100% found this document useful (1 vote)
204 views1 page

Pipe Riser Clamps for Engineers

This document provides specifications for the National Pipe Hanger Corporation's Fig. NR20 Pre-Insulated Pipe Riser Clamp. It is designed to provide vertical support for insulated pipes carrying fluids like chilled water, hot water, and steam. The clamp uses calcium silicate insulation and carbon steel materials. Charts provide dimensions and load ratings for the clamp in different pipe sizes and insulation thicknesses.

Uploaded by

Francis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
204 views1 page

Pipe Riser Clamps for Engineers

This document provides specifications for the National Pipe Hanger Corporation's Fig. NR20 Pre-Insulated Pipe Riser Clamp. It is designed to provide vertical support for insulated pipes carrying fluids like chilled water, hot water, and steam. The clamp uses calcium silicate insulation and carbon steel materials. Charts provide dimensions and load ratings for the clamp in different pipe sizes and insulation thicknesses.

Uploaded by

Francis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NATIONAL PIPE HANGER CORPORATION

FIG. NR20 Pre-Insulated Pipe Riser Clamp


For Upward and Downward Riser Loads

Ordering: Fig. NR20 - (Pipe Size) x (Insulation Thickness)-(Finish) e.g. NR20-3x1-P


PIPE VERT. INS. THK. = 1” INS. THK. = 11/2” INS. THK. = 2” INS. THK. = 21/2” INS. THK. = 3” INS. THK. = 4”
A B C D
SIZE LOAD E F E F E F E F E F E F
2” 750 0.63 1.05 1
/2 x 4 2 12.38 5.63 13.5 6.69 14.5 7.75 15.5 8.75 16.5 9.75 18.63 11.88
21/2” 900 0.63 1.05 1
/2 x 4 2 12.88 6.13 14.25 7.75 15.5 8.75 16.5 9.75 17.5 10.75 19.63 12.88
3” 1200 0.63 1.05 1
/2 x 4 2 13.5 6.69 14.5 7.75 15.5 8.75 16.5 9.75 17.5 10.75 19.63 12.88
4” 1800 0.63 1.05 1
/2 x 4 2 14.5 7.75 15.5 8.75 16.5 9.75 17.63 10.75 18.63 11.88 20.63 13.88
5” 2400 0.63 1.05 1
/2 x 4 2 15.5 8.75 16.5 9.75 17.5 10.75 18.63 11.88 19.63 12.88 21.88 15.13
6” 3000 0.88 1.05 1
/2 x 6 4 16.5 9.75 17.63 10.75 18.63 11.88 19.63 12.88 20.63 13.88 22.88 16.13
8” 3900 0.88 1.05 1
/2 x 6 4 18.63 11.88 19.63 12.88 20.63 13.88 21.75 15.13 22.88 16.13 24.88 18.13
10” 4800 1.13 1.05 1
/2 x 6 4 21.38 13.88 22.5 15.13 23.63 16.13 24.63 17.13 25.63 18.13 27.63 20.13
12” 6800 1.13 1.315 1
/2 x 8 6 23.88 16.13 24.88 17.13 25.88 18.13 26.88 19.13 27.88 20.13 29.88 22.13
14” 8000 1.13 1.315 1
/2 x 8 6 24.88 17.13 25.88 18.13 26.88 19.13 27.88 20.13 28.88 21.13 30.88 23.13
16” 9200 1.13 1.315 5
/8 x 8 6 27.38 19.38 28.38 20.38 29.38 21.38 30.38 22.38 31.38 23.38 33.38 25.38
18” 10000 1.13 1.315 5
/8 x 8 6 29.38 21.38 30.38 22.38 31.38 23.38 32.38 24.38 33.38 25.38 35.38 27.38
20” 10800 1.13 1.315 5
/8 x 8 6 31.38 23.38 32.38 24.38 33.38 25.38 34.38 26.38 35.38 27.38 37.38 29.38
24” 11200 1.13 1.66 5
/8 x 8 6 36.38 27.38 37.38 28.38 38.38 29.38 39.38 30.38 40.38 31.38 42.38 33.38

Applications: Features: Material Data:


• Provides vertical support to upward • Provides continuous, zero permeability vapor Insulation: Calcium Silicate meeting
and downward riser loads barrier ASTM C-585 and
• Structural insulation for load transfer C-656 Type II Grade 6
• Designed for use on: • ASTM E-84 Flame Spread/Smoke Developed: 10/20 900 psi, 28 pcf
Chilled Water Hot Water Steam • Thermal Conductivity other insulation materials, Page 34
0.61 Btu•in/(hr•ft2•°F) @ 200°F Base/Clamp: ASTM A-36 Carbon Steel
• Installation: welded to a flat surface or • Insulation chemically bonded Fasteners: ASTM A-307 Electro-Galv. Plated
rigidly braced • Four thrust plates shipped loose for field welding Shield: ASTM A-653 G-90, 18 ga Galv. Steel
• Temperature Range: +20°F to +1200°F Vapor Barrier: ASTM E-96 All Service Jacket
• Vertical Load ratings do not include • Outside hanger bolt is offset to accomodate Finishes: (H) Hot-Dip Galv. per ASTM A-123
local stress evaluation at thrust weldless eye nut on sizes 6” and above. (P) Painted Red Shop Primer
plate/pipe wall interface. Contact (B) Unfinished
factory for assistance. • See National Pipe Hanger Corporation’s
Pipe Hangers and Supports Catalog
for hardware and upper attachments.

Risers NJ (609) 261-5353 www.nationalpipehanger.com MD (301) 568-8805


May 24, 2017

You might also like