & E 203 A SFCCL-LTEM-001-EQ-DW-0150 A 200 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 150.00
14 Coil Details for E 202 (Lower) SFCCL-LTEM-001-EQ-DW-0151 A 150 US
ACT 0% 0.00
SCH 7-Jan-07 21-Feb-07 8-Mar-07 7-Apr-07 15-Feb-08 100% 150.00
15 Coil Details for E 203 A SFCCL-LTEM-001-EQ-DW-0152 A 150 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 100.00
16 Header Assembly for Coil E 202 (Lower) SFCCL-LTEM-001-EQ-DW-0153 I 100 US
ACT 0% 0.00

Page 8 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 7-Jan-07 21-Feb-07 8-Mar-07 7-Apr-07 15-Feb-08 100% 100.00


17 Header Assembly for Coil E 203 A SFCCL-LTEM-001-EQ-DW-0154 I 100 US
ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 100.00
18 Header Support Details for Coil E 202 (Lower) SFCCL-LTEM-001-EQ-DW-0155 I 100 US
ACT 0% 0.00
SCH 7-Jan-07 21-Feb-07 8-Mar-07 7-Apr-07 15-Feb-08 100% 100.00
19 Header Support Details for Coil E 203 A SFCCL-LTEM-001-EQ-DW-0156 I 100 US
ACT 0% 0.00
Details of RHS Header Box for Coil E 202 (Lower) SCH 7-Jan-07 21-Feb-07 8-Mar-07 7-Apr-07 15-Feb-08 100% 70.00
20 SFCCL-LTEM-001-EQ-DW-0157 I 70 US
& E203 A ACT 0% 0.00
Details of LHS Header Box for Coil E 202 (Lower) SCH 7-Jan-07 21-Feb-07 8-Mar-07 7-Apr-07 15-Feb-08 100% 70.00
21 SFCCL-LTEM-001-EQ-DW-0158 I 70 US
& E 203 A ACT 0% 0.00
Details of End Tubesheet for Coil E 202 (Lower) E SCH 7-Jan-07 21-Feb-07 8-Mar-07 7-Apr-07 15-Feb-08 100% 50.00
22 SFCCL-LTEM-001-EQ-DW-0159 I 50 US
203 A ACT 0% 0.00
SCH 24-Dec-06 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 100.00
23 Intermediate Tubesheets for Coil E 202 (Lower) SFCCL-LTEM-001-EQ-DW-0160 I 100 US
ACT 0% 0.00
SCH 7-Jan-07 21-Feb-07 8-Mar-07 7-Apr-07 15-Feb-08 100% 100.00
24 Intermediate Tubesheets for Coil E 203 A SFCCL-LTEM-001-EQ-DW-0161 I 100 US
ACT 0% 0.00
SCH 19-Jan-07 5-Mar-07 20-Mar-07 19-Apr-07 15-Feb-08 100% 200.00
25 GA For Coil E 203 B SFCCL-LTEM-001-EQ-DW-0170 A 200 US
ACT 0% 0.00
SCH 19-Jan-07 5-Mar-07 20-Mar-07 19-Apr-07 15-Feb-08 100% 150.00
26 Coil Details for E 203 B SFCCL-LTEM-001-EQ-DW-0171 A 150 US
ACT 0% 0.00
SCH 19-Jan-07 5-Mar-07 20-Mar-07 19-Apr-07 15-Feb-08 100% 100.00
27 Header Assembly for Coil E 203 B SFCCL-LTEM-001-EQ-DW-0172 I 100 US
ACT 0% 0.00
SCH 19-Jan-07 5-Mar-07 20-Mar-07 19-Apr-07 15-Feb-08 100% 100.00
28 Header Support Details for Coil E 203 B SFCCL-LTEM-001-EQ-DW-0173 I 100 US
ACT 0% 0.00
SCH 19-Jan-07 5-Mar-07 20-Mar-07 19-Apr-07 15-Feb-08 100% 75.00
29 Details of RHS Header Box for Coil E203 B SFCCL-LTEM-001-EQ-DW-0174 I 75 US
ACT 0% 0.00
SCH 19-Jan-07 5-Mar-07 20-Mar-07 19-Apr-07 15-Feb-08 100% 75.00
30 Details of LHS Header Box for Coil E 203 B SFCCL-LTEM-001-EQ-DW-0175 I 75 US
ACT 0% 0.00
SCH 19-Jan-07 5-Mar-07 20-Mar-07 19-Apr-07 15-Feb-08 100% 50.00
31 Details of End Tubesheet for Coil E 203 B SFCCL-LTEM-001-EQ-DW-0176 I 50 US
ACT 0% 0.00
SCH 19-Jan-07 5-Mar-07 20-Mar-07 19-Apr-07 15-Feb-08 100% 100.00
32 Intermediate Tubesheets for Coil E 203 B SFCCL-LTEM-001-EQ-DW-0177 I 100 US
ACT 0% 0.00

F SCH 975.00
MECHANICAL COMPONENT DRAWINGS 975
ACT 0.00
SCH 3-Nov-06 18-Dec-06 2-Jan-07 1-Feb-07 15-Feb-08 100% 100.00
1 GA Of Hot Parts SFCCL-LTEM-001-EQ-DW-0105 A 100 US
ACT 0% 0.00
SCH 10-Nov-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
2 Radiant Peep Door SFCCL-LTEM-001-EQ-FD-0300 I 50 US
ACT 0% 0.00
SCH 10-Nov-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
3 Radiant Access Door SFCCL-LTEM-001-EQ-FD-0301 I 50 US
ACT 0% 0.00
SCH 10-Nov-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
4 Taper duct access door SFCCL-LTEM-001-EQ-FD-0302 I 50 US
ACT 0% 0.00
SCH 10-Nov-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
5 False-air damper door SFCCL-LTEM-001-EQ-FD-0303 I 50 US
ACT 0% 0.00
SCH 10-Nov-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 100.00
6 Heat shield for False-ari damper SFCCL-LTEM-001-EQ-FD-0304 I 100 US
ACT 0% 0.00
SCH 17-Nov-06 1-Jan-07 16-Jan-07 15-Feb-07 15-Feb-08 100% 50.00
7 Flue gas duct access door SFCCL-LTEM-001-EQ-FD-0305 I 50 US
ACT 0% 0.00

Page 9 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 17-Nov-06 1-Jan-07 16-Jan-07 15-Feb-07 15-Feb-08 100% 50.00


8 WHR access door SFCCL-LTEM-001-EQ-FD-0306 I 50 US
ACT 0% 0.00
MISC.

SCH 17-Nov-06 1-Jan-07 16-Jan-07 15-Feb-07 15-Feb-08 100% 25.00


9 SS ring for catalyst tube SFCCL-LTEM-001-EQ-FD-0307 I 25 US
ACT 0% 0.00
SCH 17-Nov-06 1-Jan-07 16-Jan-07 15-Feb-07 15-Feb-08 100% 25.00
5 Penetration seal at catalyst tube outlet SFCCL-LTEM-001-EQ-FD-0308 I 25 US
ACT 0% 0.00
SCH 17-Nov-06 1-Jan-07 16-Jan-07 15-Feb-07 15-Feb-08 100% 25.00
6 Guide ring for catalyst tube SFCCL-LTEM-001-EQ-FD-0309 I 25 US
ACT 0% 0.00
SCH 17-Nov-06 1-Jan-07 16-Jan-07 15-Feb-07 15-Feb-08 100% 25.00
7 Brace for inlet hair pin tubes SFCCL-LTEM-001-EQ-FD-0310 I 25 US
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 50.00
8 Typical instrument nozzle connections SFCCL-LTEM-001-EQ-FD-0311 I 50 US
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 25.00
9 Guide plate for inlet distributor SFCCL-LTEM-001-EQ-FD-0312 I 25 US
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 50.00
10 General Notes for WHR coils. SFCCL-LTEM-001-EQ-FD-0313 I 50 US
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 100.00
11 Brackets / Guides for Intermediate Tubesheets SFCCL-LTEM-001-EQ-FD-0314 I 100 US
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 25.00
12 Washer & Sleeve Details for WHR. SFCCL-LTEM-001-EQ-FD-0315 I 25 US
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 25.00
13 Ferrules for WHR SFCCL-LTEM-001-EQ-FD-0316 I 25 US
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 100.00
14 Weldolets for WHR. SFCCL-LTEM-001-EQ-FD-0317 I 100 US
ACT 0% 0.00

G SCH 2000.00
DESIGN CALCULATIONS 2000
ACT 700.00
SCH 11-Oct-06 25-Nov-06 10-Dec-06 9-Jan-07 15-Feb-08 100% 500.00
1 Coil Design Calculations as per ASME Sec I SFCCL-LTEM-001-EQ-CL-0010 A 500 US
ACT 25-Aug-06 18-Sep-06 20-Sep-06 70% 350.00
SCH 11-Oct-06 25-Nov-06 10-Dec-06 9-Jan-07 15-Feb-08 100% 500.00
2 Coil Design Calculations as per API 530 SFCCL-LTEM-001-EQ-CL-0011 A 500 US
ACT 25-Aug-06 18-Sep-06 20-Sep-06 70% 350.00
SCH 31-Oct-06 15-Dec-06 30-Dec-06 29-Jan-07 15-Feb-08 100% 1000.00
3 Intermediate Tubesheet Design Calculations. SFCCL-LTEM-001-EQ-CL-0012 A 1000 US
ACT 0% 0.00

H SCH 150.00
FABRICATION SPECIFICATIONS 150
ACT 0.00
SCH 4-Jan-07 18-Feb-07 5-Mar-07 4-Apr-07 15-Feb-08 100% 50.00
1 Specification For Fabrication & Erection SFCCL-LTEM-001-EQ-SP-0016 I 50 US
ACT 0% 0.00
SCH 6-Mar-07 20-Apr-07 5-May-07 4-Jun-07 15-Feb-08 100% 50.00
2 Specification For Painting SFCCL-LTEM-001-EQ-SP-0017 I 50 US
ACT 0% 0.00
SCH 6-May-07 20-Jun-07 5-Jul-07 4-Aug-07 15-Feb-08 100% 50.00
3 Specification For Insulation SFCCL-LTEM-001-EQ-SP-0018 I 50 US
ACT 0% 0.00

Page 10 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

I PURCHASE SCH 1400.00


1400
REQUISITIONS/SPECIFICATIONS ACT 315.00
SCH 23-Aug-06 7-Oct-06 22-Oct-06 21-Nov-06 15-Feb-08 100% 50.00
1 PR for Inlet distributor SFCCL-LTEM-001-EQ-MR-0020 I 50 Chem P&S
ACT 21-Aug-06 13-Sep-06 45% 22.50
SCH 26-Aug-06 10-Oct-06 25-Oct-06 24-Nov-06 15-Feb-08 100% 50.00
2 PR for inlet hairpin tube SFCCL-LTEM-001-EQ-MR-0021 I 50 Chem P&S
ACT 1-Sep-06 13-Sep-06 45% 22.50
SCH 18-Aug-06 2-Oct-06 17-Oct-06 16-Nov-06 15-Feb-08 100% 100.00
3 PR for Catalyst tube SFCCL-LTEM-001-EQ-MR-0022 A 100 US
ACT 20-Jul-06 25-Jul-06 1-Aug-06 70% 70.00
SCH 20-Aug-06 4-Oct-06 19-Oct-06 18-Nov-06 15-Feb-08 100% 50.00
4 Specification for cold collector SFCCL-LTEM-001-EQ-MR-0023 A 50 Chem P&S
ACT 8-Sep-06 13-Sep-06 45% 22.50
SCH 11-Aug-06 25-Sep-06 10-Oct-06 9-Nov-06 15-Feb-08 100% 50.00
5 Specification for SD & WHB SFCCL-LTEM-001-EQ-MR-0024 I 50 Chem P&S
ACT 21-Aug-06 4-Sep-06 12-Sep-06 70% 35.00
SCH 3-Sep-06 18-Sep-06 3-Oct-06 2-Nov-06 15-Feb-08 100% 50.00
6 Specification for air preheater SFCCL-LTEM-001-EQ-MR-0025 I 50 Chem P&S
ACT 0% 0.00
SCH 10-Sep-06 25-Oct-06 9-Nov-06 9-Dec-06 15-Feb-08 100% 50.00
7 PR for spring for inlet hair pins SFCCL-LTEM-001-EQ-MR-0026 I 50 US
ACT 8-Sep-06 5% 2.50
SCH 22-Nov-06 6-Jan-07 21-Jan-07 20-Feb-07 15-Feb-08 100% 50.00
8 PR for false-air damper SFCCL-LTEM-001-EQ-MR-0027 I 50 US
ACT 0% 0.00
SCH 7-Aug-06 21-Sep-06 6-Oct-06 5-Nov-06 15-Feb-08 100% 100.00
9 PR for tubular reformer burners SFCCL-LTEM-001-EQ-MR-0028 A 100 US
ACT 0% 0.00
SCH 11-Aug-06 25-Sep-06 10-Oct-06 9-Nov-06 15-Feb-08 100% 200.00
10 PR for WHR Pipe & Pipe Fittings. SFCCL-LTEM-001-EQ-MR-0029 I 200 US
ACT 22-Sep-06 70% 140.00
SCH 21-Aug-06 5-Oct-06 20-Oct-06 19-Nov-06 15-Feb-08 100% 50.00
11 Specification for Finning Procedure of WHR Coils SFCCL-LTEM-001-EQ-MR-0030 I 50 US
ACT 0% 0.00
SCH 21-Aug-06 5-Oct-06 20-Oct-06 19-Nov-06 15-Feb-08 100% 200.00
12 PR for WHR Header Fittings. SFCCL-LTEM-001-EQ-MR-0031 I 200 US
ACT 0% 0.00
PR for Intermediate Tube Sheets, Brackets & SCH 16-Sep-06 31-Oct-06 15-Nov-06 15-Dec-06 15-Feb-08 100% 50.00
13 SFCCL-LTEM-001-EQ-MR-0032 A 50 US
Guides. ACT 0% 0.00
SCH 29-Nov-06 13-Jan-07 28-Jan-07 27-Feb-07 15-Feb-08 100% 50.00
14 PR for Ferrules. SFCCL-LTEM-001-EQ-MR-0033 I 50
ACT 0% 0.00
SCH 2-Dec-06 16-Jan-07 31-Jan-07 2-Mar-07 15-Feb-08 100% 100.00
15 PR for refractory SFCCL-LTEM-001-EQ-MR-0034 I 100 US
ACT 0% 0.00
Specification for catalyst loading & unloading SCH 1-Mar-07 15-Apr-07 30-Apr-07 30-May-07 15-Feb-08 100% 100.00
16 SFCCL-LTEM-001-EQ-MR-0035 I 100 US
system ACT 0% 0.00
SCH 18-Sep-06 26-Sep-06 3-Oct-06 2-Nov-06 15-Feb-08 100% 100.00
17 Specification for ID / FD FAN SFCCL-LTEM-001-EQ-MR-2001 I 100 US
ACT 0% 0.00

