UNCLASSIFIED
Exhibit P-40, Budget Line Item Justification: PB 2020 Army Date: March 2019
Appropriation / Budget Activity / Budget Sub Activity: P-1 Line Item Number / Title:
2032A: Missile Procurement, Army / BA 05: Support Equipment and Facilities / BSA 1242C93000 / Air Defense Targets
10: Support Equipment & Facilities
ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A
Line Item MDAP/MAIS Code: N/A
Prior FY 2020 FY 2020 FY 2020 To
Resource Summary Years FY 2018 FY 2019 Base OCO Total FY 2021 FY 2022 FY 2023 FY 2024 Complete Total
Procurement Quantity (Units in Each) 394 394 394 - 394 394 394 394 394 394 - 3,152
Gross/Weapon System Cost ($ in Millions) 435.358 5.728 6.417 - 10.593 10.593 6.807 6.749 6.884 7.002 - 485.538
Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - -
Net Procurement (P-1) ($ in Millions) 435.358 5.728 6.417 - 10.593 10.593 6.807 6.749 6.884 7.002 - 485.538
Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - -
Total Obligation Authority ($ in Millions) 435.358 5.728 6.417 - 10.593 10.593 6.807 6.749 6.884 7.002 - 485.538
(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)
Initial Spares ($ in Millions) - - - - - - - - - - - -
Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - -
Gross/Weapon System Unit Cost ($ in Thousands) 1,104.970 14.538 16.287 - 26.886 26.886 17.277 17.129 17.472 17.772 - 154.041
Description:
FY 2020 funding totals include $0.0M for Base and $10.593M for Overseas Contingency Operations (OCO); of which $10.593M and 394 quantity is realigned as part of the OCO for Base Requirements. FY 2020
OCO for Base Requirements is OCO funding for base budget requirements in support of the National Defense Strategy. The Budget requests these funds in OCO to comply with the base budget defense caps
included in the Budget Control Act of 2011.
Air Defense Artillery (ADA) Targets program procures target hardware and associated training services to include scoring, payload, and ground support equipment to enable Air Defense Artillery Soldiers
and units to conduct required training. This training consists of Department of the Army Pamphlet (DA PAM) 350-38 (Standards in Training Commission) required gunnery tables and aerial target tracking,
training, and scoring. Target systems are also available to support collective training exercises and Force Development Testing and Experimentation (FDT&E) investigations of engagement techniques for small
unmanned aircraft systems.
FY 2020 FY 2020 FY 2020
Secondary Distribution FY 2018 FY 2019 Base OCO Total FY 2021 FY 2022 FY 2023 FY 2024
Army Quantity 394 394 0 394 394 394 394 394 394
Total Obligation Authority 5.728 6.417 0.000 10.593 10.593 6.807 6.749 6.884 7.002
Total: Quantity 394 394 0 394 394 394 394 394 394
Secondary Distribution Total Obligation Authority 5.728 6.417 - 10.593 10.593 6.807 6.749 6.884 7.002
LI 1242C93000 - Air Defense Targets UNCLASSIFIED
199
Army Page 1 of 6 P-1 Line #25
UNCLASSIFIED
Exhibit P-40, Budget Line Item Justification: PB 2020 Army Date: March 2019
Appropriation / Budget Activity / Budget Sub Activity: P-1 Line Item Number / Title:
2032A: Missile Procurement, Army / BA 05: Support Equipment and Facilities / BSA 1242C93000 / Air Defense Targets
10: Support Equipment & Facilities
ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A
Line Item MDAP/MAIS Code: N/A
Exhibits Schedule Prior Years FY 2018 FY 2019 FY 2020 Base FY 2020 OCO FY 2020 Total
MDAP/
Exhibit ID MAIS Quantity / Total Cost Quantity / Total Cost Quantity / Total Cost Quantity / Total Cost Quantity / Total Cost Quantity / Total Cost
Type Title* Subexhibits CD Code (Each) / ($ M) (Each) / ($ M) (Each) / ($ M) (Each) / ($ M) (Each) / ($ M) (Each) / ($ M)
P-5 C93000 / Air Defense Targets P-5a 394 / 435.358 394 / 5.728 394 / 6.417 - / - 394 / 10.593 394 / 10.593
P-40 Total Gross/Weapon System Cost 394 / 435.358 394 / 5.728 394 / 6.417 - / - 394 / 10.593 394 / 10.593
*Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications.
Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding.
Justification:
FY 2020 Base procurement dollars in the amount of $10.593 million supports Air Defense Artillery Targets and scoring, payload, and ground support equipment for training required in DA PAM 350-38, Standards
in Training Commission (STRAC). These items support gunnery tables, aerial target tracking (Captive Flight Trainer (CFT) and Tracking Head Trainer (THT) 5.56) training, Missile Live Fire training when missiles
are allocated in accordance with (IAW) the Missile Distribution Plan, and U.S. Army Avenger systems worldwide. Training requirements are generated by Department of the Army Major Field Commands, Training
Centers, Division Level Commands, and real world mission rehearsals. These field requirements have been reviewed and validated against ongoing force restructuring and are consistent with the approved
training doctrine. These targets are necessary to meet Army Regulation 220-1 (Unit Status Reporting) training requirements, training strategies and gunnery standards, and soldier qualification in support of
unit readiness. Funding is also resourced for the implementation of Microsoft Windows 10 operating system (OS) upgrades on all Ground Control Stations as directed by Deputy Secretary Of Defense memo to
strengthen the Department's cyber security posture.
In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland
defense missions, domestic emergency responses, and providing military support to civil authorities.
LI 1242C93000 - Air Defense Targets UNCLASSIFIED
200
Army Page 2 of 6 P-1 Line #25
UNCLASSIFIED
Exhibit P-5, Cost Analysis: PB 2020 Army Date: March 2019
Appropriation / Budget Activity / Budget Sub Activity: P-1 Line Item Number / Title: Item Number / Title [DODIC]:
2032A / 05 / 10 1242C93000 / Air Defense Targets C93000 / Air Defense Targets
ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code:
Resource Summary Prior Years FY 2018 FY 2019 FY 2020 Base FY 2020 OCO FY 2020 Total
Procurement Quantity (Units in Each) 394 394 394 - 394 394
Gross/Weapon System Cost ($ in Millions) 435.358 5.728 6.417 - 10.593 10.593
Less PY Advance Procurement ($ in Millions) - - - - - -
Net Procurement (P-1) ($ in Millions) 435.358 5.728 6.417 - 10.593 10.593
Plus CY Advance Procurement ($ in Millions) - - - - - -
Total Obligation Authority ($ in Millions) 435.358 5.728 6.417 - 10.593 10.593
(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)
Initial Spares ($ in Millions) - - - - - -
Gross/Weapon System Unit Cost ($ in Thousands) 1,104.970 14.538 16.287 - 26.886 26.886
Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding.
Prior Years FY 2018 FY 2019 FY 2020 Base FY 2020 OCO FY 2020 Total
Total Total Total Total Total Total
Unit Cost Qty Cost Unit Cost Qty Cost Unit Cost Qty Cost Unit Cost Qty Cost Unit Cost Qty Cost Unit Cost Qty Cost
Cost Elements ($ K) (Each) ($ M) ($ K) (Each) ($ M) ($ K) (Each) ($ M) ($ K) (Each) ($ M) ($ K) (Each) ($ M) ($ K) (Each) ($ M)
