0% found this document useful (0 votes)
88 views

CHECK LIST FOR Plaster

This checklist outlines key steps to complete before plastering a building, including completing electrical and plumbing lines, ensuring proper hacking and ghadai of concrete surfaces, addressing any leaks, installing window sills and frames properly, watering surfaces the day before, installing level pads and farmas for mixing mortar, attaching chicken mesh at joins, and ensuring the floor is clean before plastering. The site engineer and project engineer must both sign off to confirm all items are addressed before plastering can begin.

Uploaded by

Bipin Sarode
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views

CHECK LIST FOR Plaster

This checklist outlines key steps to complete before plastering a building, including completing electrical and plumbing lines, ensuring proper hacking and ghadai of concrete surfaces, addressing any leaks, installing window sills and frames properly, watering surfaces the day before, installing level pads and farmas for mixing mortar, attaching chicken mesh at joins, and ensuring the floor is clean before plastering. The site engineer and project engineer must both sign off to confirm all items are addressed before plastering can begin.

Uploaded by

Bipin Sarode
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CHECK LIST FOR PLASTER

Project: Building Name: Location :

1 Completion of concealed electrical/plumbing lines  


2 Adequate hacking on all RCC surface.  
3 Ghadai [cutting of bulges] of RCC [if any].  
4 Leakages if any [toilets/wc] attended.  
5 Window sill completed.  
6 Window plumb & level checked. +  

7 Verticality of window/door frames.  


8 Watering (Tarai) is done on day before.  
9 Fixing level pads [Dhadas] in plumb.  
10 Availability of Farmas for mortar mixing.  
11 Concrete nails to door hold fasts on colomns side..  
12 Fixing Chicken mesh at RCC/masonry joins.  
13 Availability of mortar trays [optional].
14 Changes [Alterations] if any completed.
15 Fan hooks on ceiling in position.
16 Junctions boxed temporarily sealed.
17 Whether floor is clean before plaster.

O.K. Comments, if any:

Name & Signature Name & Signature

Site Engineer Project Engineer

You might also like