Document Title: GENERAL ARRANGEMENT, EQUIPMENT SITE LAYOUT
Project Doc. 4000046273-PGCA-EA-B01-004 Revision:
Number: C1
Vendor Doc. 76-03060741-DOC001 Vendor
E
Number: Rev.:
Facility Identifier: PGCA
Discipline: EL Document DWG
Type:
Submitted For: Vendor Name:
Review X Approval Info. Certified SIEMENS
Review does not constitute acceptance of design
details, calculations, test methods or materials
developed or selected by vendor nor does it relieve
vendor from full compliance with contractual or other Package Description:
obligations. Gas Turbine Generator Package
A. Approved
(Submit final document in MDR/IOM
only)
P.O. No:
Manufacture may proceed
4000046273
B. Approved with comments
(Revise and resubmit document)
Manufacture may proceed once Model/Serial No.:
comments are incorporated SGT-300-1S
C. Rejected
(Resubmit)
Manufacture may not proceed VDRL Prime Code:
I. For Information Only B01
(Submit final document in MDR/IOM
only) Tag No.:
Name: Xavier Grostabussiat
PGCA-EZ-8110A
Signature: PGCA-EZ-8110B
PGCA-EZ-8110C
Date: 12 Dec 2019
PEGAGA DEVELOPMENT
PROJECT
Unrestricted
Comment Response Sheet
Company : MDC Oil & Gas (SK320) Ltd CRS for Doc.: 76-03060741-DOC001 Rev C
Project Title : Provision Of Engineering, Procurement, Construction, Installation Doc. Title : Equipment Site Layout GA
And Commissioning (EPCIC) for the Pegaga Development
Project Doc. No. : 4000046273-PGCA-EA-B01-004 Rev: 5.3
PO No. : 4000046273
Commente Status
No. Page Comment Response Date Remarks
d by O/C *
1. 1 Logo dislocated? Noted. HXF 03/20/2019 C
2. 1 Ensure this column are signed Noted. HXF 03/20/2019 C
3. 1 PGCA-EZ-8110A, PGCA-EZ-8110B, PGCA- Noted. HXF 03/20/2019 C
EZ-8110C
4. 2 Comment refer to the revised AAF drawing as Noted. HXF 03/20/2019 C
attached
5. 3 AAF to provide ducting point support for us to Will be provided on the detailed HXF 03/20/2019 C
install the support for the ductings. arrangement drawings (DOC010, 011 and
023) or the foundation drawing (DOC003)
once the layout has been confirmed.
6. 3 Oil mist piping routing shall be check against Noted. HXF 03/20/2019 O
NAVIS model to avoid clashing with beam etc.
7. 3 Height for air outlet shall be 5000mm to avoid Noted. HXF 03/20/2019 C
clashes
Page 1 of 5
Comment Response Sheet
Commente Status
No. Page Comment Response Date Remarks
d by O/C *
8. 3 AAF to ensure sufficient space for removal the Noted. HXF 03/20/2019 C
filter from side in between enclosure air intake.
9. 3 Tilt 15 degree refer to attach PDMS model. Noted. HXF 03/20/2019 C
This is ON HOLD subject to confirmation by
safety since it will blow directly to future air
compressor about 8m away. At the main time
SIE to advice hot air temperature produce & air
velocity and minimum distance requirement
required for the air cool down.
10. 3 to add PGCA-EZ-8110A Noted. HXF 03/20/2019 C
11. 3 to add PGCA-EZ-8110B Noted. HXF 03/20/2019 C
12. 3 to add PGCA-EZ-8110C Noted. HXF 03/20/2019 C
13. 3 Door move to this side Noted. HXF 03/20/2019 C
14. 3 air outlet ducting of Unit A facing side Noted. HXF 03/20/2019 C
Page 2 of 5
Comment Response Sheet
Commente Status
No. Page Comment Response Date Remarks
d by O/C *
Revision 5.2
15. 1 Please ensure these filters can be easily Noted. HXF 08/01/2019 C
access for maintenance
16. 1 GENERATOR CACA COOLER OUTLET IS As previously confirmed, there is no issue. HXF 08/01/2019 C
LOCATED HERE. PLS DETAIL OUT THE
DIMENSION SO WE KNOW THAT HOT AIR
CIRCULATION WILL NOT OCCUR
17. 1 Refer to comment in attached email the drain The U-trap drain has been removed to HXF 08/01/2019 C
point is clashing with the beam. Vendor to refer avoid the clashing. New 3D model will be
to the Navis Model given in separate email to sent to customer to double check.
avoid the clashing.
