Comparison Statement in Between scope and executed work at site for Metal W-
Beam Crash Barrier RHS
As per Site Measurement As per Scope
Sl. No. From To Side Length From To Side Length
772620 772665 RHS 45 MBCB
1 772677.00 772722 RHS 45 MBCB 772650 772760 RHS 110
772737 772774 RHS 37 MBCB
2 772940 772960 RHS 20
773337 773369.7 RHS 32.7 MBCB
3 773360 773380 RHS 20
773377.8 773410.3 RHS 32.5 MBCB
4 775291.5 775328 RHS 36.5 MBCB 775310 775340 RHS 30
5 775840 775888.6 RHS 48.6 MBCB 775840 775880 RHS 40
777206 777214.3 RHS 8.3 MBCB
6 777210 777230 RHS 20
777217.5 777230.30 RHS 12.8 MBCB
779627.50 779635.80 RHS 8.3 MBCB
779620 779640 RHS 20
7 779639.90 779660.6 RHS 20.7 MBCB
789094.1 789130.9 RHS 36.8 MBCB
8 789138.70 789167 RHS 28.3 MBCB 789100 789180 RHS 80
789170.7 789191.70 RHS 21 MBCB
791460.00 791505.00 RHS 45 MBCB
9 791505.00 791510.50 RHS 0 Gap 791460 791520 RHS 60
791510.50 791539.5 RHS 29 MBCB
792796.2 792820.9 RHS 24.7 MBCB
792828.1 792848.4 RHS 20.3 MBCB
10 792861.5 792882.4 RHS 20.9 MBCB 792800 792900 RHS 100
792888.2 792896.6 RHS 8.4 MBCB
792900.40 792917.1 RHS 16.7 MBCB
793500 793508 RHS 8
11 793500 793549 RHS 49 MBCB
793508 793540 RHS 32
793642 793754 RHS 112 MBCB
12 793640 793850 RHS 210
793757 793865.5 RHS 108.5 MBCB
794010 794026 RHS 16
13 793992 794176.9 RHS 184.9 MBCB 794026 794140 RHS 114
794140 794190 RHS 50
794536.9 794545.2 RHS 8.3 MBCB
14 794550.4 794558.7 RHS 8.3 MBCB 794400 794594 RHS 194
794562.4 794567.1 RHS 4.7 MBCB
794668.5 794673.8 RHS 5.3 MBCB
794686.4 794698.7 RHS 12.3 MBCB
15 794690 794780 RHS 90
794703.3 794711.6 RHS 8.3 MBCB
794725.3 794782.4 RHS 57.1 MBCB
796133.8 796146.1 RHS 12.3 MBCB
16 796140 796210 RHS 70
796154 796215.7 RHS 61.7 MBCB
796839.7 796852 RHS 12.3 MBCB
796861.9 796874.2 RHS 12.3 MBCB
796882.3 796890.6 RHS 8.3 MBCB
796895.4 796903.7 RHS 8.3 MBCB
17 796809 797000 RHS 191
796907.7 796916 RHS 8.3 MBCB
796918.1 796926.4 RHS 8.3 MBCB
796930.4 796950.7 RHS 20.3 MBCB
Comparison Statement in Between scope and executed work at site for Metal W-
Beam Crash Barrier RHS
As per Site Measurement As per Scope
17 796809 797000 RHS 191
Sl. No. From To Side Length From To Side Length
796968 796980.3 RHS 12.3 MBCB
18 796997.3 797180 RHS 182.7 MBCB 797000 797160 RHS 160
19 797184 797188.7 RHS 4.7 MBCB
20 797381.9 797425.4 RHS 43.5 MBCB 797404 797460 RHS 56
797459.6 797487.9 RHS 28.3 MBCB
797496.3 797508.6 RHS 12.3 MBCB
797510.3 797526.6 RHS 16.3 MBCB
797528.1 797552.4 RHS 24.3 MBCB
797558.7 797571 RHS 12.3 MBCB
21 797578 797586.3 RHS 8.3 MBCB 797460 797650 RHS 190
