Design Criteria: A) Overland Flow Time, T (Minutes)

This document provides the design details for a drainage basin with the following key points: 1) The basin is designed for a 10-year storm with a time of concentration of 15 minutes on a site with coarse-grained sandy soil. 2) Dimensions of the settling and sediment storage zones are determined to be 56m by 10m and 54m by 8m deep respectively, with a total basin volume of 665m3. 3) The basin outlet is designed as a 900mm diameter pipe with 3 perforations to discharge 0.845m3/s, which together with a 2m wide spillway discharging 0.371m3/s meets the design flow of 0.809

Uploaded by

Nor Imran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
166 views4 pages

Design Criteria: A) Overland Flow Time, T (Minutes)

This document provides the design details for a drainage basin with the following key points: 1) The basin is designed for a 10-year storm with a time of concentration of 15 minutes on a site with coarse-grained sandy soil. 2) Dimensions of the settling and sediment storage zones are determined to be 56m by 10m and 54m by 8m deep respectively, with a total basin volume of 665m3. 3) The basin outlet is designed as a 900mm diameter pipe with 3 perforations to discharge 0.845m3/s, which together with a 2m wide spillway discharging 0.371m3/s meets the design flow of 0.809

Uploaded by

Nor Imran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Project Detailed Information:

Company Name: Perunding


MOBD Sdn Bhd

File No.:
Description: Drainage-Jln Yahya Designer: Aween Checker:
Awal Date: 4 September, 2019 Date:
Reference Calculation Output

1. Design Criteria

Design Manual : MSMA 2nd Edition (SUStoM)


Design Type : Dry Sediment Basin
Outlet Design Storm ARI : 10 years

2. Determination Time of Concentration


a) Overland Flow Time, to (minutes)
Table 2.1 Friend's Equation
Table 2.2 to = (107 × n* × L1/3)/S1/5
= (107 × 0.028 × 100.0001/3)/2.5001/5
= 11.37 min

Hence, standard storm duration = 15 min

3. Determination Type of Soil


Table Soil Type = Coarse-grained sand, sandy loam; less than 33%<0.02mm
12.16 Dry Sediment Basin is selected

4. Determination of Basin Dimension


Table The Surface Area is 291.50 m2/ha and the Total Volume is 350.00 m3/ha. Required
12.18 surface area =
The Required Surface Area for the site = 291.50 × 1.90 = 553.85 m2(Note: 553.85 m2
This is the Average Surface Area for the Settling Zone Volume) Required Total
Basin Volume
The Required Total Basin Volume for the site = 350.00 × 1.90 = 665.00 m3 = 665.00 m3

a) Settling Zone
Table The Required Settling Zone, V1 = 332.50 m3 (half of the Total Volume) and
12.17 the Settling Zone Depth y1 = 1.00 m

Settling Zone Average Width, W1 = 10.00 m

Settling Zone Average Length


L1 = V1/(W1 × y1)
= 332.50/(10.00 × 1.00)
= 33.25 m
2

Minimum L1 = V1/(W1 × y1) = 332.500/(1.00 × 10.00 = 55.39 m

Maximum L1 = y1 × 200.00 = 200.00 m

Provided L1 = 56.00 m

Check Settling Zone Dimensions:


L1/y1 ratio = 56.00/1.00 = 56.00 56.00<200.00
OK
L1/W1 ratio = 56.00/10.00 = 5.60 5.60>2.00 OK

b) Sediment Storage Zone

The required Sediment Storage Zone Volume, V2 = 332.50 m3

For a Side Slope Z = 2(H): 1(V), the dimensions at top the Sediment Storage
Zone are,
W2 = W1 - 2 × y1/2 × Z
= 10.00 - 2 × 1.00/2 × 2
= 8.00 m

L2 = L1 - 2 × y1/2 × Z
= 56.00 - 2 × 1.00/2 × 2
= 54.00 m

The required Depth for the Sediment Storage Zone, which must be at least
0.3m, can be calculated from the following relationship,
V2 = Z2y23 - Zy22(W2 + L2) + y2(W2L2)

