Abu Rawash Wastewater Plant Upgrade

The document appears to be an engineering drawing showing a layout of tanks and piping. It includes 6 numbered tanks connected by piping. There is also an electrical pit and two drainage pits shown. The document provides notes about the scope not including power/control cables and that openings should be defined by the project companies. It also includes schedules for equipment, reservations, and traps as well as design information at the bottom.

Uploaded by

Ahmed Hussien
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
300 views5 pages

Abu Rawash Wastewater Plant Upgrade

The document appears to be an engineering drawing showing a layout of tanks and piping. It includes 6 numbered tanks connected by piping. There is also an electrical pit and two drainage pits shown. The document provides notes about the scope not including power/control cables and that openings should be defined by the project companies. It also includes schedules for equipment, reservations, and traps as well as design information at the bottom.

Uploaded by

Ahmed Hussien
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

TANK 01

TANK 06
TANK 04
TANK 02
C
D
A
B
TANK 05
TANK 03 F
D D
C NOTE:
ELECTRICAL THIS DRAWING DO NOT INCLUDE ANY OPENING FOR POWER AND CONTROL CABLES
PIPELINE INLET SLUDGE THEIR FOR SUCHES OPENINGS SHOULD BE DEFINED BY AQUALIUM / ORASCOM
PIT
FROM TANK-04
OPENING SCHEDULE
VWS EGYPT
SCOPE
LOAD AREA 18,20
JV SCOPE
LIST OF RESERVATIONS
LIST OF TRAPS
LIST OF ELECTRICAL RESERVATIONS
111-PV-0001
Main Equipment Schedule
ITEM Code DESCRIPTION Characteristics
18,47 ³
111-PV-0002 6 29/01/2020 GKE JNA FOR_APPROVAL NHA
5 09/10/2019 GKE JNA FOR_APPROVAL NHA
4 02/07/2019 GKE JNA FOR_APPROVAL NHA
3 GKE JNA FOR APPROVAL
REV. DATE BY CHECK DESCRIPTION APPROVED
18,47 UPGRADE AND RAISING CAPACITY OF
ABU RAWASH WASTEWATER TREATMENT PLANT
EMPLOYER: CONSULTANT:
EPC CONTRACTOR: SUB-CONTRACTOR:
FGL 18,10
DRAINAGE PIT FOR
PORTABLE PUMP
750x750x600mm
FGL 18,10
DOCUMENT TYPE:
DETAILED DESIGN DRAWING- MECHANICAL
PIPELINE OUTLET SLUDGE
CONTRACTOR CODE
ORQ DD -- -- -- -- SHEETS: 1/5
NUMBER:
ORIGINATOR DOC. TYPE LOCATION SUB-LOCATION DWG NO. REV. SCALE: 1:50
PIPELINE INLET SLUDGE DRAWING TITLE:
NEW PRIMARY SLUDGE PUMPING STATION-04&6
FROM TANK-06 C [UNIT 111.D]
PLAN VIEW LEVEL+21.50
SUBCONTRACTOR REFERENCE NO.: DWG-04.11-ME-041( r.6)
REFERENCE SPECIFICATION(S): CONSULTANT CODE:
FOR CONTRACTOR:
NAME: SIGNATURE: DATE: 12/03/2019
B ENGINEER ACTION:
TANK 01
TANK 06
TANK 04
TANK 02
C
B A

D
D D TANK 05
TANK 03 F
C
ELECTRICAL
PIPELINE INLET SLUDGE
PIT NOTE:
FROM TANK-04 THIS DRAWING DO NOT INCLUDE ANY OPENING FOR POWER AND CONTROL CABLES
THEIR FOR SUCHES OPENINGS SHOULD BE DEFINED BY AQUALIUM / ORASCOM
OPENING SCHEDULE
LOAD AREA 18,20
VWS EGYPT
SCOPE
JV SCOPE
LIST OF RESERVATIONS
LIST OF TRAPS
LIST OF ELECTRICAL RESERVATIONS
111-PV-0001
Main Equipment Schedule
ITEM Code DESCRIPTION Characteristics
18,47 ³
111-PV-0002
6 29/01/2020 GKE JNA FOR_APPROVAL NHA
5 09/10/2019 GKE JNA FOR_APPROVAL NHA
4 02/07/2019 GKE JNA FOR_APPROVAL NHA
3 GKE JNA FOR APPROVAL
18,47 REV. DATE BY CHECK DESCRIPTION APPROVED
UPGRADE AND RAISING CAPACITY OF
ABU RAWASH WASTEWATER TREATMENT PLANT
EMPLOYER: CONSULTANT:
FGL 18,10
DRAINAGE PIT FOR EPC CONTRACTOR: SUB-CONTRACTOR:
PORTABLE PUMP
750x750x600mm
FGL 18,10
PIPELINE OUTLET SLUDGE
DOCUMENT TYPE:
DETAILED DESIGN DRAWING- MECHANICAL
PIPELINE INLET SLUDGE CONTRACTOR CODE
ORQ DD -- -- -- -- SHEETS: 2/5
NUMBER:
FROM TANK-06 C DRAWING TITLE:

