0% found this document useful (0 votes)
614 views1 page

CT-2602 HE 2611 DEBUTANIZER COLUMN - Rev 0Cx

The document provides general notes for a debutanizer column and reboiler. It lists 4 notes regarding emergency shutdown procedures, equipment location requirements, ventilation, and clearance between column and reboiler components.

Uploaded by

Maria
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
614 views1 page

CT-2602 HE 2611 DEBUTANIZER COLUMN - Rev 0Cx

The document provides general notes for a debutanizer column and reboiler. It lists 4 notes regarding emergency shutdown procedures, equipment location requirements, ventilation, and clearance between column and reboiler components.

Uploaded by

Maria
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTAS GENERALES

CT-2604 HE-2611 NOTES 1,15 General Notes


DEBUTANIZER DEBUTANIZER HH
COLUMN REBOILER PIT PI NOTES:
2615 2BM 2615 1. FOR EMERGENCY SHUT DOWN CAUSE AND EFFECT RELATION SEE DOCUMENT
VH PSV LPG/F-PCF-GN-PRF-00-001 "CAUSE AND EFFECT CHART".
2. FE-2609 AND FV-2609 HAVE TO BE LOCATED AT GRADE.

3/4"MDB2A1-1
NOTE 11 2604C SPARE
3. VENTILATION NOZZLE.
BLOCKED OUTLET 4. HE-2611 BAFFLE TOP SHALL BE AT LEAST 12 in ABOVE CT-2604 HHL.

3/4"BA-01
6"BA-02 6"x4" 3"K4" 5. DELETED.
FP A2A1
LO 4"x3" SET AT NOTE 17 OVERHEAD VAPORS 6. FACILITY FOR LPG REPROCESS IN CASE OF HIGH PENTANE CONTENT.
B2A1 353 psi-g TO HE-2612 7. FACILITY FOR NGL REPROCESS IN CASE OF HIGH PENTANE CONTENT.
3/4"GL-01 12"-PG-26032-B2A1-PP 8. LOCAL INDICATION ACCESIBLE TO THE OPERATOR.
MP-PRE-26-007-1/1
SEE DETAIL "H" (NO POCKETS) 9. THREE POSITION SWITCH:
NOTE 19 SET@ 320 psi-g MODE 1=NORMAL OPERATION
NOTE 21 3/4"BA-01 PV
PSV FP PIC M=2,3 MODE 2=GAS OPERATION
LC MODE 3=PARTIAL GAS OPERATION
2604B 4"BA-05 2603 FOR DETAIL INFORMATION REFER TO LPG/F-PCF-GN-PRU-00-004 (FILOSOFIA DE CONTROL
BLOCKED OUTLET DE PROCESO).

3/4"BA-01
6"BA-02 6"x4" 3"K4" PV 10. FAILURE CLOSE VALVE POSITION IN LINE 6"-OT-26058-B2A1-EC DIRECTION.
10"-VH-26073-A2A1-VA

FP A2A1 NOTE 17 SET AT 11. DRAINS AND VENTS ACCORDING TO DISCHARGE TYPE ARE GOING TO THE FOLLOWING P&DS:
LO 2603
B2A1 4"x3" 371 psi-g LPG TO OVHD GAS COMPRESSOR DISCHARGE TYPE P&ID
3/4"GL-01 8"-PG-26043-B2A1-EC PU-PRE-07-074-1/1
MP-PRE-26-002-1/1 VC COLD FLARE
SEE DETAIL "H" PU-PRE-07-071-1/1
8"BA-05 8"x6" 6"-300# 8"x6" 8"BA-05

3/4"BA-01
NOTE 21 3/4"BA-01 PI VL LOW PRESSURE FLARE PU-PRE-06-061-1/1
FLP

3/4"BA-01
PSV FP
LO 2613 VH HIGH PRESSURE FLARE MP-PRE-05-002-1/1
2604A 4"BA-05 NOTE 8 DC CLOSED DRAIN PU-PRE-09-091-1/2-2/2

3/4"MDB2A1-1
BLOCKED OUTLET SEE DETAIL "E" 12. 20 DIAMETERS OF STRAIGHT PIPELINE UPSTREAM AND 4 DIAMETERS DOWNSTREAM OF THE
PI
3/4"BA-01

6"BA-02 6"x4" 3"K4" 3/4"MDB2A1-1 NOTE 21 FLOW ELEMENT.


FP A2A1 NOTE 17 SET AT 8"x4" 2614A NOTE 24 13. DELETED.
LO
A2A1 B2A1 4"x3" 353 psi-g TO PY-2605 14. VORTEX BREAKER.
B2A1 2" 3/4"GL-01 PIT PY 6"BA-05 6"GL-03 PIC M=1 15. TRANSMITER MUST BE SIL 2 CERTIFIED.
TI MP-PRE-26-007-1/1
LC 2614A 2614 2605 16. DELETED
SEE DETAIL "H" 3/4"BA-01 2630 PIT 17. PSV INLET/OUTLET DIAMETERS CONFIRMED BASED ON FINAL VENDOR INFORMACION.
NOTE 21 FP 18. DELETED.
2614B

2"-MDB2A1-2
LO

3/4"-MDB2A1-1
TO PIC-2614 19. SET @ 320 psig FOR OPERATION MODE 2 AND 3. FOR OPERATION MODE 1, PIC-2603 SHALL BE
4"BA-05 M=1,2,3 PV FORCED TO OPERATE ON MANUAL MODE AND CLOSE PV-2603.
PI MP-PRE-26-007-1/1 20. HAND SWITCH IS LOCATED AT MATRIX PANEL IN CCR.
TIT
3/4"BA-01

2" 21. FOR TYPICAL DRAIN ARRANGEMENT DETAILS SEE P&ID: LPG/F-PCF-GN-PRE-00-001-01.
LC 2630 PI 2614B TI H 22. I-3FB ACTIVETED UNDER SDV-2633 NOT OPEN (ZSO) AND CONFIRMATION OF CLOSE POSITION
NOTE 3 FIC

8"-PG-26070-B2A1-PP
6" 2614 NOTE 8 2634 (ZSC).
3/4"GL-01

2610 23. FORCE TV-2632 TO FAILURE POSITION WHEN SDV-2608 CLOSES.


NOTE 20 L
HS 24. SELECTOR TO BE PROVIDED FOR TRANSMITTER PIT MAINTENANCE PORPUSES.

3/4"MDB2A1-1
TE
2607A FIT
2630 TIT TE
1½" 2610 NOTE 9
2634 2634 FV
HS
INHIBIT OPEN / CLOSE 2610 LPG REFLUX M=1,2,3
HS 1½" FROM P-2603A/B 2615
6"-LG-26111-B2A1-VA NOTE 12 6"-LG-26039-B2AL-VA
3AR 3FA 2607 12" MP-PRE-26-007-1/1
TI TIT 6"BA-05 6"CK-04 6"BA-05 6"x3" 3"-300# 6"x3" 6"BA-05
24" MIN FO

3/4"BA-01
3/4"BA-01
2667 2667 MH DETAIL "A"
RO DETAIL "B" 1 FE ZLO ZLC
SEE DETAIL "D"
2602 NOTE 21 2610 XXX XXX
BDV
TE 2 0.4" EC
2607 I
2667 VC DC
8"-VH-26072-A2A1-VA 6"-PG-26071-B2A1-PP 3"GL-03 3"BA-05
VH 10 SEE DETAIL "D"
3/4"BA-01

8"BA-05 8"x6" 6"-300# 6"BA-05 TIT TE NOTE 21


NOTE 11 LO FLP LO I I I
2658 2658 SDV
MH
3/4"GL-01

24" XXX
H
TIC
TI
DEBUTANIZER FEED 12"x8" 12" 11 2632
FROM HE-2610 2658 NOTE 8 L ZSO ZSC PST
MP-PRE-26-005-1/1 8"-PC-26061-B2A1-EC
12 TI XXX XXX XXX
3/4"BA-01

(TWO PHASE FLOW) 8"CK-04 8"BA-15


2632 SDV
TIT TE CT-2604 24"
34 MH XXX
2659 2659
LPG REPROCESS NOTE 6 TE TIT
FROM SPHERES 2632 2632
2"-LG-26060-B2AL-VA
MP-PRE-26-004-1/1
TI
3/4"BA-01

