Office of the Asst. Executive Engineer (Ele.
), C, O&M Sub-division - S7 MURGESHPALYA
RR No. Account ID Bill No. Billing Period Bill Date Due Date Disconnection Date
(7SKEH55055) 5874186000 587419391009 12-03-2020 - 12-05-2020 12-05-2020 26-05-2020 10-06-2020
Name & Address: Type Domestic - LT2A
Tariff 1LT2A1-N
M.V.KRISHNA KISHORE Sanctioned load (KW) 3.00
NO.10/11,KNO.232/1MUNNE
KOLAL Sanctioned load (HP)
BANGALORE, KAR -560037
Meter Readings for Meter ID 5874186793
Description Date KWH Meter KVAH Meter MD meter PF
Present Reading 12-05-2020 14725
Previous Reading 12-03-2020 14240
Difference 485 0
Meter Constant 1
Consumption 485 0 0
Less/Add:
0
Consumption
Net Consumption 485
Your Detailed Bill
Description Amount (Rs.)
Fixed charges: For the First 1.00 KW at Rs60.00 per kW (for 61 of 30 days) 122.00
Fixed charges: For every additional 2.00 KW at Rs70.00 KW (for 61 of 30 days) 284.67
Energy Charges : For the first 61.000 KWH at Rs3.75 per KWH (for 61 of 30 days) 228.75
Energy Charges : For the next 142.333 KWH at Rs5.20 per KWH (for 61 of 30 days) 740.13
Energy Charges : For the next 203.334 KWH at Rs6.75 per KWH (for 61 of 30 days) 1,372.50
Energy Charges : For the next 78.333 KWH at Rs7.80 per KWH (for 61 of 30 days) 611.00
Interest on Revenue 0.00
Interest on Tax 0.00
Tax 265.71
Current Bill Amount 3624.76
Arrears 0.00
Bill Correction -962.00
Bill rounding adjustment 0.24
Net Payable Amount 2663.00
Rupees Two Thousand Six Hundred Sixty-Three Only
Sd/-
Assistant Executive Engineer (Ele.)