0% found this document useful (0 votes)
268 views1 page

Sc-Mix Design PDF

This document provides specifications for shotcrete used in tunnel construction, including mix proportions, batch weights, testing requirements, and approvals. It lists the project name and location, cement and aggregate quantities and sources for the shotcrete mix, requirements for recording batch data, slump and temperature tests, and requirements for casting test specimens and obtaining engineer approval.

Uploaded by

jitendra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
268 views1 page

Sc-Mix Design PDF

This document provides specifications for shotcrete used in tunnel construction, including mix proportions, batch weights, testing requirements, and approvals. It lists the project name and location, cement and aggregate quantities and sources for the shotcrete mix, requirements for recording batch data, slump and temperature tests, and requirements for casting test specimens and obtaining engineer approval.

Uploaded by

jitendra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

No:

Client : Project :
Dated :-
Rev:-0
Four laning of Parwanoo-Solan Section of NH-22
Page :- 010f 01
Barog Tunnel

SheetNo:-
SITE
Grade of Shotcrete
SHOTCRETE SITE CONTROL
Date of Spraying
Chainage
Location

Approved Mix Proportions


Batch Qty Cement 10mm Crushed Sand Natural Sand Water HRWR

Batch Weight Mix Data


Batch Moisture
Corrected
Quantity, Water Adjustment
Moisture Batch
Mix Ingredeints SSD condition Absorption Source Remarks
Content (%) quantity
(Kg) (%) (%) (Kg) (Kg)
--------m3

Cement

10mm

C.Sand

N.Sand

Water

Admixture
Initial 30minutes 1hr.
Slump

Concrete Temperature Air Temperature

………………………………………………………………………………………
Particulars of Specimen Cast ……………………………………………………………………………………
…………………………………………………………………………………..
……………………………………………………………………………………..

Approved by Engineer: Issued by Contractor:

Name: ................................ Name: ................................


Sign : ................................ Sign : ................................
Date : ................................ Date : ................................