ORIGINATOR DOC. TYPE LOCATION SUB-LOCATION DWG NO. REV. SCALE: 1:50
NEW PRIMARY SLUDGE PUMPING STATION-04&6
[UNIT 111.D]
PLAN VIEW LEVEL+20.00
SUBCONTRACTOR REFERENCE NO.: DWG-04.11-ME-042 ( r.6)
REFERENCE SPECIFICATION(S): CONSULTANT CODE:
B
FOR CONTRACTOR:
NAME: SIGNATURE: DATE: 12/03/2019
ENGINEER ACTION:
111-TP-0001
NOTE:
THIS DRAWING DO NOT INCLUDE ANY OPENING FOR POWER AND CONTROL CABLES
THEIR FOR SUCHES OPENINGS SHOULD BE DEFINED BY AQUALIUM / ORASCOM
OPENING SCHEDULE
VWS EGYPT
SCOPE
LIST OF RESERVATIONS
JV SCOPE
LIST OF TRAPS
LIST OF ELECTRICAL RESERVATIONS
Main Equipment Schedule
ITEM Code DESCRIPTION Characteristics
³
6 29/01/2020 GKE JNA FOR_APPROVAL NHA
5 09/10/2019 GKE JNA FOR_APPROVAL NHA
4 02/07/2019 GKE JNA FOR_APPROVAL NHA
3 GKE JNA FOR APPROVAL
REV. DATE BY CHECK DESCRIPTION APPROVED
UPGRADE AND RAISING CAPACITY OF
ABU RAWASH WASTEWATER TREATMENT PLANT
EMPLOYER: CONSULTANT:
EPC CONTRACTOR: SUB-CONTRACTOR:
DOCUMENT TYPE:
DETAILED DESIGN DRAWING- MECHANICAL
CONTRACTOR CODE
ORQ DD -- -- -- -- SHEETS: 3/5
NUMBER:
ORIGINATOR DOC. TYPE LOCATION SUB-LOCATION DWG NO. REV. SCALE: 1:50
DRAWING TITLE:
NEW PRIMARY SLUDGE PUMPING STATION-04&6
[UNIT 111.D]
SECTIONS A-A & B-B
SUBCONTRACTOR REFERENCE NO.: DWG-04.11-ME-043( r.6)
REFERENCE SPECIFICATION(S): CONSULTANT CODE:
FOR CONTRACTOR:
NAME: SIGNATURE: DATE: 12/03/2019
ENGINEER ACTION:
NOTE:
THIS DRAWING DO NOT INCLUDE ANY OPENING FOR POWER AND CONTROL CABLES
THEIR FOR SUCHES OPENINGS SHOULD BE DEFINED BY AQUALIUM / ORASCOM
OPENING SCHEDULE
LIST OF RESERVATIONS
LIST OF TRAPS
LIST OF ELECTRICAL RESERVATIONS
Main Equipment Schedule
ITEM Code DESCRIPTION Characteristics
³
6 29/01/2020 GKE JNA FOR_APPROVAL NHA
5 09/10/2019 GKE JNA FOR_APPROVAL NHA
4 02/07/2019 GKE JNA FOR_APPROVAL NHA
3 GKE JNA FOR APPROVAL
REV. DATE BY CHECK DESCRIPTION APPROVED
UPGRADE AND RAISING CAPACITY OF
ABU RAWASH WASTEWATER TREATMENT PLANT
EMPLOYER: CONSULTANT:
EPC CONTRACTOR: SUB-CONTRACTOR:
DOCUMENT TYPE:
DETAILED DESIGN DRAWING- MECHANICAL
CONTRACTOR CODE
ORQ DD -- -- -- -- SHEETS: 4/5
NUMBER:
ORIGINATOR DOC. TYPE LOCATION SUB-LOCATION DWG NO. REV. SCALE: 1:50
DRAWING TITLE:
NEW PRIMARY SLUDGE PUMPING STATION-04&6
[UNIT 111.D]
VIEWS C & D
SUBCONTRACTOR REFERENCE NO.: DWG-04.11-ME-044( r.6)
REFERENCE SPECIFICATION(S): CONSULTANT CODE:
FOR CONTRACTOR:
NAME: SIGNATURE: DATE: 12/03/2019
ENGINEER ACTION:
111-TP-0001
NOTE:
THIS DRAWING DO NOT INCLUDE ANY OPENING FOR POWER AND CONTROL CABLES
THEIR FOR SUCHES OPENINGS SHOULD BE DEFINED BY AQUALIUM / ORASCOM
OPENING SCHEDULE
LIST OF RESERVATIONS
LIST OF TRAPS
LIST OF ELECTRICAL RESERVATIONS
Main Equipment Schedule
ITEM Code DESCRIPTION Characteristics
³
111-TP-0001
6 29/01/2020 GKE JNA FOR_APPROVAL NHA
5 09/10/2019 GKE JNA FOR_APPROVAL NHA
4 02/07/2019 GKE JNA FOR_APPROVAL NHA
3 GKE JNA FOR APPROVAL
REV. DATE BY CHECK DESCRIPTION APPROVED
UPGRADE AND RAISING CAPACITY OF
ABU RAWASH WASTEWATER TREATMENT PLANT
EMPLOYER: CONSULTANT:
EPC CONTRACTOR: SUB-CONTRACTOR:
DOCUMENT TYPE:
SHOP DRAWING- MECHANICAL
CONTRACTOR CODE
ORQ DD -- -- -- -- SHEETS: 5/5
NUMBER:
ORIGINATOR DOC. TYPE LOCATION SUB-LOCATION DWG NO. REV. SCALE: 1:50
DRAWING TITLE:
NEW PRIMARY SLUDGE PUMPING STATION-04&6
[UNIT 111.D]
SECTIONS E-E & F-F
SUBCONTRACTOR REFERENCE NO.: DWG-04.11-ME-045 ( r.6)
REFERENCE SPECIFICATION(S): CONSULTANT CODE:
FOR CONTRACTOR:
NAME: SIGNATURE: DATE: 12/03/2019
ENGINEER ACTION: