ATTENDANCE
SHEET
Name Time in Time out Signature
SELF ASSESSMENT
CHECKLIST
INSTALL AND CONFIGURE COMPUTER SYSTEMS
Assemble computer hardware
Prepare installer
Install operating system and drivers for peripherals/ devices
Install application software
Conduct testing and documentation
SET-UP COMPUTER NETWORKS
Install network cables
Set network configuration
Set router/Wi-Fi/ wireless access point/repeater configuration
Inspect and test the configured computer networks
SET-UP SERVERS
Set-up user access
Configure network services
Perform testing, documentation and pre-deployment procedures
MAINTAIN AND REPAIR COMPUTER SYSTEMS AND NETWORKS
Plan and prepare for maintenance and repair
Maintain computer systems and networks
Rectify/correct defects in computer systems and networks
Inspect and test the computer systems and networks
DATE GATHERING FORM
Sample Data Gathering Instrument for Trainee’s
Characteristics in Computer System Servicing NC II
Please answer the following instrument according to the characteristics
described below. Encircle the letter of your choice that best describes you as a
learner. Blank spaces are provided for some data that need your response.
Characteristics of learners
Language, literacy and Average grade in: Average grade in:
numeracy (LL&N)
English Math
a. 95 and above a. 95 and above
b. 90 to 94 b. 90 to 94
c. 85 to 89 c. 85 to 89
d. 80 to 84 d. 80 to 84
a. 75 to 79 e. 75 to 79
Cultural and language Ethnicity/culture:
background a. Ifugao
b. Igorot
c. Ibanag
d. Gaddang
e. Muslim
f. Ibaloy
g. Others( please specify)_____________
Education & general Highest Educational Attainment:
knowledge a. High School Level
b. High School Graduate
c. College Level
d. College Graduate
e. with units in Master’s degree
f. Masteral Graduate
Characteristics of learners
g. With units in Doctoral Level
h. Doctoral Graduate
PRE-TEST
Name:___________________________ Date:_________________ Score:___________
TEST I
A. Multiple Choice: Using Blank Sheet of Paper Choose the appropriate answer by writing the letter of
the correct answer.
1. It is the collection of physical parts of a computer system.
a. Hardware
b. System unit
c. software
d. Personal Computer
2. A device used to safely ground a person working on very sensitive electronic equipment,
to prevent the buildup of static electricity on their body, which can result in electrostatic
discharge.
a. Port Forwarding
b. DHCP Server
c. DHCP Reservation
d. Anti-static wrist strap
3. In this step you will need to gather first the necessary part to build the computer
a. Procuring Parts
b. Open the case
c. Assemble ram
d. Start the computer
4. Refers to switching on a computer by turning on the electrical supply using a switch. A
computer will run all the self-test after a hard boot.
a. Hard boot
b. Fast boot
c. Soft boot
d. Slow boot
LEARNING
CONTRACT
POST-TEST
Name:___________________________ Date:_________________ Score:___________
TEST I
A. Multiple Choice: Using Blank Sheet of Paper Choose the appropriate answer by writing the letter of
the correct answer.
1. It is the collection of physical parts of a computer system.
a. Hardware
b. System unit
c. software
d. Personal Computer
2. A device used to safely ground a person working on very sensitive electronic equipment,
to prevent the buildup of static electricity on their body, which can result in electrostatic
discharge.
a. Port Forwarding
b. DHCP Server
c. DHCP Reservation
d. Anti-static wrist strap
3. In this step you will need to gather first the necessary part to build the computer
a. Procuring Parts
b. Open the case
c. Assemble ram
d. Start the computer
4. Refers to switching on a computer by turning on the electrical supply using a switch. A
computer will run all the self-test after a hard boot.
