Trend of Gas Turbine Technology
Asian-born Gas Turbines for CES
Kawasaki Heavy Industries, Ltd
2008.4.2
1
Kawasaki Heavy Industries, Ltd.
Organization as of April, 2006
President Tadaharu Ohashi
Headquarter
Aerospace
Technical Institute
Rolling Stock
Gas Turbine & Machinery
Consumer Product
Kawasaki Plant Systems, Ltd Kawasaki Shipbuilding Corp.
Split Off as of Oct. 1, 2002
Earth Technica Co.,Ltd.(*)
Split off as of Apr. 1, 2005
(*)Note:Joint Company with Kobe Steel Ltd.
2
Gas Turbine Division Product
Industrial Marine (Naval)
L20A Gas Turbine SM1C
GPB180 Package Marine Gas Turbine
1.5MW Co-Generation L20A 20MW Class
Aero (Civil) Aero (Defense)
A320 V2500Engine CH-47 T55Engine
(Production Sharing Partnership)
3
History of Kawasaki Industrial Gas Turbine
From Small to Medium with own Technology
1943 ● Completed the first gas turbine engine for aircrafts in Japan
1952 ● Started overhauling jet engines
1972 ● Started development of industrial gas turbine
1974 ● Completed first S1A-01 type : 200kW gas turbine
1977 ● First Kawasaki gas turbine genset : 200kW delivered
1979 ● First genset to overseas customer delivered
1984 ● First Kawasaki Gas Turbine Co-generation system 2x1.0 MW delivered
1985 ● Accumulated delivery of 1,000th set
1988 ● 1.5MW M1A-13 type gas turbine completed
1993 ● 5.5MW M7A-01 type gas turbine completed
1995 ● 1.5MW M1A-13D Dry Low NOx type gas turbine completed
1998 ● Overseas sales and service affiliates were established in the U.S., Germany and Malaysia
1999 ● 6.5MW M7A-02 type gas turbine completed
● 5.5MW M7A-01D Dry Low NOx type gas turbine completed
● Accumulated order of 5,000th engine
● Experimental ceramic gas turbine completed and achieved the world record of 42.1% in 300kW class
2000 ● 18MW L20A gas turbine completed
2001 ● Akashi Works NO.4 Power Plant of GPC180D : 17.6 MW commercial start-up
2005 ● Akashi Works Energy Center, which comprises 24.7MW Combined Cycle and
7.8MW Flexible Heat and Power Gas Turbine Power Plant, start-up
2006 ● 7.7 MW class M7A-03 type gas turbine completed.
4
Evolution of Industrial Gas Turbine
8000 (Units)
Number of Engine Products 7000
5000
30 4000
3000 L20A
2000
10 1000 M7A-02 M7A-03
M7A-01
HGT
Output Power (MW)
3 M1A-23
M1A-13 M1A-23B
M1A-03 SMGT
M1A-01 M1F-03
1
S2A-01 S7A-01
ACT90
0.3 S1C-05
S1A-01 S1A-02
CGT
302
S3A-01
0.1
0.03
S5A-01
0.01
1970 1975 1980 1985 1990 1995 2000 2005 2010 Year
Standby /Peak-cut Base Load(Continuous) National Project
5
Special Features of GTG for CHP
Large size GTG for utility
1. Stable power demands 60
50
Steam Demand
2. High electrical efficiency Demand Max. June
Steam Demand [t/h]
40
3. Continuous operation
30
20
Demand Min. Jan.
4. High reliability with high price
10
0
0 2 4 6 8 10 12 14 16 18 20 22 24
Time [hr]
Small & Medium size GTG for CHP (CES)
1. Fluctuated heat and power demands 60
Power Demand
Demand Max. August
2. High CHP efficiency 50
Power Demand [MW]
40
3. Continuous/DSS/WSS operation 30
20
Demand Min.
