0% found this document useful (0 votes)
368 views1 page

Engineering P&ID for Debutanizer

The document provides general notes for a natural gas liquid (NGL) aircooler, recirculation system including: 1) The level control valve for the NGL aircooler is located near the NGL feed/product exchanger. 2) The NGL feed/product exchanger is located at a minimum distance from the aircooler at grade level. 3) An emergency shutdown cause and effect relationship can be found in document LPG/F-PCF-GN-DRF-00-001. 6) Drains and vents are routed to different process and instrumentation diagrams depending on discharge type.

Uploaded by

Maria
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
368 views1 page

Engineering P&ID for Debutanizer

The document provides general notes for a natural gas liquid (NGL) aircooler, recirculation system including: 1) The level control valve for the NGL aircooler is located near the NGL feed/product exchanger. 2) The NGL feed/product exchanger is located at a minimum distance from the aircooler at grade level. 3) An emergency shutdown cause and effect relationship can be found in document LPG/F-PCF-GN-DRF-00-001. 6) Drains and vents are routed to different process and instrumentation diagrams depending on discharge type.

Uploaded by

Maria
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTAS GENERALES

HE-2610 HE-2613 A/B P-2604 A/B General Notes


DEBUTANIZER FEED/NGL NGL AIRCOOLER NGL RECIRCULATION
PRODUCT EXCHANGER PUMPS NOTES:
(NOTE 2) 1. CT-2603 LEVEL CONTROL VALVE (FV-2606) LOCATED NEAR EXCHANGER HE-2610.
2. EXCHANGER HE-2610 LOCATED AT MINIMUM DISTANCE FROM CT-2604, AT GRADE LEVEL.
3. FOR EMERGENCY SHUT DOWN CAUSE AND EFFECT RELATION SEE DOCUMENT
LPG/F-PCF-GN-DRF-00-001 "CAUSE AND EFFECT CHART".
4. DELETED.
5. DELETED.
TI 6. DRAINS AND VENTS ACCORDING TO DISCHARGE TYPE ARE GOING TO THE FOLLOWING P&DS:
2625 DISCHARGE TYPE
NOTE 9 P&ID
PU-PRE-07-074-1/1
VC COLD FLARE
PU-PRE-07-071-1/1
TI TIT VL LOW PRESSURE FLARE PU-PRE-06-061-1/1
VH HIGH PRESSURE FLARE MP-PRE-05-002-1/1
2625A 262
DC CLOSED DRAIN PU-PRE-09-091-1/2-2/2
7. BAY AND FANS SHARED BY HE-2613/HE-2615/HE-2616.
8. 20 DIAMETERS OF STRAIGHT PIPELINE UPSTREAM AND 4 DIAMETERS DOWNSTREAM OF THE
TE FLOW ELEMENT.
NGL PRODUCT/RECYCLE 2625 9. LOCAL INDICATION ACCESIBLE TO THE OPERATOR.
FROM CT-2604/BOTTOM DEBUTANIZER FEED 10. DELETED.
6"-PN-26050-B2A1-EC TO CT-2604 11. PSV INLET/OUTLET LINE DIAMETERS CONFIRMED BASED ON FINAL VENDOR
MP-PRE-26-006-1/1 1½" INFORMATION.
8"-PC-26061-B2A1-EC
MP-PRE-26-006-1/1
(TWO PHASE FLOW) 12. DELETED.
13. ADDITIONAL SCREEN TO BE PROVIDED FOR START UP PROCEDURE.
10"x8" 14. DELETED.
A2A1
B2A1
15. FOR MOTORS DETAILS SEE P&ID: LPG/F-PCF-GN-PRE-00-003-01.
3/4"GA-01 6"GA-05 FROM LIC-2612
10"BA-06 16. FOR TYPICAL DRAIN ARRANGEMENT DETAILS SEE P&ID: LPG/F-PCF-GN-PRE-00-001-01.
1"-DC-26363-A2A1-VA MP-PRE-26-006-1/1 17. DELETED.
DC 0.4"-EC
1"GL-01 1"GA-01 NOTE 6
VL
HE-2610

