0% found this document useful (0 votes)
102 views4 pages

Tender 007 4.5 CR

This document appears to be a bill of quantities for construction work. It includes 6 sections with various line items: 1) Provisional Sum, 2) General Works, 3) Blacktop works, 4) Shoulder Works, 5) Construction of Humepipe culvert RCC Box culvert and Brick masonari drain works, and 6) Construction of Gabion Retaining Wall. For each line item, it specifies the item description, unit, quantity, and space for the bidder to provide their unit rate and total amount. The document provides detailed information on the materials, quantities, and specifications for all components of the construction project.

Uploaded by

Ankit Yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views4 pages

Tender 007 4.5 CR

This document appears to be a bill of quantities for construction work. It includes 6 sections with various line items: 1) Provisional Sum, 2) General Works, 3) Blacktop works, 4) Shoulder Works, 5) Construction of Humepipe culvert RCC Box culvert and Brick masonari drain works, and 6) Construction of Gabion Retaining Wall. For each line item, it specifies the item description, unit, quantity, and space for the bidder to provide their unit rate and total amount. The document provides detailed information on the materials, quantities, and specifications for all components of the construction project.

Uploaded by

Ankit Yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Bill of Quantities

1 Provisional Sum
Procument Item Details

SL.
Item Description Unit Quantity Unit Rate(NPR) Amount(NPR)
No

1 Relocation of Public services (Electrical poles, Ps 1.0 200000.0 200,000.00


Irrigation canal, Water supply lines, Diversion at river,
etc)
2 General Works
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Insurance for loss or damage to works,
plants, material, equipment property,
1 Ls 1.0
personnel and for third party personnel
injury or death .
Maintain traffic flow either by
diversion or traffic control and provide
safety measures during working hours
2 LS 1.0
as instructed by the engineer.
(Flagman,traffic sign and diversion
etc.)
Provision for installation of sign-
3 boards with project/contract Nos. 2.0
information(1.8m x 1.2m)
3 Blacktop works
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Scarifying the existing road surface to
a depth of 50 mm and disposal of
1 scarified Material with in all lifts and m2 14500.0
lead as per Drawing and Technical
Specifications.
Construction of Embankment with
Material obtained from Borrow pits
Providing, laying, spreading and
2 m3 3420.0
compacting embankment with borrow
material as per Drawing and Technical
(Side cutting is not alloweded)
Providing and laying granular sub-
base on prepared surface, mixing at
3 OMC, and compacting to achieve the m3 2262.0
desired density, complete as per
Drawing and Technical Specifications.
Providing and laying Crusher Run
Macadam on a prepared surface,
spreading and mixing , watering and
4 m3 1631.25
compacting to form a layer of Base
course as as per Drawing and
Technical Specifications.
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Providing and applying prime coat
MC30/70 with Hot Bitumen (
including cutter) on prepared surface
5 of granular base including cleaning of lit 10875.0
road surface and spraying by
mechanical means as per Technical
Specification . By machine
Tack coat with Bitumen By
Mechanical Means Providing and
applying tack coat with hot Bitumen
6 at specified rate on the prepared non- lit 7832.9
bituminous surfaces including
cleaning as per Technical Speciation .
By Machine
Providing and laying Bituminous
concrete/ Asphalt using crushed
aggregates of specified grading,
7 premixed with bituminous binder and m3 429.2
filler as per Drawing and Technical
Specifications mechanical

Supplying and applying thermoplastic


road marking paint including cleaning,
8 m2 108.75
watering, brooming etc all complete.
(BS3262)
4 Shoulder Works
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Providing and laying granular sub-
base on prepared surface, mixing at
1 OMC, and compacting to achieve the m3 544.0
desired density, complete as per
Drawing and Technical Specifications.
Construction of Embankment with
Material obtained from Borrow pits
Providing, laying, spreading and
2 compacting embankment with borrow m3 928.0
material as per Drawing and Technical
for shoulder works.(Side cutting is not
alloweded)
5 Construction of Humepipe culvert RCC Box culvert and Brick masonari drain works
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Excavation for Structures Foundation
Earth work in excavation of
foundation of structures, including
construction of shoring and bracing,
1 m3 595.32
removal of stumps and other
deleterious matter and backfilling with
approved Material as per Drawing and
Technical Specifications.
One layear flat brick solling with sand
2 filling in joint , etc all complete as per m2 901.68
specification .
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Providing and laying of
Plain/Reinforced Cement Concrete
3 M15/40 in Foundation complete as m3 109.88
per Drawing and Technical
Specifications.
Providing and Laying Reinforced
Cement Concrete NP3 collar jointed
pipe for culverts including fixing
4 rm 30.0
collar with cement mortar 1:2 as per
Drawing and Technical Specification.
D) 900 mm internal Dia.
Providing and laying of
Plain/Reinforced cement concrete in
5 sub-structure complete as per drawing m3 133.82
and Technical Specifications RCC
Grade M 25 Height up to 5 m
Providing , Preparing and Installing
form work including necessary
supports and removing after
6 m2 773.72
completion for foundation and
footings. (Class F1 Finish) Using
timber (soft
Providing and laying , fitting and
placing un-coated Mild steel / HYSD
7 reinforcement complete in foundation ton. 10.26
as per drawing and technical
specification
Providing and Laying Brick masonary
work in (1:4) cement mortar in
foundation/ structure complete
8 m3 381.47
excluding pointing and plastering, as
per Drawing and Technical
specifications.
Back filling in layers in foundation
pits, trenches , etc, including
9 m3 365.7
compaction and watering etc.
complete, lead 10m.
6 Construction of Gabion Retaining Wall
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Earth work excavation in foundation
1 including shoring ,strutting, bracing, m3 75.0
and disposal etc all complete (905)
Supply and fabrication of different
sizes of gabion boxes/mattress
including rolling, cutting, placing,
stretching and filling with stone and
binding, all work complete including
2 m3 337.5
the cost of heavy zinc coated gabion
wires, mesh wire- 10 SWG, selvedge
wire- 8 SWG and binding wire 12
SWG, (2400) , Hexagonal mesh type
100mmx120 mm ( 2401)
Back filling in layers in foundation
pits, trenches, etc including
3 compaction and watering etc all m3 562.5
complete as standard specfication,
lead 10 mtr , depth upto 1.5-3 m
Total of Procument Items
Total Item Price

VAT

Grand Total