In contract administration there are certain clauses that consultants, Consultants who is an
engineers,quantity surveyors,project managers and contractors should experienced
know.This doesn’t mean that it is enough knowing the technical term.It is Contracts
important to understand the how to apply liquidated damages in Engineer/Trainer/Quan
construction contracts and how to prevent LD imposed on your project. Surveyor.I provide
consultation,quantity
Liquidated Damages or LD is another important term discussed in surveying services
construction contracts. Sometimes contractors misunderstand liquidated and workshops for
damages as a penalty for not completing the construction project within construction
companies.
https://sihelaconsultants.com/liquidated-damages-in-construction-contracts/ 1/10
5/14/2020 What are Liquidated Damages in Construction Contracts - Sihela Consultants
the stipulated time fame. However liquidated damages are not a penalty FOLLOW
imposed on contractor. FREE
COURSE
Have you ever experienced liquidated damages imposed on your projects?
Name
Subscribe
Damages in Construction
Construction
Contracts? Disputes : What
are the
Liquidated Damages are pre-determined damages mentioned in the
Common
construction contract agreement. Both parties to the contract agree to
Causes
this amount as the amount to recover if the contract is breached. Usually
Liquidated Damages are recovered by the Employer if the contractor fails What are
to substantially complete the work within the stipulated time for Liquidated
completion. Damages in
https://sihelaconsultants.com/liquidated-damages-in-construction-contracts/ 2/10
5/14/2020 What are Liquidated Damages in Construction Contracts - Sihela Consultants
ARCHIVES
May 2020
March 2020
February 2020
By signing the contract agreement, contractor agrees on the amount of October 2019
Liquidated Damages that Employer can recover if the contractor fails to September 2019
deliver the project within the Time for Completion.
August 2019
Due to Liquidated Damages clause contractor knows that he has to April 2019
complete the project without delay.This is beneficial to the employer as
July 2018
he will not lose money from a dragged project.
September 2017
https://sihelaconsultants.com/liquidated-damages-in-construction-contracts/ 3/10
5/14/2020 What are Liquidated Damages in Construction Contracts - Sihela Consultants
Events
Amount of Liquidated Damages are determined based on the possible
loss incur to the Employer if the contractor fails to complete the project Post-Contract
on time. Pre-Contract
Press Releases
Possible losses for the Employer due to a
Projects
late project
Tender Stage
Possible losses to the client include rental cost, loss of possible income if
the project completed on time, extra running costs, temporary Uncategorized
accommodation costs etc depending on the nature of the project scope. Workshops
Once these costs are identified, Liquidated Damages per day or per week
is calculated. This is the amount mentioned in any construction contract GET IN
as Liquidated Damages for the project. The amount can be per day or per TOUCH
week and it can be recovered if practical completion is not achieved for
the whole project or a phase depending on the type of contract. +65
The amount of Liquidated Damages and the recovery period of it vary contact@sihelaconsultan
from project to project (or from contract to contract)
www.sihelaconsultants.c
https://sihelaconsultants.com/liquidated-damages-in-construction-contracts/ 4/10
5/14/2020 What are Liquidated Damages in Construction Contracts - Sihela Consultants
For example, if the liquidated damages per day is $ 2000 and if the
contractor’s substantial completion is 7 days delay then the employer is
entitled to recover $14,000 as Liquidated Damages from the contractor.
However the contractor still need to complete the project to the
satisfaction of Employer and Engineer/Architect
This allows contractor to complete the work scope without any delay.
However the contractor should apply in writing following the clauses in
contract agreement when he finds the grounds for EOT claims.
Benefits of Liquidated
Damages in Construction
Contracts
Sometimes contractors think that LD imposed on them doesn’t have any
advantage.However Liquidated Damages clause serves many benefits to
the parties to the contract.
However if the delay of the project is due to a reason that is beyond the
contractor, he can claim EOT. Sometimes these reasons and scenario can
create environment for disputes.
In the event that the delay is due to sub contracted work and if Liquidated
Damages are mentioned in your sub-contractor agreement, then you can
recover some part of liquidated damages from the sub-contractor
depending on the project and contractual situation.
In this way you can recover part of your LD from the sub contractor who
created the delay.However this should be according to your contract.
Related posts:
About Author
Amila Gamage
A well experienced Contracts Engineer/
Trainer/ Quantity Surveyor with over 16
years of industry experience in both high rise
buildings and civil engineering projects.
Comments
Ali Reply
April 9, 2020 at 3:39 am
https://sihelaconsultants.com/liquidated-damages-in-construction-contracts/ 8/10
5/14/2020 What are Liquidated Damages in Construction Contracts - Sihela Consultants
Leave a Reply
Your email address will not be published. Required fields are marked *
Comment*
Name* Email*
Website
Save my name, email, and website in this browser for the next time I
comment.
POST COMMENT
https://sihelaconsultants.com/liquidated-damages-in-construction-contracts/ 10/10