The document describes the design of a cantilever retaining wall that is 1.5 meters tall. It provides dimensions and material properties and calculates the forces and moments acting on the wall. These include active and passive earth pressures. Stability is checked at the heel of the wall and it is determined that the wall design is safe against overturning, sliding, and inadequate reinforcement.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views14 pages

03.02.2017 - Cantilever Retaining Wall - With Toe 14.09.2019

The document describes the design of a cantilever retaining wall that is 1.5 meters tall. It provides dimensions and material properties and calculates the forces and moments acting on the wall. These include active and passive earth pressures. Stability is checked at the heel of the wall and it is determined that the wall design is safe against overturning, sliding, and inadequate reinforcement.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

CANTILEVER RETAINING WALL

Retaining wall R1
Ht of wall below GL 1.8 m
Total Height of wall 6.5 m
Base width 4.5 m
Depth of base slab 1.3 m
Thickness of wall 0.45 m
Surcharge on wall 10 kN/m2
Coeff of active earth pressure 0.33
Coeff of passive earth pressure 3
Grade of Concrete M 20 20 N/mm2
Yield Str of steel (Fe) 500 500 N/mm2
SBC (assumed) 400 N/mm2

Descpt Force CG Moment Total


Force dut to Passive earth pressure
F1 87.48 0.6 52.488 52.49
Force dut to Active earth pressure
F2 (sur) 52 3.9 202.8
F2 (soil) 81.12 3.033 246.037 448.84
Pressure diagram

0.45 Passive 10
W1

6.5 5.20 W3
NGL NGL

1.8
1.3
b W2
4.05 97.2 10 31.2
4.5 41.2

Stabiltity calculation (abt heel) (point a)


Des Weight calculation(kN) CG Moment Total
W1 4.05*5.2*18 379.08 2.025 767.637
W2 4.05*1.3*25 131.625 2.025 266.5406
W3 6.5*0.45*25 73.125 4.275 312.6094 1346.787
Moment due to Active earth pressure (+) 448.84
Moment due to Passive earth pressure (-) -52.49

Total ƩW 583.83 ƩM 1743.137


ƩM/ ƩW = 1743.137/ 583.83
z = 2.986
e = 2.986-4.5/2 b/6 = 0.75
= 0.736 (should be less than b/6)
Hence Safe

Pressure = P/b * (1 ± 6e/b)


P max= 583.83/4.5)*(1 + (6*0.736)/4.5)
257.06 kN/m2 Hence Safe

P min= 583.83/4.5*(1 -(6*0.736)/4.5)


2.421813333 kN/m2 Hence Safe

Stem Design
d req = Mu/(0.133*20*1000)
503.10 mm
D provided = 450 mm
d prov = 395

Ast req = Mu/ (0.87*500*(1-0.42*0.46)d)


= 3237.72 mm2
Provided 16 @ 150
Ast prov = 1339.73 mm2

Check for Overturning:

Resisting Moment (Due to self wt of structure) and Passive Earth Pressure (Abt b)
Des Weight calculation(kN) CG Moment Total
W1 4.05*5.2*18 379.08 2.475 938.223
W2 4.05*1.3*25 131.625 2.475 325.7719
W3 6.5*0.45*25 73.125 0.225 16.45313 1332.938 kNm

Overturning moment (by active earth pressure) 448.84 kNm


0.9 times RM should be greater than 1.2 times OM
FOS = (0.9*1332.938/448.84
2.67 Hence Safe

Check for Sliding:


Total Vertical force to dead load = 1346.787 kN
Co eff - of friction = 0.3
Frictional force (P) 404.04
Horizontal force 133.12
FOS = ɥW / P
FOS should be less than 1.5 = (0.3*1346.787)/133.12
= 3.04
Hence Safe- Shear Key not required

Design of Shear Key:


Passive earth pressure = 97.2
= 4.5*97.2
= 437.4 kN/m2
Depth of shear key = 0

Total passive force = 0 kN


FOS = 404.04+0)/133.12
= 3.04
Hence safe
Design of Heel

c 4.5 a

257.06 f 2.42
e
d
231.6

Loads Weight Cg from a Moment Total


W3 4.05*5.2*18 379.08 2.025 767.637
Self wt 4.05*1.3*25 131.625 2.025 266.5406 1034.178
Deduction
Upward pressure acef
2.42*4.05 9.801 2.025 19.84703
Upward pressure edf
0.5*229.18*4.05 464.0895 2.7 1253.04 1272.887
238.71 kNm

d req = Mu/(0.133*20*1000)
366.89 mm
D provided = 1300 mm
d prov = 1245 mm

Ast req = Mu/ (0.87*500*(1-0.42*0.46)d)


