Section Iii-2.0-Tec - 2.1-Offshore Epc Projects Successfully Completed in Nig. in The Last 7 Years

Uploaded by

Edo-Abasi Ekere
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views2 pages

Section Iii-2.0-Tec - 2.1-Offshore Epc Projects Successfully Completed in Nig. in The Last 7 Years

Uploaded by

Edo-Abasi Ekere
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DETAILS OF PREVIOUS EXPERIENCE WITHIN THE PAST SEVEN (7) YEARS IN NIGERIA

YEAR NAME OF CLIENT NAME/LOCATION/TYPE OF SCOPE OF WORK CONTRACT VALUE DURATION STATUS/PERCENTAGE CLIENT CONTACT
CONTRACT

i) Received and Off Load Piping Material from AELTransport at INDEXPRO PIPE LAY AREA IN PORT HARCOURT AND LOAD OUT TO INDEX PRO:
KWALE GAS PLANT MILESTONE COMPLETION
ii) Conduct Welders prequalification CERTIFICTAE ATTACHED
iii) ROW clearing
iv) String up and weld all Line pipe as per Specification
v) IN-PLANT PIPING FABRICATION & INSTALLATION-KWALE & AKRI
vi) Blast and Coat including all product supplied as per Specifications
vii) Hydrotest and flush pipeline
vii) Painting touch up and completion of joint painting
viii) Precommisioning activities
xvi) Handover all Quality Documentation and deliver full traceability report
AKRI GAS RECOVERY PROJECT-
IN-PLANT PIPING FABRICATION
Jul-05 NAOC/AMAZON & INSTALLATION-KWALE & $ 355,780.49 30 DAYS 100%-COMPLETED THIERRY BLOCH-08105205960
AKRI

1.Engineering (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built.)
2. Material Procurement
3. Onshore Fabrication And Installation Activities for:
i) Fabrication of Deployment Chute & Grillage (Value- NGN
12,875,800.00) ii) Fabrication of Turning Bollard (Value: NGN
Dec-18 CNL/MARINE PLATFORMS LTD. MEJI FLAXIBLE PIPE 14,988,000.00) iii) Fabrication of Support Pad PO-7 for ₦ 111,293,337.50 3 months 100%-COMPLETED ENGR. TAIWO OGUNSAMI
PROJECT Seven Pacific (Value: NGN 1,009,000.00) iv) Fabrication of Tensioner
Grillage and sea Fastening Clamps ( Value: NGN 15,773,467.50) v) Fabrication of RDS INDEX PRO:
Grillage & Seafastening (Value: NGN 66,647,070.00) Pos ATTACHED
4.NDT Inspection,Padeye Pull Test,blasting, painting and delivery at FOT Onne
5. Installation Activities For all the fabricated items

INDEX PRO:
PO ATTACHED

1.Engineering (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built.)
2. Material Procurement
3. Onshore Fabrication And Installation Activities for:
Dec-18 CHEVRON/MARINE PLATFORMS MEJI FLAXIBLE PIPE
i) Fabrication of 2 Underbender & 2 Nos Hose deployment ₦ 52,991,400.00 1 Month 100%-COMPLETED ENGR. TAIWO OGUNSAMI
LTD. PROJECT
chute 4.NDT
Inspection,Padeye Pull Test,blasting, painting and delivery at FOT Onne 5.
Installation Activities For all the fabricated items

1.Engineering (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built.)
2. Material Procurement
TOTAL/MARINE PLATFORMS 3. Onshore Fabrication And Installation Activities for:
Dec-18
LTD. AKPO LWI PROJECT i) Fabrication of PCH Interface Tower ₦ 10,773,000.00 3 months 100%-COMPLETED ENGR. TAIWO OGUNSAMI
4.NDT Inspection,Padeye Pull
Test,blasting, painting and delivery at FOT Onne 5. Installation Activities
For all the fabricated items

1.Material Procurement, & Fabrication of 64 No. CB 1 Stanchions, 50 No. CB2 Stanchions, 2 No. 18m spreader Bars, 2 No. 10m ₦ 125,680,965.00
Spreader Bars, 1 No. Spreader Bar for concrete matress, & 2 No of Surfer Landers. 2. Inspection (MPI/NDT, Pull Tests & UT),
blasting, painting and delivered at Brawal Jetty, FLT. 3. Seafastening of the above mentioned
fabricated items onboard River Nelson & Jascon 60 Barges respectively
JAN.-MAR. SAIDEL/MARINE PLATFORMS SOUTHERN SWAMP SALES GAS 60 DAYS 100% COMPLETED ENGR. SAMSON OWOLABI
2018 LIMITED EVACUATION PROJECT