J SCH 14885.00
VENDOR DOCUMENTATION 14885
ACT 0.00
J-1 SCH 350.00
INLET DISTRIBUTOR 350
ACT 0.00
SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 50.00
1 Inlet Distributor Fabrication drawing SFCCL-LTEM-001-EQ-VD-8601 I 50 Chem P&S
ACT 0% 0.00
SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 100.00
2 Design Calculation for Inlet Distributor SFCCL-LTEM-001-EQ-VD-8602 I 100 Chem P&S
ACT 0% 0.00
SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 50.00
3 Fabrication Procedure for Inlet Distributor SFCCL-LTEM-001-EQ-VD-8603 I 50 Chem P&S
ACT 0% 0.00
SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 25.00
3 Pneumatic Test Procedure for Inlet Distributor SFCCL-LTEM-001-EQ-VD-8604 I 25 Chem P&S
ACT 0% 0.00

Page 11 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 25.00


4 Hydrostatic Test Procedure for Inlet Distributor SFCCL-LTEM-001-EQ-VD-8605 I 25 Chem P&S
ACT 0% 0.00
SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 25.00
5 Procedure for Radiography Testing of Equipment SFCCL-LTEM-001-EQ-VD-8606 I 25 Chem P&S
ACT 0% 0.00
SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 25.00
6 Procedure for Ultrasonic Examination SFCCL-LTEM-001-EQ-VD-8607 I 25 Chem P&S
ACT 0% 0.00
SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 25.00
7 Procedure for Liquid Penetrant Examination SFCCL-LTEM-001-EQ-VD-8608 I 25 Chem P&S
ACT 0% 0.00
SCH 21-Nov-06 5-Jan-07 20-Jan-07 19-Feb-07 15-Feb-08 100% 25.00
8 Instruction Manual for Inlet Distributor SFCCL-LTEM-001-EQ-VD-8609 I 25 Chem P&S
ACT 0% 0.00

J-2 SCH 250.00


INLET HAIR-PIN TUBE 250
ACT 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 50.00
1 Inlet Hair pin tube Fabrication drawing SFCCL-LTEM-001-EQ-VD-8620 I 50 Chem P&S
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 100.00
2 Design Calculation for Inlet Hair-pin tube SFCCL-LTEM-001-EQ-VD-8621 I 100 Chem P&S
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 50.00
3 Fabrication Procedure for Inlet Hair-pin Tube SFCCL-LTEM-001-EQ-VD-8622 I 50 Chem P&S
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 25.00
4 Hydrostatic Test Procedure for Inlet Hair-Pins SFCCL-LTEM-001-EQ-VD-8623 I 25 Chem P&S
ACT 0% 0.00
SCH 24-Nov-06 8-Jan-07 23-Jan-07 22-Feb-07 15-Feb-08 100% 25.00
5 Instruction Manual for Inlet Hair-pin Tube SFCCL-LTEM-001-EQ-VD-8624 I 25 Chem P&S
ACT 0% 0.00

J-3 SCH 650.00


CATALYST TUBE 650
ACT 0.00
SCH 16-Nov-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 100.00
1 GA of catalyst tube Assembly SFCCL-LTEM-001-EQ-VD-8030 A 100 US
ACT 0% 0.00
SCH 16-Nov-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 100.00
2 Catalyst tube(Inlet and Main catalyst tube) SFCCL-LTEM-001-EQ-VD-8031 A 100 US
ACT 0% 0.00
SCH 16-Nov-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 100.00
3 Catalyst Tube Reducer SFCCL-LTEM-001-EQ-VD-8032 I 100 US
ACT 0% 0.00
SCH 16-Nov-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 50.00
4 Outlet Tube SFCCL-LTEM-001-EQ-VD-8033 I 50 US
ACT 0% 0.00
SCH 16-Nov-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 50.00
5 Loose Flange SFCCL-LTEM-001-EQ-VD-8034 I 50 US
ACT 0% 0.00
SCH 16-Nov-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 25.00
6 Two Part Ring SFCCL-LTEM-001-EQ-VD-8035 I 25 US
ACT 0% 0.00
SCH 16-Nov-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 25.00
7 Catalyst Grid SFCCL-LTEM-001-EQ-VD-8036 I 25 US
ACT 0% 0.00
SCH 16-Nov-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 50.00
8 Cast Support Tube SFCCL-LTEM-001-EQ-VD-8037 I 50 US
ACT 0% 0.00
SCH 16-Nov-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 50.00
9 Minimum Sound Wall Calculations SFCCL-LTEM-001-EQ-VD-8038 I 50 US
ACT 0% 0.00
SCH 16-Nov-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 50.00
10 Fabrication Procedure For Catalyst Tube SFCCL-LTEM-001-EQ-VD-8039 I 50 US
ACT 0% 0.00
SCH 16-Nov-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 50.00
11 Instruction Manual for Catalyst tube SFCCL-LTEM-001-EQ-VD-8040 I 50 US
ACT 0% 0.00

Page 12 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

J-4 SCH 1160.00


COLD COLLECTOR 1160
ACT 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 100.00
1 General Arrangement drawing for Cold collector SFCCL-LTEM-001-EQ-VD-8630 A 100 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 100.00
2 Refractory anchor detail for Cold Collector SFCCL-LTEM-001-EQ-VD-8631 I 100 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 50.00
3 Transportation arrangement for Cold collector SFCCL-LTEM-001-EQ-VD-8632 I 50 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 100.00
4 Saddle Details for Cold Collector SFCCL-LTEM-001-EQ-VD-8633 I 100 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 100.00
5 Detail of Nozzles for Cold Collector SFCCL-LTEM-001-EQ-VD-8634 I 100 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 50.00
6 Manway Details for Cold Collector SFCCL-LTEM-001-EQ-VD-8635 I 50 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 50.00
7 Thermowell Details for Cold Collector SFCCL-LTEM-001-EQ-VD-8636 I 50 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 5.00
8 HTAS Name Plate Details for Cold Collector SFCCL-LTEM-001-EQ-VD-8637 I 5 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 5.00
9 L&T Name Plate for Cold Collector SFCCL-LTEM-001-EQ-VD-8638 I 5 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 50.00
10 General Notes Drawings for Cold Collector SFCCL-LTEM-001-EQ-VD-8639 I 50 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 50.00
11 Tolerances Drawing for Cold Collector SFCCL-LTEM-001-EQ-VD-8640 I 50 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 100.00
12 Foundation load data for cold collector SFCCL-LTEM-001-EQ-VD-8641 I 100 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 25.00
13 Spare part list - erection SFCCL-LTEM-001-EQ-VD-8642 I 25 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 25.00
14 QA plan for Cold Collector SFCCL-LTEM-001-EQ-VD-8643 I 25 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 200.00
15 Design Calculation for Cold Collector SFCCL-LTEM-001-EQ-VD-8644 I 200 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 25.00
16 Procedure for Suarface Treatment & Painting SFCCL-LTEM-001-EQ-VD-8645 I 25 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 25.00
17 Procedure for PWHT - Cold Collector SFCCL-LTEM-001-EQ-VD-8646 I 25 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 25.00
18 Weld Map - Cold Collector SFCCL-LTEM-001-EQ-VD-8647 I 25 Chem P&S
ACT 0% 0.00
Procedure for Liquid Penetrant Examination - Cold SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 25.00
19 SFCCL-LTEM-001-EQ-VD-8648 I 25 Chem P&S
Collector ACT 0% 0.00
Procedure for Magnetic particle Examination - Cold SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 25.00
20 SFCCL-LTEM-001-EQ-VD-8649 I 25 Chem P&S
Collector ACT 0% 0.00
Procedure for Radiographic Examination - Cold SCH 18-Nov-06 2-Jan-07 17-Jan-07 16-Feb-07 15-Feb-08 100% 25.00
21 SFCCL-LTEM-001-EQ-VD-8650 I 25 Chem P&S
Collector ACT 0% 0.00

Page 13 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

J-5 975.00
STEAM DRUM 975
0.00
SCH 23-Sep-06 8-Oct-06 23-Oct-06 22-Nov-06 15-Feb-08 100% 100.00
1 Datasheet For Steam Drum SFCCL-LTEM-001-EQ-VD-8660 A 100 Chem P&S
ACT 0% 0.00
SCH 23-Sep-06 8-Oct-06 23-Oct-06 22-Nov-06 15-Feb-08 100% 100.00
2 Assembly of steam drum SFCCL-LTEM-001-EQ-VD-8661 A 100 Chem P&S
ACT 0% 0.00
SCH 30-Aug-06 14-Sep-06 29-Sep-06 29-Oct-06 15-Feb-08 100% 100.00
3 Foundation Load Data SFCCL-LTEM-001-EQ-VD-8662 I 100 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
4 SD- Manhole M1 & M2 SFCCL-LTEM-001-EQ-VD-8663 I 50 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
5 SD- Detail of Nozzles SFCCL-LTEM-001-EQ-VD-8664 I 50 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
6 SD- Detail of Nozzles SFCCL-LTEM-001-EQ-VD-8665 I 50 Chem P&S
ACT 0% 0.00
SCH 14-Oct-06 29-Oct-06 13-Nov-06 13-Dec-06 15-Feb-08 100% 50.00
7 SD- Internal Assembly SFCCL-LTEM-001-EQ-VD-8666 I 50 Chem P&S
ACT 0% 0.00
SCH 14-Oct-06 29-Oct-06 13-Nov-06 13-Dec-06 15-Feb-08 100% 50.00
8 SD- Saddle details SFCCL-LTEM-001-EQ-VD-8667 I 50 Chem P&S
ACT 0% 0.00
SCH 14-Oct-06 29-Oct-06 13-Nov-06 13-Dec-06 15-Feb-08 100% 50.00
9 SD- Externals SFCCL-LTEM-001-EQ-VD-8668 I 50 Chem P&S
ACT 0% 0.00
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 25.00
10 SD- HTAS name plate SFCCL-LTEM-001-EQ-VD-8669 I 25 Chem P&S
ACT 0% 0.00
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 25.00
11 SD-Manufacturer’s name plate SFCCL-LTEM-001-EQ-VD-8670 I 25 Chem P&S
ACT 0% 0.00
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 25.00
12 SD-General notes for steam drum SFCCL-LTEM-001-EQ-VD-8671 I 25 Chem P&S
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 50.00
13 Dished End For Steam Drum SFCCL-LTEM-001-EQ-VD-8672 I 50 Chem P&S
ACT 0% 0.00
SCH 16-Sep-06 1-Oct-06 16-Oct-06 15-Nov-06 15-Feb-08 100% 100.00
14 SD-Des. Report for pressure part (Part 1) SFCCL-LTEM-001-EQ-VD-8673 I 100 Chem P&S
ACT 0% 0.00
SCH 16-Sep-06 1-Oct-06 16-Oct-06 15-Nov-06 15-Feb-08 100% 100.00
15 SD-Wind, seismic & saddle design (Part 2) SFCCL-LTEM-001-EQ-VD-8674 I 100 Chem P&S
ACT 0% 0.00
SCH 26-Nov-06 11-Dec-06 26-Dec-06 25-Jan-07 15-Feb-08 100% 25.00
16 WPS/PQR for SD SFCCL-LTEM-001-EQ-VD-8675 I 25 Chem P&S
ACT 0% 0.00
SCH 26-Nov-06 11-Dec-06 26-Dec-06 25-Jan-07 15-Feb-08 100% 25.00
17 QA plan for SD SFCCL-LTEM-001-EQ-VD-8676 I 25 Chem P&S
ACT 0% 0.00