Which gives. y2> 0.3 m

332.50 = 4y23 - 124.00y22 + 432.00y2 V2>332.50 m3


OK
For y2 = 1.20m, V2 = 346.75 m3

c) Overall Basin Dimension Total Basin


Dimension
Top Water Level:

Top Width = W1 + 2 × Z × y1/2 WT = 12.00 m


= 10.00 + 2 × 2 × 1.00/2 = 12.00 m

Top Length = L1 + 2 × Z × y1/2 LT = 58.00 m


= 56.00 + 2 × 2 × 1.00/2 = 58.00 m

Base
Bottom Width = W1 - 2 × Z × y1/2 + y2) WB = 3.20 m
= 10.00 - 2 × 2 × (1.00/2 + 1.20) = 3.20 m
3

Bottom Length = L1 - 2 × Z × y1/2 + y2) LB = 49.20 m


= 56.00 - 2 × 2 × (1.00/2 + 1.20) = 49.20 m

Depth: y1 = 1.00 m
Settling Zone, y1 = 1.0 m

Sediment Storage Zone, y2 = 1.20 m y2 = 1.20 m

Side Slope:

Z = 2(H): 1(V) Z=2(H):1(V)

4. Sizing of Basin Outlet

The Spillway is designed for 10 year ARI flood.

Qrequired = Q10 - Qriser

a) Design rainfall intensity equation


Eq. 2.2 i = λTK/(d + θ)ƞ

where:
i = average rainfall intensity (mm/hr) for selected ARI (T) and storm
duration (d)
T = average recurrence interval, ARI (years)
d = storm duration (hours); 0.20 ≤ d ≤ 72
λ , K, θ and ƞ = fitting constants dependent on the rain gauge location

Location ARI, T Storm Derrived Parameters


(years) duratio λ K θ ƞ
n,
d(min)
Johor - Stor JPS 10 15.00 59.972 0.163 0.121 0.793
Johor Bahru

i = 59.972 × 100.163/(15.00/60 + 0.121)0.793 i=191.617mm/


= 191.617 mm/hr hr

b) Determine runoff coefficient, C

Table 2.6 C (Impervious) = 0.80 (Landuse = Flat and Apartment)

C (Pervious) = 0.80 (Landuse = Flat and Apartment)

Eq. 2.3 Q10 = CIA/360 Q10=0.809 m3/s


= [(1.70 × 0.80) + (0.20 × 0.80)] × 191.617/360
= 0.809 m3/s
4

c) Determination of Outlet Pipe Sizing and Qriser

Outlet Riser: 900 mm diameter perforated pipe.

Average Surface Area,


Aav = [(12.00 × 58.00) + (49.20 × 3.20)]/2 = 426.72 m2

Orifice Area,
Atotal = (2Aav/tCd√2g) × √y
= (2 × 426.72)/(24 × 60 × 60) × 0.6 × √(2 × 9.81)) × √(1.00 + 1.20)
= 0.00551 m3

Using an orifice of 50 mm, area of each orifice is


Ao = (π × D2)/4 = (3.142 × 0.0502)/4 = 0.00196 m2

Total number of orifice required = 0.00551/0.001963


=3

Eq. 2.6 Qriser = CoAo(2gHo)0.5 Qriser=0.845


= 0.6 × (3.142 × 0.902)/4 × (2 × 9.81 × 0.250)0.5 = 0.845 m3/s m3/s

d) Spillway Sizing

Qrequired = Q10 - Qriser = 0.809 - 0.845 = -0.036 m3/s Qrequired=-0.036


m3/s

Eq. 2.10 Qspillway = CspBH1.5

Table 2.7 B = 2.00 m, H = 0.25 and Csp = 1.49 from Table 2.7

Qspillway = 1.49 × 2.00 × 0.251.5 Qspillway=0.371


= 0.371 m3/s m3/s>-0.036 m3
OK
Total Basin Depth including spillway
= 1.00 + 1.20 + 0.30 + 0.25
= 2.75 m