= 546.32 mm2
Provided 16 @ 150
Ast prov = 1339.73 mm2
Min rein = 1560 mm2
Retaining wall
Ht of wall below GL 0.75 m
Total Height of wall 1.5 m
Base width 0.9 m
Depth of base slab 0.5 m
Thickness of wall 0.3 m
Surcharge on wall 10 kN/m2
Coeff of active earth pressure 0.33
Coeff of passive earth pressure 3
Grade of Concrete M 25 25 N/mm2
Yield Str of steel (Fe) 500 500 N/mm2
SBC (assumed) 250 N/mm2

Descpt Force CG Moment Total


Force dut to Passive earth pressure
F1 15.1875 0.25 3.796875 3.8
Force dut to Active earth pressure
F2 (sur) 10 1 10
F2 (soil) 3 0.833 2.499 12.5
Pressure diagram
Water Empty case
0.3 Passive 10
W1

1.5 1.00 W3
NGL NGL

0.75
0.5
b W2
0.6 40.5 10 6
0.9 16

Water Full Case Pressure diagram

7.5
4.4555
NGL `

9.73
Stabiltity calculation (abt heel) (point a)
Des Weight calculation(kN) CG Moment Total
W1 0.6*1*18 10.8 0.3 3.24
W2 0.6*0.5*25 7.5 0.3 2.25
W3 1.5*0.3*25 11.25 0.75 8.4375 13.9275
Moment due to Active earth pressure (+) 12.5
Moment due to Passive earth pressure (-) -3.8

Total ƩW 29.55 ƩM 22.628


ƩM/ ƩW = 22.628/ 29.55
z = 0.766
e = 0.766-0.9/2 b/6 = 0.15
= 0.316 (should be less than b/6)
Revise

Pressure = P/b * (1 ± 6e/b)


P max= 29.55/0.9)*(1 + (6*0.316)/0.9)
102 kN/m2 Hence Safe

P min= 29.55/0.9*(1 -(6*0.316)/0.9)


-36.3355556 kN/m2 Revise

Stem Design
d req = SQRT(Mu/(0.133*20*1000))
83.96 mm
D provided = 300 mm
d prov = 245

Ast req = Mu/ (0.87*500*(1-0.42*0.46)d)


= 218.06 mm2
Provided 10 @ 150
Ast prov = 523.33 mm2

Check for Overturning:

Resisting Moment (Due to self wt of structure) and Passive Earth Pressure (Abt b)
Des Weight calculation(kN) CG Moment Total
W1 0.6*1*18 10.8 0.6 6.48
W2 0.6*0.5*25 7.5 0.6 4.5
W3 1.5*0.3*25 11.25 0.15 1.6875 16.4675 kNm
Overturning moment (by active earth pressure) 12.5 kNm
0.9 times RM should be greater than 1.2 times OM
FOS = (0.9*16.4675/12.5
1.19 Revise

Check for Sliding:


Total Vertical force to dead load = 29.55 kN
Co eff - of friction = 0.45
Frictional Force(P) 13.3
Horizontal force 13
FOS = ɥW / P
FOS should not be less than 1. = (0.45*29.55)/13
= 1.02
Revise or Provide Shear key

Design of Heel 0.3

c 0.9 a 0.193

102072.53 102072.5

0.3

Loads Weight Cg from a Moment Total


W3 0.6*1*18 10.8 0.3 3.24
Self wt 0.6*0.5*25 7.5 0.3 2.25 5.49
Deduction
Upward pressure acef
*0.6 0 0.3 0
Upward pressure edf
0.5*0*0.6 0 0.4 0 0
5.49 kNm

d req = SQRT(Mu/(0.133*20*1000))
55.64 mm
D provided = 500 mm
d prov = 445 mm

Ast req = Mu/ (0.87*500*(1-0.42*0.46)d)


= 5272.89 mm2
Provided 10 @ 125
Ast prov = 628 mm2
Min rein = 600 mm2
Hence safe