2"CK-04 2"BA-15 MH
NC 2659 24" DETAIL "B"

NGL REPROCESS NOTE 8 I ZLO ZLC


FROM TANKS NOTE 7 XXX XXX
2"-PN-89013-B2A1-VA PDI
MP-PRE-89-002-1/1 LIT LIC
2"BA-05
3/4"BA-01

2"CK-04 2"GA-15 2602A FIC


NC 35 2609 2609
GW L 2609
H
PDT PDI SEE DETAIL "I"
TI I I
2602 2602 NOTE 21 FIT BDY BDY
2609 2636
2"BA-05 FV A B
3/4"GL-01 PI 2609 C5 FROM PENTANE DRAW-OFF
NOTE 14
2604A 1½" TO AIRCOOLER HE-2615
NOTE 12 3"-NP-26045-B2A1-VA
2"MDB2A1-2

3/4"BA-01 3"-NP-26044-B2A1-VA
MP-PRE-26-007-1/1
36 4"x3" NO POCKETS NOTE 1 (TWO PHASE FLOW)
3/4"MDB2A1-1

4" 3"GA-05 3"x1½" 1½"-300# 3"x1½" 3"GA-05


ZSO ZSC

3/4"GA-01
FC
NOTE 2

THIS DOCUMENT IS PROPERTY OF TIPIEL SA IT MAY NOT BE COPIED, REPRODUCED AND/OR CIRCULATED WITHOUT AUTHORIZATION
NOTE 1 XXX XXX

ESTE DOCUMENTO ES PROPIEDAD DE TIPIEL SA Y NO DEBE SER COPIADO, REPRODUCIDO Y/O CIRCULADO SIN SU AUTORIZACIÓN.
FE
3/4"GL-01

3/4"GL-01

HH 2CI 2BM 1A11


TI TIT TE SEE DETAIL "D" BDV
41 2609 NOTE 21 OPEN / CLOSE
2631 3FF 2631 2631 PI PIT HS XXX
B2A1 B2A1 14" NOTE 2
2616 2616 3FF 2608
A2A1 A0G1
3/4"-DC-26364-A2A1-VA

2"GA-05
3/4"-VC-26365-A0G1-N

SP

3/4"MSB2A1-1
I 14"-PG-26049-B2A1-EC 1½"GA-05 1½"GL-03 NOTES 10, 23
DETAIL "A"
024-1 J (NO POCKETS)
42 12" SDV TV
DOCUMENTOS DE REFERENCIA
2608 2632 HOT OIL Reference Documents
FROM FH-0801 DOCUMENTO No. DESCRIPCIÓN
SEE DETAIL "I" HHL: 80 in 6"-OT-26058-B2A1-EC B A REF. Document No. REV. Description
NOTE 21 PU-PRE-08-002-1/1
HL: 65 in HH
LL = 27 in LI 6"300# 6"GA-05 6"X4" 6"X4" 6"GA-05
2"GA-05 TI FC C 6"OT-08003-B2A1-EC

3/4"GA-04

3/4"GA-04
LLL = 12 in
2BJ 2610A
DC VC 2633
2"GA-05 TI SEE DETAIL "I"
H NOTE 21 TIT
TO LV-2612 2661 REVISIONES
LIC LIT LG 2"GA-05 2633
MP-PRE-26-005-1/1 24" LI Revisions
2612 2612 2608 MH LI 0 29-JUN-2018 ISSUED FOR CONSTRUCTION E.GARCIA I.SANCHEZ O.SANGUINOD.MANRIQUE
2616

Calle 38 No. 8-62 Bogotá - Colombia.


L (CONTRACT 3010893)
2610B LL
TIT 2"GA-05 LL D3 26-APR-2018 DETAILED ENGINEERING FINAL ISSUE E.GARCIA I.SANCHEZ O.SANGUINOD.MANRIQUE
TE (CONTRACT 3010893)
2"GA-05 2661 NOTE 1 A2 01-FEB-2018 ISSUED FOR COMMENTS M.SANTAMARIA I.SANCHEZ O.SANGUINOD.MANRIQUE
12"-PN-26048-B2A1-EC

2633 14"x10" 14"x10"

