TANFINET Corporation has published the tender on 05th December 2019 and
conducted pre-bid meeting on 21.02.2020. During, the pre bid meeting, TANFIENT
has received queries from all bidders which includes System Integrators, OEMs and
OFC manufacturers. Pre-Bid queries received are consolidated and processed for
response in the form of Corrigendum.
While the process of finalizing the tender and selection of the System Integrators (SI)
for the project was in progress, unexpectedly the entire nation has come under Lock
Down due to pandemic COVID-19.
BharatNet facilitates implementation of a comprehensive State controlled network
which will ensure effective communication across all villages even during calamities.
Currently, Tamil Nadu have a State controlled connectivity infrastructure only up to
Block level which itself is grossly insufficient to meet the administrative needs of the
Government. Lack of connectivity from Block to village level would hamper the activity
of the State administration in mitigating any natural disaster specified in the Disaster
Management Act, 2005.
Considering
(a) The fact that Tamil Nadu is the last State to implement BharatNet under
State-Led-Model,
Thus, it is imperative to revisit the existing tender conditions with regard to Technical,
Financial and other eligibility conditions and specify a revised Project Execution Period
(PEP) to ensure that project is completed within the stringent timelines so as to equip
the State to handle any such natural disasters and emergent situations in future by
invoking the power under Rule 17 of the Tamil Nadu Transparency in Tenders Rules
2000.
Accordingly, taking into account the deadlines specified in the revised MOU and the
emergent situation being faced by Tamil Nadu and the Nation with COVID-19, the
Project Execution Period (PEP) has been revised to
9 months (i.e 8 months execution +1 Month Go Live) starting from
1st June 2020. Implementing BharatNet project within the Project Execution Period
(8+1) months, will be a singular and signature service by TANFINET for Tamil Nadu
and for the Nation.
Under these circumstances, suitable corrigendum has been prepared duly after
considering various factors like pre-bid queries, BBNL Guidelines, amendment to the
MoU issued by Department of Telecommunications, Govt of India on 4.3.2020 for
revised Project Execution Period (PEP) and the COVID-19 pandemic. The bidders are
therefore, requested to submit their bids based on the Tender dated 5.12.2019 and
the Corrigendum hereunder published.
Annexure A & B
Corrigendum Proposed from Queries Received from prospective bidders in Pre-Bid Meeting & subsequently through e-
mails
Tender Ref No: NIT/TANFINET/001/PACKAGE-A/ B/C/D – Dated 05-12-2019
Tender Pag Claus Content of
Sno Document e No e No Clause Existing Clause Revised Clause
Annexure A Technical Scrutiny:
Technical scrutiny will be carried out by the
technical committee considering the
compliance sheet and support documents
provided by the bidder for the quoted network
components: -
The bidder has to qualify the technical
scrutiny for in order to proceed further.
Technical Presentation:
1. The qualified bidder has to show up a
technical presentation to the technical
committee about his approach and
way forward in implementation.
4/28
authority. Financial bid will be opened after
evaluation of the technic bids and successful
completion of POC only.
5/28
required to give demonstration of the
envisaged solution (PoC) to Purchaser as per
the test cases below
The date and time of technical presentation
and PoC shall be informed to individual
bidders by TANFIENT. Each bidder shall be
given a time slot of two hours for technical
presentation. Additional time shall not be
given for either Technical presentation or
PoC.
6/28
Annexure A 1. Aerial OF Cable (ADSS
Cable): 24 pair ADSS on
power lines: As per TEC GR
No. TEC/GR/TX/OFC-
022/02/MAR-17 with latest
amendments if any. (Type
2A)
2. Aerial OF Cable (ADSS
Cable): 48 pair ADSS on
power lines: As per TEC GR
No. TEC/GR/TX/OFC-
022/02/MAR-17 with latest
amendments if any. (Type 2A) 1. Aerial OF Cable (ADSS Cable): 24 Fiber
3. Underground (OFC Cable): ADSS on power lines: As per TEC GR No.
96 pair ADSS on power lines: TEC/GR/TX/OFC-022/02/MAR-17 with
As per TEC GR No. latest amendments if any. (Type 2A)
TEC/GR/TX/OFC- 2. Aerial OF Cable (ADSS Cable): 48 Fiber
022/02/MAR-17 with latest ADSS on power lines: As per TEC GR No.
amendments if any. TEC/GR/TX/OFC-022/02/MAR-17 with
4. Underground (OFC Cable): latest amendments if any. (Type 2A)
144 pair ADSS on power 3. Underground (OFC ribbon Cable): 96
lines: As per TEC GR No. Fiber : As per TEC GR No.
