0% found this document useful (0 votes)
118 views2 pages

Coal & Dolochar Consm Report in Power Plant

The document reports the daily consumption of dolomite, char, coal, and coal transferred to auction at a power plant from April 1-30. It shows the quantities in metric tons of inhouse dolomite and char consumed, outside dolomite consumed, coal waste rejected, coal fines, and total coal consumed each day. It also notes the quantities of coal transferred to auction each day.

Uploaded by

Debasish Ghosh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
118 views2 pages

Coal & Dolochar Consm Report in Power Plant

The document reports the daily consumption of dolomite, char, coal, and coal transferred to auction at a power plant from April 1-30. It shows the quantities in metric tons of inhouse dolomite and char consumed, outside dolomite consumed, coal waste rejected, coal fines, and total coal consumed each day. It also notes the quantities of coal transferred to auction each day.

Uploaded by

Debasish Ghosh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

COAL & DOLOCHAR CONSM REPORT IN POWER PLANT

DOLOCHAR CONSM(MT) COAL CONSM(MT) COAL TRANSFER TO


DATE INHOUSE DOLO INHOUSE CHAR OUTSIDE DOLO AUCTION W.REJECT COAL FINES TOTAL AUCTION
1-Apr 50.39 50.39 25.19 66.03 15.00
2-Apr 45.46 45.46 22.73 58.34 0.00
3-Apr 46.40 46.40 23.20 72.00 15.00
4-Apr 47.18 47.18 23.59 72.04 15.00
5-Apr 47.16 47.16 23.58 78.11 15.00
6-Apr 47.93 47.93 23.96 80.18 15.00
7-Apr 50.38 50.38 25.19 79.05 15.00
8-Apr 52.00 52.00 26.00 83.99 15.00
9-Apr 52.88 52.88 26.44 85.8 15.00
10-Apr 54.81 54.81 27.40 84.98 15.00
11-Apr 55.93 55.93 27.96 82.18 15.00
12-Apr 47.85 47.85 23.93 78.37 15.00
13-Apr 49.88 49.88 24.94 79.29 15.00
14-Apr 51.28 51.28 25.64 77.8 15.00
15-Apr 45.30 45.30 22.65 76.76 15.00
16-Apr 46.96 46.96 23.48 75.59 15.00
17-Apr 46.33 46.33 23.16 72.18 15.00
18-Apr 39.54 39.54 19.77 63.15 15.00
19-Apr 28.69 28.69 14.35 47.27 0.00
20-Apr 36.42 36.42 18.21 60.95 15.00
21-Apr 40.96 40.96 20.48 67.61 15
22-Apr 20.00 20.00 11.97 8.77 8.75 17.51 35.03 15
23-Apr 23.6 23.6 11.8 9.75 9.83 19.42 39.00 0
24-Apr 44.5 44.5 22.27 18.97 15 31.76 65.73 15
25-Apr 42.32 42.32 21.18 21.34 15 34.84 71.18 15
26-Apr 43.48 43.48 1.76 29.59 15 27.69 72.28 15
27-Apr 43.11 43.11 21.56 20.88 15 34.34 70.22 15
28-Apr 41.74 41.74 20.89 19.77 15 34.86 69.63 15
29-Apr 44.55 44.55 22.29 15 31.72 25.89 72.61 15
30-Apr

REMARKS:- 1)Those above cell which is not maintioned any figure i.e we not entered the qty figure of coal separately(aucti
WER PLANT
COAL TRANSFER TO PP FROM DRI
W.REJECT COAL FINES TOTAL
39.09 18.95 73.04
26.00 10.14 36.14
75.01 20.87 110.88
47.70 9.34 72.04
38.96 18.15 72.11
61.80 18.38 95.18
37.27 18.78 71.05
51.30 29.69 95.99
63.32 9.48 87.8
36.83 19.15 70.98
35.65 16.53 67.18
40.58 22.80 78.38
37.68 20.61 73.29
35.34 20.61 70.95
34.47 20.29 69.76
35.91 19.68 70.59
46.89 10.29 72.18
36.00 20.15 71.15
21.70 10.57 32.27
21.96 31.00 67.96
29.87 17.74 62.61
30.63 19.4 65.03
0 0 0
31.76 18.97 65.73
30.72 20.46 66.18
52.69 29.59 97.28
28.34 20.88 64.22
30.86 19.77 65.63
55.89 31.72 102.61

e of coal separately(auction,w.reject&coal fines) in SAP system.