₦ 42,848,150.00
1.Engineering (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built.) 2.
Sep-17 CHEVRON/MARINE
LTD
PLATFORMS AGBAMI PHASE THREE
PROJECT
Material Procurement 3. Onshore Fabrication of the 1 No. Production Manifold Grillage, 2 Nos. Suction Pile Grillage,
4.NDT Inspection,Padeye Pull Test,blasting, painting and delivery at FOT Onne 5. Seafastening of the 25 Days 100% COMPLETED ENGR. DAPPA TOMBODIAA
fabricated items onboard African Inspiration
1.Material Procurement, Fabrication of the 1 No. Riser Recovery Frame(Chute), 2 No of Holdback padeyes, 2 No. Drip tray ₦ 49,826,667.50
and 2No. Coral Stantion, 1 No. Diving LARS Grillage, 1 No. Snatch block padeye, 1No Hang Off Frame.
SNEPCO/MARINE PLATFORMS BOOR ENGINEERING
May-17 LIMITED SUPPORT PROJECT 28 Days. 100% COMPLETED ENGR. AUSTINE ABODIKE

1.Engineering (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built.)
2. Material Procurement 3. Onshore Fabrication of the 1No. Coil Tubing, 1 No.CROSS IWOCS 33 Grillage, 1 No.
Jan-17 SNEPCO/MARINE
LTD
PLATFORMS BONGA SIL/LWI PROJECT Moonpool Gillage, 1 No. LARS Lunching & Recovery system Grillage, 1 No. CROSS WRP Grillage , 1 No. Dive Spread ₦ 53,850,750.00 37 Days 100% COMPLETED ENGR. AUSTINE ABODIKE
Structural Grillage 4.NDT Inspection,Padeye Pull Test,blasting, painting and
delivery at FOT Onne 5. Seafastening of the fabricated coil tubing onboard BOA Deep C

1.Material Procurement, Fabrication of the ROV Grillage (A-Frame and WINCH Frame). Inspection, blasting, painting and ₦ 17,345,000.00
delivered at FOT, Onne.
Apr-16 MPN/MPL ROV GRILLAGE (JASCON 55) 9 Days 100% COMPLETED ENGR. DAPPA TOMBODIAA

1.Engineering (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built.)
Mar-16 ARIOSH/OCEAN INSTALLER LTD 8" AND 4" CLAMP 2. Material Procurement 3. Onshore Fabrication of the 2Nos 8" & 4" Clamp ₦ 4,350,500.00 8 Days 100% COMPLETED ENGR. MUYIWA JEGEDE
4.NDT Inspection,Padeye Pull Test,blasting, painting and delivery at Ladol - Lagos

1.Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As- ₦ 17,890,469.00
Built Drawing.) 2.Procurement:( Material Procurement, Inspection and Verification.
3. Onshore Fabrication: (Fabrication of Manifold Grillage (ii) NDT Inspection, blasting and painting
Mar-16 ARIOSH/OCEAN INSTALLER LTD MANIFOLD GRILLAGE (iii) Delivery at Ladol Yard - Lagos, (iv) Close Out Documentation. 5 Days 100% COMPLETED ENGR. MUYIWA JEGEDE

1.Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As- ₦ 10,550,340.00
Built Drawing.) 2.Procurement:( Material Procurement, Inspection and Verification.
3. Onshore Fabrication: (Fabrication of 4No. Chutes (ii) NDT Inspection, blasting and painting (iii) Delivery at Ladol
Mar-16 ARIOSH/OCEAN INSTALLER LTD CHUTE Yard - Lagos, (iv) Close Out Documentation. 16 Days 100% COMPLETED ENGR. DAVID ATOYEBI
1.Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As- ₦ 6,085,065.00
Built Drawing.) 2.Procurement:( Material Procurement, Inspection and Verification.
3. Onshore Fabrication: (Fabrication of 4No. Spreader Beam (ii) NDT Inspection, blasting and painting (iii) Delivery
Feb-16 ARIOSH/OCEAN INSTALLER LTD SPREADER BAR at Ladol Yard - Lagos, (iv) Close Out Documentation. 15 Days 100% COMPLETED ENGR. MUYIWA JEGEDE

