0% found this document useful (0 votes)
67 views1 page

Task Sheet 1.5-2

1. The document provides a procedure for setting the contact gap of a contact breaker in a conventional ignition system. It lists the necessary tools, materials and equipment which include hand tools, power tools, a voltmeter, feeler gauge, timing light, distributor test bench, and an actual vehicle. 2. The procedure involves removing the distributor assembly, pushing the vehicle to open the points, measuring the gap with a feeler gauge, adjusting the gap by loosening a fixing screw and sliding the assembly or using a screwdriver on an adjusting slot, oiling the pivot, rechecking the gap, and tightening the fixing screw. 3. Assessment of performing the procedure correctly will involve written and oral questioning

Uploaded by

Mario Tolo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views1 page

Task Sheet 1.5-2

1. The document provides a procedure for setting the contact gap of a contact breaker in a conventional ignition system. It lists the necessary tools, materials and equipment which include hand tools, power tools, a voltmeter, feeler gauge, timing light, distributor test bench, and an actual vehicle. 2. The procedure involves removing the distributor assembly, pushing the vehicle to open the points, measuring the gap with a feeler gauge, adjusting the gap by loosening a fixing screw and sliding the assembly or using a screwdriver on an adjusting slot, oiling the pivot, rechecking the gap, and tightening the fixing screw. 3. Assessment of performing the procedure correctly will involve written and oral questioning

Uploaded by

Mario Tolo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TASK SHEET 1.

5-2
Title: Procedure In Setting The Contact Gap of the Contact Breaker
Performance Objective: Given the ACTIVITY SHEET 1.5-2, you
should be able to perform procedure in
Setting The Contact Gap of the Contact
Breaker.
Supplies/Materials Equipment : Activity Sheet 1.5-1, Handtools
and Power tools, Testing equipment, Distributor assembly, ignition coil
and condenser, Actual vehicle equipped with conventional ignition
System

Steps/Procedure:
Procedure in removing the contact breaker point
1. Prepare the tools and materials needed in removing the contact
breaker point.
Tools and materials needed:
 Hand tools and Power tools,
 Voltmeter
 Feeler Gauge
 Timing light
 Distributor test bench
 Distributor assembly
 Ignition coil and condenser
 Actual vehicle equipped with conventional ignition System
2. Put the car in top gear and push it forwards a short distance until the
point open.
3. Place the correct size feeler-gauge blade between the points to measure
the gap.
4. Adjust the gap by freeing the fixing screw and sliding the entire
assembly.
5. Push the sliding type with a thin screwdriver blade rotating in its
adjusting slot, or just adjust the screw
6. Put a drop of light oil on the moving contact pivot.
7. Place the feeler gauge blade between the points, and a screwdriver
blade in the adjusting slots.
8. Tighten the fixing screw, then check that points gap remains the same.

Assessment Method:

Written - Oral Questioning


Performance Criteria checklist

You might also like