TENDER SPECIFICATIONS FOR 175t25t FLAMEPROOF EOT CRANE
TENDER SPECIFICATIONS FOR 175t25t FLAMEPROOF EOT CRANE
2. The firm should have successfully completed Design, Manufacture, Installation, Testing
and Commissioning of at least 5nos. of double girder EOT cranes of capacity 200t and
above and Span equal to 20m and above during last 7 years ending 31.12.2014.
Bidders have to provide relevant certificates from the Owners (end users) along with
the submission of bid for consideration of bid document.
3. The firm should have successfully completed Design, Manufacture, and commissioning
of EOT cranes with VVVF (VFD) drive & control systems at least 10 nos. of cranes
and at least one crane of capacity not less than 150t in last 10 years.
4. The firm should have successfully completed Design, manufacture and establishment of
fail safe mechanisms & controls like Emergency disc brake on rope drum (actuated in
case of failure in power transmission line), wire rope spooling monitoring and
redundant (double) wire rope reeving system at least in 2nos. of EOT cranes in last
10years.
5. The firm should have experience and knowledge in the Design and manufacture of EOT
crane with dual drive hoist (Twin load path). It is preferable to have completed
realization of such cranes.
6. The firm should have successfully completed Design, manufacture, and establishment
of at least 05 nos. of EOT cranes (not less than 100t capacity) with twin motor with
planetary gearbox system for Hoist mechanism for last 10 years.
7. The firm should have successfully completed Design, manufacture, and establishment
of at least 05 nos. of EOT cranes (not less than 100ton capacity) for ladle cranes (hot
metal handling cranes) for reputed steel mills for last 10 years.
8. The firm should have facility to full load test and over load testing of 200t EOT crane
(hoist and cross travel) at their factory.
9. The firm should have successfully completed Design, manufacture and establishment
Page 1 of 3
of high capacity EOT cranes (100t and above) to the satisfaction of reputed third party
inspection agencies like M/s MECON and M/s M.N.Dastur.
10. Bidder shall furnish the details of their factory like manpower, machinery, quality
system etc., for department to access their capability. Bidder shall submit above
information in the format given in “Questionnaire” attached as Annexure to this BQR.
The bidder should also meet the following financial qualification requirements:
2.1 The Bidder should have annual turn over of not less than a value of Rs. 10 crores
per year last three financial years ending 31-03-2014.
2.2 Firm should have undertaken and successfully completed following value of works
related EOT cranes at least in last 05 (Five) years :
Single work of EOT cranes not less than : Rs.10 Crores.
(or)
Two works of EOT cranes not less than : Rs.5 crores (each)
(or)
Three works of EOT Cranes not less than : Rs.4 crores (each)
2.3 Bidder should possess a current Solvency Certificate from Nationalized Bank for an
amount of not less than 10 crores.
2.4 IT/ TDS certificate shall be submitted with Loss & Profit.
2.5 Bidder shall submit audited statement of financial status for last 03 years.
III. The following documents shall be submitted along with the application for
prequalification of Bid:
1. Firm establishment certificate and nature of work (for Sl no.1).
2. Detail of work of similar type completed during the last seven years ending 31.12.2014
( for Sl. No.2).
3. Satisfactory work Completion certificates from the clients, with the work order copies
(for S.Nos 2 & 3).
4. Performance Report of EOT cranes established (with years of service) from End users,
with addresses and contact person with phone numbers.
5. Documentary evidence (Technical details & drawings) for fulfilling special technical
conditions (Sl. no. 2, 3, 4 & 5).
6. Copy of audited Balance Sheets for last three years.
7. IT / TDS certificates for last three years.
8. Current Solvency Certificate.
9. List EOT crane projects ( for capacity 100t and above / Span 20m and above)
completed for last 10 years with PO copies.
Page 2 of 3
10. List, value and work order copies of total projects under Execution with Purchaser
name and address.
11. Duly filled “Questionnaire” with signature, name, phone no and company seal.
12. Structure and Organizational Chart
13. List of personnel with qualification & experience in the firm in the areas of design,
production, quality, safety, administration etc.,
14. List of Machinery & Equipments to be used for the work.
15. Any other relevant information which add value to above.
IMPORTANT NOTES :
1. Bidder shall furnish all the above details fully and explicitly.
2. Please note that the “BID” without above mentioned the documents/information in
support of the eligibility criteria will be summarily rejected.
3. No further clarifications will be seeking in this regard.
Step - 1: Short listing based on documents submitted, satisfying the all eligibility criteria
given above by the firm or individual along with their Bid / application. (Non-
submission of any document as given in above list within stipulated time leads to
rejection of Bid)
Step - 2: Subsequently Bidder’s competency, their technical achievements and financial status
will be evaluated suitable for his project. Feedbacks from Bidder`s clients will be
verified.
Step – 3: Visit to sites/EOT Cranes by technical team (ISRO or Third party) where Bidder has
established above mentioned capacity EOT cranes.
Step - 4: If required to visit will be made to their factory/ firm by technical team (ISRO or
third party) for accessing the capability of manufacturer.
Step - 5: Mean while technical Bids will be opened and scrutinized for meeting all technical
specification and supply conditions.
ISRO - SHAR reserves right to verify the information / data furnished by Bidder. If the
same is found as fault or with any deviation the bid will be rejected.
Only those Bidders who are found suitable & meeting all the above qualification
Criteria/requirements will be finally qualify for opening the Price Bids for evaluation.
Page 3 of 3
Annexure to Bid Qualification
Sl.
Items/ Information Specification/ details of items Remarks
No.
Type of Industry (SSU, Medium, Govt, etc.,)
1.
2. Year of Establishment
Annual Turnover (in Rs. lakhs) for last
3.
three years year ending up to 31-03-14
3.1 Turn over – 2013-14
3.2 Turn over – 2012-13
3.3 Turn over – 2011-12
Orders executed during last 03 years,
capacity of EOT Cranes, references are is
to be mentioned. (Separate sheet can
attached for this)
4. a. 2013-14
b. 2012-13
c. 2011-12
Quality Certification of company
5. (ISO, TUV, etc.,)
Page 1 of 6
Annexure to Bid Qualification
Page 2 of 6
Annexure to Bid Qualification
Page 3 of 6
Annexure to Bid Qualification
Welding Professionals:
a. No. of welders (MMAW)
Qualification details
Qualified by
b. No. of welders (GMAW)
20.
Qualification details
Qualified by
c. No. of welders (TIG)
Qualification details
Qualified by
Details of Welding Inspection Equipment &
welding inspector available with supplier
21. ( LPT, UT, MPT, X-ray, etc)
Any out sourcing can be mentioned.
Page 4 of 6
Annexure to Bid Qualification
Page 5 of 6
Annexure to Bid Qualification
Page 6 of 6
SATISH DHAWAN SPACE CENTRE SHAR
SOLID PROPELLANT PLANT
Ref: SHAR/SPP/2015002267
CONTENTS OF BOOKLET
Annexure – 2 :
3 49
Schematic of Pendant Button operating station
Annexure – 3 :
4 Quality Assurance, Inspection and Testing plan for 50 to 60
EOT Cranes
Annexure – 4 :
5 61
Price format for Spare parts for EOT crane.
TECHNICAL SPECIFICATIONS OF
175t/25t FLAMEPROOF EOT CRANE
SECTION – I
GENERAL SPECIFICATIONS
SDSC SHAR Page:1 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder shall completely fill the following format of technical specifications & supply conditions with
mentioning required details. Bidder can add more information and details, if required, by attaching seperate
sheets, by giving point no. of this format. Inadequate /incomplete, ambiguous, or unsustainable information,
A against any of the clauses of the specifications / requirements shall be treated as non-compliance to tender
and quotation will be rejected. Generalized statements like crane shall be manufactured "as per your
specifications" or "as per IS standards" or "as per enclosed specification" is not acceptable and Bidder shall
submit all the specifications by filling in the following FORMAT only, otherwise it is not valid.
Bidder shall submit complete information asked in Qualification Criteria and Questionaire for qualifying for
B bid with all informations, certificates and earlier references of manufacture should be enclosed. The offer
meeting all the requirements & conditions in all respects will only be considered for further processing.
Deviations with respect to specifications given below are not acceptable. However Bidder can submit /
C
suggest improvements, if any, seperately by indicating the clause no. in this specifications.
Contact Person :
NAME & ADDRESS
D
OF THE Bidder : FAX No :
Mobile No : Email :
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
1 SCOPE OF SUPPLY
Supply & Erection of Bridge gantry rail along with its accessories for bay length
1.2
of around 32.0meter. (Gantry girder is in the scope of Department / Purchaser).
Supply & erection of Drag chain power cable system for EOT crane as per the
1.3
specifications mentioned.
Main Hoist (175t) shall be provided with dual rope reeving system i.e., two
independent wire ropes shall be provided with balanced reeving system, wire
1.4
rope spooling & monitoring as per the specifications mentioned in this
document.
VVVF panels shall be erected in a separate room at ground level and cabling
1.5 must be done to the EOT crane at gantry girder height of 19m as per clerance
diagram enclosed.
The scope of work shall also include procurement of all materials including
importing of components (from other countries) required for completion of the
1.6
work, coordinated planning for manufacture, inspection, painting, load testing at
supplier works.
Erection, testing & commissioning of EOT crane shall be done as per the
1.8 Technical Specifications, conditions given below and also in accordance with
latest editions of IS: 3177, IS: 807 & relevant codes and standards.