J-6 1500.00
WASTE HEAT BOILER 1500
0.00
SCH 23-Sep-06 8-Oct-06 23-Oct-06 22-Nov-06 15-Feb-08 100% 100.00
1 Datasheet For WHB SFCCL-LTEM-001-EQ-VD-8680 A 100 Chem P&S
ACT 0% 0.00
SCH 23-Sep-06 8-Oct-06 23-Oct-06 22-Nov-06 15-Feb-08 100% 100.00
2 Assembly of WHB SFCCL-LTEM-001-EQ-VD-8681 I 100 Chem P&S
ACT 0% 0.00
SCH 30-Aug-06 14-Sep-06 29-Sep-06 29-Oct-06 15-Feb-08 100% 100.00
3 Foundation Load Data SFCCL-LTEM-001-EQ-VD-8682 I 100 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
4 WHB-Nozzle for shell side SFCCL-LTEM-001-EQ-VD-8683 I 50 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
5 WHB-Nozzle for channel side SFCCL-LTEM-001-EQ-VD-8684 I 50 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
6 WHB-Manhole M1 SFCCL-LTEM-001-EQ-VD-8685 I 50 Chem P&S

Page 14 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
6 WHB-Manhole M1 SFCCL-LTEM-001-EQ-VD-8685 I 50 Chem P&S
ACT 0% 0.00
SCH 7-Oct-06 22-Oct-06 6-Nov-06 6-Dec-06 15-Feb-08 100% 50.00
7 WHB-Manhole M2 SFCCL-LTEM-001-EQ-VD-8686 I 50 Chem P&S
ACT 0% 0.00
SCH 14-Oct-06 29-Oct-06 13-Nov-06 13-Dec-06 15-Feb-08 100% 50.00
8 WHB-Tube sheet & baffle details SFCCL-LTEM-001-EQ-VD-8697 I 50 Chem P&S
ACT 0% 0.00
SCH 14-Oct-06 29-Oct-06 13-Nov-06 13-Dec-06 15-Feb-08 100% 50.00
9 WHB-Internals SFCCL-LTEM-001-EQ-VD-8698 I 50 Chem P&S
ACT 0% 0.00
SCH 14-Oct-06 29-Oct-06 13-Nov-06 13-Dec-06 15-Feb-08 100% 25.00
10 WHB-Ferrules SFCCL-LTEM-001-EQ-VD-8699 I 25 Chem P&S
ACT 0% 0.00
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 25.00
11 WHB-Det. Of refractory anchors SFCCL-LTEM-001-EQ-VD-8700 I 25 Chem P&S
ACT 0% 0.00
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 50.00
12 WHB-Saddles SFCCL-LTEM-001-EQ-VD-8701 I 50 Chem P&S
ACT 0% 0.00
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 50.00
13 WHB-Details of deflector SFCCL-LTEM-001-EQ-VD-8702 I 50 Chem P&S
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 50.00
14 WHB-Externals SFCCL-LTEM-001-EQ-VD-8703 I 50 Chem P&S
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 25.00
15 WHB-HTAS name plates SFCCL-LTEM-001-EQ-VD-8704 I 25 Chem P&S
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 25.00
16 WHB-Manufacturer’s name plate SFCCL-LTEM-001-EQ-VD-8705 I 25 Chem P&S
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 25.00
17 WHB-General notes SFCCL-LTEM-001-EQ-VD-8706 I 25 Chem P&S
ACT 0% 0.00
SCH 4-Nov-06 19-Nov-06 4-Dec-06 3-Jan-07 15-Feb-08 100% 25.00
18 Transportation Sketch for RG WHB SFCCL-LTEM-001-EQ-VD-8707 I 25 Chem P&S
ACT 0% 0.00
Spare Parts for Erection, Pre-commissioning & SCH 4-Nov-06 19-Nov-06 4-Dec-06 3-Jan-07 15-Feb-08 100% 25.00
19 SFCCL-LTEM-001-EQ-VD-8708 I 25 Chem P&S
Commissioning for RG WHB ACT 0% 0.00
SCH 4-Nov-06 19-Nov-06 4-Dec-06 3-Jan-07 15-Feb-08 100% 25.00
20 Procedure for Liquid Penetrant Examination-RGB SFCCL-LTEM-001-EQ-VD-8709 I 25 Chem P&S
ACT 0% 0.00
SCH 8-Nov-06 23-Nov-06 8-Dec-06 7-Jan-07 15-Feb-08 100% 25.00
21 Procedure for Ultrasonic Examination - RGB SFCCL-LTEM-001-EQ-VD-8710 I 25 Chem P&S
ACT 0% 0.00
SCH 8-Nov-06 23-Nov-06 8-Dec-06 7-Jan-07 15-Feb-08 100% 25.00
22 Procedure for Radiographic Testing SFCCL-LTEM-001-EQ-VD-8711 I 25 Chem P&S
ACT 0% 0.00
SCH 11-Nov-06 26-Nov-06 11-Dec-06 10-Jan-07 15-Feb-08 100% 25.00
23 Procedure for Magnetic particle examination SFCCL-LTEM-001-EQ-VD-8712 I 25 Chem P&S
ACT 0% 0.00
SCH 11-Nov-06 26-Nov-06 11-Dec-06 10-Jan-07 15-Feb-08 100% 25.00
24 Procedure for Hydrostatic testing - RGB SFCCL-LTEM-001-EQ-VD-8713 I 25 Chem P&S
ACT 0% 0.00
SCH 11-Nov-06 26-Nov-06 11-Dec-06 10-Jan-07 15-Feb-08 100% 25.00
25 Procedure for PWHT - RGB SFCCL-LTEM-001-EQ-VD-8714 I 25 Chem P&S
ACT 0% 0.00
SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 25.00
26 Weld Map - RGB SFCCL-LTEM-001-EQ-VD-8715 I 25 Chem P&S
ACT 0% 0.00
SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 25.00
27 Alkali Boil out procedure for RG WHB SFCCL-LTEM-001-EQ-VD-8716 I 25 Chem P&S
ACT 0% 0.00
SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 100.00
28 WHB-Des. Of press. Parts (Shell part1/1) SFCCL-LTEM-001-EQ-VD-8717 A 100 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 3-Dec-06 18-Dec-06 17-Jan-07 15-Feb-08 100% 100.00
29 WHB- Des. Of press. Parts (tube part1/2) SFCCL-LTEM-001-EQ-VD-8718 A 100 Chem P&S
ACT 0% 0.00
SCH 18-Nov-06 3-Dec-06 18-Dec-06 17-Jan-07 15-Feb-08 100% 100.00
30 WHB- Wind, seismic & saddle design (part 2) SFCCL-LTEM-001-EQ-VD-8719 A 100 Chem P&S
ACT 0% 0.00

Page 15 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 18-Nov-06 3-Dec-06 18-Dec-06 17-Jan-07 15-Feb-08 100% 25.00


31 WPS/PQR for WHB SFCCL-LTEM-001-EQ-VD-8720 I 25 Chem P&S
ACT 0% 0.00
SCH 22-Nov-06 7-Dec-06 22-Dec-06 21-Jan-07 15-Feb-08 100% 25.00
32 QA plan for WHB SFCCL-LTEM-001-EQ-VD-8721 I 25 Chem P&S
ACT 0% 0.00
SCH 22-Nov-06 7-Dec-06 22-Dec-06 21-Jan-07 15-Feb-08 100% 25.00
33 Operating & Maintenance Manual SFCCL-LTEM-001-EQ-VD-8722 I 25 Chem P&S
ACT 0% 0.00

J-7 SCH 2850.00


BURNER 2850
ACT 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 200.00
1 GA of burner-size 1Type 1A SFCCL-LTEM-001-EQ-VD-8050 A 200 US
ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 200.00
2 GA of burner-size 1 Type-1B SFCCL-LTEM-001-EQ-VD-8051 A 200 US
ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 200.00
3 GA of burner-size 1 Type-1C SFCCL-LTEM-001-EQ-VD-8052 A 200 US
ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 200.00
4 GA of burner-size 1Type - 1D SFCCL-LTEM-001-EQ-VD-8053 A 200 US
ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 200.00
5 GA of burner-size 2 Type-2A SFCCL-LTEM-001-EQ-VD-8054 A 200 US
ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 200.00
6 GA of burner-size -2 Type-2B SFCCL-LTEM-001-EQ-VD-8055 A 200 US
ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 200.00
7 GA of burner-size -2 Type -2C SFCCL-LTEM-001-EQ-VD-8056 A 200 US
ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 200.00
8 GA of burner-size - 2 Type 2D SFCCL-LTEM-001-EQ-VD-8057 A 200 US
ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 200.00
9 Reformer Burner Layout SFCCL-LTEM-001-EQ-VD-8058 A 200 US
ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 300.00
10 Burner Data sheet for burner- size1&2 SFCCL-LTEM-001-EQ-VD-8059 A 300 US
ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 50.00
11 Quality Assurance Plan for Ref. Burners SFCCL-LTEM-001-EQ-VD-8060 A 50 US
ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 100.00
12 Performance Test Procedure for Burner SFCCL-LTEM-001-EQ-VD-8061 A 100 US
ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 100.00
13 Burner Performance Curve for Size-1&2 SFCCL-LTEM-001-EQ-VD-8062 A 100 US
ACT 0% 0.00
Supplier Standard for Burner Plate & refractory SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 100.00
14 SFCCL-LTEM-001-EQ-VD-8063 A 100 US
block for reformer burners Size1& Size2 ACT 0% 0.00
Packing, Storage and Preservation procedure for SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 50.00
15 SFCCL-LTEM-001-EQ-VD-8064 I 50 US
Reformer Burners ACT 0% 0.00
Installation Operation and Maintenance Manual for SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 50.00
16 SFCCL-LTEM-001-EQ-VD-8065 I 50 US
burners ACT 0% 0.00
Performance Test Report for Reformer Burners SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 50.00
17 SFCCL-LTEM-001-EQ-VD-8066 I 50 US
Size-1 & Size-2 ACT 0% 0.00
SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 25.00
18 WPS/PQR for Reformer Burners Size-1 & Size-2 SFCCL-LTEM-001-EQ-VD-8067 I 25 US
ACT 0% 0.00
Airflow test report for Reformer Burners Size-1 & SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 100.00
19 SFCCL-LTEM-001-EQ-VD-8068 A 100 US
Size-2 ACT 0% 0.00
Airflow test procedure for Reformer Burners Size-1 SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 100.00
20 SFCCL-LTEM-001-EQ-VD-8069 A 100 US
& Size-2 ACT 0% 0.00

Page 16 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 5-Dec-06 20-Dec-06 4-Jan-07 3-Feb-07 15-Feb-08 100% 25.00


21 Supplier catalogue for Igniters -Burners SFCCL-LTEM-001-EQ-VD-8070 I 25 US
ACT 0% 0.00

J-8 SCH 250.00


INLET HAIR-PIN TUBE SPRING 250
ACT 0.00
SCH 16-Dec-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 200.00
1 GA Spring for Inlet hairpin support SFCCL-LTEM-001-EQ-VD-8080 A 200 US
ACT 0% 0.00
SCH 16-Dec-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 50.00
2 Part Detail for spring support SFCCL-LTEM-001-EQ-VD-8081 I 50 US
ACT 0% 0.00

J-9 SCH 100.00


MISC 100
ACT 0.00
SCH 16-Dec-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 50.00
1 Safety Door SFCCL-LTEM-001-EQ-VD-8090 I 50 US
ACT 0% 0.00
SCH 16-Dec-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 50.00
2 Actuator details SFCCL-LTEM-001-EQ-VD-8091 I 50 US
ACT 0% 0.00

J-10 SCH 5100.00


REFRACTORY 5100
ACT 0.00
Genaral Arrangement - Plan & Elevation Reformer SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 300.00
1 SFCCL-LTEM-001-EQ-VD-8100 A 300 US
& WHR package ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 300.00
2 Thermal Calculations SFCCL-LTEM-001-EQ-VD-8101 A 300 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
3 Refractory BOQ SFCCL-LTEM-001-EQ-VD-8102 I 100 US
ACT 0% 0.00
RADIANT

