LOAD-GENERATION BALANCE REPORT
Maximum Load/Demand till Date
Date: November 20, 2019 Date Time Load(MW)
Hours: 19:00 Hours 27-Dec-18 18:18hrs 399.35MW
Sl. No. Hydropower Plant Unit MW Name of Feeders Load (MW) Sign Remarks
Unit- I 99.78 400kV THP - Siliguri Fdr- I 111.68 +
Unit- II 120.81 400kV THP - Siliguri Fdr- II 0.00
Unit- III 0.00 400kV THP - Siliguri Fdr- IV 106.63 + Unit-III at standby.
Unit- IV 0.00 400kV THP - Malbase Fdr- III 162.80 + Unit-IV & V under shutdown.
1 1020MW THP
Unit- V 0.00 400kV Malbase - Siliguri 92.56 + 400kV THP_SILI II under
Unit- VI 168.98 - - - Maintenace.
Error at Station/Auxiliary
Total 389.57 8.46
Consumption/Losses
Unit-I 0.00 400kV MHP - Jigmeling Fdr - I 90.20 +
Unit-II 0.00 400kV MHP - Jigmeling Fdr - II 86.50 +
Unit-III 178.95 400kV MHP - Jigmeling Fdr - III 0.00
Unit-I & IV under
Unit-IV 0.00 400kV MHP - Jigmeling Fdr - IV 0.00
2 720MW MHP Maintenance.
- - 200MVA, 400/132kV ICT 0.00
Unit-II at standby.
- - (Local Load) 0.00
Error at Station/Auxiliary
Total 178.95 2.25
Consumption/Losses
Unit- I 0.00 220kV CHP - Birpara Fdr- I 23.45 +
Unit- II 0.00 220kV CHP - Birpara Fdr- II 23.31 +
Unit- III 85.61 220kV CHP - Malbase Fdr- III 74.76 +
Unit- IV 89.61 220kV CHP - Semtokha Fdr- IV 32.94 +
- - 220kV Malbase - Birpara Fdr. -18.63 -
2 336MW CHP
- - 66kV CHP - Chumdo Fdr. 13.85 + Unit-I & II under shutdown
- - 66kV CHP - Gedu Fdr. 4.84 +
- - 3x3MVA, 66/11kV TFR 1.63 +
Error at Station/Auxiliary
Total 175.22 0.44
Consumption/Losses
Unit- I 5.55 220kV BHP - Semtokha Fdr. 22.82 +
24MW BHP (U/S) Unit- II 5.55 66kV BHP - Lobeysa Fdr. 17.20 +
Total 11.10 220kV BHP - Tsirang Fdr. -6.89 -
3 Unit- I 11.56 5MVA, 66/11kV TFR 0.68 +
Unit- II 11.08 30MVA ICT, 220/66kV
40MW BHP (L/S)
Error at Station/Auxiliary
Total 22.64 0.07
Consumption/Losses
Unit-I 34.88 220kV DHPC - Tsirang Fdr. 34.64 +
Unit-II 0.00 220kV Jigmeling - Dagapela Fdr.
4 126MW DHPC - - 5MVA, 220/33kV TFR Unit II at Standby
Error at Station/Auxiliary
Total 34.88 0.24
Consumption/Losses
Unit- I 12.61 132kV KHP - Nangkhor Fdr- I 28.26 +
Unit-II 0.00 132kV KHP - Kilikhar Fdr- II 7.27 +
Unit- III 12.60 5MVA, 132/11kV TFR 0.50 +
Unit- IV 10.15 132kV Gelephu - Salakati Fdr. -7.55 -
5 60MW KHP Unit-II shutdown
- - 132kV Motanga - Rangia Fdr. 10.50 +
- - 220kV Tsirang - Jigmeling 24.83 +
Error at Station/Auxiliary
Total 35.36 -0.67
Consumption/Losses
Note: Load summary on November 20, 2019 at 19:00hrs.
Total Generation Total Load [Generation - Total Load [Feeder
Sl. No Region Total Export/Import Load Balance
(MW) Export (MW)] Summation (MW)]
1 Western Grid 633.41 269.58 260.51 339.00 9.07
2 Eastern Grid 214.31 59.49 57.91 179.65 1.58
Total 847.72 329.07 318.42 518.65 10.65
Note: Load Summary on November 20, 2018 at 19:00hrs
19:00Hrs Load
Sl. No Region Day Peak Load (MW) Month Peak Load (MW)
(MW)
1 Western Grid 284.42 284.42 281.60
2 Eastern Grid 45.20 48.32 62.24
National 329.62 332.74 343.84
NOTES:
1. The Instantaneous load balance is calculated as (Total generation - (Total export-Import ) - Total domestic load) do not tend towards zero. This could be due to the following reasons:
i) Not all the meters are digital and nor are all the meter at all locations can be read at same time (say 9:00hrs) due to many meter to be read manually.
ii) The clocks of all the locations are not synchronized.