SDSC SHAR Page:2 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Main hoist drive system shall be designed to provide assurance
that a failure of single component of hoist mechanism (Motor, Gearbox,
brake, coupling, wire rope) would not result in loss of load and uncontrolled
movement of the lifted load. This can be accomplished by the application of
dual hoist drive unit described below.
1.9 Dual Hoist Drive with two gearboxes and rope drum (Twin Load path) :
The dual-hoist drive shall have rope drum, two parallel shaft helical gear
trains ( on each side of drum), two drive motors (each gearbox driven by
motors) and at least two holding brakes located on input shaft of geartrain
and realted couplings. This shall ensure two independendant load paths for
main hoist drive and each of two independant load paths shall be capable of
driving & holding the rated load of 175t.
Supplier shall arrange "Third party inspection Agency " for design
verifications, approvals, inspection during manufacture, load teasting,
and certfying the EOT crane as per QAP.
1.10 Arranging the third party inspection is in the scope of supplier for the entire
scope of work as given above and as per QAP enclosed. Bidder shall engage
TPIA - Third Party Inspection Agencies like M/s Mecon,(or) M/s M.N.Dhastur
only. The finalization of third party agency shall be done on mutual agreement
between ISRO and Bidder.
2 Quantity of Crane : 01 No. (One)
3 Usage of EOT crane
This Heavy duty EOT crane is used for handling of
hazardous / dangerous materials like rocket motors,
propellant containers, delicate flight hardware etc., for
positioning and assembly during process operations.
Failure of EOT crane & its components during handling
3.1 Application
may result in loss of life and property. Hence Bidder
shall design, manufacture and erect the crane with
emphasis on quality, reliability and safety and shall
ensure smooth & reliable operation of crane with long
service life.
This heavy duty EOT crane will be put to use for 365
Usage period & Days’ intermittent duty (Class II duty as per IS3177)
3.2
desired life of crane with CT, LT and Hoist movements. EOT Crane shall
be designed for minimum life of 30years.
4 Hazardous area conditions
The EOT crane shall be equipped with flame proof electrical systems suitable
4.1 for operating in hazardous area classified as Zone 1, Gas group IIA / IIB, T4 as
per relevant IS 5572 / IEC standards.
VVVF panels shall be provided in a separate room at the ground level and
4.2 cabling must be done to the EOT crane which is at a height of ~19m. The
VVVF panels shall be suitable for normal atmospheric conditions.
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
6 MAIN PARAMETERS OF EOT CRANE
Main Hoist with dual Main speed : 2.0 m/min & creep speed: 0.2m/min with
6.6.1 load path (four motors all motors running--Main speed :1m/min & creep speed
& two gearboxes) :0.1m/min when half the motors are running.
6.6.2 Auxilary Hoist 2.5 m/min in main speed, 0.25 m/min in creep speed.
6.6.3 Cross travel 6.0 m/min in main speed, 0.6 m/min in creep speed.
6.6.4 Long travel 6.0 m/min in main speed, 0.6 m/min in creep speed.
Side clearance
(Distance from centre
6.7 400mm (minimum) on both sides.
of gantry rail to nearest
obstruction)
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
DSL side :
6.11 Main Hook : around 2.00m
Aux. Hook : around 3.50m
Hook Approaches
(Refer Clearance
6.12 diagram) (supplier shall Non-DSL Side Main Hook : around 3.20m
optimise these values) Aux. Hook : around 1.70m
6.14 LT wheel base as per IS807 / shall not be less than 1/5th of span.
shall be as minimum as possible for having optimum
LT hook approaches for better utilization of crane &
6.15 Width of Crane building.
Max. Width of crane around 8.00m.
6.16 Main Hoist Drive
Main hoist drive system shall be designed to provide assurance
that a failure of a single component in hoist mechanism would not result
in loss of load and uncontrolled movement of the lifted load. This can be
6.16.1 accomplished by the application of dual hoist drive units. The wire rope
drum, hook, hooknut, and load block structure are exempted from this
requirement. Supplier shall accomplish above failure proof design feature as
described below.
Dual Hoist Drive with two planetary gearboxes, 4 drive motors and rope
drum (Twin drive Load Path) : The dual-hoist drive shall have rope drum,
two parallel shaft helical planetary gear trains (on each side of drum), four
drive motors (each gearbox driven by two motors) and at least two brakes
per motor located on input side of each gearbox and related couplings. This
shall ensure two independendant load paths for main hoist drive and each of
two independant load paths shall be capable of driving & holding the full rated
load. Each gear box train shall be sized for the total full-load drive
torque with appropriate service factor as per IS4137. All motors shall be driven
through two/four VVVF drives with syncronization with proper control &
interlocks. There shall be two independent wire ropes, each shall be capable of
holding the rated load. Refer Schematic arrangement given in Fig .1. Supplier
can suggest & design alternate configuration to meet above safety,
6.16.2 redundancy, and reliable Main Hoist system with optimum hook
approaches.
Motors and gearboxes shall be rated such that each set of motor and Gearbox
will take full rated torque at rated speed i.e., 2m/min
In case of any problem & failure in one load path, easy & safe switch over to
second/redundant load path shall be done smoothly without free fall and heavy
jerks. Proper arrangement shall be made for safe & reliable mechanical
decoupling of defective drive system.
Proper Electrical and drive interlocks shall be provided betwee motors and
brakes such that drive system is safe gaurded without damage, incase of failure
in one load path and to overloading of other load path.
SDSC SHAR Page:5 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Service brakes shall be located on Input shaft of gearbox. 2nos. of Imported
6.16.3
flameproof brakes per motor shall be provided.
Single motor with one Horizontal, foot mounted, parallel shaft Helical gearbox
6.17.1
of standard make mentioned in this specification.
6.18 LT Drive
LT drive shall be provided with twin drive system at two corners of crane.
Horizontal foot mounted helical gearboxes, motors and thruster brakes shall be
6.18.1 used.
Drive size shall be selected such that Crane can be moved by two motors
drives with one VFD.
Each corner drive components shall be easily accessible and shall be designed
6.18.2
with inter changeable components.
Wherever applicable the driving pinions shall not interfere with the removal of
6.18.3
wheels.
Number of wheels for 8Nos or 16Nos. & Drive wheels : 50% of total wheels
6.18.4
LT drive based on design.
6.19 CT Drive
CT drive shall be provided with sufficient no. of drive systems / central drive.
6.19.1 Helical parallel shaft gearbox, motor and imported thruster brakes shall be
used.
All the drive components shall be easily accessible and shall be designed with
6.19.2
interchangeable systems. (If twin drive is selected for CT)
Wherever applicable the driving pinions shall not interfere with the removal of
6.19.3
wheels.
Number of wheels for 4Nos or 8nos.,and Drive wheels : 50% or 25% of total
6.19.4
CT drive wheels based on design
Diameter of wheels for
6.19.5 Not less than 630 mm.
CT drive
Type of bearings for Anti-friction, Heavy duty Double row Spherical Roller
6.20
LT/CT wheels Bearings
Type of mounting of
6.21 "L" type brackets with fit bolts and locknuts.
LT/CT wheels
SDSC SHAR Page:6 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Total Weight of EOT
6.22 Crane (tons) Bidder to Specify
Weight of Electricals
on top of crane Bidder to Specify
6.26
Weight of electrical
Panels in room (tons) Bidder to Specify
SECTION – II
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
7 MECHANICAL DESIGN AND ELEMENTS' DETAILS
The stresses in all components of hoist mechanism and gearboxes should not
7.1.1 exceed 66% of yield point (proof stress) of the material for the component
under break down conditions of motor i.e. pull out torque of motor.
All mechanical components in Hoist (vertical load path), shall be designed for
7.1.2 infinite fatigue life. Fatigue analysis shall be based on the crane maximum rated
load.
Materials with less than 15% elongation shall not be used for any of
7.1.3 mechanical load bearing component except for electrical motors, panels and
hydraulic components.
No cast iron part should be used as load bearing member on the crane except
7.1.5 for electrical equipment. Similarly wood or combustible material and Bush
bearing should not be used in any part of the crane.
Rope Drum shall be of welded / fabricated type of IS:2062 steel with duly stress
7.4.1 relieved. Rope drum shall be designed as specified in IS:3177 in general.
Allowable stress in drum shall not be more than 1/5th of UTS.
7.4.2 Rope drum diameter shall be minimum 40 times the diameter of wire rope.
SDSC SHAR Page:8 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Fleet angle of wire rope from drum to sheave shall not be more than 2.5 deg
7.4.3
and drawings & calculations shall be provided in this regard.
Drum grooves shall be helical and machined with smooth surface finish. Drum
7.4.4
grooves shall be dimensioned as per IS3177.
Length of the drum shall be sufficient to accommodate the rope in one layer of
the rope requisite for the specified lift and in addition rope drum shall be
provided with not fewer than three dead turns at each anchored end and at
7.4.5
least one spare groove at the other end when hook is at full height of lift
condition. Grooves shall be finished smooth and shall be rounded at edges &
corners.
Rope dead ends shall be clamped with minimum three clamping wedges with
7.4.6 two numbers of bolts on each clamp. The bolts shall be at the centre of
clamp and shall be wire locked.
The design of the rope reeving system shall be such that a single rope
7.5.1 failure will not result in the loss of the lifted load. A load balance
sytem shall be provided on each rope system.
Reeving system shall be divided into two separate load paths so that either
7.5.2 path will support the rated load and maintain vertical alignment in the event of
rope breakage or failure in one rope system.