797593.7 797598 RHS 4.3 MBCB
797601.7 797605 RHS 3.3 MBCB
797608.5 797616.8 RHS 8.3 MBCB
797626.3 797630.6 RHS 4.3 MBCB
797636.4 797641.1 RHS 4.7 MBCB
22 797650 797679 RHS 29
23 799153 799173.7 RHS 20.7 MBCB 799150 799160 RHS 10
24 802755 802767.7 RHS 12.7 MBCB 802753 802760 RHS 7
25 802783.4 802920.1 RHS 136.7 MBCB 802760 802983 RHS 223
26 802935 803012.8 RHS 77.8 MBCB 802983 803030 RHS 47
807078 807094.7 RHS 16.7 MBCB
27 807079 807140 RHS 61
807103.9 807124.6 RHS 20.7 MBCB
807140 807170 RHS 30
28 807137.3 807202 RHS 64.7 MBCB
807170 807213 RHS 43
29 812116 812128.3 RHS 12.3 MBCB
30 812132.3 812145 RHS 12.7 MBCB
812158.5 812178.8 RHS 20.3 MBCB
31 812160 812250 RHS 90
812191.8 812252.5 RHS 60.7 MBCB
32 813450 813486.7 RHS 36.7 MBCB 813450 813480 RHS 30
813566 813580 RHS 14
813560 813732.3 RHS 172.3 MBCB
33 813580 813760 RHS 180
34 813735.9 813772.6 RHS 36.7 MBCB 813760 813773 RHS 13
Total 2360.9 2658
Comparison Statement in Between scope and executed work at site for Metal Comparison Statement in Between scope and executed work at site for Metal
W- Beam Crash Barrier LHS W- Beam Crash Barrier RHS
As per site Measurement As per Scope As per Site Measurement As per Scope
Sl. No. From To Side Length From To Side Length Sl. No. From To Side Length From To Side Length
771251 771348 LHS 97 1 772620 772665 RHS 45 772650 772760 RHS 110
1 771280 771330 LHS 50
771353.12 771373.12 LHS 20 772677.00 772722 RHS 45
2 773090 773150 LHS 60 772737 772774 RHS 37
3 775217.5 775286.6 LHS 69.1 775230 775280 LHS 50 2 772940 772960 RHS 20
4 779588.57 779637.5 LHS 48.93 779590 779630 LHS 40 3 773337 773369.7 RHS 32.7 773360 773380 RHS 20
5 780782.7 780803.4 LHS 20.7 773377.8 773410.3 RHS 32.5
6 780825.7 780866.6 LHS 40.9 780830 780890 LHS 60 4 775291.5 775328 RHS 36.5 775310 775340 RHS 30
781958 782107 LHS 149 5 775840 775888.6 RHS 48.6 775840 775880 RHS 40
7 781960 782110 LHS 150
782109.6 782117.9 LHS 8.3 6 777206 777214.3 RHS 8.3 777210 777230 RHS 20
783177.5 783210.35 LHS 32.85 777217.5 777230.30 RHS 12.8
783226.35 783234.95 LHS 8.6 7 779627.50 779635.80 RHS 8.3 779620 779640 RHS 20
783242.45 783250.75 LHS 8.3 779639.90 779660.6 RHS 20.7
8 783261.9 783266.2 LHS 4.3 783190 783290 LHS 100 8 789094.1 789130.9 RHS 36.8 789100 789180 RHS 80
783269.85 783290.25 LHS 20.4 789138.70 789167 RHS 28.3
783295.85 783304.15 LHS 8.3 789170.7 789191.70 RHS 21
783331.15 783347.75 LHS 16.6 9 791460.00 791505.00 RHS 45 791460 791520 RHS 60
9 783358.75 783439.95 LHS 81.2 783360 783430 LHS 70 791505.00 791510.50 RHS 0