Rad. Sec-Side Walls Shelf Support & Brick Hook SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
4 SFCCL-LTEM-001-EQ-VD-8103 I 150 US
Disposition ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
5 Rad. Sec-Side Wall Shelf Support Assembly SFCCL-LTEM-001-EQ-VD-8104 I 150 US
ACT 0% 0.00
Rad. Sec-Side Wall (Grid H&F) Lining SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
6 SFCCL-LTEM-001-EQ-VD-8105 I 150 US
Arrangement ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
7 Rad. Sec-Side Wall(Grid H&F) Stud Layout SFCCL-LTEM-001-EQ-VD-8106 I 150 US
ACT 0% 0.00
Rad. Sec-Side Wall (Grid D&G) Lining SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
8 SFCCL-LTEM-001-EQ-VD-8107 I 150 US
Arrangement ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
9 Rad. Sec-Side Wall (Grid D&G) Stud Layout SFCCL-LTEM-001-EQ-VD-8108 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
10 Rad. Sec.-Cross Section SFCCL-LTEM-001-EQ-VD-8109 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
11 Rad. Sec.-Sectional Plan - 1 SFCCL-LTEM-001-EQ-VD-8110 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
12 Rad. Sec.- Sectional Plan - 2 SFCCL-LTEM-001-EQ-VD-8111 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
13 Rad. Sec.- End wall Lining Arrangement SFCCL-LTEM-001-EQ-VD-8112 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
14 Rad. Sec.-Arch Lining Arrangement SFCCL-LTEM-001-EQ-VD-8113 I 150 US

Page 17 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
14 Rad. Sec.-Arch Lining Arrangement SFCCL-LTEM-001-EQ-VD-8113 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
15 Rad. Sec.-Floor Lining Arrangement SFCCL-LTEM-001-EQ-VD-8114 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 150.00
16 Rad. Sec-End Wall Access Door Cover Lining Det. SFCCL-LTEM-001-EQ-VD-8115 I 150 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
17 Taper Duct - Arch & Floor Lining SFCCL-LTEM-001-EQ-VD-8116 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
18 Taper Duct - Wall Lining SFCCL-LTEM-001-EQ-VD-8117 I 100 US
ACT 0% 0.00
CONVECTION

Refractory lining detail - convection section SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 200.00
19 SFCCL-LTEM-001-EQ-VD-8118 I 200 US
modules ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
20 Flue gas duct (FG1 - Taper duct to Convection) SFCCL-LTEM-001-EQ-VD-8119 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
21 Flue gas duct (FG2 - Convection to Convection) SFCCL-LTEM-001-EQ-VD-8120 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
22 Flue gas duct (FG3 - Convection to ID fan) SFCCL-LTEM-001-EQ-VD-8121 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
23 Flue gas duct (FG4 - ID fan to Stack) SFCCL-LTEM-001-EQ-VD-8122 I 100 US
ACT 0% 0.00
STACK

SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00


24 Ref. Lining Det. for Stack SFCCL-LTEM-001-EQ-VD-8123 I 100 US
ACT 0% 0.00

COLD COLLECTOR

SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00


25 Cold collector-LIning Arrangement & Details SFCCL-LTEM-001-EQ-VD-8124 I 100 CHEM P&S
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
26 Cold collector Formwork-Reformer Package SFCCL-LTEM-001-EQ-VD-8125 I 100 CHEM P&S
ACT 0% 0.00
HOT PARTS

Hot Parts Insulation - Hairpin tubes, Catalyst tubes SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
27 SFCCL-LTEM-001-EQ-VD-8126 I 100 US
inlet/outlet ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
28 Hot Parts Insulation - Inlet Distributor SFCCL-LTEM-001-EQ-VD-8127 I 100 CHEM P&S
ACT 0% 0.00
DOORS

SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00


29 Rad. Sec.-Peep Door-Lining Details SFCCL-LTEM-001-EQ-VD-8128 I 50 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
30 Radiant Access Door SFCCL-LTEM-001-EQ-VD-8129 I 50 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
31 Taper duct access door SFCCL-LTEM-001-EQ-VD-8130 I 50 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
32 False-air damper door SFCCL-LTEM-001-EQ-VD-8131 I 50 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
33 Flue gas duct access door SFCCL-LTEM-001-EQ-VD-8132 I 50 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
34 WHR access door SFCCL-LTEM-001-EQ-VD-8133 I 50 US
ACT 0% 0.00

Page 18 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

MISC.

Det of Cerachem Blanket Z-Blok 1425°C lining SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
35 SFCCL-LTEM-001-EQ-VD-8134 I 50 US
Det. ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
36 Det of Cerablanket Z-Blok 1260°C lining Det. SFCCL-LTEM-001-EQ-VD-8135 I 50 US
ACT 0% 0.00
Monolithic CF module (No folded module) corner SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
37 SFCCL-LTEM-001-EQ-VD-8136 I 50 US
module details ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
38 VF Peep Hole Block 1425°C-560x300 side Wall SFCCL-LTEM-001-EQ-VD-8137 I 50 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
39 VF Peep Hole Block 1425°C-460x460 End Wall SFCCL-LTEM-001-EQ-VD-8138 I 50 US
ACT 0% 0.00
Peep Hole Block JM 26 Bricks 560x300 for Side SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
40 SFCCL-LTEM-001-EQ-VD-8139 I 50 US
Wall ACT 0% 0.00
SCH 30-Jan-07 16-Mar-07 31-Mar-07 30-Apr-07 15-Feb-08 100% 50.00
41 Lining anchors Refractory - Reformer Package SFCCL-LTEM-001-EQ-VD-8140 I 50 US
ACT 0% 0.00
Cold Collector -Lining Anchors / Studs / Vapour SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 50.00
42 SFCCL-LTEM-001-EQ-VD-8141 I 50 US
borrics ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
43 Product Datasheets for Refractory materials SFCCL-LTEM-001-EQ-VD-8142 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
44 Refractory Dry Out Procedure SFCCL-LTEM-001-EQ-VD-8143 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
45 Lining Installation instructions SFCCL-LTEM-001-EQ-VD-8144 I 100 US
ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 25.00
46 Storage instructions / shelf life SFCCL-LTEM-001-EQ-VD-8145 I 25 US
ACT 0% 0.00
Refractory lining design basis & Instructions for SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 25.00
47 SFCCL-LTEM-001-EQ-VD-8146 I 25 US
Temperature measurement ACT 0% 0.00
SCH 1-Apr-07 16-May-07 31-May-07 30-Jun-07 15-Feb-08 100% 100.00
48 Lining Description - Reformer Package SFCCL-LTEM-001-EQ-VD-8147 I 100 US
ACT 0% 0.00

SCH 300.00
J-11 AIR PREHEATER (APH) 300
ACT 0.00
SCH 16-Oct-06 31-Oct-06 15-Nov-06 15-Dec-06 15-Feb-08 100% 100.00
1 APH Datasheet SFCCL-LTEM-001-EQ-VD-8160 A 100 US
ACT 0% 0.00
SCH 23-Oct-06 7-Nov-06 22-Nov-06 22-Dec-06 15-Feb-08 100% 100.00
2 APH General Assembly with load data SFCCL-LTEM-001-EQ-VD-8161 A 100 US
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 50.00
3 APH Detail 1 SFCCL-LTEM-001-EQ-VD-8164 I 50 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 50.00
4 APH Detail 2 SFCCL-LTEM-001-EQ-VD-8165 I 50 US
ACT 0% 0.00

J-12 SCH 700.00


FD FAN 700
ACT 0.00
SCH 16-Oct-06 31-Oct-06 15-Nov-06 15-Dec-06 15-Feb-08 100% 100.00
1 FD Fan Datasheet SFCCL-LTEM-001-EQ-VD-8180 A 100 US
ACT 0% 0.00
SCH 23-Oct-06 7-Nov-06 22-Nov-06 22-Dec-06 15-Feb-08 100% 50.00
2 Performance Curve SFCCL-LTEM-001-EQ-VD-8181 I 50 US
ACT 0% 0.00
SCH 23-Oct-06 7-Nov-06 22-Nov-06 22-Dec-06 15-Feb-08 100% 50.00
3 Fan start-up curve SFCCL-LTEM-001-EQ-VD-8182 I 50 US

Page 19 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - SYSTEM TOTAL POINTS ALLOTED : 26100 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 3.89%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. CATEGORY Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%
3 Fan start-up curve SFCCL-LTEM-001-EQ-VD-8182 I 50 US
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 100.00
4 FD Fan Motor Datasheet SFCCL-LTEM-001-EQ-VD-8185 I 100 US
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 100.00
5 FD Fan Actuator Datasheet SFCCL-LTEM-001-EQ-VD-8180 I 100 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 100.00
6 FD Fan General Assembly SFCCL-LTEM-001-EQ-VD-8195 I 100 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 50.00
7 Fan Detail Drawing SFCCL-LTEM-001-EQ-VD-8197 I 50 US
ACT 0% 0.00
SCH 11-Nov-06 26-Nov-06 11-Dec-06 10-Jan-07 15-Feb-08 100% 100.00
8 FD Fan Motor Gneral Assembly SFCCL-LTEM-001-EQ-VD-8211 I 100 US
ACT 0% 0.00
SCH 18-Nov-06 3-Dec-06 18-Dec-06 17-Jan-07 15-Feb-08 100% 50.00
9 Fan Damper drawing SFCCL-LTEM-001-EQ-VD-8215 I 50 US
ACT 0% 0.00

J-13 SCH 700.00


ID FAN 700
ACT 0.00
SCH 23-Oct-06 7-Nov-06 22-Nov-06 22-Dec-06 15-Feb-08 100% 100.00
1 ID Fan Datasheet SFCCL-LTEM-001-EQ-VD-8230 A 100 US
ACT 0% 0.00
SCH 23-Oct-06 7-Nov-06 22-Nov-06 22-Dec-06 15-Feb-08 100% 50.00
2 Performance Curve SFCCL-LTEM-001-EQ-VD-8231 I 50 US
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 50.00
3 Fan start-up curve SFCCL-LTEM-001-EQ-VD-8232 I 50 US
ACT 0% 0.00
SCH 28-Oct-06 12-Nov-06 27-Nov-06 27-Dec-06 15-Feb-08 100% 100.00
4 ID Fan Motor Datasheet SFCCL-LTEM-001-EQ-VD-8235 I 100 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 100.00
5 ID Fan Actuator Datasheet SFCCL-LTEM-001-EQ-VD-8240 I 100 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 100.00
6 ID Fan General Assembly SFCCL-LTEM-001-EQ-VD-8245 I 100 US
ACT 0% 0.00
SCH 11-Nov-06 26-Nov-06 11-Dec-06 10-Jan-07 15-Feb-08 100% 50.00
7 Fan Detail Drawing SFCCL-LTEM-001-EQ-VD-8247 I 50 US
ACT 0% 0.00
SCH 18-Nov-06 3-Dec-06 18-Dec-06 17-Jan-07 15-Feb-08 100% 100.00
8 ID Fan Motor Gneral Assembly SFCCL-LTEM-001-EQ-VD-8260 I 100 US
ACT 0% 0.00
SCH 26-Nov-06 11-Dec-06 26-Dec-06 25-Jan-07 15-Feb-08 100% 50.00
9 Fan Damper drawing SFCCL-LTEM-001-EQ-VD-8265 I 50 US
ACT 0% 0.00

Page 20 of 38
LARSEN & TOUBRO LTD.
DOCUMENT NO. REV
LTEM
DOCUMENT SFCCL-LTEM-001-PE-
1
CONTROL INDEX GN-0001
PROJ : SFCCL – 700 MTPD Methanol Plant + 100
PAGE NO. : II
MTPD CO

STRUCTURAL

DOCUMENTS / DRAWINGS
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - STRUCTURAL TOTAL POINTS ALLOTED : 19800 SCHEDULED PROGRESS : 178.66%