Upper block assembly and lower load block assembly shall be designed
7.5.3 such that the sheaves will be contained & maintain vertical balance of load
in the event of failure of single wire rope.
Dual rope reeving system shall be designed such that the bottom load block &
7.5.4 hook shall follow a true vertical path ( true vertical lift) during hoisting and during
with No load & Full load conditions.
During hoisting & lowering hook block shall not oscillate/ rotate without load or
7.5.5
with load.
i). Sensing and automatic signaling of excessive rope load/displacement to
either side shall be provided.
ii). Provision, tooling and procedure shall be provided for adjustment of
7.5.6
wireropes to take equal load.
iii). The vertical displacement of the load, following a rope failure, shall be
minimized.
In the event of a hook over travel, where the lower block contacts the
7.5.7
crane trolley structure, the ropes shall not be cut or crushed.
Minimum factor of safety of 10 shall be provided for wire rope of Main Hoist on
7.5.9 Minimum Breaking Strength (MBS) of rope with two ropes combined together.
With single rope the factor of safety shall be 5 on the MBS of main hoist rope.
7.5.10 No joints shall be used for wire ropes under this specification.
SDSC SHAR Page:9 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Auxillary hoist wire rope shall be single path & conventional reeving system
with true vertical lift as per IS3177. Wire rope shall have factor of safety of 6
on Minimum Breaking Strength (MBS). The make wirerope shall be of M/s
7.5.11
USHA MARTIN only. Wire rope shall be Non-rotating type, Hotdip Galvanized,
35x7 construction, Core : IWRC, RH, Regular lay, preformed, Minimum tensile
strength/Grade : 1960MPa.
Sheave diameters (at the bottom of groove) shall be minimum 29 times rope
7.6.4
diameter. Sheave fleet angle shall not be more than 2.5 degrees.
Equalizer sheave diameter (at the bottom of groove) shall be minimum 18 to
7.6.5
20 times the diameter of wirerope for Aux Hoist.
The equalizer sheave /Equalizer Bar shall be mounted above the trolley floor
and shall be easily accessible for maintenance from the floor of the trolley.
7.6.6
Equalizer Bar / sheave shall be made in such a manner that it can
turn or swivel to align itself with the pull of the ropes.
All Sheaves shall have guards, which fit closed to the flange having a clearance
7.6.9 not more than 1/3rd rope diameter between sheave and inside of guard, to
prevent the wire rope from leaving the sheave grooves.
All the upper block sheaves shall be mounted above the trolley platform for
7.6.10
ease of maintenance and inspection.
7.7 GEARBOXES
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Helical parallel shaft, Crane duty, gearboxes, shall be
used for CT & LT drives. LT drive shall be of
Gear Boxes for CT & horizontal foot mounted gearboxes.
7.7.2
LT drives Travel drive gearbox ratings for bending strength and
pitting resistance shall be based on 2 times rating of
AC motor.
Torque & Power rating 3) Due consideration shall be given for braking torque
7.7.4 of Gearboxes / Pinions on input shaft of Gearboxes.
/ Gears / Shafts
4) The stresses in all components of hoisting
machinery and gearboxes should not exceed 66% of
yield point of the material for the component under
break down conditions ( Pull Out Torque) of motor.
Drawings and dimensional details of gear boxes, selection criteria, power rating
& torque rating calculations, bearing details, data sheets from gearbox
7.7.5
manufacturer shall be submitted for TPIA / Purchaser (SDSC SHAR) approvals
during design engineering phase.
Main hoist gearboxes shall be designed & manufactured as per class '4' duty
7.7.6
of IS:4137.
7.7.7 Gearboxes with parallel shaft helical gearing shall be used for all motions.
7.7.9 All gear teeth shall be helical and with helix angle not less than 15°.
7.7.10 All gears shall be of forged alloy steel preferably case hardeneing steels.
Gear teeth shall be cut in metric module system. All gear teeth shall be profile
7.7.11
ground to smooth with less error & for low noise while running.
SDSC SHAR Page:11 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
All gear boxes shall be totally enclosed and splash or forced lubrication system
shall be provided. Gearboxes shall have sufficient heat radiation area to
7.7.12
maintain lubricant at temperatures below maximum operating
temperature
Vertical Gearboxes shall have an oil pump lubrication system when
vertical gearing exceeds of two reductions. Tubing/ Piping for gearbox
7.7.13 lubrication shall be provided with SS316/SS304 and must be properly clamped.
No hoses shall be used. Visual indicator for oil flow shall be provided in line.
Gearbox cover shall be split horizontally at each shaft centre line and fastened
7.7.18 and arranged so that the top half can be removed for inspection and repair
without disturbing the bottom half.
Radial clearance between the gear box inner surface and the outside diameter
7.7.19 of the gears shall be at least 1 ¼ times the depth of the largest gear tooth
inside gear box or 20 mm whichever is higher.
No oil leakage is allowed from gearboxes. Oil drip pans shall be provided
7.7.20
around the gearbox.
The noise level at gear box must not be more than 75-80 dBA measured at a
7.7.22 distance of 1m from the direct vicinity of the gear box. This is very important for
all the gearboxes, and any gearbox making more noise is liable to be rejected.
Realiable oil seal arrangement i.e., preferabley double stage oil sealing
7.7.23
arrangment shall be provided for shafts of gearboxes.
7.8.3 Shaft supports on plummer blocks of SKF / FAG / TIMKEN make only.
SDSC SHAR Page:12 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
7.9 Brakes
Imported Flameproof thruster drum brakes shall be used for all drives / motions
in EOT crane. Make of brakes shall be M/s Pincsh Bubenzer-Germany, M/s
SIBRE-Germany, M/s Galvi-Italy, M/s Wittonkramer-UK , M/s SIME-GKN
Stromag-France. Thrusters for all brakes shall be Explosion proof (Ex d),
ATEX/ PTB Certified, Make of thrusters : EMG, Germany or Brook crompton,
UK. ATEX/ PTB/ Exproof Certificates for brakes & thrusters shall be submitted
7.9.1 for Approvals.
Brakes shall be mounted on the input pinion shaft of the gear boxes.
Brake drum size and thermal rating shall be selected such that with the duty
7.9.6 cycle mentioned, the surface temperature shall not exceed "T4" classification
of hazardous area.
No oil leakage is allowed from thruster brakes. Oil drip pans shall be provided
7.9.9
under thrusters.
SDSC SHAR Page:13 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
shall be made from forged / cast steel / SG iron.
7.12 Couplings
Flexible Couplings
Drum/ Barrel couplings of M/s Malmedie, Germany
between gearbox and
shall be used for Main hoist . Selection criteria, service
rope drum for main
factor (as per ISO-M8 class), Torque rating, drawing
hoist ( For dual load
shall be submitted for approval.
7.12.2 path/ twin drive)
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
General design & sizing of wheels shall be as per IS:3177.Crane wheels of
minimum 630mm dia for cross travel and minimum 710mm for long travel shall
7.13.3
be used. Necessary sizing & contact stress calculations as per IS:3177 shall
be submitted.
Wheel bearings shall be provided with suitable gearing points on both the sides
7.15.2
of wheel and shall be made approachable.
Trunion of wheel bogies shall be provided with suitable greasing points for both
7.15.3
the sides of the pins.
7.15.5 Hoisting ropes shall be lubricated with lubricant approved by rope manufacturer.
7.16 Keys & Keyways Material of keys shall be 45C8 or alloy steel.
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
In Mian hoist motion of EOT Crane, wire rope spooling monitoring shall be
provided. The wire rope spooling monitor is an electro-mechanical assembly
that senses improper or mis spooling of wirerope from drum grooves. Improper
spooling is sensed prior to wire rope damage. Since, wire rope damage and
loss of the load can result, if improper wire rope spooling is detected, the wire
rope spooling monitor actuates the Failure Detection System (i.e., limit switches
) and stops main hoisting motion.
TECHNICAL SPECIFICATIONS OF
175t/25t FLAMEPROOF EOT CRANE
SECTION – III
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
8.3 Unless otherwise specified, only bolted or welded joints shall be used.
8.4 Black bolts shall not be used in the main structures of the crane.
All the bolts, nuts, washers etc., shall be heavy duty galvanized and shall be
8.5
protected against corrosive environment.
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
End carriage shall be fabricated as solid box section
8.12 End Carriages made from rolled steel plates IS:2062, except for
essential openings which shall be reinforced.
End ties for cranes with more than four bridge wheels shall be of
8.12.1
rigid type. End ties shall be constructed of box sections in structural steel.
8.15 Details of Bogie joint of End carriages shall be provided along with quotation.
The trolley frame shall be built up of rolled sections and plates to form a rigid &
8.18.1 robust structure and shall be arranged to afford maximum accessibility to
mechanical and electrical parts placed on it.
The trolley frame shall be of rigid construction such that lifted loads do not
8.18.2
cause deflections that impair the proper operation of machinery.
No parts shall be mounted under the trolley except for the gravity limit switch
8.18.3 weight. Top pulley block and all other pulleys, equalizer bars, fitments shall be
mounted on the top of trolley platform only.
Trolley shall be designed such that at the highest position of hook there shall be
8.18.4 a clear distance of 700 mm between the lowest point of trolley obstruction and
the highest point of bottom block.
Safe access for maintenance and removal of all mechanical and electrical parts
8.19
must be ensured without any additional scaffolding.
SDSC SHAR Page:18 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
All electrical cables on trolley shall be so laid that they are not liable to be
8.21
damaged and can be easily inspected and maintained.