10 791943.3 791964.2 LHS 20.9 791960 791970 LHS 10 791510.50 791539.5 RHS 29
11 793426.5 793591 LHS 164.5 793470 793526 LHS 56 10 792796.2 792820.9 RHS 24.7 792800 792900 RHS 100
793599.3 793845.7 LHS 246.4 792828.1 792848.4 RHS 20.3
12 793526 793908 LHS 382
793859.5 793908.2 LHS 48.7 792861.5 792882.4 RHS 20.9
793992 794131 LHS 139 792888.2 792896.6 RHS 8.4
13 794136.5 794152.8 LHS 16.3 794010 794160 LHS 150 792900.40 792917.1 RHS 16.7
794154.6 794166.9 LHS 12.3 11 793500 793549 RHS 49 793500 793508 RHS 8
794200 794220.5 LHS 20.5 793508 793540 RHS 32
14 794211 794398 LHS 187
794223.5 794239.9 LHS 16.4 12 793642 793754 RHS 112 793640 793850 RHS 210
15 794520 794580 LHS 60 793757 793865.5 RHS 108.5
16 794606.4 794647.1 LHS 40.7 794603 794630 LHS 27 13 793992 794176.9 RHS 184.9 794010 794026 RHS 16
794648.9 794664.8 LHS 15.9 794026 794140 RHS 114
794668.5 794680.5 LHS 12 794140 794190 RHS 50
17 794630 794839 LHS 209
794689.7 794773 LHS 83.3 14 794536.9 794545.2 RHS 8.3 794400 794594 RHS 194
794782.2 794839 LHS 56.8 794550.4 794558.7 RHS 8.3
796407.6 796452.1 LHS 44.5 794562.4 794567.1 RHS 4.7
796456.9 796473.2 LHS 16.3 15 794668.5 794673.8 RHS 5.3 794690 794780 RHS 90
796509.8 796522.5 LHS 12.7 794686.4 794698.7 RHS 12.3
796528.5 796568.8 LHS 40.3 794703.3 794711.6 RHS 8.3
18 796395 796793 LHS 398
796685.6 796714.3 LHS 28.7 794725.3 794782.4 RHS 57.1
796718.1 796738.4 LHS 20.3 16 796133.8 796146.1 RHS 12.3 796140 796210 RHS 70
Comparison Statement in Between scope and executed work at site for Metal Comparison Statement in Between scope and executed work at site for Metal
W- Beam Crash Barrier LHS W- Beam Crash Barrier RHS
As per site Measurement As per Scope As per Site Measurement As per Scope
Sl. No. From To Side Length From To Side Length Sl. No. From To Side Length From To Side Length
18 796395 796793 LHS 398
796744.9 796757.2 LHS 12.3 796154 796215.7 RHS 61.7
796763.8 796796.2 LHS 32.4 17 796839.7 796852 RHS 12.3 796809 797000 RHS 191
19 796832.5 796881.4 LHS 48.9 796860 796880 LHS 20 796861.9 796874.2 RHS 12.3
797079.7 797184.3 LHS 104.6 796882.3 796890.6 RHS 8.3
20 797070 797190 LHS 120
797193.8 797218.2 LHS 24.4 796895.4 796903.7 RHS 8.3
21 797419.2 797671.1 LHS 251.9 797440 797670 LHS 230 796907.7 796916 RHS 8.3
801727.9 801768.5 LHS 40.6 796918.1 796926.4 RHS 8.3
22 801740 801780 LHS 40
801771.5 801783.8 LHS 12.3 796930.4 796950.7 RHS 20.3
801903.8 801972.5 LHS 68.7 796968 796980.3 RHS 12.3
23 801886 802160 LHS 274
801981.1 801997.4 LHS 16.3 18 796997.3 797180 RHS 182.7 797000 797160 RHS 160
802503.2 802552 LHS 48.8 19 797184 797188.7 RHS 4.7
