Sl. No. Hydropower Plant Unit MW Load (MW) Sign Remarks Name of Feeders

1. The document provides a load-generation balance report for November 20, 2019 at 19:00 hours. 2. It details the generation from various hydropower plants across Western and Eastern grids totaling 847.72MW of total generation. 3. The total load on the Western grid was 269.58MW with 339MW of export. The total load on the Eastern grid was 59.49MW with 179.65MW of export. The overall load balance showed a surplus of 10.65MW.

Uploaded by

Kinley Rabgay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views2 pages

Sl. No. Hydropower Plant Unit MW Load (MW) Sign Remarks Name of Feeders

1. The document provides a load-generation balance report for November 20, 2019 at 19:00 hours. 2. It details the generation from various hydropower plants across Western and Eastern grids totaling 847.72MW of total generation. 3. The total load on the Western grid was 269.58MW with 339MW of export. The total load on the Eastern grid was 59.49MW with 179.65MW of export. The overall load balance showed a surplus of 10.65MW.

Uploaded by

Kinley Rabgay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

LOAD-GENERATION BALANCE REPORT

Maximum Load/Demand till Date

Date: November 20, 2019 Date Time Load(MW)


Hours: 19:00 Hours 27-Dec-18 18:18hrs 399.35MW

Sl. No. Hydropower Plant Unit MW Name of Feeders Load (MW) Sign Remarks
Unit- I 99.78 400kV THP - Siliguri Fdr- I 111.68 +
Unit- II 120.81 400kV THP - Siliguri Fdr- II 0.00
Unit- III 0.00 400kV THP - Siliguri Fdr- IV 106.63 + Unit-III at standby.
Unit- IV 0.00 400kV THP - Malbase Fdr- III 162.80 + Unit-IV & V under shutdown.
1 1020MW THP
Unit- V 0.00 400kV Malbase - Siliguri 92.56 + 400kV THP_SILI II under
Unit- VI 168.98 - - - Maintenace.
Error at Station/Auxiliary
Total 389.57 8.46
Consumption/Losses
Unit-I 0.00 400kV MHP - Jigmeling Fdr - I 90.20 +
Unit-II 0.00 400kV MHP - Jigmeling Fdr - II 86.50 +
Unit-III 178.95 400kV MHP - Jigmeling Fdr - III 0.00
Unit-I & IV under
Unit-IV 0.00 400kV MHP - Jigmeling Fdr - IV 0.00
2 720MW MHP Maintenance.
- - 200MVA, 400/132kV ICT 0.00
Unit-II at standby.
- - (Local Load) 0.00
Error at Station/Auxiliary
Total 178.95 2.25
Consumption/Losses
Unit- I 0.00 220kV CHP - Birpara Fdr- I 23.45 +
Unit- II 0.00 220kV CHP - Birpara Fdr- II 23.31 +
Unit- III 85.61 220kV CHP - Malbase Fdr- III 74.76 +
Unit- IV 89.61 220kV CHP - Semtokha Fdr- IV 32.94 +
- - 220kV Malbase - Birpara Fdr. -18.63 -
2 336MW CHP
- - 66kV CHP - Chumdo Fdr. 13.85 + Unit-I & II under shutdown
- - 66kV CHP - Gedu Fdr. 4.84 +
- - 3x3MVA, 66/11kV TFR 1.63 +
Error at Station/Auxiliary
Total 175.22 0.44
Consumption/Losses
Unit- I 5.55 220kV BHP - Semtokha Fdr. 22.82 +
24MW BHP (U/S) Unit- II 5.55 66kV BHP - Lobeysa Fdr. 17.20 +
Total 11.10 220kV BHP - Tsirang Fdr. -6.89 -
3 Unit- I 11.56 5MVA, 66/11kV TFR 0.68 +
Unit- II 11.08 30MVA ICT, 220/66kV
40MW BHP (L/S)
Error at Station/Auxiliary
Total 22.64 0.07
Consumption/Losses
Unit-I 34.88 220kV DHPC - Tsirang Fdr. 34.64 +
Unit-II 0.00 220kV Jigmeling - Dagapela Fdr.
4 126MW DHPC - - 5MVA, 220/33kV TFR Unit II at Standby
Error at Station/Auxiliary
Total 34.88 0.24
Consumption/Losses
Unit- I 12.61 132kV KHP - Nangkhor Fdr- I 28.26 +
Unit-II 0.00 132kV KHP - Kilikhar Fdr- II 7.27 +
Unit- III 12.60 5MVA, 132/11kV TFR 0.50 +
Unit- IV 10.15 132kV Gelephu - Salakati Fdr. -7.55 -
5 60MW KHP Unit-II shutdown
- - 132kV Motanga - Rangia Fdr. 10.50 +
- - 220kV Tsirang - Jigmeling 24.83 +
Error at Station/Auxiliary
Total 35.36 -0.67
Consumption/Losses

Note: Load summary on November 20, 2019 at 19:00hrs.

