CONSTRUCTION CHECK SHEET E-019A
ELECTRICAL
Inverter
PROJECT
DESCRIPTION
n-BUTYL LITHIUM DILUTION FACILITY PROJECT No. 44-NC-2900
SYSTEM
DESCRIPTION
INVERTOR SYSTEM No. 010
SERVICE
TAG No.
DESCRIPTION
A. LOCATION ..........................................................................................................................
SYSTEM ..............................DUTY..................................................
MANUFACTURER............................................TYPE / MODEL...................................................
B. INSPECTION:
Item Description of check Results
01 Check all equipment is suitable for area
02 Verify equipment is suitable for IP rating & is supplied as per the data sheet
03 Verify name plate details against data sheet
04 Visually inspect equipment for external damage
05 Check equipment fixings and mountings are secure
06 Check inside of the equipment is clean, dry and silica gel etc. has been removed
07 Check all doors can be opened and are not obstructed
08 Internally inspect the Inverter for damage
09 Check outgoing distribution is complete and correctly identified
10 Ensure outgoing isolators / MCB s are isolated
11 Confirm main isolator is lockable
12 Check all equipment carries the correct circuit identification
13 On completion of all cable glanding confirm spare entries are correctly plugged
14 Check gaskets and seals are not damaged
15 Check all bolts are correct and none are missing
C. REMARKS / OBSERVATIONS:
COMPLETED BY CONTRACTOR APPROVED BY JACOBS ACCEPTED BY CHEMETALL
NAME NAME NAME
COMPANY COMPANY REF. IND.
SIGN & DATE SIGN & DATE SIGN & DATE
Sheet 1 of 1