Tech. Bid
Tech. Bid
1.0 The site is loacted in Chhota Udepur district. NH 56 was earlier reffered as SH 11
. State Highway 11 was upgraded to NH 56 in 2013. The location work after
Chhota Udepur town (Approx. 2 km from Chhota Udepur town) with NH 56
Chainage as 381/305 (Near Runwad village)
2.0 The project length is constrcution of Approaches of ROB. The major treatment is
as per PQ document
(a) TEMPERATURE
The project road lies in the State of Gujarat. This state is situated in western part of Indian
and has semi arid climate Ref. Index. Map. Large part of the state lies between 350 C and
isotherms. May is the hottest month and January the coldest. The isotherm generally run
east west and the temperature increase steadily as one moves southwards.
Gujarat receives most of its rainfall form the south-west monsoon between June and
September with maximum intensity in July and August. The monsoon arrives earlier in the
south and east and last longer than in the northwest. Hence the rainfall intensity ranges from
over 2400 mm in the southwest to less than 250 mm in the extreme west. Some depressions
and cyclones in the Arabian Sea which move across the coastal area sometimes bring rains
and strong winds in the months of April to June and October to November.
(i) Areas with more than 1000 mm rainfall include the districts of Valsad, Dangs, Surat and the
eastern parts of Vadodara with Rajpipla Hills.
(ii) Areas receiving rainfall between 800 mm and 1000 mm include Panchmahals, Vadodara,
Anand, Kheda and part of Ahmedabad.
(iii) Areas having rainfall between 400 mm and 800 mm include Saurashtra and areas north of
Ahmedabad.
(iv) Areas receiving less than 400 mm rainfall include Kachch Banaskantha and Coastal
Jamnagar.
(c) HUMIDITY:
The relative humidity in all parts of the State, with the exception of the coastal areas is low
in the summer the relative humidity varies from 75 and 80 percent in winter from 40 to 50
percent. The coastal areas, on the other hand, have moderately high humidity all the year
round with a maximum in the summer months reaching as high as high as 90 percent.
(d) HYDROLOGY:
- -
Mahi river is the major river (perennial) in the south of the state which serves as the main
water source for drainage – Mahi river, river discharge in to Gulf of Khambhat.
(e) TOPOGRAPHY:
Gujarat is located in western side of the India and bounded by the State of Rajasthan in the
north, Madhya Pradesh in east and Maharashtra in south. It has also an international border
with Pakistan on its north for length of about 360 km. The state of Gujarat covers a total
area of 195,904 sq. km. and is situated between 20"06" to 24"42". North latitude and
68 10" to 74 24" East longitude. The state has the longest coastline in the country measuring
about 1600 km along western part of India, extending from Lakhpat in North to Damam in
the south.
(i) The Alluvial Plains extend in North Gujarat to Bulsar in the south, and westward to the little
Rann and Banni area of Kachchh.
(ii) The Eastern hilly tract lies between the altitude of 300 –1400 m and forms a major divide.
(iii) Uplands of Kachchh and Saurashtra consist of sandstone shale and basalt rock with
elevations of about 150-500 m sloping radically towards the coast. The Girnar hill forest is
at an elevation 1117 m.
(iv) The Eastern hilly tract lies between the altitude of 300 –14000 m and forms a major divide.
(v) The low-laying coastal tract ranges in elevation from 3-25 m surrounding the Kachchh and
Saurashtra uplands. These low laying areas extend from Rann of Kachchh to little Rann of
Kachchh and to the low laying delta region of Bhadar, Bhoqavo, Mahl, Dhadar. Narmada
and Tapi rivers.
(vi) The Marshy to saline desert of Rann of Kachchh and little Rann of Kachchh extend into the
saline Tracts around the Gulf of Cambay. This vast fields of salt mixed with clay is devoid
of any vegetation or habitation. The general elevation of this tract varies between 3 To 10
Mtr.
Passenger Road Transport in the state is mainly provided by Gujarat State Transport
Corporation, a State Government undertaking Goods transport operation is with the private
sector.
- -
(h) COMMUNICATION FACILITIES:
The communication facilities in the State consist of post, telegraph, telex and fax. These
facilities are provided by the Post and Telegraph Department of Government of India.
Besides private sector operated courier, fax and other similar services, Government
facilities also exists in all important cities of the state.
All the important cities have full fledged Government medical Hospitals besides private
clinics and nursing homes etc.
Expected construction period from contracts is 11 months (Eleven month)from the date of
award.
Free access to the work sites will be assured by the Employer for expected Agencies.
1. Soil Characteristics
The Soils of Gujarat state can be classified into Black Cotton Soils. Alluvial Soils, Saline
Alkaline Soils and desert Soils.
a) Black Soils : -The black soils are either medium black or deep black.
i) Medium Black Soil :-Medium black soils are found in Saurashtra, some parts of
Sabarkantha and Panchmahal district,
South – west of Ahmedabad and parts of Vadodara and Kachchh district. This soil
type is not so deep. Soil textures clay loam to clayey.
ii) Deep Black Soil.:-The deep black soils are found in the district of Vadodara,
Vadodara, Surat and Valsad, Soil depth varies from less than one meter to as deep as
six meters. These soils have very heavy clay content. Montmorilloniteper
domination.
.b) Alluvial Soils :-These soils in Gujarat are formed due to silting by Indus river
system. These soils occur through Banaskantha district and the greater part of
Mehsana and Sabarkantha. Ahmedabad, Kheda district, Further more alluvial soils
also occur in the northern part of Vadodara and Jambusar and eastern part of Surat
and Valsad district.
.c) Saline – Alkaline Soils:-These soils are found in " Bhal Tract " of Surendranagar,
- -
Bhavnagar, Ahmedabad, and Kheda district and also in southern part of state along
the sea-coast except in Vadodara, Surat and Valsad district. Saline soil is also found
in portions Kachchh. Mehsana and Banaskantha district due to less rain fall and
high evaporation.
.d) Desert Soils :-These are mainly found in Dssert of Kuchchh (Northern and north –
eastern parts).
.e) Earthquake Zone :-The District of Kachchh comes under the Zone-5 of the earth
quake where as districts of Saurashtra comes under Zone-3 & Zone-4. The part of
Vadodara district comes under Zone-4 where as other district of Gujarat comes
under Zone-3. Since the district of Kachchh and some district of Saurashtra, part of
Vadodara district comes under Earth quake Zones of moderate intensity, necessary
precautions are to be taken for the construction works.
Executive Engineer
National Highway Division
Vadodara
- -
IMPORTANT INSTRUCTION
&
WORK AND SITE CONDITIONS
- -
WORK AND SITE CONDITIONS
Name of Work
Construction of ROB approaches between Km. 381/8 to 382/4 near Runwad Village on NH
56.
Location of work LLL
The site is situated inChhota Udepurbetween Km 381/0 to 383/0 of N.H. 56
Bench Mark
Standard bench mark shall have to be established and connection to the G.T.S. bench mark with
reference to which the whole work shall be carried out. The contractor shall establish reference
bench mark at suitable spot The maintenance of the reference bench marks shall be the
responsibility of the contractor.
Site Condition
The Site
It shall be deemed that the contractor has satisfied himself as to the nature and location of
the work general and local condition and particularly these pertaining to transport handing and
availability of storage of materials, availability of labour, weather condition, high and low rides,
highestcombined effect of tide floods, tidal variation at the site ground level and that the tenderer
has estimated his cost accordingly and Government in no case will be held responsible for the
staff accommodation or any deductions, interpretations or conclusion drawn from the contractor.
The climatic in this region is moderately hot and humid. The monsoon depends upon the advance
of the south west wind but the normal rainy season commence from early June and last up to
October in the region of work. But occasionally, shower or two may be excepted over earlier.
There is generally no rain beyond October though some stray may be experienced. The yearly
total rainfall in the area is about 100 cms the climate during winter -season goes down to about
120C. In summer (i.e. April to June), the whether is hot and some times the temperature goes
upto45oC
Some unskilled labour and batsmen used to manning ordinary country craft may be
available locally, but skilled labour will hardy be available in the immediate neighborhood for
work of this type and magnitude.
1.4.4 Marketing Centre
Nearest marketing centre for daily necessitation in Bodeli & Chhota Udepur.
- -
Some facilities may be available in Bodeli & Chhota Udepurand nearby village. Thecontractor
has however to make his arrangement for land for housing, stores, fields,offices, accommodations
for his labour and other employees etc. at the site of work.
Nearest big railway station is Chhota Udepurabout6.00Km away from site which have local
connectivity. For connectivity to other cities in India, Vadodara Jn. Railway station is about 90.00
Km from Bodeli.
1.5 Materials
1.5.1The Materialswill be available from the quarries. But the exact details regarding quality,
transport, facilities, for the same etc. may be ascertained by the contractor before hand.
1.5.2Asphalt will be brought by the contractor. All other materials will have to be arranged for
and brought by the contractor of their own.
1.5.3No Government machinery will be available for this work and the contractor will have to
take his own arrangement in this regard.
Executive Engineer
Signature of Contractor National Highway Division
Vadodara
- -
Additional Instructions to persons tendering
1. DETAILS OF WORKS:
The work included in this contract shall be carried out in accordance with the
specification, rules and regulations as laid down in the books mentioned below in order of
the priority.
(1) Specification for roads and bridge works Ministry of Surface Transport, 5th
Revision, 2013.
(3) Relevant I.S.-and IRC specified in specifications of item.
(4) P.W.D. Hand Book Vol. I and II.
If the reference books quoted above fall short for the items quoted in the Schedules
of this contract reference shall be made to Indian Standard specification of latest additions.
If any items of this contract are not covered by the reference books quoted above, details,
and specification directed by the Chief Engineer (R & B) Department, Gujarat shall be
final..
Statement as to the conditions under which the work is to be performed including plans,
surveys, measurements, dimensions, calculations, estimates, boring etc. are made solely to
furnish a basis of completion of tenders and the Govt. does not guarantee on represent
that, they are given approximately correct. The contractor shall satisfy himself by his own
inquiry, investigation and search regarding all materials effecting the work to be done and
labour and materials needed and shall make himself reliance thereon.
The work including in this contract, shall be carried out in accordance with the
specifications, rules and regulations as laid down in the books mentioned below in order
of the property.In the absence of provision in tenders papers the provision and standards
laid down in the books mentioned below in order of priority shall be followed
(1) M.O.S.T. book of specification for road and bridge works 5th Revision, 2013.
(2) Relevant latest I.S. and I.R.C. Standards.
(3) P.W.D. Hand Book Volume - I & II, latest edition. If the reference books quoted
above fall short for the items quoted in the schedule of this contract, reference
shall, be made to Indian Standard Specifications of the latest Edition. If any, of the
items of this contract are not covered by the reference books quoted above decision
and specifications as directed by the Chief Engineer, N.H. Gujarat shall be final.
This shall depend on the standard specifications followed in difference countries of
the world for the items concerned.
3. PROGRAMME:
The Executive Engineer may at any time give direction as to in order and manner in which
the several parts of the work shall be carried out and the contractor shall strictly observe
such directions.
4. RETURNS:
- -
The contractor shall at all time be responsible for any damage and trespass committed by his
agent and working people in carrying out the work unless such trespass is authorized by
the Executive Engineer in writing.
The contractor shall furnish to the Executive Engineer every week during the progress of
the work classified weekly returns of the number of the people employed on the work
during the-work. The report of skilled labour shall be given in the proscribed form. The
contractor, if directed by the Executive Engineer shall increase or decrease the strength of
the labour both skilled and un-skilled, the contractor shall also furnish the following
returns.
(i) A weekly medical report showing the health of the Contractor’s camp and number
of their illness.
(ii) A report of any accident which may have occurred within 24 hours of its.
5. POLICE PROTECTION:
If a special protection of the camp or work of people is asked for by the contractor, the
Public Works Deptt. Shall arrange for such protection, if possible with the authorities
concerned and the full cost of the same shall be debited to contractor and recovered from
his bill.
The contractor shall procure his sole expenses all permits and licence and pay all charges
and fees for lawful execution of the work.
7. TEMPORARY QUARTERS:
The contractor will be required to make his own arrangement for the housing of all his
staff and work people during the execution of work.
The contractor shall maintain at his own expenses efficient staff as may be required by the
Engineer-in-chargeSuitable fire preventive measure to the satisfaction of the Executive
Engineer shall be taken by the contractor.
After months of the completion date, of the work or any extension granted thereof by the
Executive Engineer shall becomes the property of the P.W.D. and the contractor shall not
be entitled to any payments or compensation whatsoever in respect thereof.
8.All unused materials and all plants and equipments not removed by the contractor within two
months of the completion date of the works or any extension granted there of by the
Executive Engineer shall become the property of the public works Department
and the contractor shall not be entitled to any payment or compensation whatsoever in
respect thereof.
- -
(a) The contractor shall follow rules regarding medical and sanitary arrangements to
be provided in labour camps as mentioned in tender and as per rules in force and
amended from time to time.
(b) The contractor shall make arrangement for all anti Malaria measures, to be
provided for the labour employed on the work. The Anti Malaria measures shall be
as directed by the Assistant Director of Public Health and local authority.
The contractor will not permitted to sublet any of the work without permission of the P.
W. D.
If the P.W.D. gives permission for any part of the work to be sublet, the main contractor
shall take full responsibility for the quality of work. Before ordering subletting of ft work,
the contractor shall submit the name of the sub-contactor proposed for the -approval of the
P.W.D. and shall afterwards sent the two copies of the orders for the works proposed to
the subletted. While submitting the name of the sub-contractor for approval, manufactures
or makers, if the name of the makers shall be submitted. The sublet orders shall contain all
necessary information given in the specification to unable to sub-contractor or supplier in
more, in accordance therewith.
The sublet order shall contain the time In with the sub-contractor undertake the delivery of
the materials or the completion or non completion as affecting the time given In this
tender for the completion of the whole contract.
The contractor shall employ skilled and fully experienced engineer for carrying out the
work. Before employing a skilled and experienced Resident Engineer, the contractor shall
obtain the previous permission and approval of the Superintending Engineer for making
such appointment as to the suitability and eligibility of the Resident Engineer. The
Resident Engineer shall be considered at any time to be acting for the contractor with full
responsibility in every respect. While submitting such proposal, the qualifications and
experience' of the persons shall be fully listed. it must be seen that person with proven and
sufficient experience shall be preferred.