May
4. High reliability with relatively low price 10
0
0 2 4 6 8 10 12 14 16 18 20 22 24
5. High starting reliability Time [hr]
DSS: Daily Start and Stop, WSS: Weekly Start and Stop
6
Key factors for CES Business
• Less use of scarce primary energy sources
• Lower investment cost
• Lower O&M cost
• Lower emissions
• Reliable heat and power supply
• Highly efficient GTG for CHP(CES)
• Fuel flexibility
• Low lifecycle cost (LCC) design
• Glocal (Global and local) maintenance service
• Low NOx emission
• Reliable equipment supply
7
GPB180D
Gas Turbine Generator Set
8
GPB180D (L20A) Gas Turbine
Lower life cycle cost for power production
Concept of Development:
-Lower Fuel Cost, High Efficiency
High TIT, High Pressure Ratio
-High Exhaust Gas Energy
Reasonably High Exhaust Gas Temperature
-Low Emission
Dry Low Emission system
Design:
-Low Cost Design
Minimum Compressor & Turbine Stages
Compressor 11 Stages, Turbine 3 Stages
Low Maintenance Cost:
-Robust & Long Life Design
9
GPB180D (L20A) Gas Turbine
Design Specification
Air-Inlet Compressor
Output
Turbine No.2 Bearing
Thrust
Bearing Combustor
No.1 BRG
Exhaust
Generator End 17.84MWe (ISO,100%CH4)) Type Single shaft
output
Dimension L6.6m×H2.7m×W2.2m
Rotating speed 9420 rpm
Inlet air flow 58 kg/s Weight 14Ton
Pressure ratio 18.3 Compressor Axial 11 stages
Turbine inlet 1250 ℃ Combustor 8 cans
temp.
Exhaust gas 542 ℃ Turbine Axial 3 stages
temp.
Emission NOx < 23 ppm (O2=15%) Specifications are subject to change without
CO < 25 ppm (O2=15%) prior notice.
10
GPB180D Gas Turbine Generator Set
Performance
Specifications are subject to change without prior notice. Catalog Jun.2007
11
Kawasaki Heavy Industries, Ltd
Facilities for GPB180D
Kawasaki Heavy Industries Engine Assemble Engine Test Cell
Complete Engine Power Section Complete Engine Power Section
Akashi works at Akashi at Akashi
turbine blade
Kawasaki Heavy Industries High-speed Balancer Packaging
Complete rotor Assembly Gas Turbine Enclosure
Kobe works at Kobe at Kobe
12
Japan KHI Akashi Japan Chiba-Minato Iran KPIC
Japan Osaka Gas/ Japan Mitsubishi/ Japan Mitsubishi/
Daihatsu Kawajiri Shiohama
Malaysia PML Korea GwangMyeong
References
13
Chiba-Minato Power Station
Japan
Chiba
Owner : Summit Mihama Power Corp. Prefecture
Specifications - Combined cycle power generation system
- GTG Type GPB180D
- Electrical Output 49MW (GTGx2, STx1)
- Steam 65 t/h (0.83MPaG)
- Fuel City Gas
- NOx 5 ppm (02=16 %)
14
Chiba-Minato Power Station
System Flow
Electricity is bought by
PPS and sent to
consumers through
utility network
15
Chiba-Minato Power Station
General Arrangement
Main Building L20A GTG
CCR/E&C/BOILER
S/T Generator Cooling Water
HRSG Tower Supply
Chillers &
Air Comp.
Area: 6500 m2
16
GwangMyeong CES
Korea
GwangMyeong
Owner : Samchully City
Specifications - GTG Type GPB180D x 2 (KHI supply)
- STG x 1
- Electrical Output 46MW @15 degC
- Hot water 120 t/h @15 degC
- Fuel City Gas
17
GwangMyeong CES System Flow Diagram
STEAM
FUEL TURBINE
HOB
HRSG
HOT WATER
SUPPLY
GAS TURBINE
DH
HEATER WATER
HRSG RETURN
GAS TURBINE
SIMPLIFIED SYSTEM
18
Maintenance
19
Inspection Schedule
Engine Inspection Plan (Continuous operation, 0 – 140000 E.O.H. hr year)
Inspection Level Inspection Interval (E.O.H x10000 hour)
Inspection D Initial Bore scope (IBI) 500hr. - - - -
Inspection C Bore scope inspection (BSI - 4 7 10 13
Inspection B Hot section inspection (HSI) 1,2 5 8 11 14
-
Inspection A Overhaul (O/H) 3 6 9 12
E.O.H
x10000 1 2 3 4 5 6 7 8 9 10 11 12 13 14
hour
D:Initial D
C : BSI C C C C
B: HSI B B B B B B
A: O/H A A A A
year** 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
** Year : Continuous operation reference E.O.H. 8750 hours per Year
20
Bore scope Inspection (BSI)
INLET COLLECTOR BORE SCOPE BORE SCOPE BORE SCOPE COMBUSTOR BORE SCOPE EXHAUST DUCT
INSPECTION COVER INSPECTION HOLE 2S I / HOLE 5S I / HOLE 10S TRANSITION DUCT I / HOLE 3N
IGV, 1R 2R, 3R 5R, 6R 10R, 11R 1B 5R, 6R 5R, 6R
Bore scope Inspection
REMOVED
COMBUSTOR,
LINER, T/D
Bore scope
Screen
"Bore scope" is an instrument to inspect internal areas of the gas turbine. It is a combination of flexible optical fibers and an illuminating lamp to allow direct look
around the scope head. The bore scope inspection is done at site. This maintenance work can be executed without disassembling casings. The flow path inside
the gas turbine can be inspected visually by the bore scope through inspection holes and disassembled combustor casing openings.
