This document discusses the timing and power sequence of a motherboard during startup. It begins with the battery powering the RTC module and crystal oscillator. When the power button is pressed, the I/O chip generates power on signals that notify the southbridge and enable boot blocks. Voltages like 3.3VSB and 5V are then generated before the CPU VTT voltage. Once the VTT is stable, the CPU receives power good signals and is reset to begin operation.
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
477 views

Motherboard Power Timing Knowledge Analysis

This document discusses the timing and power sequence of a motherboard during startup. It begins with the battery powering the RTC module and crystal oscillator. When the power button is pressed, the I/O chip generates power on signals that notify the southbridge and enable boot blocks. Voltages like 3.3VSB and 5V are then generated before the CPU VTT voltage. Once the VTT is stable, the CPU receives power good signals and is reset to begin operation.
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

Board power Timing Knowledge Analysis

Keywords:
Motherboard repair training course introduces the timing board power there is

knowledge of the collection, and many more examples to illustrate.

Below is an example 915 +775 motherboard timing Minga electricity


from S5 (insert battery ATX and ATX power supply connected to the
mains) Start:

    

(1) South Bridge RTC module to the motherboard battery power transmission (VCC

RTC).

    

(2) 32.768 kHz crystal oscillator start-up drums, Southbridge RTC module to work.

    

(3) By the motherboard CMOS jumper to RTC battery module RTCRST # transmission, so

that the internal RTC data SouthbridgeData register is maintained.

    

(4) 3.3VSB simultaneously send and Southbridge I / O, both standby modules to

work.

    

Standby Module (5) 110 to get the 3.3VSB produce RSMRST # (high and one low and

one high transition, generally only measureTo a high level, because the plug

ATX immediately after the transition is completed), RSMRST # not just 3.3VSB of

PG.These are pressing the power switch on the front of the timing, the next step

The trigger timing of the motherboard.

                    
                   

(6) Press the power switch, power-generating level transitions needle (needle here

involves jumping boot type and boot signalChange, refer to I / O Department

The contents of the order W83627 example).

          

Below W83627 official trigger timing diagram.

              

(7) Power Transmission jump W83627 PSIN # (high and one low and one high jump):

Notice I / O power.

    

(8) 110 PSOUT # (high and one low and one high jump) notification Southbridge
PWRBTN # (high and one low and one high jump),I / O notification Southbridge

standby mode boot block.

    

(9) The SLP-S3 # Southbridge set high (continuous high) to cancel the "non-core

peripheral power supply circuit (S3 containingRighteousness) "that accepts open

Southbridge

Native Command, ready to boot.

    

SUSB # (I / O pin receives Southbridge use this to send status signals S3) (10)

110 sustained by continued low rpm high.

    

(11) 110 through PSON # (Power Supply On) pin output going low to low figure above

SLP S3 #To SLSD # line. If the motherboard

Not in this example three power circuit, after running to clear other boot door.

    

(12) After the normal ATX switching power supply output will send a 5V ATXPG to

the I / O through the gray 8.

    

(13) 110 obtained after ATXPG uses its own integrated PG - PG transfer multiple

buffers this signal is decomposed into twoInto the Southbridge and

Northbridge. This step

After, the board will get all ATX output voltage, the power supply has an input

section,When the chip except the power supply to meet other conditions of work,
Once reset to work.

                                   
 
(14) After the normal ATX, first produced 775CPU VTT voltage use. This voltage

can be obtained from the Vcore,Must separate from the ATX via voltage adjustment

Day after obtaining unit.After two VTT produces a direct result of: CPU 's VID

module starts by issuing a combination of signals to the VID levelCPU main power

supply

Power management chip circuitry; motherboard will generate VTT power good signal

VTT__ PWRGD, into the CPUTower and clock generator, as both are

Working enable control signal. At this point, Vcore and clock have been

generated.

    

After (15) Vcore stable, CPU main power supply main power management chip output

VRMPWRGD to Southbridge.
    

(16) Southbridge get VRM PWRGD output after CPU. __ PWRGD to the CPU. Thus,

when the power supply and the CPUBell had been ready after reset CPU to work.

    

(17) Southbridge issued the original reset signal reset Northbridge Southbridge,

Northbridge reset the CPU.

    

(18) CPU addressing instruction fetch and run the command.