The Standard specifications, the plants, the special provisions and all supplementary
documents are essential parts of the contract and requirement occurring in one shall be
binding as though in occurring in all. They shall be intended to be co-operative to describe
and provide for a complete work. Incase of disagreement the plant shall have procurence
over the standard specifications. Figures, dimensions shall given over scale dimension. In
any case such variation shall be decided by the Superintending Engineer.
- -
(i) For Resident Engineer, Agent and employees of the contractor, contractor shall
provide proper facilities.
(ii) The inspection of the work shall not relieve the contractor from his obligation to
fulfill the terms of the contract as herein prescribed by the plans and specification.
(iii) The contractor shall furnish written information to the Executive Engineer stating
the original sources of supply and dates of manufacturing of all materials brought
or manufactured away from the actual site of the work.
(iv) The contractor shall furnish the Executive Engineer with every reasonable facility
as assistance for ascertaining whether or not the work performed is in accordance
with the requirements and instructions of the Plans and estimates and specification,
if so, directed the contractor any times before and after considered. Necessary for
fresh inspection at his own cost. After the inspection, the contractor shall restore
the said portion of the work to the conditions required by the specifications at his
own cost.
(v) In order to ensure a proper time sequence for required inspection and approval, this
Information shall be furnished at least two weeks before of otherwise as directed
by the Executive Engineer in advance of the use of incorporation in the work of
any such materials and this shall be given In writing by the contractor.
(vi) Failure to reject any defective work of materials, any time will not is any way,
prevent luster rejection when such defect is discovered or observed.obligate the
Department to the final acceptance.
(vii) Supervision of work
The work also proposed to be technically audited by the consultant for which the
contractor will have to extend all co-operation in collection of sample laboratory
testing and mix design etc.
14. The contractor shall obtain from P.W.D. stations of the place or places, where it is
permitted for his to deposit the materials excavated. The contractor shall accept the site as
he funds it, and any work that may go necessary to carry out, the contractor shall be
provided for in his contract price.
15. The contractor shall be responsible for the true and proper setting out of the works and or
the correctness of the positions, levels, dimensions, and alignments of all parts of the
works and for the provisions of all necessary instruments appliances and labour in
connection therewith. If any time, during the progress of the works any error shall appear
or arised in the positions, levels dimensions or alignment or any part of the works. The
contractor shall at his own expenses, rectify such errors is based on the correct dab
supplied in writing by Executive Engineer in which case the expense of rectifying the
same shall be borne by the Govt. The checking or any setting out or any line or level by
the Executive Engineer or his representative shall not in any way, relieve the contractor of
his responsibilities for the correctness thereof. The Contractor shall carefully protect and
procure all bench marks, site, nails, pegs and other thing used in setting at work.
16. As order book shall be provided and maintained by the contractor for the work and the
contractor shall sign the orders given by the department and shall carry them out. Work
order book is the property of the Govt. and shall remaining the custody of Govt. That is
supervisory staff on duty. Compliance shall be carried out promptly and reported to the
Executive Engineer In good time so that work can be chocked.
- -
17. EXTRA - ITEM RATE UST:
Incase of the extra items, the contractor shall invariably supply the rate analysis based on
the labour, materials, required in the items along with his quotations for the items. The
rate of extra items shall be decided by the competent authority of the department. The
final decision of the competent authority of the P.W.D. regarding rates, specifications etc.
shall be binding upon the contractor. The decision of competent authority shall be final.
18. As petty items, occurring in the work and as found necessary actual execution shall be
carried out in general as per P.W.D. Hand Book Volume-I and 11 latest edition and as per
general specification current in division and as per orders of the Executive Engineer from
time to time.
19. It shall be distinctly and dearly understood that commodity of the contract and
specifications, on the ground of custom prevailing is not be allowed. Extra charges of
claims in respect of the extra works will not be allowed unless the work to which they
related is clearly beyond the spirit and meaning of the specifications or unless such work
are ordered of the specified manner before the work is taken in hand, in writing by the
Executive Engineer..
20. The contractor shall provide all labour and pegs, strings and other materials as required for
lining and measuring all the work without any payment from the Government.
21. The dimensions, figures and drawing etc. shall be followed as supplied by the Executive
Engineer or by the Architect from time to time. No claims or dispute from contractor shall
be entertained due to charge in plans or detailed drawings.
22. The contractor shall provide suitable stones with flat top and temporary bench mark, page,
required for lining out and fixing the necessary levels without any extra cost. If required
such stones may be build in masonry at such places and in such manner as the Executive
Engineer or his Assistant in charge of the work determines.
23. All purpose connected with work, the contractor are required to make their own
arrangements for a sufficient supply, or water or, quality and quantity and at such places
on the work as may be ordered by the Executive Engineer. The rate quoted in the contract
are for completed work and shall cover all the contractor's cost in supplying water to the
terms stipulated in the clause of this contract. Incase the contractor was to make use of
plots, adjacent to work site, for stacking materials etc. they have to approach owners of
these plots or such other authority and make their own arrangements. The Executive
Engineer will not be held responsible for any complaints on such cases from anybody.
24. Every spot on the work and site shall be kept clear of accumulation of debris from time to
time.
25. All the materials to be used in the work may from time to time subject to test as per
relevant IS or directed by the Executive Engineer at the expenses of the Contractor.
26. Notwithstanding that, all proper precautions may have been taken by the contractor during
the progress of the work, the contractor shall be hold responsible for all damages, whether
- -
to the work under execution or to any other property or live persons during the progress of
work and the period maintenance.
27. The site of the work after the completion of the work shall be given to the sub division
officer-in-charge in neat and clean conditions after removing all the rubbish laying in
compound of ground.
28. The contractor shall as far as possible employ the labours work giving priority to the
labour besides locally.
29.Theboard stating the detailed specifications and details of work as per overnment Circular
No.TNC-1090-24-S, Dated 17-08-2002, should be erected as directed on the site of work
by the contractor without claiming extrafor the same.
- -
SPECIAL CONDITIONS OF THE
CONTACT
- -
SPECIAL CONDITIONS OF THE CONTRACT
The bidders are requested to read, understand and take note of the following conditions
before bidding for the work
1. The work must be started by the successful bidder within 10 days for the date of issue of
the work order.
2. No extension in time limit for payment of security deposit shall be granted.
3. Once paver work is started there shall not be any break except on account of rainy season
or force majors. If work is suspended after starting penalty at rate of Rs. 25000/day shall
be levied in addition to the penalty applicable.
4. Agency must submit list of machinery proposed to be deployed on the work/works
along with current location, existing commitments to be met with these machineries, and
stipulated/targeted date of completion of the existing commitments.
5. There is concurrent bidding for works and tenders are Onlineinvited vide tender notice 01of
2015-16. looking to the urgency bidder/bidders intending to bid for any of the work/works
mentioned in above tender notice shall note that all the works are required to be started
simultaneous, immediately upon award of the work & time limit for completion of work is
including monsoon period.
6. Even if one bidder stood lowest for more than one work, all the works awarded to him
shall be required to start simultaneous. Hence all the bidder intending to bid for more than
one work mentioned in above tender notice shall ensure availability of set of machineries
for each work.
7. No extension in time limit on ground of having more works on hand and deployment of
machineries to another works shall be allowed.
8. The Batch Type Hot Mix Plant having it capacity 100-120 TPH shall be Used only
Executive Engineer
(Signature of Contractor National Highway Division
Vadodara
- -
SPECIAL CONDITIONS
Government of India,
Ministry of Surface Transport
(Road Wing)
The methodology and equipment to be used on the project shall be furnished by the
contractor to the engineer well, in advance of commencement of work and approval of the
Engineer obtained prior to its adoption and use.
The contractor shall give a trial run of the equipment for establishing its capability to
achieve the laid down specification and tolerance to the satisfaction of the Engineer before
commencement of work, if so desired by the Engineer.
All equipment provided shall be proven efficiency and shall be operated and maintained at
all times in a manner acceptable to the Engineer.
No equipment or personnel will be removed from site without permission of the Engineer.
The contractor shall furnish his programme of construction for execution of the work
within the stipulated time schedule together with methodology of construction of each
item of work and obtain the approval of the Engineer prior to actual commencement of
work.
In case of slippage from the approved work programme at any stage, the contractor shall
furnish revised programme to make or the slippage within the stipulated time schedule and
obtain the approval of the Engineer to the revised programme. This is suggesting of
special conditions for bituminous surface work with hot mix plant and paver finisher
(Govt. circular No.SSR-1087-205-21-C dtd. 29-10-87 and dt.27-9-89).
The provisions of said special conditions for hot mix plant work shall prevail over all
other conditions.
- -
4.0 Action In case of disproportionate progress
In case of extremely poor progress of the work or any item at any stage of work which in
the opinion of the Engineer can not be made good by the contractor considering his
available resources, the Engineer will get it accelerated to makeup the lost time through
any other agency and recover the additional cost incurred if any, in getting the work done
from the contractor after informing him in writing about the action envisaged by him.
Setting out the work as spelt out in Clause-109 of Ministry's specifications for Road and
Bridge Works (5th Revision) will be carried out by the contractor.
Action for arrangement for traffic during construction will be taken by the contractor as
envisaged in the contract documents and spelt out in Clause-112 of Ministry's
55specification for Road and Bridge Works (5th Revision).
The onus of achieving quality of work will be on the contractor who will take actions as
stipulated in Section - 900 of Ministry's specification for Road and Bridge Works (5th
Revision).
9.0 Ministry’s specification for Road and Bridge Works (5th Revision Aug-01)
The Ministry's specification for Road and Bridge Works (5th Revision) will form part of
the contract documents and the contractor will be legally bound to the various stipulations
made therein unless and otherwise specifically relaxed or waived wholly or partly through
a special clause in the contract document.
10.0 Documentation
The contractor will prepare drawing(s) of the work as constructed and will supply original
with three copies to the Engineer who will verify and certify these drawings. Final as
constructed drawing(s) shall then be prepared by the contractor and supplied in triplicate
along with a micro film of the same to the Engineer for record and reference purpose.
11.0 The use of batch typehotmix plant having it capacity of 100-120 TPH for mixing bitumen
and aggregate use of Mechanical sensor paver for laying the mix, mechanical sprayer for
tack coat and tandem vibratory roller are compulsory for this work.
- -
12.0 The work shall be executed with the equipment as per M.O.S.T., Specification
(5thRevision) where in details of the types of equipments are given in various
specifications, and in accordance with instruction contained in Ministry Circular No.
RWNH/33065/90-D-O-55, dated 06-04-90 in respect of paver finisher for bituminous
work.
13.0 Bidder is instructed to see that the Security Deposit must be paid within in ten days from
the date of the notification of acceptance of his tender. In case of failure to do so,
compensation of Rs. 15,000-00 (Rupees Fifteen Thousand only) per day shall be imposed
up to next ten days. There after his E. M. D. shall be liable to be forfeited Govt., if
necessary, may taken an appropriate further action for rejection of his tender.
- -
Additional Condition Vide G.M. No. 10810/(8)/OH, Dated 4-6-96
1.0 If the member of Labour co-operative societies do not work themselves and obtain
commission by subletting the work, as a whole or by dividing work in groups and given
work to piece workers, the very purpose of the scheme would be defected. Therefore the
labour co-operative societies will not sublet the work and the works will be executed by
the member labour of the society.
2.0 In case, where the works required to be carried out by the labourers other than the
members of the labour co-operative societies with the man days more than 25 prior
permission of, the Executive Engineer will be necessary.
3.0 The labour co-operative societies shall have to allow the officers of the cooperative
societies department to examine for audit purposes, the muster rolls as and when required.
4.0 Labour co-operative societies shallhave to submit a quarterly returns statingthe monthly
attendance of man-days on the, muster rolls of members labourson each work to the
District Registrar as well as the Executive Engineer.
5.0 If the labour co-operative society is found -violating the terms and conditionsmentioned
above, the labour co-operative society will liable for thecancellation of work contract and
or Registration as decided by the ExecutiveEngineer.
New Conditions
All the provisions of contract labour regulations and abolition Act 1970 and contract
labour regulation and abolition Gujarat Rules 1981 shall be binding to the contractors.
Government Circular No. CLA/1984/C-3010/G-2, dated 30-07-1984.
The contractor shall not eligible to get the blank tender form and if issued the tender shall
not considered if any nearest relative is working in the concerned Division/Circle (As per Govt. of
Gujarat, R & B Department Resolution No. TNC/1081/4/C. Dt. 27-07-.1984.)
All the provision of minimum wages Act shall be applicable to the contractor and the
contractor shall be responsible for the implantation of all the provisions of the said Act.
1.00 % (one percent) of estimated amount put to tender, shall be recovered from the
contractor excluding cost of materials to be supplied as per Schedule - A towards testing charges
of the materials (Vide Govt. of Gujarat, Vernacular' Resolution No. TNC/1085/(4)/C, Dtd.
20-12-91.
- -
ANNEXURE – A
SPECIAL CONDITIONS FOR BITUMINOUS SURFACE WORKS
WITH USE OF BATCH TYPE HOT MIX PLANT AND PAVER FINISHER.
1. The Batch type hot mixed plant having it capacity 100-120 TPH and accessories
to be used for the work shall be conformity with the specifications prescribed
vide Govt. of India, Ministry of Road Transport and Highway. The Plant shall be
equipped with all units and accessories as per latest I.S. Specification.
2. The work of laying aggregate mixed with bitumen shall start on site or work
only after 8.00 hours in the morning and continue up to 17.00 hrs. in winter
season and up to 18.30 hours in summer. No work shall be done except during
the period mentioned above and also on Sundays and National Holidays viz.
26th January, 15th August and 2nd October.
3. The contractor shall invariably get the job mix formula for the mix approved by
the Engineer-in-Charge before starting the work.
4. The laying work of bitumen surface by paver finisher will not be allowed after
31st May of year or on set of Monsoon whichever is earlier.
5. Riding quality of treated reach is brought to at least 2000 mm/km.
6. VG-30 (60/70) grade bitumen having softening point greater than 45 shall be
used for mixing and Emulsion shall be used in tack coat.
- -
ANNEXURE – B
ADDITIONAL REQUIREMENT FOR PAVER FINISHER
(AS PER M.O.S.T. SPECIFICATION – III REVISION 1998)
REQUIREMENT FOR ESSENTIAL FEATURE FOR PAVER FINISHER.
A] Loading hoppers and suitable distributing mechanism.
B] All devices having hydrostatic drive/control.
C] The machine shall have a hydraulically extendable screed or appropriate
width requirements.
D] The screed shall have tamping and vibrating arrangement for initial
compaction to the layer as it is spread without rutting or otherwise marring
the surface. It shall have adjustable amplitude and infinitely variable
frequency.