802555.6 802575.9 LHS 20.3 20 797381.9 797425.4 RHS 43.5 797404 797460 RHS 56
24 802510 802650 LHS 140
802579.5 802587.4 LHS 7.9 21 797459.6 797487.9 RHS 28.3 797460 797650 RHS 190
802589.4 802648.6 LHS 59.2 797496.3 797508.6 RHS 12.3
804752 804776.7 LHS 24.7 797510.3 797526.6 RHS 16.3
804782.3 804806.6 LHS 24.3 797528.1 797552.4 RHS 24.3
25 804814.4 804916.7 LHS 102.3 804760 805010 LHS 250 797558.7 797571 RHS 12.3
804922.2 804942.5 LHS 20.3 797578 797586.3 RHS 8.3
804955.5 805005.8 LHS 50.3 797593.7 797598 RHS 4.3
26 805214.2 805222.5 LHS 8.3 805058 805220 LHS 162 797601.7 797605 RHS 3.3
805226.1 805242.4 LHS 16.3 797608.5 797616.8 RHS 8.3
27 805220 805262 LHS 42
805252.4 805260.7 LHS 8.3 797626.3 797630.6 RHS 4.3
28 805266.1 805276.4 LHS 10.3 797636.4 797641.1 RHS 4.7
29 805281.3 805289.6 LHS 8.3 22 797650 797679 RHS 29
30 805340 805360 LHS 20 23 799153 799173.7 RHS 20.7 799150 799160 RHS 10
31 807378 807408.3 LHS 30.3 807390 807400 LHS 10 24 802755 802767.7 RHS 12.7 802753 802760 RHS 7
32 807412.2 807520.5 LHS 108.3 807400 807500 LHS 100 25 802783.4 802920.1 RHS 136.7 802760 802983 RHS 223
807524.4 807532.7 LHS 8.3 26 802935 803012.8 RHS 77.8 802983 803030 RHS 47
33 807548.1 807580.8 LHS 32.7 807500 807752 LHS 252 27 807078 807094.7 RHS 16.7 807079 807140 RHS 61
807590.1 807650.8 LHS 60.7 807103.9 807124.6 RHS 20.7
34 807972.8 807993.5 LHS 20.7 807960 807990 LHS 30 28 807137.3 807202 RHS 64.7 807140 807170 RHS 30
813285.2 813305.9 LHS 20.7 807170 807213 RHS 43
35 813279 813350 LHS 71
813309.4 813317.7 LHS 8.3 29 812116 812128.3 RHS 12.3
36 813319.4 813407.7 LHS 88.3 813350 813400 LHS 50 30 812132.3 812145 RHS 12.7
813419.9 813476.6 LHS 56.7 31 812158.5 812178.8 RHS 20.3 812160 812250 RHS 90
37 813400 813499 LHS 99
813478.3 813500 LHS 21.7 812191.8 812252.5 RHS 60.7
813560 813648.3 LHS 88.3 32 813450 813486.7 RHS 36.7 813450 813480 RHS 30
38 813580 813660 LHS 80
813651.9 813660.2 LHS 8.3 33 813560 813732.3 RHS 172.3 813566 813580 RHS 14
Total 3266.28 Total 4049 813580 813760 RHS 180
6707 34 813735.9 813772.6 RHS 36.7 813760 813773 RHS 13
Comparison Statement in Between scope and executed work at site for Metal Comparison Statement in Between scope and executed work at site for Metal
W- Beam Crash Barrier LHS W- Beam Crash Barrier RHS
As per site Measurement As per Scope As per Site Measurement As per Scope
Sl. No. From To Side Length From To Side Length Sl. No. From To Side Length From To Side Length
5627.18 Total 2360.9 2658
Revised Scope of Toe Wall
Revised Scope of Toe Wall
