Uemc-F-Tw 033 Rev 0

The document appears to be a test certificate for trackwork on an electrified double track project between Rawang and Ipoh in Malaysia. It contains inspection details like chainages, curves, and test specifications for things like super elevation, versine, gauge, cross level, vertical alignment, and lateral alignment. The test results are recorded and the certificate requires signatures from the supervising consultant and contractor.

Uploaded by

TAMIL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
100 views1 page

Uemc-F-Tw 033 Rev 0

The document appears to be a test certificate for trackwork on an electrified double track project between Rawang and Ipoh in Malaysia. It contains inspection details like chainages, curves, and test specifications for things like super elevation, versine, gauge, cross level, vertical alignment, and lateral alignment. The test results are recorded and the certificate requires signatures from the supervising consultant and contractor.

Uploaded by

TAMIL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

ELECTRIFIED DOUBLE TRACK PROJECT

BETWEEN
UEM CONSTRUCTION RAWANG AND IPOH (BALANCE OF WORKS)

TEST CERTIFICATE
Test Conducted For : TRACKWORK Form No
INSPECTION DETAIL FOR TRACKWORK
Serial No :
1. Location :_____________________________________ 5. Status of Test : 1st. _______ 2nd. _______ 3rd. _________
2. Offset :_____________________________________
3. Chainages : From_____________to_________________
4. Date of Laying :_____________________________________

CURVE CHAINAGE FROM CH. TO CH. STRAIGHT CHAINAGE FROM CH TO CH REMARKS


Curve No :
Radius :
Length of Transition BTC

ETC

Length of Circular Curve BCC

ECC

Length of Transition BTC

ETC

TEST SPEC. REQUIREMENT SITE RESULTS REMARKS


1. Super Elevation
2. Versine (@10 m Chord)
3. Difference in Versine
4. Difference in S. Elevation
5. Gauge
i) Static +2 -1
ii) Dynamic +3 -1
iii) Variation between +2 -2
adjacent sleeper
6. Cross Level
i) Static +1.5 -1.5
ii) Dynamic +3 -2
7. Vetical Alignment over 10m Chord
i) Static +2 -4
ii) Dynamic +3 -3
8. Laterval Alignment over 10m Chord
i) Static +2 -2
ii) Dynamic +4 -4
9. Twist (1.8m base & 3 measures/
25m intervals)
i) Static +1 mm/m
ii) Dynamic +2 mm/m
10. Sleeper Spacing 5mm

Supervising Consultant

Name : Signature : Date :

Contractor
Name : Signature : Date :

UEMC-F-TW033 Rev 0 Date: 01-06-05