E] The paver shall be equipped with necessary control mechanism so as to
ensure that the finished surface is free from surface blemishes.
F] The paver shall be fitted with an Mechanical control device to leveling and
profile control within the specified tolerance
G] The screed shall have the internal heating arrangement 20 mm M.S.S. can be
laid by means of self propelled mechanical paver with suitable screeds
capable of spreading, temping and finishing the mix true to the specified
lines, grades and cross section. Dense Bituminous macadam (clause-507)
semi dense bituminous concrete of thickness more than 20mm (clause-511)
and bituminous concrete (clause-512) shall, however be laid only with paver
finisher having essential features as spelt out in clause 504.3.5. The paver
shall be fitted with an electronic sensing device for automatic leveling and
profile control within the specified tolerance.
- -
SPECIAL TERMS AND CONDITIONS FOR THERMOPLAST PAINT
WORK
1) Agency should carry out the such type of work by only of Thermoplastic
paint laying machine (Power driven only) with temperature controller and
automatic mixing arrangement of glass beads in required proportion.
3) Guarantee security deposit shall be retained @ 10% of the cost of the item of
thermoplast paint from the R.A. bills, which will be released after expiry of
guarantee period.
4) Agency who carry out the such type of work shall have an experience of
carrying out similar type of work.
5) Test certificates as per M.O.S.T. Specification for Road and Bridge works
Clause 803.4.2.2(vi) should be furnished of reputed laboratory before starting
the work.
Signature of Contractor
Executive Engineer
National Highway Division
Vadodara
- -
Special Terms and Conditions for Retro-Reflective Sign
Boards Work
1.0 Warranty certificate for five year and seven years, for Engineering and High
intensity grade of signs from sheeting manufacturer should be given at time
of supplying of the boards.
2.0 A certificate of authorization from the sheeting manufacturer should be
submitted at the time of supplying of the boards.
3.0 The responsibility for handing, upkeep and safety of the boards lies with the
contractor until the completion of work and final payment are released.
4.0 Contractor will have to ensure how he is going to arrange repair or
replacement of defective boards after intimation from the div8ision, what
maximum time for completion will be required by the contractor.
5.0 Warranty security deposit shall be retained @ 5% of the cost of the Retro-
reflective-boards from the R.A. bill which will be released after expiring the
warranty period,
Signature of Contractor
Executive Engineer
National Highway Division
Vadodara
- -
Executive Engineer
National Highway Division
Vadodara
- -
Executive Engineer
National Highway Division
Vadodara
- -
- -
- -
IMPORTANT NOTICE TO BIDDER
- -
IMPORTANT NOTICE TO BIDDER
The work is also proposed to be technically audited & Q.A. by the Consultants for which
the contractor will have to extend all co-operation of samples, laboratory testing, mix design etc.
The rectification of remarks made by third party inspection is bound to contractor.
Bidders who have filled up required information of details of structures and organization
and final position arrangement resources including personnel, equipment, experience, work, land
etc. in Performa while submitting technical bid shall not be consider for opening of price bid.
Signature of Contractor
- -
LETTER OF AGREEMENT
The Rate Analysis given in Appendix is not binding to the Department. Also
then in that case we will bring in good quality of materials as approved by the
Department from the other source of supply. We will not claim any compensation
thereof.
Signature of Contractor
- -
GOVERNMENT VERNACULAR CIRCULAR
The rates for road materials and labours on work site are to be filled up for
the items given in Appendix “A” attached herewith. The agreement letter which is
attached herewith has to be submitted duly signed. If the rates are abnormally
low/high the classification will have to be given without taking into consideration
the estimate rates of the year. The rates of the materials and labour charges for the
Hot Mix work shall have to be filled up as per Appendix attached. The tender will
not be considered if the above rates are not filled.
Signature of Contractor
- -
APPENDIX – A
The rates considered for the materials as per specifications and labour on site of
work while calculating the rates of items of the tender.
(A) Labour :
Signature of Contractor
- -
;ZSFZzLGF 5lZ5+ S|DF\S o V[;PV[;PVFZq!_)*qVF.ALq(!sAf
TFP 5q)q!)((
8[g0Z EZGFZ .ÔZNFZMV[ VF ;FY[GF 5lZlXQ8 c A c DF\ NXF"jIF D]HAGL NZM NXF"JJF
D]HAGL VF.8DM DF8[ D]bI DF, ;DFG SFDGF :Y/[ p5ZGF NZM NXF"JJFGF ZC[X[ TYF T[ ;FY[G] \
V[SZFZ5+ VF5JFG]\ ZC[X[P VFDF Ô[ S\. VJF:TlJS ZLT[ GLRFqpRF EFJ EIF" CX[ TM T[ V\U[G]\
:5Q8LSZ6 56 VF5JFG]\ ZC[X[P
,MB\0 VG[ ;LD[g8 BFTF TZOYL VF5JFDF\ G VFJ[, T[JF lS:;FDF\ ,MB\0 VG[ ;LD[g8GF
:Y/ p5ZGF EFJ 56 5lZlXQ8DF\ NXF"JJFG]\ ZC[X[P
HIFZ[ Z:TF SFDGF 8[g0ZDF\ Ô[ 0FDZ ;5F8L CM8DL1F %,Fg8 TYF 5[JZ OL GL XZYM
SZJFGF SFDGM ;DFJ[X YTM CM. T[JF NZ[S SFDGF 8[g0ZDF\ 8[g0ZGL V\NFÒજીત lS\DT wIFGDF\ ,L3F
;LJFI CM8DL1F 0FDZ ;5F8L SZJFGF SFD DF8[ DF,;FDFG TYF DH]ZLGF NZM 5lZlXQ8 D]HA
NXF"JJFGF ZC[X[ VG[ T[ :LJFI T[ 8[g0Z U6TZLDF\ ,[JFDF\ VFJX[ GCLP
SMg8=FS8ZGL ;CLP
- -
5lZlXQ8 v V
8[g0Z VF.8DGF EFJM EZTL JBT[ J6TZL U6GL5\ ,LW[, D\H]ZL TYF :5[XLOLS[XGDF\
H6FjIF D]HAGF DF,v;FDFG V\U[GF cSFDGF :Y/ p5ZGF 50TZ EFJM c
V\U[ lJUT
V\ G\P DH]ZMGF N{lGS NZ NZ
!P S0LIF4 ;]YFZ4 %,\dAZ JU[Z[ :SL<0 ~FP
ZP EZTL4 C[<5Z JU[Z[ ;[P 5MP :SL<0 ~FP
#P DH]ZM s:+L4 5]Z]QFf :SL<0 DH]ZM ~FP
$P D]bT DF,v;FDFGGF SFDGF :Y/ ~FP
5P D]bI DF,v;FDFGGF SFDGF :Y/ ~FP
&P D]bI DF,v;FDFGGF SFDGF :Y/ ~FP
p5ZGF 50TZ EFJMP
!P DSFGM
V\ G]P 8[g0Z VF.8D G\AZ DF, ;FDFGGL lJUT I]GL8 NZ
!P .8M !__ G\U ~FP
ZP 5yYZ4 R6TZGM
BF6
,L0 SLP DLP WP DLP ~FP
#P S5RL4 !Z 5LP5LP
YL Z_ 5LP5LP
BF6 WP DLP ~FP
,L0 SLP5LP
$P Z[TL 5|%TL :YFG
,L0 SLP 5LP
5P ,FS0]v;FUMvS8
;F.h
;FZ[ZF\X IFNL DF8[
sVf AFZL WP DLP ~FP
- -
sAf AFZ6F\ WP DLP ~FP
- -
VF:OF<8 SLPDLP
,L0 SLPDLP
$P s%,Fg8v5[JZv
ZM,Zf
lJU[Z[GF EF0F
;CLT D[ P 8G
,L0 SLPDLP
SMg8=FS8ZGL ;CLP
- -
;ZSFZzLGF\ 5lZ5+ S|DF\SoV[;P8LPVFZq!_)*q(ZqC4 TFZLB Z*P!!P)* TYF Z!P!!P)( DF\
H6FjIF D]HA Z:TFGF\ SFDM DF8[ .HFZNFZMV[ 5]ZM 5F0JFDF\ YTL 0FDZ .HFZNFZ[ GLR[GL XZTMV[
5]ZM 5F0JFGM ZC[X[P
s!f .HFZNFZ 0FDZ SIF\YL ,FjIF T[ V\U[G] AL, V;,DF\ lJEFUG[ ZH] SZJFG]\ ZC[X[P
s#f 0FDZ H[ 8[gSZDF\ ,FJJFDF\ VFJ[ T[ 8[gSZGL JFCG G\AZ ATFJJFGM ZC[X[P
s$f 0FDZ p5Z .HFZNFZzLV[ V[0JFg; 5[D[g8 VYJF ;LSIM0" V[0JFg; D/L XSX[ GCLP
s5f .HFZNFZ[ ZH] SZ[, 0FDZGF\ V;, AL, 0FDZGL U|[0 sSJM,L8L V[U[f GL p<,[B CMJM
HM.V[P VF V\U[ .HFZNFZMG[ 0FDZGF\ U|[0 V\U[G]\ 8[:8 ZLh<8 U|[0 V\U[G]\ 5|DF65+ ZH]
SZJFG]\ ZC[X[P
s&f .HFZNFZ[ 0FDZGL VFJS HFJS ;L,S V\U[G]\ ZHL:8Z %,Fg8q;F.8 p5Z lGEFJJFG]
ZC[X[P
s૭f 9[S[NFZ[ BZLN[, 0FDZGF\ 8[:8L\UGF HZ}ZL 5|DF65+M ;FNZ SZJFGF\ ZC[X[P
SMg8=FS8ZGL ;CLP
- -
SZFZ v 5+
s!f p5ZMST 5lZlXQ8DF\ VF5[, EFJMGL RSF;6L V\U[GL CM. T[ BFTFG[ A\3GSTF" ZC[X[ GCLP
T[DH T[DF\ NXF"J[, BF6 DYS[YL :5[XLOLS[XG D]HAGM DF, ;FDFG GCL D/[ TM4 T[:5[XLOLS[XG
5|DF6[GM BFT] DFgI SZ[ T[ VgI HuIFV[YL ,FJL VF5LX]\P H[ DF8[ SM. J/TZGM S,[.D D]SJFDF\
VFJX[ GCLP
sZf C]\qVD[ VFYL V[SZFZ S~\ K]\qSZLV[ KLV[ S[ DFZFqVDFZF GÒSGF ;UF VF lJEFULI
SR[ZLDF\ T[DH T[ C[9/GL 5[8F lJEFULI SR[ZLDF\ SFI"5F,S .HG[Z4 GFIA SFI"5F,S .HG[Z4
DNNGLX .HG[Z4 Vl3S DNNGLX .HG[Z4 VMJZXLIZ lJEFULI lC;FAGLX4 :8MZlS5Z4
VlTlYqlJzFDU'CGF D[G[HZ TYF JT]"/GL SR[ZLDF\ Vl31FS .HG[ZzL TZLS[ TYF T[ p5ZF\T
5\RFITGF SFDM DF8[ જીÒ<,F 5\RFITDF AF\3SFD ;lDTLGF R[ZD[G S[ Ò<,F 5\RFITGF VgI
5NF3LSFZL TZLS[ CF, 8[g0Z EZJFGL TFZLB[ SFD SZTF GYL S[4 CMN'F 3ZFJTF GYLP
:Y/ o
TFZLB o
SMg8=FS8ZGL ;CLP
- -
U]HZFT ;ZSFZzLGF DFU" VG[ DSFG lJEFUGF\
9ZFJ S|DF\S v 8LPV[GP;LPq!_((qVF.PALPqZZ_s!(f;
;lRJF,I4 UF\WLGUZ TFP !*v!Zv!)((
s!f 9[S[NFZ V[ VF.PV[;P 5|DF65+JF/L TYF D]bI pt5FNS S\5GLDF\YL ;LWL ZLT[ ;LD[g8
D[/JJFGM ZC[X[P T[GL BZF. DF8[ T[GF\ AL,M ;\W\lWT SFI"5F,S .GH[ZzLG[ ZH] SZJFDF\ ZC[X[
VG[ ;LD[g8 AF\WSFDGF\ :Y/ s:8MZf 5Z ,FjIF AFN BFTF TZOYL H~ZLIFT 5|DF6[ 8[:8 SIF" AFN
IMuITFG]\ 5|DF5+ D[/JL SFDDF\ JF5ZJFGM ZC[X[P Ô[ ;LD[g8 IMuITF 5|DF6[ GCL\ CMI TM T[GL
TFtSF,LS :Y/ 5ZYL N]Z SZJFGM ZC[X[P
sZf ,MB\0 BZLNL :8L, VMYMZL8L VMO .g0LIF VYJF VgI D}/ pt5FNS S\5GLVM 5F;[YL H
9[S[NFZ[ SZJFGL ZC[X[ VG[ T[GF\ I]SJ6LGF\ JFpRZM 56 BZF. DF8[ ZH] SZJFGF\ ZC[X[P T[DH
,MB\0 IMuI U]6JTFJF/]\ K[ S[ GCL\ m T[GL BZF. BFTF DFZOT[ Y. UIF AFNH p5IMUDF\ ,[JFG\]
ZC[X[ VG[ T[GM 8[:8 56 .ÔZNFZ[ ZH] SZJFGM ZC[X[P
SMg8=FS8ZGL ;CLP
- -
GOVERNMENT CIRCULAR
- -
.v8[g0ZL\UDF\ 8[g0Z OL V\U[GM 0=FO8qR[S:S[G SZL
.v8[g0ZL\UGF VgI 0MSI]D[g8; ;FY[ ZH] SZJF VG[
8[g0Z DMS,JF AFAT
U]HZFT ;ZSFZ
DFU" VG[ DSFG lJEFU
5lZ5+ S|DF\So 5ZRv!_Z__(v5v;
;lRJF,I4 UF\WLGUZ
TFZLBP !(q!qZ__(P
5lZ5+ o
DFU" VG[ DSFG lJEFUDF\ CF, ~FP5_ ,FBYL JW] ZSDGF 8[g0ZM .v8[g0Z 5wWlTYL D[/JJFDF\
VFJ[ K[P 5|JT"TL 5wWlT D]HA 8[g0Z OL TYF VG[":8 0L5MhL8 lJEFULI SR[ZLV[ ~A~ RMSS;
;DIDIF"NFDF\ D[/jIF AFN V[Hg;LGF\ 8[g0Z BM,JFDF\ VFJ[ K[P VF 5wWlTDF\ D/[, OlZIFN wIFGDF\
,[TF\ .v8[g0Z 5wWlTDF\ GLR[ D]HA O[ZOFZ SZJF lG6"I ,[JFDF\ VFJ[ K[P VF XZTGM ;DFJ[X NZ[S 8[g0Z
GM8L;q8[g0ZGF\ D];NŸFDF\ SZJFGM ZC[X[P
"Demand Draft for E.M.D.& tender fee shall be submitted in electronic format
only through online (by scanning) while uploading the bid. This submission shall
mean that E.M.D. & tender fee are received for purpose of opening the bid.
