Total Available Minutes Total Downtime Minutes Total Productive Time

The document provides downtime data in minutes for machines in the Truck Tyre Building and Tractor Tyre Building departments from August 27th to 31st and September 1st to 19th. In the first period, the total downtime was 18,505 minutes or 47.3% of total available time, with mechanical faults, no material, and absence being the top three reasons. The breakdown of non-productive minutes was band - 2,740, tread - 8,360, sidewall - 900, and bead - 0. In the second period, the total downtime was 24,470 minutes or 28.3% of available time, once again with mechanical faults, no material, and absence being the primary causes

Uploaded by

saad bin sadaqat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views3 pages

Total Available Minutes Total Downtime Minutes Total Productive Time

The document provides downtime data in minutes for machines in the Truck Tyre Building and Tractor Tyre Building departments from August 27th to 31st and September 1st to 19th. In the first period, the total downtime was 18,505 minutes or 47.3% of total available time, with mechanical faults, no material, and absence being the top three reasons. The breakdown of non-productive minutes was band - 2,740, tread - 8,360, sidewall - 900, and bead - 0. In the second period, the total downtime was 24,470 minutes or 28.3% of available time, once again with mechanical faults, no material, and absence being the primary causes

Uploaded by

saad bin sadaqat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Down time(Minutes) 27th, 28th & 31st Aug - 2020

Dept Machine
Mechanical Electrical No
Fault Fault Material Absence N.S D.E S.F Others Total

TK-01 - - 900 900 - - - 240 2,040


Truck Tyre Building

TK-02 690 - 450 - 900 - - - 2,040


TK-03 - - 750 - - - 210 240 1,200
TK-04 - - 450 450 - - - - 900
TK-05 - - 1,350 900 450 - - - 2,700
Total 690 - 3,900 2,250 1,350 - 210 480

TR-01 450 - 350 - - - - - 800


TR-02 - - 1,140 - - - - - 1,140
Tractor Tyre Building

TR-03 - 75 1,020 - - - - - 1,095


TR-04 - - 1,320 - - - 120 - 1,440
TR-05 - - 420 - - - 90 - 510
TR-06 - - 2,250 - - 180 - - 2,430
TR-07 - 400 1,300 - - - - - 1,700
TR-10 - - 300 - - - 210 - 510
Total 450 475 8,100 - - 180 420 -

Total 1,140 475 12,000 2,250 1,350 180 630 480

Total available minutes 39,150 *Tread 8,360


total downtime minutes 18,505 47.3% NM Break-up
** Band 2,740
Total productive time 20,645 52.7% *** Sidewall 900
**** Bead -
*Band 2,740
**Bead -
***Sidewall 900
****Tread 8,360
Down time(Minutes) 01 - 19th Sept - 2020
Dept Machine
Mechanical Electrical No
Absence N.S D.E S.P Others Total
Fault Fault Material

TK-01 2,390 750 240 2,700 - 900 6,980


Truck Tyre Building

TK-02 810 750 240 3,600 - 5,400

TK-03 810 1,680 1,920 900 - 450 5,760

TK-04 150 870 340 450 - - 1,810

TK-05 530 1,110 990 1,230 660 - 4,520

Total 4,690 5,160 3,730 7,980 900 660 - 1,350

Total available minutes 86,400 *Band 2,160

total downtime minutes 24,470 28.3% ** Tread 1,330


N.M Break-up
Total productive time 61,930 71.7% *** Bead 240