Hand rails along girder Handrails of 1000mm height shall be provided along
8.22.1
platform the length of the girder near to platform.
Hand rails for around Handrails of 1000mm height shall be provided on all
8.22.2
trolley the four sides of the trolley.
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
CT & LT Rails shall be prevented from creeping in the
Rail stoppers /Wheel
8.28 longitudinal direction by welded rail stops and Wheel
ramps
ramps.
Suitable jacking pads should be provided on end
8.29 Jacking pads carriages and trolley for jacking up the crane & trolley
for changing track wheels & bearings .
Safety pads shall be provided under the end carriages
and crab to prevent the crane/ trolley from falling more
8.30 Safety Pads
than 25mm in the event of breakage of a track
wheel/axle or bogie pin.
8.31.1 Spring buffers are to be provided on four ends of the bridge and trolley.
Buffers shall be rigidly bolted in place preferably along the Centre line of crane
8.31.2
rail or trolley rail as the case may be, such that the bolts are not in direct shear.
Buffers shall be designed to absorb the kinetic energy released at 50% of the
8.32 full load rated travelling speed, the average rate of deceleration not exceeding
5.0 m/s² at 50% of the rated travelling speed.
NDT of Butt joints of All butt joints shall be 100% radiographed or Ultrosonic
8.35
girders tested for both compression and tension joints.
Welded snugs shall be fitted against against the feet of all pedestals,
8.38 gearboxes, brakes etc., except motors. Motors shall be provided with alignment
screws for side alignment.
8.39 Ladders
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Approach ladders to be provided for reaching the trolley at two locations along
8.39.2
the span of the girder.
Fasteners for pedestal blocks, motors, gear boxes etc., shall be easily
8.41 removable from the top of platform. Studs or body bound bolts shall not be used
as fasteners for mechanical items except for fixing covers.
TECHNICAL SPECIFICATIONS OF
175t/25t FLAMEPROOF EOT CRANE
SECTION – IV
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
9.0 ELECTRICAL DESIGN AND DETAILS
The Electrical equipment shall conform to IS3177 and also to the latest Indian
electricity rules and regulations as regards safety requirements, earthing and
other essential provisions specified therein.
Panels: (Non FLP), Make: M/s Rittal only. (Located in separate room at ground
9.8
level, suitable air conditioned units shall be part of the VFD panel).
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
9.8.7 Individual isolating switch (with SDF) to be provided for each panel.
9.8.8 Individual Power Contactors are to be provided for each motion for controlling.
9.8.9 Panel lighting shall be provided and it shall be CFL or LED lamps only.
All the Panels shall be provided with space heaters to avoid moisture
9.8.10
condensation.
Rubber mats of 2mx1m shall be provided before the all panels such that
9.8.11
persons stand on rubber mats during maintenance.
The bottom most row of equipment mounted inside the panel excepting terminal
9.8.12 strip shall be at least 350mm above the panel bottom cover to facilitate
inspection and repairs.
All the power terminals are to be selected for connecting the ring type lugs (in
9.9.1
both panel and FLP junction boxes)
All the power terminals and live parts are to be covered with proper terminal
9.9.2
covers.
All the power and control terminals are to be provided with suitable terminal
9.9.4
numbers.
Mounting of panels Panels are to be mounted on the floor with required
9.10
and resistance boxes anchored Bolts and nuts.
AC4 Duty
Manually operable
TPNSFU with Semi
9.13
conductor fuses
To be provided for all panels except protective panel.
SDSC SHAR Page:23 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Hoist, Aux hoist, CT and LT power supply to VVVF
drives to be routed through Semi conductor fast acting
9.14 Fuses
Fuses of adequate rating only. Semi conductor fuses
shall have a indicator for fusing.
Output voltage – 24 V DC
9.16.1 Terminal blocks shall be of 750 Volts grade of the stud type and shrouded.
Provisions shall be made for label inscriptions for the easy identification of
9.16.3
terminal blocks.
ON/OFF/TRIP inscriptions shall be clearly marked over the individual panel with
9.16.5 clear marking of direction of the operation of handle apart from the standard
marking provided by the switchgear manufacturer.
Safety in arrangements
between phases - 25 mm
9.18
between phases and neutral - 25 mm
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
All the live parts to be covered properly in order to avoid possibility of in advent
touching.
9.18 All the joints / tapping points of the terminal blocks / terminals shall be suitably
cont. shrouded to prevent accidental contact.
All the switchgear and termincal blocks to be covered with suitable electrical
protective cover.
VVVF Drives
The power/current rating of VVVF drive shall be one step higher than the
selected rating of motor.
LT – 2 Nos.
9.20 For Hoist motions, Control shall sense sufficient motor torque (or current)
before releasing holding brakes (i.e., torque proving).
The Control circuit shall be so designed as to ensure that brakes for all motions
are applied near about zero speed of rotation.
Suitable input and output chokes are to be provided for
controlling the harmonics from VVVF drive to source for
all VVVF drives.
Input and output THD should not exceed 5 % and individual Harmonics
9.21
chokes should not exceed 3 %.
It needs to be demonstrated at site during erection and
commissioning.
9.22 DBU Suitable size and rating of DBU for all the above drives.
SDSC SHAR Page:25 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Dynamic braking resistors of suitable capacity/rating
shall be provided to all VVVF drives. For Hoist motions
DBRs shall be sized for a minimum of 150% of
motor full load torque and it shall not be less than the
torque limit setting of the VFD in the hoisting
direction.
Crane duty Motors suitable for Inverter Operations shall be as per IS3177.
For accepting the input from VVVF drives, 60% CDF, min of with 300 starts per
hours, IP55, and Pull out torque of not less than 2.75 times of nominal value
and specifically designed for crane duty application .
All the motors shall be housed with inbuilt thermistor and it is to be linked with
VVVF drive for necessary protection like switch OFF the motor in case of
increase in surface temperature more than T4 classification of hazardous area.
SDSC SHAR Page:26 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
The Motors shall have preferably ZZ type bearings.
No of motors required
Main Hoist Motion - 4 Nos. (as per design, required power/torque capacity )
No. of motors
Power of motor
Frame size
Details to be provided
related to motor make
9.28
selection and
calculations duty : Crane Inverter duty,
Current drawn by Maximum Current drawn by all motors with full load
9.29
motors should not exceed 80% of the full load rated current.
Torque Rating of Motor full load torque rating shall be min. 120% of
9.30
motors calculated rating on full load.
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Main Hoist motors - one no. per motor
Floor operated pendant (Push Button Station) shall be provided with 3-way
Selector Switch for selecting the hoist motors.
PBS shall be provided with push buttons for controlling crane motions:
Cross Travel motion Right / Left - Main speed & Creep speed (with 5Hz)
Long Travel motion Fwd / Rev - Main speed & Creep speed
Pendent Shall be provided with Key way switch Lockable at OFF (for Control
ON command),
PBS shall also provide with 2-way Switch for Under Bridge Lights.
All push buttons at Push button station are to be powered through Intrinsic safe
module only apart from other control elements like limit switch, over speed
switch, etc..,
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Interlocking is to be carried out for selection of
command for all the motions.
9.35 Interlocks
Auxiliary contactor level: Hard wired interlocks are to
be provided such that when Aux.contactor operates
with respect to the motion selected, remaining Aux.
contactors with respect to other Aux. hoist motions
should not be operated.
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
The crane rails, structures, motor/brake frames, metal
enclosures of all electrical equipment, conduit and trays
shall be effectively grounded with double earthing and
shall be connected to building earth through gantry
9.42 Earthing
rails. The laying of Earth strip from Gantry rail to Earth
pit ( which is around 10meter away from the crane
bay) outside the building is in the scope of EOT
Crane's supplier.
Limit Switches for Aux Rotary Limit Switch – 1 No. (For hoist and lower limit)
9.46
Hoist
Gravity Limit Switch – 1 No.
Limit Switches for CT
9.47 Lever type - 2 Nos. for CT & 2 Nos. for LT
& LT
SECTION – V
CONDITIONS OF SUPPLY OF
175t/25t FLAMEPROOF EOT CRANE
SDSC SHAR Page:31 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Painting with Epoxy Two coat of epoxy primer (Apcodur CP 680 of M/s
10.2 Primer (Total thickness Asian Paints or equivalent) shall be applied to a Dry
of 80 microns) Film Thickness (DFT) of 80 microns.
Interior of all gear box housings shall be sand blasted and painted with two
10.6
coats of oil resisting durable paint.
Questionnarie, attached with BQR, duly filled by Vendor given along with the
11.2
"Appendix" of this specifications.
Technical Specifications with Point-wise Specifications to all points as given in
this "Specification cum Compliance Statement" (given in this FORMAT).
11.3
Deviations, if any shall be mentioned clearly in a separate sheet. (See. II in
page 1).
GA drawing showing full details of crane, with dimensions, span, height of lift,
end clearances, head room, overhead clearance, hook approach limits,
11.4
weights, wheel loads, major components and general arrangement of main
Hoist Drive etc..
11.5 The bidder shall quote separately for erection and commissioning of Crane.
SDSC SHAR Page:32 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
DESIGN APPROVALS:
Bidder shall submit following list of Three sets (03 sets) of drawings/
calculations / documents (in 03 -three sets) for approval before manufacture of
12.1 crane within 4 weeks after placement of purchase order. (12.5 to 12.40).