Accordingly offer of those shall be opened whose E.M.D.& tender fee is received
electronically. however for the purpose of realization of D.D. bidder shall send the
D.D. in original through R.P.A.D. so as to reach to Executive Engineer Division
Vadodara within stipulated days from the last date of uploading. penaltative action
for not submitting D.D. in original to E.E. by bidder shall be initiated. D.D. for
Exemption Certificate is not necessary However Exemption Certificate shall have
to be submitted electronically through online.
Any documents in supporting of tender bid shall be submitted in electronic
format only through online (by scanning etc) & hard copy will not be accepted
separately."
8[g0Z DF8[ AFGFGL ZSD s.PV[DP0LPf TYF 8[g0Z OL GF\ 0LDFg0 0=FO8 VMG ,F.G :S[G SZL .,[S8=MGLS
OMZD[8DF\ 8[g0Z V5,M0 SZJFGM ZC[X[P VF 5|SFZ[ ZH] YI[, lJUT[ AFGFGL ZSD VG[ 8[g0Z OL D/[,
U6JFGL ZC[X[ VG[ TNŸVG];FZ 8[g0Z BM,JFDF\ VFJX[ T[ VG];FZ .,[S8=MGLS OMZD[8DF\ AFGFGL ZSD
VG[ 8[g0Z OL D/[, CMI T[GL H VMOZ BM,JFDF\ VFJX[P BZ[BZ R]SJ6F DF8[ 8[g0Z EZGFZ[ 0LDFg0
0=FO8 V;,DF\ ZHL:80" 5M:8 V[P0LPG[ SFI"5F,S .HG[ZzL4 ZFQ8=LI WMZLDFU" lJEFU4 E~RG[
- -
V5,M0L\UGL K[<,L TFZLBYL lNGv*DF\ D/[ T[ VG];FZ ZH] SZJFGF\ ZC[X[P V;,DF\ 0LDFg0 0=FO8 GCL\
DMS,GFZ ;FD[ lX1FFtDS 5U,F X~ SZJFDF\ VFJX[P AFGF D]lST DF8[ 0LDFg0 0=FO8 H~ZL AGX[ GCL\P
5Z\T] D]lSTGF 5|DF65+ .,[S8=MGLS,L VMG ,F.G ZH] SZJFG]\ ZC[X[P
8[g0ZAL0GF\ DF8[ H~ZL VFWFZ DF8[GF SM. 56 0MSI]D[g8 VMG ,F.G .,[S8=MGLS OMZD[8DF\
:S[G SZL DMS,JFGF ZC[X[ VG[ CF0" SM5L V,FINL ZLT[ :JLSFZJFDF\ VFJX[ GCL\Pcc
;CLqv
p5;lRJ4
DFU" VG[ DSFG lJEFU
5|lT4
v ;J[" VlW1FS .HG[ZzLVM
ZFHI lJEFUq 5\RFIT DFPDPJT]"/qG[PCFPJT]"/q5FPIMPqJT]"/
ZFPDFPIMPJT]"/4 UF\WLGUZ ;lCT
v ;J[" XFBFVM4 DFPDPlJP4 ;lRJF,I4 UF\WLGUZP
vv ovo vv
GS, ZJFGF 5|lT4 SFI"5F,S .HG[ZzL4 Ò<,F DFPDPlJEFU4 J0MNZFqq XC[Z DFPDPlJEFU4
J0MNZFqq 5], sGD"NFf AF\WSFD lJEFU4 J0MNZFqq E~R DFPDPlJEFU4 E~Rqq ZFH5L5/F
DFPDPlJEFU4 ZFH5L5/F qq UMWZF DFPDPlJEFU4 UMWZF qq NFCMN DFPDPlJEFU4 NFCMN qq TZO HF6
;F~\ TYF H~ZL VD, SZJF ;F~\P
;CLqv
- -
.v8[g0ZL\UDF\ 8[g0Z OL VG[ VgI
0MSI]D[g8; ZH] SZJF V\U[P
U]HZFT ;ZSFZ
DFU¶ VG[ DSFG lJEFU4
5lZ5+S|DF\S 5ZR q !_Z__( q 5 q ; s5F8¶OF., f
;lRJF,I4 UF\WLGUZ
TFPZ*v!!vZ__(
J\RF6[ ,LWM ov TFP!(v!v_( GM 5lZ5+S|DF\S 5ZR q !_Z__(v5 v;
5lZ5+ ov
DFU¶ VG[ DSFG lJEFUDF\ CF,DF\ 8[g0ZM .v8[g0Z 5wWlT YL :JLSFZJFDF\ VFJ[ K[P T[ VgJI[ ;DFG
S|DF\S GF TFP!(v!v_( GF 5lZ5+DF\ 8[g0Z OL VG[ AFGFGL ZSD H[ T[ SFI¶5F,S .HG[ZG[ BZ[BZ R]SJJF
DF8[ lNGv* DF\ V;,DF\ ZHL:80¶ 5M:8 V[P0LP YL DMS,JFGL T[DH V;,DF\ 0LDFg0 0=FO8 GCL DMS,GFZ
;FD[ lX1FFtDS 5U,F\ ,[JFGL HMUJF. CTLP
p5ZMST 5lZ5+DF\ GLR[ D]HA V\XT o ;]WFZM SZL VF XZTGM ;DFJ[X 8[g0Z GM8L; q 8[g0ZGF
D];N=FDF\ Through R.P.A.D. so as to reach to E.E. Division- Within 7 days from
the last date of uploading G[ AN,[ “ to S.E. at the time of tender opening or
send the same through R.P.A.D. so as to reach to E.E. Division- Within 7
days from the last date of opening. “ ;]WFZM SZJFDF\ VFJ[ K[ T[DH BZ[BZ 8[g0Z OL T[DH
AFGFGL ZSD lGIT ;DIDF\ .HFZNFZ G EZ[ TM .HFZNFZGL GM\W6L V[S JQF¶ DF8[ V[A[g;DF\ ZFBJFGL
SFI¶JFCL SZL .v8[g0ZL\U GM SM0 V[S JQF¶ DF8[ ZN SZFX[P
s VFZPS[PRF{CF6 f
BF; OZH 5ZGF VlWSFZL
DFU¶ VG[ DSFG lJEFU4
5|lT4
v ;J[¶ D]bI .HG[Z VG[ VlWS ;lRJzL4 DFU¶ VG[ DSFG lJEFU4 ;lRJF,I4 UF\WLGUZ
v ;J[¶ p5;lRJzL4 DFU¶ VG[ DSFG lJEFU4 ;lRJF,I4 UF\WLGUZ
v ;J[¶ VlW1FS .HG[ZzL4 ZFHI lJEFU4 q 5\RFIT DFPDPJT]¶/ q G[PCFPJT]¶/ q 5FPIMPJT]¶/ q
ZFPDFPIMP JT]¶/ UF\WLGUZ ;CLT
v ;J[¶ SFI¶5F,S .HG[ZzL4 DFU¶ VG[ DSFG JT]¶/ q 5\RFIT DFPDPJT]¶/ q G[PCFPJT]¶/ q
5FPIMPDFU¶ VG[ DSFG
v ;J[¶ XFBFVM q DFPDPlJP q ;lRJF,I q UF\WLGUZ
v l;,[S8 OF.,
- -
8[g0ZDF\ EZ[, V;FDFgI p\RF EFJMGF
;\NE[¶ SFD 5Z 50TF\ BR¶ 5Z lGI\+6
ZFBJF TYF SFDGL GF6F\SLI 5|UlT EF{lTS
5|UlT ;FY[ ;]D[/DF\ ZC[ T[ DF8[ H~ZL
HMUJF. SZJF AFATP
U]HZFT ;ZSFZ
DFU¶ VG[ DSFG lJEFU4
5lZ5+S|DF\S 5ZR q !_Z__( q s&! f q ;
TFPZ*v!!vZ__(
5lZ5+
8[g0ZDF\ V;FDFgI p\RF S[ GLRF EFJM .HFZNFZzLVM wJFZF 36LJFZ EZFTF CMJFG]\ ;ZSFZzLGF
wIFG
5Z VFJ[, K[P VFJF lS:;FVMDF\ SFDGL GF6F\SLI 5|UlT VG[ EF{lTS 5|UlTGM ;]D[/ G ZC[JFGL ;\EFJGF
ZC[,L K[P VFYL SFDGL EF{lTS 5|UlT 5|DF6[ GF6F\SLI 5|UlT ZC[ S[ H[YL ;ZSFZzL 5Z ;DI 5C[,F\ VIMuI
GF6F\SLI AMH G 50[ T[ DF8[ GLR[ D]HAGL HMUJF. 8[g0ZDF\ SZJFGM lG6¶I SZJFDF\ VFJ[, K[PVF HMUJF.
TDFD SFDMGF VF 5lZ5+GL TFZLB 5KL D\H]Z YTF\ 0LP8LP5LPDF\ VR}S 56[ SZJFGM ZC[X[P
HMUJF. ov
H[ SM. VF.8DGM EZ[, EFJ T[ VF.8DGF 8[g0ZDF\ D}S[, V\NFHL EFJ SZTF\ 8[g0ZDF\ D}S[, V\NFHL
ZSD YL ;DU| 8[g0Z H[8,F 8SF p\R] S[ GLR] D\H}Z YI]\ CMI T[ 8SFJFZL YL !_ 8SF YL JW] p\RM ZC[TM CMI T[
8SFJFZL YL !_ 8SF YL JW] p\RM ZC[TM CMI T[JL VF.8DG]\ R}SJ6]\ ZGL\U AL, JBT[ T[ VF.8DGF V\NFHL
EFJ D\H}Z 8[g0ZGL 8SFJFZL T[ VF.8DGF V\NFHL EFJ YL 5 8SF GL DIF¶NFDF\ SZJFDF\ VFJX[P VF ZLT[
JLYC[<0 ZFB[, ZSD SFD ;\TMQFSFZS ZLT[ 5}6¶ YI[ OF.G, AL, D\H]Z SZTL JBT[ jIFHEFZ6 JUZ K}8L
SZJFDF\ VFJX[P
pNFCZ6 ov
pST HMUJF. GL :5Q8 ;DH6 DF8[ VF ;FY[ VF5[, pNFCZ6 wIFG[ ,[J]\
!P 8[g0ZDF\ D}S[, V\NFHL ZSD ~FP!__qv
ZP D\H}Z YI[, 8[g0ZGL ZSD ~FP!!_qv
#P 8[g0ZDF\ D}S[, V\NFHL ZSD ;FD[ BZ[BZ D\H}Z YI[, 8[g0ZGL 8SFJFZL !_ 8SF
$P 8[g0ZGL V[S VF.8DGM 8[g0ZDF\ D}S[, V\NFHL EFJ ~FP!_qv
- -
5P T[ VF.8DGM EZ[, EFJ ~FP!$qv
&P T[ VF.8DDF\ EZ[, p\RF EFJGL 8SFJFZL $_ 8SF
*P T[ VF.8D DF8[ ZGL\U AL, JBT[ R}SJJF5F+ EFJ ~FP!_ + SMP# 5|DF6[
!_
8SF p\RF V\NFHL EFJGF
5
8SF 5|DF6[ ~FP!!P5_
(P OF.G, AL, JBT[ jIFH EFZ6 JUZ R}SJJF5F+ ~FP!$P__ v !!P5_
YTM JLY C[<0 ZFB[, EFJ ~FPZP5_
HM ;NZ VF.8DGF EFJ ~FP !ZP__ S[ T[YL GLR[ EZ[, CMT TM ZGL\U AL,DF\ EFJ S5FT VF
HMUJF. D]HA SZJFGL ZC[T GCLP
s VFZP S[PRF{CF6 f
BF; OZH 5ZGF VlWSFZL
DFU¶ VG[ DSFG lJEFU
5|lT4
TDFD VlW1FS .HG[ZzLVM4 DFU¶ VG[ DSFG lJEFU4
TDFD SFI¶5F,S .HG[ZzLVM4 DFPDPlJEFU4
GS, ZJFGF ov
!P ;lRJzLGF V\UT DNNGLXzL4 DFPDPlJEFU4
ZP TDFD D]bI .HG[ZzL VG[ VP;PzL DFPDPlJEFU4
#P TDFD TF\l+S p5;lRJzLVM4 DFPDPlJEFU4
$P GFPSFP.PzLVM DFPDPlJEFU4 5|M5Z
5P GF6F\ XFBF 4 DFPDPlJEFU4
&P GFP;[PVPl;,[S8 OF.,
*P XFBF l;,[S8 OF.,
- -
Acceptance of Bank Guarantee asSecurity Deposit and EarnestMoney Deposit.
Government of Gujarat
Finance Department
GR No. EMD-SD/102006/108/GRF-DM Cell
Dated 10th April, 2006
Preamble :
Resolution :
i) IDBI Bank
ii) UTI Bank
iii) HDFC Bank and
iv) ICICI Bank
The tendering authority will be required to ascertain the authenticity of the
Bank Guarantee and set up necessary Internal control procedures.
By order and in the name of the Governor of Gujarat.
Sd/-
(K.L. Tenaji)
Joint Secretary & Director (IF)
Finance Department
To
Principal Secretary to His Excellency Governor of Gujarat, Raj Bhavan,
Gandhinagar.
- -
Principal Secretary to Hon. Chief Minister
PS to Leader of Opposition Party
PS to Hon. Finance Minister
PS to all Hon. Ministers, State Ministers and Deputy Ministers
Secretary, Legislative Assembly Secretariat, Gandhinagar
PS to Chief Secretary
PS to Additional Chief Secretary Finance
PS to Principal Secretary Expenditure, Finance Department
PS to Secretary (EA), Finance Department
All Administrative Departments, Sachivalaya, Gandhinagar
All Heads of Department
All Public Enterprises of the State
Accountant General-I (Audit) Gujarat, Ahmedabad
Accountant General (A&E) Gujarat, Ahmedabad
Accountant General-II (Audit) Gujarat, Rajkot
Accountant General (A&E) Gujarat, Rajkot
All Branches, Finance Department
Select file 'GRF DM-Cell'.