ACTUAL PROGRESS : 0.27%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

A 8325.00
RADIANT STRUCTURE 8325
30.00
SCH 31-Aug-06 15-Sep-06 30-Sep-06 30-Oct-06 15-Feb-08 100% 25.00
1 Structural design basis of radiant section SFCCL-LTEM-001-SE-SP-5050 I 25 US
ACT 25-Aug-06 25-Sep-06 70% 17.50
SCH 20-Dec-06 4-Jan-07 19-Jan-07 18-Feb-07 15-Feb-08 100% 500.00
2 Structural design calculation of radiant section SFCCL-LTEM-001-SE-CL-5001 I 500 US
ACT 0% 0.00
SCH 30-Sep-06 15-Oct-06 30-Oct-06 29-Nov-06 15-Feb-08 100% 250.00
3 Foundation load data for Reformer SFCCL-LTEM-001-SE-DW-5100 I 250 US
ACT 8-Sep-06 5% 12.50
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 250.00
4 Radiant section GA ELEVATION -1 SFCCL-LTEM-001-SE-DW-5400 I 250 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 100.00
5 Radiant section Connection details - 1 SFCCL-LTEM-001-SE-DW-5401 I 100 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 250.00
6 Radiant section GA ELEVATION - 2 SFCCL-LTEM-001-SE-DW-5404 I 250 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 100.00
7 Radiant section Connection details - 2 SFCCL-LTEM-001-SE-DW-5405 I 100 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 250.00
8 Radiant section GA ELEVATION - 3 SFCCL-LTEM-001-SE-DW-5408 I 250 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 100.00
9 Radiant section Connection details - 3 SFCCL-LTEM-001-SE-DW-5409 I 100 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 250.00
10 Radiant section GA ELEVATION - 4 SFCCL-LTEM-001-SE-DW-5412 I 250 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 100.00
11 Radiant section Connection details - 4 SFCCL-LTEM-001-SE-DW-5413 I 100 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 250.00
12 Radiant section GA ELEVATION - 5 SFCCL-LTEM-001-SE-DW-5416 I 250 US
ACT 0% 0.00
SCH 15-Jan-07 30-Jan-07 14-Feb-07 16-Mar-07 15-Feb-08 100% 100.00
13 Radiant section Connection details - 5 SFCCL-LTEM-001-SE-DW-5417 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
14 Radiant section GA ELEVATION - 6 SFCCL-LTEM-001-SE-DW-5420 I 250 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 100.00
15 Radiant section Connection details - 6 SFCCL-LTEM-001-SE-DW-5421 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
16 Radiant section GA ELEVATION - 7 SFCCL-LTEM-001-SE-DW-5424 I 250 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 100.00
17 Radiant section Connection details - 7 SFCCL-LTEM-001-SE-DW-5425 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
18 Radiant section GA ELEVATION - 8 SFCCL-LTEM-001-SE-DW-5428 I 250 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 100.00
19 Radiant section Connection details - 8 SFCCL-LTEM-001-SE-DW-5429 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
20 Radiant section GA ELEVATION - 9 SFCCL-LTEM-001-SE-DW-5432 I 250 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 100.00
21 Radiant section Connection details - 9 SFCCL-LTEM-001-SE-DW-5433 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
22 Radiant section GA ELEVATION - 10 SFCCL-LTEM-001-SE-DW-5436 I 250 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 100.00
23 Radiant section Connection details - 10 SFCCL-LTEM-001-SE-DW-5437 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
24 Radiant section GA ELEVATION - 11 SFCCL-LTEM-001-SE-DW-5440 I 250 US
ACT 0% 0.00

Page 23 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - STRUCTURAL TOTAL POINTS ALLOTED : 19800 SCHEDULED PROGRESS : 178.66%


ACTUAL PROGRESS : 0.27%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 100.00


25 Radiant section Connection details - 11 SFCCL-LTEM-001-SE-DW-5441 I 100 US
ACT 0% 0.00
SCH 22-Jan-07 6-Feb-07 21-Feb-07 23-Mar-07 15-Feb-08 100% 250.00
26 Radiant section GA ELEVATION - 12 SFCCL-LTEM-001-SE-DW-5444 I 250 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 100.00
27 Radiant section Connection details - 12 SFCCL-LTEM-001-SE-DW-5445 I 100 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 250.00
28 Radiant section GA ELEVATION - 13 SFCCL-LTEM-001-SE-DW-5448 I 250 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 100.00
29 Radiant section Connection details - 13 SFCCL-LTEM-001-SE-DW-5449 I 100 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 250.00
30 Radiant section GA ELEVATION - 14 SFCCL-LTEM-001-SE-DW-5452 I 250 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 100.00
31 Radiant section Connection details - 14 SFCCL-LTEM-001-SE-DW-5453 I 100 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 250.00
32 Radiant section GA ELEVATION - 15 SFCCL-LTEM-001-SE-DW-5456 I 250 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 100.00
33 Radiant section Connection details - 15 SFCCL-LTEM-001-SE-DW-5457 I 100 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 250.00
34 Radiant section GA ELEVATION - 16 SFCCL-LTEM-001-SE-DW-5460 I 250 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 100.00
35 Radiant section Connection details - 16 SFCCL-LTEM-001-SE-DW-5461 I 100 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 250.00
36 Radiant section GA ELEVATION - 17 SFCCL-LTEM-001-SE-DW-5464 I 250 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 100.00
37 Radiant section Connection details - 17 SFCCL-LTEM-001-SE-DW-5465 I 100 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 250.00
38 Radiant section GA ELEVATION - 18 SFCCL-LTEM-001-SE-DW-5468 I 250 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 100.00
39 Radiant section Connection details - 18 SFCCL-LTEM-001-SE-DW-5469 I 100 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
40 Lifting and Shipping and transportation dwg -1 SFCCL-LTEM-001-SE-DW-5472 I 50 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
41 Lifting and Shipping and transportation dwg -2 SFCCL-LTEM-001-SE-DW-5473 I 50 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
42 Lifting and Shipping and transportation dwg -3 SFCCL-LTEM-001-SE-DW-5474 I 50 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
43 Lifting and Shipping and transportation dwg -4 SFCCL-LTEM-001-SE-DW-5475 I 50 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
44 Lifting and Shipping and transportation dwg -5 SFCCL-LTEM-001-SE-DW-5476 I 50 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
45 Lifting and Shipping and transportation dwg -6 SFCCL-LTEM-001-SE-DW-5477 I 50 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
46 Lifting and Shipping and transportation dwg -7 SFCCL-LTEM-001-SE-DW-5478 I 50 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
47 Lifting and Shipping and transportation dwg -8 SFCCL-LTEM-001-SE-DW-5479 I 50 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
48 Lifting and Shipping and transportation dwg -9 SFCCL-LTEM-001-SE-DW-5480 I 50 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
49 Lifting and Shipping and transportation dwg -10 SFCCL-LTEM-001-SE-DW-5481 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 50.00
50 Grating dwg -1 SFCCL-LTEM-001-SE-DW-5486 I 50 US
ACT 0% 0.00

Page 24 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - STRUCTURAL TOTAL POINTS ALLOTED : 19800 SCHEDULED PROGRESS : 178.66%


ACTUAL PROGRESS : 0.27%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 50.00


51 Grating dwg -2 SFCCL-LTEM-001-SE-DW-5487 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 50.00
52 Grating dwg -3 SFCCL-LTEM-001-SE-DW-5488 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 50.00
53 Grating dwg -4 SFCCL-LTEM-001-SE-DW-5489 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 50.00
54 Grating dwg -5 SFCCL-LTEM-001-SE-DW-5490 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 50.00
55 Grating dwg -6 SFCCL-LTEM-001-SE-DW-5491 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 50.00
56 Grating dwg -7 SFCCL-LTEM-001-SE-DW-5492 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 50.00
57 Grating dwg -8 SFCCL-LTEM-001-SE-DW-5493 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 50.00
58 Grating dwg -9 SFCCL-LTEM-001-SE-DW-5494 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 50.00
59 Grating dwg -10 SFCCL-LTEM-001-SE-DW-5495 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 50.00
60 Grating dwg -11 SFCCL-LTEM-001-SE-DW-5496 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 50.00
61 Grating dwg -12 SFCCL-LTEM-001-SE-DW-5497 I 50 US
ACT 0% 0.00
SCH 4-Oct-06 19-Oct-06 3-Nov-06 3-Dec-06 15-Feb-08 100% 50.00
62 1 st BOM OF REFORMER SFCCL-LTEM-001-SE-BQ-5200 I 50 US
ACT 0% 0.00
SCH 30-Jan-07 14-Feb-07 1-Mar-07 31-Mar-07 15-Feb-08 100% 50.00
63 2 nd BOM OF REFORMER SFCCL-LTEM-001-SE-BQ-5200 I 50 US
ACT 0% 0.00
SCH 31-May-07 15-Jun-07 30-Jun-07 30-Jul-07 15-Feb-08 100% 50.00
64 3 rd BOM OF REFORMER SFCCL-LTEM-001-SE-BQ-5200 I 50 US
ACT 0% 0.00

B 2700.00
WHR STRUCTURE / CONVECTION MODULE 2700
7.50
SCH 21-Oct-06 5-Nov-06 20-Nov-06 20-Dec-06 15-Feb-08 100% 50.00
1 Structural design basis of WHR section SFCCL-LTEM-001-SE-SP-5051 I 50 US
ACT 22-Sep-06 5% 2.50
SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 500.00
2 Structural design report of WHR section SFCCL-LTEM-001-SE-CL-5002 I 500 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 100.00
3 Foundation load data for WHR SFCCL-LTEM-001-SE-DW-5102 I 100 US
ACT 22-Sep-06 5% 5.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 200.00
4 WHR GA dwg SFCCL-LTEM-001-SE-DW-5600 I 200 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 150.00
5 GA WHR module A SFCCL-LTEM-001-SE-DW-5601 I 150 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 100.00
6 Detail of WHR module A dwg SFCCL-LTEM-001-SE-DW-5602 I 100 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 150.00
7 GA WHR module B SFCCL-LTEM-001-SE-DW-5605 I 150 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 100.00
8 Detail of WHR module B dwg SFCCL-LTEM-001-SE-DW-5606 I 100 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 150.00
9 GA WHR module C SFCCL-LTEM-001-SE-DW-5609 I 150 US
ACT 0% 0.00

Page 25 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - STRUCTURAL TOTAL POINTS ALLOTED : 19800 SCHEDULED PROGRESS : 178.66%


ACTUAL PROGRESS : 0.27%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 100.00


10 Detail of WHR module C dwg SFCCL-LTEM-001-SE-DW-5610 I 100 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 150.00
11 GA WHR module D SFCCL-LTEM-001-SE-DW-5613 I 150 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 100.00
12 Detail of WHR module D dwg SFCCL-LTEM-001-SE-DW-5614 I 100 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 150.00
13 GA WHR module E SFCCL-LTEM-001-SE-DW-5617 I 150 US
ACT 0% 0.00
SCH 27-Mar-07 11-Apr-07 26-Apr-07 26-May-07 15-Feb-08 100% 100.00
14 Detail of WHR module E dwg SFCCL-LTEM-001-SE-DW-5618 I 100 US
ACT 0% 0.00
SCH 4-Mar-07 19-Mar-07 3-Apr-07 3-May-07 15-Feb-08 100% 50.00
15 Lifting and Shipping and transportation dwg -1 SFCCL-LTEM-001-SE-DW-5630 I 50 US
ACT 0% 0.00
SCH 4-Mar-07 19-Mar-07 3-Apr-07 3-May-07 15-Feb-08 100% 50.00
16 Lifting and Shipping and transportation dwg -2 SFCCL-LTEM-001-SE-DW-5632 I 50 US
ACT 0% 0.00
SCH 4-Mar-07 19-Mar-07 3-Apr-07 3-May-07 15-Feb-08 100% 50.00
17 Lifting and Shipping and transportation dwg -3 SFCCL-LTEM-001-SE-DW-5634 I 50 US
ACT 0% 0.00
SCH 21-Apr-07 6-May-07 21-May-07 20-Jun-07 15-Feb-08 100% 50.00
18 Grating dwg-1 SFCCL-LTEM-001-SE-DW-5640 I 50 US
ACT 0% 0.00
SCH 16-Apr-07 1-May-07 16-May-07 15-Jun-07 15-Feb-08 100% 100.00
19 Platform & header supporting structural dwg-1 SFCCL-LTEM-001-SE-DW-5645 I 100 US
ACT 0% 0.00
SCH 16-Apr-07 1-May-07 16-May-07 15-Jun-07 15-Feb-08 100% 100.00
20 Platform & header supporting structural dwg-2 SFCCL-LTEM-001-SE-DW-5647 I 100 US
ACT 0% 0.00
SCH 16-Apr-07 1-May-07 16-May-07 15-Jun-07 15-Feb-08 100% 100.00
21 Platform & header supporting structural dwg-3 SFCCL-LTEM-001-SE-DW-5649 I 100 US
ACT 0% 0.00
SCH 16-Apr-07 1-May-07 16-May-07 15-Jun-07 15-Feb-08 100% 100.00
22 Platform & header supporting structural dwg-4 SFCCL-LTEM-001-SE-DW-5651 I 100 US
ACT 0% 0.00

C SCH 775.00
REFORMER STACK 775
ACT 8.75
SCH 30-Sep-06 15-Oct-06 30-Oct-06 29-Nov-06 15-Feb-08 100% 25.00
1 Structural design basis of Stack SFCCL-LTEM-001-SE-SP-5052 I 25 US
ACT 21-Sep-06 5% 1.25
SCH 17-Oct-06 1-Nov-06 16-Nov-06 16-Dec-06 15-Feb-08 100% 150.00
2 Structural design report of Stack SFCCL-LTEM-001-SE-CL-5019 I 150 US
ACT 21-Sep-06 5% 7.50
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 50.00
3 Foundation load data for STACK SFCCL-LTEM-001-SE-DW-5106 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 150.00
4 Stack GA SFCCL-LTEM-001-SE-DW-5900 I 150 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
5 Stack details -1 SFCCL-LTEM-001-SE-DW-5901 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
6 Stack details -2 SFCCL-LTEM-001-SE-DW-5904 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
7 Stack platform -1 SFCCL-LTEM-001-SE-DW-5907 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
8 Stack platform -2 SFCCL-LTEM-001-SE-DW-5909 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
9 Stack platform grating -1 SFCCL-LTEM-001-SE-DW-5911 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
10 Stack platform grating -2 SFCCL-LTEM-001-SE-DW-5913 I 50 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00
11 Lifting and Shipping and transportation dwg -1 SFCCL-LTEM-001-SE-DW-5915 I 50 US
ACT 0% 0.00