2. This report is generated to give an idea of the generation & load flow for the system at a particular instant.
LOAD-GENERATION BALANCE REPORT
Maximum Load/Demand till Date
Date: November 21, 2019 Date Time Load(MW)
Hours: 09:00 Hours 27-Dec-18 18:18hrs 399.35MW
Sl. No. Hydropower Plant Unit MW Name of Feeders Load (MW) Sign Remarks
Unit- I 100.03 400kV THP - Siliguri Fdr- I 81.44 +
Unit- II 97.99 400kV THP - Siliguri Fdr- II 0.00
Unit- III 0.00 400kV THP - Siliguri Fdr- IV 77.25 + Unit-III at standby.
Unit- IV 0.00 400kV THP - Malbase Fdr- III 114.66 + Unit-IV & V under shutdown.
1 1020MW THP
Unit- V 0.00 400kV Malbase - Siliguri 70.03 + 400kV THP_SILI-II under
Unit- VI 80.95 - - - Maintenace.
Error at Station/Auxiliary
Total 278.97 5.62
Consumption/Losses
Unit-I 0.00 400kV MHP - Jigmeling Fdr - I 88.70 +
Unit-II 0.00 400kV MHP - Jigmeling Fdr - II 88.70 +
Unit-III 180.02 400kV MHP - Jigmeling Fdr - III 0.00
Unit-I & IV under
Unit-IV 0.00 400kV MHP - Jigmeling Fdr - IV 0.00
2 720MW MHP Maintenance.
- - 200MVA, 400/132kV ICT 0.00
Unit-II at standby.
- - (Local Load)
Error at Station/Auxiliary
Total 180.02 2.62
Consumption/Losses
Unit- I 0.00 220kV CHP - Birpara Fdr- I 20.23 +
Unit- II 0.00 220kV CHP - Birpara Fdr- II 20.16 +
Unit- III 75.57 220kV CHP - Malbase Fdr- III 88.46 +
Unit- IV 69.53 220kV CHP - Semtokha Fdr- IV 1.47 -
- - 220kV Malbase - Birpara Fdr. -34.40 -
3 336MW CHP Unit-I & II under shutdownn.
- - 66kV CHP - Chumdo Fdr. 8.57 +
- - 66kV CHP - Gedu Fdr. 5.40 +
- - 3x3MVA, 66/11kV TFR 0.95 +
Error at Station/Auxiliary
Total 145.10 -0.14
Consumption/Losses
Unit- I 5.50 220kV BHP - Semtokha Fdr. 40.59 +
24MW BHP (U/S) Unit- II 5.50 66kV BHP - Lobeysa Fdr. 14.64 +
Total 11.00 220kV BHP - Tsirang Fdr. -22.35 -
4 Unit- I 11.46 5MVA, 66/11kV TFR 0.43 +
Unit- II 10.93 30MVA ICT, 220/66kV
40MW BHP (L/S)
Error at Station/Auxiliary
Total 22.39 0.08
Consumption/Losses
Unit-I 35.40 220kV DHPC - Tsirang Fdr. 35.18 +
Unit-II 0.00 220kV Jigmeling - Dagapela Fdr.
5 126MW DHPC - - 5MVA, 220/33kV TFR Unit-II at Standby
Error at Station/Auxiliary
Total 35.40 0.22
Consumption/Losses
Unit- I 12.30 132kV KHP - Nangkhor Fdr- I 28.11 +
Unit-II 0.00 132kV KHP - Kilikhar Fdr- II 4.08 +
Unit- III 10.10 5MVA, 132/11kV TFR 0.50 +
Unit- IV 10.40 132kV Gelephu - Salakati Fdr. -4.90 -
6 60MW KHP Unit-II under shutdown
- - 132kV Motanga - Rangia Fdr. 11.39 +
- - 220kV Tsirang - Jigmeling 10.68 +
Error at Station/Auxiliary
Total 32.80 0.11
Consumption/Losses
Note: Load summary on November 21, 2019 at 09:00hrs.
Total Generation Total Load [Generation - Total Load [Feeder
Sl. No Region Total Export/Import Load Balance
(MW) Export (MW)] Summation (MW)]
1 Western Grid 492.86 247.47 241.69 234.71 5.78
2 Eastern Grid 212.82 39.61 36.88 183.89 2.73
Total 705.68 287.08 278.57 418.60 8.51
Note: Load Summary on November 21, 2018 at 09:00hrs
09:00Hrs Load
Sl. No Region Day Peak Load (MW) Month Peak Load (MW)
(MW)
1 Western Grid 266.71 266.71 293.93
2 Eastern Grid 34.03 54.81 62.30
National 300.74 321.52 356.23
NOTES:
1. The Instantaneous load balance is calculated as (Total generation - (Total export-Import ) - Total domestic load) do not tend towards zero. This could be due to the following reasons:
i) Not all the meters are digital and nor are all the meter at all locations can be read at same time (say 9:00hrs) due to many meter to be read manually.
ii) The clocks of all the locations are not synchronized.
2. This report is generated to give an idea of the generation & load flow for the system at a particular instant.