Technical TEC/GR/TX/OFC- TEC/GR/TX/OFC-022/02/MAR-17/ , TEC
Specification 022/02/MAR-17 with latest GR No. TEC/GR/OFC-05/02/Mar 2006
- Package B, amendments if any. with latest amendments if any.
5 55 II C&D
7/28
Annexure B Cable loops are to be provided
Installation for future maintenance purposes
Cable Loop / at regular spacing. (As per
storage / Joint guidelines of BBNL, Annexure B- Cable loops for overhead is 10 mtrs in both
Closure Instruction of Aerial and UG the direction and 20 mtrs in both the
36 6.4 Cable implementation) directions for underground.
1) All components mentioned under Section C& D should be provided with compliance Yes/No as mentioned below with
supporting document.
Make Offered:
Model Offered:
Pg. No in
Compliance
S. No. Parameter Minimum Specifications Supporting
Yes/No
Doc.
.
8/28
2) Section C- Component -6) HCI is replaced with below mentioned components.
Server
Make Offered:
Model Offered:
S. Compliance
Parameter Minimum Specifications Pg. No in Supporting Doc.
No. Yes/No
Latest series/ generation of 64 bit x86/
equivalent processor(s) with 14 or higher
Cores
1. Processor Processor speed should be minimum 2.4
GHz
Minimum 2 processors per each physical
server
2. RAM For workload: As per the requirement
1. 2 X 10GbE LAN ports for providing
Ethernet connectivity
Network 2. Dual-port 16Gbps FC HBA for providing
3.
interface FC connectivity
Optional: 2 X 20GbE converged interface
(for both ethernet ad FC) or better
Power
4. Dual Redundant Power Supply
supply
RAID
5. As per requirement/solution
support
9/28
Make Offered:
Model Offered:
S. Compliance
Parameter Minimum Specifications Pg. No in Supporting Doc.
No. Yes/No
Licensed version of 64 bit latest version
Operating
6. of Linux/ Microsoft® Windows based
System
Operating system)
7. Form Factor Blade
Shall support Industry standard
8. Virtualization virtualization hypervisor like Hyper-V and
VMWARE.
Blade Chassis
Make Offered:
Model Offered:
Compliance
S. No. Minimum Specification Pg. No in Supporting Doc.
Yes/No
Minimum 6U size, rack-mountable, capable of
1 accommodating minimum 8 or higher hot pluggable
blades
Dual network connectivity of 10 G speed for each
blade server for redundancy shall be provided or
2
converged interconnects for both ethernet and FC
connectivity in redundancy
10/28
Make Offered:
Model Offered:
Compliance
S. No. Minimum Specification Pg. No in Supporting Doc.
Yes/No
Backplane shall be completely passive device. If it is
3 active, dual backplane shall be provided for
redundancy.
Have the capability for installing industry standard
flavours of Microsoft Windows, and Enterprise Red
4
Hat Linux OS as well as virtualization solution such
as VMware and Hyper-V.
USB ports shall be available in chassis, can be
5 internal or external, which can be shared by all the
blades allowing remote installation of software
6 Minimum 1 USB port
Minimum 4x10 G ethernet interface and 2x16 Gbps
Fibre Channel module for connectivity to the
7 external Fibre channel Switch and ultimately to the
storage device or converged interface with minimum
4x10 G and 2x8G FC ports in each interconnect
Hot plug/hot-swap redundant power supplies to be
8
provided, along with power cables
Power supplies shall have N+N. All power supplies
9
modules shall be populated in the chassis.
Required number of PDUs and power cables, to
10 connect all blades, Chassis to Data Centre power
outlet.
11 Hot pluggable/hot-swappable redundant cooling unit
11/28
Make Offered:
Model Offered:
Compliance
S. No. Minimum Specification Pg. No in Supporting Doc.
Yes/No
Provision of systems management and deployment
12 tools to aid in blade server configuration and OS
deployment
Blade enclosure shall have provision to connect to
display console/central console for local
13
management such as troubleshooting,
configuration, system status/health display.