- -
U]HZFT ;ZSFZ
DFU" VG[ DSFG lJEFU
5lZ5+ S|DF\Sv 8LV[G;Lq!_qZ__Z s!$fq;4
;lRJF,I4 UF\WLGUZ
TFZLBP Z(q$qZ__#
lJQFI ovZFHI ;ZSFZGF AF\WSFD DF8[ J5ZFTF UF{6 BlGHMGL ZMI<8LEZJF AFATP
5lZ5+ ov
DFU" VG[ DSFG lJEFUGF\ ;\NE"DF\ NXF"J[, TFPZ#q!_q() GM 5lZ5+ VD,L AGTF\ VF
5lZ5+ D]HA 5lZ5+GL TFZLBYL ;LSIMZL8L 0L5MhL8 5ZT SZJF DF8[ ZMI<8L EIF" V\U[GF\
5|DF65+GM VFU|C ZFBJFGM ZC[X[ GlC\P T[J]\ GSSL SZJFDF\ VFJ[,P VF ;]WFZM 8[g0ZGF\ S,Mh v #&
sALv!f VG[ 8[g0Z S,Mhv#5 sALvZf OMD"DF\ pD[ZJFDF\ VFJ[,P 5Z\T] 8[g0Z S,Mh G\AZv! DF\ VF
9ZFJ ;\NE[" H~ZL ;]WFZM H[ T[ ;DI[ SZJFDF\ VFJ[, G CMJFYL4 8[g0ZGF\ S,Mhv! VG[ S,Mhv#&
sALv!f S,Mhv#5 sALvZf JrR[ lJ;\UTTF ZC[JF 5FD[, K[P VF lJ;\UTTF N}Z SZJFGL AFAT
;ZSFZzLGF\ ;lS|IF lJRFZ6F C[9/ CTLP VF lJ;\UTTF N}Z SZJFGL AFAT[ 5]bT lJRFZ6FGF\ V\T[ 8[g0Z
OMD" ALv! VG[ ALvZ GF\ S,Mhv! GF\ OSZFvZ DF\ sDFPDPf lJEFUGF\ TFPZ#v!_v() GF\
5lZ5+GF\ ;\NE[" ccIncluding the Royalty charge if No Due Certificate' is not
prodiuced by the contractorcc XaNM N]Z SZL4 S,Mh G\P! DF\ GLR[ D]HAGM ;]WFZM SZJFDF\
VFJ[ K[P
Fifty percentage of the Security Deposit alongwith performance bond
shall become refundable within fifteen days after the final completion
certificate is issued as per clause-7. All dues under this contract or other
contract or otherwise shall be recovered from the aforesaid amount of fifty
percentage of the said security deposit and the balance shall be refunded
within fifteen days after the final certificate is issued as per clause-7. The
remaining fifty percentage of the security deposit shall be refunded after the
- -
expiry of the Defect Liability period as per Clause 17 and 17A, after
deducting there from the amount of expenses, if any, due to Govt. under this
contract. (See Performance Bond on Page No. 44).
VF p5ZF\T VUFp TFPZ#q!_q() GF\ 5lZ5+DF\ NXF"J[, XZTMDF\ JWFZFGL !vV[ XZT
pD[ZJFDF\ VFJ[ K[P
!oV[ v ccOF.G, AL,GL GS, HL<,FGF ;\,uG pnMU VG[ BF6 lJEFUGF\ HL<,F E]:TZ
VlWSFZLG[ VF5JFGL ZC[X[Pcc
VF ;}RGFGM VR]S VD, YFI T[ HMJF ;J[" ;\A\lWTMG[ H6FJJFDF\ VFJ[ K[P
s VXMS 5\0IF f
p5 ;lRJ4
DFU" VG[ DSFG lJEFU
5|lT4
;J[" VlW1FS .HG[ZzLVM4 DFPDPJT]"/M4 5\RFIT DFPDPJT]"/M4 V[S;5|[;J[ JT]"/4 ZFQ8=LI WMZL DFU"
JT]"/4 5F8GUZ IMHGF JT]"/ ;lCTP
;J[" SFI"5F,S .HG[ZzLVM sp5ZMST JT]"/M C[9/GF lJEFUM ;lCTf
GS, ZJFGF ov
pnMU BF6 VG[ pHF" lJEFU4 ;lRJF,I4 UF\WLGUZP
GD"NF H/ ;\5ltT VG[ 5F6L 5]ZJ9F lJEFU4 ;lRJF,I4 UF\WLGUZP
lGIFDSzL4 E]:TZ lJ7FG VG[ BGLH BFT]4 a,MS G\P!#4 +LHF DF/[ H]GF ;lRJF,I4 UF\WLGUZP
lGIFDSzL4 U]HZFT .HG[ZL ;\XMWG ;\:YF4 J0MNZFP
lGIFDSzL4 V[gHLGLIZL\U :8FO SM,[H4 UF\WLGUZP
D[G[HL\U 0LZ[S8ZzL4 U]HZFT ZFHI AF\WSFD lGUD ,LP4 UF\WLGUZP
D[G[HL\U 0LZ[S8ZzL4 U]HZFT ZFHI DFU" lJSF; lGUD ,LP4 UF\WLGUZP
;J[" TF\l+S VlWSFZLzLVM sGFPSFP.PzLVM ;lCTf4 DFU" VG[ DSFG lJEFU4 ;lRJF,I4 UF\WLGUZP
;J[" 5|MH[S8 XFBFVM DFU" VG[ DSFG lJEFU4 ;lRJF,I4 UF\WLGUZP
;L,[S8 OF.,P
- -
U]HZFT ;ZSFZ
DFU¶ VG[ DSFG lJEFU4
;lRJF,I4 UF\WLGUZ
5lZ5+ S|DF\S o 8LPV[G;L q !_ q Z__Z v s!$f q ; TFPZ*v$vZ__5
lJQFI ov ZFHI ;ZSFZ AF\WSFD DF8[ J5ZFTF UF{6 BlGHGL ZMI<8L EZJF AFATP
;\NE¶ ov pWMU VG[ BF6 lJEFUGM 9ZF S|DF\S V[DV[DVFZ q !!Z___ q Z_!# q
TFP!v)vZ__$
5lZ5+ ov
pWMU4 BF6 VG[ pHF¶ lJEFUGF TFPZ5v!v)! GF 9ZFJ S|DF\S V[D;LVFZ q Z!(( v s(f q &5 v
K VgJI[ ZFHI ;ZSFZGF4 5\RFITGF VG[ ;ZNFZ ;ZMJZ GD¶NF lGUDGF AF\WJFDF\ VFJTF\ Z:TFVMGF S[
l;\RF. JU[Z[GF SFDM DF8[ HIFZ[ ;FNL DF8L s VM0L¶GZL S,[vVY¶ f VG[ s ;MO8 f D]ZD JF5ZJFDF\ VFJ[ tIFZ[
U]HZFT UF{6 BlGH lGIDv!)&& D]HA ZMI<8L ,[JFGM lGID ,FU] 50X[ GCLP V[8,[ S[ VF SFDM DF8[
SMg8=FS8ZM 5F;[ ;FNL DF8L s VF[0L¶GZL S,[ vVY[¶ f VG[ s ;MO8 f D]ZD DF8[ ZMI<8L ,[JFGL YX[ GCL T[JL
HMUJF. SZJFDF\ VFJ[,P CJ[ p5Z ;\NE¶DF\ NXF¶J[, pWMU VG[ BF6 lJEFUGF TFP!v)vZ__$ GF 9ZFJYL
TFP Z5v!v)! GF 9ZFJ ZN SZJFDF\ VFJ[, K[P
VFYL CJ[ ALv! 8[g0Z OMD¶DF\ B\0v#& VG[ ALvZ 8[g0Z OMD¶DF\ B\0v#5 DF\ GLR[ D]HA ;]WFZM
SZJFDF\ VFJ[ K[P ZFHI ;ZSFZGF AF\WSFD DF8[ J5ZFTF\ UF{6 BlGHGL ZMI<8L AFATP
s!f TFP!v#v)! GF 9ZFJ D]HA PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPD]ZD l;JFIGF VgI ;]WLGF XaNM
SZL SZL OST GLR[ D]HA HMUJF. VD,DF\ ZC[XP[
UF{6 BGLH AFATDF\ ZFPUF{PBPlGP!)&& VG[ T[GF VG];\WFGDF\ JBTM JBT ACFZ 5F0JFDF\
VFJ[, 9ZFJM ,FU] 50X[4 VG[ T[ D]HA ,Lh S[ 5ZDL8 ,[JFG]\ VG[ ZMI<8L EZJFGL ZC[X[P s pWMU VG[ BF6
lJEFU 9ZFJ S|DF\S V[DV[DVFZv!!vZ___vZ_!# v K TFP!v)v_$ f
s VXMS 5\0IF f
p5;lRJzL4
DFU¶ VG[ DSFG lJEFU
5|lT4
;J[¶ VlW1FS .HG[ZzL
s DFPDPJT]¶/Mq 5\RFIT s DFPDPfJT]¶/M q V[S;5|[; J[ JT]¶/ q ZFHI DFU¶ IMHGF JT]¶/ q ZFQ8=LI WMZL DFU¶
JT]¶/q 5F8GUZ IMHGF JT]¶/ ;CLT f
;J[¶ SFI¶5F,S .HG[ZzLVM4 s p5ZMST JT]¶/M C[9/GF TDFD lJEFUM ;CLT f
GS, ZJFGF
pWMU VG[ BF6 lJEFU4 ;lRJF,I4 UF\WLGUZ
GD¶NF 4 H/;\5ltT 4 5F6L 5]ZJ9F VG[ S<5;Z lJEFU4 ;lRJF,I4 UF\WLGUZ
lGIFDSzL4 .HG[ZL ;\XMWG ;\:YF4 J0MNZF
lGIFDSzL4 V[gHLGLIZLU :8FO SM,[H4 UF\WLGUZ
D[G[HL\U 0LZ[S8ZzL4 U]HZFT ZFHI AF\WSFD lGUD ,L4P UF\WLGUZ
D[G[HL\U 0LZ[S8ZzL4 U]HZFT ZFHI DFU¶ lJSF; lGUD ,L4 UF\WLGUZ
;J[¶ TF\l+S VlWSFZLzLVM s GFPSFP.P ;CLT fDFPDPlJEFU4 ;lRJF,I4
;J[¶ 5|MH[8 XFBFVM4 DFPDPlJEFU4 ;lRJF,I4
;L,[S8 OF.,P
- -
U]HZFT ;ZSFZ
DFU" VG[ DSFG lJEFU
5lZ5+ S|DF\S o V[;V[;VFZv!_Z__$vVF.ALv$!sZ$f;
;lRJF,I4 UF\WLGUZ
TFP Zq!ZqZ__&
lJQFI o DSFGM VG[ VgI AF\WSFDGF SFDNFZMGF S<IF6 ;[; V[S8 !))& C[9/
!@ ;[; ccU]HZFT lA<0L\U V[g0 VWZ Sg:8=SXG JS"; J[,O[Z AM0"cc DF
HDF\ SZFJJF V\U[P
;\NE" o s!f zD VG[ ZMHUFZ lJEFU4 ;lRJF,I4 UF\WLGUZGM 9ZFJ S| o
;L0A<I]V[vZ__$v($!vV[Dv#4 TFP #_P!PZ__&P
sZf zD VG[ ZMHUFZ lJEFU4 ;lRJF,I4 UF\WLGUZGM 9ZFJ S| o
;L0A<I]V[vZ__$v!(#!vV[Dv#4 TFP )P!ZPZ__5P
5 lZ 5 + o
p5ZMST lJQFIGF ;\NE"DF\ NXF"J[, zD VG[ ZMHUFZ lJEFU4 ;lRJF,I4 UF\WLGUZGF TFP
#_q!q_& tYF TFP )q!Zq_5 GF 9ZFJM sGS, ;FD[, K[f TZO ;J[" ;\A\lWTMG]\ wIFG NMZTF\ VFYL
H6FJJFDF\ VFJ[ K[ S[ D\H}Z SZFTF 0=FO8 8[g0;" 5[5;"DF\ c;[;c V\U[ HMUJF. SZLG[ .HFZNFZMGF NZ
DlCG[ SZ[, SFDGF lA,GF R]SJ6FDF\YL ! sV[Sf 8SM ;[; SF5LG[ T[ ZSD U]HZFT lA<0L\U V[g0 VWZ
Sg:8=SXG JS"; J[,O[Z AM0" GF ;\NE" sZf C[9/GF 9ZFJYL lGIT SZ[, C[0v;AC[0 BFT[ ;\A\lWT
SFI"5F,S .HG[ZzL wJFZF HDF SZFJJFGL ZC[X[P CJ[ 5KL YL H[ GJF V\NFHM D\H}Z SZJFDF\ VFJ[ T[JF
V\NFHGL NZ[S VF.8DGF EFJMDF\ !@ JWFZM SZLG[ JWFZ[, EFJ D]HA V\NFHM D\H]Z SZJFGF ZC[X[P
TYF 0=FO8 8[g0;" 5[5;"DF\ T[ D]HA ZSD D]SJFGL ZC[X[P DM8F VG[ ;]JFrI V1FZ[ ITB DF\ AL,DF\YL
S5FT YGFZ AWF\H 5|SFZGF 8[1Fq;[; lJU[Z[ GM p<,[B SZJFGM ZC[X[P
VF ;}RGFVMGM VD, R}:T 56[ YFI T[GL NZ[S ;A\lWTMV[ GM\W ,. T[ D]HA SFI"JFCL
VR}S ZLT[ CFY WZJFGL ZC[X[P
;CLqv
sVXMS 5\0IFf
p5 ;lRJ
DFU" VG[ DSFG lJEFU
5|lT4
;J[" VlW1FS .HG[ZzLVM4 DFPDP JT]"/4q5\RFIT DFPDP JT]"/qG[PCFPJT]"/qV[S:5|[; J[
JT]"/qZFPDFPIMPJT]"/q5F8GUZ IMHGF JT]"/ TYF .,[S8=LS, DFPDP JT]"/ ;CLTP