chainage
Sl.No. Side Length (m) Remarks
From To
789+810 789+825 RHS 15
1 789+831 789+837 RHS 6 Toe wall
2 783+492 783+512 BHS 20 Toe wall
3 783+555 783+565 BHS 10 Toe wall
4 792+830 792+853 BHS 23.2375 Toe wall
5 792+861 792+877 BHS 15.9375 Toe wall
6 793+425 793+908 RHS 483 Toe wall
7 793+868 793+908 LHS 40 Toe wall
8 793+979 794+209 LHS 230 Toe wall
9 794+580 794+585 LHS 5 Toe wall
10 794+575 794+580 RHS 5 Toe wall
11 794+608 794+613 LHS 5 Toe wall
12 794+608 794+613 RHS 5 Toe wall
13 794+726 794+740 RHS 14
794+743 794+782 RHS 39 Toe wall
14 796+192 796+222 RHS 30 Toe wall
15 796+201 796+222 LHS 21 Toe wall
16 796+251 796+272 BHS 20.5 Toe wall
17 796+830 796+890 LHS 60 Toe wall
18 797+043 797+219 LHS 175.75 Toe wall
19 797+378 797+388 RHS 10 Toe wall
20 797+419 797+550 LHS 131 Toe wall
21 797+556 797+680 LHS 124.5 Toe wall
799+621 799+637 RHS 15.5
22 799+644 799+655 RHS 11.5
799+665 799+701 RHS 35.5 Toe wall
23 802+480 802+600 LHS 120 Toe wall
24 802+592 802+642 LHS 50 Toe wall
25 802+642 802+680 LHS 38 Toe wall
26 802+666 802+680 RHS 14 Toe wall
27 802+755 802+765 LHS 10.4 Toe wall
28 802+755 802+776 RHS 21.4 Toe wall
802+780 802+922 RHS 141.6
29
802+936 803+008 RHS 72 Toe wall
33 804+990 805+000 LHS 10 Toe wall
34 806+991 807+035 RHS 44 Toe wall
35 807+131 807+190 RHS 59 Toe wall
807+377 807+408 LHS 31.3
36
807+411 807+527 LHS 115.7 Toe wall
37 807+957 808+005 LHS 48 Toe wall
38 813+336 813+419 LHS 83 Toe wall
39 813+338 813+462 RHS 124 Toe wall
40 813+420 813+479 LHS 59 Toe wall
41 813+560 813+720 RHS 160 Toe wall
42 813+560 813+740 LHS 180 Toe wall
Total Length RHS in Km (A) RHS 1.306
Total Length LHS in Km (B) LHS 1.538
Total Length BHS in Km ( C) BHS 0.090
As per Site Measurement Toe
wall/Retaining wall in Km (A+B+2*C) 3.0225
Revised Scope of Protection work
Revised Scope of Protection work
Remedia
chainage l Action
Length
Side (m) Type of Protection Work to be
Sl. No. From To taken
779.630 779.63375 RHS 4 Jute geotextile as per IS 14986 Specifications.
1 To be
779.64225 779.700 RHS 58 Jute geotextile as per IS 14986 Specifications. restore
3 783.492 783.512 BHS 20 kerb with chute drain @ 20m c/c as per IRC SP-42 2014 cl.4.4.9 To be
Complet
4 783.555 783.565 BHS 10 kerb with chute drain @ 20m c/c as per IRC SP-42 2014 cl.4.4.9 ed
789.810 789.825 RHS 15 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification To be
5 Complet
789.831 789.835 RHS 4 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification ed
6 789.865 789.875 RHS 10 Jute geotextile as per IS 14986 Specifications.