1.Engineering (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built.) 2.
Feb-16 ARIOSH/OCEAN INSTALLER LTD H-LINK Material Procurement 3. Onshore Fabrication of the Sub-Sea H-Link. 4.NDT ₦ 4,952,000.00 10 Days 100% COMPLETED ENGR. MUYIWA JEGEDE
Inspection,Padeye Pull Test,blasting, painting and delivery at Ladol - Lagos

1.Material Procurement, Fabrication of the ROV Blacket Frame and the ROV Tooling Basket. Inspection, blasting, painting ₦ 23,546,000.00
Jan-16 CHEVRON/MPL ROV TOOLING BASKET and delivered at FOT, Onne. 9 Days 100% COMPLETED ENGR. TAIWO OGUNSAMI

FABRICATION OF CARGO 1.Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-
Jul-15 CHEVRON/ MARINE PLATFORMS SKIP MAN RIDING BASKET, Built Drawing.)
3. Onshore Fabrication:
2.Procurement:( Material Procurement, Inspection and Verification.
(i) Fabrication of Cargo Skip and Waste Skip. (ii)NDT ₦ 15,000,000.00 15 Days 100%COMPLETE ENGR. SEGUN ARATUNDE
WASTE SKIP AND GAS RACK Inspection, blasting and painting (iii) Delivery at Quay Side FOT - Onne, (iv) Close Documentation.

Fabrication Of 4Nos. GE Hose


May-15 CHEVRON/ MARINE PLATFORMS Reel & 4Nos Spreader Bar 1.Engineering (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built.) 2. Material ₦ 25,600,000.00 10 Days 100% COMPLETED ENGR. EFOSA OSAZUWA
Procurement

PP00011-ABO-12 Well
Jan-15 CEONA / MARINE PLATFORMS Completion (Installation And 1.Engineering (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built.) ₦ 45,000,000.00 27 Days 100% COMPLETED ENGR. SEGUN ARATUNDE
2. Material Procurement
Fabrication)

1.Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-
Built Drawing.) 2.Procurement:( Material Procurement, Inspection and Verification.
Jan-15 TOTAL/MARINE PLATFORMS WEST JUPITER ROV PROJECT 3. Onshore Fabrication: (i) Fabrication of A-Frame and WINCH Grillage. (ii)Access Platforms ₦ 65,000,000.00 16 Days 100% COMPLETED ENGR. TAIWO OGUNSAMI
(iii) Access Ladder (iv)Stair Access Platform (v)A-Frame & WINCh Frame Brackets
(vi)NDT Inspection, blasting and painting (iii) Delivery at Quay Side FOT - Onne, (iv) Close Documentation.

1.Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings.
MODIFICATION OF SURFER 2.Procurement:( Material Procurement, Inspection and Verification. (3) key task; labour;
Oct-14 CEONA / MARINE
PLATFORMS/AGIP LANDING/DEMOB OF materials; tools; facilities; personnel and consumables required to undertake the preparation; welding and finishing work ₦ 18,000,000.00 8Days 100% COMPLETED ENGR. MICHEAL TONA
NORMARD PACIFIC on the Suffer landing. (4)Works management -Docementation, As-built Dossier, Supervisionof welding personnel during
works onboard, HSE management, Interface with the Normand Pacific Personnel and Logistics.

Oct-14 SNEPCO/LADOL/MARINE MOBILIZATION SUPPORT AT (1) Seafastening of Equipment, Containers and Structural Frame work. (2) Works management
-Docementation, Material Control, tool, Consumables, Supervision of welding personnel during works onboard, HSE ₦ 15,400,550.00 3Days 100% COMPLETED ENGR. TAIWO OGUNSAMI
PLATFORMS SEA EAGLE
management, Interface with the Normand Pacific Personnel and Logistics.