a. Hard boot
b. Fast boot
c. Soft boot
d. Slow boot
EVALUATION
FORM
APPLICATION
FORM
PERFORMANCE
TEST
RPL
COC3- SET-UP COMPUTER SERVERS
TASK:
1. Set-Up User Access
2. Configure Network Services
3. Perform testing, documentation and
pre-deployment procedures
PERFORMANCE
TEST
SLOW LEARNER to COMPETENT
C0C2-Set-Up Computer Network
TASK:
1. Install Network Cables
2. Set Network Configuration
3. Set Router/Wi-Fi/Wireless Access
point/Repeater configuration
4. Inspect and test Computer Networks
PERFORMANCE
TEST
NOT YET COMPETENT
COC1- INSTALL AND CONFIGURE
COMPUTER NETWORKS
TASK:
1. Assemble Computer Hardware
2. Prepare Installer
3. Install Operating System and Drivers for
peripherals/devices
4. Install Application Software
5. Conduct Testing and Documentation.
PERFORMANCE
CRITERIA
CHECKLIST
RPL
COC3- SET-UP COMPUTER SERVERS
TASK:
1. Set-Up User Access
2. Configure Network Services
3. Perform testing, documentation and pre-deployment procedures
PERFORMANCE CRITERIA YES NO
User folder is created in accordance with network operating system (NOS)
features
Network services to be configured are confirmed based on user/system
requirements
Operation and security check are undertaken based on end-user requirements
NOT YET COMPETENT
COC1- INSTALL AND CONFIGURE COMPUTER SYSTEMS
TASK:
1. Assemble Computer Hardware
2. Prepare Installer
3. Install Operating System and drivers for peripherals /devices
4. Install application software
5. Conduct testing and documentation
PERFORMANCE CRITERIA YES NO
Assemble Computer Hardware
Prepare Installer
INSTITUTIONAL ASSESSMENT
PERFORMANCE CRITERIA YES NO
Install Operating System and Drivers for Peripherals/devices in
accordance with established installation procedures
Install Application Software
However you miss to perform installing drivers and configurations.
RE-ASSESSMENT
Install Operating System
Install Application Software, and perform installing drivers and
configurations.
SLOW LEARNER to COMPETENT
COC2- SET-UP COMPUTER NETWORKS
TASK:
1. Install Computer Network Cables
2. Set Network Configuration
3. Set router/Wi-Fi/Wireless Access point/ repeater configuration
4. Inspect and test the configured computer network
PERFORMANCE CRITERIA YES NO
Set Network Configuration
Set router/Access point
Inspect and test the configured computer networks
INSTITUTIONAL ASSESSMENT
PERFORMANCE CRITERIA YES NO
Check network connectivity of each terminal
You have configured LAN port in accordance with manufacturers instruction
and network design
Undertake final inspection
Oral questions
RPL
1. Why is it important to Set- Up Computer Server?
NOT YET COMPETENT
2. Why do we need to prepare USB installer?
SLOW LEARNER to COMPETENT
3. What is the use of Network Cabling?
COMPUTER SYSTEM SERVICING NCII
INSTALL AND CONFIGURE COMPUTER SYSTEMS
SET-UP COMPUTER NETWORKS
SET-UP COMPUTER SERVERS
MAINTAIN AND REPAIR COMPUTER SYSTEMS
AND NETWORKS
JELLANE SEñORA
JEN RENTOY
SAM RAFALLO
SHAIRRA COPLA
JESSA POBOCAN
WRITTEN TEST
Name:___________________________ Date:_________________ Score:___________
TEST I
A. Multiple Choice: Using Blank Sheet of Paper Choose the appropriate answer by writing the letter of
the correct answer.
1. It is the collection of physical parts of a computer system.
a. Hardware
b. System unit
c. software
d. Personal Computer
2. A device used to safely ground a person working on very sensitive electronic equipment,
to prevent the buildup of static electricity on their body, which can result in electrostatic
discharge.
a. Port Forwarding
b. DHCP Server
c. DHCP Reservation
d. Anti-static wrist strap
3. In this step you will need to gather first the necessary part to build the computer
a. Procuring Parts
b. Open the case
c. Assemble ram
d. Start the computer
4. Refers to switching on a computer by turning on the electrical supply using a switch. A
computer will run all the self-test after a hard boot.
a. Hard boot
b. Fast boot
c. Soft boot
d. Slow boot