Total Generation Total Load [Generation - Total Load [Feeder


Sl. No Region Total Export/Import Load Balance
(MW) Export (MW)] Summation (MW)]
1 Western Grid 633.41 269.58 260.51 339.00 9.07
2 Eastern Grid 214.31 59.49 57.91 179.65 1.58
Total 847.72 329.07 318.42 518.65 10.65

Note: Load Summary on November 20, 2018 at 19:00hrs

19:00Hrs Load
Sl. No Region Day Peak Load (MW) Month Peak Load (MW)
(MW)
1 Western Grid 284.42 284.42 281.60
2 Eastern Grid 45.20 48.32 62.24
National 329.62 332.74 343.84
NOTES:

1. The Instantaneous load balance is calculated as (Total generation - (Total export-Import ) - Total domestic load) do not tend towards zero. This could be due to the following reasons:
i) Not all the meters are digital and nor are all the meter at all locations can be read at same time (say 9:00hrs) due to many meter to be read manually.
ii) The clocks of all the locations are not synchronized.
2. This report is generated to give an idea of the generation & load flow for the system at a particular instant.
LOAD-GENERATION BALANCE REPORT

Maximum Load/Demand till Date

Date: November 21, 2019 Date Time Load(MW)


Hours: 09:00 Hours 27-Dec-18 18:18hrs 399.35MW

Sl. No. Hydropower Plant Unit MW Name of Feeders Load (MW) Sign Remarks
Unit- I 100.03 400kV THP - Siliguri Fdr- I 81.44 +
Unit- II 97.99 400kV THP - Siliguri Fdr- II 0.00
Unit- III 0.00 400kV THP - Siliguri Fdr- IV 77.25 + Unit-III at standby.
Unit- IV 0.00 400kV THP - Malbase Fdr- III 114.66 + Unit-IV & V under shutdown.
1 1020MW THP
Unit- V 0.00 400kV Malbase - Siliguri 70.03 + 400kV THP_SILI-II under
Unit- VI 80.95 - - - Maintenace.
Error at Station/Auxiliary
Total 278.97 5.62
Consumption/Losses
Unit-I 0.00 400kV MHP - Jigmeling Fdr - I 88.70 +
Unit-II 0.00 400kV MHP - Jigmeling Fdr - II 88.70 +
Unit-III 180.02 400kV MHP - Jigmeling Fdr - III 0.00
Unit-I & IV under
Unit-IV 0.00 400kV MHP - Jigmeling Fdr - IV 0.00
2 720MW MHP Maintenance.
- - 200MVA, 400/132kV ICT 0.00
Unit-II at standby.
- - (Local Load)
Error at Station/Auxiliary
Total 180.02 2.62
Consumption/Losses
Unit- I 0.00 220kV CHP - Birpara Fdr- I 20.23 +
Unit- II 0.00 220kV CHP - Birpara Fdr- II 20.16 +
Unit- III 75.57 220kV CHP - Malbase Fdr- III 88.46 +
Unit- IV 69.53 220kV CHP - Semtokha Fdr- IV 1.47 -
- - 220kV Malbase - Birpara Fdr. -34.40 -
3 336MW CHP Unit-I & II under shutdownn.
- - 66kV CHP - Chumdo Fdr. 8.57 +
- - 66kV CHP - Gedu Fdr. 5.40 +
- - 3x3MVA, 66/11kV TFR 0.95 +
Error at Station/Auxiliary
Total 145.10 -0.14
Consumption/Losses
Unit- I 5.50 220kV BHP - Semtokha Fdr. 40.59 +
24MW BHP (U/S) Unit- II 5.50 66kV BHP - Lobeysa Fdr. 14.64 +
Total 11.00 220kV BHP - Tsirang Fdr. -22.35 -
4 Unit- I 11.46 5MVA, 66/11kV TFR 0.43 +
Unit- II 10.93 30MVA ICT, 220/66kV
40MW BHP (L/S)
Error at Station/Auxiliary
Total 22.39 0.08
Consumption/Losses
Unit-I 35.40 220kV DHPC - Tsirang Fdr. 35.18 +
Unit-II 0.00 220kV Jigmeling - Dagapela Fdr.
5 126MW DHPC - - 5MVA, 220/33kV TFR Unit-II at Standby
Error at Station/Auxiliary
Total 35.40 0.22
Consumption/Losses
Unit- I 12.30 132kV KHP - Nangkhor Fdr- I 28.11 +
Unit-II 0.00 132kV KHP - Kilikhar Fdr- II 4.08 +
Unit- III 10.10 5MVA, 132/11kV TFR 0.50 +
Unit- IV 10.40 132kV Gelephu - Salakati Fdr. -4.90 -
6 60MW KHP Unit-II under shutdown
- - 132kV Motanga - Rangia Fdr. 11.39 +
- - 220kV Tsirang - Jigmeling 10.68 +
Error at Station/Auxiliary
Total 32.80 0.11
Consumption/Losses

Note: Load summary on November 21, 2019 at 09:00hrs.

Total Generation Total Load [Generation - Total Load [Feeder


Sl. No Region Total Export/Import Load Balance
(MW) Export (MW)] Summation (MW)]
1 Western Grid 492.86 247.47 241.69 234.71 5.78
2 Eastern Grid 212.82 39.61 36.88 183.89 2.73
Total 705.68 287.08 278.57 418.60 8.51

Note: Load Summary on November 21, 2018 at 09:00hrs

09:00Hrs Load
Sl. No Region Day Peak Load (MW) Month Peak Load (MW)
(MW)
1 Western Grid 266.71 266.71 293.93
2 Eastern Grid 34.03 54.81 62.30
National 300.74 321.52 356.23
NOTES:

1. The Instantaneous load balance is calculated as (Total generation - (Total export-Import ) - Total domestic load) do not tend towards zero. This could be due to the following reasons:
i) Not all the meters are digital and nor are all the meter at all locations can be read at same time (say 9:00hrs) due to many meter to be read manually.
ii) The clocks of all the locations are not synchronized.
2. This report is generated to give an idea of the generation & load flow for the system at a particular instant.