18. 1 fan accessibility and maintenance strategy to Updated in Rev C. HXF 08/01/2019 C
be spell out clearly
19. 1 Specify location & gap size for Deck Updated in Rev C. HXF 08/01/2019 C
penetration
20. 1 details of this Oil mist coalescer to be provided, Lube oil coalescer size details is on gas HXF 08/01/2019 C
as well as actual location to be shown. Looks turbine GA 6071-B01-001 and
as potential clash with service platform maintenance GA 6074-B01-003.
21. 1 is this final location of enclosure access doors Yes. Refer to maintenance GA 6074-B01- HXF 08/01/2019 C
? 003 for doors swing range.
Vendor to verify accessability are not block and
sufficient space to swing the doors and
withdrawal and re-installation of the gas turbine
22. 1 Vendor to show support locations and type Support locations and type will be on HXF 08/01/2019 C
foundation drawing 76-03060741-DOC003
Page 3 of 5
Comment Response Sheet
Commente Status
No. Page Comment Response Date Remarks
d by O/C *
23. 1 Refer to attach oil mist piping vent comment in Updated in Rev C. HXF 08/01/2019 C
the attached email. Vendor to revise according
to NAVIS model.
24. 1 3D model in stp file given previously not tally New 3D model will be sent to customer. HXF 08/01/2019 C
with this drawings. Refer comment in the
attached email
25. 1 provide height? Updated in Rev C. HXF 08/01/2019 C
26. 1 1.Vendor to relocate the P2 cooler to avoid the 1. Updated in Rev C. P2 cooler has been HXF 08/01/2019 C
clashes with the platform structure. Refer to the moved to GT side, instead of GT End.
separate email attached with regards to this 2. P2 cooler is overhung. It’s standard
clashed. installation.
2. Is the P2 cooler overhung? is it standard
installation?
27. 1 Vendor to explain / clarify this P2 cooler See item #28. HXF 08/01/2019 C
28. 1 PLS PROVIDE DETAILS, IS IT CLOSE LOOP P2 cooler cools air from the compressor HXF 08/01/2019 C
TYPE? stage which is then used to purge fuel gas
pilot injector nozzles while running on liquid
fuel. It is a closed loop system.
29. 1 SHOW FOOTING DETAILS Refer to foundation GA 6074-B03-001. HXF 08/01/2019 C
30. 1 We hope the height of the package is The height is increased by 50 mm. New 3D HXF 08/01/2019 C
maintained after we receive the footing detail. model will be sent to customer.
Otherwise our model will be wrong!
31. 1 Indicate which one combustion intake, Updated in Rev C. HXF 08/01/2019 C
enclosure air intake etc.
Page 4 of 5
Comment Response Sheet
Commente Status
No. Page Comment Response Date Remarks
d by O/C *
32. 1 availability of service platform and sufficient Service Platform are outside of our scope. HXF 08/01/2019 C
space for filter replacement work.
33. 1 Show north orientation Updated in Rev C. HXF 08/01/2019 C
34. 1 P2 cooler not shown? ( 2 place) Updated in Rev C. HXF 08/01/2019 C
35. 1 Do ensure that there are access platform Service Platform are outside of our scope. HXF 08/01/2019 C
available to regularly inspect and maintain
these air inlet filters (item 2 and 4 in this
drawing)
Revison 5.3
36. 1 What about train A and B layout in details. It is The keyplan on the top right-hand side of HXF 10/08/2019 C
required for SFSB to ensure the package fit the document shows the configuration for
and no clash on the platform the 3 trains. Additional details are provided
on the Combustion Air Intake, Exhaust and
Ventilation General Arrangement drawings
listed on the VRDL. A 3D model has also
been provided to help with fitment on the
platform.
37. 1 is this gap consistent with site layout by SFSB This question is for SFSB. HXF 10/08/2019 C
? Vendor to confirm
Additional Notes (if any)
* O - Open, C - Closed
Page 5 of 5