21
Hot Section Inspection (HSI)
Remove Main Housing
Combustor Inspection Turbine Inspection
In order to maintain hot section parts at site, the gas turbine is designed to be able to disassemble hot section casings. The hot section inspection makes it
possible to inspect all hot section parts and replace almost all of them at site. But a certain maintenance space at site is necessary for this maintenance work.
If there is any likely defective part, which needs detailed examination, restore the turbine section by using a spare one of the defective part, and examine and
repair the removed defective part separately.
22
Hot Section Inspection (HSI)
Turbine Inspection
12
2 14
1
3,9 13
4,10
5,11 Inspection Parts & Location
1 Combustor Liner
2 Transition Duct
3 –11 Turbine
15 6
7 8
12 Main HSG
13 Nozzle Support
14 Seal Wall
15 Inner/Outer Diffuser
23
Overhaul (O/H)
"Overhaul" is executed at Kawasaki factory in Japan. This overhaul inspection is done to check the condition by close examination of all gas turbine parts by
disassembling them completely including the compressor. Life-controlled parts and repairable parts are replaced. After examining and replacing work, the gas
turbine parts are cleaned and reassembled. High speed balancing of the rotor assembly and mechanical running test of the complete gas turbine are done to
confirm the soundness.
24
Merits of O/H with Engine Exchange
1. Minimized down time
2. Overhaul at GT manufacturing facility
3. Works under Certified Quality
Management System
4. Works with qualified engineers and
technicians
5. Best O/H facilities with good environment
6. Complete tests including high speed
balancing
25
Remote Monitoring
26
Techno-Net System
Professional staffs monitor & support customers
Site
Telephone/
Internet Internet
Techno-Net server
Kawasaki Gas Turbine
World Business Centers
Kawasaki
Group
Domestic
Site Gas Turbine LAN
Monitor
Maintenance Monitoring
Supporter Technical advisor Staff
27
Gas Turbine Monitoring
Kawasaki Techno-Net System
KMS
KHI Seishin Site More than 250
Japan
Akashi … Techno-Net Clients
Japan
KMS
Server
Server Japan Central &Japan Eastern
Server
Site
Site
Europe
…
KGE USA
Frankfurt Server KGTA
Server Huston
…
Server
Asia&
… Middle east
KGA
Site Kuala Lumpur
Global remote monitoring Reduction of serious failures
• Remote monitoring • Enforced monitoring
through telephone net • Diagnosis
• Internet monitoring
28
Customer
Korean Customer Services
Maintenance Equipment Spare&Tool
Operation Schedule Un- Spare GTG Sets Site tool
schedule Mngmnt TechnoNet &Spares
KMS Korea
Information
•Communication in Korean language TechnoNet
•O & M training (Site)
•First-aid maintenance support Emergency
Spares
•Schedule maintenance
Tools
•Domestic spare & tool management Korea
Kawasaki Japan
•Technical support for better availability TechnoNet
•O & M training (Class room)
•Global spare & tool management Capital By Air / Ferry
&Critical
•Logistic support spares
•Schedule maintenance
Tools
•Technical advisor supply
29
Topics
• Rising GTG Package price
• GT development trend
– Fuel flexibility
– Low emission
• Investment cost
30
Thank you
고맙습니다
Get
Reliable Contact point:
Eco-friendly
Kawasaki Machine Systems Korea, Ltd.
Park, Jeong-Min
Energy
e-mail : [email protected]
Tel : (032) 821-6945
Fax : (032) 821-6947
Now
Mobile : 010-6329-8911
31