The document outlines the steps for house construction which includes excavation and site cleaning, laying of lean concrete and steel for foundation, formwork and concrete pouring for slabs and floors, formwork, steel laying, and concrete pouring for walls, and formwork, steel laying, and concrete pouring for the roof. Floor and wall finishing involves tiles, paint, and checks for smoothness. Labor and equipment rental is required at various stages.

Uploaded by

Yasi Eemo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
131 views1 page

WBS Assignment

The document outlines the steps for house construction which includes excavation and site cleaning, laying of lean concrete and steel for foundation, formwork and concrete pouring for slabs and floors, formwork, steel laying, and concrete pouring for walls, and formwork, steel laying, and concrete pouring for the roof. Floor and wall finishing involves tiles, paint, and checks for smoothness. Labor and equipment rental is required at various stages.

Uploaded by

Yasi Eemo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

EXCAVATION RENTING LABOR LINING OF SITE

EARTHWORK

SITE CLEANING

LEAN CONCRETE RENTING LABOR LINING OF SITE

STEEL INSPECTION

STEEL LAYING

ANTI RUST SPRAY

FOUNDATION OF BUILDING
ORDERING AND
FORMWORK RENTING LABOR
APPLYINGTHE FORMWORK

ORGANIZING AND
CONCRETE POURING LABOR RENT
POURING MIXTURE

BACKFILLING

SLAB FORMWORK

STEEL INSPECTION ANALYSIS OF RESULTS

STEEL LAYING

ANTI RUST SPRAY


FLOOR CONSTRUCTION

ORDERING AND
FORMWORK RENTING LABOR
APPLYINGTHE FORMWORK

HOUSE CONSTRUCTION ORGANIZING AND


CONCRETE POURING LABOR RENT
POURING MIXTURE

WALL FORMWORK

STEEL INSPECTION ANALYSIS OF RESULTS

STEEL LAYING

ANTI RUST SPRAY


WALL CONSTRUCTION

ORDERING AND
FORMWORK RENTING LABOR
APPLYINGTHE FORMWORK

ORGANIZING AND
CONCRETE POURING LABOR RENT
POURING MIXTURE

WALL FORMWORK

STEEL INSPECTION

STEEL LAYING

ANTI RUST SPRAY


ROOF CONSTRUCTION

ORDERING AND
FORMWORK RENTING LABOR
APPLYINGTHE FORMWORK

CONCRETE POURING

JOINTER

TILES

ADMIXTURE
FLOOR/WALL FINISHING
MATERIAL

SMOOTHNESS AND OTHER


PAINT RENTING LABOR
CHECK AFTER