Note: It is the responsibility of the supplier to get the drawings/ documents
approved from TPIA/ Purchaser (SDSC SHAR).
If the drawings and other particulars are returned by the Purchaser (SDSC
SHAR), because they are incomplete or faulty, the Bidder shall make the
necessary correction / modifications and resubmit the drawings and
12.3
calculations within a reasonable time, but in any case, should not exceed two
weeks from the date of receipt of purchaser’s / third party inspection agency's
comments.
Design of load bearing structures shall be as per IS 807 and drive mechanisms
12.4 as per IS 3177 and Main Hoist Gearboxes as per IS4137 and also as per
technical specifications in to consideration.
GA Drawing of individual drive mechanisms for Main Hoist, Aux. Hoist, CT and
12.7
LT. G.A drawing of Main Hoist drive shall be submitted.
General Arrangement drawing of Dual wire rope reeving with dimensions and
12.8
rope equlizer assembly.
Design & Constructional Drawings of Girder, end carriage, and trolley their
12.9
connections with bill of materials.
GA drawings, details and selection criteria, design calculations for gear boxes
12.11
with manufaturer's data sheets as per this specifications and conditions.
LT rail arrangement (on Gantry Girders) drawing to scale with Bill of Materials
12.12
(BOM).
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Sizing calculations for selection of Machine elements like wire rope, hook
12.14 blocks, cross head, sheave pins, rope drum, couplings, wire rope pulleys,
shafts, bearings etc.,
Calculation for bridge girder with deflection & camber, trolley frame, end
12.15
carriage, with weight breakup.
Quality Assurance Plan for total crane manufacture, erection & testing as given
12.19
in Annexure - 3.
Delivery schedule of EOT crane in the form of Bar chart indicating different
12.20
stages.
All the componets of crane which are lifted for erection shall be design
12.25 checked for erection / lifting loads and necessary Calculations shall be
submitted.
Calculation for selection of motors, brakes, drives, cables and switch gear with
12.26 manufacturer datasheets & Exproof certificates. All Motors' torque and speed
curves shall be submitted for approval.
Electrical circuit diagrams of EOT crane with individual drive circuits, control
12.27
circuit, and with interlocks' circuits.
12.29 Wire rope spooling monitoring G.A drawing and electrical circuit.
Weight of each bridge girder as assembled and ready for erection, with and
12.32
without mechanical and electrical components.
12.33 Weight of each end carriage as assembled and ready for erection.
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Test certificates of all items like raw materials, hooks, wire ropes, motors etc
13.2 and for all crane parts certified by "Competent person of third party agency"
as per QAP & standards.
13.5 2 sets of Gearbox spare parts and service manuals shall be provided.
13.10 Final test certificate of EOT crane from TPIA with inspection report
Final as built drawings of crane and machinery, Maintenance & spare part
13.11 Manuals, test certificates shall be supplied in soft form in the forms of DVDs
and Memory stick in the latest software format.
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Verticality of End
14.5 < 1mm (measured at every 1m interval)
Carriages
Difference in height
14.8 <1/1000 of wheel gauge maximum at 1m interval
between trolley rails
CT/LT wheel
14.11 <2mm (measured at all wheels) Wheel alignment
displacement
CT / LT wheel
14.12 less than 0.1 mm in diameter of wheel
diameter variation
Squareness of Girders
14.13 within 1.60mm ( for wheel base of ~4000mm)
to End carriages
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
The crane hook should be tested and certified by the dock labor board / govt.
15.7
Approved test house for twice its SWL and test certificate should be provided.
Testing the extra safety features in EOT crane i.e. performance & interlock
15.11
checking of twin hoist system.
SDSC SHAR Page:37 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Material (lifting
Fully in the supplier's scope. All lifting machines /
equipment, lifting
16.5 tackles used shall be tested & certified as per
tackles, etc) required
standards before their usage for lifting crane.
during erection.
Department shall provide suitable hooks on the roof in the facility for lifting of
crane components. Supplier can use these hooks for lifting of crane
components during erection of Crane. The capacity & location of erection
16.6 hooks shall be given by manufacture during detail engineering. However the
lifting machinery ( power winch, pulley blocks, wire ropes, lifting gear, etc.,) and
accessories are in the scope of supplier. All lifting machines/tackles' Test
certificates shall be furnished.
Initial filling of lubricants and spare parts required for commissioning at site
16.7
shall be provided by the supplier.
No Load test, Full load test and overload test (for
125%SWL) shall be done as per QAP and as per
Performance Proving &
IS3177. Proving out for the Crane’s Capacity and
16.8 Smooth running of
Smooth Functioning of the Crane at Full load (SWL)
EOT crane
and Over load (125%SWL) shall be the responsibility of
the supplier.
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Structural Steel All the structural raw materials (plates, angles, beams)
17.2 Materials Plates, rolled shall be NEW and of reputed make of M/s SAIL / M/s
sections JINDAL/ M/s ESSAR/ M/s TATA STEEL / VIZAG-RINL
17.12 Flame Proof Motors M/s. Siemens / Bharat Bijilee / Crompton Greaves
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Other reputed and reliable makes of bought out items will be conisdered during
17.24 detail engineering with submission of technical details, references and
credentials. However about other makes final decision is of SDSC SHAR.
In the design of Crane, all Indian standards, all safety regulations as applicable
under provision of factory Act, Indian Electricity rules etc. as prevailing in the
18.1
country / State of Andhra Pradesh (site of installation) shall be taken into
consideration.
Arrangements shall be made by the supplier for the inspection and testing of
the crane during different stages of its manufacture starting form the raw
18.2 materials till the completion of the crane by the SDSC,SHAR and/or Third Party
Agency at the suppliers site as per the QAP schedule.
18.3 Dimensions of all parts used on crane shall conform to metric standards.
No cast iron part should be used on the crane except for electrical equipment.
18.4 Similarly wood or combustible material and Bush bearing should not be used in
any part of the crane. Open gears should not be used in any drive / motion.
Assembly at site is to be kept as minimum as possible to enable early
18.5 commissioning of the crane. Welding of crane at site is to be avoided as far as
possible.
The supplier should satisfy himself about the site condition beforehand to avoid
18.6
any difficulty during erection and commissioning of the crane
Supplier shall submit complete erection plan with details of erection loads &
18.7 pattern of wheel loads that will act on building civil structure, erection
procedure, material handling procedure etc.
During the erection, testing and commissioning of the crane at site in
Sriharikota, the supplier has to make his own arrangements for boarding,
18.8 lodging, transportation of his men and materials. However, hostel
accommodation may be provided by the purchaser (SDSC SHAR) on
chargeable basis, if available.
Free electricity and water will be provided by the purchaser for the erection,
testing and commissioning of the crane at the site.
18.9
Supplier shall make his own arrangements for welding and gas-cutting works if
any, that are required for erection and commissioning of Cranes.
For unloading the crane parts at site (in respective building) material handling
18.10 support like Forklifts (~12 ton cap.) and mobile crane (~20 ton/50ton cap.) will
be provided by department at free of cost.
A toolbox containing all necessary tools as given in Page no. 40 required for the
18.11
maintenance of the crane should be from part of supply along with the Crane.
SDSC SHAR Page:40 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
SDSC, SHAR / Third Party Inspection Agency (TPIA) shall have the right of
inspection and supervision of the manufacturing process adopted by the
supplier for the manufacture of equipment at various stages through their
authorized representatives. In case the manufacturing process adopted is not
18.12
found suitable and commensurate with the desired quality of the equipment, the
Supplier will be advised to adopt the correct manufacturing process which will
be binding on the supplier. SDSC, SHAR’s decision regarding the quality of
work and its acceptability shall be final and binding on the Supplier.
Delivery Schedule : 12 months for total work. The crane shall supply the
19.1 crane within 10 months from date of Order and shall be erected &
commissioned with in 2 months from date of supply.
All Taxes (like sales tax, VAT, service tax etc.,) and duties applicable shall be
19.3
indicated clearly in quotation.
Excise duty (ED) exemption Certificate will be issued by the Department for the
final product. (Hence, ED shall be NIL). Also Octroai exemption will be provided
19.4.1
by department on request from supplier. ED exemption will not be provided for
input materials.
Customs duty (CD) exemption certificate shall be issued by the purchaser for
the imported components used for this EOT crane. Hence, details of items, qty
19.4.2
and cost of the imported items shall be mentioned in the quotation. Bidder shall
provide necessary details accordingly for availing CDEC.
Performance Bank guarantee (PBG) for 10% of total cost of the crane shall
19.7 be provided by the Vendor for a period of 12 months from the date of
commissioning and acceptance of the crane at purchaser’s site at Sriharikota.
SDSC SHAR Page:41 of 41
175t / 25t FLAMEPROOF EOT CRANE
SPP
SPECIFICATIONS CUM COMPLIANCE STATEMENT
Bidder OFFER /
Sl.No. DESCRIPTION ISRO SPECIFICATION
ACCEPTANCE
Validity of Offer shall be minimum period of 120 days from the tender due
19.9
date.
Sl.
Description of Item Units Required Qty
No.
Double end Spanners from 10-11 to 36-41
1 (set of 13nos.) of make : M/s Snap On / Set 01
Taparia)
Ring Spanners from 10-11 to 36-41 (set of
2 13nos.) Set 01
CODES AND STANDARDS FOR 175t / 25t FLAME PROOF EOT CRANE
The design, manufacture and testing of the crane shall conform to the latest editions of the
following codes and standards wherever applicable:
Code of Practice for Design, Manufacture, Erection and Testing
IS:807
(Structural Portion) of Cranes and Hoists.