;J[" SFI"5F,S .HG[ZzLVM4 p5ZMST JT]"/M C:TSGF ;J[" lJEFUMP
;J[" TF\+LS VlWSFZLzLVM GFPSFP.PzLVM ;CLT4 DFPDP lJEFU4 ;lRJF,I4 UF\WLGUZP
;J[" 5|MH[S8 XFBFVM4 DFPDP lJEFU4 ;lRJF,I4 UF\WLGUZP
;L,[S8 OF.,vZ__&4 ;vXFBF DFPDP lJEFU4 ;lRJF,I4 UF\WLGUZP
- -
CM8DL1F 5[JZ %,Fg8q 0=DDL1F 5[JZ %,Fg8GF
DLS[GLS, ;8L"lOS[8GF JFlQF"S ZLgI]V, AFATP
U]HZFT ;ZSFZ
DFU" VG[ DSFG lJEFU
5lZ5+ S|DF\So V[D;LV[Gv!__*q!&$q(qC4
;lRJF,I4 UF\WLGUZ
TFZLBP !_q!_qZ__*P
5lZ5+ ov
;\NE"DF\ NXF"J[, ;ZSFZzLGF 5lZ5+MYL .HFZNFZMGF DFl,SLGF CM8DL1Fq 0=DSL1F 5[JZ %,Fg8; VnTG
ZFBJF V\U[ ;]RGFVM VF5JFDF\ VFJ[, K[P
5|:T]T %,Fg8GF ;8L"lOS[8G]\ JFlQF"S ZLgI]V, D[/JJFDF\ YTF lJ,A\G[ wIFG[ ,. GLR[ D]HA ;]RGFVM HFZL
SZJFDF\ VFJ[ K[P
.HFZNFZMGF DFl,SLGF CM8DL1Fq 0=DDL1F %,Fg8G]\ ;\A\lWT DLS[GLS, SFI"5F,S .HG[ZzLV[ TYF SFI"5F,S
.HG[ZzL s;LJL,fV[ ;\I]ST ZLT[ %,Fg8GL D],FSFT SZL4 R[SL\U SZL JFlQF"S ZLgI]V, 5|DF65+ VF5JFG]\ ZC[X[P
VF V\U[ SM. XZTL D\H]ZL VF5TF\ 5C[,F\ VlW1FS .HG[ZzL sIF\l+Sf DFPDP JT]"/4 VDNFJFNGM 5ZFDX"
SZJFGM ZC[X[P
U]HZFTGF ZFHI5F,zLGF C]SDYL VG[ T[DGF GFD[4
;CLqv
s 0LPALPVCFZLf
;[SXG VlWSFZL4
DFU" VG[ DSFG lJEFU
5|lT4
v VlW1FS .HG[ZzL IF\l+S sDFPDPf JT]"/4 VDNFJFN
v ;J[" VlW1FS .HG[ZzLVM s5\RFIT ;lCTf sDFPDPf JT]"/4
v ;J[" SFI"5F,S .HG[ZzLVM4 s5\RFIT DFPDPlJP ;lCTf
v ;J[" TF\l+S XFBFVM4 sDFPDPf lJEFU4 ;lRJF,I4 UF\WLGUZP
v ;J[" TF\l+S VlWSFZLzLVM sDFPDPf lJEFU4 ;lRJF,I4 UF\WLGUZP
v l;,[S8 OF.,vZ__*
vv ovo vv
HFJSq!*)&q_*4
TFPZ)q!_q_*P
GS, ZJFGF 5|lT4 GFPSFP.P ZFPWMPDFP5[PlJP NFCMNq UMWZF
GS, 5LPALPXFBFq VM0L8Z NFCMNv UMWZFq GS, lC;FAL VlWSFZLzL
TZO HF6 ;F~\P
;CLqv
SFI"5F,S .HG[Z4
ZFQ8=LI WMZL DFU" lJEFU
- -
0FDZ SFDGL RSF;6L DF8[ SMZS8L\U DXLG J;FJJF TYF
~FP!__P__ ,FBYL p5ZGF SFD DF8[ .HFZNFZzL wJFZF O],8F.D
SJM,LOF.0 .HG[Z ZFBJF V\U[P
U]HZFT ;ZSFZ
DFU" VG[ DSFG lJEFU
5lZ5+ S|DF\So VFZHLV[Gq&_Z__&s#5fv;
;lRJF,I4 UF\WLGUZ
TFZLBP !# D[ Z__*P
5lZ5+ ov
0FDZ SFDGL U]6JtTF HF/JJF SMZ ;[d5, ,[JF DF8[ SMZS8L\U DXLG .HFZNFZzLV[ J;FJJFG]\
p5ZMST ;\NE"sZfGF 5lZ5+YL OZlHIFT 9ZFJL GJL GM\W6L TYF ZLgI]V, SZTL JBT[ RSF;6L SZJF lG6"I
SZ[, K[P 1F[+LI S1FFV[ SFDM 5Z ;[d5, ,[JFI TYF IMuI ZLT[ RSF;6L YFI T[ DF8[ U]6J\T lGIDGG[ 56
lJG\TL SZFI[, K[P VG]EJ[ H6FI[, K[ S[ .HFZNFZzL wJFZF VF DXLGGM jIF5S 5|DF6DF\ p5IMU SZJFDF\
VFJTM GYLP H[GF SFZ6[ 0FDZ SFDGL U]6JtTFGL RSF;6L jIF5S 5|DF6DF\ Y. XSTL GYLP
;3G lJRFZ6FGF V\T[ CJ[ 5KL D\H]Z YGFZ EFJD];N'F 5+SDF\ GLR[ NXF"J[, BF; XZTM NFB,
SZJFG]\ VFYL GSSL SZJFDF\ VFJ[ K[P
!P SMZS8L\U DXLGGM jIF5S ZLT[ p5IMU Y. XS[ TYF Z:TFVMGF 0FDZ SFDGL U]6JtTFGL RSF;6L
lJlWJT ZLT[ Y. XS[ T[ C[T];Z GLR[ NXF"J[, XZT NFB, SZJFG]\ GSSL SZJFDF\ VFJ[ K[P
cc5_ DLDL YL JW] 0FDZ SFDGL ;\I]ST HF0F.sALV[;HLPALALV[D l;JFIf CMI T[JF Z:TFGF SFDDF\
NZ Z5_ DL8Z NL9 V[S S|M; ;[SXG 5Z 0FDZ SFDGL 5CM/F. VG];FZ A[ YL RFZ SMZ;[d5, .HFZNFZ[ 5MTFGF
SMZS8L\U DXLG J0[ ;\A\lWT GFIA SFI"5F,S .HG[ZzLGL CFHZLDF\ D[/JL VF5JFGF ZC[X[ VG[ VF ;[d5,
;L, SZL DFgI ,[AMZ[8ZL DFZOT YLSG[X4 0[g;L8L TYF AL8I]DLG; SMg8[g8GF 5lZ1F6 SZFJL 5lZ6FDM
D[/JJFGF ZC[XP[ ;\TMQFSFZS 5lZ6FDM VFjIF ;FY[4 0FDZ SFDGL R]SJJF5F+ ZSDGF\ 5 8SF ZSD JLYC[<0
ZFBJFDF\ VFJX[P H[ ZSD ;\TMQFSFZS 5lZ6FDM VFjIF AFN H K]8L SZFX[P 5Z\T] ;\TMQFSFZS 5lZ6FD GlC\
D[/JJFGF lS:;FVMDF\ SZFZGL VgI XZTM VG];FZ SFI"JFCL Y. XSX[Pcc
ZP ALP! TYF ALPZ SZFZ OMD"DF\ SFD 5Z .HFZNFZ[ V[gHLGLIZ ZFBJFGL HMUJF.G[ V;ZSFZS AGFJJF
~FP!__ ,FB S[ T[YL JW] ZSDGL 8[g0ZDF\ D]S[, V\NFHL ZSDGF SFDM DF8[ GLR[ NXF"J[, XZT NFB, SZJFG]\
VFYL GSSL SZJFDF\ VFJ[ K[P
cc SZFZ C[9/GF\ SFD 5Z .HFZNFZ[ O],8F.D SJM,LOF.0 V[gHLGLIZ lGI]ST SZJFGM ZC[X[ H[ V\U[ SFDGM
JS"VM0"Z D?I[ lNGv!5 DF\ SFI"5F,S .HG[ZzLGL HF6 C[9/4 GFIA SFI"5F,S .HG[ZzLV[ lGI]ST .HG[ZGF
- -
GFD4 SJM,LOLS[XG4 DFS"XL84 ;8L"lOS[84 S,Z OM8MU|FO4 lGI]STLGM C]SD4 JU[Z[ ZH] SZJFGL ZC[X[ TYF SFD
5Z CFHZ YIF V\U[GM ZL5M8" VF5JFGM ZC[X[P H[ VG];FZ SZFZ VgJI[ SFD 5Z SJM,LOF.0 .HG[ZGL p5ZMST
XZT D]HA lGI]STL YFI TYF :Y/ 5Z BZ[BZ SFDULZL G ;\EF/[ tIF\ ;]WLGF ;DIUF/F T[DH SFD RF,] ZC[ T[
;DI NZdIFG lGI]ST SZ[, .HG[Z SFDULZL ;\EF/X[ GlC\ TM T[ ;DIUF/F DF8[ ~FP!5___ 5|lT DF; ,[B[
lA,DF\YL S5FT SZJFDF\ VFJX[4 H[ GMGZLO\0[A, ZC[X[Pcc
p5ZMST HMUJF.VM CJ[ 5KL D\H]Z SZFGFZ EFJD];NŸF 5+SDF\ TFtSFl,S V;ZYL ;FD[, SZJFGL VFYL ;]RGF
VF5JFDF\ VFJ[ K[P H[GM R]:T56[ VD, YFI T[GL ;\A\lWT VlWSFZLV[ TS[NFZL ZFBJFGL ZC[X[P
;CLqv
sVXMS 5\0IFf
p5;lRJ4
DFU" VG[ DSFG lJEFU
5|lT4
v ;J[" VlW1FS .HG[ZzLVM4 ZFHI JT]"/Mq5\RFIT JT]"/MP
v ;J[" SFI"5F,S .HG[ZzLVM ZFHI lJEFU4 5\RFIT lJEFU
GS, ZJFGF ov
v ;lRJzL4 DFPDPGF V\UT DNNGLX
v D]bI .HG[Z sDFPDPf VG[ VP.PzL GF\V\UT DNNGLX
v D]bI .HG[ZzLs5\f VG[ VP.PzLGF V\UT DNNGLXP
vv ovo vv
- -
lJQFI ov Z:TF4 5],M TYF DSFGMGF AF\WSFDGL lJUTM TYF :5[XLOLS[XG V\U[GF SFDGF :Y/
p5Z AM0" D]SJF AFATP
U]HZFT ;ZSFZ4
DFU" VG[ DSFG lJEFU4
5lZ5+ S|DF\So 8LV[G;Lv!_)_vZ$v;
;lRJF,I4 UF\WLGUZ
TFP !*v(vZ__ZP
5lZ5+ ov
DFU" VG[ DSFG lJEFUGF ;\NE" C[9/GF 9ZFJMq 5lZ5+YL Z:TF4 5],M VG[ DSFGMGF
SFDMGF JS"VM0"Z VF%IF AFN T]T" H SFDGF :Y/[ SFDGL lJUT TYF :5[XLOLS[XG NXF"JT] \ AM0"
.HFZNFZzLGF :JBR[" D]SJFGL ;}RGF VF5JFDF\ VFJ[, K[P TFP!(v!!v)!GF 9ZFJ VG];FZ
VF AM0" D]SJFGL XZT 8[g0ZGF EFU TZLS[ U6JF 56 9ZFJJFDF\ VFJ[, K[P
VFD KTF\ ;ZSFZzLGF\ wIFG p5Z VFJ[, K[ S[4 p5ZMST ;]RGFVMG]\ R]:T56[ VD, SZJFDF\
VFJTM GYLP H[ IMuI G CM. VFYL VF5GF SFI"1F[+GF ~FP5P_ ,FBYL JW] Z V\NFÒ lS\DTGF SFDM
p5Z ;\NlE"T ;}RGFVMGM R]:T56[ VD, YFI T[GL NZ[S VlW1FS .HG[ZzL q SFI"5F,S .HG[ZzL q
GFIA SFI"5F,S .HG[ZzLG[ ;}RGF VF5JFDF\ VFJ[ K[P
SFDGL lJUTGM GD]GM VF ;FY[GF 5lZlXQ8DF\ NXF"J[, K[P
p5ZMST ;}RGFVMGM VD, R]:T56[ YFI T[GL SF/Ò ZFBJFGL ZC[X[P
s IP DP E8' f
p5 ;lRJ4
DFU" VG[ DSFG lJEFU
lA0F6 o 5lZlXQ8P
- -
S|DF\S o 8LV[G;Lq!_)_qZ$q;L
U]HZFT ;ZSFZ4
DFU" VG[ DSFG lJEFU4
;lRJF,I4 UF\WLGUZ
TFZLBov !*v(vZ__Z
5|lT4
;J[" VlW1FS .HG[ZzLVM4
s:8[84 5\RFIT4 :JP5|MH[S8f4
;J[" SFI"5F,S .HG[ZzLVM4
s:8[84 5\RFIT4 :JP5|MH[S8f4
lJQFI ov Z:TF4 5],M TYF DSFGMGF AF\WSFDGL lJUTM TYF :5[XLOLS[XG V\U[GF SFDGF
:Y/ p5Z AM0" D}SJF AFATPP
DFU" VG[ DSFG lJEFUGF\ ;\NE" C[9/GF 5lZ5+MYL Z:TF4 5],M VG[ DSFGMGF SFDMGF JS"
VM0"Z VF%IF AFN T]T" H SFDGF :Y/[ SFDGL lJUT TYF :5[XLOLS[XG NXF"JT]\ AM0" .HFZNFZzLGF
:JBR" D]SJFGF ;]RGM VF5JFDF\ VFJ[, K[P ;ZSFZzLGF wIFG p5Z VFJ[, K[ S[4 p5ZMST ;]RGFVMG]\
R]:T56[ VD, SZJFDF\ VFJTM GYL4 H[GL ;ZSFZzLV[ U\ELZ GM\W ,LW[, K[P
VF5GF SFI"1F[+DF\ ~FP5P_ ,FBYL JWFZ[ V\NFÒ lS\DTGF RF,] SFDM p5Z lNGv!_ DF\ AM0"
D]SJF H~ZL SFI"JFCL SZJF VFYL VF7FG];FZ ;]RGF VF5JFDF\ VFJ[ K[P VF ;J" SFDM p5Z D]SL T[GL
HF6 ;\A\lWT D]bI .HG[ZzLG[ VR}S SZJLP
s IP DP E8' f
p5;lRJ
DFU" VG[ DSFG lJEFU
- -
DXLG S|x0 :8MG V[U|LU[8GF O,[SLG[X VG[
.,MgU[XG .g0[1FGF ;\I]ST WMZ6M V5GFJJF
AFATP
U]HZFT ;ZSFZ
DFU¶ VG[ DSFG lJEFU4
5lZ5+ S|DF\S o V[;VMVFZ q !_Z__& q!_$q;v!