Single console for all blades in the enclosure, built-
14
in KVM switch or Virtual KVM features over IP
Dedicated management network port shall have
15
separate path for remote management.
SAN Switch
Make
Offered:
Model
Offered:
Minimum Compliance
S. No. Parameter Pg. No in Supporting Doc.
Specifications Yes/No
1 Power Specification 200-240V, 50-60
Hz
2 Operating temperature range 0° to 40° C
12/28
Make
Offered:
Model
Offered:
Minimum Compliance
S. No. Parameter Pg. No in Supporting Doc.
Specifications Yes/No
3 Operating Relative Humidity 10 to 90% relative
range (non-condensing) humidity
4 Total no. of ports on the Total no. of ports
proposed switch on the proposed
switch 48 with 24
ports populated
with
the interfaces
and required
licenses
5 Throughput of each FC port Throughput of
each FC port
16Gbps
6 Support for 4/8/16 Gb/s HBAs Yes
Protocol Supported
7 FC Yes
8 FCP Yes
9 FC-AL/ FC-AL-2 Yes
10 Designed for high availability Yes
with no Single Point of Failure
Power Supply
11 Hot Swappable Power supply Yes
proposed
13/28
Make
Offered:
Model
Offered:
Minimum Compliance
S. No. Parameter Pg. No in Supporting Doc.
Specifications Yes/No
12 The switch should have Yes
redundant power supply
Cooling Fans
13 Hot Swappable Cooling Fans Yes
proposed
14 (N+1) redundant Cooling Yes
Fans proposed
15 Capability for streaming the Yes
data in multiple paths with
Optimization algorithms for
streaming data through
shortest available path.
16 Capabilities for cascading of Yes
switches
17 Non-disruptive firmware Yes
update
18 End to end performance Yes
monitoring
19 Capability to interface with Yes
host based adapters (HBA) of
multiple OEM, supporting
multiple Operating System
including but not limited to
AIX, HP-UX, Linux, Solaris,
Windows, etc.
14/28
Make
Offered:
Model
Offered:
Minimum Compliance
S. No. Parameter Pg. No in Supporting Doc.
Specifications Yes/No
Zoning and security
20 Support for hardware - Yes
enforced zoning
21 Policy based security and Yes
centralised fabric
management
22 Support for Encrypted Yes
password
23 Support for PKI Digital Yes
certificates
24 Support for FCAP/DH-CHAP Yes
authentication
25 Support for RADIUS, SSL / Yes
HTTPS, SSH, SNMP V3
Support for Hardware based trunking
26 Compatibility with proposed Yes
network devices
27 Compatibility with proposed Yes
servers
28 The system should not be an Yes
end of life / end of service
product.
15/28
Primary Storage
Make Offered:
Model Offered:
S. Compliance
Parameter Minimum Specifications Pg. No in Supporting Doc.
No. Yes/No
Solution/
1 IP Based/iSCSI/FC/NFS/CIFS
Type
Storage Capacity should be considered
as per the design requirement (usable,
after configuring in offered RAID
configuration)
RAID solution offered must protect against
2 Storage double disc failure.
To store all types of data (Data, Voice,
Images, Video, etc)
Disk type: SAS and SSD drives
Storage system capable of scaling
vertically and horizontally
Rack mounted form-factor
Hardware
3 Modular design to support controllers and
Platform
disk drives expansion
At least 2 Controllers in active/active mode
The controllers / Storage nodes should be
4 Controllers upgradable seamlessly, without any
disruptions / downtime to production
workflow for performance, capacity
16/28
Make Offered:
Model Offered:
S. Compliance
Parameter Minimum Specifications Pg. No in Supporting Doc.
No. Yes/No
enhancement and software / firmware
upgrades.
RAID
5 RAID 1+0 and 6
support
Minimum 64 GB of useable cache across
all controllers. If cache is provided in
6 Cache additional hardware for unified storage
solution, then cache must be over and
above 64 GB.
The Storage System should be able to
Redundancy protect the data against single point of
7 and High failure with respect to hard disks,
Availability connectivity interfaces, fans and power
supplies
All the necessary software (GUI Based) to
configure and manage the storage space,
RAID configuration, logical drives
Management allocation, snapshots etc. are to be
8 provided for the entire system proposed.
software
Licenses for the storage management
software should include disc
capacity/count of the complete solution
17/28
Make Offered:
Model Offered:
S. Compliance
Parameter Minimum Specifications Pg. No in Supporting Doc.
