Month Activity 1 2 3 4 5 6 7 8 9 10 A B C D E F G: Planned Schedule or

The document provides information on the planned and actual schedule and costs for a project with 7 activities over 10 months. At the end of month 5, 2 activities are behind schedule but under budget, while the overall project is delayed but under budget.

Uploaded by

inder
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views10 pages

Month Activity 1 2 3 4 5 6 7 8 9 10 A B C D E F G: Planned Schedule or

The document provides information on the planned and actual schedule and costs for a project with 7 activities over 10 months. At the end of month 5, 2 activities are behind schedule but under budget, while the overall project is delayed but under budget.

Uploaded by

inder
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Planned Schedule or Baseline

Month
Activity 1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G

Planned and Actual Schedule at the end of Month-5


Month
Activity 1 2 3 4 5 6 7 8 9 10
A

C
10% work remaining
D
40% work remaining

Planned Schedule Today


Actual Schedule- Completed
Actual Schedule- To be completed

Cost overrun or underrun?


Month Cost
Planned till
Activity 1 2 3 4 5 6 7 8 9 10 Month-10
10
A

15
B
30
C
10% work remaining
30
D
40% work remaining
15
E

10
F

20
G

Planned Today
Completed
To be completed
At the end of Month 5
Status of activities
Start Completion

On time On time, completed

On time Late, completed


90% work complete
On time In progress
60% work complete
Late In progress, Delayed

Early Early, completed

Not started Delayed

Not started Delayed

Overall project- Delayed or Early?

At the end of Month 5


Cost
Actual till
Month-5 Status of costs of activities

10 Actual=10, Planned=10, No Cost Overrun or Underrun.

25 Actual=25, Planned=15, Cost overrun.


90% work complete
20 Actual= 20 , Planned= 0.90*30=27, Cost underrun.
60% work complete
10 Actual=10, Planned=0.60*30=18, Cost underrun.

10 Actual=10, Planned=15, Cost underrun.

Planned=10

Planned=20
Planned Schedule or Baseline

Month Cost

Planned till
Activity 1 2 3 4 5 6 7 8 9 10 Month-10
A

Planned Schedule and Planned Costs


Month Cost

Planned till
Activity 1 2 3 4 5 6 7 8 9 10 Month-10
3 7 10
A

5 10 15
B

10 5 5 10 30
C

20 5 5 30
D

10 5 15
E

6 3 1 10
F

4 4 12 20
G

130
Month 1 2 3 4 5 6 7 8 9 10
Sum 23 18 17 25 17 5 20 5 0 0
Cumulative 23 41 58 83 100 105 125 130 130 130
Cumulative Cost or PV
150

100

50

0
1 2 3 4 5 6 7 8 9 10

Actual Schedule and Actual Costs


Month Cost
Planned till
Activity 1 2 3 4 5 6 7 8 9 10 Month-10
A
5 5
B
10 10 5
C
12 8 10% remaining
D
1 1 4 4 40% remaining
E
7 3

Month 1 2 3 4 5 6 7 8 9 10
Sum 5 6 18 29 17
Cumulative 5 11 29 58 75

Cumulative Cost or AC
80
60
40
20
0
1 2 3 4 5 6 7 8 9 10

PV and AC
140
120
100
80
60
40
PV and AC
140
120
100
80
60
40
20
0
1 2 3 4 5 6 7 8 9 10

Planned till
Activity 1 2 3 4 5 6 7 8 9 10 Month-10
3 7 10
A
5 5
5 10 15
B
10 10 5
10 5 5 10 30
C
12 8 10% work remaining
20 5 5 30
D
1 1 4 4 40% work remaining
10 5 15
E
7 3
6 3 1 10
F

4 4 12 20
G

Today Overall project-


Delayed (overrun)
Cost underrun (less than budget)
Cost

Actual till
Month-5

Cost

Actual till
Month-5

PV
Cost
Actual till
Month-5

10

25

20

10

10

75

AC
At the end of Month 5
Actual till % work
PV EV AC CV SV Schedule Cost
Month-5 completed
10 10 10 0 0 Same Same
10 100
15 15 25 -10 0 Same Overrun
25 100
15 27 20 7 12 Underrun Underrun
20 90
30 18 10 8 -12 Overrun Underrun
10 60
0 15 10 5 15 Underrun Underrun
10 100
10 0 0 0 -10 Overrun
0
20 0 0 0 -20 Overrun
0
Project 100 85 75 10 -15 Overrun Underrun
PV: Planned Value CV: Cost Variance, CV = EV-AC
EV: Earned Value SV: Schedule Variance, SV = EV-PV
ss than budget) AC: Actual Cost
EAC: Estimated Cost at Completion
EAC = 114.7 =75+(130-85)*75/85