IS 5780 : 1980 Specification for Intrinsically Safe Electrical Apparatus and Circuits.
ANNEXURES
Annexure – 1A
Rope drum
Encoder 4
Encoder 1
Motor 1 Motor 4
Encoder 2
Encoder 3
Motor 2 Motor 3
Fig 1 : 175t Main Hoist Configuration, Dual drive and Twin load path. 45
EOT CRANE CLEARANCE DIMENSIONS – 175t / 25t FLAMEPROOF EOT Crane
(Top running, Double Girder, Flameproof EOT crane)
Rated
Facility Span
Sl.No SWL A B C D F G H P N M X Y
Name (S)
In tons
I J K L
Note :
1. The above dimensions are indicative only. EOT crane supplier shall work out the exact dimensions by keeping the view
to minimize the end hook approaches and head room and shall provide the same in Cranes GA, drawing along with
quotation.
2. EOT Crane span & lift are subjected minor changes which shall be accommodated by supplier during detail engineering.
48
Annexure – 2
No. of
Selector Indication
Crane Motion / Requirement push
Switch lamps
button
1&2
Selection of Hoist 3-way Selector
1 - -
Motor switch
2
Main UP 1
Main DOWN 1
Hoist - -
Creep UP 1
Creep DOWN 1
Main UP 1
Main DOWN 1
Aux. Hoist - -
Creep UP 1
Creep DOWN 1
Main Right 1
Main Left 1
Cross Travel - -
Creep Right 1
Creep Left 1
Main Forward 1
Main Reverse 1
Long Travel - -
Creep Forward 1
Creep Reverse 1
Control ON - 1 -
Control OFF - 1 -
49
Annexure - 3
QUALITY ASSURANCE, INSPECTION AND TESTING PLAN FOR EOT CRANE
Agency
Type / Extent
Performed
Witnessed
Sl. Components/ Characteristic to Method of of Ref. Acceptance Format of
Category Remarks
Verified
No Operations be checked check check Document Norm record
A B C D E F G H I J K
i) Identification of Raw All raw materials shall be offered with test certificates for identification for Crane manufacture Component Stamping on All materials shall be Identified by
materials structural before start of fabrication. Stamping shall be done for verification at later date. Specs./ IS 2062/ parts & Third
H 1 - _
plates, forged steel IS1570/ En steels Identification Party Agency . (HOLD)
material, Alloy steel etc., record
1 STRUCTURAL WORKS : BRIDGE GIRDERS, END CARRIAGES, CRAB FRAME, DRIVE BASES & PLATFORMS ETC.
1.1 Chemical composition/ Major T.C. Correlation One per Approved Approved Material T. C. /
Mechanical Properties (if not available heat drawings/ drawings / Tech. Supplier's Test 3,2 - 1
then test) Specs./ IS 2062 Specs./ IS 2062 Report Reports / TC review by TPIA .
Materials -
1.1.1 Plates/rolled sections Lamination /Internal Major Ultrasonic 100% ASTM A-435 ASTM A-435 Supplier IR For a l l plates of thickness > 20mm,
defects Testing 3,2 - 1 UT qualification ( volumetric test) 50
1.2 Welding Welding procedure & Critical Test piece visual One for ASME Sec.IX ASME Sec.IX WPS/ PQR
Welders qualification. & physical test. each format 2 - 1
position
a) Welding quality & Visual & IS:3658 & IS:3658 & Visual inspection & Use weld
Surface defects Critical 100% Supplier’s IR 2 - 1
Load Bearing Butt D.P. Test AWS D14.1 AWS D14.1 gauges for measurement of weld
1.2.1 welds (both tensile and size
compression) b) Sub surface defects ASME Sec.VIII ASME Sec.VIII
Critical Radiography Supplier’s IR 2 1 - Review of radiography films by I.A.
100 % Div I DivI
Legend
1 Third Party Inspection Agency (TPIA) Place: Signature of Crane Vendor
2 Vendor (Suppliers) Date: with Designation
3 Sub Vendor / Item Supplier
Annexure - 3
QUALITY ASSURANCE, INSPECTION AND TESTING PLAN FOR EOT CRANE
Agency
Type / Extent
Performed
Witnessed
Sl. Components/ Characteristic Ref. Acceptance Format of
Category Method of of Remarks
Verified
No Operations to be checked Document Norm record
check check
A B C D E F G H I J K
1.2.2 Other than load Surface defects & Size Major Visual & DPT 100% Use weld gauges for
Bearing Butt welds & Visual measurement of weld size
fillet welds check &
DP test IS:3658 IS:3658 Supplier’s IR 2 - 1
10%
random
1.2.3 Bridge Girder & End Visual, & Welding Major Visual & Visual Component Component Supplier’s IR Use weld gauges for
H Carriage inspection Measurement welding quality 100% DPT- drawing AWS drawing/ AWS measurement of weld size
before closing the box 2 1 -
random of D14.1 D14.1 (HOLD)
10%
1.2.4 Final Welding Visual Inspection Major Inspection of 100% Specification/ AWS D14.1 Supplier’s IR Visual final welding inspection by
Inspection Welding quality AWS D14.1
2 - 1
TPIA
51
1.2.5 Final Inspection of Dimensional , Camber , Major Measurement 100% Tech. Tech. Supplier’s IR Measured Dimensions shall be
fabricated components straightness, level, tolerances as Specification/ Specification/ marked on component drawing.
Girders, End carriages, Parallelism, verticality, per Component Component 2 - 1 Review of reports at next stage by
Trolley, LT drive frame, etc., specifications drawing/IS drawing/IS 807 TPIA. (HOLD)
etc.., 807
2.0 ROPE DRUM Fabricated/ Material composition/ Major T.C. Correlation One per Spec/drawing/ Spec/drawing/ Material T. C. /
Reports / TC / pressure test
Heavy duty Seamless pipe Mechanical Properties (if not available heat ASTSM A106/ ASTSM A106/ Supplier’s Test 3,2 - 2, 1
reports review by TPIA
UTS, YS, % elongation then test) IS 2062 IS 2062 Report
Welding Joint quality & Measured Dimensions shall be
2.1 ROPE DRUM joint Critical Visual/DP 100% Component ASME Sec.VIII Supplier’s IR
Welding / Seamless pipe
Weldment defects
Test/RT/ UT drawing Div I 3/2 2` 1 marked
on component drawing.
Examination of RT films by TPIA.
Stress relieving Major Verification 100% Mfg’s std. Stress relieving Supplier’s IR
3/2 2 1
chart
Legend
1 Third Party Inspection Agency (TPIA) Place: Signature of Crane Vendor
2 Vendor (Suppliers) Date: with Designation
3 Sub Vendor / Item Supplier
Annexure - 3
QUALITY ASSURANCE, INSPECTION AND TESTING PLAN FOR EOT CRANE
Agency
Type / Extent
Performed
Witnessed
Sl. Components/ Characteristic Ref. Acceptance Format of
Category Method of of Remarks
Verified
No Operations to be checked Document Norm record
check check
A B C D E F G H I J K
3.0 Material composition/ Major T.C. Correlation One per Spec/drawing/ Spec/drawing/ Material T. C. / Reports / TC to be
Mechanical Properties (if not available heat IS 2062 IS 2062 Supplier’s Test 3,2 - 2, 1
UTS, YS, % elongation then test) Report review by TPIA
3.1 Gear box Housings Stress relieving Major Verification 100% Mfg's std. Stress relieving Supplier's IR SR chart will be reviewed by TPIA.
2 - 1
chart
Fabricated
3.2 Surface defects & Major Visual/DP Test/ DPT 10% IS:3658/ IS:3658/AWS Supplier's IR Measured Dimensions shall be marked
dimensional check Measurement random & Component D14.1 on component drawing
2 - 1
100% drawing
visual
a) Platform Dimensional
4.0 Minor Measurement 100% Component Component Supplier's IR
b) LT Frame Conformity/
Critical drawing/ Mfr’s drawing/ Mfr’s
c) Hand Rails Visual checking / dimension TC/ Industrial TC/ Industrial 2 - 1 52
d) chequered Plates Mfr’s TC s / others standards standards
at random
Legend
1 Third Party Inspection Agency (TPIA) Place: Signature of Crane Vendor
2 Vendor (Suppliers) Date: with Designation
3 Sub Vendor / Item Supplier
Annexure - 3
QUALITY ASSURANCE, INSPECTION AND TESTING PLAN FOR EOT CRANE
Agency
Type / Extent
Performed
Witnessed
Sl. Components/ Characteristic Ref. Acceptance Format of
Category Method of of Remarks
Verified
No Operations to be checked Document Norm record
check check
A B C D E F G H I J K
Measured Dimensions shall be marked
5.1.2 Gear box Assembly Dimensional Major Measurement/ 100% Gearbox GA Gearbox GA Supplier's IR
on Gearbox GA drawings with
H conformity/ Inspection Visual check of drawing Drawing.
allowed dimensional variations.
of machined surfaces Internal 2 - 1
(HOLD)
like gearbox base, painting
bearing mounts etc.,.
