PROJECT: PROPOSED CONSTRUCTION OF ONE-STOREY MASJID
LOCATION COTABATO CITY
OWNER:
SUBJECT: BILL OF MATERIALS
ITEM DESCRIPTION Quantity Unit Material Unit Cost Total
IV CONCRETE WORKS 7.57 cu.m.
4.1 COLUMN FOOTINGS 1.37 cu.m.
4.1.1 Cement 10.00 bags 250.00 2,500.00
4.1.2 Sand 1.00 cu.m. 600.00 600.00
4.1.3 Gravel 2.00 cu.m. 600.00 1,200.00
-
4.3 COLUMNS ( 0.25m X 0.25m) 3.50 cu.m.
4.3.1 Cement 32.00 bags 250.00 8,000.00
4.3.2 Sand 3.00 cu.m. 600.00 1,800.00
4.3.3 Gravel 5.00 cu.m. 600.00 3,000.00
-
4.4 BEAMS 2.70 cu.m.
4.4.1 Cement 25.00 bags 250.00 6,250.00
4.4.2 Sand 2.00 cu.m. 600.00 1,200.00
4.4.3 Gravel 4.00 cu.m. 600.00 2,400.00
SUB-TOTAL CONCRETE WORKS 26,950.00
VI REBAR WORKS -
6.1 COLUMN and FOOTING -
6.1.4 10 mm Ø RSB 88.00 pcs. 160.00 14,080.00
6.1.4 12 mm Ø RSB 56.00 pcs. 275.00 15,400.00
6.3.10 #16 GI Tie Wire 3.00 kgs 90.00 270.00
-
6.3 BEAMS - KGS -
6.3.2 10 mm Ø RSB 61.00 pcs. 160.00 9,760.00
6.3.3 12 mm Ø RSB 36.00 pcs. 200.00 7,200.00
6.3.10 #16 GI Tie Wire 30.00 kgs 90.00 2,700.00
-
-
-
footing: 0.098 1.372
coloumn: 0.25 3.5
beam: 2.7
ties/stirrups
476 523.6 87.26667
361 361 60.16667
CONRETE
unit no. of
volume/AREA members/LENGTH VOLUME
footing 0.363 9 3.267
COLUMN 1 0.8505 9 7.6545
COLUMN 2 0.1875 9 1.6875
BEAM 1 0.0875 40 3.5
BEAM 2 0.0875 10 0.875
BEAM 3 0.07 10 0.7
BEAM 4 0.06 2 0.12
ROOF BEAM 1 0.06 40 2.4
ROOF BEAM 2 0.0875 20 1.75
TIE BEAM 0.05 60 3
suspended slab 11.63 1 11.63
slab on ground 12.1 1 12.1
total