Tower Schedule for Estimation of Lines under 13th PLAN
Tower Quantity for proposed 220kV D/C KTPP-Patratu (Route
1 Type length of 95KM approx.)
A+0 100
A+3 36
A+6 36
S+0 21
S+3 11
S+6 10
B+0 15
B+3 6
220 KV
B+6 6
D/C Type
C+0 30
C+3 10
C+6 15
C+12 9
D+6 3
LXC 2
220KV GANTRY 10.5M 6
Total 316
132KV D/C LILO of existing 132KV DTPS - Jamuria line at proposed
2 Type 132KV DSTPS syard (Route Length of 1 KM approx)
220 KV M/C C +0 2
220 KV M/C C +3 1
220 KV M/C C +6 1
132KV D/C D+0 1
132KV D/C D+3 1
Total 6
220KV S/C LILO of proposed 220KV Ramgarh - Jindal line to 220KV
3 Type proposed Patratu S/s (Route Length 7KM approx.)
A+3 3
B+3 5
C+0 5
C+3 5
220 KV C+6
D/C Type 3
C+12 4
D+0 1
D+3 2
LXC 2
220KV GANTRY 10.5M 2
Total 32
220KV S/C LILO of 220KV MTPS-Durgapur line to Barjora SS S/s
4 Type (Route Length 4KM approx.)
S+6 2
B+6 2
C+0 2
220 KV
C+3 2
D/C Type
C+6 4
D+0 2
D+6 1
Total 15
220KV D/C LILO of 220KV CTPS-Kalyaneswari line to RTPS S/yard
5 Type (Route Length 6KM approx.)
220 KV C+3 4
D/C Type D+0 4
C+0 3
220KV
C+3 3
M/C Type
C+6 4
220KV GANTRY 10.5M 8
Total 26
Shifting of 220KV D/C MTPS - Barjora Line from MTPS - A to MTPS -B
6 Type Switchyard (Route Length 11 KM approx.)
A+6 2
S+6 3
B+6 7
C+0 1
220 KV
C+3 2
D/C Type
C+6 4
C+12 4
D+6 4
LXC 3
A+6 3
B+6 3
220KV
C+0 2
M/C Type
C+3 3
C+6 3
Total 44