No. Yes/No
and any additional disks to be plugged in
in the future, upto max capacity of the
existing controller/units.
A single command console for entire
storage system.
Should also include storage performance
monitoring and management software
Should provide the functionality of
proactive monitoring of Disk drive and
Storage system for all possible disk
failures
Should be able to take "snapshots" of the
stored data to another logical drive for
backup purposes
The storage array must have complete
cache protection mechanism either by de-
Data
9 staging data to disk or providing complete
Protection
cache data protection with battery backup
for up to 4 hours
18/28
Secondary Storage
Make Offered:
Model Offered:
S. Compliance
Parameter Minimum Specifications Pg. No in Supporting Doc.
No. Yes/No
Secondary Storage
(Archival/Backup) can be on any
media such as Disks, Disk
systems, etc. or its combination.
(so as to arrive at lower cost per
TB)
May or may not use de-
1. Solution/Type
duplication technology
Disk type: SAS/ NL SAS
Compatible with primary storage
Must use latest stable
technology platform, with
support available for next 7 to 10
years.
To store data as required, to
meet the archival requirement
2. Backup Size
for different type of
data/information
Rack mounted, Rack based
3. Hardware Platform
Expansion shelves
19/28
Make Offered:
Model Offered:
3) Section D- Component- 4)-c Lock & Key - Two lock is required for each PoP. One door located at the training hall should be
locked always. 3 keys for each lock. Lock details: Maxed Globe Pressing Padlock 2 Inch Safety Lock or equivalent.
4) Section II- Technical Specification Package B,C & D- 3) Carrier Ethernet switch removed.
20/28
5) Section D: 3) Technical Specifications for 1.0 kVA ONLINE UPS System
21/28
S No Parameter Existing clause Revised Clause
Min. 15 amp inbuilt (for any future expansion
of back-up time). Charger shall be settable for Suitable for 1 hour battery
24 Charger
1/2/4/6/8/10/12/14 A ratings as per the need backup
of battery charging
Operating temperature 0-40 deg C with full load @ 0.9PF. Later de-
25.a 0-40 deg C with full load
range rating applicable upto 50 deg C
Indication required -> Over Temperature,
Indication required -> Over
Load on Battery, Battery on Charge, Battery
Temperature, Load on
25.b Other low, Mains on Fan Speed control (as per load
Battery, Battery on Charge,
& room temp) shall be possible
Battery low, Mains on.
Bus start fail, Bus over &
under, Inverter soft start
failure, Inverter voltage high &
low, Inverter output short,
Battery voltage high & low,
charger output short, over
Bus start fail, Bus over & under, Inverter soft temperature, overload,
start failure, Inverter voltage high & low, charger failure, over input
Inverter output short, Battery voltage high & current, over input current,
low, charger output short, over temperature, battery not connected, over
27.b Measurements (On LCD)
overload, charger failure, over input current, charge, EPO enable.
over input current, battery not connected,
over charge, EPO enable, Programmable All the Fault indication
output enable. mentioned in the RfP is not
required to be shown on the
LCD. However, all the Fault
indications mentioned in the
RfP should reflect through
alarms and LED indications
etc.
22/28
S No Parameter Existing clause Revised Clause
Inverter voltage & frequency, Frequency
converter, ECO mode, ECO voltage range,
Inverter voltage & frequency,
Bypass setting, Bypass voltage range,
Frequency converter, ECO
Autonomy limitation setting, Battery total Ah
mode, ECO voltage range,
setting, Charger current, Bypass frequency
Bypass setting, Bypass
27.c Settable data range, Programmable outlet, Programmable
voltage range, Charger
outlet setting, Charger boost & float voltage
current, Bypass frequency
setting, EPO logic setting, Isolation
range, Charger boost & float
transformer O/P (if applicable in design of
voltage setting "
OEM), Display setting for autonomy,
Acceptable input voltage range.
