Design Criteria: A) Overland Flow Time, T (Minutes)
Design Criteria: A) Overland Flow Time, T (Minutes)
File No.:
Description: Drainage-Jln Yahya Designer: Aween Checker:
Awal Date: 4 September, 2019 Date:
Reference Calculation Output
1. Design Criteria
a) Settling Zone
Table The Required Settling Zone, V1 = 332.50 m3 (half of the Total Volume) and
12.17 the Settling Zone Depth y1 = 1.00 m
Provided L1 = 56.00 m
For a Side Slope Z = 2(H): 1(V), the dimensions at top the Sediment Storage
Zone are,
W2 = W1 - 2 × y1/2 × Z
= 10.00 - 2 × 1.00/2 × 2
= 8.00 m
L2 = L1 - 2 × y1/2 × Z
= 56.00 - 2 × 1.00/2 × 2
= 54.00 m
The required Depth for the Sediment Storage Zone, which must be at least
0.3m, can be calculated from the following relationship,
V2 = Z2y23 - Zy22(W2 + L2) + y2(W2L2)
Base
Bottom Width = W1 - 2 × Z × y1/2 + y2) WB = 3.20 m
= 10.00 - 2 × 2 × (1.00/2 + 1.20) = 3.20 m
3
Depth: y1 = 1.00 m
Settling Zone, y1 = 1.0 m
Side Slope:
where:
i = average rainfall intensity (mm/hr) for selected ARI (T) and storm
duration (d)
T = average recurrence interval, ARI (years)
d = storm duration (hours); 0.20 ≤ d ≤ 72
λ , K, θ and ƞ = fitting constants dependent on the rain gauge location
Orifice Area,
Atotal = (2Aav/tCd√2g) × √y
= (2 × 426.72)/(24 × 60 × 60) × 0.6 × √(2 × 9.81)) × √(1.00 + 1.20)
= 0.00551 m3
d) Spillway Sizing
Table 2.7 B = 2.00 m, H = 0.25 and Csp = 1.49 from Table 2.7