A material non-conformity report was issued for a project regarding a violation of customer specifications. The report documents the material code and description, violation details, corrective and preventive actions taken by the supplier to address the root cause, and approval of closure by quality managers.

Uploaded by

Asad Maher
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
214 views1 page

Material Non-Conformity Report - Rev 01

A material non-conformity report was issued for a project regarding a violation of customer specifications. The report documents the material code and description, violation details, corrective and preventive actions taken by the supplier to address the root cause, and approval of closure by quality managers.

Uploaded by

Asad Maher
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MATERIAL NON-CONFORMITY REPORT

PROJECT TITLE: _______________________________________________________________________________________________


CONTRACT NO:_____________________________________
NCR CONTROL NO:______________________________________________
SUPPLIER:____________________________________________________________________________________________________

INSPECTION REQUEST NO: RE-INSPECTION REQUEST NO:

TIME:____________________________ DAY:______________________________________
DATE:____________________________________
PURCHASE DATE:______________________________________________________________________________________________________

MATERIAL CODE & DESCRIPTION:________________________________________________________________________________________


CUSTOMER REFERENCE SPECIFICATION:___________________________________________________________________________________
Violation Description:

NCR Issued By: _______________________________________________ (Name & Designation)


DATE:________________________________ NCR Closure Expected Date:______________________________
NCR received & accepted By:__________________________________________(Name & Designation)
DATE:________________________________
Corrective Action:

Preventive Action:

Root Cause Analysis:

Corrective & Preventive Action Accepted By:___________________________________________(Name & Designation)

Root Cause Analysis Accepted By:___________________________________________(Name & Designation)

APPROVED APPROVED WITH COMMENTS NOT APPROVED, REDO

MNCR Accepted & Closed By QA/QC Manager: __________________________________________ (Name & Designation)
Final Date of Closure by QA/QC Manager:________________________________________________

CNCR Accepted & Closed By SAOO/TSD/CPMD Egineer: _____________________________________________________(Name & Designation)


Final Date of Closure by PID:________________________________________________

MNCR Accepted & Closed By PID: __________________________________________ (Name & Designation)


Final Date of Closure by PID:________________________________________________