0% found this document useful (0 votes)
338 views2 pages

010-023 Air Intake Manifold: Install

Uploaded by

Naing Min Htun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
338 views2 pages

010-023 Air Intake Manifold: Install

Uploaded by

Naing Min Htun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Air Intake Manifold Page 1 of 2

010-023 Air Intake Manifold

Install
Front Gear Train

Install the cover and a


new gasket.

Torque
Value: 24 n.m [18 ft-
lb]

Rear Gear Train

Apply RTV sealant,


Part Number
3164070, to the
intake manifold in
the path illustrated.

NOTE: Install the


gear housing
within 10 minutes
of applying sealant
or the sealant will
not seal correctly.

mk:@MSITStore:F:\MR_D.CHM::/english/procedures/40/40-010-023-shopas.html 04/06/2012
Air Intake Manifold Page 2 of 2

Once installed,
allow the to dry for
30 minutes before
running the engine.

Install the intake


manifold and
mounting capscrews.

Tighten the mounting


capscrews.

Torque
Value: 24 n.m [18 ft-
lb]

Last Modified: 24-Apr-2006

Copyright © 2000-2010 Cummins Inc. All rights reserved.

mk:@MSITStore:F:\MR_D.CHM::/english/procedures/40/40-010-023-shopas.html 04/06/2012

You might also like