Flyaway Cost
Recurring Cost
Remotely Piloted
Vehicle Target 1,095.387 395 432.678 5.992 394 2.361 6.756 394 2.662 - - - 6.962 394 2.743 6.962 394 2.743
(†)
(RPVT)
(†) 0.269 394 0.106 0.284 394 0.112 0.322 394 0.127 - - - 0.332 394 0.131 0.332 394 0.131
Infrared Kit Payload
(†) 27.333 3 0.082 27.250 4 0.109 30.000 4 0.120 - - - 31.000 5 0.155 31.000 5 0.155
Launcher
Manual Navigation
(†) - - - 10.429 14 0.146 11.857 14 0.166 - - - 12.214 14 0.171 12.214 14 0.171
GCS
BVR Navigation
(†) - - - 27.000 4 0.108 30.750 4 0.123 - - - 31.750 4 0.127 31.750 4 0.127
GCS
(†) 12.063 32 0.386 12.063 16 0.193 13.700 20 0.274 - - - 14.100 20 0.282 14.100 20 0.282
BVR Payload
Acoustic Scoring
(†) 13.385 26 0.348 13.792 24 0.331 13.393 28 0.375 - - - 13.786 28 0.386 13.786 28 0.386
Payload
Acoustic Scoring
(†) - - - 43.000 8 0.344 47.778 9 0.430 - - - 49.222 9 0.443 49.222 9 0.443
GCS
Radar Scoring
(†) - - - 16.900 20 0.338 18.750 20 0.375 - - - 19.300 20 0.386 19.300 20 0.386
Payload
(†) - - - - - - 17.000 1 0.017 - - - 18.000 1 0.018 18.000 1 0.018
Radar Scoring GCS
RPVT Lighting Kit
(†) 0.294 34 0.010 0.273 22 0.006 0.323 31 0.010 - - - 0.323 31 0.010 0.323 31 0.010
Payload
Program Management
1,579.000 1 1.579 1,597.000 1 1.597 1,646.000 1 1.646 - - - 1,815.000 1 1.815 1,815.000 1 1.815
Support
LI 1242C93000 - Air Defense Targets UNCLASSIFIED
201
Army Page 3 of 6 P-1 Line #25
UNCLASSIFIED
Exhibit P-5, Cost Analysis: PB 2020 Army Date: March 2019
Appropriation / Budget Activity / Budget Sub Activity: P-1 Line Item Number / Title: Item Number / Title [DODIC]:
2032A / 05 / 10 1242C93000 / Air Defense Targets C93000 / Air Defense Targets
ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code:
Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding.
Prior Years FY 2018 FY 2019 FY 2020 Base FY 2020 OCO FY 2020 Total
Total Total Total Total Total Total
Unit Cost Qty Cost Unit Cost Qty Cost Unit Cost Qty Cost Unit Cost Qty Cost Unit Cost Qty Cost Unit Cost Qty Cost
Cost Elements ($ K) (Each) ($ M) ($ K) (Each) ($ M) ($ K) (Each) ($ M) ($ K) (Each) ($ M) ($ K) (Each) ($ M) ($ K) (Each) ($ M)
Smoke Generator
(†) 0.400 15 0.006 0.421 19 0.008 0.474 19 0.009 - - - - - - - - -
Payload
Over the Horizon BVR
(†) 27.167 6 0.163 19.000 4 0.076 20.750 4 0.083 - - - - - - - - -
Payload
Subtotal: Recurring Cost - - 435.358 - - 5.729 - - 6.417 - - 0.000 - - 6.667 - - 6.667
Subtotal: Flyaway Cost - - 435.358 - - 5.729 - - 6.417 - - 0.000 - - 6.667 - - 6.667
Software Cost
Recurring Cost
Technical Refresh -
- - - - - - - - - - - - 3,926.000 1 3.926 3,926.000 1 3.926
Windows OS Update
Subtotal: Recurring Cost - - - - - - - - - - - 0.000 - - 3.926 - - 3.926
Subtotal: Software Cost - - - - - - - - - - - 0.000 - - 3.926 - - 3.926
Gross/Weapon System
1,104.970 394 435.358 14.538 394 5.728 16.287 394 6.417 - - - 26.886 394 10.593 26.886 394 10.593
Cost
Remarks:
FY 2020 increase in unit cost for Windows Operating System upgrade, which is necessary to maintain the system's authority to operate.