2"GA-05

2"GA-05
2"GA-05 1½" H (CONTRACT 3010893)
LIT LI D2 29-DEC-2016 APRROVED FOR DESIGN (REVISED AHS SHOWN) C.LOPEZ H.MONTOYA O.SANGUINO A.ARRIETA
2"GA-05 TE 0.6"-EC 10" 3FF D1 15-NOV-2016 APPROVED FOR DESIGN C.LOPEZ H.MONTOYA O.SANGUINO A.ARRIETA
1oo2

2610A 2BP 10" 2611A


2661 0.6" EC L A1 28-SEP-2016 ISSUE FOR COMMENTS C.LOPEZ H.MONTOYA O.SANGUINO A.ARRIETA
6"GA-05 HE-2611 FECHA DESCRIPCIÓN PREPARÓ CHEQUEÓ APROBÓ AUTORIZÓ
LIT LI 0.6"-EC GW REV. Date Description Prepared by Checked by Approved by Authorized by
2610B 2"GA-05 NOTE 4 LIT LIT
2610A
2"GA-05 LL 2611A 2616

EXCHANGERS HE-2611 LIT 2"GA-05 SEE DETAIL "I"


TYPE KETTLE 2"GA-05 2610C 2CD NOTE 21
6"
2"GA-05

2"GA-05

SURFACE 1716 ft^2


NOTE 1 6"GA-05 SEE DETAIL "I"
OP. PRESS. SHELL/TUB. 325 psi-g / 96 psi-g
OP. TEMP. SHELL/TUB. 2"GA-05 NOTE 21
(371 / 386 °F) / (550 / 426 °F)
DES. PRESS. SHELL/TUB. FV / 360 psi-g / 300 psig 3"x2" 3"GA-05 3"CK-04 3"GA-05 LI
11 ft

DES. TEMP. SHELL/TUB. V.B LG


DUTY
(435/40 °F) / (600/59 °F)
18.20 MMBTU/hr
SP H 3/4"GA-01 2610C 2617
INGENIERÍA COMPRAS CONSTRUCCIÓN Y PUESTA EN
038 C
LL
MATERIAL
TRIM NUMBER
C.S.
PN-26093-B2A1-EC
6"-PN-26108-B2A1-EC NO POCKETS PI SERVICIO DE LA PLANTA DE ESTABILIZACIÓN DE
NOTE 22 2617 CONDENSADOS DEL CPF CUPIAGUA
2"GA-01

3/4"MSB2A1-1 3/4"GA-04

6"GA-05
3FB
OPEN /
TOWERS CT-2604 HS
TYPE TRAYS
CLOSE
2"GA-01 HOT OIL PIPING AND INSTRUMENTATION DIAGRAM
2633B 2"GA-01 3/4"GL-01 TO HE-2609
HEIGHT 111 ft 6"-OT-08001-B2A1-EC
DEBUTANIZER COLUMN
6"-300# 6"GA-05

MP-PRE-26-004-1/1
B2A1
A2A1

DIAMETER TOP/BOTTOM 78 in / 90 in
ZSO ZSC 3/4"GA-01 NOTE 11
OP. PRESSURE 178 psi-g / 183 psi-g
OP. TEMPERATURE 152 °F / 321 °F 2CD 2"-DC-09239-A2A1-VA
DC ESCALA CONTRATO PLANO No. HOJA
Scale Contract Drawing No. Sheet REV.
DES. PRESSURE 353 psi-g / 360 psi-g +HYD/FV CLOSE TE TIT TI
2"GL-03
FC

DES. TEMPERATURE 270 °F / 435 °F 3CP 2635 2635 2635 DE


MATERIAL C.S. N/A 3010893 LPG/F-PCF-MP-PRE-26-006-1/1 01 Of 01 0
TRIM NUMBER PN-26092-B2A1-EC ZSO NGL PRODUCT/RECYCLE
DETAIL "A" 1½" TO HE-2610
2633 6"-PN-26050-B2A1-EC CÓDIGO TIPIEL:
MP-PRE-26-005-1/1 1348-0000-PID-0021-06-01
ARCHIVO CAD: LPGFPCFMPPRE26006.1-1.0 PID - DEBUTANIZER COLUMN.dwg FDP ISO A1_1 : ISO A1 841x 594mm
CAD File

You might also like