100% found this document useful (1 vote)
2K views2 pages

Technical Submittal Format

This document is a technical submittal for the construction of the main tunnel as part of the Zayed Road Network in Mina Zayed area. It was submitted by Voltas ltd to the Department of Transport and various other project entities such as the main contractor ITINERA/AGILITY JV, the engineer Bilfinger -Tebodin, and project management consultant Parsons. The submittal is for a road tunnel and pertains to Stage 1 of the larger Zayed Road Network project.

Uploaded by

rakeshamech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views2 pages

Technical Submittal Format

This document is a technical submittal for the construction of the main tunnel as part of the Zayed Road Network in Mina Zayed area. It was submitted by Voltas ltd to the Department of Transport and various other project entities such as the main contractor ITINERA/AGILITY JV, the engineer Bilfinger -Tebodin, and project management consultant Parsons. The submittal is for a road tunnel and pertains to Stage 1 of the larger Zayed Road Network project.

Uploaded by

rakeshamech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

TECHNICAL SUBMITTAL

For
XXXXXXXXXXXXX

Project : CONSTRUCTION OF ZAYED ROAD NETWORK IN MINA


ZAYED AREA - STAGE1- MAIN TUNNEL
Client : DEPARTMENT OF TRANSPORT
Employer : Musanada
Main Contractor : ITINERA/AGILITY JV
Contractor : Voltas ltd
Engineer : BILFINGER -TEBODIN
PMC : PARSONS
Revision : 00
Date :

You might also like