Contact ratio of No Load Test shall be witnessed
Gear box assembly Major Measurement & 100% Gearbox GA Gearbox GA Supplier's IR
surfaces/ Backlash/ by TPIA. Noise level of gearboxes
no load running drawing / drawing / IS4460/
testing Noise level & Bearing shall be ≤ 80dBA. Temperature rise
5.1.3 IS4460/ AGMA Specification / 2 1 - shall be as per gearbox manufacture
(No load run test for temperature/ Breather/ / Specification Noise level of standards.
minimum of 4 hours ) Oil level gauge gear box ≤ 80dBA
Legend
1 Third Party Inspection Agency (TPIA) Place: Signature of Crane Vendor
2 Vendor (Suppliers) Date: with Designation
3 Sub Vendor / Item Supplier
Annexure - 3
QUALITY ASSURANCE, INSPECTION AND TESTING PLAN FOR EOT CRANE
Agency
Type / Extent
Performed
Witnessed
Sl. Components/ Characteristic Ref. Acceptance Format of
Category Method of of Remarks
Verified
No Operations to be checked Document Norm record
check check
A B C D E F G H I J K
5.4 Plummer blocks & PB & bearing sizes/ Major Correlation with 100% Approved Approved Mfr's TC/ Review of Test certificates by TPIA and
bases Material composition/ Mfr’s TC drawing/ drawing/ Supplier's IR issue Compliance certificate.
Mechanical properties Specification Specification/ 2 - 1 Measured Dimensions shall be marked
on Component drawings with allowed
dimensional variations.
5.5 LT & CT Wheels
5.5.1 Material composition/ Major Correlation with 100% Approved Approved Mfr's TC/ Test Review of Test certificates by TPIA and
Mechanical properties Mfr’s TC drawing / Tech. drawing / Tech. reports/ issue Compliance certificate.
a) Material Forged steel Specification Specification
3, 2 - 1
Hardness of material / Supplier's IR
C55Mn75 IS:1570/BS970 IS:1570/BS970
UT of forged blanks Major UT checking 100% ASTM A-388 ASM A-388 Mfr's TC Review of Test certificates by TPIA and
3, 2 - 1
Supplier's IR issue Compliance certificate. 54
b) Wheels after
5.5.2 Dimensional Conformity Major Measurement 100% Approved Approved Supplier's IR Measured Dimensions shall be marked
machining with Keys &
for Bore, wheel tread, Component Component on each Component drawings with
key ways 2 - 1
taper of flange / drawing drawing allowed dimensional variations.
Hardness/depth
5.6 WHEEL AXLES with key Material composition/ Major Correlation with 100% Approved Approved Mfr's TC/ Test Measured Dimensions shall be marked
ways & keys Mechanical properties Mfr’s TC / drawing / Tech. drawing / Tech. reports/ 3,2 on each Component drawings with
Dimensional inspection Measurement Specification Specification Supplier's IR
- 1
allowed dimensional variations.
IS:1570/BS970 IS:1570/BS970
UT & DPT /MPT
Legend
1 Third Party Inspection Agency (TPIA) Place: Signature of Crane Vendor
2 Vendor (Suppliers) Date: with Designation
3 Sub Vendor / Item Supplier
Annexure - 3
QUALITY ASSURANCE, INSPECTION AND TESTING PLAN FOR EOT CRANE
Agency
Type / Extent
Performed
Witnessed
Sl. Components/ Characteristic Ref. Acceptance Format of
Category Method of of Remarks
Verified
No Operations to be checked Document Norm record
check check
A B C D E F G H I J K
b) Visual Inspection Measured Dimensions shall be marked
5.7.2 Overall visual inspection Major Measurement 100% Component Component Mfr's TC
c) Dimensional Inspection on each Component drawings with
/ All dimensions as per with vernier / drawing / drawing /
allowed dimensional variations.
drawing like bore, Micrometer Specification Specification 3 - 1,2
width, groove, Noise level of
etc.,/hardness of gear box < 80db
5.8 Snatch block Cross Material composition/ Major Correlation with 100% Approved Approved Mfr's TC/ Test Measured Dimensions shall be marked
head Mechanical properties Mfr’s TC / drawing / Tech. drawing / Tech. reports/ 3, on each Component drawings with
- 1
Dimensional Measurement Specification Specification Supplier's IR 2 allowed dimensional variations.
inspection, 100% UT & IS:1570/BS970 IS:1570/BS970
MPT
5.9 Snatch block assembly Dimensional Conformity Major Measurement 100% Approved Assembly Supplier's IR Review of reports by TPIA
2 - 1
Assembly dwg . Drawing
Material composition/ 55
Major Correlation 100% Component Component Mfr's TC Proof load test from Govt. approved
Mechanical properties/ 3 - 2, 1
with TC. drawing / IS1875 drawing /IS 1875 test house.
and 100% UT& DPT /
MPT
5.10 Hook
Proof Load Test Major Testing 100% IS5749/IS3815 IS5749/IS3815 Mfr's TC 3 - 2, 1
Material composition/ Major Correlation with 100% Approved comp. Approved comp. Mfr's TC/ Test Measured Dimensions shall be marked
5.11 Mechanical properties Mfr’s TC / drawing / Tech. drawing / Tech. reports/ 3, on each Component drawings with
- 1
Specification Specification Supplier's IR 2 allowed dimensional variations.
Brake Drums with key IS:1570/IS1030 IS:1570/IS1030
and Key ways 1. Dynamic balance report shall be
Dimensions/ Dynamic Major Balancing test/ 100% Component Component Mfr's TC
reviewed by TPIA.
balancing/ Key way and Measurement drawing / drawing /
key inspection. with Specification Specification 2. Measured Dimensions shall be
5.12 2 - 1 marked on each Component drawings
with allowed dimensional variations.
Legend
1 Third Party Inspection Agency (TPIA) Place: Signature of Crane Vendor
2 Vendor (Suppliers) Date: with Designation
3 Sub Vendor / Item Supplier
Annexure - 3
QUALITY ASSURANCE, INSPECTION AND TESTING PLAN FOR EOT CRANE
Agency
Type / Extent
Performed
Witnessed
Sl. Components/ Characteristic Ref. Acceptance Format of
Category Method of of Remarks
Verified
No Operations to be checked Document Norm record
check check
A B C D E F G H I J K
6 BOUGHT-OUT & Other items
Dimensional, Genuine Major Mfr's TC 100% Component Component Mfr's TC Review of Mfr's TC by TPIA.
of make, Lay, core and drawing/ BOOM drawing / BOOM 3,2 - 1 Visual examination of wire rope for any
6.1 Wire Rope stands, Tensile grade defects by 2 & 1.
6.3 Machined Fit Bolts & Material composition/ Major Correlation with 100% Approved comp. Approved comp. Mfr's TC/ Test Measured Dimensions shall be marked
Nuts Mechanical properties / Mfr’s TC / drawing / Tech. drawing / Tech. reports/ 3, on each Component drawings with
Measure dimensions Measurement Specification /IS Supplier's IR
- 1
Specification 2 allowed dimensional variations. 56
IS:1570/IS1030
Type / Genuine make
6.4 FASTENERS (Bolts, nuts, Major Mfr's TC/ 100% Approved make TVS/UNBRAKO Mfg TC/
conformity 2 - 1
washers, lock nuts) Invoice and type Supplier IR
7 ELECTRICAL EQUIPMENT
7.1 Electrical Control Dimensional, Visual Major Electrical test 100% Electrical Circuit Approved Supplier's IR Review of test certificates of all bought
Panels ( VVVF drive Sequence / Functional diagram/ drawing/ out items by IA
panels) and high voltage Test Approved Specification. 3 1
drawing/
Specifications
7.2 Motor Visual/ Name Plate Major Name Plate 100% IS 325/ Spec IS 325/spec Mfr's TC 2 - 1
7.2.1 Routine / No load test Major Elec. test 100% IS 325 IS 325 Mfr's TC 3 - 2, 1 Review of TC & Flameproof
certificates by TPIA
7.2.2 Flameproof test cert. Major Gap measure 100% IS2148/ CMRI IS2148/ CMRI Type test cert. 3 - 2,1
Legend
1 Third Party Inspection Agency (TPIA) Place: Signature of Crane Vendor
2 Vendor (Suppliers) Date: with Designation
3 Sub Vendor / Item Supplier
Annexure - 3
QUALITY ASSURANCE, INSPECTION AND TESTING PLAN FOR EOT CRANE
Agency
Type / Extent
Performed
Witnessed
Sl. Components/ Characteristic Ref.Acceptance Format of
Category Method of of Remarks
Verified
No Operations to be checked Document Norm record
check check
A B C D E F G H I J K
7.3 Brakes and Visual/ Name plate/ Major Name plate 100% Approved Approved Mfr's TC/ Type Review of TC & Ex-proof certificates
Make Torque & Thrust / details, make Drawing/ Make/ Drawing/ Make/ test cert for by
Thrusters, Material TC verify / Test Verification of BOM/Spec BOM/Spec/ Flameproof / TPIA
3 - 1
certificate/ Ex proof TC ATEX- PTB/ Supplier IR
Brake Coil certificate Verification of IS2148 -CMRI
Accessibility of parts. Ex-proof TC
7.4 Resistance box Megger test, Resistance Major Electrical test 100% BOM/ drawing BOM/ drawing / Mfr's TC Review by TPIA.
3 - 1
value / Specifications. Specifications.