Page 26 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - STRUCTURAL TOTAL POINTS ALLOTED : 19800 SCHEDULED PROGRESS : 178.66%


ACTUAL PROGRESS : 0.27%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 50.00


12 Lifting and Shipping and transportation dwg -2 SFCCL-LTEM-001-SE-DW-5917 I 50 US
ACT 0% 0.00

D SCH 1025.00
FG BOILER 1025
ACT 6.25
SCH 31-Aug-06 15-Sep-06 30-Sep-06 30-Oct-06 15-Feb-08 100% 25.00
1 Structural design basis of FG-Boiler SFCCL-LTEM-001-SE-SP-5053 I 25 Chem P&S
ACT 22-Sep-06 5% 1.25
SCH 30-Nov-06 15-Dec-06 30-Dec-06 29-Jan-07 15-Feb-08 100% 250.00
2 Structural design report of FG-Boiler SFCCL-LTEM-001-SE-CL-5004 I 250 Chem P&S
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 100.00
3 Foundation load data for FGB SFCCL-LTEM-001-SE-DW-5103 I 100 Chem P&S
ACT 22-Sep-06 5% 5.00
SCH 7-Apr-07 22-Apr-07 7-May-07 6-Jun-07 15-Feb-08 100% 150.00
4 FG Boiler Dwg -1 SFCCL-LTEM-001-SE-DW-5700 I 150 Chem P&S
ACT 0% 0.00
SCH 7-Apr-07 22-Apr-07 7-May-07 6-Jun-07 15-Feb-08 100% 150.00
5 FG Boiler Dwg -2 SFCCL-LTEM-001-SE-DW-5701 I 150 Chem P&S
ACT 0% 0.00
SCH 7-Apr-07 22-Apr-07 7-May-07 6-Jun-07 15-Feb-08 100% 150.00
6 FG Boiler Dwg -3 SFCCL-LTEM-001-SE-DW-5704 I 150 Chem P&S
ACT 0% 0.00
SCH 7-Apr-07 22-Apr-07 7-May-07 6-Jun-07 15-Feb-08 100% 100.00
7 FG Boiler platform Dwg - 1 SFCCL-LTEM-001-SE-DW-5706 I 100 Chem P&S
ACT 0% 0.00
SCH 30-Apr-07 15-May-07 30-May-07 29-Jun-07 15-Feb-08 100% 50.00
8 Grating dwg SFCCL-LTEM-001-SE-DW-5720 I 50 Chem P&S
ACT 0% 0.00
SCH 16-May-07 31-May-07 15-Jun-07 15-Jul-07 15-Feb-08 100% 50.00
9 Lifting and Shipping and transportation dwg -1 SFCCL-LTEM-001-SE-DW-5725 I 50 Chem P&S
ACT 0% 0.00

E SCH 12675.00
J-MODULE 1125
ACT 0.00
SCH 22-Oct-06 6-Nov-06 21-Nov-06 21-Dec-06 15-Feb-08 100% 10875.00
1 Structural design basis of J-Module SFCCL-LTEM-001-SE-SP-5054 I 25 US
ACT 0% 0.00
SCH 10-Dec-06 25-Dec-06 9-Jan-07 8-Feb-07 15-Feb-08 100% 900.00
2 Structural design report of J-Module SFCCL-LTEM-001-SE-CL-5003 I 200 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 100.00
3 Foundation load data for J- Module SFCCL-LTEM-001-SE-DW-5101 I 100 US
ACT 0% 0.00
SCH 6-Mar-07 21-Mar-07 5-Apr-07 5-May-07 15-Feb-08 100% 200.00
4 J-Module GA -1 SFCCL-LTEM-001-SE-DW-5500 I 200 US
ACT 0% 0.00
SCH 6-Mar-07 21-Mar-07 5-Apr-07 5-May-07 15-Feb-08 100% 200.00
5 J-Module GA -2 SFCCL-LTEM-001-SE-DW-5503 I 200 US
ACT 0% 0.00
SCH 6-Mar-07 21-Mar-07 5-Apr-07 5-May-07 15-Feb-08 100% 50.00
6 J-Module fabrication details -1 SFCCL-LTEM-001-SE-DW-5510 I 50 US
ACT 0% 0.00
SCH 6-Mar-07 21-Mar-07 5-Apr-07 5-May-07 15-Feb-08 100% 50.00
7 J-Module fabrication details -2 SFCCL-LTEM-001-SE-DW-5513 I 50 US
ACT 0% 0.00
SCH 31-Mar-07 15-Apr-07 30-Apr-07 30-May-07 15-Feb-08 100% 100.00
8 GA plan -1 SFCCL-LTEM-001-SE-DW-5520 I 100 US
ACT 0% 0.00

Page 27 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - STRUCTURAL TOTAL POINTS ALLOTED : 19800 SCHEDULED PROGRESS : 178.66%


ACTUAL PROGRESS : 0.27%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 31-Mar-07 15-Apr-07 30-Apr-07 30-May-07 15-Feb-08 100% 100.00


9 GA plan -2 SFCCL-LTEM-001-SE-DW-5523 I 100 US
ACT 0% 0.00
SCH 10-Apr-07 25-Apr-07 10-May-07 9-Jun-07 15-Feb-08 100% 50.00
10 Lifting and Shipping and transportation dwg -1 SFCCL-LTEM-001-SE-DW-5530 I 50 US
ACT 0% 0.00
SCH 10-Apr-07 25-Apr-07 10-May-07 9-Jun-07 15-Feb-08 100% 50.00
11 Lifting and Shipping and transportation dwg -2 SFCCL-LTEM-001-SE-DW-5531 I 50 US
ACT 0% 0.00

F 5600.00
STEAM-DRUM SUPPORTING STRUCTURE 1575
0.00
SCH 30-Sep-06 15-Oct-06 30-Oct-06 29-Nov-06 15-Feb-08 100% 25.00
1 Structural design basis of Steam drum supporting structure SFCCL-LTEM-001-SE-SP-5055 I 25 US
ACT 20-Sep-06 5% 0.00
SCH 16-Dec-06 31-Dec-06 15-Jan-07 14-Feb-07 15-Feb-08 100% 250.00
2 Structural design report of Steam drum supporting structure. SFCCL-LTEM-001-SE-CL-5005 I 250 US
ACT 0% 0.00
SCH 30-Nov-06 15-Dec-06 30-Dec-06 29-Jan-07 15-Feb-08 100% 100.00
3 Foundation load data for Steam Drum SFCCL-LTEM-001-SE-DW-5107 I 100 US
ACT 20-Sep-06 5% 0.00
SCH 10-Apr-07 25-Apr-07 10-May-07 9-Jun-07 15-Feb-08 100% 250.00
4 GA - steam drum supporting structure dwg- 1 SFCCL-LTEM-001-SE-DW-5800 I 250 US
ACT 0% 0.00
SCH 10-Apr-07 25-Apr-07 10-May-07 9-Jun-07 15-Feb-08 100% 250.00
5 GA - steam drum supporting structure dwg- 2 SFCCL-LTEM-001-SE-DW-5803 I 250 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
6 Fabrication Details dwg -1 SFCCL-LTEM-001-SE-DW-5810 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 4075.00
7 Fabrication Details dwg -2 SFCCL-LTEM-001-SE-DW-5811 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
8 Fabrication Details dwg -3 SFCCL-LTEM-001-SE-DW-5820 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
9 Fabrication Details dwg -4 SFCCL-LTEM-001-SE-DW-5821 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
10 Fabrication Details dwg -5 SFCCL-LTEM-001-SE-DW-5822 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
11 Fabrication Details dwg -6 SFCCL-LTEM-001-SE-DW-5823 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
12 Fabrication Details dwg -7 SFCCL-LTEM-001-SE-DW-5824 I 50 US
ACT 0% 0.00
SCH 13-May-07 28-May-07 12-Jun-07 12-Jul-07 15-Feb-08 100% 50.00
13 Fabrication Details dwg -8 SFCCL-LTEM-001-SE-DW-5825 I 50 US
ACT 0% 0.00
SCH 31-May-07 15-Jun-07 30-Jun-07 30-Jul-07 15-Feb-08 100% 100.00
14 Platform layout-1 SFCCL-LTEM-001-SE-DW-5835 I 100 US
ACT 0% 0.00
SCH 31-May-07 15-Jun-07 30-Jun-07 30-Jul-07 15-Feb-08 100% 100.00
15 Platform details -2 SFCCL-LTEM-001-SE-DW-5836 I 100 US
ACT 0% 0.00
SCH 31-May-07 15-Jun-07 30-Jun-07 30-Jul-07 15-Feb-08 100% 100.00
16 Platform details -3 SFCCL-LTEM-001-SE-DW-5837 I 100 US
ACT 0% 0.00

G 3475.00
Duct support + Pipe Rack + APH support +Staircase 3475
0.00
Structural design basis for Duct support + Pipe Rack + APH SCH 20-Sep-06 25-Sep-06 30-Sep-06 30-Oct-06 15-Feb-08 100% 50.00
1 SFCCL-LTEM-001-SE-SP-5056 I 50 US
support ACT 0% 0.00
Structural design report for Bypass Duct support between SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 150.00
2 SFCCL-LTEM-001-SE-CL-5007 I 150 US
WHR & APH ACT 0% 0.00
SCH 21-Apr-07 6-May-07 21-May-07 20-Jun-07 15-Feb-08 100% 150.00
3 Bypass duct support between WHR & APH , Dwg-1 SFCCL-LTEM-001-SE-DW-5850 I 150 US
ACT r 5% 0.00

Page 28 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - STRUCTURAL TOTAL POINTS ALLOTED : 19800 SCHEDULED PROGRESS : 178.66%


ACTUAL PROGRESS : 0.27%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 21-Apr-07 6-May-07 21-May-07 20-Jun-07 15-Feb-08 100% 150.00


4 Bypass duct support between WHR & APH , Dwg-2 SFCCL-LTEM-001-SE-DW-5853 I 150 US
ACT 0% 0.00
SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 150.00
5 Structural design report for APH bypass duct support SFCCL-LTEM-001-SE-CL-5008 I 150 US
ACT 0% 0.00
SCH 30-Apr-07 15-May-07 30-May-07 29-Jun-07 15-Feb-08 100% 75.00
6 APH bypass duct support dwg-1 SFCCL-LTEM-001-SE-DW-5855 I 75 US
ACT 0% 0.00
SCH 30-Apr-07 15-May-07 30-May-07 29-Jun-07 15-Feb-08 100% 75.00
7 APH bypass duct support dwg-2 SFCCL-LTEM-001-SE-DW-5858 I 75 US
ACT 0% 0.00
SCH 30-Apr-07 15-May-07 30-May-07 29-Jun-07 15-Feb-08 100% 75.00
8 APH to FD fan duct support dwg-1 SFCCL-LTEM-001-SE-DW-5860 I 75 US
ACT 0% 0.00
SCH 30-Apr-07 15-May-07 30-May-07 29-Jun-07 15-Feb-08 100% 75.00
9 APH to FD fan duct support dwg-2 SFCCL-LTEM-001-SE-DW-5863 I 75 US
ACT 0% 0.00
SCH 30-Apr-07 15-May-07 30-May-07 29-Jun-07 15-Feb-08 100% 75.00
10 APH to FD fan duct support dwg-3 SFCCL-LTEM-001-SE-DW-5866 I 75 US
ACT 0% 0.00
SCH 30-Apr-07 15-May-07 30-May-07 29-Jun-07 15-Feb-08 100% 75.00
11 APH to FD fan duct support dwg-4 SFCCL-LTEM-001-SE-DW-5869 I 75 US
ACT 0% 0.00
SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 150.00
12 Structural design report for ID fan to stack duct support SFCCL-LTEM-001-SE-CL-5009 I 150 US
ACT 0% 0.00
SCH 30-Apr-07 15-May-07 30-May-07 29-Jun-07 15-Feb-08 100% 75.00
13 ID fan to Stack duct support dwg-1 SFCCL-LTEM-001-SE-DW-5870 I 75 US
ACT 0% 0.00
SCH 30-Apr-07 15-May-07 30-May-07 29-Jun-07 15-Feb-08 100% 75.00
14 ID fan to Stack duct support dwg-2 SFCCL-LTEM-001-SE-DW-5873 I 75 US
ACT 0% 0.00
SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 75.00
15 Structural design report for Pipe rack in front of reformer SFCCL-LTEM-001-SE-CL-5010 I 75 US
ACT 0% 0.00
SCH 30-Apr-07 15-May-07 30-May-07 29-Jun-07 15-Feb-08 100% 75.00
16 Pipe rack in front of reformer dwg- 1 SFCCL-LTEM-001-SE-DW-5880 I 75 US
ACT 0% 0.00
SCH 30-Apr-07 15-May-07 30-May-07 29-Jun-07 15-Feb-08 100% 75.00
17 Pipe rack in front of reformer dwg- 2 SFCCL-LTEM-001-SE-DW-5883 I 75 US
ACT 0% 0.00
SCH 15-Nov-06 30-Nov-06 15-Dec-06 14-Jan-07 15-Feb-08 100% 150.00
18 Structural design report for APH supporting structure SFCCL-LTEM-001-SE-CL-5006 I 150 US
ACT 0% 0.00
SCH 16-Jan-07 31-Jan-07 15-Feb-07 17-Mar-07 15-Feb-08 100% 75.00
19 APH supporting structure dwg-1 SFCCL-LTEM-001-SE-DW-5750 I 75 US
ACT 0% 0.00
SCH 16-Jan-07 31-Jan-07 15-Feb-07 17-Mar-07 15-Feb-08 100% 75.00
20 APH supporting structure dwg-2 SFCCL-LTEM-001-SE-DW-5753 I 75 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 75.00
21 APH supporting structure Fab dwg SFCCL-LTEM-001-SE-DW-5756 I 75 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 75.00
22 APH supporting structure Fab dwg SFCCL-LTEM-001-SE-DW-5759 I 75 US
ACT 0% 0.00
SCH 16-Sep-07 1-Oct-07 16-Oct-07 15-Nov-07 15-Feb-08 100% 50.00
23 Fan Platform dwg-1 SFCCL-LTEM-001-SE-DW-5850 I 50 US
ACT 0% 0.00
SCH 16-Sep-07 1-Oct-07 16-Oct-07 15-Nov-07 15-Feb-08 100% 50.00
24 Fan Platform dwg-2 SFCCL-LTEM-001-SE-DW-5853 I 50 US
ACT 0% 0.00
SCH 16-Sep-07 1-Oct-07 16-Oct-07 15-Nov-07 15-Feb-08 100% 50.00
25 Fan Platform dwg-3 SFCCL-LTEM-001-SE-DW-5856 I 50 US
ACT 0% 0.00
SCH 16-Sep-07 1-Oct-07 16-Oct-07 15-Nov-07 15-Feb-08 100% 50.00
26 Fan Platform dwg-4 SFCCL-LTEM-001-SE-DW-5859 I 50 US
ACT 0% 0.00
SCH 20-Dec-06 4-Jan-07 19-Jan-07 18-Feb-07 15-Feb-08 100% 150.00
27 Structural design report for stair case structure near reformer SFCCL-LTEM-001-SE-CL-5011 I 150 US
ACT 0% 0.00