;lRJF,I4 UF\WLGUZ
TFPZ5v!vZ__*
5|:TFJGF ov
cDXLG S|x0 :8MG V[U|LU[8c V[ AF\WSFDDF\ J5ZFT]\ D]bI D8LZLI<; K[PVF D8LZLI<; DF8[GF
U]6JtTFGF lJlJW WMZ6M 5{SLGM V[S c O,[SLG[X VG[ .,MgU[XG c .g0[1F s ;\I]ST f K[P H[ DLGL:8=L VMO ZM0
8=Fg;5M8¶ V[g0 CF.J[h sMORT & H f wJFZF 5|SFXLT :5[XLOLS[XG OMZ ZM0 A|LH JS¶GL RMYL VFJltTDF\
NXF¶jIF VG];FZ #_ 8SF YL JW] G CMJM HM.V[P HIFZ[ VUFp DLGL:8=L VMO ;ZO[.; 8=Fg;5M8¶ GL ALHL
VFJltTDF\ OST O,[SLG[X .g0[1FG]\ WMZ6 JW]DF\ JW] #5 8SF ;]WLG]\ CT]P VFD ;\XMWGM q VG]EJ T[DH
VWTG DXLGZLGL p5,aWLGM jIF5 q ;Z/TF T[DH VFlY¶S 5F;VMG[ wIFG[ ,.G[ U]6JtTFGF WMZ6MDF\ 56
GJF ;]WFZF q JWFZF SZJFDF\ VFJ[ K[P VUFpGF O,[SLG[X .g0[1FGF WMZ6MDF\ CJ[ .,MgU[XG .g0[1F 56 HM0L
;\I]ST WMZ6 NFB, SZJFDF\ VFJ[, K[P 5Z\T] CF, U]HZFT ZFHIDF\ VFJ[, S|XZ I]GL8M 5{SLGF DM8F EFUGF
I]GL8M 5Z\5ZFUT 5wWlTYL SFI¶ZT K[P T[DF\YL GJF ;\I]ST WMZ6M 5lZ5]6¶ SZ[ T[JM pt5FlNT DF, D/L XSTM
GYLP H[ V[S jIJCFZLS D]xS[,L K[P 5Z\5ZFUT 5wWlTGF S|XZDF\ VF 5|SFZGL D]xS[,LVM VFJ[ K[P T[ AFATGM
p<,[B 8[SGLS, HG¶,DF\ 5|l;wW YTF\ 8[SGLS, 5[5;¶DF\ 56 YI[, K[P VFYL ;\I]ST WMZ6M D[/JJF CF,GF
S|XZ I]GL8MDF\ ;FZF V[JF 5|DF6DF\ ;]WFZF JWFZF SZJF VFJxIS AG[ T[D K[P H[DF\ JWFZFG]\ GF6F\SLI ZMSF6
56 SZJ] 50[ T[DH ;DI 56 jIlTT YFI VFYL O,[SLG[X T[DH .,MgU[XG .g0[1FGF ;\I]ST WMZ6MGM VD,
SZJF s .HFZNFZM G[ f 5]ZTM ;DI VF5JM 56 H~ZL K[P T[ wIFG[ ,. GLR[ D]HAGL ;]RGFVM VF5JFDF\
VFJ[ K[P
DLGL:8=L VMO ZM0 8=Fg;5M8¶ V[g0 CF.J[ wJFZF 5|SFXLT :5[XLOLS[XG OMZ ZM0 V[g0 A|LH JS¶GL ;G[
Z__! GL RMYL VFJltT VG];FZ DXLG S|x0 :8MG V[U|LU[[8 DF8[ O,[SLG[X T[DH .,MgU[XG ;\I]ST .g0[1FGL
DCtTD #_ 8SF GL DIF¶NFG]\ WMZ6 V5JJFG]\ GSSL SZJFDF\ VFJ[, K[P
DFU¶ VG[ DSFG lJEFU C:TS RF,TF SFDMDF\ 5|JT¶DFG :5[XLOLS[XG 5|DF6[ O,[SLG[X VG[
.,MgU[XGGF ;\IS]T .g0[1FGL DCtTD DIF¶NF #_ 8SF ZFBJFDF\ VFJ[, K[P
U]HZFT ZFHIDF\ DM8F EFUGF S|XL\U I]GL8M BFGUL DFl,SLGF K[ VG[ T[DF\ H~ZL IF\l+S O[ZOFZM
SZJFDF\ VFJ[ TM ;\I]ST .g0[1FGF WFZFWMZ6 D]HAGM DF, D/L XS[P
U]HZFT ZFHIDF\ RF,TF BFGUL S|XL\U DXLGMDF\ H~ZL IF\l+S ;]WFZF JWFZF TFP#_v)v_* ;]WLDF\
SZJFDF\ VFJ[ TM H TFP!v!_v_* 5KLYL DFU¶ VG[ DSFG lJEFUGF Z:TFVMDF\ J5ZFTF V[UL| U[8GL
U]6JtTF WFZF WMZ6 D]HAGL D/L ZC[P VFYL GLR[ D]HAGL ;}RGFVM VF5JFDF\ VFJ[ K[P
sVf DFU¶ VG[ DSFG lJEFUDF\ RF,TF\ SFDMGF .HFZNFZMV[ H [ T[ S|XL\U I]GL8MDF\ H~ZL IF\l+S ;]WFZF
JWFZF Y. UI[, K[P VG[ WFZF WMZ6 D]HAGL U]6JtTFGM V[U|LU[8 D/L ZC[ K[ T[J]\ 5|DF65+ VlW1FS
- -
.HG[ZzL s IF\l+S f VDNFJFN DFPDPJT]¶/4 VDNFJFNG]\ CMI T[GL 5F;[YL H DF,;FDFG BZLN SZJFGM
ZC[X[P VF 5|DFl6T YI[, S|XL\U I]GL8 l;JFIGF SM.56 S|XZ 5F;[YL DF,;FDFG ;%,FI G YFI T[GL SF/HL
,[JFGL ZC[X[P VlW1FS .HG[ZzL s IF\l+S f wJFZF ;8L¶OF.0 G YI[, S|XLU I]GL8 5F;[YL VFJ[, WFZFWMZ6
JUZGM DF,;FDFG VFp8ZF.8 ZLH[S8 SZJFDF\ VFJX[P
sAf DFU¶ VG[ DSFG lJEFUGF V[;PVMPVFZP DF\ TYF V\NFHMDF\ V[U|LU[8GF EFJDF\ H~ZL ;]WFZF JWFZF
SZLG[ TFP!v!_v_* YL VD,DF\ ,FJJFGF ZC[X[P
sSf NZ[S lJEFULI SR[ZLVMV[ T[VMGF TFAFGF H[ H[ .HFZNFZMGL GM\W6L YI[, K[P T[VMG[ ;NZC]
;]RGFGM VD, SZJF DF8[ ,[BLT HF6 SZJFGL ZC[X[ TYF BFGUL S|XL\U I]GL8MG[ 56 VFGL ,[BLT HF6
SZJFGL ZC[X[P ;NZC] ;]RGFGF VD, DF8[ BFGUL S|XZ I]GL8M T[DH .HFZNFZM ;FY[ NZ[S lJEFULI
SR[ZLV[ V[S ;\I]ST A[9S SZLG[ ;DH VF5JFGL ZC[X[ H[YL TFP!v!_v_* 5KL DFU¶ VG[ DSFG lJEFU
C:TS RF,TF\ SM.56 SFDMDF\ WFZF WMZ6 D]HAGL U]6JtTF l;JFIGM DF,;FDFG JF5ZJFDF\ G VFJ[ T[GL
TS[NFZL ZFBJFGL ZC[X[P
p5ZMST ;]RGFVMGM VD, R]:T56[ SZJFGM ZC[XP[
s V[;PV[PE8| f
p5;lRJ D]PDP
DFU¶ VG[ DSFG lJEFU
5|lT4
GS, ZJFGF ov
v ;lRJzL4 DFPDPGF V\UT ;lRJzL4 DFPDPlJEFU4 ;lRJF,I4 UF\WLGUZ
v ;J[¶ D]bI .HG[ZzLVM VG[ VP;PzLVM4 DFPDPlJEFU4 ;lRJF,I4 UF\WLGUZ
v ;J[¶ VlW1FS .HG[ZzLVM4
v ;J[¶ TF\l+S VlWSFZLVM4 DFPDPlJEFU4 ;lRJF,I4 UF\WLGUZ
v OF., S|DF\SvV[;VF[VFZ v!_Z__& s!_$ f;P! DF\ ZFBJF ;F~
v l;,[S8 OF.,
- -
DXLG S|x0 :8MG V[U|LU[8GF O,[SLG[X VG[
.,MgU[XG .g0[1FGF ;\I]ST WMZ6M V5GFJJF
AFATP
U]HZFT ;ZSFZ
DFU¶ VG[ DSFG lJEFU4
5lZ5+ S|DF\S o V[;VMVFZ q !_Z__& q!_$q;v!
;lRJF,I4 UF\WLGUZ
TFP!*v!_vZ__*
5|:TFJGF ov
U]HZFT ;ZSFZzLGF DFU¶ VG[ DSFG lJEFU wJFZF ;\NE¶LT 5ZL5+ S|DF\S V[;PVMPVFZP q
!_Z__& q !_$ q ;P! TFPZ5v!vZ__* YL AF\WSFDDF\ J5ZFTF DXLG S|x0 :8MG V[U|LU[8 DF8[ .,[SLG[X
T[DH .,MgU[XG ;\I]ST .g0[1FGL DCtTD #_ 8SF DIF¶NFG]\ WMZ6 V5GFJJFG]\ GSSL YI[, CT]P H[ DF8[ U]HZFT
ZFHIDF\ RF,TF BFGUL S|XL\U I]GL8MDF\ H~ZL TF\l+S ;]WFZF JWFZF TFP #_v)vZ__* ;]WLDF\ SZJF VG[
TFP!v!_vZ__* 5KL YL DFU¶ VG[ DSFG lJEFUGF Z:TFVMGF SFDDF\ J5ZFTF\ V[U|LU[8 WFZF WMZ6
D]HAGL U]6JtTF JF/M JF5ZJFDF\ VFJ[ T[D H6FJ[, CT]P
S|XZ I]GL8MDF\ H~ZL ;]WFZF JWFZF ;]RJ[, ;DIUF/F DF\ Y. XS[, G CMJFYL JFZ\JFZ ;DIDIF¶NF
JWFZJF DF8[GL ZH]VFTM YI[, CTLP
p5ZMST AFAT[ ;ZSFZzL wJFZF 5]bT lJRFZ6FGF V\T[ S|XL\U I]GL8MDF\ H~ZL ;]WFZF JWFZF SZJF
DF8[GL V\lTD TFP #_v)vZ__* G[ AN,[ TFP#!v!ZvZ__( SZJFDF\ VFJ[, K[P
p5ZMST ;]RGFVMGM VD, R]:T56[ SZJFGM ZC[X[P
s V[;PV[PE8| f
p5;lRJ s D]PDPf
DFU¶ VG[ DSFG lJEFU
GS, ZJFGF ov
v ;lRJzL4 s DFPDPf GF V\UT ;lRJzL4 DFPDPlJEFU4 ;lRJF,I4 UF\WLGUZ
v ;J[¶ D]bI .HG[ZzLVM VG[ VP;PzLVM DFPDPlJEFU4 ;lRJF,I4 UF\WLGUZ
v ;J[¶ VlW1FS .HG[ZzLVM
v ;J[¶ TF\l+S VlWSFZLzLVM4 DFPDPlJEFU4 ;lRJF,I4 UF\WLGUZ
v OF., S|DF\S V[;PVMPVFZP q !_Z__& q s!_$ f q ;P! DF\ ZFBJF ;F~
v l;,[S8 OF.,
- -
AF\WSFDGF D8LZLI, T[DH SMd5MG[g8; ;[d5,
GL U]6JtTF DF8[GF 5ZL1F6 5{SLGF (_ 8SF
5ZL1F6 :Y/ 5Z TYF 5ZL1F6 ;ZSFZ DFgI
,[AMZ[8ZL q U[ZL wJFZF TYF !_ 8SF U[ZL
,[AMZ[8ZLDF\ SZFJJF AFATP
U]HZFT ;ZSFZ
DFU¶ VG[ DSFG lJEFU
5lZ5+ S|DF\S 5ZR q !_Z__* q Z( q ;
;lRJF,I4UF\WLGUZ
TFZLB ov #!v!ZvZ__)
5lZ5+ o
AF\WSFDGF D8LZLI<; T[DH SMd5MG[g8;GF ;[d5, GL U]6JtTF DF8[GF 5lZ1F6 CF, U[ZL S[ ;ZSFZ
DFgI ;\:YF s ,[AMZ[8ZL f DFZOT[ SZJFDF\ VFJ[ K[P SFDMGL 5|UlTGL ;DL1FF NZdIFG 1F[+LI VlWSFZLVM
TZOYL HF6JF D/[, K[ S[ pST CIFT 5|lS|IFDF\ 8[:8L\U GF 5lZ6FDM lJ,\AYL D/[ K[4 H[DF\ ;DI 56 B}A
jIlTT YFI K[P .HFZNFZ V[;M;LI[XG TZOYL VFJL ZH]VFTM D/[ K[P VFYL VF D]xS[,L wIFG[ ,[TF\
.HFZNFZzL wJFZF H[ T[ SFD DF8[ :YF5JFDF\ VFJTL ,[AMZ[8ZLDF\ :Y/ 5Z H 5ZL1F6 SZJFDF\ VFJ[ TM lJ,\A
lGJFZL XSFI T[ AFAT lJRFZ6F C[9/ CTLP 5]bT lJRFZ6FGF V\T[ GLR[ D]HAGL GLlT CF,GF TASS[
VG];ZJF GSSL SZJFDF\ VFjI] K[P
GLR[ H6FJ[, 5ZL1F6MDF\ 5|JT¶DFG 5wWlTDF\ O[ZOFZ SZL OLSJgXL VG];FZ H~ZL 5lZ1F6M 5{SL !_
8SF ;ZSFZ DFgI ,[AMZ[8ZL q U[ZL TYF !_ 8SF U[ZL ,[AMZ[8ZL VG[ (_ 8SF OL<0 ,[AMZ[8ZL wJFZF
SZFJJFGF ZC[X[P 5Z\T] U[ZLDF\ GLR[GF NZ[S 5{SL VMKFDF\ VMK] ! s V[S f 5ZL1F6 U[ZL ,[AMZ[8ZLDF\ SZJFG]\
ZC[X[ TYF VMFKFDF\ VMK] V[S 5ZL1F6 U[ZL q ;ZSFZ DFgI ,[AMZ[8ZLDF\ SZFJJFGM ZC[X[P H[DF\ GLR[ NXF¶J[,
5ZL1F6M :Y/ 5Z SZJFGF ZC[ K[P
V[ V[U|LU[8 s!f U|[0[XG