Manufacturer - > ISO 9001,
Manufacturer - > ISO 9001, TL 9000, ISO ISO 14001 & OHSAS 18001
14001 & OHSAS 18001 (ISO & OHSAS for (ISO & OHSAS for Indian
28 Manufacturer Indian Operation of OEM only) . Factory Operation of OEM only) .
calibration lab of manufacturer shall be NABL Factory calibration lab of
accredited in India manufacturer shall be NABL
accredited in India
23/28
6) Section D: 2) Technical Specifications for 2.0 kVA ONLINE UPS System
24/28
be settable for 1/2/4/6/8/10/12/14 A ratings
as per the need of battery charging
Operating temperature 0-40 deg C with full load @ 0.9PF. Later de-
25.a 0-40 deg C with full load
range rating applicable upto 50 deg C
Indication required -> Over Temperature,
Indication required -> Over
Load on Battery, Battery on Charge, Battery
Temperature, Load on
25.b Other low, Mains on Fan Speed control (as per
Battery, Battery on Charge,
load & room temp) shall be possible
Battery low, Mains on.
Bus start fail, Bus over &
under, Inverter soft start
failure, Inverter voltage high
& low, Inverter output short,
Battery voltage high & low,
charger output short, over
Bus start fail, Bus over & under, Inverter soft temperature, overload,
start failure, Inverter voltage high & low, charger failure, over input
Inverter output short, Battery voltage high & current, over input current,
low, charger output short, over temperature, battery not connected, over
27.b Measurements (On LCD)
overload, charger failure, over input current, charge, EPO enable.
over input current, battery not connected,
over charge, EPO enable, Programmable All the Fault indication
output enable. mentioned in the RfP is not
required to be shown on the
LCD. However, all the Fault
indications mentioned in the
RfP should reflect through
alarms and LED indications
etc.
Inverter voltage & frequency, Frequency Inverter voltage &
27.c Settable data converter, ECO mode, ECO voltage range, frequency, Frequency
Bypass setting, Bypass voltage range, converter, ECO mode, ECO
25/28
Autonomy limitation setting, Battery total Ah voltage range, Bypass
setting, Charger current, Bypass frequency setting, Bypass voltage
range, Programmable outlet, Programmable range, Charger current,
outlet setting, Charger boost & float voltage Bypass frequency range,
setting, EPO logic setting, Isolation Charger boost & float
transformer O/P (if applicable in design of voltage setting "
OEM), Display setting for autonomy,
Acceptable input voltage range.
Manufacturer - > ISO 9001,
Manufacturer - > ISO 9001, TL 9000, ISO ISO 14001 & OHSAS
14001 & OHSAS 18001 (ISO & OHSAS for 18001 (ISO & OHSAS for
28 Manufacturer Indian Operation of OEM only) . Factory Indian Operation of OEM
calibration lab of manufacturer shall be only) . Factory calibration
NABL accredited in India lab of manufacturer shall be
NABL accredited in India
26/28
7) NMS Integration:
2 Fault Root cause alarms indicating affected services/locations (API for pulling both –
such pending alarms at any point of time and cleared alarms for a duration). The
alarm info shall also have alarm instance number(ID), alarm name, category,
severity, occurrence time at NE, affected NE entity, clearance time at NE(for
cleared alarms). The same alarm instance ID should be mentioned in both
occurrence and clearance information for a particular alarm. The NMS_LOG_TIME
and NMS_CLEAR_LOG_TIME also shall be shared.
Note: Only Root Cause alarms which are Service Affecting including alarms which
bring the NE down shall be shared after applying due grace period and RCA for
confirmation of fault existence.
3 Configuration Software versions, ports configuration at SNI/UNI sides, Available bandwidth
4 Trouble Ticket TT number indicating Network Element and fault ( alarm name ), TT Raised Time,
TT Status, Aging, present assignee
27/28
5 Performance Management PM parameters of any requested monitored elements/interface, daily Bandwidth
utilization for all State / District / Block / GPs
6 Service / Connection Services / connections configured, their type, BW configured, Date of creation/
Inventory modification, service status, subscriber, Location and NE Details
7 GIS Please suggest the ways data can be shared from state GIS with BBNL GIS
8 SLA SLA definitions, violations
*- the algorithm used to calculate should be shared. This will be reviewed in order to maintain uniformity amongst all NMSs.
Apart from these the notification structure for informing the near real time change in status of NEs, root cause alarms etc. should
be made available. All integration will be done on basis of LGD codes which will be shared by BBNL statewise shortly.
28/28