Page 29 of 38
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - STRUCTURAL TOTAL POINTS ALLOTED : 19800 SCHEDULED PROGRESS : 178.66%


ACTUAL PROGRESS : 0.27%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 75.00


28 Staircase for reformer dwg-1 SFCCL-LTEM-001-SE-DW-5860 I 75 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 75.00
29 Staircase for reformer dwg-2 SFCCL-LTEM-001-SE-DW-5863 I 75 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 75.00
30 Staircase for reformer fab dwg SFCCL-LTEM-001-SE-DW-5866 I 75 US
ACT 0% 0.00
SCH 29-Jan-07 13-Feb-07 28-Feb-07 30-Mar-07 15-Feb-08 100% 75.00
31 Staircase for reformer fab dwg SFCCL-LTEM-001-SE-DW-5869 I 75 US
ACT 0% 0.00
Structural design report for stair case structure near steam SCH 8-Mar-07 23-Mar-07 7-Apr-07 7-May-07 15-Feb-08 100% 150.00
32 SFCCL-LTEM-001-SE-CL-5012 I 150 US
drum ACT 0% 0.00
SCH 10-Apr-07 25-Apr-07 10-May-07 9-Jun-07 15-Feb-08 100% 75.00
33 Steam drum staircase dwg-1 SFCCL-LTEM-001-SE-DW-5870 I 75 US
ACT 0% 0.00
SCH 10-Apr-07 25-Apr-07 10-May-07 9-Jun-07 15-Feb-08 100% 75.00
34 Steam drum staircase dwg-2 SFCCL-LTEM-001-SE-DW-5873 I 75 US
ACT 0% 0.00
SCH 10-Apr-07 25-Apr-07 10-May-07 9-Jun-07 15-Feb-08 100% 75.00
35 Steam drum staircase fab dwg SFCCL-LTEM-001-SE-DW-5876 I 75 US
ACT 0% 0.00
SCH 10-Apr-07 25-Apr-07 10-May-07 9-Jun-07 15-Feb-08 100% 75.00
36 Steam drum staircase fab dwg SFCCL-LTEM-001-SE-DW-5879 I 75 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 75.00
37 Foundation load data for APH + Pipe rack SFCCL-LTEM-001-SE-DW-5104 I 75 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 75.00
38 Foundation load data for Duct supporting structure SFCCL-LTEM-001-SE-DW-5199 I 75 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 75.00
39 Foundation load data for Cold collecter SFCCL-LTEM-001-SE-DW-5109 I 75 US
ACT 0% 0.00
SCH 31-Oct-06 15-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 75.00
40 Foundation load data for Fans SFCCL-LTEM-001-SE-DW-5105 I 75 US
ACT 0% 0.00

H 800.00
COMMON DWGS AND SPECIFICATION 800
0.00
SCH 8-Jan-07 23-Jan-07 7-Feb-07 9-Mar-07 15-Feb-08 100% 100.00
1 Fabrication specification SFCCL-LTEM-001-SE-SP-5060 I 100 US
ACT 0% 0.00
SCH 3-Oct-06 18-Oct-06 2-Nov-06 2-Dec-06 15-Feb-08 100% 200.00
2 Foundation layout dwg-1 SFCCL-LTEM-001-SE-DW-5885 I 200 US
ACT 0% 0.00
SCH 3-Oct-06 18-Oct-06 2-Nov-06 2-Dec-06 15-Feb-08 100% 200.00
3 Foundation layout dwg-2 SFCCL-LTEM-001-SE-DW-5887 I 200 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
4 Standered splice plate detail dwg -1 SFCCL-LTEM-001-SE-DW-5888 I 50 US
ACT 0% 0.00
SCH 13-Feb-07 28-Feb-07 15-Mar-07 14-Apr-07 15-Feb-08 100% 50.00
5 Standered splice plate detail dwg -2 SFCCL-LTEM-001-SE-DW-5890 I 50 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 25.00
6 Stair tread & typ grating clamp details dwg SFCCL-LTEM-001-SE-DW-5892 I 25 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 25.00
7 Hand rails and sectional details dwg SFCCL-LTEM-001-SE-DW-5894 I 25 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 25.00
8 standered ladder dwg-1 SFCCL-LTEM-001-SE-DW-5896 I 25 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 25.00
9 standered ladder dwg-2 SFCCL-LTEM-001-SE-DW-5898 I 25 US
ACT 0% 0.00
SCH 28-Feb-07 15-Mar-07 30-Mar-07 29-Apr-07 15-Feb-08 100% 100.00
10 General notes dwg SFCCL-LTEM-001-SE-DW-5899 I 100 US
ACT 0% 0.00

Page 30 of 38
LARSEN & TOUBRO LTD.
DOCUMENT NO. REV
LTEM
DOCUMENT SFCCL-LTEM-001-PE-
1
CONTROL INDEX GN-0001
PROJ : SFCCL – 700 MTPD Methanol Plant + 100
PAGE NO. : III
MTPD CO

PROCESS

DOCUMENTS / DRAWINGS
SUPPLIER : L&T UNIT SYSTEM/ LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - PROCESS TOTAL POINTS ALLOTED : 1700 SCHEDULED PROGRESS : 100.00%


ACTUAL PROGRESS : 1.62%
MILESTONES

WEIGHTAGE
CATEGORY

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting Issued For Client As Built
ITEM DRG./ DOC NO. Completion Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

A SCH 1700.00
DOCUMENTS / DRAWINGS 1700
ACT 27.50
SCH 25-Nov-06 5-Dec-06 10-Dec-06 9-Jan-07 15-Feb-08 100% 200.00
1 CFD for combustion air circuit (Analysis by TIC) SFCCL-LTEM-001-PC-CL-1200 I 200
ACT 0% 0.00
SCH 19-Nov-06 29-Nov-06 4-Dec-06 3-Jan-07 15-Feb-08 100% 200.00
2 Hydraulic calculation for fuel gas lines SFCCL-LTEM-001-PC-CL-1201 I 200
ACT 0% 0.00
Summary of hydraulic calculation for other critical SCH 15-Nov-06 25-Nov-06 30-Nov-06 30-Dec-06 15-Feb-08 100% 400.00
3 SFCCL-LTEM-001-PC-CL-1202 I 400
lines ACT 19-Sep-06 5% 20.00
SCH 9-Oct-06 19-Oct-06 24-Oct-06 23-Nov-06 15-Feb-08 100% 50.00
4 Line list updation (Reformer area) SFCCL-LTEM-001-PC-LI-1110 I 50
ACT 22-Sep-06 5% 2.50
SCH 11-Oct-06 21-Oct-06 26-Oct-06 25-Nov-06 15-Feb-08 100% 150.00
5 P&ID for steam generation system SFCCL-LTEM-001-PC-UI-1050 A 150
ACT 0% 0.00
SCH 11-Oct-06 21-Oct-06 26-Oct-06 25-Nov-06 15-Feb-08 100% 150.00
6 P&ID for reformer SFCCL-LTEM-001-PC-PI-1001 A 150
ACT 0% 0.00
SCH 11-Oct-06 21-Oct-06 26-Oct-06 25-Nov-06 15-Feb-08 100% 150.00
7 P&ID for waste heat recovery SFCCL-LTEM-001-PC-PI-1002 A 150
ACT 0% 0.00
Updation of process datasheets for reformer SCH 9-Nov-06 19-Nov-06 24-Nov-06 24-Dec-06 15-Feb-08 100% 100.00
8 SFCCL-LTEM-001-PC-SP-1010 I 100
instruments ACT 0% 0.00
SCH 23-Feb-07 5-Mar-07 10-Mar-07 9-Apr-07 15-Feb-08 100% 200.00
9 Updation of operating manual (Reformer) SFCCL-LTEM-001-PC-SP-1020 I 200
ACT 0% 0.00
SCH 10-Sep-06 20-Sep-06 25-Sep-06 25-Oct-06 15-Feb-08 100% 50.00
10 Utility consumption (Reformer) SFCCL-LTEM-001-PC-LI-1120 I 50
ACT 20-Sep-06 5% 2.50
SCH 10-Sep-06 20-Sep-06 25-Sep-06 25-Oct-06 15-Feb-08 100% 50.00
11 Power consumption (Reformer) SFCCL-LTEM-001-PC-LI-1130 I 50
ACT 21-Sep-06 5% 2.50

Page 33 of 38
LARSEN & TOUBRO LTD.
DOCUMENT NO. REV
LTEM
DOCUMENT SFCCL-LTEM-001-PE-
1
CONTROL INDEX GN-0001
PROJ : SFCCL – 700 MTPD Methanol Plant + 100
PAGE NO. : IV
MTPD CO

PIPING

DOCUMENTS / DRAWINGS
SUPPLIER : L&T UNIT SYSTEM/ SFCCL-LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - PIPING TOTAL POINTS ALLOTED : 8300 SCHEDULED PROGRESS : 101.20%


ACTUAL PROGRESS : 0.03%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

A SCH 200.00
PIPING LAYOUT 200
ACT 2.50
Piping layout( plan and elevation) & loading for SCH 5-Oct-06 20-Oct-06 4-Nov-06 4-Dec-06 15-Feb-08 100% 50.00
1 SFCCL-LTEM-001-PP-GA-4901 A 50 CHEM P&S
reformer ACT 1-Sep-06 5% 2.50
SCH 25-Sep-06 10-Oct-06 25-Oct-06 24-Nov-06 15-Feb-08 100% 50.00
2 Piping layout & loading for WHR SFCCL-LTEM-001-PP-GA-4902 A 50 CHEM P&S
ACT 0% 0.00
SCH 23-Jan-07 7-Feb-07 22-Feb-07 24-Mar-07 15-Feb-08 100% 50.00
3 Piping layout & loading for steam drum SFCCL-LTEM-001-PP-GA-4903 A 50 CHEM P&S
ACT 0% 0.00
SCH 1-Jan-07 16-Jan-07 31-Jan-07 2-Mar-07 15-Feb-08 100% 50.00
4 Piping layout & loading for FGB SFCCL-LTEM-001-PP-GA-4904 A 50 CHEM P&S
ACT 0% 0.00

B SCH 100.00
MISC. DRAWINGS 100
ACT 0.00
SCH 2-Dec-06 16-Jan-07 31-Jan-07 2-Mar-07 15-Feb-08 100% 50.00
1 Piping paltform/grating cutout dwg. SFCCL-LTEM-001-PP-GA-4905 I 50 CHEM P&S
ACT 0% 0.00
SCH 2-Dec-06 16-Jan-07 31-Jan-07 2-Mar-07 15-Feb-08 100% 50.00
2 Piping pedestal loading layout. SFCCL-LTEM-001-PP-GA-4906 I 50 CHEM P&S
ACT 0% 0.00