2"-VL-26110-A2A1-VA
2CF

THERMAL
HH 3/4"X1" NOTE 11
1"GA-01 NOTE 3 2BA PI SET AT
FROM LIC-2607 H 6"GA-05 10"BA-05
FIC 2630 572 psi-g

1"BA-01
MP-PRE-26-004-1/1 OPEN /
2606 CLOSE
L 2BP 2BB 1A11 PSV
6"-PN-26051-B2A1-PP 10"x8" HS 2609 2"x1"
2606

3/4"BA-01
A2A1 2"BA-01
FIT NOTE 1 3FC
B2A1
2606 FV NOTE 3 1"x3/4"
DEBUTANIZER FEED 2606 CLOSE
FROM CT-2603 PIT
NOTE 8 8"-PC-26031-B2A1-EC 3FC
MP-PRE-26-004-1/1 2630 3/4"BA-01
(TWO PHASE FLOW)
3/4"BA-01

3/4"BA-01

8"-PC-26030-B2A1-EC 8"BA-05 8"x4" 4"300# 8"x4" 8"BA-05 DETAIL "B"

3/4"MDB2A1-1
FC 1"BA-01
FP
FE LV SDV LO
3/4" 2612 2606
2606
3/4"GL-01 TO NGL STORAGE TANKS
3"-PN-26053-B2A1-VA 3"-PN-26054-B2A1-VA
TA-PRE-89-001-1/1

3/4"GA-01

3/4"GA-01
3/4"BA-01 3"GA-05 3"x1½" 1½"-300# 3"x1½" 3"GA-05 3"300#
4"GA-05 4"GL-03 FC FC

1"GL-01

1"GL-01
SEE DETAIL "F"
NOTE 16
B2A1 B2A1
A2A1 A0G1 SP NC
1"-DC-26227-A2A1-VA

I
1"-VC-26240-A0G1-N
024-1 J 1"GA-05 1"GL-03

FIC
2614 DETAIL "B"
L

FV ZLO ZLC
DC VC
2614 XXX XXX
2"-PN-26120-B2A1-VA NOTE 6 NOTE 6 I

3/4"GA-01
2"GA-05 2"x1" 1"-300# 2"x1" 2"GA-05
FO
I I I
NOTE 9 SDY
TI XXX
2624A NC
TI TIT TE 1"GA-05 1"GL-03 ZSO ZSC PST
2624 2624 2624 XXX XXX XXX
L 1½"
SDV
XXX

THIS DOCUMENT IS PROPERTY OF TIPIEL SA IT MAY NOT BE COPIED, REPRODUCED AND/OR CIRCULATED WITHOUT AUTHORIZATION
2"-PN-26119-B2A1-VA

ESTE DOCUMENTO ES PROPIEDAD DE TIPIEL SA Y NO DEBE SER COPIADO, REPRODUCIDO Y/O CIRCULADO SIN SU AUTORIZACIÓN.
6"GA-05

1A11 3KC
SEE DETAIL
NOTE 15 START/STOP
3/4"GA-01 STOP HS
MCC
2BG 2CD 2BP 3FB 2621
NOTE 3
3" H DOCUMENTOS DE REFERENCIA
3" PI PIT PIT PI Reference Documents
HH
PI REF.
DOCUMENTO No.
REV.
DESCRIPCIÓN
HH 2628 2628 2611 2611 Document No. Description
TI L L 2623
3"
3/4"MDB2A1-1

3/4"MDB2A1-1
3" 2628
HE-2613
NOTE 7
NOTE 3
NOTE 13
SEE DETAIL REVISIONES
NOTE 15 NOTE 3 3FB FIC Revisions
3/4"GA-01

3/4"GA-01
VSH VSH
MCC MCC 4"GA-05 4"x3" 3"x2" 3"CK-04 3"GA-05
2608 0 29-JUN-2018 ISSUED FOR CONSTRUCTION E.GARCIA I.SANCHEZ O.SANGUINOD.MANRIQUE
2613A 2613B P-2604A

Calle 38 No. 8-62 Bogotá - Colombia.


H (CONTRACT 3010893)
TI 2BP SP F
D3 26-APR-2018 DETAILED ENGINEERING FINAL ISSUE E.GARCIA I.SANCHEZ O.SANGUINOD.MANRIQUE
NOTE 3 START/ START/ NOTE 3 325 Y PIT (CONTRACT 3010893)
STOP STOP 2626 SEE DETAIL "G" SEE DETAIL "G"
NOTE 16 NOTE 16 A2 01-FEB-2018 ISSUED FOR COMMENTS M.SANTAMARIA I.SANCHEZ O.SANGUINOD.MANRIQUE
2623 (CONTRACT 3010893)
STOP