sZf O,[SLG[X VG[ .,MU[XG J[<I]
s#f .d5[S8 J[<I]
s$f JM8Z VA;M5¶XG
AL DF8L s!f lO<0 V[O0L0L VG[ V[OV[D;L
sZf ;LJ V[GF,L;L;
;L Z[TL s!f U|[0[XG
0L .\8M s!f 0FID[GXG VG[ 8M,Zg; 8[:8
sZf JM8Z VA;M5¶XG
. S|M\S|L\8 s!f GMG 0L:8=LS8LJ 8[:8 s V[<8=F ;MGLS 8[:8L\U 5wWlT YL f
sZf :,d5 8[:8
s#f SMd5|[;LJ :8=[gY
V[O AL8I]DLG; DLS; s!f 0FDZGL 8SFJFZL
HL 0=FI DL1F D8LZLI, s!f U|[0[XG
- -
XZTM ov
!P .HFZNFZ[ SFDGL U]6JtTF DF8[ WFZF WMZ6 5|DF6[GL VG[ p5Z H6FJ[, 5lZ1F6M DF8[ 5|DFl6T
YI[, H~ZL TDFD ;FWGM ;lCTGL lO<0 8[:8L\U ,[AMZ[8ZL :J BR[" SFDGF :Y/[ IMuI HuIF p5Z
:YF5JFGL ZC[XP[ Z:TFGF SFD DF8[ ,FU] 50TF %,Fg8GF :Y/G[ SFDG]\ :Y/ U6L XSFIP 5Z\T] SFDG]\
:Y/ ,[AMZ[8ZLYL N}Z CMI TM .HFZNFZzL wJFZF DMAF., ,[AMZ[8ZLGL H~ZL jIJ:YF ZFBJFGL
ZC[X[P
ZP SFP.PzL HIFZ[ :Y/ 5Z T[VMG]\ R[SL\U SZJF HFI tIFZ[ 8[:8L\U T[VMV[ T[DGL ~A~DF\ 56 SZFJJFG]\
ZC[X[P
#P WFZF WMZ6 5|DF6[GF 5ZL1F6MGL ;\bIF 5{SL (_@ 5ZL1F6 lO<0 ,[AMZ[8ZLDF\ .HFZNFZGF VlWS'T
SJM,LOF.0 .HG[Z S[ H[VMG[ ;\A\lWT SFI"5F,S .HG[ZzLV[ I-CARD VF5[, CMI T[DGF wJFZF
BFTFGF GFPSFP.P q DP.P q VPDP.PGL CFHZLDF\ H SZJFGF ZC[X[ VG[ 5lZ6FDMDF\ ;\I]ST ;CLVM
SZJFGL ZC[X[P HIFZ[ !_@ 5lZ1F6 U[ZL q ;ZSFZ DFgI ,[AMZ[8ZL sVMKFDF\ VMK]\ V[S 5ZL1F6f
VG[ !_@ U[ZL ,[AMZ[8ZL sVMKFDF\ VK]\ V[S 5ZL1F6f DFZOT[ SZFJJFGF ZC[X[P
$P S], 5lZ1F6MGF (_@ 5lZ1F6 V[S H :Y/[ V[S H ;DI[ V[S H TASSFDF\ GCL\ SZTF\ SFDGL 5|UlT
D]HA H[ TAASSFV[ H[vT[ SFDULZLG[ VG]~5 H[ D8LZLI<; JF5ZJFG]\ YT]\ CMI TN]VG];FZ
X~VFTGF TASSFDF\ ZFBJ]\P JrR[GF\ TASSFDF\ T[DH VFBZL TASSFDF\ SZFJJFG]\ ZC[XP[ VFD KTF\
VF AFAT[ :YFlGS S1FFV[YL GFPSFP.PzLV[ H~lZIFT D]HA TASSFJFZ 5ZL1F6M GSSL SZJFGF
ZC[X[P
5P U]6JtTF lGIDG WFZF WMZ6 5|DF6[GF AWF H ZHL:8Z lGIlDT ZLT[ lGEFJJFGF ZC[X[ VG[ T[
H[vT[ :Y/[ ,[AMZ[8ZLDF\ p5,aW ZC[ T[D ZFBJFGF ZC[X[P
&P HM SM. SFZ6;Z 8[:8L\UGF ;FWG V5|F%I CMI VYJF J;FJJFDF\ ;DI HFI T[D CMI S[ jIJCF~ G
CMI sH[D S[4 .,[S8=MD[l8S A[ZL\Uf TM VFJF 5ZL1F6M U[ZL q ;ZSFZ DFgI ;\:YFVMDF\ SZFJL XSFX[
VG[ VF AFATGM lG6"I ;\A\lWT SFP.PzL q GFPSFP.PzLV[ SZJFGM ZC[XP[ U[ZLDF\ G Y. XS[ T[JF
8[:8 ;ZSFZ DFgI ,[AMZ[8ZLDF\ SZFJL XSFIP
*P lJEFUGF 1Fl+I :8FO[ GFPSFP.PqDP.PqVPDP.Pq V[ T[DH .HFZNFZGF TF\l+S :8FO wJFZF U[ZLDF\
5ZL1F6 HFT[ SZJFGM ;\TMQFSFZS VG]EJ D[/JL VF AFATG]\ U[ZLG]\ 5|DF65+ 56 D[/JJFG]\ ZC[X[P
H[ T[ lH<,F q 5|FN[lXS :TZ[ U[ZLGL ,[AMZ[8ZLDF\ SMQF¶ Sg0S8 SZJF DF8[ H~ZLZL OL H[ T[ lJEFUGF
SFP.PzL V[ R]SJJFGL ZC[X[ VG[ VF SFI¶JFCL ;DIAwW 5}6¶ YFI T[ DF8[ ;A\lWT VP.PzL.V[ VF
SFDULZLGL JBTMJBT ;DL1FF SZJFGL ZC[X[P
(P VF 5lZ5+YL p5Z H6FJ[, 5ZL1F6M 5{SL (_@ 5ZL1F6M 1F[l+I ,[AMZ[8ZLDF\ SZJFGM ;DI
TFP_!v_!vZ_!_ YL SZJFGM ZC[X[P
)P U[ZLDF\ 8[:8L\U SZFJTF\ ;DI[ U[ZLGM 8[:8L\U RFH¶ tJZLT EZJFGM Z[C[X[P H[YL 5ZL1F6GF 5ZL6FDM
;DI;Z D[/JL XSFIP
sVFZPS[P RF{CF6f
BF; OZH 5ZGF VlWSFZL s lJPIMPf
DFU¶ VG[ DSFG lJEFU
- -
U]HZFT ;ZSFZ4
DFU[" VG[ DSFG lJEFU4
5lZ5+ S|DF\S o V[;V[;VFZv!_))vVF.ALvs)fv;4
!$qZ4 ;ZNFZ EJG
UF\3LGUZP TFP Z&q_*q))P
5lZ5+ ov
5|JT"DFG 5wWT D]HA 0FDZ SFDGF 8[g0ZF[DF\ .HFZNFZ[ 5F[T[ 0FDZ ,FJLG[ SFD[F SZJFGL HF[UJF.
YI[,L CF[I GJF 0FDZGF[ 8[:8 YIF AFNH p5IF[U SZJF[ H~ZLZ CF[I NZ[S %,FG ;F.8 p5Z 0FDZ 5lZ1F6
DF8[GL DF/BFlSI ;J,TF[ TYF ;FWGF[ .HFZNFZ NJFZF p5,aW CF[JF[ H~ZL AG[, K[P VFYL VFJF ;A\lWTF[G[
;]RGF 5F9JJFDF\ VFJ[ K[ S[ %,Fg8 ;F.8 5Z 0FDZGF 5lZ1F6 HF[UJF. CJ[5KLYL 0FDZGF SFDGF 8[g0ZF[DF\
lJxI ZFBJFGL ZC[X[ JW]DF\ :Y/ 5ZGL 8[:8 SFDULZL DF8[G]\ 7FG NZ[S TF\l+S SD"RFZLG[ ZC[ T[ DF8[ 0FDZGF
5lZ1F6GL TFl,D U[ZLG[ H]NL H]NL 5|IF[UXF/F TZOYL lJEFUGFNZ[S DNNGLX .HG[ZqVlWS DNNGLX .HG[Zq
GFIA SFI"5F,S .HG[ZqSFI"5F,S .HG[Z[ D[/JJFGL ZC[X[P
%,Fg8 ;F.8 p5Z 0FDZGF 5lZ1F6F[G]\ ZÒ:8Z ;A\lWT 1F[l+IVlWSFZLzLV[ lGEFJJFG]\ ZC[X[P
%,Fg8 ;F.8 p5Z 0FDZ 5lZ1F6GL 5wwlT DF8[ GLR[ 5|DF6[ 8[g0ZDF\ HF[UJF. ZFBJFGL ZC[X[P
s!f DF/BFSLI ;J,T ov
- -
:Y/ p5Z VFXZ[ Z5 RMPDLPGF 1F[+O/GL 5FSF AF\3SFDJF/L ,[AMZ[8ZL H~ZL 5F6L TYF ,F.8GL
;]JLWF ;lCT AGFJJFGL ZC[X[P
sZf ;FWGMGL ;J,T ov
0FDZ SFDGF\ GLR[ NXF"J[, H]NFH]NF 5lZ1F6M DF8[ T[GL ;FD[ NXF"J[, VF.V[; D]HAGF\ ;F3GM p5,a3
SZFJJFGF\ ZC[X[P
s!f 5[GL8|[XG 8[:8 o VF.V[; v !Z_#
sZf ;MOGL\U 5M.g8 8[:8 o VF.V[; v !Z_$
s#f 0S8L,L8L 8[:8 o VF.V[; v !Z_(
s$f JL:SM;L8L 8[:8 o VF.V[; v !Z_&
s5f :5[ZLOLS[XG U|[JL8L 8[:8 o VF.V[; v !Z_Z
p5ZMST ;F3GM VF.V[; 5|DFl6T CMJF Ô[.V[4 T[DH[ T[G[ lGIlDT ZLT[ 0[,LA|[8 SZFJL CF,TDF\ ZFBJFGF\
ZC[X[P
s#f 5lZ1F6GL ;\bIF ov
V[DPVMPV[;P8LP :5[XLOLS[XG ;[SXG )__ D]HA 0FDZ SFDMDF\ SJM,L8L AF.g0ZGF\ ;\bIF
V[h ZLSJFI0" NXF"J[, K[P T[ Ô[TF NZ A[ 8[gSZ NL9 GD]GFGF +6 5lZ1F6 %,Fg8 ;F.8 p5Z SZFJJFGF
ZC[X[P TNp5ZFT CJ[ 5KLYL 8[A,GF :TE # VG[ $ DF NXF"jIF 5=DF6[GF 5lZ1F6M U[ZLDF 56
SZJJFGF ZC[X[P
vvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv
VF.V[; !Z_!q!)*(qD]HA 5ZL1F6M SZJFGL ;]WFZ[, ;\bIF
5ZL1F6GL ;\bIF
vvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv
8[gSZGL ;\bIF 5ZL1F6GL 8[gSZGL ;\bIF 5ZL1F6GL ;\bIF
;\bIF
vvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv
! ! 5 YL !_ !
Z YL !5 Z !! YL Z_ Z
!& YL 5_ # Z! YL 5_ #
5! YL !5_ 5 5! YL !__ $
AFSL NZ[S 5_8[gSZ NL9
vvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv
- -
p5Z D]HAGF\ 0FDZGF\ ;F.8 p5Z T[DH U[ZL DF\ 5lZ1F6M SZFJJFGL HMUJF. CJ[ 5KLGF\
NZ[S 0FDZ SFDGF\ 8[g0ZMDF\ VJxI ZFBJFGL ZC[X[P
VF ;]RGFVMGM VD, R]:T56[ YFI T[G]\ NZ[S 1F[l+IVlWSFZLVMV[ VJxIwIFG ZFBJ]\
;CLqv
s ;LPV[DPEÎ f
GFIA ;lRJ4
DFU" VG[ DSFG lJEFU
5|lT4
!P ;J[" VlW1FS .HG[ZzLVM4 DFP VG[ DP JT]"/4 5\RFIT DFP VG[ DP JT]"/q
G[PCFP JT]"/qV[S:5|[; J[ JT]"/q5FP IMP JT]"/ ;CLTP
ZP ;J[" SFI"5F,S .HG[ZzLVM4 p5ZMST JT]"/M4 C:TSGF ;J[" lJEFUMP
#P ;J[" TF\l+S VlWSFZLzLVM sGFPSFP.PzLVM ;CLTf4 DFPDP lJEFU4 ;lRJF,I4UF\WLGUZP
$P ;J[" 5|MH[S8 XFBFVM sZ:TFG[ ,UTLf4 DFPDP lJEFU4 ;lRJF,I4 UF\WLGUZP
5P l;,[S8 OF., v !)))q;vXFBF4 DFPDP lJEFU4 ;lRJF,I4 UF\WLGUZP
- -
FORMAT FOR
BID SECURITY (BANK GUARANTEE)
- -
is stated in the Instructions to Bidders or as it may be extended by the Employer,
notice of which extension(s) to the Bank is hereby waived. Any demand in respect
of this Guarantee should reach the Bank not later than the above date.
DATE _________________________ SIGNATURE
_______________________________
WITNESS _______________________ SEAL
_____________________________________
[Signature, Name, and Address]
* The Bidder should insert the amount of the guarantee in words and figures
denominated in Indian Rupees. This figure should be the same as shown in Clause
16.1 of the Instructions to Bidders.
* 45 days after the end of the validity period of the Bid. Date should be inserted by