7.5 Master controller / Sequence, Number Major Visual 100% BOM/ drawing / BOM/ drawing / Mfr's TC Review of TC by I.A.
Limit switches / Switch of cams, Idle Specifications. Specifications. 3 - 1
Gear operational test
57
7.6 Cables Routine test Major Test One per BOM/spec. BOM/spec. Mfr's TC Review of TC by I.A.
3 - 1
8H ASSEMBLY OF CRANE (Before assembly of EOT crane all parts shall be inspected by TPIA/Purchaser. Supplier shall inform readiness of all parts) (HOLD)
8.1 Bridge Girder & Overall Dimension s Major Measurement/ 100% Approved Approved Supplier's IR Measured Dimensions /
End carriage Structural Alignment & visual General General alignment values shall be
assembly. LT Wheel alignment. inspection Arrangement Arrangement 2 1 - marked on GA
Span measurement drawing / drawing / /component drawings with allowed
Diagonal Checks Specifications Specifications dimensional variations.
8.2
Crab assembly with Dimensional & CT Major Measurement 100% Approved Approved Supplier's IR Measured Dimensions /
Main Wheel alignment drawing / drawing / alignment values shall be
Hoist & CT machinery Couplings’ alignment Specifications Specifications marked on GA
2 1 -
/component drawings with
allowed dimensional variations.
Legend
1 Third Party Inspection Agency (TPIA) Place: Signature of Crane Vendor
2 Vendor (Suppliers) Date: with Designation
3 Sub Vendor / Item Supplier
Annexure - 3
QUALITY ASSURANCE, INSPECTION AND TESTING PLAN FOR EOT CRANE
Agency
Type / Extent
Performed
Witnessed
Sl. Components/ Characteristic Ref.Acceptance Format of
Category Method of of Remark
Verified
No Operations to be checked Document Norm record
check check s
A B C D E F G H I J K
9 H LOAD TESTING AT WORKS (HOLD)
NO LOAD TEST
9.1 NO Load test/ Major NO Load test/ 100% Approved dwg / Approved dwg / Supplier's IR & Measure Gear Box Noise. (Noise
(MH ,AH , CT & LT Performance & Safety Measurement IS807/ IS 3177 IS807/ IS 3177 Load test Level should be <80dBA).
mechanisms) 2 1 -
systems verification of parameters /Specification /Specification Format
speed, Current etc.,
9.2 FULL LOAD (SWL) TEST AT WORKS FOR HOIST & CT MOTIONS
DEFLECTION TEST
9.2.1 Deflection Major Measurement 100% Specifications/ Specifications/ Supplier's IR & Deflection < Span/1000 . Record
With Safe Working Load as per approved IS807/ IS 3177 IS807/ IS 3177 Load test 2 1 - procedure of test & measurement
procedure. Format with sketch.
Main Hoist and Auxiliary
9.2.2 Performance, duty cycle, Major Full Load test/ 100% Approved dwg / Approved dwg / Load test Measure Gear Box Noise. (Noise
Hoist With Safe Working 58
Speeds, Current, , Safety Measurement IS807/ IS 3177 IS807/ IS 3177 report 2 1 - Level should be <85dBA) .
Load
systems etc., of parameters /Specification /Specification /Supplier's IR
CT Mechanism With Safe
9.2.3 Performance, duty cycle, Major Full Load test/ 100% Approved dwg / Approved dwg / Load test Measure Gear Box Noise. (Noise
Working Load
Speeds, Current, , Safety Measurement IS807/ IS 3177 IS807/ IS 3177 report 2 1 - Level should be <85dBA) .
systems etc., of parameters /Specification /Specification /Supplier's IR
9.2.4 OVER LOAD (125% SWL) Static test/ Capability of Major Capability of CT 100% Approved dwg / Approved dwg / Supplier's IR & Record procedure followed for test
TEST all motions/ Permanent &Hoist motion/ IS807/ IS 3177 IS807/ IS 3177 Load test & measurement with sketch. After
2 1 -
(MH, AH & CT) set Measurement /Specification /Specification report testing check for any damage,
cracks/paint flaking in load bearing
members.
10 PAINTING
10.1 Sand/ Grit Blasting & Surface Cleanliness/ Major Visual Random Specification / Specification / Supplier's IR
Surface Cleaning 2 - 1
texture visual inspection SSPC SA2 1/2 SSPC SA2 1/2
10.2 Primer Coat Painting DFT Thickness/ visual Major Measurement Random Specification / Specification / Supplier's IR Paint thickness shall be measured
2 - 1
inspection in µm / Visual DFT ≥75µm DFT ≥75 µm with paint thickness gauge/
elcometer.
Legend
1 Third Party Inspection Agency (TPIA) Place: Signature of Crane Vendor
2 Vendor (Suppliers) Date: with Designation
3 Sub Vendor / Item Supplier
Annexure - 3
QUALITY ASSURANCE, INSPECTION AND TESTING PLAN FOR EOT CRANE
Agency
Type / Extent
Performed
Witnessed
Sl. Components/ Characteristic Ref.Acceptance Format of
Category Method of of Remarks
Verified
No Operations to be checked Document Norm record
check check
A B C D E F G H I J K
10.3 Epoxy paint Painting DFT Thickness/ visual Major Measurement/ Random Specification / Specification / Supplier's IR Paint thickness shall be measured with
(Two coats of 80 µm & inspection Visual DFT ≥195 µm DFT ≥195 µm 2 - 1 paint thickness gauge/ elcometer . Final
40 µm) DFT measured in presence of TPIA.
11 ERECTION AT SITE
Gantry rail Span, Level, Major Measurement 100% Approved Approved Supplier's IR Tolerances:
11.1 GANTRY GIRDER RAIL
straightness, rail Joints of parameters drawing / IS 807 drawing / IS 807 Rail span : ±5mm; Slope of rail : 1/1000
ALIGNMENT
and Rail clamp distance. Specification / Specification / 2 - 1 at 2m interval; Height diff : ±10mm
IS3177 IS3177 between LH & RH rails; Rail Gap :2mm;
Straightness of rails: ±5mm
12.1
NO LOAD TEST
NO Load test/ Major NO Load test/ 100% Approved dwg / Approved dwg / Supplier's IR & Measure Gear Box Noise. (Noise Level 59
(MH ,AH , CT & LT Performance & Safety Measurement IS807/ IS 3177 IS807/ IS 3177 Load test should be <80dBA).
mechanisms) 2 1 -
systems verification of parameters /Specification /Specification Format
speed, Current etc.,
DEFLECTION TEST
12.2 Deflection Major Measurement 100% Specifications/ Specifications/ Supplier's IR & Deflection < Span/1000 . Record
With Safe Working Load as per approved IS807/ IS 3177 IS807/ IS 3177 Load test 2 1 - procedure of test & measurement with
procedure. Format sketch.
Main Hoist and Auxiliary
12.3 Performance, duty cycle, Major Full Load test/ 100% Approved dwg / Approved dwg / Load test Measure Gear Box Noise. (Noise Level
Hoist With Safe Working
Speeds, Current, , Safety Measurement IS807/ IS 3177 IS807/ IS 3177 report 2 1 - should be <85dBA) .
Load
systems etc., of parameters /Specification /Specification /Supplier's IR
CT Mechanism With Safe
12.4 Performance, duty cycle, Major Full Load test/ 100% Approved dwg / Approved dwg / Load test Measure Gear Box Noise. (Noise Level
Working Load
Speeds, Current, , Safety Measurement IS807/ IS 3177 IS807/ IS 3177 report 2 1 - should be <85dBA) .
systems etc., of parameters /Specification /Specification /Supplier's IR
Legend
1 Third Party Inspection Agency (TPIA) Place: Signature of Crane Vendor
2 Vendor (Suppliers) Date: with Designation
3 Sub Vendor / Item Supplier
Annexure - 3
QUALITY ASSURANCE, INSPECTION AND TESTING PLAN FOR EOT CRANE
Agency
Type / Extent
Performed
Witnessed
Sl. Components/ Characteristic Ref. Acceptance Format of
Category Method of of Remarks
Verified
No Operations to be checked Document Norm record
check check
A B C D E F G H I J K
12.5 LT Mechanism With Performance, duty cycle, Major Full Load test/ 100% Approved dwg / Approved dwg / Load test Measure Gear Box Noise. (Noise Level
Safe Working Load Speeds, Current, , Safety Measurement IS807/ IS 3177 IS807/ IS 3177 report should be <85dBA) .
systems etc., of parameters 2 1 -
/Specification /Specification /Supplier's IR
12.6 Brake Path Test/ Each Brake holding Major Measurement 100% Specifications/ Specifications/ Load test
Brakes Effectiveness Brake path / Delay of path & Brake path Brake path report
testing for all motions between two brakes Brake currents ≤17mm for Hoist ≤17mm for Hoist /Supplier's IR 2 1 -
12.7 Static test/ Capability of Major Capability of CT 100% Approved dwg / Approved dwg / Supplier's IR & Record procedure followed for test &
OVER LOAD (125%
all motions/ Permanent &Hoist motion/ IS807/ IS 3177 IS807/ IS 3177 Load test measurement with sketch. After testing
SWL) set Measurement report check for any damage, cracks/paint
/Specification /Specification 2 1 -
TEST (MH, AH , CT and flaking in load bearing members.
LT motions) 60
Final Painting & touch up Aesthetic look of crane/ Thickness Tech . Tech . Final DFT measured in presence of
13. Major Random Supplier's IR 2 1 -
DFT measurement measurement Specifications. Specifications. TPIA.
Legend
1 Third Party Inspection Agency (TPIA) Place: Signature of Crane Vendor
2 Vendor (Suppliers) Date: with Designation
3 Sub Vendor / Item Supplier
Annexure - 4
LIST OF OPTIONAL SPARE PARTS (LUMPSUM PRICE)
II Mechanical
61