1)      Remove section of 6” FO cargo pipeline and carry fabrication to fit new flowmeter which will be supplied by the
equipment maker (2)      Remove section of ½ inch fuel supply and return pipeline for port and
Dec-14 THOME INSTALLATION REMOTE FO starboard main engine, carry out fabrication of the pipeline and install new flow meters (1 on each fuel supply/return line) ₦ 21,550,000.00 14 Days 100% COMPLETED ENGR. ETIM NSEHEUBONG
MONITORING (3)      Remove section 3/8 inch fuel supply and return pipeline for auxiliary engine No 1 & 2, carry out fabrication of the
pipeline and install new flow meters (4)      Install electrical cabinet and cable and keep ready
for termination which shall be carried out by the equipment supplier

SOW include the following: key task; labour; materials; tools; facilities; personnel and consumables required to undertake
DECK STRENGHTENING the preparation; welding and finishing work for the list task below. (i) DeckStrengthening
Oct-14 CEONA/MARINE PLATFORMS ONBOARD THE NORMAND work (ii) Ondeck Strengthening (iii) Underdeck Stiffening (iv) On deck Stiffening ₦ 18,850,950.00 14Days 100% COMPLETED ENGR SANDY
LIMITED PACIFIC PROJECT (v) Works management -Docementation, As-built Dossier, Supervisionof welding personnel during works onboard, HSE
management, Interface with the Normand Pacific Personnel and Logistics.

FABRICATION OF 1.Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-
Built Drawing.) 2.Procurement:( Material Procurement, Inspection and Verification.
Dec-14 BUMI ARMADA / ROSTRUM OIL BOOMREST, CRANE 3. Onshore Fabrication: (i) Fabrication of CraneFoundation (ii)Crane Boom Rest Cross Over ₦ 43,856,000.00 29 Days 100% COMPLETED ENGR. EDET ASUQUO
& GAS FOUNDATION & CROSSOVER Platform and (iv) Crane Pedestral Reinforcement (v) NDT Inspection (vi) blasting and
PLATFORM
painting (vii) Delivery at Kidney Island Port Harcourt (ix) Close Documentation.

1.Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-
Nov-14 CHEVRON/MARINE PLATFORMS FABRICATION OF IUTA
LIFTING FRAME
Built Drawing.) 2.Procurement:( Material Procurement, Inspection and Verification.
3. Onshore Fabrication: (Fabrication of IUTA Lifting Frame (ii) NDT Inspection, blasting and painting (iii) Delivery ₦ 24,500,250.00 7 Days 100% COMPLETED ENGR. OMISANYA SULAIMAN
at Quay Side FOT - Onne, (iv) Close Documentation.

A FRAME & WINCH Total Refurbishment: (i) Load out from MPL base-Onne.(ii) Refurbishment of A-Frame & WINCH Seafastening Grillage (iii)
Oct-14 MARINE PLATFORMS SEAFASTENING GRILLAGE Fabrication of 10No. Cruciform Plate (iv) Blasting and Painting (v) As-Built (vi) Close out Documentation (vii) Delivery at ₦ 23,465,897.00 9 Days 100%COMPLETED ENGR. TAIWO OGUNSAMI
REFURBISHMENT MPL Yard - Onne

1.Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-
Built Drawing.) 2.Procurement:( Material Procurement, Inspection and Verification. ₦ 16,000,000.00
3. Onshore Fabrication: (Fabrication of Extendable and Fixed Ladder, 4No. Handrails, (ii) NDT Inspection, blasting
and painting (iii) Delivery at SNEPCO Yard - Onne, (iv) Close Documentation.
Sep-14 SNEPCO / MARINE PLATFORMS EXTENDABLE/ FIXED 15 Days 100% COMPLETED ENGR. TOSIN OBAJIMI
LADDDER

1.Engineering, Material Procurement, Fabrication of the Bladder Tank Frame. Inspection, blasting, painting and delivery of ₦ 35,000,000.00
SUBSEA BLADDER TANK 2 subsea bladder containment tank. (PO issued already).Minor engineering work may be required on the tanks.
Jul-14 SNEPCO / MARINE PLATFORMS SUPPORT 24 Days 100% COMPLETED ENGR. TOSIN OBAJIMI

2014 Elcrest E&P EPC of Helipad Design and Construction of Helipad ₦ 85,000,000.00 3months 100% COMPLETED Jay Christison +234-803-5251-029

Jul-13 Oando Exploration/Vandrezzar EPC of Well head Platform


Energy Services Limited and 15k Pipeline EPC of Well head Platform and 15k Pipeline from Well head to Beneboye Flowstation, 5km Offshore and 10k Onshore ₦ 256,089,562.50 6months 100% COMPLETED Wale Salu Cell+234-813-6617-987