C SCH 5200.00
STRESS ANALYSIS 4400
ACT 0.00
SCH 5-Oct-06 19-Nov-06 4-Dec-06 3-Jan-07 15-Feb-08 100% 200.00
1 Stress report in reformer area ( fuel gas line ) SFCCL-LTEM-001-PP-CL-4001 A 200 CHEM P&S
ACT 0% 0.00
Stress report in WHR area ( K 431/203 to E 203B SCH 25-Oct-06 9-Dec-06 24-Dec-06 23-Jan-07 15-Feb-08 100% 1000.00
2 SFCCL-LTEM-001-PP-CL-4002 A 200 CHEM P&S
inlet ) ACT 0% 0.00
Stress report in WHR area ( E 203B outlet to E203 SCH 25-Oct-06 9-Dec-06 24-Dec-06 23-Jan-07 15-Feb-08 100% 200.00
3 SFCCL-LTEM-001-PP-CL-4003 A 200 CHEM P&S
A inlet ) ACT 0% 0.00
Stress report in WHR area ( E 203 A outlet to SCH 25-Oct-06 9-Dec-06 24-Dec-06 23-Jan-07 15-Feb-08 100% 200.00
4 SFCCL-LTEM-001-PP-CL-4004 A 200 CHEM P&S
R201) ACT 0% 0.00
Stress report in WHR area ( R 202 outlet to E201 SCH 25-Oct-06 9-Dec-06 24-Dec-06 23-Jan-07 15-Feb-08 100% 200.00
5 SFCCL-LTEM-001-PP-CL-4005 A 200 CHEM P&S
Inlet) ACT 0% 0.00
Stress report in WHR area ( E201 Outlet to H-201 SCH 25-Oct-06 9-Dec-06 24-Dec-06 23-Jan-07 15-Feb-08 100% 200.00
6 SFCCL-LTEM-001-PP-CL-4006 A 200 CHEM P&S
Inlet) ACT 0% 0.00
Stress report in Steam Drum area(B 201 to E202 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
7 SFCCL-LTEM-001-PP-CL-4007 A 200 CHEM P&S
Inlet) ACT 0% 0.00
Stress report in Steam Drum area( E202 Outlet to SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
8 SFCCL-LTEM-001-PP-CL-4008 A 200 CHEM P&S
Piperack) ACT 0% 0.00
Stress report in Steam Drum area( E202 Outlet to SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
9 SFCCL-LTEM-001-PP-CL-4009 A 200 CHEM P&S
Piperack) ACT 0% 0.00
Stress report in Steam Drum area( FG Boiler E205 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
10 SFCCL-LTEM-001-PP-CL-4010 A 200 CHEM P&S
Riser 1) ACT 0% 0.00
Stress report in Steam Drum area( FG Boiler E205 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
11 SFCCL-LTEM-001-PP-CL-4011 A 200 CHEM P&S
Riser 2) ACT 0% 0.00
Stress report in Steam Drum area( FG Boiler E205 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
12 SFCCL-LTEM-001-PP-CL-4012 A 200 CHEM P&S
Riser 3) ACT 0% 0.00
Stress report in Steam Drum area( FG Boiler E205 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
13 SFCCL-LTEM-001-PP-CL-4013 A 200 CHEM P&S
Downcomer 1) ACT 0% 0.00
Stress report in Steam Drum area( FG Boiler E205 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
14 SFCCL-LTEM-001-PP-CL-4014 A 200 CHEM P&S
Downcomer 2) ACT 0% 0.00

Page 36 of 38
SUPPLIER : L&T UNIT SYSTEM/ SFCCL-LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - PIPING TOTAL POINTS ALLOTED : 8300 SCHEDULED PROGRESS : 101.20%


ACTUAL PROGRESS : 0.03%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

Stress report in Steam Drum area( FG Boiler E205 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
15 SFCCL-LTEM-001-PP-CL-4015 A 200 CHEM P&S
Downcomer 3) ACT 0% 0.00
Stress report in Steam Drum area( RG Boiler E210 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
16 SFCCL-LTEM-001-PP-CL-4016 A 200 CHEM P&S
Riser 1) ACT 0% 0.00
Stress report in Steam Drum area( RG Boiler E210 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
17 SFCCL-LTEM-001-PP-CL-4017 A 200 CHEM P&S
Riser 2) ACT 0% 0.00
Stress report in Steam Drum area( RG Boiler E210 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
18 SFCCL-LTEM-001-PP-CL-4018 A 200 CHEM P&S
Riser 3) ACT 0% 0.00
Stress report in Steam Drum area( RG Boiler E210 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
19 SFCCL-LTEM-001-PP-CL-4019 A 200 CHEM P&S
Downcomer 1) ACT 0% 0.00
Stress report in Steam Drum area( RG Boiler E210 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
20 SFCCL-LTEM-001-PP-CL-4020 A 200 CHEM P&S
Downcomer 2) ACT 0% 0.00
Stress report in Steam Drum area( RG Boiler E210 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
21 SFCCL-LTEM-001-PP-CL-4021 A 200 CHEM P&S
Downcomer 3) ACT 0% 0.00
Stress report in Steam Drum area( Recycled Co2 SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 100% 200.00
22 SFCCL-LTEM-001-PP-CL-4022 A 200 CHEM P&S
from K205) ACT 0% 0.00

D SCH 500.00
ISOMETRICS 500
ACT 0.00
SCH 18-Feb-07 4-Apr-07 19-Apr-07 19-May-07 15-Feb-08 100% 100.00
1 Piping Isometric extraction for reformer SFCCL-LTEM-001-PP-IS-4201 I 100 CHEM P&S
ACT 0% 0.00
SCH 24-Mar-07 8-May-07 23-May-07 22-Jun-07 15-Feb-08 100% 100.00
2 Piping Isometric extraction for WHR SFCCL-LTEM-001-PP-IS-4301 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-Apr-07 7-Jun-07 22-Jun-07 22-Jul-07 15-Feb-08 100% 100.00
3 Piping Isometric extraction for Steam Drum SFCCL-LTEM-001-PP-IS-4401 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Jun-07 6-Aug-07 21-Aug-07 20-Sep-07 15-Feb-08 100% 100.00
4 Piping Isometric extraction for other area SFCCL-LTEM-001-PP-IS-4501 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Jun-07 6-Aug-07 21-Aug-07 20-Sep-07 15-Feb-08 100% 100.00
5 Piping isometric control index. SFCCL-LTEM-001-PP-IS-4200 I 100 CHEM P&S
ACT 0% 0.00

E SCH 2400.00
GENERAL ARRAGEMENT DRAWIGS 2400
ACT 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
1 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4101 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
2 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4102 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
3 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4103 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
4 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4104 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
5 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4105 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
6 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4106 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
7 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4107 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
8 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4108 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
9 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4109 I 100 CHEM P&S
ACT 0% 0.00

Page 37 of 38
SUPPLIER : L&T UNIT SYSTEM/ SFCCL-LTEM REVISION: 1
PROJECT: METHANOL PLANT DOCUMENT CONTROL INDEX PROJECT START DATE : 06/06/06
LTEM JOB CODE : SFCCL PROJECT END DATE : 15/10/07
STATUS AS ON : 25-Apr-20

DISCIPLINE - PIPING TOTAL POINTS ALLOTED : 8300 SCHEDULED PROGRESS : 101.20%


ACTUAL PROGRESS : 0.03%
MILESTONES

WEIGHTAGE

DWG / DOC
REVISION

% PROG.
LATEST
Drafting Issued For Issued For
REMARK /

SCH /
SR DRAWING/ DOC. WTD APPROVAL

ACT
Start Drafting As Built
ITEM DRG./ DOC NO. CATEGORY Completion Client Construction STATUS
NO. TITLE PROGRESS CODE
5% 30% 30% 30% 5%

SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00


10 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4110 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
11 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4111 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
12 Piping GAD reformer including support SFCCL-LTEM-001-PP-GA-4112 I 100 CHEM P&S
ACT 0% 0.00
SCH 23-May-07 7-Jul-07 22-Jul-07 21-Aug-07 15-Feb-08 100% 100.00
13 Piping GAD reformer ( Elevation). SFCCL-LTEM-001-PP-GA-4113 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Jun-07 6-Aug-07 21-Aug-07 20-Sep-07 15-Feb-08 100% 100.00
14 Piping GAD WHR including support SFCCL-LTEM-001-PP-GA-4114 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Jun-07 6-Aug-07 21-Aug-07 20-Sep-07 15-Feb-08 100% 100.00
15 Piping GAD WHR including support SFCCL-LTEM-001-PP-GA-4115 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Jun-07 6-Aug-07 21-Aug-07 20-Sep-07 15-Feb-08 100% 100.00
16 Piping GAD Steam Drum including support SFCCL-LTEM-001-PP-GA-4116 I 100 CHEM P&S
ACT 0% 0.00
Piping GAD Steam Drum ( RG boiler ) including SCH 22-Jun-07 6-Aug-07 21-Aug-07 20-Sep-07 15-Feb-08 100% 100.00
17 SFCCL-LTEM-001-PP-GA-4117 I 100 CHEM P&S
support ACT 0% 0.00
Piping GAD Steam Drum ( FG bolier ) including SCH 21-Aug-07 5-Oct-07 20-Oct-07 19-Nov-07 15-Feb-08 100% 100.00
18 SFCCL-LTEM-001-PP-GA-4118 I 100 CHEM P&S
support ACT 0% 0.00
Piping GAD Steam Drum ( Elevation ) including SCH 21-Aug-07 5-Oct-07 20-Oct-07 19-Nov-07 15-Feb-08 100% 100.00
19 SFCCL-LTEM-001-PP-GA-4119 I 100 CHEM P&S
support ACT 0% 0.00
Piping GAD other area ( ID /FD fan,stack) SCH 22-Jul-07 5-Sep-07 20-Sep-07 20-Oct-07 15-Feb-08 100% 100.00
20 SFCCL-LTEM-001-PP-GA-4120 I 100 CHEM P&S
including support ACT 0% 0.00
Piping GAD other area ( pipe rack ) including SCH 22-Jul-07 5-Sep-07 20-Sep-07 20-Oct-07 15-Feb-08 100% 100.00
21 SFCCL-LTEM-001-PP-GA-4121 I 100 CHEM P&S
support ACT 0% 0.00
SCH 22-Jul-07 5-Sep-07 20-Sep-07 20-Oct-07 15-Feb-08 100% 100.00
22 Piping GAD battery limit tie in point dwg. SFCCL-LTEM-001-PP-GA-4122 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Jul-07 5-Sep-07 20-Sep-07 20-Oct-07 15-Feb-08 100% 100.00
23 Piping Key plan Dwg. SFCCL-LTEM-001-PP-GA-4123 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Jul-07 5-Sep-07 20-Sep-07 20-Oct-07 15-Feb-08 100% 100.00
24 Piping GAD U/G Tie in points. SFCCL-LTEM-001-PP-GA-4124 I 100 CHEM P&S
ACT 0% 0.00

F SCH 0.00
PIPING SUPPORTING 400
ACT 0.00
SCH 20-Dec-06 3-Feb-07 18-Feb-07 20-Mar-07 15-Feb-08 0% 0.00
1 Pipe Support Design (special support sketches ) SFCCL-LTEM-001-PP-DW-4801 I 100 CHEM P&S
ACT 0% 0.00
SCH 20-Dec-06 3-Feb-07 18-Feb-07 20-Mar-07 15-Feb-08 0% 0.00
2 Pipe Support Design (spring specification ) SFCCL-LTEM-001-PP-DW-4802 I 100 CHEM P&S
ACT 0% 0.00
SCH 20-Dec-06 3-Feb-07 18-Feb-07 20-Mar-07 15-Feb-08 0% 0.00
3 Pipe support design ( vessel clit with loading ) SFCCL-LTEM-001-PP-DW-4803 I 100 CHEM P&S
ACT 0% 0.00
SCH 7-Jun-07 22-Jul-07 6-Aug-07 5-Sep-07 15-Feb-08 0% 0.00
4 Pipe Support Design Finish SFCCL-LTEM-001-PP-DW-4804 I 100 CHEM P&S
ACT 0% 0.00

G SCH
MTO 300
ACT
SCH 2-Dec-06 16-Jan-07 31-Jan-07 2-Mar-07 15-Feb-08 0% 0.00
1 First MTO ( preliminary) SFCCL-LTEM-001-PP-BQ-4101 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Feb-07 8-Apr-07 23-Apr-07 23-May-07 15-Feb-08 0% 0.00
2 Second MTO SFCCL-LTEM-001-PP-BQ-4102 I 100 CHEM P&S
ACT 0% 0.00
SCH 22-Jun-07 6-Aug-07 21-Aug-07 20-Sep-07 15-Feb-08 0% 0.00
3 Final MTO SFCCL-LTEM-001-PP-BQ-4103 I 100 CHEM P&S
ACT 0% 0.00

Page 38 of 38