Annexure-1H - I&C Scope Matrix

This document outlines the scope of control and instrumentation for a tilting and drum transfer system. It specifies that the vendor is responsible for designing, supplying, installing, and commissioning field instruments and cables. The end client is responsible for the control system, UPS, and commissioning supervision while the project owner is responsible for power cables from the MCC to the control system. The vendor must also provide engineering documents, start-up spares, and operation manuals.

Uploaded by

Sridhar Vedula
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
300 views2 pages

Annexure-1H - I&C Scope Matrix

This document outlines the scope of control and instrumentation for a tilting and drum transfer system. It specifies that the vendor is responsible for designing, supplying, installing, and commissioning field instruments and cables. The end client is responsible for the control system, UPS, and commissioning supervision while the project owner is responsible for power cables from the MCC to the control system. The vendor must also provide engineering documents, start-up spares, and operation manuals.

Uploaded by

Sridhar Vedula
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

SCOPE OF CONTROL & INSTRUMENTATION FOR MECHANICAL

PACKAGES
Rev :P0
PROJECT : POWDER PLANT & ASSOCIATED RAW MATERIAL
FACILITIES OF PHWR FUEL FABRICATION FACILITY
PACKAGE / ITEM : TILTING AND DRUM TRANSFER SYSTEM Sheet:1 of 2

ATTACHMENT-2
Notes: 1) TPL’ Scope shall be indicated as ’T’, End Client’ Scope shall be indicated as ’C’ and Vendor/Bidder scope
shall be indicated as ‘V’, “

Scope
Inputs Super Commiss Remarks
for Design vision ioning
Sl.No. Description design & of
Supply Erection
& Engg. Com
Engg. miss
ioning
1 Field Instruments. including the V V V V V V
erection hardware and
mounting accessories

2 Field Junction Boxes and Local V V V V V V


Control Panel (if required)
3 Cables and Cable Tray
3.1 Field Instruments/Valves to V V V V V V
Junction Box/ Local Control
Panel
3.2 Junction Box to Control System V C C C V C
3.3 MCC to Marshalling cabinet of T T T T T T
control system
3.4 Power distribution along with V V V V V V
cables to bidder supplied
equipment
3.5 Branch Cable tray/conduit with V V V V V V
supports for all C&I cables
supplied by bidders
4 Control System V C C C V/T C Vendor to provide
necessary inputs for
control system
5 UPS and UPS DB V C C C C C Input requirement shall
be specified by Vendor
6 Mandatory Spares V V V - - -
7. Recommended Spares V V V - - -
8. Start up and Commissioning V V V - - -
Spares
9. Preparation of Operation and V V V V V V
Control Philosophy, Logics

10. Cable routing drawing as V V V V V V


applicable

11. Interconnection cable schedule V V V V V V


and Cable Schedule (in
Purchaser Format)

Engineering Group: Projects Group:


PRPD CHKD RVWD APPD REVIEWED APPROVED
DE LE EPEE PE HEAD-ENGG
Sign Sign
Name Name
Designation Designation
Date Date
Std Format No. Provisional No.21 Rev P0 Dt
SCOPE OF CONTROL & INSTRUMENTATION FOR MECHANICAL
PACKAGES
Rev :P0
PROJECT : POWDER PLANT & ASSOCIATED RAW MATERIAL
FACILITIES OF PHWR FUEL FABRICATION FACILITY
PACKAGE / ITEM : TILTING AND DRUM TRANSFER SYSTEM Sheet:2 of 2

ATTACHMENT-2
Notes: 1) TPL’ Scope shall be indicated as ’T’, End Client’ Scope shall be indicated as ’C’ and Vendor/Bidder scope
shall be indicated as ‘V’, “

Scope
Inputs Super Commiss Remarks
for Design vision ioning
Sl.No. Description design & of
Supply Erection
& Engg. Com
Engg. miss
ioning
12. Datasheets and other V V V V V V
documents related to Field
Instruments, Control Valves,
Analyzers etc.

13. All Engineering and As-built V V V V V V


Documents pertaining to bidder
scope

14. Statutory approval if any V V V V V V


required for E&I equipment

Engineering Group: Projects Group:


PRPD CHKD RVWD APPD REVIEWED APPROVED
DE LE EPEE PE HEAD-ENGG
Sign Sign
Name Name
Designation Designation
Date Date
Std Format No. Provisional No.21 Rev P0 Dt