STOP

HS HS
3GC 3GD TIT FIT FIT D2 29-DEC-2016 APRROVED FOR DESIGN (REVISED AHS SHOWN) C.LOPEZ H.MONTOYA O.SANGUINO A.ARRIETA

3/4"MDB2A1-1
2613A 2613B

3"-PN-26055-B2A1-VA
TIT 2628 D1 15-NOV-2016 APPROVED FOR DESIGN C.LOPEZ H.MONTOYA O.SANGUINO A.ARRIETA
2614 2608 FV
NOTE 9 A1 28-SEP-2016 ISSUE FOR COMMENTS C.LOPEZ H.MONTOYA O.SANGUINO A.ARRIETA
2626 2608 NGL RECYCLE FECHA DESCRIPCIÓN PREPARÓ CHEQUEÓ APROBÓ AUTORIZÓ
TI TO HE-2608 REV. Date Description Prepared by Checked by Approved by Authorized by
HH HH
VAH 3GC 3GD 2626A VAH TE MP-PRE-26-001-1/1

3/4"GA-01
NOTE 8 3"GA-05 3"x2" 2"-300# 3"x2" 3"GA-05
2613A TE 2613B 2628 FO 3"-PN-26056-B2A1-VA
2626 1A11 3KC
SEE DETAIL FE FE SEE DETAIL "F"
1½" 1½" NOTE 15 START/STOP 2614 2608 NOTE 16
STOP HS
6"-PN-26052-B2A1-VA MCC
6"GA-05 6"x4" 2BG 2CD 2BP 3FB 2623 NOTE 8
A2A1
B2A1

(NO POCKETS)
NOTE 3 2"GA-05 2"GL-03
1"-DC-26247-A2A1-VA H
DC PI PIT PIT PI INGENIERÍA COMPRAS CONSTRUCCIÓN Y PUESTA EN
3/4"GA-01

1"GL-01 1"GA-01
NOTE 6 2629 2629 2614 2612
L L SERVICIO DE LA PLANTA DE ESTABILIZACIÓN DE
3/4"MDB2A1-1

3/4"MDB2A1-1

CONDENSADOS DEL CPF CUPIAGUA

EXCHANGERS HE-2610 AIRCOOLERS HE-2613 PUMPS P-2604A/B


TYPE BEU HORIZONTAL TYPE FORCED TYPE CENTRIFUGAL
NOTE 13 PIPING AND INSTRUMENTATION DIAGRAM
3/4"GA-01

3/4"GA-01

SURFACE 968 ft^2 EXTENDED SURFACE 20591 ft^2 THROUGHPUT 129.7 gpm
OP. PRESS. SHELL/TUB. 203 / 183 psi-g FANS / BAY 2/1 (NOTE 7) DISCH. PRESSURE 456 psi-g
4"GA-05 4"x3" 3"x2" 3"CK-04 3"GA-05 DEBUTANIZER FEED PREHEATING
OP. TEMP. SHELL/TUB. (210/220 °F) / (321/222 °F) OP. PRESSURE 173 psi-g DIFF. PRESSURE 294.5 psi SP
P-2604B
F
DES. PRESS. SHELL/TUB. 415 psi-g / 360 psi-g OP. TEMPERATURE 222 / 110 °F DES. PRESSURE 665 psi-g 325 Y ESCALA CONTRATO PLANO No. HOJA
SEE DETAIL "G" SEE DETAIL "G" Scale Contract Drawing No. Sheet REV.
DES. TEMP. SHELL/TUB. (310/40 °F) / (435/59) °F DES. PRESSURE 360 psi-g DES. TEMPERATURE 230 °F
DUTY 3.61 MMBTU/hr DES. TEMPERATURE 310 °F OP. TEMPERATURE 110 °F NOTE 16 NOTE 16
DE
MATERIAL C.S. DUTY 3.44 MMBTU/hr SP. GR. AT COND. 0.654 N/A 3010893 LPG/F-PCF-MP-PRE-26-005-1/1 01 Of 01 0
TRIM NUMBER PC-26089-B2A1-EC MATERIAL C.S. TRIM NUMBER PN-26091-B2A1-VA
TRIM NUMBER PN-26090-B2A1-VA CÓDIGO TIPIEL:
1348-0000-PID-0021-05-01
ARCHIVO CAD: LPGFPCFMPPRE26005.1-1.0 PID - DEBUTANIZER FEED PREHEATING.dwg FDP ISO A1_1 : ISO A1 841x 594mm
CAD File

You might also like