FY 2020 FY 2020 FY 2020
Secondary Distribution FY 2018 FY 2019 Base OCO Total
Army Quantity 394 394 0 394 394
Total Obligation Authority 5.728 6.417 0.000 10.593 10.593
Total: Quantity 394 394 - 394 394
Secondary Distribution
Total Obligation Authority 5.728 6.417 - 10.593 10.593
(†)
indicates the presence of a P-5a
LI 1242C93000 - Air Defense Targets UNCLASSIFIED
202
Army Page 4 of 6 P-1 Line #25
UNCLASSIFIED
Exhibit P-5a, Procurement History and Planning: PB 2020 Army Date: March 2019
Appropriation / Budget Activity / Budget Sub Activity: P-1 Line Item Number / Title: Item Number / Title [DODIC]:
2032A / 05 / 10 1242C93000 / Air Defense Targets C93000 / Air Defense Targets
O Method/Type Date Specs Date
C or Award of First Qty Unit Cost Avail Revision RFP Issue
Cost Elements O FY Contractor and Location Funding Vehicle Location of PCO Date Delivery (Each) ($ K) Now? Available Date
Remotely Piloted Vehicle Target
2018 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2018 Jun 2018 394 5.992 Y
(RPVT)
Remotely Piloted Vehicle Target
2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 394 6.756 Y
(RPVT)
Remotely Piloted Vehicle Target
✓ 2020 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2020 Jun 2020 394 6.962 Y
(RPVT)
Infrared Kit Payload 2018 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2018 Jun 2018 394 0.284 Y
Infrared Kit Payload 2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 394 0.322 Y
Infrared Kit Payload ✓ 2020 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2020 Jun 2020 394 0.332 Y
Launcher 2018 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2018 Jun 2018 4 27.250 Y
Launcher 2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 4 30.000 Y
Launcher ✓ 2020 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2020 Jun 2020 5 31.000 Y
Manual Navigation GCS 2018 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2018 Jun 2018 14 10.429 Y
Manual Navigation GCS 2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 14 11.857 Y
Manual Navigation GCS ✓ 2020 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2020 Jun 2020 14 12.214 Y
BVR Navigation GCS 2018 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2018 Jun 2018 4 27.000 Y
BVR Navigation GCS 2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 4 30.750 Y
BVR Navigation GCS ✓ 2020 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2020 Jun 2020 4 31.750 Y
BVR Payload 2018 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2018 Jun 2018 16 12.063 Y
BVR Payload 2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 20 13.700 Y
BVR Payload ✓ 2020 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2020 Jun 2020 20 14.100 Y
Acoustic Scoring Payload 2018 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2018 Jun 2018 24 13.792 Y
Acoustic Scoring Payload 2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 28 13.393 Y
Acoustic Scoring Payload ✓ 2020 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2020 Jun 2020 28 13.786 Y
Acoustic Scoring GCS 2018 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2018 Jun 2018 8 43.000 Y
Acoustic Scoring GCS 2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 9 47.778 Y
Acoustic Scoring GCS ✓ 2020 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2020 Jun 2020 9 49.222 Y
Radar Scoring Payload 2018 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2018 Jun 2018 20 16.900 Y
Radar Scoring Payload 2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 20 18.750 Y
Radar Scoring Payload ✓ 2020 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2020 Jun 2020 20 19.300 Y
Radar Scoring GCS 2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 1 17.000 Y
Radar Scoring GCS ✓ 2020 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2020 Jun 2020 1 18.000 Y
RPVT Lighting Kit Payload 2018 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2018 Jun 2018 22 0.273 Y
RPVT Lighting Kit Payload 2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 31 0.323 Y
RPVT Lighting Kit Payload ✓ 2020 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2020 Jun 2020 31 0.323 Y
LI 1242C93000 - Air Defense Targets UNCLASSIFIED
203
Army Page 5 of 6 P-1 Line #25
UNCLASSIFIED
Exhibit P-5a, Procurement History and Planning: PB 2020 Army Date: March 2019
Appropriation / Budget Activity / Budget Sub Activity: P-1 Line Item Number / Title: Item Number / Title [DODIC]:
2032A / 05 / 10 1242C93000 / Air Defense Targets C93000 / Air Defense Targets
O Method/Type Date Specs Date
C or Award of First Qty Unit Cost Avail Revision RFP Issue
Cost Elements O FY Contractor and Location Funding Vehicle Location of PCO Date Delivery (Each) ($ K) Now? Available Date
Smoke Generator Payload 2018 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2018 Jun 2018 19 0.421 Y
Smoke Generator Payload 2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 19 0.474 Y
Over the Horizon BVR Payload 2018 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2018 Jun 2018 4 19.000 Y
Over the Horizon BVR Payload 2019 Griffon Aerospace Inc. / Madison, AL C / FFP AMCOM Mar 2019 Jun 2019 4 20.750 Y
LI 1242C93000 - Air Defense Targets UNCLASSIFIED
204
Army Page 6 of 6 P-1 Line #25