7 792.830 792.853 BHS 23 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
8 792.861 792.877 BHS 16 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
9 793.425 793.908 RHS 483 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
11 793.880 793.915 LHS kerb with chute drain @ 20m c/c as per IRC SP-42 2014 cl.4.4.9
12 794.030 794.100 LHS 70 kerb with chute drain @ 20m c/c as per IRC SP-42 2014 cl.4.4.9 To be
Complet
13 794.580 794.585 LHS 5 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification ed
14 794.575 794.580 RHS 5 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
15 794.608 794.613 LHS 5 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
16 794.608 794.613 RHS 5 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
To be
17 794.610 794.670 RHS 60.000 Jute geotextile as per IS 14986 Specifications.
restore
794.726 794.740 RHS 14 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
18
794.743 794.782 RHS 39 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
19 796.192 796.222 RHS 30 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
20 796.201 796.222 LHS 21 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
21 796.251 796.272 BHS 21 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
22 796.665 796.710 RHS 45 Jute geotextile as per IS 14986 Specifications.
23 796.830 796.890 LHS 60 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
24 797.043 797.219 LHS 176 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
25 797.378 797.388 RHS 10 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
26 797.419 797.550 LHS 131 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
To be
27 797.556 797.580 LHS 24 Jute geotextile as per IS 14986 Specifications. restore
799.621 799.637 RHS 15.5 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
28 799.644 799.655 RHS 11.5 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
799.665 799.701 RHS 35.5 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
800.530 800.584 RHS 54 Jute geotextile as per IS 14986 Specifications.
29
800.593 800.604 RHS 11 Jute geotextile as per IS 14986 Specifications.
30 802.030 802.100 RHS 70 Jute geotextile as per IS 14986 Specifications.
31 802.480 802.512 LHS 32 Jute geotextile as per IS 14986 Specifications.
32 802.592 802.642 LHS 50 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
33 802.642 802.680 LHS 38 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
34 802.666 802.680 RHS 14 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
35 802.755 802.7654 LHS 10.40 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
36 802.755 802.7764 RHS 21.4 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
802.837 802.894 RHS 57 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
37
802.936 803.008 RHS 72 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
38 804.880 804.950 RHS 70 Jute geotextile as per IS 14986 Specifications.
39 804.950 804.990 LHS 40 Jute geotextile as per IS 14986 Specifications.
40 804.990 805.000 LHS 10 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
805.072 805.100 LHS 28 Jute geotextile as per IS 14986 Specifications.
41
805.111 805.150 LHS 39 Jute geotextile as per IS 14986 Specifications.
42 kerb with chute drain @ 20m c/c as per IRC SP-42 2014 cl.4.4.9
43 813.560 813.580 BHS 20 Stone Pitching as per section 2504 of MORT&H(vth rev.) specification
44 kerb with chute drain @ 20m c/c as per IRC SP-42 2014 cl.4.4.9
Length in RHS ( Km)(A)
RHS 1.213
Length in LHS (Km)(B)
LHS 0.740
Length in BHS (Km) ( C )
BHS 0.110
Executed Protection Work in Km
2.173
=(A+B+2*C)
1.Turfing with sods as per cl.307 of MORTH specification is to be provided for protection of side slopes against erosion along the project Highway other
than Protection work covered in the above table.
2. Energy Dissipating Basin should be provided at the Toe as per Cl. 4.4.9 of SP-42-2014, (Fig.4.23)
Revised Scope of Drain work
Revised Scope of Drain work
Chainage
Length
Sl No Side (Mtr.)
From To
780873.5 781439.5 LHS 566
780872.5 781439.5 RHS 567
781496.5 781863 LHS 366.5
1
781522 781863 RHS 341
783600 783729.7 LHS 129.7
783744.3 783932 LHS 187.7
2
783600 783729.6 RHS 129.6
783744.4 783932 RHS 187.6
784023 784451 LHS 428
3
784023 784452 RHS 429
805395 805553.15 LHS 158.15
805558.85 806347.15 LHS 788.3
806352.85 806900 LHS 547.15
4
805395 805553.15 RHS 158.15
805558.85 806348.7 RHS 789.85
806351.3 806900 RHS 548.7
814100 814435 LHS 335
5
814100 814435 RHS 335
814435 815380 LHS 945
6
814435 815378 RHS 943
Total 8880.4
(Single side)